2018-11-02 1 Ministry of Transportation and Infrastructure (MOTI) Peace District By Hali Davenport Acting District Manager November 8, 2018 2018 Project Delivery Update D-1 November 8, 2018

Upload: others

Post on 20-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

1

Ministry of Transportation and Infrastructure (MOTI)

Peace District

By Hali DavenportActing District Manager

November 8, 2018

2018 Project Delivery Update

D-1

November 8, 2018

Page 2: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

2

RESURFACING COMPLETED

• North Peace Asphalt Surfacing

• Jackfish Lake Road Sealcoat• West Fraser Road Paving• H97 Dawson Creek to

Kiskatinaw Bridge Mill & Fill • H29 Bullmoose to Sukunka

HIPR

ADDITIONAL RESURFACING

• Farrell Creek Road

• Patch paving on Braden, Sweetwater, BessboroughRoads

D-1

November 8, 2018

Page 3: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

3

BRIDGE WORK COMPLETED

• Large Culvert Replacement• Roseland Culvert

Replacement• Scour Remediation –

McLean & St John 3• Brassey Creek Bridge –

Substructure Rehabilitation

BRIDGE PROJECTS IN PROGRESS

`

• La Guarde Culvert Replacement – 2019 early tender

• Scour Remediation Design & Survey – Benson & Gunter Remediation in 2019

• Taylor Bridge Business Case

D-1

November 8, 2018

Page 4: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

4

ENGINEERING/ CONSTRUCTION

• H97/Swanson Lumber Road Signalization (design only)• Baldonnel Area Drainage Review and Road Improvements• Farrell Creek Geotechnical Assessment• South Taylor Hill Phase 2 • Peace District Pullouts

COMMUNITY SAFETYENHANCEMENTS

COMPLETED

• Murray River Boat Launch Access Improvements• 911 Signage• North Taylor Hill Reflectivity • H97 Museum Cross Walk

D-1

November 8, 2018

Page 5: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

5

COMMUNITY SAFETY ENHANCEMENTS

• Dawson Creek Pedestrian Count Down Timers - in progress

• Chetwynd Pedestrian Count Down Timers – in progress

• Dawson Creek Bus Shelters H97/11th and H97/13th – on hold

• Canyon Creek Crosswalk -Ongoing discussions

SIDE ROAD IMPROVEMENTS

• Gravelling• Dust Control• Side Road Rehabilitation –

culvert installations, ditching, base repairs

• Slides & Washouts – 2017 freshet

• Triad Road Improvements

D-1

November 8, 2018

Page 6: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

6

SLIDES AND WASHOUTS

• 2018 freshet works and July significant rain event

• 85 sites identified throughout the Peace

• 30 delivered under Provincial funding

• Remainder delivered under MC’s quantified plan or District program

OLD FORT SLIDE

D-1

November 8, 2018

Page 7: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

7

OLD FORT SLIDE

South Peace 2016 Flood Recovery Program

2018 Flood Construction Projects

D-1

November 8, 2018

Page 8: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

8

Chetwynd Area

Zonnebeke

Tippy Corner Bridge• Replacement of the existing

2.7m culvert with a 17.5m bridge and new highway approaches

• Construction start: Spring 2018

• Mainline bridge and road works completed in October 2018

• Completion: September 2019

D-1

November 8, 2018

Page 9: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

9

Crassier Creek Bridge

• Replacement of the existing 18.2m bridge with a 36m bridge as well as 1.1km of new highway, to improve the highway geometry and improve access to the Willow Creek Mine road

• Construction completed October 2018

Willow Flats Bridge• Replacement of the

existing culvert with a 13.5m bridge and new highway approaches

• Construction substantially completed October 2018

• Minor works in 2019.

D-1

November 8, 2018

Page 10: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

10

Bowlder Creek Bridge • Located 25km west of

Chetwynd

• Replacement of the existing culvert with a 30.5m bridge and new highway approaches

• Construction: Summer 2018 – Fall 2019

Commotion Creek Bridge

• Replacement of the existing culvert with a 38m bridge and new highway approaches

• Construction substantially complete November 2018

• Minor works 2019

D-1

November 8, 2018

Page 11: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

11

Stone Creek Bridge

• Replacement of existing culvert with a 19m bridge and new highway approaches

• Mainline bridge and road works completed in October 2018

• Completion August 2019

Zonnebeke Multiplate

• H29S: Replacement of the existing culvert with a 5 meter multiplate

• Construction 2017-Summer 2019

• Project delayed

D-1

November 8, 2018

Page 12: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

12

Dawson Creek Area

Rolla Road Bridge

• Replacement of existing culverts with a 50m bridge and new highway approaches

• Construction: 2018-2020

D-1

November 8, 2018

Page 13: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

13

8th Street Bridge

• Replacement of existing culverts with a 5 lane, 48m bridge

• Construction: Fall 2018 to 2020

Walper Bridge

• Located 44 km south of Dawson Creek

• Replacement of existing culverts with a 25m bridge

• Completion Nov 2018

D-1

November 8, 2018

Page 14: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

14

2019 Flood Construction Projects

• Fur Thief Bridge, located 41 km west of Chetwynd

• Parnell Road Bridge, located 15 km north of Dawson creek on Parnell Road (213 Rd)

• Gladys Bridge, located 17 km south of Dawson Creek

• Gibbons Multi-plate, located 29 km west of Dawson Creek

For Reference

• DriveBC

• The Program Website • https://www2.gov.bc.ca/gov/content/transportation/transportation-

infrastructure/projects/highway-97-north-bridges

• TranBC Flickr site

D-1

November 8, 2018

Page 15: 2018 Project Delivery Updateprrd.bc.ca/board/agendas/2018/2018-33-983818624/pages/documen… · Microsoft PowerPoint - Program Presentation1.pptx [Read-Only] Author: AD0018 Created

2018-11-02

15

Conclusion

D-1

November 8, 2018