2019 cfsei d esign ex cellenc e award winner
TRANSCRIPT
Fram106 Este ComCons
Own
Arch
Engi
Cold
Cons
Cold
Awa
Engi
FIFRA
metech Sho Clanman Dvan, Saskat
mpleted: Aprstruction Co
ner: Brad W
hitect of Re
ineer of Re
d-Formed S
sulting Eng
d-Formed S
ard Entry S
ineers
201
RST PLACEAMETECH SH
p StructuraDrive
tchewan, C
ril 2019 ost: $4.5 m
Wilhelm, Fra
ecord: C.A.
ecord for St
Steel Specia
gineers
Steel Specia
ubmitted b
19 CFSEI D
E - COMMERHOP STRUC
al Design
Canada
illion
ameTech Sy
. Reed, C.A
tructural W
alty Engine
alty Contra
by: Shane E
DESIGN EX
RCIAL – MACTURAL DES
ystems
A. Reed & A
Work: Ralph
eer: Shane
actor: Brad
Ewing, P.E.,
1
XCELLENC
ARTIN/MARSIGN – EST
Associates, L
h Rempel, P
Ewing, P.E
Wilhelm, W
, DBIA, LEE
CE AWARD
RTIN CONSUEVAN, SASK
LTD.
P.E., Martin
E., DBIA, LE
Wilhelm Co
ED AP, Ma
D WINNER
ULTING ENGKATCHEWA
n/Martin Co
EED AP, M
onstruction
artin/Martin
R
GINEERS – AN, CANADA
onsulting E
Martin/Mart
Services, In
n Consultin
A
Engineers
tin
nc.
ng
Pro
Whformbuiltheypre-conBrabuilstorbuiladmcompro(curmat
At tCFSfabrequrequpresachpou
Owtradto thalsoweeinno
oject Ba
hen Frametecmed steel (Cld a new offy chose to in-engineered
nstruction is d Wilhelm clding. The nry administrlding and a
ministrative mmon space
vides room rrent and futterials storag
the outset ofS and minimricate as mu
uipment as puirements, asented chall
hieved. The funds of CFS–
wner Brad Wditional PEMhe four-weeo estimates teks was reduovative CFS
ackgroun
ch Systems, CFS) fabricato
ice, fabricatinnovate rath metal buildtheir busine
chose to builnew structurerative space 25,400 SF shpart of the b for the Fram for multipleture), moduge.
f the project,mize other m
ch of the propossible. Theand limitatioenges in meacility is bui–either rolled
ilhelm estimMB would haek lead time hat the PEMuced to five
S approach.
nd
a Canada-baor and contrion, and warer than build
ding (PEMB)ess focus, Frald a complete has a 20-foat the west e
hop at the eabuilding holdmetech team,e CFS roll-forular assembly
, the goal waaterials. Framoject with the height, cleaons of the roleeting this goilt entirely frd by Framet
mates that leaave been 16 wfor the all-C
MB installatioweeks with
ased cold-actor, deciderehouse facild a tradition. As CFS
ametech owntely CFS oot-tall, singlend of the
ast end. The ds offices an, and the shorm machiney, and
as to maximimetech wan
heir own rollar span ll form equipoal, but it warom 231,000 tech or purch
ad time for aweeks, comp
CFS buildingon time of 10 Martin/Ma
2
ed to lity,
nal
ner
le-
nd op
es
ize nted to l form
pment as hased.
a pared . He 0 rtin’s
Design C
The use andbays, 20-foooverhead doselection of works excludesign the f
Working cofabrication aassemblies uachieve the
The roof fraspaced at aptruss shape form machinshapes. Truthe lips cut tgusset platetrusses, chofabricator uin our desigerection.
We utilized line and two
We used inttruss sectionelements anmultiple “trchords comperection of g
The exteriorpanels. Therand other wopenings.
The roof decbraced baysbays are plawide produbuilding andirection is assemblies.
3
Challeng
d demands oot height to toors and pro a PEMB. Be
usively with facility using
llaborativelyand erectionusing standa project goal
aming consispproximately easily fabricnes. Truss chss web memto receive th
es at truss pards are reinftilizes 80 ksi
gn. Trusses a
similar truso plies at the
terior and exns to providend stability druss” assembpression megirder trusse
r wall consisre are nume
wall panels th
ck diaphrags on the nortaced such thauction aisles cd expansionresisted by s
ges and S
of this facilitytruss bearingoduction bayecause the ow CFS, Marting primarily C
y with Framn, Martin/Mard rolled C ls.
sts of three-fy three feet. cated withouhord and we
mbers are swhe webs. Truanel points wforced on eai yield stressare dapped t
ss sections (we exterior) fo
xterior colume lateral stiff
during erectiblies were stembers. We aes.
sts of built-uerous 18-foothat can be re
gm spans 175th and southat the buildican be main
n bays. Laterstrap braced
Solution
y—60-foot cg with flexibys—typicallywner/develon/Martin waCFS.
metech to ensMartin develo
shapes and
foot-deep, 60 The trussesut splices usebs are stand
waged to fit inuss connectiowhere requirach side withs coils, whichto create a be
with four plior the 25-foo
mn assemblifness and brion. Our dettitched togetalso created
up column ast-wide overhemoved or m
5 feet in the lh ends. The sing can be ex
ntained betwral loading ind bays that sp
ns
clear spans, 2bility for futuy leads to thoper/contraas challenge
sure feasibilioped truss an plate mater
0-foot-span ts consist of aing the cliendard 550S16nto chords thons are screwred. Outsideh “sister” stuh we took adearing seat f
ies at the cenot-span girde
ies built usinracing of comtails specifiedther and util a bearing se
ssemblies anhead door opmodified for
long directiosouth end strxpanded and
ween the orign the north-span across t
25-foot ure he actor ed to
ity of nd column rial to
trusses a standard nt’s roll 62-43 hat have wed, using e of the uds. The dvantage of for safe
nter column er trusses.
ng vertical mpression d that lized the eat for easy
nd wall penings future
on to strap rap braced d 30-feet-
ginal south he column
TheformshaMarmatconnee DueMarWe elem
Theresuin th(colstruin 2expfor C
e new fabricam equipmenpes that courtin/Martin terial, took a
ntinuous plateded.
e to the custortin/Martin created anaments using
e engineeringulted in roofhe shop in olumns, wallsucture was c24 days. Frampandable fabCFS constru
ation shop wnt, but the cuuld be rolled maximized
advantage ofte material fr
om assembl was unable lysis models custom des
g effort, caref, column, anonly 27 dayss, trusses) womplete (inc
metech has crication and
uction.
will allow Frurrent limit o presented a fastener capf built-up asrom coil stoc
ies and uniq to utilize tys in RAM Elign tools and
eful planningnd walls bein. The erectioas completecluding clipscreated a fund office space
ametech to pof 350S162-43 formidable
pacity in higsemblies, anck to reinforc
que nature opical CFS deements and d CFS design
g, and pre-fang fabricatedon of primaryed in five days, connectionnctional, verse and a very
4
purchase new3 and 550S1 design chall
gher strengthnd utilized ce the steel w
f the design,esign softwa designed n software.
abrication d and assemy elements ys, and the ens, and bracsatile, and visible show
w roll 62-43 lenge. h
where
, are.
mbled
entire ing)
wcase