Solicitation R2113514P1 2018 Port Everglades Master/Vision Plan Update Consultant Selection August 31, 2017

Upload: others

Post on 14-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Solicitation R2113514P1

2018 Port Everglades Master/Vision Plan Update Consultant Selection

August 31, 2017

Page 2: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Strategic Master Plan

20172020202520302035

Visionary

Practical

2038

Page 3: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

TE

AM

BERMELLO, AJAMIL & PARTNERS (B&A) – PRIME

ADEPT PUBLIC RELATIONS (CBE)CORDOVA RODRIGUEZ & ASSOCIATES, INC. (CBE)HAMMOND & ASSOCIATES, INC. (CBE)S&F ENGINEERS, INC. (CBE/DBE/MBE)MARTIN ASSOCIATES

HANDEX CONSULTING & REMEDIATION

HATCH

HDR

Page 4: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

EX

PE

RI

EN

CE

Page 5: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

EX

PE

RI

EN

CE

• Port Miami Strategic Plans (2008, 2012, 2017)

• Port Canaveral Cruise Master Plan 2014

• Port Canaveral Strategic Master Plan (2017)

• Port Tampa Bay Channelside Master Plan (2015)

• JAXPort Master Plan (2013)

• Port Everglades M/VP – Cruise & Cargo Market Study (2006, 2009)

• Singapore Marina Bay Master Plan (2017)

• Port of Seattle Pier 66 Multi-Use Cruise Facility & Master Plan (2017)

• Port of San Diego - General Planning and Financial Feasibility (2004-present)

• NY/NJ PA Master Plan (ongoing)

Page 6: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

• All Florida Ports

• Deepening the Port Miami shipping channel to 50 feet

• Maintaining the Houston ship channel

• Channel deepening and widening for an LNG facility at the Port of Freeport

• Deepening the Port of Galveston shipping channel

• Deepening the St. John’s River in Jacksonville

• Benefit-cost analysis of maintaining the Port of Baltimore’s main shipping channel at

50 feet

• Maintaining the Port of Oakland shipping channel

• Economic impacts for the Port of Boston

EX

PE

RI

EN

CE

Page 7: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

EX

PE

RI

EN

CE

• Port Miami Intermodal Rail Project - $22M (TIGER)

• Atlantic Gateway: Partnering to Unlock the I-95 Corridor - $165M (FASTLANE)

• I-10 Phoenix to Tucson Corridor Improvements - $54M (FASTLANE)

• Port of Savannah International Multi-Modal Connector - $44M (FASTLANE)

• Massport/Conley Terminal Modernization - $42M (FASTLANE)

• Fort Lauderdale Wave Streetcar Projects - $18M (TIGER)

• Port of New Orleans rail yard Improvements - $16.7M (TIGER)

• Dames Point Intermodal Container Facility - $10M (TIGER)

• Portland Marine Terminal Freight and Jobs Access Project - $7.3M (TIGER)

Page 8: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Port Tampa Bay Port Canaveral Port Miami

Port of San Diego Port of Seattle New York Terminals

Virrgin Islands PA Bar Harbor Ferry Terminal

Singapore Dublin Port Company Tarragona, Spain

Gibraltar India (Cruise Strategy) Cape Verde Islands

EX

PE

RI

EN

CE

Page 9: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

B&A is a pioneer in the use of drones

for port master planning purposes and

will integrate drones into the PEV M/VP

process to assess and map critical

assets within the Port and capture

unique video footage for marketing

purposes

HDR and HATCH have 30 years of combined LNG

experience in 150 countries

EX

PE

RI

EN

CE

Page 10: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of
Page 11: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

• The largest source of revenue - no longer growing reliably year-over-year

• Port Miami and Port Canaveral both putting serious pressure on PEV by adding new terminal capacity

for vessels up to and including Oasis-class

• LNG bunkering at competing ports being developed (early stages)

• PEV cruise infrastructure must keep pace

KE

Y

IS

SU

ES

Page 12: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Florida homeport passengers (PEV+MIA+PC+PTB)

6,000,000

7,000,000

8,000,000

9,000,000

10,000,000

11,000,000

12,000,000

13,000,000

14,000,000

2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2103 2014 2015 2016

5.7% GROWTH RATE1.5% GROWTH RATE

41% GROWTH

Florida Ports Remain Largest Despite Global

Industry Growth

Port Everglades, Port Miami and Port Canaveral remain the three largest cruise ports in the

world, despite the industry’s global expansion to Europe and Asia, according to the…

2017-2018 Cruise Industry News Annual Report.

Page 13: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Ship order progression

0

10,000

20,000

30,000

40,000

50,000

60,000

0

5

10

15

20

25

Nu

mb

er

of

ship

s

ships 2014 ships 2015 ships 2016 ships 2017 paxs 2014 paxs 2015 paxs 2016 paxs 2017

Page 14: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Florida homeport passengers

6,000,000

8,000,000

10,000,000

12,000,000

14,000,000

16,000,000

18,000,000

20,000,000

22,000,000

24,000,000

26,000,000

2003 2008 2013 2018 2023 2028

3% growth 4% growth historical

Source: B&A

Growth potential

Page 15: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

AT 1 MILLION PASSENGERS PER BERTH

OVER THE NEXT 20 YEARS THERE COULD BE

DEMAND FOR AN ADDITIONAL 10 BERTHS IN FLORIDA

Page 16: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Additional future berth options

• Port Everglades

• Current – 8 berths

• Future ???

• Port Miami

• Current - 7 berths

• Future 9-10

• Port Canaveral

• Current – 5 berths

• Future 9

• Port Tampa Bay

• Current – 3 berths

• Future 2

Page 17: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Port Everglades cruise

103,899 sf

94,916 sf

246,738 sf

100,568 sf

113,586 sf

68,279 sf

147,400 sf

102,474 sf

1,337’

8 Terminals

Page 18: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Comparison of terminal efficiency (2015)

0

100,000

200,000

300,000

400,000

500,000

600,000

700,000

800,000

Port

Canaveral

Miami Port

Everglades

Tampa New York Boston Vancouver Seattle Los

Angeles

San Diego

Pa

sse

ng

er

pe

r b

ert

h

Year round Seasonal

Page 19: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Port Canaveral – passengers per berth

0

200,000

400,000

600,000

800,000

1,000,000

1,200,000

1,400,000

Page 20: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Port Everglades potential

• PEV has the longest berths, but no new berths…….

• Terminals are updated as demand

• Agreements have locked in users to facilities, leaving little

room for new customers

• Need to increase berth availability

• Need to rethink terminal operations / layouts to maximize or

optimize use

• Balance seasonal to year-round

• Conscious of new users

Page 21: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of
Page 22: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

• Trade lanes

• North/South key

• Emerging markets – Africa, Mexico

• Asian

• Europe/Med

• Markets – Perishables

• Infrastructure

• Channel depth

• Cranes

• Surface transportation access

• Operations

• ILA/Teamsters/Non-union

• Integrated operating systems

• Truck retrieval

• Yard layouts

KE

Y

IS

SU

ES

Page 23: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

• Future demand/markets

• Gasoline

• Jet Fuel

• Alternative Fuels

• EVs

• Potential changes in vessel dimensions –

• Utilization of empty space:

• Steel

• Autos

• Project cargo/yachts

•Revenue maximization

KE

Y

IS

SU

ES

Page 24: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

• Cruise ships

• Cargo -- Crowley, SeaStar and Tote

• ECA regulations

• How to develop LNG to meet demand over time

• Land leases

• Optimization of net income

KE

Y

IS

SU

ES

0

1

2

3

4

5

Nu

mb

er o

f sh

ips

Carnival Aida Costa Disney Royal Caribbean TUI MSC

Page 25: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

NEAR-DOCK RAIL = OPPORTUNITY TO EXPAND

HINTERLAND AND REDUCE LOCAL TRUCK TRAFFIC

PHASE 9B CONTAINER YARD = OPTIONS FOR

FLEXIBLE FUTURE USE (CHASSIS STORAGE, EMPTY

STORAGE, M&R/INSPECTIONS, TRANSLOADING, OTHER?)

FTZ, COLD/FROZEN STORAGE TO SUPPORT REEFER TRADE, CRUISE PROVISIONING

LONG-TERM NEED TO RECONFIGURE/DENSIFY CONTAINER YARDS

OVER TIME TO INCREASE THROUGHPUT ON SAME FOOTPRINT

KE

Y

IS

SU

ES

SOUTHPORT

Page 26: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Single access point for trucks = potential future congestion on peak pick-up/drop-off days

More, larger vessels at berth = potential for more intense daily/weekly volume peaks for container yards/gates

Resilience

Efficiency Autonomous trucks/IOT

Logistics

24/7 Container visibility

Operations

SOUTHPORT

Page 27: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

HOW TO ACCOMMODATE LNG BUNKERING = MAJOR

CONSIDERATION FOR COMING 20 YEARS

IMPROVE T29 (CRUISE) INBALANCE WITH INCREASED

UTILIZATION OF ADJACENT

BACKLANDS (CARGO); T19, T21, T25 AND SURROUNDING

GTAS/PARKING

OTHER PROPERTIES WITHIN AND BEYOND PEV SHOULD BE IDENTIFIED FOR POTENTIAL FUTURE

DEVELOPMENT AND USE/REUSE (INCLUDING

OFFICE/COMMERCIAL)

MIXED USE AREAS INCREASE LAND UTILIZATION AND CREATE COMPLIMENTARY REVENUE

OPPORTUNITIES – HAS WORKED WELL HISTORICALLY BUT MAY COME UNDER PRESSURE AS CRUISE AND

NON-CONTAINERIZED CARGO NEEDS GROW AND CHANGE OVER TIME

KE

Y

IS

SU

ES

MIDPORT

Page 28: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Resilience

Flexibility

Berths 19-21, Terminal 29 and the “knuckle” = constraints to growth in cruise vessel size, PAX volume

Cruise Ops

Circulation/ Parking

Bulk/Ro-Ro

Containers

Vehicular access to the Midport garage and pick-up/drop-off congestion at T19, T21, T25 and T26 on multi-ship days

MIDPORT

Page 29: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

INTEGRATION OF CRUISE OPERATIONS AT

T2, T4 AND T1 (FERRY) WITH

CONVENTION CENTER ACTIVITIES AND

EXPANSION IS CHALLENGING BUT MUST BE

ACHIEVED AS PART OF THE BROADER

BROWARD COUNTY VISION FOR THE

FUTURE

PETROLEUM OPERATIONS ARE CRITICAL TO THE SOUTH FLORIDA

ECONOMY AND DEMAND IS LIKELY TO GROW AS THE REGION

GROWS: HOW AND WHERE TO ACCOMMODATE?

HOW TO ACCOMMODATE LNG BUNKERING = MAJOR

CONSIDERATION FOR THE COMING 20 YEARS

KE

Y

IS

SU

ES

NORTHPORT

Page 30: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Neo-bulk = good utilization of available land but likely to be cyclical/short-term/spot market opportunities

Resilience

Other properties within and beyond PEV should be identified for potential future development and use/reuse (including office/commercial)

Integration Cruise/ Conventions

LNG Bunkering

New Opportunities

Petroleum NORTHPORT

Page 31: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

• Identify opportunities to grow volumes and revenues in a diversified portfolio of operations

• Balance local and regional needs

• Provide for economic, environmental and community needs

• Build on existing strengths and current investments

• Preserve flexibility to adapt to new opportunities

• Explore opportunities to introduce technology and innovative practices

• Use dynamic financial modeling for evaluation

• Emphasize sustainability and optimization

• Engage a broad range of stakeholders

AP

PR

OA

CH

Page 32: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

MARKET FORCESPORT FINANCES

CO

MM

UN

ITY

NEED

S

EC

ON

OM

IC

IMP

AC

TS

Approach

Page 33: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

FINAN IALS

Page 34: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

PEV Gross income by business unit

$-

$20,000

$40,000

$60,000

$80,000

$100,000

$120,000

$140,000

$160,000

$180,000

2012 2013 2014 2015 2016

Cruise Containerized cargo Petroleum Real estate Parking Other Break Bulk Bulk

Page 35: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Individual financial modules

Page 36: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Gross income by business unit

$0

$100,000,000

$200,000,000

$300,000,000

$400,000,000

$500,000,000

$600,000,000

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

20

21

20

22

20

23

20

24

20

25

20

26

20

27

20

28

20

29

20

30

20

31

20

32

20

33

20

34

20

35

20

36

20

37

20

38

20

39

20

40

20

41

20

42

20

43

20

44

20

45

20

46

20

47

20

48

Cruise Parking and transport Gaming ships Cargo operations Real estate

Space port Exploration Tower Parks and recreation Miscellaneous

Page 37: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Net income by business unit

$0

$50,000,000

$100,000,000

$150,000,000

$200,000,000

$250,000,000

$300,000,000

$350,000,000

$400,000,000

20

08

20

09

20

10

20

11

20

12

20

13

20

14

20

15

20

16

20

17

20

18

20

19

20

20

20

21

20

22

20

23

20

24

20

25

20

26

20

27

20

28

20

29

20

30

20

31

20

32

20

33

20

34

20

35

20

36

20

37

20

38

20

39

20

40

20

41

20

42

20

43

20

44

20

45

20

46

20

47

20

48

Cruise Gaming ships Parking and transport Cargo operations Real estate

Space port Exploration Tower Parks and recreation Miscellaneous

Page 38: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

CIP by business unit

$0

$50,000

$100,000

$150,000

$200,000

$250,000

$300,000

Tho

usa

nd

s

Cruise projects Gaming vessels Cargo projects PCTC

Spaceport Real estate projects The Cove Exploration Tower

Parks and recreation General projects Project management

Page 39: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

CIP by project type

$0

$50,000

$100,000

$150,000

$200,000

$250,000

$300,000

Tho

usa

nd

s

Cruise terminal Cruise berth Parking Space berth and yard Berth and apron

Security Cargo yard Cranes Automobiles Dredging

Transportation Utilities Railroad General operations Commercial

Parks Acquistion and lease buy backs Administration

Page 40: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

CIP production

$0

$50,000

$100,000

$150,000

$200,000

$250,000

$300,000

$350,000

$400,000

Tho

usa

nd

s

CIP Maintenance

Historical capacity

Page 41: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Financing - debt service coverage (using 1.75 coverage floor)

0.00

2.00

4.00

6.00

8.00

10.00

12.00

Actual Projection

BO

ND

ISSU

E$190

M

BO

ND

ISSU

E$360

M

Page 42: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

IRR of major business investments

-5.0%

0.0%

5.0%

10.0%

15.0%

20.0%

Cruise Parking Gaming ships Cargo PCTC Spaceport The Cove Exploration Tower

Page 43: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

REVENUE PER ACRE $0

$500,000

$1,000,000

$1,500,000

$2,000,000

$2,500,000

$3,000,000

$3,500,000

$4,000,000

Cruise only Cruise with parking ParkingAll cargo Spaceport Container onlyReal estate

$0

$5,000

$10,000

$15,000

$20,000

$25,000

$30,000

$35,000

Cruise Cargo Container Spaceport

REVENUE PER LINEAL FEET OF BERTH

Page 44: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Cruise Gaming ships Parking and transport Cargo operations Real estate

Space port Exploration Tower Parks and recreation Miscellaneous

Revenue diversification

58%

3%

19%

10%

5%1%

0%3% 1%

2017

55%

1%

21%

13%5%

2%

1%

2%0%

2027

50%

1%

21%

17%

6%

2%

1%2% 0%

2037

47%

1%

18%

25%

5%

2% 1%1%

0%

2047

Set target and goals as part of the Master Plan

Page 45: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

• Climate Change Task Force / Sea level rise

Resilience, adaptation and sustainability

• Energy & air quality

Prioritize clean, renewable and efficient energy-saving alternatives

• Water quality

Monitoring, testing, stormwater management

• Planning & environmental management

Wildlife and habitat protection

• Pollution prevention & waste minimization

Beneficial reuse & BMPs

AP

PR

OA

CH

Page 46: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

AP

PR

OA

CH

• Critical to set and understand expectations

• Critical to harmonize with community needs

• Elected Officials

• Broward County Administrator & Staff

• Industry Partners

• Community Partners

Page 47: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

EX

PE

RI

EN

CE

Page 48: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

• Strong local and international experience

• Decades of successful local planning and project execution

• We know Port Everglades and share your desire to help you succeed

• We understand Port Everglades’ role in the global supply chain

• We understand its significance to the local, regional, national and global economy

• The B&A project team will bring a fresh look to the Master/Vision Plan

• Seek opportunities to innovate and enhance the value proposition across all lines of business

• We want your business and are prepared to earn it

PE

V

M/

VP

2

03

8

Page 49: 2018 Port Everglades MasterVision Plan Update€¦ · • Port Everglades M/VP –Cruise & Cargo Market Study (2006, 2009) • Singapore Marina Bay Master Plan (2017) • Port of

Thank you!