Fram 106 Este Com Cons Own Arch Engi Cold Cons Cold Awa Engi FI FRA metech Sho Clanman D van, Saskat mpleted: Apr struction Co ner: Brad W hitect of Re ineer of Re d-Formed S sulting Eng d-Formed S ard Entry S ineers 201 RST PLACE AMETECH SH p Structura Drive tchewan, C ril 2019 ost: $4.5 m Wilhelm, Fra ecord: C.A. ecord for St Steel Specia gineers Steel Specia ubmitted b 19 CFSEI D E - COMMER HOP STRUC al Design Canada illion ameTech Sy . Reed, C.A tructural W alty Engine alty Contra by: Shane E DESIGN EX RCIAL – MA CTURAL DES ystems A. Reed & A Work: Ralph eer: Shane actor: Brad Ewing, P.E., 1 XCELLENC ARTIN/MAR SIGN – EST Associates, L h Rempel, P Ewing, P.E Wilhelm, W , DBIA, LEE CE AWARD RTIN CONSU EVAN, SASK LTD. P.E., Martin E., DBIA, LE Wilhelm Co ED AP, Ma D WINNER ULTING ENG KATCHEWA n/Martin Co EED AP, M onstruction artin/Martin R GINEERS – AN, CANADA onsulting E Martin/Mart Services, In n Consultin A Engineers tin nc. ng

Upload: others

Post on 07-May-2022

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2019 CFSEI D ESIGN EX CELLENC E AWARD WINNER

 

Fram106 Este ComCons 

Own

Arch

Engi

Cold

Cons

Cold

Awa

Engi

  

FIFRA

metech Sho Clanman Dvan, Saskat

mpleted: Aprstruction Co

ner: Brad W

hitect of Re

ineer of Re

d-Formed S

sulting Eng

d-Formed S

ard Entry S

ineers

201

RST PLACEAMETECH SH

p StructuraDrive

tchewan, C

ril 2019 ost: $4.5 m

Wilhelm, Fra

ecord: C.A.

ecord for St

Steel Specia

gineers

Steel Specia

ubmitted b

19 CFSEI D

E - COMMERHOP STRUC

al Design

Canada

illion

ameTech Sy

. Reed, C.A

tructural W

alty Engine

alty Contra

by: Shane E

 

DESIGN EX

RCIAL – MACTURAL DES

ystems

A. Reed & A

Work: Ralph

eer: Shane

actor: Brad

Ewing, P.E.,

XCELLENC

ARTIN/MARSIGN – EST

Associates, L

h Rempel, P

Ewing, P.E

Wilhelm, W

, DBIA, LEE

CE AWARD

RTIN CONSUEVAN, SASK

LTD.

P.E., Martin

E., DBIA, LE

Wilhelm Co

ED AP, Ma

D WINNER

ULTING ENGKATCHEWA

n/Martin Co

EED AP, M

onstruction

artin/Martin

R

GINEERS – AN, CANADA

onsulting E

Martin/Mart

Services, In

n Consultin

A

Engineers

tin

nc.

ng

Page 2: 2019 CFSEI D ESIGN EX CELLENC E AWARD WINNER

 

Pro

Whformbuiltheypre-conBrabuilstorbuiladmcompro(curmat

At tCFSfabrequrequpresachpou

Owtradto thalsoweeinno

oject Ba

hen Frametecmed steel (Cld a new offy chose to in-engineered

nstruction is d Wilhelm clding. The nry administrlding and a

ministrative mmon space

vides room rrent and futterials storag

the outset ofS and minimricate as mu

uipment as puirements, asented chall

hieved. The funds of CFS–

wner Brad Wditional PEMhe four-weeo estimates teks was reduovative CFS

ackgroun

ch Systems, CFS) fabricato

ice, fabricatinnovate rath metal buildtheir busine

chose to builnew structurerative space 25,400 SF shpart of the b for the Fram for multipleture), moduge.

f the project,mize other m

ch of the propossible. Theand limitatioenges in meacility is bui–either rolled

ilhelm estimMB would haek lead time hat the PEMuced to five

S approach.

nd

a Canada-baor and contrion, and warer than build

ding (PEMB)ess focus, Frald a complete has a 20-foat the west e

hop at the eabuilding holdmetech team,e CFS roll-forular assembly

, the goal waaterials. Framoject with the height, cleaons of the roleeting this goilt entirely frd by Framet

mates that leaave been 16 wfor the all-C

MB installatioweeks with

ased cold-actor, deciderehouse facild a tradition. As CFS

ametech owntely CFS oot-tall, singlend of the

ast end. The ds offices an, and the shorm machiney, and

as to maximimetech wan

heir own rollar span ll form equipoal, but it warom 231,000 tech or purch

ad time for aweeks, comp

CFS buildingon time of 10 Martin/Ma

ed to lity,

nal

ner

le-

nd op

es

ize nted to l form

pment as hased.

a pared . He 0 rtin’s

Page 3: 2019 CFSEI D ESIGN EX CELLENC E AWARD WINNER

 

Design C

The use andbays, 20-foooverhead doselection of works excludesign the f

Working cofabrication aassemblies uachieve the

The roof fraspaced at aptruss shape form machinshapes. Truthe lips cut tgusset platetrusses, chofabricator uin our desigerection.

We utilized line and two

We used inttruss sectionelements anmultiple “trchords comperection of g

The exteriorpanels. Therand other wopenings.

The roof decbraced baysbays are plawide produbuilding andirection is assemblies.

Challeng

d demands oot height to toors and pro a PEMB. Be

usively with facility using

llaborativelyand erectionusing standa project goal

aming consispproximately easily fabricnes. Truss chss web memto receive th

es at truss pards are reinftilizes 80 ksi

gn. Trusses a

similar truso plies at the

terior and exns to providend stability druss” assembpression megirder trusse

r wall consisre are nume

wall panels th

ck diaphrags on the nortaced such thauction aisles cd expansionresisted by s

ges and S

of this facilitytruss bearingoduction bayecause the ow CFS, Marting primarily C

y with Framn, Martin/Mard rolled C ls.

sts of three-fy three feet. cated withouhord and we

mbers are swhe webs. Truanel points wforced on eai yield stressare dapped t

ss sections (we exterior) fo

xterior colume lateral stiff

during erectiblies were stembers. We aes.

sts of built-uerous 18-foothat can be re

gm spans 175th and southat the buildican be main

n bays. Laterstrap braced

Solution

y—60-foot cg with flexibys—typicallywner/develon/Martin waCFS.

metech to ensMartin develo

shapes and

foot-deep, 60 The trussesut splices usebs are stand

waged to fit inuss connectiowhere requirach side withs coils, whichto create a be

with four plior the 25-foo

mn assemblifness and brion. Our dettitched togetalso created

up column ast-wide overhemoved or m

5 feet in the lh ends. The sing can be ex

ntained betwral loading ind bays that sp

ns

clear spans, 2bility for futuy leads to thoper/contraas challenge

sure feasibilioped truss an plate mater

0-foot-span ts consist of aing the cliendard 550S16nto chords thons are screwred. Outsideh “sister” stuh we took adearing seat f

ies at the cenot-span girde

ies built usinracing of comtails specifiedther and util a bearing se

ssemblies anhead door opmodified for

long directiosouth end strxpanded and

ween the orign the north-span across t

25-foot ure he actor ed to

ity of nd column rial to

trusses a standard nt’s roll 62-43 hat have wed, using e of the uds. The dvantage of for safe

nter column er trusses.

ng vertical mpression d that lized the eat for easy

nd wall penings future

on to strap rap braced d 30-feet-

ginal south he column

Page 4: 2019 CFSEI D ESIGN EX CELLENC E AWARD WINNER

 

TheformshaMarmatconnee DueMarWe elem

Theresuin th(colstruin 2expfor C

e new fabricam equipmenpes that courtin/Martin terial, took a

ntinuous plateded.

e to the custortin/Martin created anaments using

e engineeringulted in roofhe shop in olumns, wallsucture was c24 days. Frampandable fabCFS constru

ation shop wnt, but the cuuld be rolled maximized

advantage ofte material fr

om assembl was unable lysis models custom des

g effort, caref, column, anonly 27 dayss, trusses) womplete (inc

metech has crication and

uction.

will allow Frurrent limit o presented a fastener capf built-up asrom coil stoc

ies and uniq to utilize tys in RAM Elign tools and

eful planningnd walls bein. The erectioas completecluding clipscreated a fund office space

ametech to pof 350S162-43 formidable

pacity in higsemblies, anck to reinforc

que nature opical CFS deements and d CFS design

g, and pre-fang fabricatedon of primaryed in five days, connectionnctional, verse and a very

purchase new3 and 550S1 design chall

gher strengthnd utilized ce the steel w

f the design,esign softwa designed n software.

abrication d and assemy elements ys, and the ens, and bracsatile, and visible show

w roll 62-43 lenge. h

where

, are.

mbled

entire ing)

wcase