2018/19-2023/24 highway bridge program · bridge no. 24c0168, new hope rd over grizzley slough, 0.5...

5
2018/19-2023/24 Highway Bridge Program See the appropriate FTIP/FSTIP for current funding commitments. 5/1/2020, 1 :09 PM Notes: 1) MPOs/RTPA's must not use this listing for programming the RTIP. 2) This is NOT an approved listing for use in developing the FTIP/FSTIP. See the HBP web site for the official proposed FTIP/FSTIP program listings: Note id: 18

Upload: others

Post on 10-Jun-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2018/19-2023/24 Highway Bridge Program · bridge no. 24c0168, new hope rd over grizzley slough, 0.5 ml n san joaquin co line. Replace existing structurally deficient 2-lane bridge

2018/19-2023/24 Highway Bridge Program

See the appropriate FTIP/FSTIP for current funding commitments.

5/1/2020, 1 :09 PM

Notes: 1) MPOs/RTPA's must not use this listing for programming the RTIP.

2) This is NOT an approved listing for use in developing the FTIP/FSTIP. See the HBP web site for the official proposed FTIP/FSTIP program listings:

Note id: 18

Page 2: 2018/19-2023/24 Highway Bridge Program · bridge no. 24c0168, new hope rd over grizzley slough, 0.5 ml n san joaquin co line. Replace existing structurally deficient 2-lane bridge

1

2018/19-2023/24 Highway Bridge Program District: 03 County: Sacramento THIS IS NOT THE FTIP!!! This is for information only!!! Funds may be obligated from FFY 18/19, 19/20,

20/21 , and 21/22.Sponsor Fed Aid Sys Project#

Sacramento County ON 3500 15924(169} BRIDGE NO. 24C0004, DILLARD RD, OVER COSUMNES RIVER, 0.2 Ml S OF S.R. 16. Install scour countermeasures on scour critical bridge. Rank 1D

Ready to Advertise HOLD ON CON.

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total Fed $ Programmed: 189,233 942,845 1,132,077

Fed$ Obligated as of 5/1/2020: 189,233 189,233I I Sacramento County ON 3801 15924(178) BRIDGE NO. 24C0013 RIO LINDA BOULEVARD OVER NORTH CHANNEL OF DRY CREEK, 0.8 MILES SOUTH OF ELKHORN

Rank O BOULEVARD. Replace functionally obsolete 2-lane bridge with a new 2-lane bridge,

Construction Authorized

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total Fed $ Programmed: 339,396 1,196,820 1,536,216

Fed$ Obligated as of 5/1/2020: 1,536,216 1,536,216

Sacramento County OFF 15924(209) i BRIDGE NO. 24C0042, TYLER IS BR RD, OVER GEORGIANA SLOUGH, 1.5 Ml E ISLETON. Replace the existing 2 lane bridge with a new 24214 Rank4 lane bridge. 5/29/2014 1:33:43 PM. 10/21/2014: Toll Credits programmed for PE &CON.

1/31/2020 Vlad Popko: E76 received and under eligibility review in District.

Not ready to ad within 6 months HOLD ON PE. HOLD ON CON.

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total Fed $ Programmed: 150,000 13,468,000 13,618,000

Fed $ Obligated as of 5/1/2020:

Sacramento County ON i BRIDGE NO. 24C0053, TWIN CITIES ROAD , OVER SNODGRASS SLOUGH. Replace the existing 2 lane structurally deficient structure with a3499 15924(164) new 2 lane structure.Rank 7

Not ready to ad within 6 months HOLD ON CON.

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total Fed $ Programmed: 2,911,752 16,656,920 19,568,671

Fed$ Obligated as of 5/1/2020 2,911,751 2,91 1,751

Sacramento County OFF i BRIDGE NO. 24C0056, MICHIGAN BAR RD, OVER COSUMNES RIVER, 1.2 Ml N OF S.R. 16. Replace the existing one lane structurally3740 15924(175} Rank 4 deficient bridge with a new one lane bridge. 10/3/2012: Toll Credits programmed for PE, R/W & CON.

Not ready to ad within 6 months HOLD ON RW. HOLD ON CON.

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total Fed $ Programmed: 2,120,000 360,000 11,303,000 13,783,000

Fed$ Obligated as of 5/1/2020: 2,120,000 2,120,000

Caltrans, Division of Local Assistance 5/1/2020, 1:09 PM DetProjline2 FL4 SmlTxt Page 2

Page 3: 2018/19-2023/24 Highway Bridge Program · bridge no. 24c0168, new hope rd over grizzley slough, 0.5 ml n san joaquin co line. Replace existing structurally deficient 2-lane bridge

District: 03 County: Sacramento Sponsor Fed Aid Sys Project#

Sacramento County ON 3430 15924(155} Rank O

Construction Authorized

Prior

Fed $ Programmed: 1,629,837 Fed$ Obligated as of 5/112020: 1,629,837

Sacramento County ON 3807 15924(190) Rank 1D

Ready to Advertise HOLD ON CON.

Prior

Fed $ Programmed: 919,428 Fed$ Obligated as of 5/112020 919,428

Sacramento County ON 3284 15924(142) Rank O

Construction Authorized

Prior

Fed $ Programmed: 1,078,406 Fed$ Obligated as of 5/112020: 1,078,404

Sacramento County ON 3809 15924(182) Rank 1B

Ready to Advertise HOLD ON CON.

Prior

Fed$ Programmed 1,467,717

Fed$ Obligated as of 5/112020 1,467,715

Sacramento County ON 3808 15924(181) Rank O

Construction Authorized

Prior

Fed $ Programmed: 669,198 Fed$ Obligated as of 5/112020: 3,554,516

2018/19-2023/24 Highway Bridge Program THIS IS NOT THE FTIP!!! This is for information only!!! Funds may be obligated from FFY 18/19, 19/20, 20/21 , and 21 /22.

BRIDGE NO. 24C0155, FRANKLIN BLVD, OVER MOKELUMNE RIVER OVERFLOW, 1.8 Ml N SAN JQUIN CO LIN. Replace the existing structurally deficient 2 lane bridge with a new 2 lane bridge.

18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total

8,742,338 10,372,175

I I 1,629,837

BRIDGE NO. 24C0168, NEW HOPE RD OVER GRIZZLEY SLOUGH, 0.5 Ml N SAN JOAQUIN CO LINE. Replace existing structurally deficient 2-lane bridge with a new 2-lane bridge. On system (RSTP) toll credits for CON, these other Federal funds on project must be programmed in FTIP.

18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total

4,112,088 5,031,517 919,428

BRIDGE NO. 24C0171, ELK GROVE-FLORIN R, OVER ELDER CREEK, 0.1 Ml N GERBER RD. Replace functionally obsolete 2 lane bndge and widen to 6 lanes. Only 5 lanes are eligible. The 5th lane is required for staged construction and 6th lane is non participating. Project must appear in 20 year RTP.

18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total

5,827,045 6,905,451

1,078,404

BRIDGE NO. 24C0306, AL TA MESA ROAD OVER LAGUNA CREEK, 0.4 Ml N OF SR 104. Replace existing structurally deficient 2-lane bridge with a new 2-lane bridge.

18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total

7,178,101 8,645,818 1,467,715 I I

BRIDGE NO. 24C0328, WINDING WAY OVER CHICAGO CREEK, 0.1 Ml W CHICAGO AVE. Replace ex1st1ng functionally obsolete 2- lane bridge with a new 2- lane bridge. On system (RSTP) toll credits for CON, these other Federal funds on project must be programmed in FTIP.

18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total

2,885,318 3,554,517 3,554,516

Caltrans, Division of Local Assistance 5/1/2020, 1 :09 PM DetProjline2 FL4 SmlTxt Page 3

Page 4: 2018/19-2023/24 Highway Bridge Program · bridge no. 24c0168, new hope rd over grizzley slough, 0.5 ml n san joaquin co line. Replace existing structurally deficient 2-lane bridge

2018/19-2023/24 Highway Bridge Program District: 03 County: Sacramento THIS IS NOT THE FTIP!!! This is for information only!!! Funds may be obligated from FFY 18/19, 19/20,

20/21 , and 21/22. Sponsor Fed Aid Sys Project#

Sacramento County OFF 4211 15924(210) BRIDGE NO. 24C0332, KIEFER BLVD OVER DEER CREEK, 0.7 Ml NW STATE RTE 16. Replace the existing functionally obsolete one lane Rank 7 structure with a new two lane bridge (not capacity increasing). Toll Credits programmed for PE & CON.

1214/2020 DLA-Admin: E76 process complete.

Not ready to ad within 6 months HOLD ON CON.

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total Fed $ Programmed: 1,533,000 1,820,000287,0001

Fed$ Obligated as of 5/1/2020: 287,000 287,000I Sacramento County ON 1828 15924(119) BRIDGE NO. 24C0361, ELVERTA RD, OVER NORTH CHANNEL DRY CREEK, BTWN 28TH ST GBSN RN PK R Replace 2 lane bndge with 6

Rank 5 lane bridge.

13/6/2020 Vlad Popko: E76 received and under eligibility review in District.

Not ready to ad within 6 months HOLD ON PE. HOLD ON RW. HOLD ON CON.

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total Fed $ Programmed: 457,025 958,889 8,151,400 9,567,314

Fed$ Obligated as of 5/1/2020: 457,025 457,025

Sacramento County ON 4608 BRIDGE NO. PM00184, Bridge Preventive Maintenance Program (BPMP) various bridges in Sacramento County. See Caltrans Local Assistance Rank 2A HBP website for backup list of projects.

Not ready to ad within 6 months HOLD ON PE. HOLD ON CON.

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total Fed $ Programmed: 585,183 1,754,957 2,340,140

Fed$ Obligated as of 5/1/2020:

Caltrans, Division of Local Assistance 5/1/2020, 1 :09 PM DetProjline2 FL4 SmlTxt Page4

Page 5: 2018/19-2023/24 Highway Bridge Program · bridge no. 24c0168, new hope rd over grizzley slough, 0.5 ml n san joaquin co line. Replace existing structurally deficient 2-lane bridge

2018/19-2023/24 Highway Bridge Program District: 03 County: Sacramento THIS IS NOT THE FTIP!!! This is for information only!!! Funds may be obligated from FFY 18/19, 19/20,

20/21 , and 21 /22. Sponsor Fed Aid Sys Project#

Report Total:

Number of Projects: 13

Prior 18/19 19/20 20/21 21/22 22/23 23/24 Beyond Total

Fed$ 11,781,992 4,082,139 1,395,889 25,859,571 945,183 12,245,845 41,564,276 97,874,895

Local Match 1,458,719 373,824 2,120,729 1,462,764 1,131,917 122,156 2,385,454 9,055,562 LSSRP Bond

Local AC 1,196,820 -1 ,196,820 14,569,382 -14,569,382 8,151,400 -8, 151,400

Total for all Phases 14,437,532 3,259,142 18,086,000 12,752,953 10,228,500 12,368,000 35,798,330 106,930,457

Fed$ Obligated as of 5/1/2020: 16,151,125 287,000 16,151 ,125

Project Priority/Rank Descriptions:

Rank 0: Construction Obligated. These projects cannot be pushed out of the 4 year element of the FTIP. Rank 1A: For the general support of the federally mandated bridge inspection program and scour plan of action development. Rank 1 B: Projects ready to advertise and have major structural deficiencies. Rank 1C: High cost cash managed projects with AC conversion. (Projects may or may not be ready to advertise.) Rank 1 D: Projects ready to advertise and are Prop 1 B seismic funded projects or scour countermeasure projects or

rehab/replacement of scour critical bridges. (All are ready to advertise.) Rank 1 E: All other projects ready to advertise. Rank 2A: Bridge Preventive Maintenance Plans Rank 28: Individually listed projects in the FTIP with construction funded in the 4 year element of the FTIP. Rank 3A: Projects nearly ready to advertise. Bridges have major structural deficiencies. Rank 38: Projects nearly ready to advertise. Prop 1 B seismic funded projects or scour countermeasure projects or

rehab/replacement of scour critical bridges. Rank 3C: Projects nearly ready to advertise. All other classes of projects. Rank 4: Not ready to advertise. Bridges have major structural deficiences. Rank 5: Not ready to advertise. Prop 1 B seismic funded projects or scour countermeasure projects or rehab/replacement of

scour critical bridges. Rank 6: Not ready to advertise. STIP match and voluntary seismic projects. Rank 7: Not ready to advertise. General bridge rehabilitation/replacement.

Caltrans, Division of Local Assistance 5/1/2020, 1:09 PM DetProjline2 FL4 SmlTxt Page 5