2019 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

Recommended by the Transportation Advisory Committee

February 26, 2019

Approved by the Board of Supervisors May 29, 2019

2018-2019 THROUGH 2022-2023

McCartney Road Project Before and After at Weaver Crossing

2019 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

2018-2019 THROUGH 2022-2023

The Pinal County Board of Supervisors (Board) proudly presents the 2019 Five-Year Transportation Improvement and Maintenance Program (TIMP) for Budget Years 2018-2019 through 2022-2023. The TIMP is Pinal County’s near-term transportation plan that identifies potential funding and establishes a tentative schedule for planning, construction, and maintenance projects. It is fiscally constrained and updated annually with new projects added to the fifth year.

The Transportation Advisory Committee (TAC) is the Board appointed, ten member panel representing each of Pinal County’s five supervisor districts. The TAC is charged with prioritizing transportation projects for the TIMP and recommending the draft TIMP to the Board. On February 26, 2019, the TAC met in an open public meeting and recommended approval of the 2019 TIMP for Budget Years 2018-2019 through 2022-2023.

In recognition of their significant contributions, we would like to thank the TAC officers and members for their service to Pinal County.

First Row (L-R): Ron Vogler, District 4; Chair Maxine Brown, District 5; David Garcia, District 1 Second Row (L-R): Vice-Chair Kevin Louis, District 3; Ted Hawkins, District 4; Rusty Riggs, District 3

Not Pictured: William Beebe, District 5; Jim Fabris, District 2; and Anna Flores, District 1

2019 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

2018-2019 THROUGH 2022-2023

The TAC conducts three public meetings during the months of September, November, and February in Florence and considers public comments in developing recommendations to the Board. We encourage you to attend the meetings and offer comments on the TIMP and future transportation projects.

Meetings are held on Tuesdays at the Pinal County Administrative Complex and begin at 2:30 p.m. as follows:

Agendas and minutes are posted in compliance with Arizona’s Open Meeting Law and can be found on Pinal County’s website: http://www.pinalcountyaz.gov/PublicWorks/TransportationPlanning/Pages/TACSchedule.aspx.

Funding for the TIMP is provided by revenues from the Pinal County Transportation Excise Tax, the half-cent sales tax, approved by voters in 2005. The sole purpose of the tax is to fund construction, maintenance, and roadside development projects throughout the county. Shopping and buying your gasoline locally ensure that quality transportation projects are planned and implemented countywide. With your support, we can continue building and improving the county’s transportation system.

Pinal County Board of Supervisors

September 24, 2019 November 26, 2019 February 25, 2020

Pete Rios, District 1; Chairman Mike Goodman, District 2; Vice-Chairman Stephen Miller, District 3; Anthony Smith, District 4; Todd House, District 5

2019 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

2018-2019 THROUGH 2022-2023

GLOSSARY

Activity – Project work such as: pre-construction/construction/new construction/reconstruction, drainage, dust palliative, pavement preservation or safety.

Construction – The building of roadway and/or related infrastructure improvements.

Drainage – The management of storm water to protect private and/or public infrastructure.

Dust Palliative – A surface treatment applied to unimproved roadways to control dust.

New Construction – The establishment of a roadway and/or related infrastructure improvements.

Pavement Preservation – A topical treatment that extends the service life of existing pavement surfaces.

Pre-Construction – The project work conducted prior to construction of roadway and/or related infrastructure improvements such as: planning, environmental, design, and right-of-way acquisition.

Reconstruction – The rebuilding of roadway and/or related infrastructure improvements. Elements of new construction may be incorporated into the project.

Safety – The project work that eliminates or reduces the severity of roadway hazards. Examples include intersection realignment, guardrails, improved signage and/or pavement markings, traffic signals or related studies.

Status – The current state of the project such as: cancelled, closed, completed, pending, programmed, and underway

Cancelled – The project was terminated due to financial or other constraints such as unresolved right-of-way issues or changing priority.

Closed – The project was combined with another project (including allocated funding) to streamline activities or allocated funding for project was not used.

2019 FIVE-YEAR TRANSPORTATION IMPROVEMENT & MAINTENANCE PROGRAM

2018-2019 THROUGH 2022-2023

GLOSSARY (continued)

Completed – The project was successfully finished/constructed and closed out.

Pending – The project is about to start or awaiting the completion of another activity.

Programmed – The project was approved/authorized and scheduled for a future budget year.

Underway – The project is in progress.

Unfunded – Funding has not been identified/allocated.

Budget Year 2018-2019Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Arizona City Safety Study Multiple Intersections Pre-Construction $100,000 14ProgrammedJohn Kraft a

Baseline Avenue Mohican Rd-East 980 feet Construction $55,417 15PendingLindsey Randall b

Cactus Wren Street Mountain View Rd-Val Vista Rd New Construction $61,700 25UnderwayLindsey Randall a

Florence-Kelvin Highway Donnelly Wash-East 2 miles Construction $0 21ClosedJohn Kraft b

Gantzel Road Chandler Heights Rd Construction $325,000 32, 5CompletedLindsey Randall a

Germann Road Meridian Rd-Ironwood Dr New Construction $1,728,756 32PendingCeleste Garza b

Germann Road Meridian Rd-Ironwood Dr Pre-Construction $244,124 42UnderwayCeleste Garza a

Hohokam Road Paisano Dr-Quartzite Dr Construction $286,300 41UnderwayLindsey Randall b

Lost Dutchman Road Sun Rd-Prospectors Rd Construction $156,000 55PendingLindsey Randall a

McCartney Road Interstate 10-Evans Rd Reconstruction $3,500,000 51, 3CompletedLindsey Randall b

Safety Program Countywide Safety $500,000 67ProgrammedJohn Kraft a

Sunland Gin Road Battaglia Dr Intersection Safety $350,000 64CompletedJohn Kraft b

$7,307,297SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Arica Road Isom Rd-Trekell Rd Dust Palliative $120,000 74CompletedJohn Kraft a

Battaglia Drive Chuichu Rd-Del Rio Rd Pavement Preservation $200,000 73, 4UnderwayJohn Kraft b

Carefree Place State Route 347-Pepper Pl Dust Palliative $500,000 84PendingJohn Kraft a

Cattle Tank Road Davis Ranch Rd-Park Link Dr Dust Palliative $1,300,000 81, 4CompletedJohn Kraft b

Chuichu Road Battaglia Dr-Interstate 8 Pavement Preservation $2,000,000 93CompletedJohn Kraft a

Dust Abatement Program Countywide Dust Palliative $1,000,000 97ProgrammedJoe Ortiz b

Dust Abatement Program Apache Junction area Dust Palliative $500,000 105ProgrammedLindsey Randall a

Fulcar Road Hidden Valley Rd-Table Top Rd Dust Palliative $240,000 104CompletedJohn Kraft b

Mount Lemmon Road Campo Benito Rd-.5 miles south of AZ Zipline Dust Palliative $250,000 111CompletedJohn Kraft a

Peters Road Santa Cruz Wash-Corrales Rd Dust Palliative $252,083 113PendingJohn Kraft b

Sage Street Barnes Rd-Miller Rd Dust Palliative $120,000 124CompletedJohn Kraft a

Sotol Road Warren Rd-Hidden Valley Rd Dust Palliative $150,000 124CompletedJohn Kraft b

Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St Pre-Construction $0 135ClosedLindsey Randall a

$6,632,083SUBTOTAL MAINTENANCE

$13,939,380GRAND TOTAL 2018-2019

District 7 = Multiple districts or countywide

Budget Year 2019-2020Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Florence-Kelvin Highway Donnelly Wash-Apache Kid. Rd Construction $1,050,000 131ProgrammedJohn Kraft b

Gantzel Road Queen Creek (Wash) Pre-Construction $50,000 142, 5ProgrammedLindsey Randall a

Hash Knife Draw Road Schnepf Rd-Sierra Vista Dr Construction $110,000 145PendingLindsey Randall b

Jackpot Street Skyline Dr-Rolling Ridge Rd Construction $82,500 155PendingLindsey Randall a

Magma Road Hunt Hwy-Gary Rd (Edwards Rd) Pre-Construction $500,000 152UnderwayLindsey Randall b

Roberts Road Felix Rd-Joel Rd Construction $38,542 165ProgrammedLindsey Randall a

Rolling Ridge Road Schnepf Rd-Sierra Vista Dr Construction $110,000 165ProgrammedLindsey Randall b

Safety Program Countywide Safety $500,000 177ProgrammedJohn Kraft a

Sage Brush Avenue Schnepf Rd-Sierra Vista Dr Construction $110,000 175ProgrammedLindsey Randall b

Stagecoach Pass Avenue Ghost Rider St-Sierra Vista Dr Construction $0 185ClosedLindsey Randall a

Tombstone Street Skyline Dr-Rolling Ridge Rd Construction $82,500 185PendingLindsey Randall b

Val Vista Road Warren Rd-Hidden Valley Rd Construction $520,000 194CompletedJohn Kraft a

$3,153,542SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Ashmoore Street Passmore Rd-Baldwin Av Dust Palliative $59,000 193, 4ProgrammedJohn Kraft b

Boyd Road Roosevelt St-End of road (Scenic St) Dust Palliative $11,000 205CompletedLindsey Randall a

Dolores Place-Shirley Road Olberg Rd-Avram Rd Dust Palliative $78,100 202UnderwayLindsey Randall b

Donnaloy Road Wilma Rd-Brenner Pass Rd Dust Palliative $84,700 212UnderwayLindsey Randall a

Dust Abatement Program Countywide Dust Palliative $2,000,000 217ProgrammedJoe Ortiz b

Marlow Road Jacob Waltz St-End of road Dust Palliative $15,958 225PendingLindsey Randall a

Olberg Road Arizona Farms Rd-Brenner Pass Rd Dust Palliative $102,083 222UnderwayLindsey Randall b

Pavement Preservation Program Countywide Pavement Preservation $700,000 237ProgrammedJoe Ortiz a

Plaza Drive Moon Vista St-Goldpoppy St Dust Palliative $6,667 235ProgrammedLindsey Randall b

Reed Road Bartlett Rd-At wash before Cactus Forest Rd Dust Palliative $91,667 241ProgrammedLindsey Randall a

Stagecoach Pass Avenue Schnepf Rd-Sierra Vista Dr Dust Palliative $328,333 245ProgrammedLindsey Randall b

Whirly Bird Road Amarillo Valley Rd-Ralston Rd Dust Palliative $300,000 254ProgrammedJohn Kraft a

$3,777,508SUBTOTAL MAINTENANCE

$6,931,050GRAND TOTAL 2019-2020

District 7 = Multiple districts or countywide

Budget Year 2020-2021Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Bunkhouse Road Veteran's Memorial Blvd-San Manuel Lodge Reconstruction $50,000 251ProgrammedJohn Kraft b

Cordones Road Catalina Hills Rd-Biosphere Rd Pre-Construction $0 264CancelledJohn Kraft a

Hunt Highway (Old) Pioneer Path-Wildhorse Dr Construction $125,000 262ProgrammedLindsey Randall b

Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development Construction $1,250,000 272ProgrammedCeleste Garza a

Kenworthy Road Germann Rd-Pima Rd Reconstruction $550,000 272ProgrammedLindsey Randall b

Magma Road Hunt Hwy-Gary Rd (Edwards Rd) Construction $3,500,000 282PendingLindsey Randall a

Mountain View Road Broadway Av Intersection Construction $250,000 285ProgrammedLindsey Randall b

Ocotillo Road Meridian Rd-Ironwood Dr Construction $0 292CancelledLindsey Randall a

Red Rock Access Road Red Rock to Pinal Airpark Rd Pre-Construction $250,000 294ProgrammedJohn Kraft b

Safety Program Countywide Safety $500,000 307ProgrammedJohn Kraft a

$6,475,000SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Bowlin Road Hidden Valley Rd-Stonebluff Rd Dust Palliative $100,000 304ProgrammedLindsey Randall b

Logan Boulevard Diffin Rd-Reed Rd Dust Palliative $125,000 311ProgrammedLindsey Randall a

Louis Johnson Drive Amarillo Valley Rd-State Route 347 Dust Palliative $250,000 314ProgrammedLindsey Randall b

Midway Road Beggs Rd-Marsh Rd Dust Palliative $230,000 323, 4ProgrammedLindsey Randall a

Rhea Road Brennar Pass Rd-Donnaloy Rd Dust Palliative $30,000 322ProgrammedLindsey Randall b

River Road Redington Rd-Copper Creek Rd Dust Palliative $200,000 331ProgrammedJohn Kraft a

Rockcliffe Boulevard Oracle Ranch Rd (West)-Alice St Dust Palliative $30,000 331ProgrammedJohn Kraft b

Stonebluff Road Farrell Rd-Bowlin Rd Dust Palliative $100,000 344ProgrammedLindsey Randall a

Tweedy Road Storey Rd-Randolph Rd Dust Palliative $250,000 343ProgrammedLindsey Randall b

$1,315,000SUBTOTAL MAINTENANCE

$7,790,000GRAND TOTAL 2020-2021

District 7 = Multiple districts or countywide

Budget Year 2021-2022Transportation Improvement and Maintenance ProgramIMPROVEMENT

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Florence-Kelvin Highway Apache Kid Rd-Zellweger Rd Construction $250,000 351ProgrammedJohn Kraft a

Heather Drive Kashmir Rd-Lamb Rd Construction $125,000 354ProgrammedJohn Kraft b

Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development Construction $1,250,000 362ProgrammedCeleste Garza a

Kenworthy Road Combs Rd-Chandler Heights Rd Construction $1,500,000 362, 5ProgrammedLindsey Randall b

Peart Road Interstate 8-Early Rd Reconstruction $2,520,000 373ProgrammedJohn Kraft a

Pinal Airpark Road Interstate 10-Trico Rd Construction $650,000 374ProgrammedJohn Kraft b

Safety Program Countywide Safety $500,000 387ProgrammedJohn Kraft a

Trekell Road S. Hanna Rd-Interstate 8 Reconstruction $540,000 383ProgrammedJohn Kraft b

$7,335,000SUBTOTAL IMPROVEMENT

MAINTENANCEProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Camino Viejo Road Camino Viejo W-Enrada del Oro Dr Dust Palliative $940,000 395ProgrammedLindsey Randall a

Encanto Lane Cactus Forest Rd-840' North Dust Palliative $100,000 391ProgrammedLindsey Randall b

Orville Drive Diffin Rd-Quail Run Rd Dust Palliative $130,000 401ProgrammedLindsey Randall a

River Road Redington Rd-Copper Creek Rd Dust Palliative $200,000 401ProgrammedJohn Kraft b

Thunderbird Road Teel Rd-Mayer Rd Reconstruction $450,000 414ProgrammedJohn Kraft a

$1,820,000SUBTOTAL MAINTENANCE

$9,155,000GRAND TOTAL 2021-2022

District 7 = Multiple districts or countywide

Budget Year 2022-2023Transportation Improvement and Maintenance ProgramImprovement

Project Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Judd Road - Tourmaline Drive Gantzel Rd - Copper Basin Development Construction $1,250,000 412New ProjectCeleste Garza b

Quail Run Road Dirt Rd - Orville Rd Culvert/ARDP $75,000 421New ProjectLindsey Randall a

Ralston Road at Vekol Wash Crossing Contruction $1,500,000 424New ProjectJohn Kraft b

Safety Program Countywide Safety $500,000 437ProgrammedJohn Kraft a

Skyline Drive Charbray Dr - Gantzel Rd New Construction $2,000,000 432New ProjectLindsey Randall b

$5,325,000SUBTOTAL Improvement

MaintenanceProject Location Activity PageDistrictStatus

PROJECT TYPE

Total CostProject Manager

Fresno Road Warren Rd - Ralston Rd Dust Palliative $150,000 444New ProjectJohn Kraft a

MaryLynne Lane Missile Base Rd - North .75 mi Dust Palliative $150,000 444New ProjectJohn Kraft b

Mount Lemmon Road Rio Del Oro Rd - .14 East of Camp Ground Dust Palliative $750,000 451New ProjectJohn Kraft a

Ottawa Road Ottawa Rd - Bobcat Rd - Watson Wy Dust Palliative $150,000 453New ProjectJohn Kraft b

Park Link Drive 1 mile East of Pecan Dust Palliative $1,000,000 461New ProjectJohn Kraft a

River Road Redington Rd - Copper Creek Rd Dust Palliative $200,000 461New ProjectJohn Kraft b

Royce Road Ivar Rd - Hooper Trl Dust Control $50,000 472New ProjectLindsey Randall a

Selma Hwy Pinal County Portions (1.0 mi) Pavement Preservation $425,000 471,3New ProjectJohn Kraft b

$2,875,000SUBTOTAL Maintenance

$8,200,000GRAND TOTAL 2022-2023

District 7 = Multiple districts or countywide

Length in Miles

Arizona City Safety Study Multiple Intersections

Pre-Construction

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager John Kraft E-mail [email protected]

Comments Location: Battaglia Drive from Sunland Gin Road to Overfield Road, Battaglia Drive from Chuichu Road to Del Rio Road, Lamb Road from Battaglia Drive to Milligan Road, Milligan Road from Sunland Gin Road Overfield Road, Overfield Road from Battaglia Drive to Milligan Road, and Sunland Gin Road from Battaglia Drive to Milligan RoadActivity: Reviewing drainage concerns throughout Arizona City Streets and Mountain View Estates. Working with Flood Control on possible retention basin near Henness, South of Battaglia.

Status Programmed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

1a

Length in Miles

Baseline Avenue Mohican Rd-East 980 feet

Construction

$55,417

$0

$55,417

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected after July 2018. Construction delayed to Spring 2019 due to lack of right-of-way donations, straightening up intersection and concreting dip. Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.19

1b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Cactus Wren Street Mountain View Rd-Val Vista Rd

New Construction

$61,700

$0

$61,700

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected after July 2018. From Pending to Underway. Chip seal Spring 2019.

Status Underway

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.22

2a

Length in Miles

Florence-Kelvin Highway Donnelly Wash-East 2 miles

Construction

$0

$0

$0

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Pending. Design expected July 2018 and construction expected Summer 2019. From pending to closed. Project will be combined with Florence-Kelvin Highway, from Gardenshire Rd. to Apache Kid Rd, BY2019-2020.Cost: From $800,000 to $0

Status Closed

Maintenance Area Riverside

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

2

2b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Gantzel Road Chandler Heights Rd

Construction

$325,000

$0

$325,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2, 5Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Traffic SignalStatus: From Programmed to Completed. Traffic signal activitated July 2017.

Status Completed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

3a

Length in Miles

Germann Road Meridian Rd-Ironwood Dr

New Construction

$98,696

$1,630,060

$1,728,756

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Construction of two-lane roadBudget Year: Carryover from 2014-2015 to 2018-2019County Cost: $98,696 reflects Pinal County's cost share matchStatus: From Programmed to Pending. Design underway and construction expected Winter 2018. Project was awarded Surface Transportation Program (federal) funds through Maricopa Association of Governments. Design nearly complete, will advertise construction March 2019, project start Fall 2019.

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 6621139

1

3b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Germann Road Meridian Rd-Ironwood Dr

Pre-Construction

$13,866

$230,258

$244,124

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Right-of-way acquisition, environmental, design for construction of two-lane road, and plan review by the Arizona Department of TransportationCounty Cost: $13,866 reflects Pinal County's cost share matchBudget Year: 2017-2018 to 2018-2019Status: Design underway and is approximately 60% complete (Stage 3) with review/management by Arizona Department of Transportation. Project was awarded Surface Transportation Program (federal) funds through Maricopa Association of Governments. Construction scheduled Winter 2018.

Status Underway

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 6621139

1

4a

Length in Miles

Hohokam Road Paisano Dr-Quartzite Dr

Construction

$286,300

$0

$286,300

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected Summer 2018. From Pending to Underway. Chip seal Spring 2019Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Underway

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.33

4b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Lost Dutchman Road Sun Rd-Prospectors Rd

Construction

$156,000

$0

$156,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction scheduled Summer 2018. Need right-of-way donation, if obtained construction scheduled Summer 2019. Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.6

5a

Length in Miles

McCartney Road Interstate 10-Evans Rd

Reconstruction

$3,500,000

$0

$3,500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1, 3Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Installation of culverts at dip crossings. Status: Construction completed November 2018.

Status Completed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

3.1

5b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Safety Program Countywide

Safety

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct funding to the Roadway Safety ProgramCounty Cost: Reduce from $1,000,000 to $500,000 and carryover $500,000 to Budget Year 2020-2021 to rebalance Safety Program funding.

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

6a

Length in Miles

Sunland Gin Road Battaglia Dr Intersection

Safety

$350,000

$0

$350,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Westbound Turn laneStatus: From Programmed to Underway. Design underway and construction scheduled Summer 2018. From underway to Completed November 2018.

Status Completed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 19118

0

6b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Arica Road Isom Rd-Trekell Rd

Dust Palliative

$120,000

$0

$120,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Completed.

Status Completed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

7a

Length in Miles

Battaglia Drive Chuichu Rd-Del Rio Rd

Pavement Preservation

$200,000

$0

$200,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3, 4Project Manager John Kraft E-mail [email protected]

Comments Status: From Pending to Underway. Profile mill and AC overlay from Chuichu Rd to Peart Rd is complete. Peart Rd to Toltec Hwy micro surfacing Spring 2019.

Status Underway

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

4.5

7b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Carefree Place State Route 347-Pepper Pl

Dust Palliative

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Dust palliative includes 4.1 miles of the following roadways: Carefree Place, Reitz Ranch Road, Padilla Road, Clayton Road, and Lopez Road.Budget Year: Advance from 2019-2020 to 2018-2019 to combine with projects programmed under the State Implemention Plan for completion after July 2018.Status: From Programmed to Pending. ARDP Spring/Summer 2019.

Status Pending

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 27124

4.1

8a

Length in Miles

Cattle Tank Road Davis Ranch Rd-Park Link Dr

Dust Palliative

$1,300,000

$0

$1,300,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1, 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Asphalt rock dust palliativeCounty Cost: From $750,000 to $1,300,000 due to Bureau of Land Management requirementsBudget Year: From 2016-2017 to 2017-2018 to 2018-2019Status: From Pending to Underway. Phased construction (Phase 2-Clearing and Grubbing) underway with chip seal expected Fall 2018. From Underway to Completed, awaiting repair of pavement in13 area due to rain/flooding issues. Notice of Termination after 70% of native seed is re-established.

Status Completed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

5.5

8b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Chuichu Road Battaglia Dr-Interstate 8

Pavement Preservation

$2,000,000

$0

$2,000,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Pending. Planning to contract Pavement Preservation after July 2018. From Programmed to Complete.

Status Completed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

4.3

9a

Length in Miles

Dust Abatement Program Countywide

Dust Palliative

$1,000,000

$0

$1,000,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 7Project Manager Joe Ortiz E-mail [email protected]

Comments Activity: Area Engineers' discretionary project(s) to address fugitive dust (Particulate Matter 2.5 and 10) in Pinal County's Non-Attainment areas

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

9b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Dust Abatement Program Apache Junction area

Dust Palliative

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Area Engineer's discretionary project(s) to address fugitive dust (Particulate Matter 10) in Pinal County's Non-Attainment area (T1N, R8E)Status: 3.22 miles of Asphalt rock dust palliatives in the southeast Apache Junction area scheduled Summer 2018. Looking to chip an additional 1 mile Spring 2019.

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

10a

Length in Miles

Fulcar Road Hidden Valley Rd-Table Top Rd

Dust Palliative

$240,000

$0

$240,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Completed. Completed in 2016 as part of the State Implementation Plan.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

2

10b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Mount Lemmon Road Campo Benito Rd-.5 miles south of AZ Zipline

Dust Palliative

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager John Kraft E-mail [email protected]

Comments Activity: Continuation of asphalt rock dust palliative and cutoff walls at wash crossingBudget Year: From 2020-2021 to 2018-2019Status: From Programmed to Pending. Asphalt rock dust palliative is expected Summer 2018. From Pending to Complete on 8/20/2018.

Status Completed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 141

2

11a

Length in Miles

Peters Road Santa Cruz Wash-Corrales Rd

Dust Palliative

$252,083

$0

$252,083

Activity

County Cost

Non County Cost

MAINTENANCE

District 3Project Manager John Kraft E-mail [email protected]

Comments Budget Year: From 2017-2018 to 2018-2019Status: From Programmed to Pending. Construction scheduled after July 2018. ARDP Summer 2019Project Manager: From Lindsey Randall to John KraftE-mail: From [email protected] to [email protected]

Status Pending

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1.6

11b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Sage Street Barnes Rd-Miller Rd

Dust Palliative

$120,000

$0

$120,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Completed. Construction completed August 2017.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

12a

Length in Miles

Sotol Road Warren Rd-Hidden Valley Rd

Dust Palliative

$150,000

$0

$150,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Completed. Completed April 2017.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1

12b

Budget Year 2018-2019 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Stagecoach Pass Avenue Schnepf Rd-Ghost Rider St

Pre-Construction

$0

$0

$0

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Underway to Closed. Funding and project is combined with Stagecoach Pass Avenue project programmed in Budget Year 2019-2020.County Cost: From $50,000 to $0.Activity: In-house design and right-of-way design. Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Closed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.8

13a

Length in Miles

Florence-Kelvin Highway Donnelly Wash-Apache Kid. Rd

Construction

$1,050,000

$0

$1,050,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager John Kraft E-mail [email protected]

Comments Activity: L-2 Standard - 6 inch Aggregate Base over Double Chip SealStatus: Combined with Florence-Kelvin Highway project from Donnelly Wash, East 2 miles. New limits are from Donnelly Wash-Apache Kid Rd.Cost: Increased from $250,000 to $1,050,000

Status Programmed

Maintenance Area Riverside

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 3030

5

13b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Budget Year 2018-2019

Length in Miles

Gantzel Road Queen Creek (Wash)

Pre-Construction

$50,000

$0

$50,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2, 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]: Design to start July 2019

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 4010

0.07

14a

Length in Miles

Hash Knife Draw Road Schnepf Rd-Sierra Vista Dr

Construction

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected Summer 2018 as part of the State Implementation Plan. Need 2 out of 33 grants of easements from property owners. Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Pending

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 8125

1

14b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Jackpot Street Skyline Dr-Rolling Ridge Rd

Construction

$82,500

$0

$82,500

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]: From Programmed to Pending. All grants of easement received from proerty owners.

Status Pending

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 10116

0.75

15a

Length in Miles

Magma Road Hunt Hwy-Gary Rd (Edwards Rd)

Pre-Construction

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Right-of-way acquisition from Arizona State Land DepartmentStatus: Right-of-way application has been submitted to Arizona State Land Department

Status Underway

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

15b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Roberts Road Felix Rd-Joel Rd

Construction

$38,542

$0

$38,542

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]: Construction Fall 2019

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 15035

0.35

16a

Length in Miles

Rolling Ridge Road Schnepf Rd-Sierra Vista Dr

Construction

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]: Have 2 of 36 grants of easements form property owners

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 16114

1

16b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Safety Program Countywide

Safety

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct funding to the Roadway Safety ProgramCounty Cost: Reduce from $1,000,000 to $500,000 and carryover $500,000 to Budget Year 2021-2022 to rebalance Safety Program funding.

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

17a

Length in Miles

Sage Brush Avenue Schnepf Rd-Sierra Vista Dr

Construction

$110,000

$0

$110,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]: Have 2 of 40 grants of easements from property owners

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 17126

1

17b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Stagecoach Pass Avenue Ghost Rider St-Sierra Vista Dr

Construction

$0

$0

$0

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Closed. Funding and project is combined with Stagecoach Pass Avenue project programmed in Budget Year 2019-2020.County Cost: $28,333.00 to $0.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Closed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 18127

1

18a

Length in Miles

Tombstone Street Skyline Dr-Rolling Ridge Rd

Construction

$82,500

$0

$82,500

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]: From Programmed to PendingActivity: Received all grants of easements from property owners

Status Pending

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 20115

0.75

18b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Val Vista Road Warren Rd-Hidden Valley Rd

Construction

$520,000

$0

$520,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager John Kraft E-mail [email protected]

Comments Status: From Programmed to Completed. Completed August 2017 as part of the State Implementation Plan.

Status Completed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 22036

1

19a

Length in Miles

Ashmoore Street Passmore Rd-Baldwin Av

Dust Palliative

$59,000

$0

$59,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3, 4Project Manager John Kraft E-mail [email protected]

Comments

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 23022

0.5

19b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Boyd Road Roosevelt St-End of road (Scenic St)

Dust Palliative

$11,000

$0

$11,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]: From Programmed to CompletedActivity: Completed Summer 2018 with Dust Abatement project

Status Completed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 25015

0.1

20a

Length in Miles

Dolores Place-Shirley Road Olberg Rd-Avram Rd

Dust Palliative

$78,100

$0

$78,100

Activity

County Cost

Non County Cost

MAINTENANCE

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected Summer 2018 as part of the State Implementation Plan. From Pending to Underway. First coat completed, scheduling second coat. Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Underway

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 28121

0.71

20b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Donnaloy Road Wilma Rd-Brenner Pass Rd

Dust Palliative

$84,700

$0

$84,700

Activity

County Cost

Non County Cost

MAINTENANCE

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected Summer 2018 as part of the State Implementation Plan. From Pending to Underway. First coat completed, second coat being scheduled. Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Underway

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 29120

0.77

21a

Length in Miles

Dust Abatement Program Countywide

Dust Palliative

$2,000,000

$0

$2,000,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 7Project Manager Joe Ortiz E-mail [email protected]

Comments Activity: Area Engineers' discretionary project(s) to address fugitive dust (Particulate Matter 2.5 and 10) in Pinal County's Non-Attainment areas

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

21b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Marlow Road Jacob Waltz St-End of road

Dust Palliative

$15,958

$0

$15,958

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]: From Programmed to PendingActivity: Summer 2020

Status Pending

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 30012

0.15

22a

Length in Miles

Olberg Road Arizona Farms Rd-Brenner Pass Rd

Dust Palliative

$102,083

$0

$102,083

Activity

County Cost

Non County Cost

MAINTENANCE

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Status: From Programmed to Pending. Construction expected Summer 2018 as part of the State Implementation Plan. From Pending to Underway. First coat completed, second coat being scheduled. Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Underway

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 31119

0.93

22b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Pavement Preservation Program Countywide

Pavement Preservation

$700,000

$0

$700,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 7Project Manager Joe Ortiz E-mail [email protected]

Comments Activity: Direct funding to the Pavement Preservation Program

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

23a

Length in Miles

Plaza Drive Moon Vista St-Goldpoppy St

Dust Palliative

$6,667

$0

$6,667

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 32016

0.06

23b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Reed Road Bartlett Rd-At wash before Cactus Forest Rd

Dust Palliative

$91,667

$0

$91,667

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Lindsey Randall E-mail [email protected]

Comments Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 35029

0.74

24a

Length in Miles

Stagecoach Pass Avenue Schnepf Rd-Sierra Vista Dr

Dust Palliative

$328,333

$0

$328,333

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Location: From Schnepf Rd-Ghost Rider St to Schnepf Rd-Sierra Vista DrStatus: Combined Stagecoach Pass Avenue projects from Budget Year 2018-2019 and 2019-2020 into one Stagecoach Pass Avenue project from Schnepf Rd-Sierra Vista Dr. Development North of area will improve roadway and county will chip seal roadway once improvements are made.County Cost: from $250,000 to $328,333.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

1.8

24b

Budget Year 2019-2020 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Whirly Bird Road Amarillo Valley Rd-Ralston Rd

Dust Palliative

$300,000

$0

$300,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Dust palliative includes Whirly Bird Road from Amarillo Valley Rd to Ralston Rd and Garnet Road from Whirly Bird Rd to Century Rd

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 36008

3

25a

Length in Miles

Bunkhouse Road Veteran's Memorial Blvd-San Manuel Lodge

Reconstruction

$50,000

$0

$50,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager John Kraft E-mail [email protected]

Comments Activity: Resize culvert to driveway and reconstruct roadway for proper drainage

Status Programmed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 134

0.2

25b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Budget Year 2019-2020

Length in Miles

Cordones Road Catalina Hills Rd-Biosphere Rd

Pre-Construction

$0

$0

$0

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Design Concept Report for new roadwayCounty Cost: From $250,000 to $0.00Status: From Programmed to Cancelled. Project is now funded by the Pinal Regional Transportation Authority.

Status Cancelled

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 156

3.5

26a

Length in Miles

Hunt Highway (Old) Pioneer Path-Wildhorse Dr

Construction

$125,000

$0

$125,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Concrete ford crossingProject Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 181

0

26b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development

Construction

$1,250,000

$0

$1,250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Construction of new road on Judd Road alignmentCounty Cost: $1,250,000 will be programmed annually for 4 years (Year 1).

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 176

1.5

27a

Length in Miles

Kenworthy Road Germann Rd-Pima Rd

Reconstruction

$550,000

$0

$550,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: RehabilitationProject Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 178

1

27b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Magma Road Hunt Hwy-Gary Rd (Edwards Rd)

Construction

$3,500,000

$0

$3,500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Continuation of improvements on alignmentStatus: Project is a high priority for Transportation Advisory Committee and Staff. Staff is exploring other funding opportunities to advance the project schedule. From Programmed to Pending.Budget Year: 2020-2021County Cost: From $1,250,000.00 to $3,500,000.00

Status Pending

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 1420144

1.5

28a

Length in Miles

Mountain View Road Broadway Av Intersection

Construction

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Intersection reconstruction and culvert installationProject Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 179

0

28b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Ocotillo Road Meridian Rd-Ironwood Dr

Construction

$0

$0

$0

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Roadway wideningStatus: This portion of Ocotillo Rd has been annexed by Queen Creek, project has been closed and will be constructed by Queen Creek.

Status Cancelled

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 177

1

29a

Length in Miles

Red Rock Access Road Red Rock to Pinal Airpark Rd

Pre-Construction

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Environmental Clearnace/Right-of-Way Acquisition. Replacement project for Cordones Road. Red Rock Access Road was previously programmed on the Transportation Improvement and Maintenance Program but was cancelled in 2015. Pre-Construction funding is necessary to evaluate a secondary access to Pinal Airpark.

Status Programmed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

3

29b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Safety Program Countywide

Safety

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct funding to the Roadway Safety ProgramCounty Cost: Add $500,000 to Budget Year 2020-2021 to rebalance Safety Program funding.

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

30a

Length in Miles

Bowlin Road Hidden Valley Rd-Stonebluff Rd

Dust Palliative

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.6

30b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Logan Boulevard Diffin Rd-Reed Rd

Dust Palliative

$125,000

$0

$125,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Dust palliative is contingent on receiving right-of-way donationsProject Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 147

1

31a

Length in Miles

Louis Johnson Drive Amarillo Valley Rd-State Route 347

Dust Palliative

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 137

2

31b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Midway Road Beggs Rd-Marsh Rd

Dust Palliative

$230,000

$0

$230,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3, 4Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 130

2

32a

Length in Miles

Rhea Road Brennar Pass Rd-Donnaloy Rd

Dust Palliative

$30,000

$0

$30,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments Status: Dust palliative may be completed in conjunction with the Donnaloy Road project that is programmed in Budget Year 2019-2020.Project Manager: From Celeste Garza to Lindsey RandallE-mail: From [email protected] to [email protected]

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0.3

32b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

River Road Redington Rd-Copper Creek Rd

Dust Palliative

$200,000

$0

$200,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager John Kraft E-mail [email protected]

Comments Status: Dust palliative is contigent on receiving right-of-way donations.Length: Dust palliative will extend to existing 5 miles of paved roadway.County Cost: $200,000 will be programmed annually for 4 years (Year 1).

Status Programmed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 191

8

33a

Length in Miles

Rockcliffe Boulevard Oracle Ranch Rd (West)-Alice St

Dust Palliative

$30,000

$0

$30,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager John Kraft E-mail [email protected]

Comments Comments: Dust palliative is contigent on receiving right-of-way donations

Status Programmed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 132

0.25

33b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Stonebluff Road Farrell Rd-Bowlin Rd

Dust Palliative

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 149

1

34a

Length in Miles

Tweedy Road Storey Rd-Randolph Rd

Dust Palliative

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 3Project Manager Lindsey Randall E-mail [email protected]

Comments Comments: Carmichael Road to Randolph Road is located within the City of Coolidge

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 1400188

2

34b

Budget Year 2020-2021 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Florence-Kelvin Highway Apache Kid Rd-Zellweger Rd

Construction

$250,000

$0

$250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 1Project Manager John Kraft E-mail [email protected]

Comments Activity: L-2 Standard - 6 inch Aggregate Base over Double Chip SealProject Manager: From Angeline To to John Kraft

Status Programmed

Maintenance Area Riverside

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 253

0.75

35a

Length in Miles

Heather Drive Kashmir Rd-Lamb Rd

Construction

$125,000

$0

$125,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Roadway construction with Aggregate Base and Asphalt ConcreteLength: 900'

Status Programmed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 249

900

35b

Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Judd Road-Tourmaline Drive Gantzel Rd-Copper Basin Development

Construction

$1,250,000

$0

$1,250,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Construction on new road on Judd alignmentCounty Cost: $1,250,000 will be programmed annually for 4 years (Year 2)

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 176

1.5

36a

Length in Miles

Kenworthy Road Combs Rd-Chandler Heights Rd

Construction

$1,500,000

$0

$1,500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 2, 5Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Construction of an L-2 Standard roadway. This project in contingent on funding availability (project is partially funded at this time).

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 207

1.15

36b

Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Peart Road Interstate 8-Early Rd

Reconstruction

$2,520,000

$0

$2,520,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 3Project Manager John Kraft E-mail [email protected]

Comments Activity: Remove existing pavement and replace with L-2 Modified Standard.

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 269

2

37a

Length in Miles

Pinal Airpark Road Interstate 10-Trico Rd

Construction

$650,000

$0

$650,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Driveways, possible left turn acceleration/merge lane, and possible roadway mill and replace.

Status Programmed

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 251252

2

37b

Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Safety Program Countywide

Safety

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct funding to the Roadway Safety ProgramCounty Cost: Add $500,000 to Budget Year 2021-2022 to rebalance Safety Program funding.

Status Programmed

Maintenance Area Multiple

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

0

38a

Length in Miles

Trekell Road S. Hanna Rd-Interstate 8

Reconstruction

$540,000

$0

$540,000

Activity

County Cost

Non County Cost

IMPROVEMENT

District 3Project Manager John Kraft E-mail [email protected]

Comments Activity: Remove existing pavement and replace with L-2 Modified Standard.

Status Programmed

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 271

0.4

38b

Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Camino Viejo Road Camino Viejo W-Enrada del Oro Dr

Dust Palliative

$940,000

$0

$940,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 5Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: State Land right-of-way is needed to complete the dust palliative

Status Programmed

Maintenance Area Apache Junction

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 212

2.4

39a

Length in Miles

Encanto Lane Cactus Forest Rd-840' North

Dust Palliative

$100,000

$0

$100,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Dust Palliative will include Indigo Road, the unpaved segment of Leisure Lane, and Page Road for a total of 1 mile.

Status Programmed

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 193

1

39b

Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Orville Drive Diffin Rd-Quail Run Rd

Dust Palliative

$130,000

$0

$130,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager Lindsey Randall E-mail [email protected]

Comments

Status Programmed

Maintenance Area San Tan

Transporation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 217

1.13

40a

Length in Miles

River Road Redington Rd-Copper Creek Rd

Dust Palliative

$200,000

$0

$200,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 1Project Manager John Kraft E-mail [email protected]

Comments Status: Dust palliative is contigent on receiving right-of-way donations.Length: Dust palliative will extend to existing 5 miles of paved roadway.County Cost: $200,000 will be programmed annually for 4 years (Year 2).

Status Programmed

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 191

8

40b

Budget Year 2021-2022 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Budget Year 2021-2022

Length in Miles

Thunderbird Road Teel Rd-Mayer Rd

Reconstruction

$450,000

$0

$450,000

Activity

County Cost

Non County Cost

MAINTENANCE

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Roadway Widening

Status Programmed

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 216

1.5

41a

Length in Miles

Judd Road - Tourmaline Drive Gantzel Rd - Copper Basin Development

Construction

$1,250,000

$0

$1,250,000

Activity

County Cost

Non County Cost

Improvement

District 2Project Manager Celeste Garza E-mail [email protected]

Comments Activity: Construction on new road on Judd alignmentCounty Cost: $1,250,000 will be programmed annually for 4 years (Year 3)

Status New Project

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

41b

Budget Year 2022-2023 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Quail Run Road Dirt Rd - Orville Rd

Culvert/ARDP

$75,000

$0

$75,000

Activity

County Cost

Non County Cost

Improvement

District 1Project Manager Lindsey Randall E-mail [email protected]

Comments Activity: Construct with Orville Road project in Budget Year 2021-2022

Status New Project

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 283

42a

Length in Miles

Ralston Road at Vekol Wash Crossing

Contruction

$1,500,000

$0

$1,500,000

Activity

County Cost

Non County Cost

Improvement

District 4Project Manager John Kraft E-mail [email protected]

Comments

Status New Project

Maintenance Area Hidden Valley

Funding SourcePROJECT TYPE

Total Cost

Project Number 382

42b

Budget Year 2022-2023 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Safety Program Countywide

Safety

$500,000

$0

$500,000

Activity

County Cost

Non County Cost

Improvement

District 7Project Manager John Kraft E-mail [email protected]

Comments Activity: Direct fuunding to the Roadway Safety ProgramCounty Cost: Add $500,000 to Budget Year 2022-2023 to rebalance Safety Program funding

Status Programmed

Maintenance Area Multiple

Transprtation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

43a

Length in Miles

Skyline Drive Charbray Dr - Gantzel Rd

New Construction

$2,000,000

$0

$2,000,000

Activity

County Cost

Non County Cost

Improvement

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments

Status New Project

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 325

43b

Budget Year 2022-2023 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Fresno Road Warren Rd - Ralston Rd

Dust Palliative

$150,000

$0

$150,000

Activity

County Cost

Non County Cost

Maintenance

District 4Project Manager John Kraft E-mail [email protected]

Comments

Status New Project

Maintenance Area Hidden Valley

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 337

44a

Length in Miles

MaryLynne Lane Missile Base Rd - North .75 mi

Dust Palliative

$150,000

$0

$150,000

Activity

County Cost

Non County Cost

Maintenance

District 4Project Manager John Kraft E-mail [email protected]

Comments Activity: Dust Palliative to County right-of-way, approximately .75 miles.

Status New Project

Maintenance Area Arizona City

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 295

44b

Budget Year 2022-2023 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Mount Lemmon Road Rio Del Oro Rd - .14 East of Camp Ground

Dust Palliative

$750,000

$0

$750,000

Activity

County Cost

Non County Cost

Maintenance

District 1Project Manager John Kraft E-mail [email protected]

Comments

Status New Project

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 393

45a

Length in Miles

Ottawa Road Ottawa Rd - Bobcat Rd - Watson Wy

Dust Palliative

$150,000

$0

$150,000

Activity

County Cost

Non County Cost

Maintenance

District 3Project Manager John Kraft E-mail [email protected]

Comments

Status New Project

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 286

45b

Budget Year 2022-2023 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Park Link Drive 1 mile East of Pecan

Dust Palliative

$1,000,000

$0

$1,000,000

Activity

County Cost

Non County Cost

Maintenance

District 1Project Manager John Kraft E-mail [email protected]

Comments

Status New Project

Maintenance Area Arizona City

Funding SourcePROJECT TYPE

Total Cost

Project Number 319

46a

Length in Miles

River Road Redington Rd - Copper Creek Rd

Dust Palliative

$200,000

$0

$200,000

Activity

County Cost

Non County Cost

Maintenance

District 1Project Manager John Kraft E-mail [email protected]

Comments Status: Dust palliative is contingent on receiving right-of-way donations.Length: Dust palliative will extend to existing 5 miles of paved roadway.County Cost: $200,00 will be programmed annually for 4 years (Year 3).

Status New Project

Maintenance Area Oracle

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number

46b

Budget Year 2022-2023 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)

Length in Miles

Royce Road Ivar Rd - Hooper Trl

Dust Control

$50,000

$0

$50,000

Activity

County Cost

Non County Cost

Maintenance

District 2Project Manager Lindsey Randall E-mail [email protected]

Comments

Status New Project

Maintenance Area San Tan

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 285

47a

Length in Miles

Selma Hwy Pinal County Portions (1.0 mi)

Pavement Preservation

$425,000

$0

$425,000

Activity

County Cost

Non County Cost

Maintenance

District 1,3Project Manager John Kraft E-mail [email protected]

Comments Length: Overlay 1.0 mile of County maintained portion

Status New Project

Maintenance Area Casa Grande

Transportation Excise TaxFunding SourcePROJECT TYPE

Total Cost

Project Number 415

47b

Budget Year 2022-2023 Public Works Department 31 N. Pinal Street, Building FP.O. Box 727Florence, AZ 85132

520-866-6411 (telephone)520-866-6511 (fax)