Technical Specifications SS Pipes & Tubes P a g e 1 | 20
Annexure-I
SUPPLY OF SEAMLESS SS PIPES & TUBES
I. TECHNICAL SPECIFICATIONS:
1. Standard (Pipe) : ASTM A312 TP
2. Standard (Tube) : ASTM A 269-07a
3. Manufacturing Process : a. Tubes & Pipes Up to 80NB - Cold
Pilgered & Seamless
b. 100NB to 200NB – Hot finished
Seamless
4. Material of construction : SS 304L/SS 316L Pipes
5. Edge preparation (for Pipes) : As per ANSI B 16.25
6. End Finish (For Tubes) : Square cut, smooth & deburred ends
7. Length : 5 to 7 m
8. Dimensional tolerance : As per ANSI B36.19
9. Straightness : Shall be + 3 mm over a length of 3 m.
10.Quantity : Refer Table-A
11.Testing :
a) All pipes shall be tested hydrostatically as per ASTM A530/ASTM A 999.
All tubes shall be tested hydrostatically as per ASTM A1016.
b) All pipes & tubes shall be visually examined for absence of scratches, dents,
surface irregularities, etc.
c) Detailed chemical analysis & IGC test as per ASTM A262 Practice-E shall
be carried out one per each heat (ladle)/lot during raw material. However,
after final production minimum one sample for each size of pipe & tube for
each heat/lot shall be tested to confirm chemical composition & IGC. Test
certificates shall be produced during inspection.
d) Minimum one test specimen from each heat (ladle)/lot for each size of pipe
and tube material shall be carried out mechanical testing like UTS, yield &
percentage of elongation as per ASTM A530/ASTM A 999/ ASTM A 269-
07a during raw material inspection and after final production one sample for
each size of pipe & tube. All the test certificates shall be produced during
inspection.
Note: For Mother Hollows/ raw material MIL certificates to be provided with
chemical, mechanical and IGC tests.
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 2 | 20
e) Average grain size shall be tested as per ASTM-E-112 on finished product i.e.
one sample from one size & each material and grain size shall be in between
5 to 8.
f) Dimensional tolerance of the pipes (i.e. ID, OD & wall thickness) shall comply
as per ASTM A.999
g) All the pipes shall be tested by Ultrasonic Test as per Practice ASTM E-213/
ASTM A999 for all sizes. All tubes shall be tested by Eddy current test as
per practice ASTM E 426.
12. Manufacturing Conditions :
a) All pipes & tubes up to 80NB shall be manufactured by Cold Pilgering
process only.
b) All pipes & tubes above 80NB shall be manufactured by Hot finished
seamless only.
c) Manufacturer should have in-house Cold pilgering facility for sizes up to
80NB.
d) Hot extruded mother hollows/Pipes shall be used for manufacturing of
seamless pipes. Hot pierced mother pipes are not acceptable. The
supplier has to produce MIL certificates for manufacturing process along with
proof of raw material supply for this tender quantity. The same will be
reviewed at the time of raw material inspection. The source of raw material
(Mother Hollows) for cold pilgering shall be procured from the following
suppliers. The proof of supply for the tendered quantity of this purchase
order shall be produced along with MIL Certificates.
1. M/s Nippon Steel & Sumitomo metal Corporation
2. M/s KOBE Steel, Japan 3. M/s POSCO (SeAH CCS), South Korea, 4. M/s Sandvik Asia Ltd, India. 5. M/s Ratnamani Metals and Tubes, India
6. M/s DK Corporation, Korea.
7. M/s Tubacex Group
e) Size of mother hollow/pipes shall be one order higher than that of the
required pipe size. Otherwise offer will not be considered.
f) Cold Pilgering is to be taken up after acceptance of raw material by SDSC
SHAR.
g) Cold pilgered pipes shall be solution annealed as per ASTM A 312 and tubes
as per ASTM A269.
h) Heat treatment charts shall be submitted for purchaser & TPI for review and
clearance.
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 3 | 20
i) All pipes & tubes shall be pickled and passivated as per ASTM A380 both
inside & outside surfaces. However, for Tubes OD 6.35 mm shall be
bright annealed.
13. Inspection Clause:
a) Third Party Inspection (TPI) shall be engaged by the supplier. TPI can be
DNV/LIOYDS/BVIS/TUV. Scope of Third Party Inspection is as per QAP given in
Annexure-II. The cost of TPI shall be inclusive.
b) Inspection: By Purchasers representative as well as TPI as per QAP given in
Annexure-II. Material shall be cleared by both Department Engineer & TPI.
c) All the tests shall be carried out by NABL approved laboratory.
d) Supplier has to inform the purchaser, the stage wise material readiness in
advance at least 10 days for participation in inspection.
e) Purchaser has the right to inspect the pipes at any stage during course of
manufacturing.
14. Dispatch & Delivery:
a) Pipes & Tubes shall be cleaned and dried before dispatch. Ends shall be
protected with suitable plastic caps to avoid entry of dust, water and foreign
materials during storage and transportation.
b) Supplier shall supply all the ordered items within Eight months from the date of
purchase order.
c) Allowable Variation in quantity: One Length of Pipe/tube on total quantity in
each size.
d) Packing: Material shall be wrapped in polythene sheet and packed in a wooden
box as seaworthy package.
e) Marking: All pipes & tubes shall be clearly marked on three places on each pipe
& Tube indicating Project Title, manufacturer’s reference, material grade,
dimensions (Pipe size & Schedule), Heat/ Lot number. The template shall be
sent for purchaser’s approval before marking.
f) Dispatch: Supplier shall obtain dispatch clearance from the purchaser for the
items inspected. Stage wise internal inspection certificates & TPI certificates (as
applicable) shall be submitted to purchaser for production clearances. Subject to
the clearance from purchaser only, items shall be dispatched.
15. Documentation:
a) Test certificate for chemical analysis, tensile & IGC tests and hydrostatic test
shall be supplied along with dispatch documents.
b) Production of master file: Three hard copies of production master file shall be
supplied along with one digital copy (CD containing Scanned Originals) and shall
contain the following.
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 4 | 20
� Dimensional and visual check reports
� Raw material test certificates
� Physical, Chemical, IGC and micro structure examination test reports of final
product.
� Hydro test reports.
� Ultrasonic test reports.
� Eddy current test reports.
� Heat treatment charts
� All the above reports / test results shall be bound neatly.
II. GENERAL CONDITIONS:
a) Compliance: Point wise compliance to tender specifications shall be submitted
and any deviation from the specification shall be highlighted clearly in the offer.
Technical Compliance duly filled as per Annexure-III to be submitted along
with the offer.
b) Pricing: Price quoted is inclusive of all the testing charges (i.e. Chemical,
mechanical, IGC, ultrasonic, eddy current testing, hydro testing, pickling &
passivation).
c) Warranty: Material supplied shall be warranteed for 18 months from the date
of acceptance at our premises.
d) Manufacturers of SS pipes only shall submit quote. Offers from dealers & traders
are not accepted.
e) The purchaser has the right to place part order and the bidder’s acceptance
for the same shall be indicated in the offer.
f) The purchaser has right to cancel the order at any stage, if the supplier is not
meeting the technical specifications and QAP.
III. Sizes and Supply Quantity
Table-A
Sl.No Pipe Specification Quantity (Mtrs)
1. 15NB SCH40S 304L 2100
2. 15NB SCH160S 304L 1650
3. 15NB SCH40S 316L 100
4. 20NB SCH40S 304L 600
5. 20NB SCH 160 304L 500
6. 20NB SCH XXS 304L 700
7. 25NB SCH40S 304L 1600
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 5 | 20
Sl.No Pipe Specification Quantity (Mtrs)
8. 25NB SCH40S 316L 150
9. 40NB SCH40S 304L 1900
10. 40NB SCH40S 316L 450
11. 40NB SCH160S 304L 1600
12. 40NB SCHXXS 304L 1450
13. 50NB SCH40S 304L 4150
14. 50NB SCH40S 316L 100
15. 80NB SCH 10S 304L 400
16. 80NB SCH 10S 316L 300
17. 80NB SCH 40S 316L 400
18. 100 NB SCH10S 304L 300
19. 150 NB SCH10S 304L 100
20. 200 NB SCH10S 304L 50
21. 12.7 mm OD X2.1 mm thk 304L 1000
22. 6.35 mm OD X 1.0 mm thk 304L 1900
23. 6.35 mm OD X1.5 mm thk 304L 1400
IV. Bid/Offer Submission details:
a) Supplier shall present the bids on two-part basis as highlighted below:
� Part-I: Techno-Commercial bid
� Part-II: Price bid.
Part-I: Techno-Commercial bid:
The tenderer shall necessarily present the following in the techno-
commercial bid:
• The tenderer shall furnish point-wise confirmation (Technical Compliance
attached in Annexure-III) for the technical specifications given in the enquiry.
However, change of specifications/ deviations (if any) shall be brought out in the
offer with detailed justification. Suppliers are expected to furnish quotations with
best match to standards, materials of construction and other technical conditions
• The tenderer shall necessarily furnish the details of previously executed orders
Necessary documentary evidence along with end user certificate (confirming the
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 6 | 20
satisfactory performance of the goods supplied) shall be submitted along with
offer as a mandatory requirement. Non-compliance of this requirement shall
lead to rejection of the offer.
• Tenderer need to furnish the details related to commercial terms indicating
payment terms, details of bank guarantee in case of advance payments & name
of Third Party Inspection Agency proposed etc.
• In case, the tenderer is not interested to participate in the tender, the tenderer
shall submit regret letter giving reasons, failing which future enquiries will not be
sent.
• The Bidders shall indicate clearly the delivery/time period for supplying the items
to SDSC SHAR.
• Bidder need to submit Unpriced price bid copy (as highlighted below)
indicating the description of all the cost elements considered, without
indicating the price. Tenderer shall note that indication of price in the
techno-commercial bid shall lead to dis-qualification of bid.
• The price bids will be opened only after evaluation and acceptance of the
technical bid of the respective tenderer.
Format of Un-Priced Price Bid:
� Confirmation of technical specifications by supplier shall be given in the format as given in Annexure-III
� Confirmation of item wise cost break up by the supplier
Sl. No
Description Quantity (Mtrs)
Unit Cost
Total Cost
(Rs)
Separate Cost
mentioned in
price bid
(YES/NO)
1. 15NB SCH40S 304L 2100
Cost to be
indicate only
in the
price bid
Cost
to be indica
te only in the
price bid
2. 15NB SCH160S 304L 1650
3. 15NB SCH40S 316L 100
4. 20NB SCH40S 304L 600
5. 20NB SCH 160 304L 500
6. 20NB SCH XXS 304L 700
7. 25NB SCH40S 304L 1600
8. 25NB SCH40S 316L 150
9. 40NB SCH40S 304L 1900
10. 40NB SCH40S 316L 450
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 7 | 20
Sl. No
Description Quantity (Mtrs)
Unit Cost
Total
Cost (Rs)
Separate Cost
mentioned in
price bid
(YES/NO)
11. 40NB SCH160S 304L 1600
12. 40NB SCHXXS 304L 1450
13. 50NB SCH40S 304L 4150
14. 50NB SCH40S 316L 100
15. 80NB SCH 10S 304L 400
16. 80NB SCH 10S 316L 300
17. 80NB SCH 40S 316L 400
18. 100 NB SCH10S 304L 300
19. 150 NB SCH10S 304L 100
20. 200 NB SCH10S 304L 50
21. 12.7 mm OD X 2.1 mm thk 304L 1000
22. 6.35 mm OD X 1.0 mm thk 304L 1900
23. 6.35 mm OD X1.5 mm thk 304L 1400
24. Packing Charges - -
25. Transportation Charges - -
26. Taxes (as applicable), if any
Part-II: Price bid indicating the price:
Price bid should be submitted by the tenderer in the following format with price break up.
Sl. No
Description Quantity (Mtrs)
Unit Cost
Total Cost (Rs)
1. 15NB SCH40S 304L 2100
2. 15NB SCH160S 304L 1650
3. 15NB SCH40S 316L 100
4. 20NB SCH40S 304L 600
5. 20NB SCH 160 304L 500
6. 20NB SCH XXS 304L 700
7. 25NB SCH40S 304L 1600
8. 25NB SCH40S 316L 150
9. 40NB SCH40S 304L 1900
10. 40NB SCH40S 316L 450
11. 40NB SCH160S 304L 1600
12. 40NB SCHXXS 304L 1450
13. 50NB SCH40S 304L 4150
14. 50NB SCH40S 316L 100
15. 80NB SCH 10S 304L 400
16. 80NB SCH 10S 316L 300
17. 80NB SCH 40S 316L 400
18. 100 NB SCH10S 304L 300
19. 150 NB SCH10S 304L 100
20. 200 NB SCH10S 304L 50
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 8 | 20
Bid Evaluation criteria: Total Landed cost at Sriharikota for each size & schedule
(Basic +TPI+ Packing charges + taxes applicable +Transportation charges from ex-
works to SDSC-SHAR) will be the basis for evaluation of offer.
V. Offer Validity:
The validity of the offers / tenders should be 120 days from the date of opening of
the tenders. Tenders with offer validity less than the period mentioned above, will not be considered for evaluation.
VI. GST:
As per notification no 47/2017-Integrated Tax (Rate) Dt:14.11.2017 Issued by
Ministry of Finance (dept of Revenue), SDSC SHAR is eligible to avail a reduced rate
of IGST @ 5% for the procurements made by the Dept. of Space (DOS) being a
public funded research Institution. Accordingly, SHAR will provide IGST exemption
certificate.
VII. Payment Terms:
In general, our payment terms will be 100% within 30 days after commissioning.
However, if Vendors/Suppliers are requesting for advance payment, department may consider as given below,
a) 30% of order value as advance against submission of Advance Bank Guarantee b) 60% of order value against receipt of items at SDSC SHAR
c) Balance 10% of order value against satisfactory performance of items against Performance Bank Guarantee.
VIII. Advance Payment:
Wherever advance payment is requested, Bank Guarantee from any Nationalized Bank/Scheduled Bank should be furnished. In case of advance payments, if the
party is not supplying the material within the delivery schedule, interest will be levied as per the Prime Lending Rate of RBI plus 2% penal interest.
Interest will be loaded for advance payments/stage payments as per the prime lending rate of RBI and will be added to the landed cost for comparison purpose.
In case of different milestone payments submitted by the parties, a standard and transparent methodology like NPV will be adopted for evaluating the offers.
IX. Liquidated Damages:
In all cases, delivery schedule indicated in the Purchase Order/Contract is the
essence of the contract and if the party fails to deliver the material within the
21. 12.7 mm OD X 2.1 mm thk304L 1000
22. 6.35 mm OD X 1.0 mm thk 304L 1900
23. 6.35 mm OD X 1.5 mm thk 304L 1400
24. Packing Charges - -
25. Transportation Charges - -
26. Taxes (as applicable), if any
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 9 | 20
delivery schedule, Liquidated Damages will be levied @ 0.5% per week or part thereof subject to a maximum of 10% of total order value.
X. Performance Bank Guarantee:
Performance Bank Guarantee for 10% of the order value should be furnished in the form of Bank Guarantee from nationalized/scheduled bank or by Demand Draft
valid till warranty period plus sixty days as claim period.
XI. Security Deposit:
Security Deposit for 10% of the order value is mandatory, Party shall furnish the Security Deposit in the form of Bank Guarantee from nationalized/scheduled bank
or by Demand Draft valid till completion of the contract period plus sixty days towards claim period for faithful execution of the contract.
XII. Arbitration:
Disputes, if any, shall be settled mutually failing which it shall be referred to an One-man Arbitrator to be appointed by Director, SDSC SHAR in accordance with
the Indian Arbitration and Conciliation Act 1996, whose decision shall be final and binding on both the parties.
XIII. Tender Evaluation criteria:
1. Tenderers should have satisfactorily executed the following Seamless SS Pipe
and Tube manufacturing through cold pilgering during the last Five years.
a) Single order value not less than Rs. 5.6 Crores. (or)
b) Two orders of value not less than Rs. 4.3 Crores each. (or)
c) Three orders of value not less than Rs. 2.8 Crores each.
2. Details of the last five years purchase orders shall be submitted along with offer.
3. Tenderers should have average annual turnover for the last three years
(FY: 2016 – 17, 2017 – 18 & 2018-19) of Rs. 8.4 Crores and above on an
annum.
4. The supplier shall have at least 5 years of service of manufacturing and
supplying SS pipes through cold pilgering process.
5. Solvency certificate for the current Financial Year 2019-20 from a scheduled
bank for a value not less than Rs.2.8 Crores or above.
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 10 | 20
Annexure-II
IV. Quality Assurance Plan (QAP)
Sl. No
Characteristics/ Type of check
Reference documents
Method of check
Supplier’s QC
TPI Scope
Purchaser’s Inspector
1.
Identification of raw material with MIL test certificates per
heat/lot with chemical, physical, and IGC test
reports for production (Parent material/mother hollows check) @
------
Raw material
Identification and test
certificates review.
H
100%
W
100%
W
100%
2. Verification of cold pilgering process.
------ Witnessing H
100% W
100% W
10%
3. Verification of Heat Treatment process
------ Witnessing H
100% R
100% W /R 10%
4. Sample selection after final production for each Size &
material
As per PO Visual W
100% W
100% 10 %W
5.
After final production Chemical analysis (One
sample per each heat/lot for each size) on selected
samples.
• For Pipes as per
ASTM A312 TP 304L
• For tubes as per ASTM A269-07a TP316L
Verification of
material test certificates
H
100%
R
100%
R
100%
6.
After final production IGC test (One sample per each
heat/ lot & for each pipe & tube size) on selected
samples.
• As per ASTM A262 practice E for both pipes
and tubes.
Verification H
100% R
100% R
100%
7. Grain Size examination (one
per each size and heat no) As per ASTM E112 Verification
H
100%
R
100%
R
100%
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 11 | 20
Sl. No
Characteristics/ Type of check
Reference documents
Method of check
Supplier’s QC
TPI Scope
Purchaser’s Inspector
8. Ultrasonic test on finished pipes. (For both Longitudinal & Transverse discontinues)
• For pipes as per ASTM E213/ASME
sec V/ASTM A999.
Witnessing H
100%
W
100%
W
100%
9. Eddy current test on finished tubes.
• For tubes as per ASTM E426.
Witnessing H
100% W
100% W
100%
10.
After final production Physical & Mechanical test (One sample each heat/lot
for each size) on selected samples.
• For pipes as per ASTM A312 TP 304L/316L.
• For tubes as per ASTM A269-07a.
Verification
R 100%
R 100%
R 100%
11. Rockwell Hardness and flattening Tests
ASTM A370 Witnessing H
100% R
100% W
10%
12. Bend test (One sample for each heat/lot size) (Up to
max. Possible sizes)
As per Standards Witnessing H
100% R
100% W
100%
13. Hydrostatic test
• For pipes as per
ASTM A 530/ASTM A999.
• For tubes as per
ASTM A 1016.
Witnessing H
100%
W 10% (RN)
W 10% (RN),
R 100%
14. Pickling and Passivation
• As per ASTM
A380 for both pipes and tubes.
Witnessing H
100%
W
10% (RN)
W
10% (RN)
15. Visual & Dimensional check As per ANSI B 36.19 Witnessing H
100%
W 10%
(RN)
W 10%(RN)
Legend: R – Review, RN – Randomly, W-Witnessing, H – Hold
@ Supplier has to procure the raw material with MIL traceability
@ Supplier shall indicate the maximum size & schedule of the pipe for bend test.
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 12 | 20
Annexure-III
Technical Compliance (To be submitted by the bidder along with Technical Bid)
Tenderer shall furnish point-wise confirmation for the following. Change of specifications/ deviations (if any) shall be brought out in the offer with detailed
justification.
Sl.
No
ISRO
Description
Technical Compliance (To be filled by the
party)
I. Technical Specifications
1. Standard (Pipe) as per ASTM A312 TP
2. Standard (Tube) as per ASTM A 269-07a
3. a. Tubes & Pipes Up to 80NB – Cold Pilgered & Seamless
b. 100NB to 200NB – Hot finished Seamless
4. Material of construction shall be SS 304L/316L (Pipes & Tubes)
5. Edge preparation shall be as per ANSI B 16.25 (For Pipes)
6. End Finish (For Tubes) shall be Square cut, smooth & deburred ends
7. Length of each pipe & tube shall be 5 to 7 m
8. Dimensional tolerance shall be as per ANSI B36.19
9. Straightness shall be + 3 mm over a length of 3 m.
10. Compliance of the supplier on sizes of the pipes & tubes
and qty as given below shall be provided. If any change shall be brought out. (Table-A)
Sl.No Pipe Specification Quantity (Mtrs)
1. 15NB SCH40S 304L 2100
2. 15NB SCH160S 304L 1650
3. 15NB SCH40S 316L 100
4. 20NB SCH40S 304L 600
5. 20NB SCH 160 304L 500
6. 20NB SCH XXS 304L 700
7. 25NB SCH40S 304L 1600
8. 25NB SCH40S 316L 150
9. 40NB SCH40S 304L 1900
10. 40NB SCH40S 316L 450
11. 40NB SCH160S 304L 1600
12. 40NB SCHXXS 304L 1450
13. 50NB SCH40S 304L 4150
14. 50NB SCH40S 316L 100
15. 80NB SCH 10S 304L 400
16. 80NB SCH 10S 316L 300
17. 80NB SCH 40S 316L 400
18. 100 NB SCH10S 304L 300
19. 150 NB SCH10S 304L 100
20. 200 NB SCH10S 304L 50
21. 12.7 mm OD X2.1 mm thk 304L 1000
22. 6.35 mm OD X1 mm thk 304L 1900
23. 6.35 mm OD X1.5 mm thk 304L 1400
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 13 | 20
Sl. No
ISRO
Description
Technical Compliance (To be filled by the
party)
11. Testing:
a) All pipes shall be tested hydrostatically as per ASTM
A530/ASTM A 999. All tubes shall be tested hydrostatically as per ASTM A1016.
b) All pipes & tubes shall be visually examined for absence of scratches, dents, surface irregularities, etc.
c) Detailed chemical analysis & IGC test as per ASTM A262 Practice-E shall be carried out one per each heat (ladle)/lot during raw material. However, after final
production minimum one sample for each size of pipe & tube for each heat/lot shall be tested to confirm chemical
composition & IGC. Test certificates shall be produced during inspection.
d) Minimum one test specimen from each heat (ladle)/lot for each size of pipe and tube material shall be carried out mechanical testing like UTS, yield & percentage of
elongation as per ASTM A530/ASTM A 999/ ASTM A 269-07a during raw material inspection and after final
production one sample for each size of pipe & tube. All the test certificates shall be produced during inspection. Note: For Mother hallows/ raw material MIL certificates to
be provided with chemical, mechanical and IGC tests.
e) Average grain size shall be tested as per ASTM-E-112 on
finished product i.e. one sample from one size & each material and grain size shall be in between 5 to 8.
f) Dimensional tolerance of the pipes (i.e. ID, OD & wall thickness) shall comply as per ASTM A.999
g) All the pipes shall be tested by Ultrasonic Test as per Practice ASTM E-213/ ASTM A999 for all sizes. All tubes
shall be tested by Eddy current test as per practice ASTM E 426
12. Manufacturing Conditions:
a) All pipes & tubes up to 80NB shall be manufactured by
Cold Pilgering process only.
b) All pipes & tubes above 80NB shall be manufactured by
Hot finished seamless only.
c) Manufacturer should have in-house Cold pilgering facility
for sizes up to 80NB.
d) j) Hot extruded mother hollows/Pipes shall be used for
manufacturing of seamless pipes. Hot pierced
mother pipes are not acceptable. The supplier has
to produce MIL certificates for manufacturing process
along with proof of raw material supply for this tender
quantity. The same will be reviewed at the time of raw
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 14 | 20
Sl. No
ISRO
Description
Technical Compliance (To be filled by the
party)
material inspection. The source of raw material
(Mother Hollows) for cold pilgering shall be procured
from the following suppliers. The proof of supply for
the tendered quantity of this purchase order shall be
produced along with MIL Certificates.
1. M/s Nippon Steel & Sumitomo metal Corporation
2. M/s KOBE Steel, Japan
3. M/s POSCO (SeAH CCS), South Korea,
4. M/s Sandvik Asia Ltd, India.
5. M/s Ratnamani Metals and Tubes, India
6. M/s DK Corporation, Korea.
7. M/s Tubacex Group.
e) Size of mother hollow/pipes shall be one order higher
than that of the required pipe size. Otherwise offer will
not be considered.
Sl.No Pipe Specification Pipe OD & Thk.
Size of Mother Hollow selected
1. 15NB SCH40S 304L
2. 15NB SCH160S 304L
3. 15NB SCH40S 316L
4. 20NB SCH40S 304L
5. 20NB SCH 160 304L
6. 20NB SCH XXS 304L
7. 25NB SCH40S 304L
8. 25NB SCH40S 316L
9. 40NB SCH40S 304L
10. 40NB SCH40S 316L
11. 40NB SCH160S 304L
12. 40NB SCHXXS 304L
13. 50NB SCH40S 304L
14. 50NB SCH40S 316L
15. 80NB SCH 10S 304L
16. 80NB SCH 10S 316L
17. 80NB SCH 40S 316L
18. 100 NB SCH10S 304L
19. 150 NB SCH10S 304L
20. 200 NB SCH10S 304L
21. 12.7 mm OD X 2.1 mm thk 304L
22. 6.35 mm OD X 1 mm thk 304L
23. 6.35 mm ODX1.5 mm thk 304L
f) Cold Pilgering is to be taken up after acceptance of raw
material by SDSC SHAR.
g) Cold pilgered pipes shall be solution annealed as per
ASTM A 312 and tubes as per ASTM A269
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 15 | 20
Sl. No
ISRO
Description
Technical Compliance (To be filled by the
party)
h) Heat treatment charts shall be submitted for purchaser &
TPI for review and clearance.
i) All pipes & tubes shall be pickled and passivated as per
ASTM A380 both inside & outside surfaces. However,
for Tubes OD 6.35 mm shall be bright annealed.
13. Inspection Clause:
a) Third Party Inspection (TPI) shall be engaged by the
supplier. TPI can be DNV/LIOYDS/BVIS/TUV. Scope of
Third Party Inspection is as per QAP given in Annexure-II.
b) Inspection: By Purchasers representative as well as TPI
as per QAP given in Annexure-II. Material shall be
cleared by both Department Engineer & TPI.
c) All the tests shall be carried out by NABL approved
laboratory.
d) Supplier has to inform the purchaser, the stage wise
material readiness in advance at least 10 days for
participation in inspection.
e) Purchaser has the right to inspect the pipes at any stage
during course of manufacturing.
14. Dispatch & Delivery:
a) Pipes & Tubes shall be cleaned and dried before dispatch.
Ends shall be protected with suitable plastic caps to avoid
entry of dust, water and foreign materials during storage
and transportation.
b) Supplier shall supply all the ordered items within Eight
months from the date of purchase order.
c) Allowable Variation in quantity: One Length of Pipe/tube
on total quantity in each size.
d) Packing: Material shall be wrapped in polythene sheet
and packed in a wooden box as seaworthy package.
e) Marking: All pipes & tubes shall be clearly marked on
three places on each pipe & Tube indicating Project Title,
manufacturer’s reference, material grade, dimensions
(Pipe size & Schedule), Heat/ Lot number. The template
shall be sent for purchaser’s approval before marking.
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 16 | 20
Sl. No
ISRO
Description
Technical Compliance (To be filled by the
party)
f) Dispatch: Supplier shall obtain dispatch clearance from
the purchaser for the items inspected. Stage wise
internal inspection certificates & TPI certificates (as
applicable) shall be submitted to purchaser for
production clearances. Subject to the clearance from
purchaser only, items shall be dispatched.
15. Documentation:
a) Test certificate for chemical analysis, tensile & IGC tests
and hydrostatic test shall be supplied along with dispatch
documents.
b) Production of master file: Three hard copies of
production master file shall be supplied along with one
digital copy (CD containing Scanned Originals) and shall
contain the following.
� Dimensional and visual check reports
� Raw material test certificates
� Physical, Chemical, IGC and micro structure
examination test reports of final product.
� Hydro test reports.
� Ultrasonic test reports.
� Eddy current test reports.
� Heat treatment charts
� All the above reports / test results shall be bound
neatly.
II. General Conditions:
a) Compliance: Point wise compliance to tender
specifications shall be submitted and any deviation from
the specification shall be highlighted clearly in the offer.
Technical Compliance duly filled as per Annexure-III to
be submitted along with the offer.
b) Pricing: Price quoted is inclusive of all the testing
charges (i.e. Chemical, mechanical, IGC, ultrasonic, eddy
current testing, hydro testing, pickling & passivation).
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 17 | 20
Sl. No
ISRO
Description
Technical Compliance (To be filled by the
party)
c) Warranty: Material supplied shall be Warranteed for 18
months from the date of acceptance at our premises.
d) Manufacturers of SS pipes only shall submit quote. Offers
from dealers & traders are not accepted.
e) The purchaser has the right to place part order and the
bidder’s acceptance for the same shall be indicated in the
offer.
f) The purchaser has right to cancel the order at any stage,
if the supplier is not meeting the technical specifications
and QAP.
III. Sizes and Supply Quantity :
1. Sl.No Pipe Specification
Qty. to
be supplied
Qty. Quoted
1. 15NB SCH40S 304L 2100
2. 15NB SCH160S 304L 1650
3. 15NB SCH40S 316L 100
4. 20NB SCH40S 304L 600
5. 20NB SCH 160 304L 500
6. 20NB SCH XXS 304L 700
7. 25NB SCH40S 304L 1600
8. 25NB SCH40S 316L 150
9. 40NB SCH40S 304L 1900
10. 40NB SCH40S 316L 450
11. 40NB SCH160S 304L 1600
12. 40NB SCHXXS 304L 1450
13. 50NB SCH40S 304L 4150
14. 50NB SCH40S 316L 100
15. 80NB SCH 10S 304L 400
16. 80NB SCH 10S 316L 300
17. 80NB SCH 40S 316L 400
18. 100 NB SCH10S 304L 300
19. 150 NB SCH10S 304L 100
20. 200 NB SCH10S 304L 50
21. 12.7 mm OD X 2.1 mm thk 304L 1000
22. 6.35 mm OD X 1 mm thk 304L 1900
23. 6.35 mm OD X1.5 mm thk 304L 1400
IV. Bid Offer Submission Details :
1. Supplier shall present the bids on two-part basis as highlighted below:
� Part-I: Techno-Commercial bid
� Part-II: Price bid
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 18 | 20
Sl. No
ISRO
Description
Technical Compliance (To be filled by the
party)
2. The supplier shall necessarily furnish the details of
previously executed orders along with offer with necessary documentary evidence.
The tenderer shall necessarily furnish the details of previously executed orders Necessary documentary evidence along with end user certificate
(confirming the satisfactory performance of the goods supplied) shall be submitted along with offer
as a mandatory requirement. Non-compliance of this requirement shall lead to rejection of the offer
3. Tenderer need to furnish the details related to commercial terms indicating payment terms, details of bank guarantee in case of advance payments & name of
Third Party Inspection Agency proposed etc.
4. The Bidders shall indicate clearly the delivery/time period
for supplying the items to SDSC SHAR.
5. The price bids will be opened only after evaluation and acceptance of the technical bid of the respective
tenderer.
6. Bidder needs to submit Unpriced price bid copy (in the
format as given in the Specification) indicating the description of all the cost elements considered, without indicating the price. Tenderer shall note that indication of
price in the techno-commercial bid (Unpriced price bid ) shall lead to dis-qualification of bid.
7. Price bid should be submitted by the tenderer in the following format with price break up.
8. Bid Evaluation criteria: Total Landed cost (Basic +TPI+ Packing charges + taxes applicable +Transportation
charges from ex-works to SDSC-SHAR) will be the basis for finalization of the purchase order.
9. The validity of the offers / tenders should be 120 days
from the date of opening of the tenders. Tenders with offer validity less than the period mentioned above, will
not be considered for evaluation.
10. As per notification no 47/2017-Integrated Tax (Rate)
Dt:14.11.2017 Issued by Ministry of Finance (dept of Revenue), SDSC SHAR is eligible to avail a reduced rate of IGST @ 5% for the procurements made by the Dept.
of Space (DOS) being a public funded research Institution. Accordingly, SHAR will provide IGST
exemption certificate.
11. In general, our payment terms will be 100% within 30
days after commissioning. However, if Vendors/Suppliers are requesting for advance payment, department may
consider as given below, a) 30% of order value as advance against submission of
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 19 | 20
Sl. No
ISRO
Description
Technical Compliance (To be filled by the
party)
Advance Bank Guarantee
b) 60% of order value against receipt of items at SDSC SHAR
c) Balance 10% of order value against satisfactory performance of items against Performance Bank Guarantee.
12. Wherever advance payment is requested, Bank Guarantee from any Nationalized Bank/Scheduled Bank
should be furnished. In case of advance payments, if the party is not supplying the material within the delivery
schedule, interest will be levied as per the Prime Lending Rate of RBI plus 2% penal interest.
Interest will be loaded for advance payments/stage payments as per the prime lending rate of RBI and will be
added to the landed cost for comparison purpose. In case of different milestone payments submitted by the parties, a standard and transparent methodology like
NPV will be adopted for evaluating the offers.
13. In all cases, delivery schedule indicated in the Purchase
Order/Contract is the essence of the contract and if the party fails to deliver the material within the delivery
schedule, Liquidated Damages will be levied @ 0.5% per week or part thereof subject to a maximum of 10% of total order value.
14. Performance Bank Guarantee for 10% of the order value should be furnished in the form of Bank Guarantee from
nationalized/scheduled bank or by Demand Draft valid till warranty period plus sixty days as claim period.
15. Security Deposit for 10% of the order value is mandatory; Party shall furnish the Security Deposit in the
form of Bank Guarantee from nationalized/scheduled bank or by Demand Draft valid till completion of the contract period plus sixty days towards claim period for
faithful execution of the contract.
16. Disputes, if any, shall be settled mutually failing which it
shall be referred to an One-man Arbitrator to be appointed by Director, SDSC SHAR in accordance with
the Indian Arbitration and Conciliation Act 1996, whose decision shall be final and binding on both the parties.
17. Compliance for the Tender Evaluation criteria: 1. Tenderers should have satisfactorily executed the
following Seamless SS Pipe and Tube manufacturing
through cold pilgering during the last Five years. a) Single order value not less than Rs. 5.6 Crores.
(or) b) Two orders of value not less than Rs. 4.3 Crores
each. (or)
SDSC:SHAR 2019
Technical Specifications SS Pipes & Tubes P a g e 20 | 20
Sl. No
ISRO
Description
Technical Compliance (To be filled by the
party)
c) Three orders of value not less than Rs. 2.8 Crores each.
2. Details of the last five years purchase orders shall be submitted along with offer.
3. Tenderers should have average annual turnover for the last three years
(FY: 2016 – 17, 2017 – 18 & 2018-19) of Rs. 8.4 Crores and above on an annum.
4. The supplier shall have at least 5 years of service of manufacturing and supplying SS pipes through cold pilgering process.
5. Solvency certificate for the current Financial Year 2019-20 from a scheduled bank for a value not less
than Rs.2.8 Crores or above.
18. The Pipes & tubes supplied shall be warranted for trouble
free service of 18 months period from the date of receipt and acceptance at purchaser’s premises. In case any defects are noticed during the above period due to the
use of substandard materials the same shall be replaced by you at free of cost within a reasonable period.
19. Acceptance for the QAP as given in Annexure-II. Point wise confirmation shall be given by Signing and
Stamping.
S a t i sh Dhawan Spac e Cen t e r SHAR S a t i sh Dhawan Spac e Cen t e r SHAR S a t i sh Dhawan Spac e Cen t e r SHAR S a t i sh Dhawan Spac e Cen t e r SHAR
Welcome, Materials Master (isro)31 August 2017,
17:16:08 IST
MAIN VIEW HELP
Preview For STANDARD TERMS AND CONDITIONS
Page Destination: Tender Header Format Type : Normal
. :
GOVERNMENT OF INDIA
DEPARTMENT OF SPACE
SATISH DHAWAN SPACE CENTRE
PURCHASE DIVISION
Tele No.08623-225023/225174/225127 Fax No.08623-225170/22-5028 e-Mail ID : [email protected], [email protected], [email protected]
STANDARD TERMS & CONDITIONS
1.OFFERS SHALL BE SENT ONLINE ONLY USING STANDARD DIGITAL SIGNATURE CERTIFICATE OF CLASS III WITH ENCRYPTION / DECRYPTION. THE TENDERS AUTHORISED ONLINE ON OR BEFORE THE OPEN AUTHORISATION DATE AND TIME ONLY WILL BE CONSIDERED AS VALID TENDERS EVEN THOUGH THE BIDS ARE SUBMITTED ONLINE.
2.THE TENDERER MUST AUTHORISE BID OPENING WITHIN THE TIME STIPULATED IN THE SCHEDULE BY SDSC SHAR. OTHERWISE THE ONLINE BID SUBMITTED WILL NOT BE CONSIDERED FOR EVALUATION. PHYSICAL COPY WILL NOT BE CONSIDERED EVEN THOUGH IT IS RECEIVED BEFORE THE BID SUBMISSION DATE. In case of two-part tenders, parties shall submit their offers as follows:-
1) Part-I – Techno-commercial Bid (No price details shall be mentioned in this bid and shall not upload the details of price along with the techno-commercial bid) 2) Part-II – Price Bid
In view of Two Part Tender, the Offers submitted contrary to above instructions will be summarily rejected. 3.In case, the tenderer is not interested to participate in the tender, the tenderer shall submit regret letter giving reasons, failing which future enquiries will not be sent. 4.Offer Validity: The validity of the offers / tenders should be 90 days (in case of single part tender) and 120 days (in case two part
tender) from the date of opening of the tenders. Tenders with offer validity less than the period mentioned above, will not be considered for evaluation. 5.GST - GST and/or other duties/levies legally leviable and intended to be claimed should be distinctly shown separately in the tender. GST details are given below
GSTIN: 37AAAGS1366J1Z1 LEGAL NAME : SATISH DHAWAN SPACE CENTRE SHAR VALIDITY FROM:29/08/2017
TYPE OF REGISTRATION:REGULAR 6.Customs Duty - SDSC-SHAR is eligible for 100% Customs Duty exemption as per Notification No. 050/2017 539 (b) Dt: 30.06.2017.
This may be taken into account while quoting for import items, if any. In case tenderers offering items considering customs duty exemption, they should also indicate the bill of materials and price, separately, with Customs Duty component and terms and conditions thereto. 8.Advance Payment - Wherever advance payment is requested, Bank Guarantee from any Nationalized Bank/Scheduled Bank should be
furnished. In case of advance payments, if the party is not supplying the material within the delivery schedule, interest will be levied as per the Prime Lending Rate of RBI plus 2% penal interest. Interest will be loaded for advance payments/stage payments as per the prime lending rate of RBI and will be added to the landed cost for comparison purpose. In case of different milestone payments submitted by the parties, a standard and transparent methodology like NPV will be adopted for evaluating the offers.
9.Liquidated Damages - In all cases, delivery schedule indicated in the Purchase Order/Contract is the essence of the contract and if the party fails to deliver the material within the delivery schedule, Liquidated Damages will be levied @ 0.5% per week or part thereof subject to a maximum of 10% of total order value. 10.Performance Bank Guarantee - Performance Bank Guarantee for 10% of the order value should be furnished in the form of Bank
Guarantee from nationalized/scheduled bank or by Demand Draft valid till warranty period plus sixty days as claim period.
Page 1 of 3
11.Security Deposit – Security Deposit for 10% of the order value is mandatory, if the ordered value is Rs.5.00 lakhs and above. Party shall furnish the Security Deposit in the form of Bank Guarantee from nationalized/scheduled bank or by Demand Draft valid till
completion of the contract period plus sixty days towards claim period for faithful execution of the contract. 12.BANK GUARANTEE FOR FIM: Supplier has to submit Bank guarantee for equal value of Free Issue of Materials (FIM) issued by the Department from Nationalised / Scheduled Bank valid till receipt and acceptance of supply and satisfactory accounting of FIM plus sixty days as claim period.
13.The delivery period mentioned in the tender enquiry, IF ANY, is with the stipulation that no credit will be given for earlier deliveries and offers with delivery beyond the period will be treated as unresponsive. 14.The Department will have the option to consider more than one source of supply and final orders will be given accordingly.
15.The bidders should note that conditional discounts would not have edge in the evaluation process of tenders. 16.Non-acceptance of any conditions wherever called for related to Guarantee/ Warranty, Performance Bank Guarantee, Security Deposit, Liquidated damages are liable for disqualification. 17.Wherever installation/ commissioning involved, the guarantee/warrantee period shall reckon only from the date of installation and
commissioning. 18.Purchase/Price Preference will be extended to the MSMEs under the Public Procurement Policy for MSMEs formulated under the Micro, Small and Medium Enterprises Development Act, 2006 and instructions issued by Government of India from time to time. Vendors who would like to avail the benefit of MSME should clearly mention the same and submit all the documentary evidences to substantiate their claim along with tender itself.
19.The drawings, specifications, end use etc., given by the Centre/Unit along with the tender enquiry are confidential and shall not be disclosed to any third party. 20.SPECIAL CONDITIONS FOR SUBMITTING QUOTATIONS IN FOREIGN CURRENCY BY THE INDIAN AGENTS
The Tenderer should submit the following documents/information while quoting:- a)Foreign Principal's proforma invoice/quote indicating the commission payable to the Indian Agent and nature of after sales service to be rendered by the Indian Agent. b)Copy of Agency agreement with the Foreign Principal and the Indian Agent, precise relationship between them and their mutual
interest in the business. c)Registration and item empanelment of the Indian Agent. d)Agency Commission will be paid only Indian Currency.
e)Compliance of the tax laws by the Indian Agent. 21. High Sea Sales- Against High Sea Sale transactions: a.Offers shall be on all inclusive basis including delivery upto Sriharikota at the risk and cost of the supplier. Customs Clearance is the responsibility of the supplier and at his cost and risk.
b.100% payment will be made within 30 days after receipt and acceptance of the items at our site. c. GST as applicable d.Customs Duty Exemption Certificate and other relevant documents required for Customs clearance will be provided.
e.High Sea Sales Agreement furnished by the supplier in accordance with the terms and conditions of our purchase order will be signed and issued by SDSC-SHAR. 22.The following information/ documents are to be submitted wherever applicable.
1.Product Literature 2.Core banking account number of SBI, RTGS Details 3.PAN No. in quotation and invoices
4.GST Registration details. 5.In case of MSME, registration details / documents from Competent Authority. 23.EXCLUSION OF TENDERS
The following tenders shall be summarily rejected from the procurement process a.Tenders received from vendors who have not qualified in terms of their registration. b.Tenders received against publishing of a limited tender in the CPP portal.
c.Tenders of vendors who have been removed from the vendor list or banned/debarred from having business dealings. d.Unsolicited tenders from vendors. e.The tenders which materially depart from the requirements specified in the tender document or which contain false information.
f.The tenders which are not accompanied by the prescribed Earnest Money Deposit. g.The tenders of vendors who have not agreed to furnish Security Deposit, Performance Bank Guarantee and Liquidated Damages. h.The validity of the tenders is shorter than the period specified in the tender enquiry.
i.The tenders received from vendors or their agents or anyone acting on their behalf, who have promised or given to any official of the Centre/Unit/Department, a gratification in any form, or anything of value, so as to unduly influence the procurement process. j.The tenders received from vendors, who, in the opinion of the Centre/Unit, have a conflict of interest materially affecting fair competition.
Page 2 of 3
k.The tenders received from Indian agents on behalf of their foreign Principals/OEMs (in cases where the Principals/OEMs also submit their tenders simultaneously for the same item/product in the same tender).
l.In case two or more tenders are received from an Indian agent on behalf of more than one foreign Principal/OEM, in the same tender for the same item/product. m.If a firm quotes ‘NIL’ charges / consideration, the bid shall be treated as un-responsive and will not be considered.