2020 & 2024 draft lcr study results sierra area · gold hill –placer #1 and #2 115 kv lines...

20
ISO Public ISO Public 2020 & 2024 Draft LCR Study Results Sierra Area Ebrahim Rahimi Lead Regional Transmission Engineer Stakeholder Meeting March 14, 2019

Upload: others

Post on 23-Aug-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO PublicISO Public

2020 & 2024 Draft LCR Study Results

Sierra Area

Ebrahim Rahimi

Lead Regional Transmission Engineer

Stakeholder Meeting

March 14, 2019

Page 2: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

Sierra Area Transmission System & LCR Subareas

Slide 2

Table Mountain 230 kV

Palermo 230 kV

Palermo 115 kV

Pease 115 kV

Rio Oso 115 kV

Rio Oso 230 kV

Gold Hill 230 kV

Eight Mile Rd 230 kV

Brighton 230 kV

Bellota 230 kV

Lockeford230 kV

Lodi 230 kV

Bogue115 kV

E. Marysville 115 kV

E. Nicolaus115 kV

Colgate 230 kV

Legend:

230 kV

115 kV

60 kV

Atlantic 230 kV

Lake 230 kV

Pease 60 kV

Table Mountain 60 kV

Caribou 115 kV

Summit 115 kV

Drum 115 kV

Summit60 kV

Spaulding 60 kV

Sierra Area

Pease Subarea

South of Table Mountain Subarea

South of Rio Oso Subarea

South of Palermo Subarea

Drum – Rio Oso Subarea

Placer Subarea

Placer 115 kV

Page 3: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

New major transmission projects

Slide 3

Project Name Expected ISD

Year 2020

Gold Hill-Missouri Flat #1 and #2 115 kV line reconductoringIn Service

(May-18)

Pease 115/60 kV Transformer Addition Mar-20

Year 2024

Rio Oso 230/115 kV Transformer Upgrades Jun-22

Rio Oso Area 230 kV Voltage Support Jun-22

South of Palermo 115 kV Reinforcement Project Nov-22

Page 4: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

Power plant changes

Additions:

• No new resource addition

Retirements:

• No new retirements

Slide 4

Page 5: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

Sierra Area Overall: Load and Resources

Slide 5

Load (MW) 2020 2024 Generation (MW) 2020 2024

Gross Load 1,798 1,847 Market/ Net Seller/ Battery 986 986

AAEE -22 -66 Solar 6 6

Behind the meter DG 0 0 Wind 0 0

Net Load 1,776 1,781 Muni 1,129 1,129

Transmission Losses 86 83 QF 39 39

Pumps 0 0Future preferred resource

and energy storage0 0

Load + Losses +

Pumps1,862 1,864 Total Qualifying Capacity 2,160 2,160

Page 6: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

Pease Sub Area: Requirements

Slide 6

Year Category Limiting Facility ContingencyLCR (MW)

(Deficiency)

2020 BTable Mountain – Pease

60 kV line

Palermo – Pease 115 kV and

Yuba City unit59

2020 CTable Mountain – Pease

60 kV line

Palermo – Pease 115 kV and

Pease – Rio Oso 115 kV88

2024 B None NoneNo

requirement

2024 CLow voltage at

Pease 115 kV Bus

Palermo – Pease 115 kV and

Pease – Rio Oso 115 kV95

Palermo 115 kV

Pease 115 kV

Pease 60 kV

Table Mountain 60 kV

Rio Oso 115 kV

X

Overload

Contingency

X

Page 7: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

Pease Subarea: Load Profiles

Slide 7

Page 8: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

Placer Sub Area: Requirements

Slide 8

Year Category Limiting Facility ContingencyLCR (MW)

(Deficiency)

2020 BDrum – Higgins 115

kV line

Gold Hill – Placer #1 115

kV line and Chicago Park

unit

56

2020 CDrum – Higgins 115

kV line

Gold Hill – Placer #1 and

#2 115 kV lines93

2024 BDrum – Higgins 115

kV line

Gold Hill – Placer #1 115

kV line and Chicago Park

unit

67

2024 CDrum – Higgins 115

kV line

Gold Hill – Placer #1 and

#2 115 kV lines89

Gold Hill

Placer

Newcastle

Flint

Horseshoe

Higgins

DrumBell Gold Hill – Placer #2

Gold Hill – Placer #1 Drum – Higgins

XX

Overload

Contingency

Page 9: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

Placer Subarea: Load Profiles

Slide 9

Page 10: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

Palermo 230 kV

Palermo 115 kV

Pease 115 kV

Rio Oso 115 kV

Rio Oso 230 kV

Bogue115 kV

E. Marysville

115 kV

E. Nicolaus115 kV

Colgate 230 kVPease

60 kV

Gold Hill 230 kV

Eight Mile Rd 230 kV

Brighton 230 kV

Bellota 230 kV

Lodi 230 kV

Atlantic 230 kV

West Sacramento

115 kV

Lockeford230 kV

Drum 115 kV

Placer 115 kV

Drum – Rio Oso Sub Area: Requirements

Slide 10

Year Category Limiting Facility ContingencyLCR (MW)

(Deficiency)

2020 BRio Oso 230/115 kV

#2 Transformer

Palermo 230/115 kV #2

Transformer429

2020 CRio Oso 230/115 kV

#1 Transformer

Rio Oso 230/115 kV #2

Transformer and Rio Oso

Brighton 230 kV line

734 (52)

2024 B/CNo Requirement due to Rio Oso 230/115 kV Transformer

Upgrade project

X

X

Overload

Contingency

Page 11: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

Drum Rio Oso Subarea: Flow Profiles

Slide 11

Page 12: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

South of Rio Oso Sub Area: Requirements

Slide 12

Year Category Limiting Facility ContingencyLCR (MW)

(Deficiency)

2020 BRio Oso – Atlantic

230 kV

Rio Oso – Gold Hill 230 kV

and Ralston unit276

2020 CRio Oso – Atlantic

230 kV

Rio Oso – Gold Hill 230 kV

Rio Oso – Brighton 230 kV831 (94)

2024 BRio Oso – Atlantic

230 kV

Rio Oso – Gold Hill 230 kV

and Ralston unit185

2024 CRio Oso – Atlantic

230 kV

Rio Oso – Atlantic 230 kV

Rio Oso – Brighton 230 kV185

Rio Oso 230 kV

Gold Hill 230

kV

Eight Mile Rd 230 kV

Brighton 230 kV

Bellota 230 kV

Lockeford230 kV

Lodi 230 kV

Atlantic 230 kV

Page 13: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

South of Rio Oso Subarea: Flow Profiles

Slide 13

Page 14: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

South of Palermo Sub Area: Requirements

Slide 14

Year Category Limiting Facility ContingencyLCR (MW)

(Deficiency)

2020 BPease - Rio Oso

115 kV line

Table Mtn.- Rio Oso 230 kV line

and Belden unit1,091

2020 CPease - Rio Oso

115 kV line

DCTL of Table Mt. – Rio Oso

and Colgate-Rio Oso 230 kV

lines

1,569 (158)

2024 B/CNo additional requirements beyond what is needed for South of Rio

Oso and Placer sub areas. (274 MW)

Table Mountain 230 kV

Palermo 230 kV

Palermo 115 kV

Pease 115 kV

Rio Oso 115 kV

Rio Oso 230 kV

Bogue115 kV

E. Marysville

115 kV

E. Nicolaus115 kV

Colgate 230 kVPease

60 kV

Table Mountain 60 kV

Caribou 115 kV

XX

OverloadContingency

Page 15: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

South of Palermo Subarea: Flow Profiles

Slide 15

Page 16: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

South of Table Mountain Sub Area: Requirements

Slide 16

YearCate

goryLimiting Facility Contingency

LCR (MW)

(Deficiency)

2020 BNo requirement beyond what is needed for South of Palermo

(1569 MW)

2020 CTable Mountain –

Pease 60 kV

DCTL of Table Mtn. –

Palermo and Table Mtn.

Rio Oso 230 kV lines

1,764

2024 BTable Mountain –

Palermo 230 kV

Table Mountain – Rio Oso

230 kV and Belden unit788

2024 CTable Mountain –

Pease 60 kV

DCTL of Table Mtn. –

Palermo and Table Mtn.

Rio Oso 230 kV lines

1,304

Table Mountain 230 kV

Palermo 230 kV

Palermo 115 kV

Pease 115 kV

Rio Oso 115 kV

Rio Oso 230 kV

Bogue115 kV

E. Marysville

115 kV

E. Nicolaus115 kV

Colgate 230 kVPease

60 kV

Table Mountain 60 kV

Caribou 115 kV

XX

OverloadContingency

Page 17: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

South of Table Mountain Subarea: Flow Profiles

Slide 17

No reliable PI data was available

Page 18: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public Slide 18

Subarea2019 2020

Load LCR Load LCR

Pease 150 92 159 88

Placer 168 77 172 93

Drum-Rio Oso N/A 506 N/A 734

South of Rio Oso N/A 831 N/A 831

South of Palermo N/A 1,702 N/A 1,569

South of Table Mountain N/A 1,964 N/A 1,764

Total 1,758 2,247 1,862 2,068

LCR decrease is mostly due to new transmission project implementation.

N/A=Flow-through area. No defined load pocket.

Changes from 2019 to 2020

Page 19: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

Changes from 2023 to 2024

Slide 19

Subarea2023 2024

Load LCR Load LCR

Pease 157 75 157 95

Placer 174 89 174 89

Drum-Rio Oso N/A 0 N/A 0

South of Rio Oso N/A 554 N/A 185

South of Palermo N/A <629 N/A <274

South of Table Mountain N/A 1,924 N/A 1,304

Total 1,822 1,924 1,863 1,304

LCR reduction in 2024 is due to new transmission project implementation and

generation adjustment within adjacent subarea after the first contingency.

N/A=Flow-through area. No defined load pocket.

Page 20: 2020 & 2024 Draft LCR Study Results Sierra Area · Gold Hill –Placer #1 and #2 115 kV lines 89 Gold Hill Placer Newcastle Flint Horseshoe Higgins Bell Drum Gold Hill t Placer #

ISO Public

Sierra Area Total LCR Need

Slide 20

2020 LCR NeedExisting Generation

Capacity Needed (MW)Deficiency (MW) Total MW Need

Category B (Single) 1,091 0 1,091

Category C (Multiple) 1,764 304 2,068

2024 LCR NeedExisting Generation

Capacity Needed (MW)Deficiency (MW) Total MW Need

Category B (Single) 761 0 761

Category C (Multiple) 1,304 0 1,304