2019 mcip partnering workshop june 19th · 2019-09-09 · • approval of updated selection...
TRANSCRIPT
![Page 1: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/1.jpg)
2019 MCIP Workshop
2019 Dallas County MCIP Partnering
Workshop
1
from Dallas County Public Works
2019 MCIP Workshop
![Page 2: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/2.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Agenda• Welcome and Introductions• Presentation (with break)• Lunch• Information stations:
• 7th Call Application process• Dallas County Mobility Plan• Five Phase Project Delivery• MCIP Master Agreement
2
![Page 3: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/3.jpg)
2019 MCIP Workshop
County JudgeClay Lewis Jenkins
Commissioner District 1Dr. Theresa Daniel
Commissioner District 2J.J. Koch
Commissioner District 3John Wiley Price
Commissioner District 4Dr. Elba Garcia
Dallas County Commissioner Districts
![Page 4: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/4.jpg)
2019 MCIP Workshop2019 MCIP Workshop
INTRODUCTIONSNameAgencyTitle/Department
![Page 5: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/5.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Dallas County MCIP Overview In 1999 Dallas County changed from bond
financing to pay-as-you-go partnership program County participation up to 50% of eligible costs
Variable program cycle Flexibility allows program to be responsive Initiating 7th Call for Projects in April 2019 for
Construction funding in FY2022-FY2025
5
![Page 6: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/6.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Twenty years of MCIP partnership history Six MCIP Call for Projects conducted Participation from 27 of the 31 Cities in Dallas County Nearly $600M County funding committed leveraging
partnerships for a total of $1.6B in transportation infrastructure improvements built, in progress or funded
6
![Page 7: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/7.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Continuing Together to Build Transportation Infrastructure History Partnering (Trust, Commitment, Shared Vision) on
project delivery for a growing region: With cities and other stakeholders on continuous process
improvements including the recent Dallas County Mobility Plan With regional partners (TxDOT, NCTCOG, DART, NTTA) also
for effective interagency coordination
MCIP 7th Call for Projects announced in April 2019 Construction funding in FY2022-FY2025
Third edition of MCIP Master Agreement due for renewal by 2021
7
![Page 8: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/8.jpg)
2019 MCIP Workshop
MCIP Master AgreementJonathan Toffer
![Page 9: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/9.jpg)
2019 MCIP Workshop2019 MCIP WorkshopDallas County MCIP Master Agreement
Ten-year term agreement 3rd edition since Dallas County MCIP began
1st edition most cities entered into by 2001 2nd edition most cities entered into by 2011
Most will expire by Spring 2021 3rd edition will supersede previous editions
![Page 10: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/10.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Dallas County MCIP Funding Up to 50% for total eligible project costs
City funding match needed to begin design
Plan for City bond election projects Feasibility studies Preliminary design funding Full design funding Right of Way participation for transportation
projects Construction funding
![Page 11: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/11.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Dallas County MCIP Agreements
Master Agreement (ten-year term)
Funding Agreement (FA) confirms City match
Project Specific Agreement (PSA)
ConstructProject
Project selected for MCIP funding commitment
![Page 12: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/12.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Dallas County MCIP Agreements Master Agreement Ten-year term
Project Funding Agreement Unable to begin project until funding match
confirmed in Funding Agreement Funding for preliminary design
Project Specific Agreement Once scope confirmed, typically after
preliminary design completed
![Page 13: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/13.jpg)
2019 MCIP Workshop2019 MCIP Workshop
CITIES THAT HAVE ACTIVE MCIP MASTER AGREEMENTS ADDISON BALCH SPRINGS CARROLLTON CEDAR HILL COCKRELL HILL COPPELL DALLAS DESOTO DUNCANVILLE FARMERS BRANCH GARLAND GLENN HEIGHTS GRAND PRAIRIE
HIGHLAND PARK HUTCHINS IRVING LANCASTER LEWISVILLE MESQUITE RICHARDSON ROWLETT SACHSE SUNNYVALE SEAGOVILLE UNIVERSITY PARK WILMER
![Page 14: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/14.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Dallas County Public Works5 Phase Project Delivery System Phase I-Planning & preliminary design a-Project definition (CSS) b-Preliminary design
Phase II-Primary design Phase III-Design completion & ROW
initiation Phase IV-ROW completion & Utility
adjustment Phase V-Project delivery a-Construction b-Project Close out
14
![Page 15: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/15.jpg)
2019 MCIP Workshop2019 MCIP WorkshopBenefits of 5 Phase Project Delivery System Intensive planning beginning with Call for
Projects Planning charrette (if required)Design partnering Preliminary design charrettes + public workshops S.U.E. + Utility partnering + USWAT Enhanced constructability reviewContext Sensitive Solutions, Total stakeholder
involvement Early involvement in ROW acquisition Flexibility in emphasis Ability to respond to changing priorities, new
opportunities Economic Impact
15
![Page 16: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/16.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Delayed MCIP Projects Two categories of delayed projects: MCIP projects without approved agreement
for more than 4 years since selection MCIP projects with an agreement, but more
than 4 years without progress January 2019 letter sent to 12 cities that
had delayed MCIP projects If no agreement or progress plan by
January 2020 then can reapply in 7th Call Goal is for projects to be completed in
less than 10 years from selection
![Page 17: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/17.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Progress milestone dates: Confirm city funding match with
agreement within 5-year timeframe City responsibility for dams ETJ responsibility to be in a separate
dedicated agreement Update to refer to adopted Dallas County
Mobility Plan
PROPOSED UPDATES:
![Page 18: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/18.jpg)
2019 MCIP Workshop2019 MCIP Workshop
2019-Fall: Draft Master Agreement to be sent to Cities
2020: Finalize and execute Master Agreements
2021: Expiration of current Master Agreement for most cities
2028-2029: Begin process of renewing MCIP Master Agreement by 2030
SCHEDULE:
![Page 19: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/19.jpg)
2019 MCIP Workshop
BreakResume in 5-10 minutes
![Page 20: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/20.jpg)
2019 MCIP Workshop
Dallas County Mobility Plan Review
![Page 21: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/21.jpg)
2019 MCIP Workshop
• Previous update to Dallas County Thoroughfare Plan back in 1973• Solely focused on thoroughfare capacity
• Status of NCTCOG Regional Thoroughfare Plan
• Recent requests for County Mobility-Thoroughfare designation
• Integration of new technologies and unique project requests
• A need to address issues such as Population Growth and Congestion
• Update to MCIP criteria to include more transportation modes
• Continued need for a collaborative effort between Dallas County and the Cities of Dallas County
• Collaboration with Regional Transportation Agencies • DART, TxDOT, NCTCOG
![Page 22: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/22.jpg)
2019 MCIP Workshop
• October 22, 2015 – Mobility Plan Kickoff Meeting
• October 7, 2016 – Sent Letter Requesting City & Partner
Agency Participation and City Transportation Plans
• December 2, 2016 – Presented Project Update at SAME
Infrastructure Forum
• June 29, 2017 – Held Phase 1 Mobility Plan Workshop for Cities
and Partner Agencies
• October 3, 2017 – Began Phase 2 of Mobility Plan
• July 17, 2018 – Began Phase 2 City Meetings Workshop
• April 16, 2019 – Court approval of Dallas County Mobility Plan
![Page 23: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/23.jpg)
2019 MCIP Workshop
![Page 24: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/24.jpg)
2019 MCIP Workshop
![Page 25: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/25.jpg)
2019 MCIP Workshop
![Page 26: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/26.jpg)
2019 MCIP Workshop
Collect City data
Create GIS Map Package of Modal Plans and County Demographics
Receive Cities Input & Feedback
Understand Cities Major Demand Generators
Update and Define County Roadway and Trail Sections
Improve Call for Projects Application Process
Develop & Finalize Selection Criteria for 7th Call for Projects
Organize Findings into Executive Summary
April 16, 2019: Adoption of Mobility Plan by Commissioners Court
Spring 2019: Announce 7th Call for Projects
• Fall 2019: Publish Final Mobility Plan Document
![Page 27: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/27.jpg)
2019 MCIP Workshop
• Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court
• New Criteria will support four project categories:o Safetyo Roadway Capacityo Bicycle and Pedestriano Innovation
• Additional clarification on safety and innovative categories approved during April 16, 2019 Commissioners Court
![Page 28: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/28.jpg)
2019 MCIP Workshop
Apply OnlineComplete and submit
your MCIP- 7th Call applications online
New Criteria Categories
• Safety This category would consider projects that do not necessarily improve congestion or efficiency of
the roadway network, but rather are focused on improving the safety on thoroughfares or multimodal facilities. This may include improvements related to mitigating vehicle crashes, traffic calming, intersection crossings, or other safety measures. In order for a safety project to be considered, it must relate to a facility identified on the Mobility Plan. Funding will be limited to $1 million Dallas County cost participation per project.
• Innovative & Alternative Transportation Solutions This category would encourage projects that involve alternative or innovative mobility strategies,
particularly those that reduce single occupancy vehicle traffic. This category may include a wide range of transit-related improvements, including rail transit, bus transit, fixed-route shuttle service, and ride-share service. It is also intended to provide flexibility for projects that may involve future transportation technology, such as connected and autonomous vehicles, high-speed rail, Hyperloop, and “smart cities” technology. Projects considered as part of the Innovative and Alternative category should be part of a regional program already in existence coordinated by a regional project partner (e.g. NCTCOG, TxDOT, DART, or Dallas County).
![Page 29: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/29.jpg)
2019 MCIP Workshop
MCIP 7th Call for ProjectsApplication Process
![Page 30: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/30.jpg)
2019 MCIP Workshop2019 MCIP Workshop
2019 MCIP 7th Call for Projects Program Cycle and Deadlines
2019 MCIP Application Form
Eligibility and Evaluation Criteria
Cost Estimate Methodology
![Page 31: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/31.jpg)
2019 MCIP Workshop2019 MCIP Workshop
MCIP 7th Call for Projects Program Year (PY) concept: Construction funding available in FY2022-2025
for 7th Call selections Funding for Design, ROW and Utilities can be
available earlier Funding agreement required to confirm City
funding match prior to beginning design Only submit your best project(s) Comparison of submittals within each City Project readiness and funding match availability
County participation subject to agreement with City confirming funding match
![Page 32: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/32.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Schedule2019
September 27: MCIP applications due Fall: Field evaluation of submittals
2020 Jan-Feb: Finalize cost estimates, evaluations Spring: Staff recommendations to
Commissioners Summer: Commissioners select projects for
MCIP funding commitments
32
![Page 33: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/33.jpg)
2019 MCIP Workshop2019 MCIP Workshop
2019 Application Application Submittal Online submittal with supporting
documentation Shape files (if available, with proposed ROW) ROW maps showing existing and proposed Related Studies, etc…
Application Form Embedded Instructions Instruction Guide Phone Support On Website
33
https://www.dallascounty.org/departments/pubworks/mcip-projects.php
![Page 34: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/34.jpg)
2019 MCIP Workshop2019 MCIP Workshop
MCIP Call-for-Projects Webpage
34
![Page 35: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/35.jpg)
2019 MCIP Workshop2019 MCIP Workshop
MCIP Call-for-Projects Webpage
35
![Page 36: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/36.jpg)
2019 MCIP Workshop2019 MCIP Workshop
2019 MCIP Application Overview
36
Application form is setup for online completion and submittal Progress can be saved and resumed later Two parts to complete an application
Part 1: Projects Application Part 2: Technical Details for Proposed Project
Please also upload shapefiles, ROW maps and any other supporting documentation
Final submittal of each application will be online
![Page 37: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/37.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Completion of 1st Part of Application
![Page 38: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/38.jpg)
2019 MCIP Workshop
GIS Shapefile Required AttributesMTP ID(From theInteractive Map)
(Number)
Project Name
(Text)
Project Start
(Text)
Project End
(Text)
Project Length
(Number)
Project Type
(Text)
CommissionerDistrict
(Number)
2019 MCIP Application –Supporting Documentation
Right-Of-Way (ROW) Maps• Include existing ROW limits along with proposed ROW
limits• Helps towards more clearly identifying potential ROW
impacts
![Page 39: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/39.jpg)
2019 MCIP Workshop
2019 MCIP Application –Supporting DocumentationRight-Of-Way (ROW) Maps• Include existing ROW limits along with proposed ROW limits• Helps towards more clearly identifying potential ROW impacts
![Page 40: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/40.jpg)
2019 MCIP Workshop2019 MCIP Workshop
2019 MCIP Application Overview
40
Teamwork needed to complete applications, especially technical details part of the application ROW Agents Engineering Designers, Project Managers Planners, GIS Economic Analysts
![Page 41: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/41.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Project Selection Overview Project data tabulated, verified, screened,
ranked and presented for project selection by Commissioners Field evaluation of projects Within each District, projects ranked within each City
Commissioners make final decisions Quality of Project Submissions Be selective Submit only best projects
41
![Page 42: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/42.jpg)
2019 MCIP Workshop2019 MCIP Workshop
New approach: Four project type categories Applicants can choose up to two categories: Roadway Capacity & Connectivity Bicycle & Pedestrian Safety Innovative & Alternative Mobility Solutions
42
![Page 43: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/43.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Three Screenings Pre-Screening (Optional) Optional tool to help applicants decide which
of the four categories is best to submit project Eligibility Screening Mandatory questions otherwise form can’t be
submitted Goal/Performance Measure Screening Varies by each of four project type categories 7-8 goals per the four project type categories
Performance measure scoring varies by category Each category scores up to 100 points allowing
evaluation across project type categories https://dallascounty.org/Assets/uploads/docs/public-works/MCIP/Call-for-
Projects/7thCall/MCIP_2019_ScoringGuide_May2019.pdf
43
![Page 44: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/44.jpg)
2019 MCIP Workshop2019 MCIP Workshop
![Page 45: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/45.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Eligibility Screening
45
![Page 46: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/46.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Project Type Eligibility
46
![Page 47: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/47.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Specifying Project Type for Submittal
47
Note: Later questions will vary based on project type specified
![Page 48: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/48.jpg)
2019 MCIP Workshop2019 MCIP Workshop
Goal/Performance Measure Screening Interjurisdictional Project Access to Regional Destinations Is the Project Located in an Underutilized Area? Economic Impact Facility Type Context Sensitive Solutions Is it a Multimodal/Intermodal Project? How Does Project Reduce Accident Rate? Impact to Degree of Congestion Air Quality
48
Future Traffic Impacts Based 2045 Traffic Model Traffic Volume (Future impact: Build vs No-Build) Traffic Volume Growth (Forecasted volume vs current
volume)
![Page 49: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/49.jpg)
2019 MCIP Workshop
Project Cost Estimates
49
Optional cost estimating template available for use by applicants Field inspection of all projects submitted Team review of project cost estimates Follow-up with cities to reconcile
significant differences on cost estimates Dallas County can provide cost
estimating template upon request
![Page 50: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/50.jpg)
2019 MCIP Workshop
Questions?For additional information please visit
these stations after lunch Five Phase
Project Delivery 7th Call
Application Process
MCIP Master Agreement
Dallas County Mobility Plan
![Page 51: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/51.jpg)
2019 MCIP Workshop
51
Thank You&
Break for lunch!
![Page 52: 2019 MCIP Partnering Workshop June 19th · 2019-09-09 · • Approval of updated selection criteria for 7th Call for Projects during December 18, 2018 Commissioners Court • New](https://reader034.vdocuments.us/reader034/viewer/2022050610/5fb164ccc92925751029b037/html5/thumbnails/52.jpg)
2019 MCIP Workshop2019 MCIP Workshop
General Information Please visit the following web address to
find the application form, instructions and reference materials: https://www.dallascounty.org/departments/pubworks/mcip-projects.php
Submittal of applications is via online interface
Contacts for Questions: 214.653.7151 (main)
Questions on Application for 7th Call, Mobility Plan: Micah Baker ([email protected])
Questions on Dallas County MCIP, Master Agreement: Jonathan Toffer ([email protected])