County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ADAIR KY-704 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 704

(11.909) OVER PETTY'S FORK. (001B00078N)

(SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

490,000

0 175,000 490,000

1068

ADAIR KY 55 CONGESTION MITIGTN(O) KY 55 NEW TURNING LANE AT BETTY'S OK

COUNTRY COOKING

CN

Project Cost:

UT

RW

DN

PL

SPP 250,000

0 0 250,000

80003

Total for ADAIR county PL

Total Amounts:

CN

UT

RW

DN

490,000

175,000 250,000

0 175,000 740,000

ALLEN KY-100 RECONSTRUCTION(O) IMPROVEMENTS TO KY 100: CURVE, BRIDGE,

AND INTERSECTION IMPROVEMENTS FROM

NEAR THE STONY POINT ROAD INTERSECTION

TO EAST OF THE ALONZO LONG HOLLOW

ROAD INTERSECTION (12CCR)CN

Project Cost:

UT

RW

DN

PL

SPP 1,880,000

0 0 1,880,000

320

ALLEN KY-100 RECONSTRUCTION(O) IMPROVE KY-100 (OLD GALLATIN ROAD) FROM

SOUTH OF KY-2160 TO KY-980. (06CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 1,250,000

1,250,000 0 0

8305

Page 3 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ALLEN ECONOMIC DEVEL(O) IMPROVE ACCESS ROAD ON EACH END OF

INDUSTRIAL ACCESS ROAD IN SCOTTSVILLE

CN

Project Cost:

UT

RW

DN

PL

SPP 300,000

0 0 300,000

8901

ALLEN KY-3499 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3499 BRIDGE

OVER BAYS FORK. (002B00004N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

525,000

0 175,000 525,000

10000

ALLEN KY-585 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 585 BRIDGE

OVER MIDDLE FORK DRAKES CREEK.

(002B00021N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

822,500

0 245,000 822,500

10011

ALLEN US 231 AIR QUALITY(P) CONSTRUCT A NEW TURN LANE ON US 231 AT

JOHNSON ROAD TO IMPROVE ACCESS TO

INDUSTRIAL PARK

CN

Project Cost:

UT

RW

DN

PL

SPP 250,000

0 0 250,000

80004

Total for ALLEN county PL

Total Amounts:

CN

UT

RW

DN

1,250,000 1,897,500

420,000

1,880,000

1,250,000 420,000 3,777,500

Page 4 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ANDERSON US-62 SPOT IMPROVEMENTS(O) IMPROVE US-62 (VERSAILLES RD.) FROM

HILLTOP DR. TO WEST END OF BRIDGE OVER

KENTUCKY RIVER AT TYRONE

CN

Project Cost:

UT

RW

DN

PL

SPP 1,200,000

0 0 1,200,000

80001

Total for ANDERSON county PL

Total Amounts:

CN

UT

RW

DN 1,200,000

0 0 1,200,000

BALLARD US-60 MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM

STAFFORD ROAD TO BETHEL CHURCH ROAD

(INCLUDES KEVIL BYPASS)(TO BE LET WITH

1-115.10) (06CCR)(12CCR)(14CCR).

CN

Project Cost:

UT

RW

DN

PL

NH 2,500,000

0 0 2,500,000

115

BALLARD US-51 AM-BRIDGE (P) PE AND ENVIRONMENTAL FOR REPLACEMENT

OF CAIRO BRIDGE AT OR BESIDE EXISTING

LOCATION. (004B00021N)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 2,500,000

0 0 2,500,000

1140.01

BALLARD US-51 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

275,000

2,750,000

0 0 3,025,000

20000

Page 5 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for BALLARD county PL

Total Amounts:

CN

UT

RW

DN

2,750,000

2,775,000

2,500,000

0 0 8,025,000

BARREN LN-9008 AM-BRG PAINTING(P) LOUIE B NUNN PKWY (LN-9008) BRIDGE

PAINTING, CLEANING, AND MINOR REPAIRS ON

BRIDGE OVER I-65 IN BARREN CO. KY.

005B00067R, 005B00067L (2016BOP)

CN

Project Cost:

UT

RW

DN

PL

NH 500,000

500,000 0 0

195

BARREN US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 31EX BRIDGE

OVER WATER STREET. (005B00058N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

945,000

0 245,000 945,000

10001

BARREN I-65 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-065 BOTH

DIRECTION(S) FROM MILEPOINT 42.89 TO

MILEPOINT 43.307

CN

Project Cost:

UT

RW

DN

PL

PM

PM

50,000

500,000

0 550,000 0

20000

BARREN LN-9008 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF LOUIE B.

NUNN CUMBERLAND PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 16.117 TO

MILEPOINT 20.1

CN

Project Cost:

UT

RW

DN

PL

PM

PM

320,000

3,200,000

0 3,520,000 0

20003

Page 6 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BARREN LN-9008 NEW INTERCHANGE(O) NEW INTERCHANGE ON THE LOUIE NUNN

CUMBERLAND PARKWAY AT KY-249 IN

GLASGOW

CN

Project Cost:

UT

RW

DN

PL

SPP 1,500,000

0 0 1,500,000

80002

Total for BARREN county PL

Total Amounts:

CN

UT

RW

DN

500,000 3,700,000 945,000

615,000 1,500,000

500,000 4,315,000 2,445,000

BATH US-60 SAFETY(P) IMPROVE SAFETY AND EFFICIENCY AT THE

KY-211 AND US-60 INTERSECTION IN SALT LICK.

(14CCN)

CN

Project Cost:

UT

RW

DN

PL

STP 1,000,000

0 0 1,000,000

8813

BATH KY-1106 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1106 BRIDGE

OVER FLAT CREEK. (006B00069N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

595,000

2,258,000

0 595,000 2,258,000

10000

BATH KY-1944 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1944 BRIDGE

OVER WHITE OAK CREEK. (006B00076N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

473,000

1,015,000

0 473,000 1,015,000

10001

Page 7 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BATH KY-211 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 211 BRIDGE

OVER COW CREEK. (006B00043N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

315,000

717,500

0 315,000 717,500

10017

BATH US-60 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM 410,000

0 410,000 0

20001

Total for BATH county PL

Total Amounts:

CN

UT

RW

DN

4,990,500

1,793,000

0 1,793,000 4,990,500

BELL KY-2011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2011 BRIDGE

OVER RED BIRD CREEK. (007B00071N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

441,000

0 175,000 441,000

10000

BELL KY-2011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2011 BRIDGE

OVER RED BIRD CREEK. (007B00072N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

791,000

0 175,000 791,000

10001

Page 8 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BELL CR-1041 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1041 BRIDGE

OVER YORK BRANCH. (007C00003N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

193,000

595,000

0 193,000 595,000

10002

BELL KY-92 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 92 BRIDGE OVER

GREASY CREEK. (007B00040N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

490,000

0 175,000 490,000

10038

BELL KY-2012 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT, SCHOOL BUS SAFETY ISSUE.

CN

Project Cost:

UT

RW

DN

PL

PM

PM

61,000

610,000

0 671,000 0

20000

Total for BELL county PL

Total Amounts:

CN

UT

RW

DN

610,000 2,317,000

779,000

0 1,389,000 2,317,000

BOONE I-75 I-CHANGE RECONST(O) IMPROVE THE KY-536 (MT. ZION ROAD)

INTERCHANGE. (14CCR)(16CCR)

CN

Project Cost:

UT

RW

DN

PL

NH 5,430,000

5,430,000 0 0

14

Page 9 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BOONE I-75 MINOR WIDENING(O) ADD AUXILIARY LANES ON I-71/75 FROM

KY-536 TO US-42 (NB & SB) AS PER THE

INTERCHANGE JUSTIFICATION STUDY (IJS).

(10CCR)(12CCR)

CN

Project Cost:

UT

RW

DN

PL

NH 1,060,000

1,060,000 0 0

14.5

BOONE I-275 NEW INTERCHANGE(O) IMPROVE FREIGHT MOBILITY AT I-275 AND

GRAVES ROAD (CONTINUATION OF 6-8953:

INTERCHANGE JUSTIFICATION STUDY ON

I-275/GRAVES RD).

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

NH

3,000,000

4,000,000

3,000,000

5,000,000

0 3,000,000 12,000,000

78

BOONE I-75 CONGESTION MITIGTN(O) IMPROVE SAFETY, MOBILITY, OPERATIONS, AND

GEOMETRICS AT THE JUNCTION OF I-75 AND

I-275 AND THE SYSTEM-TO-SYSTEM RAMPS.

CN

Project Cost:

UT

RW

DN

PL

NH 2,000,000

0 2,000,000 0

79

BOONE US-25 MINOR WIDENING(O) MINOR WIDENING AND CONSTRUCT A

SOUTHBOUND LEFT TURN LANE ON US-25 (DRY

RIDGE-FLORENCE ROAD) AT MUBEA.

CN

Project Cost:

UT

RW

DN

PL

SPP 1,100,000

0 1,100,000 0

351.45

BOONE US-42 SAFETY(P) IMPROVE MOBILITY AT THE INTERSECTION OF

KY-842 AND US-42. (12CCR)(16CCN)

CN

Project Cost:

UT

RW

DN

PL

STP 2,500,000

2,500,000 0 0

367

Page 10 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BOONE -0 MATCHED FED FUNDS(O) NORTHERN KENTUCKY RIDESHARE PROGRAM.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SNK 414,000

414,000 0 0

400.03

BOONE -0 MATCHED FED FUNDS(O) NORTHERN KENTUCKY RIDESHARE PROGRAM.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SNK 44,000

0 44,000 0

400.14

BOONE -0 MATCHED FED FUNDS(O) NORTHERN KENTUCKY RIDESHARE PROGRAM.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SNK 44,000

0 0 44,000

400.15

BOONE -0 MATCHED FED FUNDS(O) OKI REGIONAL TRANSPORTATION PLANNING.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SNK 280,000

280,000 0 0

401.09

BOONE -0 MATCHED FED FUNDS(O) OKI REGIONAL TRANSPORTATION PLANNING.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SNK 56,000

0 56,000 0

401.14

Page 11 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BOONE -0 MATCHED FED FUNDS(O) OKI REGIONAL TRANSPORTATION PLANNING.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SNK 56,000

0 0 56,000

401.15

BOONE -0 MATCHED FED FUNDS(O) N KY PLANNING FY18 AIR QUALITY, FIAM, LAND

USE, RIDESHARE. (2016BOP)

CN

Project Cost:

UT

RW

DN

PL SNK 150,000

150,000 0 0

401.18

BOONE -0 MATCHED FED FUNDS(O) N KY PLANNING FY 2019 AIR QUALITY, FIAM,

LAND USE, RIDESHARE. (2016BOP)

CN

Project Cost:

UT

RW

DN

PL SNK 150,000

0 150,000 0

401.19

BOONE -0 MATCHED FED FUNDS(O) N KY PLANNING FY 2020 AIR QUALITY, FIAM,

LAND USE, RIDESHARE.

CN

Project Cost:

UT

RW

DN

PL SNK 150,000

0 0 150,000

401.2

BOONE KY-237 MATCHED FED FUNDS(O) INCREASE THROUGH LANE CAPACITY ON KY

237 FROM I-275 RAMPS TO CARDINAL WAY AND

IMPROVE WORLDWIDE BLVD WITH TWO-WAY

LEFT TURN AND ADDITIONAL RIGHT TURN TO SB

KY 237. (2012BOP)(ADM. BY KYTC)CN

Project Cost:

UT

RW

DN

PL

SNK 3,000,000

3,000,000 0 0

415

Page 12 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BOONE CR-1002 MATCHED FED FUNDS(O) RECONSTRUCTION OF THE INTERSECTION OF

CAMP ERNST ROAD AND LONGBRANCH ROAD.

WIDENING OF 1,900 FEET OF LONGBRANCH

ROAD. (2012BOP)

CN

Project Cost:

UT

RW

DN

PL

SNK 524,640

524,640 0 0

422

BOONE KY-3060 MATCHED FED FUNDS(O) CORRECT GEOMETRIC DEFICIENCIES AND ADD

LEFT TURN LANES ON FROGTOWN ROAD AT

TRIPLE CROWN BLVD AND CEDARWOOD.

(2012BOP)(ADM. BY KYTC)

CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

200,000

120,000

1,200,000

1,520,000 0 0

423

BOONE KY-717 SAFETY(P) IMPROVE SAFETY ALONG KY 717 AT THE 90

DEGREE BEND NEAR THE CIN/NKY AIRPORT,

0.337 MI N OF KY 1017. (FUNDING SUBJECT TO

FISCAL CONSTRAINT PENDING MPO TIP)

(2014BOP)CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

1,500,000

250,000

1,000,000

2,750,000 0 0

433

BOONE KY-3159 MATCHED FED FUNDS(O) WIDEN KY 3159 (TED BUSHELMAN BLVD) FROM

DOERING DRIVE TO KY 1017 (AERO PARKWAY)

TO PROVIDE A TWO-WAY LEFT TURN LANE TO

IMPROVE TRAFFIC FLOW FOR FUTURE

DEVELOPMENT (2016BOP)CN

Project Cost:

UT

RW

DN

PL

SNK 1,000,000

1,000,000 0 0

439

BOONE KY-237 MATCHED FED FUNDS(O) CONSTRUCT A MULTI-MODAL PATH ALONG KY

237 FROM STEPHENS ELEMENTARY SCHOOL

NORTH TO KY 20/PETERSBURG ROAD

(2016BOP).

CN

Project Cost:

UT

RW

DN

PL

SNK 1,786,400

1,786,400 0 0

440

Page 13 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BOONE KY-3076 BIKE/PED FACIL(O) CONSTRUCT NEW SIDEWALKS, DEDICATED BIKE

LANES AND RETAINING WALLS ALONG

DOLWICK ROAD TO MINEOLA PIKE TO OLYMPIC

BLVD IN THE CITY OF ERLANGER. (2016 BOP)

CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

80,000

200,000

1,576,000

280,000 1,576,000 0

441

BOONE CR-1001 MATCHED FED FUNDS(O) ADD A LEFT TURN LANE ON SB CAMP ERNST

ROAD AT LONGBRANCH ROAD (2016BOP).

CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

400,000

69,271

461,809

469,271 461,809 0

442

BOONE KY-236 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION

ALONG KY-236 (DONALDSON ROAD) FROM

KY-842 (HOUSTON ROAD) TO KY-3076

(MINEOLA PIKE).

CN

Project Cost:

UT

RW

DN

PL STP

STP

2,000,000

5,000,000

0 2,000,000 5,000,000

444

BOONE KY-3076 MAJOR WIDENING(O) IMPROVE FREIGHT MOBILITY AND REDUCE

CONGESTION ON KY-3076 (MINEOLA PIKE)

FROM KY-236 TO I-275.

CN

Project Cost:

UT

RW

DN

PL

STP 1,500,000

0 1,500,000 0

445

BOONE US-42 NEW ROUTE(O) PROVIDE EAST-WEST CONNECTIVITY AND

IMPROVED MOBILITY FROM KY-237 (PLEASANT

VALLEY ROAD) THRU KY-842 (HOPEFUL

CHURCH ROAD) TO MALL ROAD/I-75

INTERCHANGE.CN

Project Cost:

UT

RW

DN

PL

NH 1,500,000

0 0 1,500,000

446

Page 14 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BOONE -0 SAFETY(P) SPOT IMPROVEMENTS AND CONGESTION

MITIGATION IN BOONE COUNTY FOR AMAZON

DEVELOPMENT.

CN

Project Cost:

UT

RW

DN

PL

SPP 2,000,000

2,000,000 0 0

937

BOONE -0 PREFINANCD CONVRSN(O) SPOT IMPROVEMENTS AND CONGESTION

MITIGATION IN BOONE COUNTY FOR AMAZON

DEVELOPMENT. (ADDITIONAL FUNDING FOR

6-937.00)

CN

Project Cost:

UT

RW

DN

PL

SPP 2,000,000

0 2,000,000 0

937.01

BOONE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED AREA AND

SUBJECT TO MPO CONTROL FOR FY 2018.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)CN

Project Cost:

UT

RW

DN

PL

SNK 35,140,000

35,140,000 0 0

966

BOONE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED AREA AND

SUBJECT TO MPO CONTROL FOR FY 2019

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)CN

Project Cost:

UT

RW

DN

PL

SNK 9,100,000

0 9,100,000 0

966.07

BOONE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR NKY URBANIZED AREA AND

SUBJECT TO MPO CONTROL FOR FY 2020.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)CN

Project Cost:

UT

RW

DN

PL

SNK 9,200,000

0 0 9,200,000

966.08

Page 15 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BOONE KY-842 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER NS

(CNO&TP)RR ON RICHARDSON ROAD (KY 842)

0.14 MI E OF US 25 NEAR INDEPENDENCE

(008B00092N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BR

480,000

2,800,000

350,000

0 480,000 3,150,000

1087

BOONE KY-338 TRANSP ENHANCEMENT(P) PHASE II: IMPROVE INTERSECTION OPERATIONS

AT THE INTERSECTIONS OF IDLEWILD RD.

(KY-338)/JEFFERSON ST./TEMPERATE ST. AND

IMPROVE PEDESTRIAN SAFETY ALONG

IDLEWILD RD. AND JEFFERSON ST. (AS PER CN

Project Cost:

UT

RW

DN

PL

STP 500,000

500,000 0 0

3019.1

BOONE KY-237 RECONSTRUCTION(O) IMPROVE KY-237 FROM VALLEY VIEW DRIVE TO

ROGERS LANE. (14CCR)

CN

Project Cost:

UT

RW

DN

PL

STP 22,180,000

22,180,000 0 0

8001.21

BOONE I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 169.439 TO

MILEPOINT 183.08

CN

Project Cost:

UT

RW

DN

PL

PM

PM

2,180,000

21,800,000

0 0 23,980,000

20002

BOONE KY-18 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

225,000

2,250,000

0 2,475,000 0

20008

Page 16 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BOONE KY-237 RECONSTRUCTION(O) RECONSTRUCT GUNPOWDER RD. FROM US-42

TO KY-536

CN

Project Cost:

UT

RW

DN

PL

SPP 1,000,000

0 1,000,000 0

80000

BOONE KY-237 CONGESTION MITIGTN(O) EXPANSION OF ROUNDABOUTS ALONG KY-237

AT CARDINAL COVE AND GRAVES RD

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

500,000

250,000

250,000

0 1,000,000 0

80001

BOONE US 42 AIR QUALITY(P) INCREASE CAPACITY AND REDUCE CONGESTION

ON US 42 AT I 71/75

CN

Project Cost:

UT

RW

DN

PL

SPP 650,000

0 650,000 0

80003

Total for BOONE county PL

Total Amounts:

CN

UT

RW

DN

71,525,040 16,587,809 36,100,000

9,355,000 8,680,000

150,000 2,150,000 150,000

2,180,000 250,000 6,800,000

7,129,271 250,000 3,350,000

80,984,311 28,592,809 55,080,000

BOURBON KY-3364 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF STRUCTURE OVER

SCOTTS CREEK ON KY 3364, 0.7 MILE NORTH

OF US 460 AT NORTH MIDDLETOWN (BRIDGE

IMPROVEMENTS). (03KYDN)(2012BOP) (16CCN)

CN

Project Cost:

UT

RW

DN

PL

KYD 1,568,000

1,568,000 0 0

365.1

Page 17 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BOURBON US-460 RECONSTRUCTION(O) IMPROVE US-460 FROM RUSSELL CAVE ROAD

TO US-27 BYPASS IN PARIS.(12CCN)(14CCR)

(16CCR)

CN

Project Cost:

UT

RW

DN

PL

STP

STP

1,000,000

1,000,000

0 2,000,000 0

8705

BOURBON CR-1205 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HOUSTON ANTIOCH

RO BRIDGE OVER HOUSTON CREEK.

(009C00031N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

143,500

325,500

0 143,500 325,500

10007

BOURBON CR-1320 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PEACOCK ROAD

BRIDGE OVER CSX RR. (009R00605N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

220,500

518,000

0 220,500 518,000

10008

BOURBON US-68 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

250,000

2,500,000

0 2,750,000 0

20002

Total for BOURBON county PL

Total Amounts:

CN

UT

RW

DN

2,500,000 843,500

1,568,000 614,000

1,000,000

1,000,000

1,568,000 5,114,000 843,500

Page 18 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BOYD -0 MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO

HUNTINGTON-ASHLAND MPO FOR FY 2018.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SAH 6,265,000

6,265,000 0 0

208.04

BOYD -0 MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO

HUNTINGTON-ASHLAND MPO FOR FY 2019.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SAH 1,200,000

0 1,200,000 0

208.05

BOYD -0 MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO

HUNTINGTON-ASHLAND MPO FOR FY 2020.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SAH 1,200,000

0 0 1,200,000

208.06

BOYD -0 MATCHED FED FUNDS(O) PLANNING STUDY/ENVIRONMENTAL

ASSESSMENT FOR RUSH OFF ROAD (2016BOP)

CN

Project Cost:

UT

RW

DN

PL

SAH 48,000

48,000 0 0

404

BOYD US-60 CONGESTION MITIGTN(O) IMPROVE US-60 FROM I-64 AT INTERCHANGE

181 TO THE KY-180 INTERSECTION AT

CANNONSBURG. (08CCN) (10CCR)(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 5,000,000

0 0 5,000,000

8400

Page 19 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BOYD US-23 SAFETY(P) SAFETY UPGRADES AND CONSTRUCT TURN

LANES ON US-23 AT 12TH STREET -

CATLETTSBURG. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 920,000

920,000 0 0

8801

BOYD US-23 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON 12TH STREET

BRIDGE OVER THE OHIO RIVER. JOINT PROJECT

WITH OHIO. (010B00040N)(BSBP)

CN

Project Cost:

UT

RW

DN

PL

BR 1,750,000

1,750,000 0 0

10014

BOYD US-60 AM-BRIDGE (P) PAINTING AND PREVENTIVE MAINTENANCE ON

CATLETTSBURG KENOVA BRIDGE ON 35TH ST.

OVER THE OHIO RIVER. JOINT PROJECT WITH

OHIO. (010B00062N)(BSBP)

CN

Project Cost:

UT

RW

DN

PL

BR 1,200,000

0 0 1,200,000

10015

BOYD I-64 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON PERRY GENTRY

BRIDGES OVER THE BIG SANDY RIVER. JOINT

PROJECT WITH WEST VIRGINIA. (010B00046L

AND 010B00046R)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 1,500,000

0 0 1,500,000

10016

BOYD KY-854 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 854 BRIDGE

OVER GARNER CREEK. (010B00045N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

525,000

1,085,000

0 525,000 1,085,000

10018

Page 20 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BOYD I-64 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-064 BOTH

DIRECTION(S) FROM MILEPOINT 180.812 TO

MILEPOINT 183.95

CN

Project Cost:

UT

RW

DN

PL

PM

PM

250,000

2,500,000

0 2,750,000 0

20002

Total for BOYD county PL

Total Amounts:

CN

UT

RW

DN

8,935,000 3,700,000 9,985,000

48,000 775,000

8,983,000 4,475,000 9,985,000

BOYLE US-68 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 68 AND US 150

BRIDGE OVER CHAPLIN RIVER, PERRYVILLE.

(SEE 7-242.01 FOR HPP FUNDS)

(2005HPP-KY134)(011B00042N)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 1,253,000

0 0 1,253,000

242

BOYLE US-68 AM-BRIDGE (P) REPLACE U.S. 68 AND U.S. 150 BRIDGE OVER

CHAPLIN RIVER, PERRYVILLE. 011B00042N

(2005HPP-KY134)(EARMARK DOES NOT COVER

TOTAL PROJECT COST OF $1,790,000).(SD)

CN

Project Cost:

UT

RW

DN

PL

HPP 487,797

487,797 0 0

242.01

Total for BOYLE county PL

Total Amounts:

CN

UT

RW

DN

487,797 1,253,000

487,797 0 1,253,000

Page 21 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BRACKEN KY-8 FERRY OPERATION(P) OPERATION OF AUGUSTA FERRY FOR FY 2019.

(12CCR)(14CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 190,000

0 190,000 0

355.21

BRACKEN KY-8 FERRY OPERATION(P) OPERATION OF AUGUSTA FERRY FOR FY 2020.

(12CCR)(14CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 190,000

0 0 190,000

355.22

BRACKEN KY-8 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 8 BRIDGE OVER

HOLTS CREEK AT FOSTER. (012B00004N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

455,000

3,325,000

0 455,000 3,325,000

10008

Total for BRACKEN county PL

Total Amounts:

CN

UT

RW

DN

190,000 3,515,000

455,000

0 645,000 3,515,000

BREATHITT KY-15 MAJOR WIDENING(O) IMPROVE KY-15 FROM THE INTERSECTION OF

NEW KY-15/30 TO INTERSECTION OF KY-1812.

CN

Project Cost:

UT

RW

DN

PL

NH 1,500,000

0 1,500,000 0

376

Page 22 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BREATHITT KY-378 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

FROZEN CREEK ON KY 378 0.7 MI N OF KY 1812.

(013B00050N)

CN

Project Cost:

UT

RW

DN

PL

BR 735,000

0 0 735,000

1110

BREATHITT CR-1233 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MORRIS FORK ROAD

BRIDGE OVER BURTON FORK. (013C00050N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

315,000

0 140,000 315,000

10000

BREATHITT CR-1124 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF LITTLE BUCKHORN

ROAD BRIDGE OVER BUCKHORN CREEK.

(013C00016N)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

350,000

0 140,000 350,000

10001

BREATHITT KY-1812 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1812 BRIDGE

OVER JOHNSON FORK. (013B00007N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

507,500

0 175,000 507,500

10010

BREATHITT CR-1104 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BIG BRANCH ROAD

BRIDGE OVER BIG BRANCH CREEK.

(013C00008N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

385,000

0 175,000 385,000

10011

Page 23 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for BREATHITT county PL

Total Amounts:

CN

UT

RW

DN

2,292,500

2,130,000

0 2,130,000 2,292,500

BRECKINRIDGE CR-1021 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

SINKING CREEK ON DENTS BRIDGE ROAD (CR

1021) 1.4 MI W OF KY 333 (014C00003N)

CN

Project Cost:

UT

RW

DN

PL

BR 406,000

0 0 406,000

1090

Total for BRECKINRIDGE county PL

Total Amounts:

CN

UT

RW

DN

406,000

0 0 406,000

BULLITT KY-44 RECONSTRUCTION(O) SECTION 5 - FROM US-31EX TO US-31E

BYPASS. (2008BOPC).

CN

Project Cost:

UT

RW

DN

PL

SPP 1,000,000

0 1,000,000 0

150.5

BULLITT KY-44 SAFETY(P) NEW TURN LANES IN FRONT OF BULLITT EAST

HIGH SCHOOL. BREAKOUT FROM 347.5

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

500,000

100,000

0 500,000 100,000

347.51

Page 24 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BULLITT I-65 NEW INTERCHANGE(O) CONSTRUCT NEW I-65 INTERCHANGE BETWEEN

KY-480 AND KY-245.

CN

Project Cost:

UT

RW

DN

PL

NH 18,720,000

18,720,000 0 0

538

BULLITT KY-44 BIKE/PED FACIL(O) INSTALLATION OF NEW SIDEWALKS AND

REHABILITATION OF EXISTING SIDEWALKS TO

FIX GAPS IN THE PEDESTRIAN NETWORK ALONG

KY 44 FROM FRANK E. SIMON DRIVE (CITY PARK

DRIVE) EAST TO KY 61 IN SHEPHERDSVILLE. CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

60,000

60,000

220,000

120,000 220,000 0

544

BULLITT I-65 MAJOR WIDENING(O) WIDEN I-65 FROM 6 TO 8 LANES FROM KY-61

(PRESTON HIGHWAY) IN LEBANON JUNCTION TO

I-265 (GENE SNYDER FREEWAY)

CN

Project Cost:

UT

RW

DN

PL NH 250,000

0 0 250,000

550

BULLITT -0 NEW ROUTE(O) STUDY NEW CONNECTION BETWEEN I-65 IN

BULLITT COUNTY TO I-64 IN SHELBY COUNTY

TO I-71 IN OLDHAM COUNTY.

CN

Project Cost:

UT

RW

DN

PL STP 2,000,000

0 2,000,000 0

564

Total for BULLITT county PL

Total Amounts:

CN

UT

RW

DN

18,720,000 220,000

1,500,000

2,000,000 250,000

60,000 100,000

60,000

18,840,000 3,720,000 350,000

Page 25 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BUTLER KY-269 FERRY OPERATION(P) OPERATION OF REED'S FERRY AT LOGANSPORT

FOR FY 2019.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 157,200

0 157,200 0

125.14

BUTLER KY-269 FERRY OPERATION(P) OPERATION OF REED'S FERRY AT LOGANSPORT

FOR FY 2020.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 157,200

0 0 157,200

125.15

BUTLER WN-9007 RECONSTRUCTION(O) I-65 SPUR CORRIDOR; MODERNIZATION OF

EXISTING NATCHER PARKWAY FROM I-65

INTERCHANGE (EXIT 2) EXTENDING NORTH TO

THE BUTLER-OHIO COUNTY LINE. (2016BOP)

CN

Project Cost:

UT

RW

DN

PL

NH 18,250,000

0 18,250,000 0

2042.1

BUTLER KY-369 FERRY OPERATION(P) OPERATION OF THE ROCHESTER FERRY BY THE

BUTLER AND OHIO COUNTY FERRY AUTHORITY

FOR FY 2019.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 157,200

0 157,200 0

8504.09

BUTLER KY-369 FERRY OPERATION(P) OPERATION OF THE ROCHESTER FERRY BY THE

BUTLER AND OHIO COUNTY FERRY AUTHORITY

FOR FY 2020.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 157,200

0 0 157,200

8504.1

Page 26 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

BUTLER KY-70 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER

PANTHER CREEK. (016B00019N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

889,000

0 245,000 889,000

10003

BUTLER CR-1008 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WAVERLY SCHOOL

ROAD BRIDGE OVER LITTLE BULL CREEK.

(016C00031N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

266,000

0 157,500 266,000

10004

BUTLER WN-9007 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON WILLIAM H. NATCHER PARKWAY

BOTH DIRECTION(S) FROM MILEPOINT 34.724 TO

MILEPOINT 37.143

CN

Project Cost:

UT

RW

DN

PL

PM

PM

240,000

2,400,000

0 2,640,000 0

20010

Total for BUTLER county PL

Total Amounts:

CN

UT

RW

DN

20,964,400 1,469,400

642,500

0 21,606,900 1,469,400

CALDWELL KY-126 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-126 BRIDGE

OVER DREEN CREEK. (017B00023N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

1,312,500

0 245,000 1,312,500

10000

Page 27 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for CALDWELL county PL

Total Amounts:

CN

UT

RW

DN

1,312,500

245,000

0 245,000 1,312,500

CALLOWAY US-641 MAJOR WIDENING(O) MAJOR WIDENING FROM TENN. STATE LINE TO

MURRAY PRIORITY SECTION 1; FROM CLARKS

RIVER BRIDGE, NORTH 1.0 MILE TO EXISTING

4-LANE.(SEE 1-8852.00)(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 6,040,000

6,040,000 0 0

314.1

CALLOWAY US-641 MAJOR WIDENING(O) IMPROVE US-641 FROM THE TENNESSEE STATE

LINE TO MURRAY PRIORITY SECTION 2; FROM

TENN. STATE LINE TO CLARKS RIVER BRIDGE.

(SEE 1-8852.00)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

2,000,000

2,000,000

3,000,000

2,000,000 5,000,000 0

314.2

CALLOWAY KY-280 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 280 BRIDGE

OVER PANTHER CREEK. (018B00054N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

735,000

0 140,000 735,000

10008

CALLOWAY KY-1327 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

175,000

1,750,000

0 1,925,000 0

20001

Page 28 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for CALLOWAY county PL

Total Amounts:

CN

UT

RW

DN

6,040,000 1,750,000 735,000

2,000,000 315,000

2,000,000

3,000,000

8,040,000 7,065,000 735,000

CAMPBELL I-471 RECONSTRUCTION(O) STUDY AND REHABILITATE THE I-471 CORRIDOR,

CAMPBELL COUNTY, KENTUCKY. (SEE ALSO

6-8104.00)(2005HPP-KY120)

CN

Project Cost:

UT

RW

DN

PL

HPP 1,439,840

1,439,840 0 0

183

CAMPBELL I-275 AM-BRIDGE (P) BRIDGE REHABILITATION ON EXISTING COMBS

HEHL BRIDGE CARRYING I-275 OVER THE OHIO

RIVER. 019B00040L/R (LET BY ODOT)

(2016BOP)(BSBP)

CN

Project Cost:

UT

RW

DN

PL

BR 4,500,000

0 4,500,000 0

369

CAMPBELL KY-1892 MATCHED FED FUNDS(O) ROADWAY REHABILITATION ON CAROTHERS

ROAD FROM MONMOUTH STREET (US 27) TO

RIGHT TURN LANE INTO NEWPORT SHOPPING

CENTER.

CN

Project Cost:

UT

RW

DN

PL

SNK 1,005,052

1,005,052 0 0

427

CAMPBELL -0 MATCHED FED FUNDS(O) NEWPORT RIVERFRONT COMMONS -

CONSTRUCT TWO NEW PEDESTRIAN/BICYCLE

BRIDGES TO CONNECT BOTH SIDES OF THE

TAYLOR SOUTHGATE BRIDGE TO THE TRAILS

ON TOP OF THE LEVEE (2016BOP)CN

Project Cost:

UT

RW

DN

PL

SNK 1,097,427

1,097,427 0 0

434

Page 29 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CAMPBELL US-27 MATCHED FED FUNDS(O) ADD LANE ON US 27 TO PROVIDE THREE

CONTINUOUS SOUTHBOUND THROUGH-LANES

FROM MARSHALL LANE TO JOHNS HILL ROAD

(KY 3490). (2016BOP)

CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

200,000

100,000

500,000

300,000 500,000 0

443

CAMPBELL US-27 BIKE/PED FACIL(O) SOUTH MONMOUTH PHASE 1. IMPROVE/ADD

SIDEWALKS, ACCESS MANAGEMENT, STREET

LIGHTING, IMPROVE SAFETY FROM

NEWPORT/SOUTHGATE CITY LIMITS TO

CAROTHERS ROAD.CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

SNK

454,960

61,600

1,496,000

1,200,000

454,960 1,557,600 1,200,000

451

CAMPBELL US-27 BIKE/PED FACIL(O) US 27 SOUTH MONMOUTH UNDERPASS.

IMPROVE FOR PEDESTRIANS BY REPLACING

OBSOLETE STAIRS/WALKWAY WITH 10'

SIDEWALK, LIGHTING BUS STOPS AT THE

UNDERPASS OF THE CSX RAILROAD BRIDGE CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

378,400

32,000

24,000

0 0 434,400

452

CAMPBELL -0 BIKE/PED FACIL(O) RIVERFRONT COMMONS. CONSTRUCT A 15'

WIDE CONCRETE BICYCLE/PEDESTRIAN TRAIL

AND CONDUIT FOR FUTURE LIGHTING FROM

BERRY STREET TO FOURTH AVENUE. PART OF

11.5 MILE PROJECT.CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

126,000

760,000

0 126,000 760,000

453

CAMPBELL KY-8 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

TWELVEMILE CREEK ON KY 8 0.1 MI N OF NEISES

ROAD (CR 1009). (019B00003N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BR

50,000

150,000

2,500,000

0 200,000 2,500,000

1085

Page 30 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CAMPBELL CR-1363 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON COVERT

RUN PIKE (CR-1363) (0.048) OVER TRIBUTARY

TO TAYLOR CREEK. 019C00069N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

122,500

630,000

0 122,500 630,000

1095

CAMPBELL I-275 NEW ROUTE(O) TRANSPORTATION IMPROVEMENTS TO AA-I-275

CONNECTOR, CAMPBELL COUNTY.

(2005HPP-KY155)(SEE 6-8105.00 FOR "KYD"

COMPONENT)(06CCR)(10CCR)

CN

Project Cost:

UT

RW

DN

PL

HPP 690,401

690,401 0 0

8105.01

CAMPBELL -0 NEW ROUTE(O) CONSTRUCT NEW TECHNOLOGY TRIANGLE

ACCESS ROAD, CAMPBELL COUNTY,

KENTUCKY. (2005HPP-KY126)(2006BOPC).

(10CCR)

CN

Project Cost:

UT

RW

DN

PL

HPP 1,439,840

1,439,840 0 0

8105.03

CAMPBELL KY-2238 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GIBSON ROAD

BRIDGE OVER THREEMILE CREEK. (019B00060N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

318,500

0 140,000 318,500

10000

CAMPBELL US-27 AM-BRIDGE (P) SAFETY CABLE REPAIR AND PREVENTIVE

MAINTENANCE ON TAYLOR SOUTHGATE BRIDGE

OVER THE OHIO RIVER. JOINT PROJECT WITH

OHIO. (019B00076N)(BSBP)

CN

Project Cost:

UT

RW

DN

PL

BR 250,000

250,000 0 0

10007

Page 31 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CAMPBELL US-27 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

75,000

750,000

0 825,000 0

20016

Total for CAMPBELL county PL

Total Amounts:

CN

UT

RW

DN

5,922,560 5,750,000 5,408,500

454,960 463,500 378,400

200,000 111,600 32,000

100,000 1,646,000 24,000

6,677,520 7,971,100 5,842,900

CARLISLE US-51 SAFETY(P) CORRECT GEOMETRIC DEFICIENCIES AT

INTERSECTION OF US-51/US-62/FRONT ST/ELM

ST IN BARDWELL TO ADDRESS FLOW, SAFETY,

AND ACCESS ISSUES.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 250,000

0 0 250,000

333

CARLISLE US-51 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION ON US-51

FROM MILEPOINT 7.86 TO MILEPOINT 12.66

CN

Project Cost:

UT

RW

DN

PL

PM 746,000

0 0 746,000

20027

Total for CARLISLE county PL

Total Amounts:

CN

UT

RW

DN

996,000

0 0 996,000

Page 32 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CARROLL US-42 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

KENTUCKY RIVER ON US 42 IN

PRESTONSVILLE/CARROLLTON 0.13 MI E OF KY

55. (021B00043N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BR

1,460,000

1,218,000

476,000

0 1,460,000 1,694,000

1084

CARROLL KY-55 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 55 BRIDGE OVER

MAJORS RUN CREEK. (021B00019N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

980,000

0 140,000 980,000

10009

Total for CARROLL county PL

Total Amounts:

CN

UT

RW

DN

980,000

1,600,000

1,218,000

476,000

0 1,600,000 2,674,000

CARTER I-64 CONGESTION MITIGTN(O) IMPROVE MOBILITY AND REDUCE CONGESTION

AT THE KY 1/I-64 WESTBOUND OFF-RAMP

INTERSECTION.

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

NH

80,000

80,000

80,000

500,000

0 740,000 0

62

CARTER KY-67 SAFETY(P) SAFETY, SPOT IMPROVEMENTS AND

CONGESTION MITIGATION FOR INDUSTRIAL

PARKWAY (KY 67) IN CARTER, BOYD, AND

GREENUP COUNTIES FOR BRAIDY INDUSTRIES

ALUMINUM PLANT DEVELOPMENT.CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

NH

2,000,000

2,500,000

2,500,000

2,000,000

2,000,000 5,000,000 2,000,000

397

Page 33 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CARTER US-60 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US-60

(MP 4.111) OVER TYGARTS CREEK; .75 MI E OF

JCT KY 1662; 022B00037N

CN

Project Cost:

UT

RW

DN

PL

BR 693,000

693,000 0 0

1075

CARTER KY-1 SAFETY(P) IMPROVE SAFETY AT THE EAST CARTER HIGH

SCHOOL. (06CCN)(08CCR)(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 720,000

0 0 720,000

8311

CARTER KY-773 AM-BRIDGE (P) REPLACEMENT OF TWO TRUSS BRIDGES ON KY

773 OVER THE LITTLE SANDY RIVER.

(022B00074N)(022B00075N)

CN

Project Cost:

UT

RW

DN

PL

BR 5,019,000

0 5,019,000 0

8506

CARTER KY-1 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1 BRIDGE OVER

POWELL BRANCH. (022B00006N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

525,000

1,015,000

0 525,000 1,015,000

10002

CARTER KY-182 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-182 BRIDGE

OVER SINKING CREEK. (022B00140N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

490,000

1,750,000

0 490,000 1,750,000

10003

Page 34 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for CARTER county PL

Total Amounts:

CN

UT

RW

DN

693,000 5,519,000 4,765,000

2,000,000 1,095,000

2,580,000 720,000

2,580,000

2,693,000 11,774,000 5,485,000

CASEY CR-1169 AM-BRIDGE (P) REPLACE BRIDGE ON CR-1169 (0.059) OVER

SOUTH FORK CREEK. (023C00029N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

532,000

0 175,000 532,000

1067

CASEY KY-49 RECONSTRUCTION(O) RECONSTRUCT BRUSHY CREEK HILL FROM MP

1.8 TO MP 2.8.(12CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 1,250,000

0 1,250,000 0

8704

CASEY KY-2310 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2310 BRIDGE

OVER LUTTRELL CREEK. (023B00066N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

192,500

927,500

0 192,500 927,500

10000

CASEY KY-1552 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1552 BRIDGE

OVER BR OF BRUSH CREEK. (023B00061N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

70,000

266,000

0 70,000 266,000

10006

Page 35 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CASEY KY-1552 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1552 BRIDGE

OVER LONG BRANCH. (023B00062N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

70,000

266,000

0 70,000 266,000

10007

CASEY KY-3270 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3270 BRIDGE

OVER HOWE BRANCH. (023B00077N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

70,000

234,500

0 70,000 234,500

10008

CASEY KY-70 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION

CN

Project Cost:

UT

RW

DN

PL

PM

PM

375,000

3,750,000

0 4,125,000 0

20001

Total for CASEY county PL

Total Amounts:

CN

UT

RW

DN

3,750,000 2,226,000

2,202,500

0 5,952,500 2,226,000

CHRISTIAN KY-911 MAJOR WIDENING(O) IMPROVE KY-911 FROM US-41A TO OAK

GROVE.(12CCR).

CN

Project Cost:

UT

RW

DN

PL

STP 2,530,000

0 0 2,530,000

180

Page 36 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CHRISTIAN KY-1007 RECONSTRUCTION(O) RECONSTRUCT KY 1007 FROM US 68 TO

SANDERSON ROAD IN HOPKINSVILLE.(12CCR)

(14CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 3,250,000

0 0 3,250,000

227

CHRISTIAN US-41 NEW ROUTE(O) CONSTRUCT NEW CONNECTOR FROM US 41

NEAR THE INDUSTRIAL PARK TO KY 115 SOUTH

OF PEMBROKE.

CN

Project Cost:

UT

RW

DN

PL

SPP 1,000,000

0 0 1,000,000

381

CHRISTIAN EB-9004 RECONSTRUCTION(O) RECONSTRUCT THE BREATHITT PARKWAY

INTERCHANGE AT KY 1682 NORTH OF

HOPKINSVILLE. (BREATHITT PARKWAY/FUTURE

INTERSTATE SPUR PROJECT)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

250,000

1,000,000

0 250,000 1,000,000

898

CHRISTIAN CR-1116 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON SUB

STATION RD (CR 1116) OVER CSX RR 0.04 MILE E

OF US 41 024C00034N

CN

Project Cost:

UT

RW

DN

PL

BR 880,000

880,000 0 0

1085

CHRISTIAN US-41 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER CSX

RR ON WALNUT STREET (US 41A) IN

HOPKINSVILLE 475 FT NE OF EAST 21ST STREET

(CS 1016) (024B00112N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

385,000

2,002,000

0 385,000 2,002,000

1089

Page 37 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CHRISTIAN CS-1262 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER N

FORK LITTLE RIVER ON MILBROOKE DRIVE (CS

1262) 500 FT SW OF KAREN DRIVE (CS 1268)

024C00081N

CN

Project Cost:

UT

RW

DN

PL

BR 1,470,000

0 0 1,470,000

1094

CHRISTIAN KY-189 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-189 BRIDGE

OVER BRANCH OF BUCK FORK. (024B00064N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

1,032,500

0 245,000 1,032,500

10001

CHRISTIAN US-41 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 41 BRIDGE OVER

NORTH FORK LITTLE RIVER. (024B00005N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

35,000

175,000

0 35,000 175,000

10022

CHRISTIAN EB-9004 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF EDWARD T.

BREATHITT PENNYRILE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT

4.719

CN

Project Cost:

UT

RW

DN

PL

PM

PM

400,000

4,000,000

0 400,000 4,000,000

20005

CHRISTIAN EB-9004 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF EDWARD T.

BREATHITT PENNYRILE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 12.13 TO

MILEPOINT 16.5 (16.7 NON-CARDINAL)

CN

Project Cost:

UT

RW

DN

PL

PM 4,120,000

0 0 4,120,000

20006

Page 38 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CHRISTIAN KY 115 RESURFACING(P) RESURFACING ON KY 115 FROM CARNEAL

LANE TO US 41

CN

Project Cost:

UT

RW

DN

PL

PM 730,000

0 730,000 0

80000

CHRISTIAN US 41A NEW INTERCHANGE(O) US 41A NEW TURNING LANE NORTHBOUND AT

EXISTING MEDIAN CROSSOVER NEAR MILEPOST

11.4. CITY TO CONSTRUCT AND BE

REIMBURSED.

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

8,000

67,000

0 75,000 0

80001

CHRISTIAN KY 1026 RESURFACING(P) RESURFACING ON KY 1026 FROM GRACEY

SINKING FORK ROAD TO SHURDAN CREEK

ROAD

CN

Project Cost:

UT

RW

DN

PL

PM 200,000

0 200,000 0

80002

Total for CHRISTIAN county PL

Total Amounts:

CN

UT

RW

DN

880,000 997,000 15,329,500

1,323,000 1,000,000

1,000,000

3,250,000

880,000 2,320,000 20,579,500

CLARK KY-1958 NEW ROUTE(O) EXTEND THE WINCHESTER EAST BYPASS (KY

1958) FROM IRVINE ROAD (KY 89) TO KY 627

SOUTH OF WINCHESTER. (08CCN)(10CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

250,000

7,000,000

0 250,000 7,000,000

8401

Page 39 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CLARK I-64 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-064 BOTH

DIRECTION(S) FROM MILEPOINT 98.1 TO

MILEPOINT 101.78

CN

Project Cost:

UT

RW

DN

PL

PM

PM

430,000

4,300,000

0 0 4,730,000

20006

Total for CLARK county PL

Total Amounts:

CN

UT

RW

DN

4,300,000

250,000 430,000

7,000,000

0 250,000 11,730,000

CLAY CR-1160 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

OTTER CREEK ON OTTER CREEK ROAD (CR

1160) AT JUNCTION WITH MAY FORK ROAD (CR

1158)(026C00031N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

105,000

364,000

0 105,000 364,000

1099

CLAY US-421 MINOR WIDENING(O) IMPROVE US-421/KY-80 FROM KY-80 SOUTH TO

KY-149 (LOCKARTS CREEK ROAD). (00CCN)

(10CCR)(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 20,000,000

0 0 20,000,000

8003

CLAY CR-1263 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

CURRY BRANCH ROAD IN CLAY COUNTY.

(12CCN)

CN

Project Cost:

UT

RW

DN

PL

BR 960,000

0 960,000 0

8711

Page 40 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CLAY KY-66 RECONSTRUCTION(O) IMPROVE GEOMETRICS ON THE S-CURVE FROM

NORTHEAST OF KY-3135 (COLLEGE STREET)

TO NORTHEAST OF PR-1006 (MULBERRY

STREET).(14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 405,000

0 405,000 0

8856

CLAY KY-638 SAFETY(P) IMPROVE SAFETY AND SIGHT DISTANCE ALONG

KY 638 (MP 6.7 TO MP 7.1) AND ITS

INTERSECTION WITH KY 3476. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

250,000

650,000

0 0 900,000

8861

CLAY KY-1850 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1850 BRIDGE

OVER PHILLIPS FORK. (026B00087N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

595,000

0 175,000 595,000

10003

CLAY KY-577 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-577 BRIDGE

OVER LITTLE SEXTON CREEK. (026B00093N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

424,000

0 175,000 424,000

10004

CLAY CR-1055 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1055 BRIDGE

OVER WILES BRANCH. (026C00010N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

400,000

0 175,000 400,000

10005

Page 41 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CLAY CR-1117 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ARNETTS FORK

ROAD BRIDGE OVER DOUBLE CREEK.

(026C00018N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

364,000

0 140,000 364,000

10006

CLAY CR-1160 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OTTER CREEK ROAD

BRIDGE OVER GOOSE CREEK. (026C00032N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

595,000

0 175,000 595,000

10007

CLAY CR-1255 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1255 BRIDGE

OVER HORSE CREEK. (026C00070N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

371,000

0 175,000 371,000

10008

CLAY CR-1118 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD HIGHWAY 66

BRIDGE OVER RED BIRD RIVER. (026C00099N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

350,000

2,177,000

0 350,000 2,177,000

10009

CLAY US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 421 BRIDGE

OVER BRANCH OF ISLAND CREEK.

(026B00002N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

647,500

0 175,000 647,500

10039

Page 42 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CLAY HR-9006 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF HAL

ROGERS DANIEL BOONE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 19.527 TO

MILEPOINT 28.4

CN

Project Cost:

UT

RW

DN

PL

PM

PM

350,000

3,500,000

0 3,850,000 0

20003

CLAY HR-9006 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF HAL

ROGERS DANIEL BOONE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 28.4 TO

MILEPOINT 31

CN

Project Cost:

UT

RW

DN

PL

PM

PM

100,000

1,000,000

0 1,100,000 0

20004

CLAY HR-9006 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF HAL

ROGERS DANIEL BOONE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 31 TO MILEPOINT

35.08

CN

Project Cost:

UT

RW

DN

PL

PM

PM

160,000

1,600,000

0 1,760,000 0

20005

Total for CLAY county PL

Total Amounts:

CN

UT

RW

DN

7,465,000 25,937,500

2,255,000

250,000

650,000

0 9,720,000 26,837,500

CLINTON KY-738 AM-BRIDGE (P) REPLACE BRIDGE OVER CLEAR FORK CREEK ON

KY 738 0.2 MI S OF US 127X. (027B00011N)

(SR=31.5)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

525,000

0 175,000 525,000

1062

Page 43 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for CLINTON county PL

Total Amounts:

CN

UT

RW

DN

525,000

175,000

0 175,000 525,000

CRITTENDEN KY-91 FERRY OPERATION(P) OPERATION OF CAVE-IN-ROCK FERRY AT OHIO

RIVER FOR FY 2019.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 402,000

0 402,000 0

326.16

CRITTENDEN KY-91 FERRY OPERATION(P) OPERATION OF CAVE-IN-ROCK FERRY AT OHIO

RIVER FOR FY 2020.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 402,000

0 0 402,000

326.17

CRITTENDEN CR-1085 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1085

(0.048) OVER HUGHES BRANCH 028C00053N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

546,000

0 210,000 546,000

1159

CRITTENDEN KY-91 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-91 BRIDGE OVER

CROOKED CREEK. (028B00021N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

980,000

0 245,000 980,000

10000

Page 44 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for CRITTENDEN county PL

Total Amounts:

CN

UT

RW

DN

402,000 1,928,000

455,000

0 857,000 1,928,000

CUMBERLAND KY-61 AM-BRIDGE (P) ADDRESS DEFICIENCIES AND PAINTING OF

BRIDGE OVER CUMBERLAND RIVER ON KY 61

0.1 MI N OF COLD SPRINGS ROAD (CR 1204).

(029B00012N)

CN

Project Cost:

UT

RW

DN

PL

BR 3,640,000

0 0 3,640,000

1060

CUMBERLAND KY-90 AM-BRIDGE (P) ADDRESS DEFICIENCIES AND PAINTING OF

BRIDGE OVER CUMBERLAND RIVER ON KY 90

0.27 MI SE OF KY 61 AT THE SCL OF

BURKESVILLE. (029B00027N)

CN

Project Cost:

UT

RW

DN

PL

BR 5,200,000

0 0 5,200,000

1061

CUMBERLAND KY-90 RECONSTRUCTION(O) IMPROVE KY-90 FROM NORRIS BRANCH ROAD

EXTENDING WESTERLY TO PA DUERSON ROAD

NEAR MARROWBONE. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 3,500,000

0 0 3,500,000

8852

CUMBERLAND CR-1012 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WHETSTONE ROAD

BRIDGE OVER BIG WHETSTONE CREEK.

(029C00057N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

556,500

0 175,000 556,500

10001

Page 45 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

CUMBERLAND KY-379 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 379 BRIDGE

OVER BIG WILLIS CREEK. (029B00005N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

129,500

952,000

0 129,500 952,000

10009

Total for CUMBERLAND county PL

Total Amounts:

CN

UT

RW

DN

10,348,500

304,500 3,500,000

0 304,500 13,848,500

DAVIESS KY-298 SAFETY(P) RECONSTRUCT INTERSECTION AT FAIRVIEW

DRIVE (KY 3143) AND KY 298. (12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 1,800,000

0 1,800,000 0

229

DAVIESS US-60 RECONSTRUCTION(O) RECONSTRUCT ON US 60 BETWEEN OAKFORD

RD LOOP (CR 1370) TO ADDRESS FLOODING

PROBLEM IN THE VICINITY OF THE

KIMBERLY-CLARK PLANT (14CCR)

CN

Project Cost:

UT

RW

DN

PL

STP 2,000,000

0 2,000,000 0

237

DAVIESS WN-9007 RECONSTRUCTION(O) I-65 SPUR CORRIDOR; MODERNIZATION OF

EXISTING NATCHER PARKWAY FROM THE

OHIO-BUTLER COUNTY LINE (MP 37.143) TO THE

US-60 INTERCHANGE (MP 72.264) IN

OWENSBORO. (2016BOP)CN

Project Cost:

UT

RW

DN

PL

NH

NH

200,000

4,750,000

200,000 0 4,750,000

2092.1

Page 46 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

DAVIESS KY-54 MAJOR WIDENING(O) IMPROVE KY-54 FROM WEST OF THE US-60

BYPASS TO CR-1021 (JACK HINTON ROAD).

(06CCN)(10CCR)(12CCR)(14CCR)(16CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 10,540,000

0 10,540,000 0

8300

DAVIESS CR-1053 AM-BRIDGE (P) GRAVES LANE BRIDGE REPLACEMENT-0.2 MI E

JCT KY 405 (MM 1.005-1.009) OVER ALLGOOD

DITCH. (14CCN) 030C00016N

CN

Project Cost:

UT

RW

DN

PL

BR 619,500

0 0 619,500

8813

DAVIESS KY-81 MINOR WIDENING(O) EXTEND THE CURRENT 4 LANES TO THE

ROUNDABOUT AT KY-56/KY-81. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 3,750,000

3,750,000 0 0

8851

DAVIESS CR-1068 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ROCKPORT FERRY

RD BRIDGE OVER KELLY CREEK. (030C00021N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

647,500

0 175,000 647,500

10002

DAVIESS CR-1129 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD KY 54 BRIDGE

OVER BR OF N FK PANTHER CREEK.

(030C00029N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

647,500

0 175,000 647,500

10003

Page 47 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

DAVIESS CR-1257 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF LYDANNE BRIDGE S

BRIDGE OVER FLAT LICK CREEK. (030C00069N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

717,500

0 175,000 717,500

10004

DAVIESS KY-2262 AM-BRIDGE (P) ADDRESS DEFICIENCIES WITH GLOVER CARY

BRIDGE OVER OHIO RIVER. JOINT PROJECT WITH

INDIANA. (030B00118N)(BSBP)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

200,000

2,250,000

0 200,000 2,250,000

10020

DAVIESS US-231 AM-BRIDGE (P) ADDRESS DEFICIENCIES WITH NATCHER BRIDGE

OVER OHIO RIVER. JOINT PROJECT WITH

INDIANA. (030B00164N)(BSBP)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

10,000,000

0 175,000 10,000,000

10021

DAVIESS KY-764 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 764 BRIDGE

OVER UNNAMED STREAM. (030B00111N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

70,000

350,000

0 70,000 350,000

10023

DAVIESS KY-2155 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

150,000

1,500,000

0 1,650,000 0

20019

Page 48 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

DAVIESS WN-9007 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF WILLIAM H.

NATCHER PARKWAY BOTH DIRECTION(S) FROM

MILEPOINT 61.553 TO MILEPOINT 66.08

CN

Project Cost:

UT

RW

DN

PL

PM 4,238,000

0 0 4,238,000

20020

DAVIESS WN-9007 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WILLIAM H.

NATCHER PARKWAY BOTH DIRECTION(S) FROM

MILEPOINT 66.08 TO MILEPOINT 72.26

CN

Project Cost:

UT

RW

DN

PL

PM 5,768,000

0 0 5,768,000

20021

Total for DAVIESS county PL

Total Amounts:

CN

UT

RW

DN

3,750,000 5,300,000 29,988,000

1,120,000

200,000 10,540,000

3,950,000 16,960,000 29,988,000

EDMONSON KY-259 SPOT IMPROVEMENTS(O) RECONSTRUCT KY-70/KY-259 FROM 0.36 MILE

NORTH GREEN RIVER BRIDGE AT BROWNSVILLE

TO 0.42 MILE NORTH OF THE KY-70/KY-259

INTERSECTION.(06CCR)(2004BOPC)(12CCR)

(14CCR)CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

1,540,000

1,470,000

0 1,540,000 1,470,000

7030.1

EDMONSON KY-743 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 743 BRIDGE

OVER BEAVER DAM CREEK. (031B00004N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

402,500

0 157,500 402,500

10012

Page 49 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

EDMONSON I-65 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-065 BOTH

DIRECTION(S) FROM MILEPOINT 43.307 TO

MILEPOINT 43.6

CN

Project Cost:

UT

RW

DN

PL

PM

PM

40,000

400,000

0 440,000 0

20011

Total for EDMONSON county PL

Total Amounts:

CN

UT

RW

DN

400,000 402,500

197,500

1,540,000

1,470,000

0 2,137,500 1,872,500

ELLIOTT CR-1206 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR 1206 BRIDGE

OVER OVER LITTLE SANDY. (030C00032N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

455,000

1,663,000

0 455,000 1,663,000

10004

Total for ELLIOTT county PL

Total Amounts:

CN

UT

RW

DN

1,663,000

455,000

0 455,000 1,663,000

ESTILL KY-2459 SPOT IMPROVEMENTS(O) IMPROVE SAFETY ON KY-2459 (CARHARTT

AVE.) FROM KY-89 TO THE RAILROAD BRIDGE.

CN

Project Cost:

UT

RW

DN

PL

STP 250,000

0 0 250,000

206

Page 50 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ESTILL KY-1645 RECONSTRUCTION(O) IMPROVE SAFETY AND MOBILITY ON KY-1645

(KIRKLAND AVE) NEAR CR-1087 (LOCK 12

ROAD).

CN

Project Cost:

UT

RW

DN

PL

STP

STP

STP

STP

100,000

100,000

50,000

320,000

0 100,000 470,000

208

ESTILL KY-794 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 794 BRIDGE

OVER WHITE OAK CREEK. (033B00038N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

735,000

0 245,000 735,000

10012

Total for ESTILL county PL

Total Amounts:

CN

UT

RW

DN

1,055,000

345,000 250,000

100,000

50,000

0 345,000 1,455,000

FAYETTE CS-4174 MINOR WIDENING(O) CLAYS MILL ROAD; WIDEN FROM

HARRODSBURG ROAD TO NEW CIRCLE ROAD

(SECTION 1) (LFUCG T.I.P.) (LOCAL MATCH)

(ALL WORK BY LFUCG) (CONSTRUCTION SEQU.

2) (SUBJECT TO FISCAL CONSTRAINT PENDING CN

Project Cost:

UT

RW

DN

PL

SLX

SLX

1,900,000

11,000,000

0 12,900,000 0

224.1

FAYETTE -0 MATCHED FED FUNDS(O) VARIOUS 'SLX' CONTINUING PROGRAM

PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY

PLANNING, TRAFFIC SIGNAL) FOR FY 2018.

(LOCAL MATCH) (ALL WORK BY LFUCG)

(FUNDING SUBJECT TO FISCAL CONSTRAINT CN

Project Cost:

UT

RW

DN

PL

SLX 730,000

730,000 0 0

227.07

Page 51 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

FAYETTE -0 MATCHED FED FUNDS(O) VARIOUS 'SLX' CONTINUING PROGRAM

PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY

PLANNING, TRAFFIC SIGNAL) FOR FY 2019.

(LOCAL MATCH) (ALL WORK BY LFUCG)

(FUNDING SUBJECT TO FISCAL CONSTRAINT CN

Project Cost:

UT

RW

DN

PL

SLX 756,000

0 756,000 0

227.08

FAYETTE -0 MATCHED FED FUNDS(O) VARIOUS 'SLX' CONTINUING PROGRAM

PROJECTS (RIDESHARE/MOBILITY, AIR QUALITY

PLANNING, TRAFFIC SIGNAL) FOR FY 2020.

(LOCAL MATCH) (ALL WORK BY LFUCG)

(FUNDING SUBJECT TO FISCAL CONSTRAINT CN

Project Cost:

UT

RW

DN

PL

SLX 756,000

0 0 756,000

227.09

FAYETTE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR LEXINGTON URBANIZED AREA

AND SUBJECT TO MPO CONTROL FOR FY 2018.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)CN

Project Cost:

UT

RW

DN

PL

SLX 12,400,000

12,400,000 0 0

227.1

FAYETTE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR LEXINGTON URBANIZED AREA

AND SUBJECT TO MPO CONTROL FOR FY 2019.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)CN

Project Cost:

UT

RW

DN

PL

SLX 8,000,000

0 8,000,000 0

227.13

FAYETTE -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL-AID STP FUNDS

EARMARKED FOR LEXINGTON URBANIZED AREA

AND SUBJECT TO MPO CONTROL FOR FY 2020.

(FUNDING SUBJECT TO FISCAL CONTRAINT

PENDING MPO TIP)CN

Project Cost:

UT

RW

DN

PL

SLX 8,200,000

0 0 8,200,000

227.14

Page 52 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

FAYETTE -0 BIKE/PED FACIL(O) SOUTH ELKHORN TRAIL IN LEXINGTON

(PRIORITY SECTION 2); FROM JOSEPH BRYAN

WAY THROUGH NS RAILROAD TUNNEL TO

WAVELAND HISTORIC SITE (ALL WORK BY

LFUCG). (FUNDING SUBJECT TO FISCAL CN

Project Cost:

UT

RW

DN

PL

SLX 400,000

400,000 0 0

229.2

FAYETTE -0 BIKE/PED FACIL(O) SOUTH ELKHORN TRAIL(PRIORITY SECTION 3);

FROM LOCHDALE TERRACE, EXTENDING

NORTHERLY UNDER MAN O' WAR BOULEVARD

TO SHILLITO PARK.(LOCAL MATCH)(DESIGN BY

LFUCG)(ALL WORK BY LFUCG)(2004BOPC)CN

Project Cost:

UT

RW

DN

PL

SLX 625,000

625,000 0 0

229.3

FAYETTE KY-922 MAJOR WIDENING(O) IMPROVE NEWTOWN PIKE FROM KY-4 TO I-75.

(16CCR)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

2,000,000

3,000,000

0 5,000,000 0

252

FAYETTE KY-169 FERRY OPERATION(P) OPERATION OF VALLEY VIEW FERRY AT KY

RIVER FOR FY 2019.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 330,000

0 330,000 0

357.16

FAYETTE KY-169 FERRY OPERATION(P) OPERATION OF VALLEY VIEW FERRY AT KY

RIVER FOR FY 2020.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 330,000

0 0 330,000

357.17

Page 53 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

FAYETTE KY-4 MAJOR WIDENING(O) WIDEN NEW CIRCLE ROAD IN LEXINGTON FROM

GEORGETOWN ROAD TO BOARDWALK AVENUE

INCLUDING INTERCHANGE RECONSTRUCTION AT

NEWTOWN PIKE.(2002BOPC)(2004BOPP)

(10CCR)(12CCR)(14CCR)CN

Project Cost:

UT

RW

DN

PL

NH 10,000,000

0 0 10,000,000

366

FAYETTE US-27 RECONSTRUCTION(O) REPLACE L&N RAILROAD BRIDGE OVERPASS

(MP 8.378), IMPROVE DRAINAGE AND TYPICAL

SECTION ON US 27 (NORTH BROADWAY)

(12CCR)(14CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 2,440,000

0 0 2,440,000

412

FAYETTE CS-4524 RECONSTRUCTION(O) CONSTRUCT TURN LANES AT THE INTERSECTION

OF MAN O' WAR BLVD (CS-4524) AND

RICHMOND ROAD (US-25).

CN

Project Cost:

UT

RW

DN

PL

SLX 262,000

262,000 0 0

428

FAYETTE US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 421

OVER FORK OF TOWN BRANCH AT

INTERSECTION OF US 421 AND BRACKTOWN RD

(CS 4008) (034B00018N)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 800,000

0 800,000 0

1129

FAYETTE CS-3605 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON MALABU

DRIVE (CS 3605) OVER BRANCH HICKMAN

CREEK AT JCT WITH TATES CREEK ROAD (KY

1974) 034C00038N

CN

Project Cost:

UT

RW

DN

PL

BR 427,000

427,000 0 0

1132

Page 54 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

FAYETTE CR-1001 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

BRANCH OF NORTH ELKHORN CREEK ON HUME

ROAD (CR 1001) 0.7 MI NW OF US 60

(034C00001N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

735,000

0 210,000 735,000

1141

FAYETTE CS-7038 MATCHED FED FUNDS(O) REPLACE DETERIORATED WEST BOUND LANE

BRIDGE SECTION OF WILSON DOWNING ROAD

BRIDGE ACROSS WEST HICKMAN CREEK.

CN

Project Cost:

UT

RW

DN

PL

SLX

SLX

75,000

275,000

350,000 0 0

1145

FAYETTE CS-2548 NEW ROUTE(O) COMPLETE CONSTRUCTION ON POLO CLUB

BOULEVARD AT DEERHAVEN LANE AND TODDS

ROAD. (08CCN)(FUNDING SUBJECT TO FISCAL

CONSTRAINT PENDING MPO TIP)(LET BY CITY)

CN

Project Cost:

UT

RW

DN

PL

SLX 1,600,000

1,600,000 0 0

8507

FAYETTE KY-4 TRANSP ENHANCEMENT(P) SOUND BARRIERS ALONG OUTER LOOP OF NEW

CIRCLE ROAD BETWEEN TATES CREEK ROAD

AND NICHOLASVILLE ROAD. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 2,300,000

0 0 2,300,000

8801

FAYETTE CR-1121 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MCCALLS MILL RD

BRIDGE OVER BOGGS FORK. (034C00009N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

360,500

0 157,500 360,500

10009

Page 55 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

FAYETTE I-64 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-064

CARDINAL DIRECTION(S) FROM MILEPOINT 73.94

TO MILEPOINT 74.729

CN

Project Cost:

UT

RW

DN

PL

PM

PM

30,000

3,000,000

0 3,030,000 0

20009

FAYETTE I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 111.82 TO

MILEPOINT 120.792

CN

Project Cost:

UT

RW

DN

PL

PM

PM

1,080,000

10,800,000

0 0 11,880,000

20015

FAYETTE US-421 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

50,000

500,000

0 550,000 0

20016

Total for FAYETTE county PL

Total Amounts:

CN

UT

RW

DN

16,719,000 24,386,000 33,481,500

75,000 447,500 1,080,000

2,000,000 2,440,000

4,900,000

16,794,000 31,733,500 37,001,500

FLEMING KY-32 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 32

OVER MUD LICK CREEK 0.2 MILES W OF

CRAINTOWN RD (CR 1302)035B00038N

CN

Project Cost:

UT

RW

DN

PL

BR 560,000

0 0 560,000

1084

Page 56 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

FLEMING KY-111 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

ALLISON CREEK ON KY 111 1.2 MI N OF KY 156.

(035B00016N)(EBRP)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

455,000

2,135,000

0 455,000 2,135,000

1091

FLEMING CR-1240 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

FLEMING CREEK ON MCINTIRE ROAD (CR 1240)

AT THE JCT WITH PIKE BLUFF (CR 1305)

(035C00065N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BR

75,000

50,000

600,000

0 125,000 600,000

1092

FLEMING KY-111 BRIDGE REHAB(P) RESTORATION OF GRANGE CITY COVERED

BRIDGE LOCATED ON KY-111 BETWEEN

FLEMINGSBURG AND GRANGE CITY. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

TE 1,200,000

0 1,200,000 0

8804

FLEMING KY-11 SAFETY(P) IMPROVE ACCESS AND RESPONSE TIMES FOR

THE FLEMINGSBURG FIRE DEPARTMENT TO THE

BYPASS AT MP 11.574.

CN

Project Cost:

UT

RW

DN

PL

SPP 80,000

0 80,000 0

8902

FLEMING KY-111 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-111 BRIDGE

OVER BR OF HILLSBORO CREEK. (035B00018N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

455,000

1,015,000

0 455,000 1,015,000

10005

Page 57 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

FLEMING KY-367 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-367 BRIDGE

OVER JOHNSON CREEK. (035B00074N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

375,000

980,000

0 375,000 980,000

10006

FLEMING KY-2508 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2508 BRIDGE

OVER TOWN BRANCH. (035B00030N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

315,000

875,000

0 315,000 875,000

10019

FLEMING KY-111 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 111 BRIDGE

OVER DAVIS BRANCH. (035B00075N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

315,000

752,500

0 315,000 752,500

10020

FLEMING KY-681 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 681 BRIDGE

OVER DELANEY CREEK. (035B00103N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

315,000

822,500

0 315,000 822,500

10021

FLEMING KY-32 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

1,250,000

12,500,000

0 13,750,000 0

20009

Page 58 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

FLEMING US-32 SAFETY(P) IMPROVE SAFETY AND SIGHT DISTANCE ON

KY-32 BEGINNING AT 0.4 MILES WEST OF

FLEMING/ROWAN CO LINE AND ENDING 0.3

MILES EAST OF THE LINE.

CN

Project Cost:

UT

RW

DN

PL SPP 50,000

0 0 50,000

80051

Total for FLEMING county PL

Total Amounts:

CN

UT

RW

DN

13,780,000 7,740,000

3,480,000

50,000

75,000

50,000

0 17,385,000 7,790,000

FLOYD US-23 SAFETY(P) IMPROVE SAFETY AND ACCESS ON US-23

BETWEEN KY-80 AND KY-3384.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

420,000

520,000

0 940,000 0

191

FLOYD KY-1100 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 1100

OVER LITTLE PAINT CREEK NEAR

FLOYD/JOHNSON COUNTY LINE 036B00002N

CN

Project Cost:

UT

RW

DN

PL

BR 322,000

322,000 0 0

1111

FLOYD KY-2557 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

LEVISA FORK ON KY 2557 AT JCT US 23 IN

JUSTELL. (036B00040N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

525,000

3,010,000

0 525,000 3,010,000

1119

Page 59 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

FLOYD KY-550 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

BRUSH CREEK ON KY 550 AT JCT WITH KY 850.

(036B00015N)(EBRP)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

1,050,000

0 210,000 1,050,000

1121

FLOYD KY-122 SAFETY(P) CURVE REVISION TO INCLUDE IMPROVED SIGHT

DISTANCE AND A LEFT TURN LANE ON KY-122

AT THE KY-680 INTERSECTION IN MCDOWELL.

(02CCN)(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 3,950,000

0 3,950,000 0

8100

FLOYD CR-1253 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRYANT BRANCH

LEFT FORK OF CLEAR CREEK ROAD BRIDGE

OVER LEFT FK OF BEAVER CREEK.

(036C00017N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

384,000

0 175,000 384,000

10000

FLOYD KY-466 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 466 BRIDGE

OVER LEFT FORK BEAVER CREEK.

(036B00032N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

274,750

0 140,000 274,750

10014

FLOYD KY-80 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

1,225,000

12,250,000

0 13,475,000 0

20000

Page 60 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

FLOYD US-23 SAFETY(P) CONSTRUCT NEW INTERSECTION ON US-23 AT

THE ENTRANCE TO BETSY LANE HIGH SCHOOL

CN

Project Cost:

UT

RW

DN

PL

SPP 250,000

0 0 250,000

80000

Total for FLOYD county PL

Total Amounts:

CN

UT

RW

DN

322,000 16,200,000 4,718,750

2,275,000 250,000

420,000

520,000

322,000 19,415,000 4,968,750

FRANKLIN KY-3506 AM-BRIDGE (P) DEMOLITION OF THE CLOSED ROADWAY

SECTION OF THE BROADWAY BRIDGE IN

FRANKFORT.

CN

Project Cost:

UT

RW

DN

PL

BR 300,000

0 300,000 0

805

FRANKLIN CR-1230 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

BENSON CREEK ON CRAB ORCHARD ROAD (CR

1230) 200 FT NW OF KY 151 NEAR I-64 EXIT 48

(037C00010N) (EBRP)(16CCR)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

105,000

633,500

105,000 633,500 0

1078

FRANKLIN KY-420 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 420 BRIDGE

OVER CEDAR RUN CREEK. (037B00011N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

350,000

0 210,000 350,000

10000

Page 61 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

FRANKLIN KY-1689 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1689 BRIDGE

OVER TRIB TO N. ELKHORN CREEK.

(037B00034N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

332,500

0 210,000 332,500

10001

Total for FRANKLIN county PL

Total Amounts:

CN

UT

RW

DN

933,500 682,500

105,000 420,000

105,000 1,353,500 682,500

FULTON KY-1354 FERRY OPERATION(P) OPERATION OF HICKMAN FERRY AT MISSISSIPPI

RIVER FOR FY 2019.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 126,000

0 126,000 0

320.16

FULTON KY-1354 FERRY OPERATION(P) OPERATION OF HICKMAN FERRY AT MISSISSIPPI

RIVER FOR FY 2020.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 126,000

0 0 126,000

320.17

FULTON KY-1909 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1909 BRIDGE

OVER LITTLE BAYOU DE CHIEN CR.

(038B00075N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

490,000

0 175,000 490,000

10009

Page 62 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

FULTON JC-9003 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF JULIAN M.

CARROLL PURCHASE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT

1.78

CN

Project Cost:

UT

RW

DN

PL

PM

PM

175,000

1,750,000

0 1,925,000 0

20002

Total for FULTON county PL

Total Amounts:

CN

UT

RW

DN

1,876,000 616,000

350,000

0 2,226,000 616,000

GARRARD US-27 RELOCATION(O) IMPROVE US-27 FROM WEST LANCASTER

BYPASS TO KY-34. (2006BOPC) (16CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

500,000

10,000,000

0 500,000 10,000,000

196.3

GARRARD KY-563 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-563

(MP 3.89) OVER SUGAR CREEK; E-@ JCT KY 39;

040B00034N

CN

Project Cost:

UT

RW

DN

PL

BR 406,000

406,000 0 0

1122

GARRARD KY-1972 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

GILBERTS CREEK ON KY 1972 1.4 MI E OF CRAB

ORCHARD ROAD (CR 1226) AT SECL OF

LANCASTER. (040B00024N)(EBRP)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

647,500

0 210,000 647,500

1138

Page 63 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

GARRARD KY-1972 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1972 BRIDGE

OVER BRANCH OF GILBERTS CREEK.

(040B00025N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

416,500

0 175,000 416,500

10010

Total for GARRARD county PL

Total Amounts:

CN

UT

RW

DN

406,000 1,064,000

885,000

10,000,000

406,000 885,000 11,064,000

GRANT CR-1138 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON SOUTH

END OF BLANCHET ROAD 0.3 MILES

NORTHEAST OF US 25. 041C00012N (12CCN)

CN

Project Cost:

UT

RW

DN

PL

BR 1,141,000

0 1,141,000 0

8714

GRANT CR-1138 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON NORTH

END OF BLANCHET ROAD 0.2 MILES

SOUTHEAST OF THE JUNCTION WITH US 25.

041C00014N (12CCN)

CN

Project Cost:

UT

RW

DN

PL

BR 2,604,000

0 0 2,604,000

8715

GRANT CR-1142 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON NORTH

END OF DELANEY ROAD 0.1 MILE NORTH OF

THE JUNCTION WITH US 25. 041C00016N

(12CCN)

CN

Project Cost:

UT

RW

DN

PL

BR 2,240,000

0 0 2,240,000

8716

Page 64 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

GRANT KY-22 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-22 BRIDGE OVER

CLARKS CRK+BATON ROUGE R. (041B00011N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

1,732,500

0 210,000 1,732,500

10001

GRANT KY-22 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-22 BRIDGES

OVER EAGLE CREEK (041B00014N) AND

RATTLESNAKE CREEK (041B00013N).

CN

Project Cost:

UT

RW

DN

PL

BR

BR

577,500

4,165,000

0 577,500 4,165,000

10002

GRANT CR-1108 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CYNTHIANA ROAD

BRIDGE OVER COOPERTOWN CREEK.

(041C00008N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

367,500

0 175,000 367,500

10003

GRANT KY-22 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 22 BRIDGE OVER

CLARKS CRK+BATON ROUGE R. (041B00011N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

420,000

2,940,000

0 420,000 2,940,000

10010

GRANT I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075

NON-CARDINAL DIRECTION(S) FROM MILEPOINT

143.239 TO MILEPOINT 145.5

CN

Project Cost:

UT

RW

DN

PL

PM

PM

90,000

900,000

0 0 990,000

20023

Page 65 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

GRANT I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 152.112 TO

MILEPOINT 157.7

CN

Project Cost:

UT

RW

DN

PL

PM

PM

970,000

9,700,000

0 10,670,000 0

20025

GRANT I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 162.52 TO

MILEPOINT 164.4

CN

Project Cost:

UT

RW

DN

PL

PM

PM

220,000

2,200,000

0 2,420,000 0

20027

Total for GRANT county PL

Total Amounts:

CN

UT

RW

DN

13,041,000 14,949,000

2,572,500 90,000

0 15,613,500 15,039,000

GRAVES KY-80 NEW ROUTE(O) MURRAY-MAYFIELD RD; EXTEND MAYFIELD

SOUTHERN BYPASS FROM KY-303 SOUTH OF

MAYFIELD, NORTHWEST TO JULIAN M.

CARROLL PARKWAY (PURCHASE PARKWAY).

(EXTENSION OF 1-181.30)(00CCR)(12CCR)CN

Project Cost:

UT

RW

DN

PL

SPP 7,280,000

0 0 7,280,000

181.5

GRAVES CR-1088 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

PANTHER CREEK ON MCKENDREE CHURCH RD

(CR 1088) 0.3 MI E OF KY 301 042C00010N

CN

Project Cost:

UT

RW

DN

PL

BR 280,000

0 280,000 0

1157

Page 66 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

GRAVES KY-1890 AM-BRIDGE (P) REPLACE KY-1890 BRIDGE OVER LITTLE

MAYFIELD CREEK. (042B00191N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

507,500

0 140,000 507,500

10001

GRAVES CR-1214 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MARTIN ROAD

BRIDGE OVER BRANCH-OBION CREEK.

(042C00250N)

CN

Project Cost:

UT

RW

DN

PL

BR 200,000

0 200,000 0

10002

GRAVES KY-1485 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1485 BRIDGE

OVER TERRAPIN CREEK. (042B00136N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

875,000

0 210,000 875,000

10010

Total for GRAVES county PL

Total Amounts:

CN

UT

RW

DN

8,662,500

830,000

0 830,000 8,662,500

GRAYSON US-62 MINOR WIDENING(O) IMPROVE US 62 FROM LEITCHFIELD BYPASS

(KY3155) TO JUST EAST OF BEEHIVE CURVE.

CONSTRUCTION SEGMENT 1.

CN

Project Cost:

UT

RW

DN

PL

STP 2,000,000

0 0 2,000,000

8502.1

Page 67 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

GRAYSON KY-3155 NEW ROUTE(O) EXTEND THE WILLIAM THOMASON BYWAY (KY

3155) FROM THE SOUTHERN INTERSECTION AT

KY 259 WESTERLY TO KY 54

CN

Project Cost:

UT

RW

DN

PL

SPP 1,000,000

0 1,000,000 0

8954

GRAYSON CR-1161 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HORNTOWN RD

BRIDGE OVER ROCK CREEK. (043C00011N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

100,000

220,000

0 100,000 220,000

10000

GRAYSON WK-9001 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 108.00 TO

MILEPOINT 111.25 (110.50 NON-CARDINAL)

CN

Project Cost:

UT

RW

DN

PL

PM

PM

230,000

2,300,000

0 0 2,530,000

20000

GRAYSON WK-9001 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 88.433 TO

MILEPOINT 91.2

CN

Project Cost:

UT

RW

DN

PL

PM 2,590,000

0 0 2,590,000

20004

GRAYSON WK-9001 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY

NON-CARDINAL DIRECTION(S) FROM MILEPOINT

91.2 TO MILEPOINT 95

CN

Project Cost:

UT

RW

DN

PL

PM

PM

150,000

1,500,000

0 0 1,650,000

20006

Page 68 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for GRAYSON county PL

Total Amounts:

CN

UT

RW

DN

8,610,000

1,100,000 380,000

0 1,100,000 8,990,000

GREEN US-68 RECONSTRUCTION(O) ADDRESS SAFETY, GEOMETRIC DEFICIENCIES

AND MAINTENANCE ISSUES ALONG US 68 FROM

1600 FEET WEST OF SOUTH THURLOW RD. (MP

9.682) EXTENDING TO THE RUSSELL CREEK

BRIDGE (MP 10.775) (3-203.00 STUDY CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

250,000

720,000

2,740,000

0 970,000 2,740,000

397.12

GREEN CR-1347 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF JONES SCHOOL RD

BRIDGE OVER BRUSH CREEK. (044C00023N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

100,000

203,000

0 100,000 203,000

10001

GREEN US-68 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 68 BRIDGE OVER

GREASY CREEK. (044B00013N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

105,000

402,500

0 105,000 402,500

10009

Total for GREEN county PL

Total Amounts:

CN

UT

RW

DN

3,345,500

205,000

250,000

720,000

0 1,175,000 3,345,500

Page 69 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

GREENUP CS-3060 BIKE/PED FACIL(O) CONSTRUCT SIDEWALKS-PHASE B ALONG

GESLING RD (CS-3060) FROM INTERSECTION OF

CARDINAL RD (CS-3061) & SEATON DR

(KY-750) TO KENWOOD DR (CS-3054/KY-1093)

& PHASE C ALONG KENWOOD DR BEGINNING CN

Project Cost:

UT

RW

DN

PL

SAH

SAH

SAH

SAH

68,000

20,000

80,000

444,000

88,000 524,000 0

401

GREENUP KY-750 MATCHED FED FUNDS(O) DESIGN AND CONSTRUCTION OF SIDEWALKS

ALONG POWELL LANE (KY-750) IN

FLATWOODS, KY BEGINNING AT END OF THE

EXISTING SIDEWALK AT MP 1.74 AND

EXTENDING APPROXIMATELY 0.7 MILES EAST TO CN

Project Cost:

UT

RW

DN

PL

SAH

SAH

SAH

32,000

64,000

370,000

466,000 0 0

402

GREENUP KY-244 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-244

(MP 0.103) OVER CSX RAILROAD; .05 MI N.E. OF

JCT US 23; 045B00039N (16CCR)

CN

Project Cost:

UT

RW

DN

PL

BR 11,655,000

11,655,000 0 0

1073

GREENUP CS-4041 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER POND

RUN ON WILLIAMS AVE (CS 4041) IN RACELAND

250 FT NW OF POND RUN ROAD (CS 4001)

(045C00119N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

840,000

0 245,000 840,000

1094

GREENUP KY-503 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-503 BRIDGE

OVER INDIAN RUN CREEK. (045B00033N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

753,000

0 245,000 753,000

10007

Page 70 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

GREENUP CR-1018 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SMITH BRANCH RD

BRIDGE OVER LEFT FK SMITH BRANCH.

(045C00114N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

280,000

595,000

0 280,000 595,000

10008

GREENUP LA-1000 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MUSKETEER DRIVE

BRIDGE OVER SLASH BRANCH. (045C00150N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

300,000

0 245,000 300,000

10009

GREENUP KY-1 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1 BRIDGE OVER

LOST CREEK. (045B00006N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

350,000

1,015,000

0 350,000 1,015,000

10022

Total for GREENUP county PL

Total Amounts:

CN

UT

RW

DN

12,025,000 444,000 3,503,000

68,000 1,365,000

52,000

64,000 80,000

12,209,000 1,889,000 3,503,000

HANCOCK US-60 MINOR WIDENING(O) IMPROVE THE WESTBOUND LANES OF US-60

FROM KY-1957 TO 0.2 MILE WEST OF KY-6106.

(12CCR)(14CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

90,000

960,000

0 90,000 960,000

226

Page 71 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for HANCOCK county PL

Total Amounts:

CN

UT

RW

DN

90,000

960,000

0 90,000 960,000

HARDIN KY-251 PHASE I DESIGN(O) KY 251 IMPROVEMENTS FROM KY 3005 TO KY

434.

CN

Project Cost:

UT

RW

DN

PL

BR2 4,200,000

0 4,200,000 0

153.01

HARDIN KY-313 MAJOR WIDENING(O) WIDEN KY 313 TO 4 LANES BETWEEN PATRIOT

PARKWAY (MP 10.598) AND THE BULLION

BOULEVARD CONNECTOR (MP 14.534).

(2016BOP)

CN

Project Cost:

UT

RW

DN

PL

BR2

BR2

750,000

12,000,000

0 750,000 12,000,000

170

HARDIN US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER P&L

AND CSX RAILROADS (MP 36.4 TO 36.8 IN WEST

POINT) (047B00007N).(16CCR)

CN

Project Cost:

UT

RW

DN

PL

BR 10,500,000

0 10,500,000 0

199

HARDIN US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 62

OVER ROLLING FORK AT THE HARDIN-NELSON

CO LINE. 047B00023N

CN

Project Cost:

UT

RW

DN

PL

BR 3,381,000

0 0 3,381,000

1093

Page 72 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

HARDIN KY-361 SAFETY(P) RELOCATE INTERSECTION OF WOODLAND

DRIVE AT US-31W. (98CCN)(06CCR)(REMAINING

FUNDS FOR AGREEMENT)(12CCR)(LET BY

KYTC)

CN

Project Cost:

UT

RW

DN

PL

BR2 2,500,000

0 0 2,500,000

7020

HARDIN KY-1357 SAFETY(P) IMPROVE SAFETY, GEOMETRICS, DRAINAGE

AND MAINTENANCE ISSUES ALONG KY-1357

(ST. JOHNS RD) FROM US-31W BYPASS TO

KY-3005 (RING ROAD). (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 3,000,000

0 0 3,000,000

8801

HARDIN KY-220 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 220 BRIDGE

OVER MARTINS BRANCH CREEK. (047B00080N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

87,500

192,500

0 87,500 192,500

10010

HARDIN KY-2212 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2212 BRIDGE

OVER PAWLEY CREEK. (047B00134N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

91,000

206,500

0 91,000 206,500

10011

HARDIN KY-2800 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2800 BRIDGE

OVER SANDY CREEK. (047B00137N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

87,500

206,500

0 87,500 206,500

10012

Page 73 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

HARDIN CR-1100 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BEWLEY HOLLOW

RD BRIDGE OVER MILL CREEK. (047C00014N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

91,000

227,500

0 91,000 227,500

10013

HARDIN BG-9002 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF MARTHA

LAYNE COLLINS BLUEGRASS PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 5.82 TO

MILEPOINT 8.837

CN

Project Cost:

UT

RW

DN

PL

PM

PM

240,000

2,400,000

0 2,640,000 0

20007

HARDIN US-31 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION

CN

Project Cost:

UT

RW

DN

PL

PM

PM

550,000

5,500,000

0 6,050,000 0

20011

HARDIN US-31 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION

CN

Project Cost:

UT

RW

DN

PL

PM

PM

250,000

2,500,000

0 2,750,000 0

20012

HARDIN US-31 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

25,000

250,000

0 0 275,000

20014

Page 74 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

HARDIN WK-9001 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY CARDINAL

DIRECTION(S) FROM MILEPOINT 132.4 TO

MILEPOINT 134.923

CN

Project Cost:

UT

RW

DN

PL

PM

PM

200,000

2,000,000

0 2,200,000 0

20018

Total for HARDIN county PL

Total Amounts:

CN

UT

RW

DN

22,900,000 18,964,000

1,597,000 25,000

3,000,000

4,950,000

0 29,447,000 21,989,000

HARLAN KY-219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

WALLINS CREEK ON KY 219 3.0 MILE SOUTH OF

SCL OF WALLINS CREEK. (048B00047N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

510,000

0 175,000 510,000

1097

HARLAN US-119 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 119

OVER KY 160/MAIN ST IN HARLAN COUNTY, KY.

048B00126N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

560,000

5,460,000

0 560,000 5,460,000

1101

HARLAN CR-1328 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON SWEET

BALL RD (CR-1328) (0.175) OVER AGES

BRANCH. 048C00072N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

455,000

0 175,000 455,000

1107

Page 75 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

HARLAN KY-219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-219 BRIDGE

OVER WALLINS CREEK. (048B00046N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

490,000

0 175,000 490,000

10010

HARLAN KY-219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-219 BRIDGE

OVER WALLINS CREEK. (048B00048N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

367,500

0 175,000 367,500

10011

HARLAN KY-72 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-72 BRIDGE OVER

CLOVER FK CUMBERLAND RVR. (048B00095N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

910,000

0 245,000 910,000

10012

HARLAN KY-179 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-179 BRIDGE

OVER FUGETT CREEK. (048B00097N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

612,500

0 175,000 612,500

10013

HARLAN KY-3451 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3451 BRIDGE

OVER EWING CREEK. (048B00146N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

525,000

0 175,000 525,000

10014

Page 76 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

HARLAN KY-2007 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2007 BRIDGE

OVER WALLINS CREEK. (048B00179N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

192,500

469,000

0 192,500 469,000

10015

HARLAN CR-1020 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RASNICK RD BRIDGE

OVER POOR FK CUMBERLAND RVR.

(048C00008N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

192,500

630,000

0 192,500 630,000

10016

HARLAN CR-1218 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BLUE LN BRIDGE

OVER PATH FK OF PUCKETT CREEK.

(048C00043N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

581,000

0 175,000 581,000

10017

HARLAN CS-1041 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KENTUCKY AV

BRIDGE OVER MARTINS FK CUMBERLAND RV.

(048C00067N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

647,500

0 175,000 647,500

10018

HARLAN CR-1082 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PRICE LN BRIDGE

OVER CLOVER FK CUMBERLAND RVR.

(048C00094N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

192,500

598,500

0 192,500 598,500

10019

Page 77 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

HARLAN CR-1253 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BANNER FORK RD

BRIDGE OVER WALLINS CREEK. (048C00138N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

427,000

0 175,000 427,000

10020

HARLAN KY-1604 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1601 BRIDGE

OVER JONES CREEK. (048B00073N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

740,600

0 175,000 740,600

10040

Total for HARLAN county PL

Total Amounts:

CN

UT

RW

DN

13,423,600

3,132,500

0 3,132,500 13,423,600

HART KY-335 ECONOMIC DEVEL(O) IMPROVE MOBILITY, CONNECTIVITY AND

SAFETY BY ADDRESSING COMMERCIAL AND

INDUSTRIAL TRAFFIC MOVEMENT FROM US-31W

SOUTH OF KY-218 TO I-65. (16CCR)

CN

Project Cost:

UT

RW

DN

PL

NH 1,500,000

0 0 1,500,000

441

Total for HART county PL

Total Amounts:

CN

UT

RW

DN

1,500,000

0 0 1,500,000

Page 78 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

HENDERSON US-60 RECONSTRUCTION(O) WATHEN LANE: UPGRADE WITH WIDENED

LANES, CURB, GUTTER AND SIDEWALK FROM

US 60 TO CITY LIMITS.

CN

Project Cost:

UT

RW

DN

PL

SHN 304,000

304,000 0 0

382

HENDERSON CS-1372 RECONSTRUCTION(O) IMPROVE SAFETY AND REDUCE CONGESTION

ON CS-1372 (WATSON LANE)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

400,000

1,400,000

0 400,000 1,400,000

383

HENDERSON -0 MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO

HENDERSON FOR FY 2018. (FUNDING SUBJECT

TO FISCAL CONSTRAINT PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SHN 1,176,000

1,176,000 0 0

700.13

HENDERSON -0 MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO

HENDERSON FOR FY 2019. (FUNDING SUBJECT

TO FISCAL CONSTRAINT PENDING MPO TIP).

CN

Project Cost:

UT

RW

DN

PL

SHN 700,000

0 700,000 0

700.14

HENDERSON -0 MATCHED FED FUNDS(O) FEDERAL 'STP' FUNDS DEDICATED TO

HENDERSON FOR FY 2020. (FUNDING SUBJECT

TO FISCAL CONSTRAINT PENDING MPO TIP).

CN

Project Cost:

UT

RW

DN

PL

SHN 700,000

0 0 700,000

700.15

Page 79 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

HENDERSON US-41 SAFETY(P) US 41/KY 812 INTERSECTION UPGRADE: ADD

RIGHT TURN AND LEFT TURN LANES INCLUDING

SIGNAL PHASING. KYTC PROJECT WITH KYTC

PROVIDING 20% MATCH.(TOLL CREDITS)

(FUNDING SUBJECT TO FISCAL CONSTRAINT CN

Project Cost:

UT

RW

DN

PL

SHN

SHN

SHN

50,000

100,000

950,000

1,100,000 0 0

711

HENDERSON CS-1453 AM-BRIDGE (P) WATHEN BRIDGE REPLACEMENT: REPLACE

EXISTING BRIDGE WITH 6FT PRECAST

CONCRETE BOX CULVERT, PAVEMENT AND

GUARDRAIL. LPA PROJECT. CITY TO PROVIDE

MATCH.(FUNDING SUBJECT TO FISCAL CN

Project Cost:

UT

RW

DN

PL

SHN

SHN

20,000

160,000

180,000 0 0

713

HENDERSON KY-2183 MATCHED FED FUNDS(O) KY 2183 / KY 1539 INTERSECTION AND

UPGRADE: PROJECT WILL RECONSTRUCT THE

INTERSECTION AND MAKE IMPROVEMENTS TO

THE SOUTHBOUND APPROACH. (2012BOP)

CN

Project Cost:

UT

RW

DN

PL

SHN

SHN

SHN

150,000

400,000

600,000

550,000 600,000 0

714

HENDERSON US-41 MATCHED FED FUNDS(O) US 41/ WOLF HILLS ROAD INTERSECTION

UPGRADE: PROJECT WILL ADD DEDICATED

RIGHT TURN AND LEFT TURN LANES INCLUDING

SIGNAL PHASING TO BE MODIFIED OR ADDED TO

EACH LEG OF THE INTERSECTION. (2012BOP)CN

Project Cost:

UT

RW

DN

PL

SHN

SHN

SHN

50,000

100,000

500,000

150,000 500,000 0

715

HENDERSON US-60 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 60

OVER GREEN RIVER AT INTERSECTION WITH KY

1078 051B00015N.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

BR 6,000,000

0 6,000,000 0

1080

Page 80 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

HENDERSON US-60 PREFINANCD CONVRSN(O) ADDRESS DEFICIENCIES OF BRIDGE ON US 60

OVER GREEN RIVER AT INTERSECTION WITH KY

1078. (SR 39) 051B00015N (ADDITIONAL

FUNDING FOR C PHASE)

CN

Project Cost:

UT

RW

DN

PL

BR 6,000,000

0 0 6,000,000

1080.01

HENDERSON I-69 NEW ROUTE(O) DEVELOP ALIGNMENT FOR I-69

HENDERSON/EVANSVILLE OHIO RIVER

CROSSING (TO BE DEVELOPED IN CONCERT

WITH 2-1088.00).(16CCR)(C-COST=$1.0 BILLION;

KYTC SHARE $600 MILLION)CN

Project Cost:

UT

RW

DN

PL

NH 500,000

0 500,000 0

1088.1

Total for HENDERSON county PL

Total Amounts:

CN

UT

RW

DN

2,286,000 7,800,000 6,700,000

304,000 900,000

250,000 1,400,000

620,000

3,460,000 8,700,000 8,100,000

HENRY KY-146 RECONSTRUCTION(O) MAJOR RECONSTRUCTION OF KY-146 BETWEEN

NEW CASTLE AT US-421 AND PENDLETON AT

KY-153. SEGMENT 1: PENDLETON ROAD (KY

153) TO LOST CREEK (1/2 MILE EAST OF

SAFETY KLEEN ENTRANCE). MILE POINT 2.1 TO CN

Project Cost:

UT

RW

DN

PL

SPP 6,930,000

0 6,930,000 0

8300

HENRY KY-997 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 997 BRIDGE

OVER WHITE SULPHUR CREEK. (052B00060N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

192,500

266,000

0 192,500 266,000

10002

Page 81 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

HENRY KY-3175 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3175 BRIDGE

OVER WHITE SULPHUR FORK. (052B00064N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

262,500

574,000

0 262,500 574,000

10003

HENRY KY-3320 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3320 BRIDGE

OVER TRIB OF HARRODS CREEK. (052B00070N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

287,000

0 210,000 287,000

10004

HENRY CR-1027 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GULLION RUN RD

BRIDGE OVER TRIB OF GULLION RUN.

(052C00045N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

231,000

0 175,000 231,000

10006

HENRY KY-1606 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1606 BRIDGE

OVER WHITE SULPHUR FORK. (052B00048N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

1,022,000

0 245,000 1,022,000

10017

HENRY I-71 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-071 BOTH

DIRECTION(S) FROM MILEPOINT 24.727 TO

MILEPOINT 28.173.

CN

Project Cost:

UT

RW

DN

PL

PM

PM

450,000

4,500,000

0 4,950,000 0

20002

Page 82 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

HENRY I-71 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-071

CARDINAL DIRECTION(S) FROM MILEPOINT

37.183 TO MILEPOINT 38.086

CN

Project Cost:

UT

RW

DN

PL

PM

PM

40,000

400,000

0 0 440,000

20007

Total for HENRY county PL

Total Amounts:

CN

UT

RW

DN

11,430,000 2,780,000

1,535,000 40,000

0 12,965,000 2,820,000

HICKMAN KY-1826 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND

APPROACHES ON KY-1826 OVER TOWN CREEK

(B79) IN CLINTON. (053B00079N)

CN

Project Cost:

UT

RW

DN

PL

BR 1,400,000

0 1,400,000 0

1062

HICKMAN CR-1011 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER IC RR

ON BALTIMORE RD (CR 1011) 0.3 MI NW OF

HICKMAN/GRAVES CO LINE 053C00003N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

266,000

1,613,500

0 266,000 1,613,500

1156

HICKMAN KY-2206 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2206 BRIDGE

OVER CANE CR FK -OBION CRK. (053B00090N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

875,000

0 210,000 875,000

10011

Page 83 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for HICKMAN county PL

Total Amounts:

CN

UT

RW

DN

1,400,000 2,488,500

476,000

0 1,876,000 2,488,500

HOPKINS US-41 MAJOR WIDENING(O) US 41A PHASE II DESIGN AND RIGHT-OF-WAY.

(2005HPP-KY135)(SEE 2-137.01 FOR "STP"

COMPONENT)

CN

Project Cost:

UT

RW

DN

PL

HPP 2,879,680

2,879,680 0 0

137.02

HOPKINS US-41 MAJOR WIDENING(O) IMPROVE US-41A FROM INDUSTRIAL DRIVE TO

YORKWOOD PLACE. (SECTION 1) (2012BOP)

(16CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 5,000,000

0 0 5,000,000

137.1

HOPKINS US-41 MAJOR WIDENING(O) WIDEN US-41A FROM YORKWOOD PLACE TO

US-41 / KY-281. (SECTION 2) (2012BOP)(16CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 8,000,000

8,000,000 0 0

137.2

HOPKINS -0 NEW ROUTE(O) CONSTRUCTION OF THE CENTER STREET

CONNECTOR ROAD BEGINNING AT CENTER

STREET AND PROCEEDING TO THE CSX

RAILROAD, SECTION 1, A DISTANCE 5,173

LINEAR FEET, THENCE PROCEEDING THROUGH A CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

400,000

200,000

800,000

0 600,000 800,000

804

Page 84 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

HOPKINS KY-260 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-260

(MP 2.14) OVER OTTER CREEK; .20 MI EAST OF

PENNYRILE PARKWAY; 054B00022N (14CCR)

CN

Project Cost:

UT

RW

DN

PL

BR 1,085,000

1,085,000 0 0

1072

HOPKINS KY-70 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER

SUGAR CREEK. (054B00088N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

1,242,500

0 210,000 1,242,500

10005

HOPKINS KY-70 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-70 BRIDGE OVER

CLEAR CREEK. (054B00182N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

1,295,000

0 210,000 1,295,000

10006

HOPKINS KY-138 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 138 BRIDGE

OVER POND RIVER. (054B00009N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

35,000

245,000

0 35,000 245,000

10024

HOPKINS KY-109 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 109 BRIDGE

OVER TRADEWATER RIVER. (054B00079N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

35,000

175,000

0 35,000 175,000

10025

Page 85 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for HOPKINS county PL

Total Amounts:

CN

UT

RW

DN

11,964,680 7,957,500

890,000

200,000

800,000

11,964,680 1,090,000 8,757,500

JACKSON KY-30 RECONSTRUCTION(O) IMPROVE KY-30 FROM US-421 TO THE OWSLEY

COUNTY LINE. (14CCR)(SEE 10-279.60 FOR PE &

ENVIR)(16CCR)(TO BE LET WITH 10-279.61)

CN

Project Cost:

UT

RW

DN

PL

STP 18,500,000

0 18,500,000 0

278.3

JACKSON KY-89 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 89 BRIDGE OVER

HORSE LICK CREEK. (055B00028N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

1,820,000

0 175,000 1,820,000

10041

Total for JACKSON county PL

Total Amounts:

CN

UT

RW

DN

18,500,000 1,820,000

175,000

0 18,675,000 1,820,000

JEFFERSON I-71 RECONSTRUCTION(O) ADDITION OF NB AND SB AUXILIARY LANES ON

I-71 NEAR KENNEDY, INCLUDING OPERATIONAL

IMPROVEMENTS TO THE ZORN INTERCHANGE.

(2004BOPC)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

800,000

1,500,000

1,000,000

0 800,000 2,500,000

48.1

Page 86 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON I-64 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON I-64 SHERMAN

MINTON BRIDGE OVER THE OHIO RIVER. (JOINT

PROJECT WITH INDIANA)(056B00279N)(BSBP)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

2,000,000

5,000,000

0 2,000,000 5,000,000

64

JEFFERSON CS-1001 MAJOR WIDENING(O) WIDEN RIVER ROAD FROM 2 TO 4 LANES FROM

EAST OF BEARGRASS CREEK NEAR POPE

AVENUE TO ZORN AVENUE. TO INCLUDE BIKE

LANES. PROJECT LENGTH 1.3 MILES.

CN

Project Cost:

UT

RW

DN

PL

SLO 11,500,000

0 11,500,000 0

91.02

JEFFERSON CS-1001 NEW ROUTE(O) EXTENSION OF RIVER ROAD, LOUISVILLE.

(2006KYD)(SEE 5-512.00 FOR PROJECT

INFORMATION)

CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

550,000

540,000

540,000

550,000 540,000 540,000

91.08

JEFFERSON I-64 RECONSTRUCTION(O) IMPROVE RAMP CAPACITY OF THE I-64

WESTBOUND RAMP TO I-264 WESTBOUND

FROM ONE TO TWO LANES FOR ENTIRE LENGTH

AND OTHER NEEDED IMPROVEMENTS TO

ADDRESS WEAVE ISSUES AT MERGE ON I-264. CN

Project Cost:

UT

RW

DN

PL

NH 10,130,000

0 10,130,000 0

159

JEFFERSON KY-1450 MAJOR WIDENING(O) WIDEN BLUE LICK ROAD FROM SNYDER

FREEWAY NORTH TO KY-61 (LOU T.I.P.)

(SECTION 2) (RU-04DEOB)(08CCR)(12CCR)

(16CCR)

CN

Project Cost:

UT

RW

DN

PL

STP 4,500,000

0 0 4,500,000

247.1

Page 87 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON CR-1006 MINOR WIDENING(O) WIDEN ENGLISH STATION ROAD FROM 2 TO 3

LANES (3RD LANE WILL BE A CENTER TURN

LANE) FROM AIKEN ROAD TO AVOCA ROAD.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP).CN

Project Cost:

UT

RW

DN

PL

SLO 6,408,000

0 0 6,408,000

353

JEFFERSON KY-22 SAFETY(P) RECONSTRUCT KY-22 AT GOOSE CREEK ROAD.

(06CCN) (2004BOPC)(14CCR)

CN

Project Cost:

UT

RW

DN

PL

STP 1,320,000

0 0 1,320,000

371.13

JEFFERSON I-65 RECONSTRUCTION(O) EXTEND AND RECONSTRUCT I-65 SB RAMP TO

BROOK STREET AND FLOYD STREET. (FUNDING

SUBJECT TO FISCAL CONSTRAINT PENDING MPO

TIP)

CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

750,000

750,000

750,000 750,000 0

378.1

JEFFERSON -0 NEW ROUTE(O) PHASE 3.EXTEND AND CONSTRUCT 2 LANE

ROADWAY WITH CONTINUOUS CENTER-TURN

LANE FROM KY 864 (BEULAH CHURCH RD) TO

US 31E (BARDSTOWN RD) AT BARDSTOWN

FALLS RD. PROJECT WILL INCORPORATE CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

3,200,000

1,500,000

4,700,000 0 0

404.01

JEFFERSON US-150 SAFETY(P) ALIGN INTERSECTION OF BROADWAY AND 18TH

STREET BY MOVING THE SOUTH LEG OF 18TH

STREET TO THE EAST. (FUNDING SUBJECT TO

FISCAL CONSTRAINT PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SLO 1,000,000

1,000,000 0 0

413

Page 88 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON -0 BIKE/PED FACIL(O) REHABILITATION AND CONSTRUCTION OF

VARIOUS SIDEWALK PROJECTS IN LOUISVILLE

METRO. (2006BOPC) (FUNDING SUBJECT TO

FISCAL CONSTRAINT PENDING MPO TIP).

CN

Project Cost:

UT

RW

DN

PL

SLO 100,000

100,000 0 0

439.05

JEFFERSON CS-1014 RECONSTRUCTION(O) CONVERSION OF ONE-WAY STREETS IN

DOWNTOWN LOUISVILLE TO TWO-WAY

TRAFFIC (MAIN,JEFFERSON,LIBERTY,

MUHAMMAD ALI, CHESTNUT,3RD STREETS).

PHASE 1CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

195,000

4,000,000

4,195,000 0 0

470

JEFFERSON CS-1049 RECONSTRUCTION(O) CONVERSION OF ONE-WAY STREETS IN

DOWNTOWN LOUISVILLE TO TWO-WAY

TRAFFIC (8TH, 7TH, SHELBY, CAMPBELL

STREETS). PHASE 2

CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

60,000

600,000

60,000 600,000 0

470.1

JEFFERSON US-31 SAFETY(P) DIXIE HIGHWAY ADDITIONAL DESIGN FUNDS.

IMPROVE DIXIE HIGHWAY BETWEEN CRUMS

LANE (KY 2049) AND ROCKFORD LANE (KY

2051)(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SLO 4,000,000

4,000,000 0 0

478

JEFFERSON CR-1005 RECONSTRUCTION(O) WIDEN HUBBARDS LANE FROM 2 TO 3 LANES

(3RD LANE WILL BE A CENTER TURN LANE)

FROM US 60 (SHELBYVILLE ROAD) TO KY 1447

(WESTPORT ROAD). ADD BIKE LANES TO

HUBBARDS LANE FROM KRESGE WAY TO KY CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

260,000

350,000

2,900,000

610,000 2,900,000 0

479

Page 89 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON KY-864 MATCHED FED FUNDS(O) KY 864 - WIDEN BEULAH CHURCH ROAD FROM

2 TO 3 LANES FROM I-265 TO CEDAR CREEK

ROAD.(2010BOP)

CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

2,950,000

1,975,000

2,950,000 1,975,000 0

481

JEFFERSON I-71 MAJOR WIDENING(O) SIX LANE PRIORITY SECTION OF I-71 BETWEEN

I-265 AND KY-329.(16CCR)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

500,000

500,000

15,000,000

1,000,000 15,000,000 0

483

JEFFERSON I-71 PREFINANCD CONVRSN(O) SIX LANE PRIORITY SECTION OF I-71 BETWEEN

I-265 AND KY-329.(16CCR)

CN

Project Cost:

UT

RW

DN

PL

NH 15,000,000

0 0 15,000,000

483.01

JEFFERSON -0 BIKE/PED FACIL(O) GOOD SAMARITAN BICYCLE/PEDESTRIAN TRAIL

CONNECTOR:CONSTRUCT A MULTI-USE BICYCLE

& PEDESTRIAN TRAIL ALONG OLD

TAYLORSVILLE ROAD & JEFFERSON ST IN

DOWNTOWN JEFFERSONTOWN CONNECTING CN

Project Cost:

UT

RW

DN

PL

SLO 1,300,000

1,300,000 0 0

486

JEFFERSON -0 BIKE/PED FACIL(O) DESIGN & CONSTRUCT SHARED USE PATH &

LOUISVILLE LOOP TRAILHEAD FACILITIES THRU

JEFFERSON MEMORIAL FOREST FROM NORTH

END OF SAND QUARRY TUNNEL AT GENE

SNYDER FWY TO WEST TERMINUS OF EXISTING CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

100,000

55,000

2,000,000

155,000 2,000,000 0

489

Page 90 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON -0 BIKE/PED FACIL(O) MISCELLANEOUS SIDEWALKS AND HANDICAP

RAMPS: CONSTRUCT AND REPLACE VARIOUS

SIDEWALKS AND HANDICAP RAMPS

THROUGHOUT THE CITY ON A REOCCURRING

ANNUAL BASIS.CN

Project Cost:

UT

RW

DN

PL

SLO 37,800

37,800 0 0

493

JEFFERSON KY-1020 BIKE/PED FACIL(O) OLMSTED PARKWAYS MULTI-USE PATH

SYSTEM-SOUTHERN PKWY: CONSTRUCTION OF

A 2.5 MILE SHARED USE PATH SYSTEM ALONG

SOUTHERN PARKWAY BETWEEN SOUTH 3RD

AND NEW CUT ROAD.CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

400,000

100,000

400,000 100,000 0

495

JEFFERSON KY-2054 BIKE/PED FACIL(O) CONSTRUCTION OF A 0.5 MILE SHARED USE

PATH SYSTEM ALONG ALGONQUIN PARKWAY

BETWEEN WILSON AVENUE AND CYPRESS

STREET.

CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

160,000

80,000

1,500,000

160,000 80,000 1,500,000

496

JEFFERSON KY-2054 BIKE/PED FACIL(O) CONSTRUCTION OF A 0.45 MILE SHARED USE

PATH SYSTEM ALONG ALGONQUIN PARKWAY

BETWEEN CYPRESS STREET AND DIXIE HWY.

CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

160,000

80,000

1,148,945

240,000 1,148,945 0

497

JEFFERSON KY-2054 BIKE/PED FACIL(O) CONSTRUCTION OF A 1.2 MILE SHARED USE

PATH SYSTEM ALONG ALGONQUIN PARKWAY

BETWEEN DIXIE HIGHWAY AND SHARP AVE.

CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

200,000

160,000

3,063,854

200,000 160,000 3,063,854

498

Page 91 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON CR-1001 BIKE/PED FACIL(O) RIVER ROAD BICYCLE AND PEDESTRIAN

IMPROVEMENTS FROM DOWNTOWN LOUISVILLE

TO THE CITY OF PROSPECT (US 42), 8.5 MILES.

(SEE 5-3036.00)

CN

Project Cost:

UT

RW

DN

PL

SLO 200,000

0 0 200,000

499

JEFFERSON -0 BIKE/PED FACIL(O) OHIO RIVER LEVEE TRAIL PHASE III. CONSTRUCT

BICYCLE/PEDESTRIAN FACILITIES ALONG

CAMPGROUND ROAD FROM END OF SHARED

USE PATH AT THE RAILROAD CROSSING ON

CAMPGROUND ROAD NEAR I-264 TO LEES LANE CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

800,000

750,000

3,000,000

800,000 750,000 3,000,000

505

JEFFERSON CR-1004 MINOR WIDENING(O) WIDEN WATTERSON TRAIL FROM 2 TO 3 LANES

FROM RUCKRIEGEL PARKWAY TO MAPLE ROAD,

AND WIDEN WATTERSON TRAIL FROM 2 TO 3

LANES FROM OLD TAYLORSVILLE ROAD TO

RUCKRIEGEL PARKWAY. PROJECT TO INCLUDE CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

264,000

352,000

1,232,000

616,000 1,232,000 0

518

JEFFERSON I-64 AM-BRIDGE (P) REPAIR DRAINAGE SYSTEM ON THE I-64 BRIDGE

OVER N.S. RAILROAD AND THE LEVEE AND

REPAIR THE LEVEE.(056B00284N)(2014BOP)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 400,000

0 0 400,000

521

JEFFERSON -0 BIKE/PED FACIL(O) DESIGN AND CONSTRUCT SHARED USE PATH

AND LOUISVILLE LOOP TRAILHEAD FACILITIES

THROUGH JEFFERSON MEMORIAL FOREST

FROM BLEVINS GAP ROAD TO NORTH END OF

SAND QUARRY TUNNEL AT GENE SNYDER FWY CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

55,000

60,000

2,000,000

115,000 2,000,000 0

523

Page 92 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON -0 BIKE/PED FACIL(O) DESIGN AND CONSTRUCT SHARED USE PATH

AND LOUISVILLE LOOP TRAILHEAD FACILITIES

THROUGH JEFFERSON MEMORIAL FOREST

FROM PENDLETON RD AT MEDORA RD TO THE

BEGINNING OF JEFFERSON MEMORIAL FOREST CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

100,000

1,000,000

100,000 1,000,000 0

524

JEFFERSON KY-2841 MATCHED FED FUNDS(O) NORTHEAST LOUISVILLE LOOP SECTION II.

CONSTRUCT A SHARED USE PATH ALONG US 60

FROM EASTWOOD CUTOFF TO EASTWOOD

RECREATION CENTER. (METRO PARKS PROJECT)

(2014BOP)CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

533,333

45,000

450,000

578,333 450,000 0

525

JEFFERSON -0 BIKE/PED FACIL(O) CONST MULTIUSE PATH THRU AB SAWYER PK

CONNECT TO SURROUNDING NEIGHBORHOODS

INCLUDE: UNDERPASS/BRIDGE/SITE

AMENITIES/CONSTRUCTION OF PEDESTRIAN

FACILITIES ALONG HURSTBOURNE PKWY FR CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

50,000

300,000

1,500,000

350,000 1,500,000 0

529

JEFFERSON KY-1932 MATCHED FED FUNDS(O) IMPROVE THE SAFETY AND CONGESTION OF KY

1932 (CHENOWETH LANE) FROM US 60

(SHELBYVILLE ROAD) TO US 42

(BROWNSBORO ROAD) APPROXIMATELY 1.07

MILES (2014BOP).CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

650,000

215,000

865,000 0 0

531

JEFFERSON KY-1931 MINOR WIDENING(O) WIDEN KY 1931 (MANSLICK ROAD) FROM 2 TO 3

LANES FROM US 31W (DIXIE HWY) TO DOSS

HIGH SCHOOL. 1.7 MILES (2014BOP)

CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

3,000,000

6,000,000

3,000,000 6,000,000 0

536

Page 93 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON I-265 MAJOR WIDENING(O) SIX LANE PRIORITY SECTION OF I-265 BETWEEN

TAYLORSVILLE ROAD AND I-71.

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

5,800,000

1,580,000

2,080,000

5,800,000 0 3,660,000

537

JEFFERSON I-71 RECONSTRUCTION(O) PROVIDE COLLECTOR-DISTRIBUTOR LANE ON

SOUTHBOUND I-71 TO FACILITATE RAMP

MOVEMENTS TO AND FROM I-265.

CN

Project Cost:

UT

RW

DN

PL

NH 5,400,000

0 5,400,000 0

539

JEFFERSON CS-1002 MATCHED FED FUNDS(O) BLUEGRASS COMMERCE PARK

BICYCLE/PEDESTRIAN TRAIL PROJECT PHASE II

ALONG BLUEGRASS PARKWAY FROM

WATTERSON TRAIL TO TUCKER STATION ROAD

AND ALONG TUCKER STATION ROAD FROM CN

Project Cost:

UT

RW

DN

PL

SLO 1,300,000

1,300,000 0 0

543

JEFFERSON I-265 I-CHANGE RECONST(O) RECONSTRUCTION OF THE I-265/I-64

INTERCHANGE. (2016BOP)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

NH

1,000,000

1,000,000

1,000,000

10,000,000

1,000,000 2,000,000 10,000,000

549

JEFFERSON I-64 CONGESTION MITIGTN(O) IMPROVEMENTS WITHIN THE I-64 CORRIDOR

FROM THE KENNEDY INTERCHANGE TO I-264

(WATTERSON EXPRESSWAY) ADDRESSING

SAFETY AND CONGESTION ISSUES. THE

IMPROVEMENTS MAY INCLUDE BUT ARE NOT CN

Project Cost:

UT

RW

DN

PL NH 250,000

0 250,000 0

553

Page 94 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON KY-1747 CONGESTION MITIGTN(O) REDUCE CONGESTION AND IMPROVE SAFETY

ALONG KY-1747 (HURSTBOURNE PARKWAY)

FROM STONY BROOK DRIVE TO I-64.

CN

Project Cost:

UT

RW

DN

PL NH 250,000

0 250,000 0

555

JEFFERSON I-71 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION

ON I-71 FROM I-264 TO I-265.

CN

Project Cost:

UT

RW

DN

PL NH 2,000,000

0 2,000,000 0

557

JEFFERSON I-65 RECONSTRUCTION(O) IMPROVE SAFETY AND REDUCE CONGESTION AT

THE I-65/I-264 (WATTERSON EXPRESSWAY)

INTERCHANGE.

CN

Project Cost:

UT

RW

DN

PL NH 500,000

0 500,000 0

559

JEFFERSON -0 RECONSTRUCTION(O) INTERSECTION RE-BUILD AT MAIN STREET/

STORY AVENUE / BAXTER AVENUE INCLUDING

TRANSITIONS BETWEEN WENTZEL STREET TO

THE WEST AND JOHNSON STREET TO THE EAST.

CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

176,000

176,000

176,000 176,000 0

561

JEFFERSON -0 SCOPING STUDY DD (O) A COMPREHENSIVE OPERATIONAL ANALYSIS

(COA) TO ANALYZE AND EVALUATE EXISTING

TARC SERVICE IN COMPARISON WITH

COMMUNITY GROWTH, ECONOMIC AND LAND

USE DEVELOPMENT, AND CURRENT AND CN

Project Cost:

UT

RW

DN

PL SLO 354,000

354,000 0 0

562

Page 95 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON -0 SCOPING STUDY DD (O) PLANNING STUDY:EXAMINE NEED FOR

BICYCLE/PED/VEHICULAR ACCESS

IMPROVEMENTS TO PROPOSED DIXIE BRT IN

CORRIDORS: KY 907 FR US 31W TO

STONESTREET RD, ROCKFORD LN FR CANE RUN CN

Project Cost:

UT

RW

DN

PL SLO 352,000

352,000 0 0

563

JEFFERSON KY-155 DESIGN ENGINEERING(O) SAFETY PROJECT FOR RECONSTRUCTION OF

TAYLORSVILLE ROAD AND SOUTH POPE LICK

ROAD INTERSECTION AND BRIDGE OVER POPE

LICK CREEK. (2016BOP)

CN

Project Cost:

UT

RW

DN

PL

STP

STP

STP

180,000

150,000

1,800,000

0 2,130,000 0

808

JEFFERSON -0 MATCHED FED FUNDS(O) DEDICATED FEDERAL AID STP FUNDS

EARMARKED FOR LOUISVILLE URBANIZED AREA

AND SUBJECT TO MPO CONTROL FOR FY 2018

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)CN

Project Cost:

UT

RW

DN

PL

SLO 24,007,000

24,007,000 0 0

965.16

JEFFERSON CR-1038 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON

CR-1038L OVER BEE LICK CREEK 056C00104N

CN

Project Cost:

UT

RW

DN

PL

BR 231,000

231,000 0 0

1061

JEFFERSON US-150 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON E

BROADWAY (US 150) OVER SOUTH FORK

BEARGRASS CREEK AT INTERSECTION WITH

BRENT STREET (CS 1312G)056B00348N (SD)

CN

Project Cost:

UT

RW

DN

PL

BR 850,000

0 850,000 0

1067

Page 96 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON CS-1017 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON E

KENTUCKY ST (CS 1017G) OVER SOUTH FORK

BEARGRASS CREEK 0.01 MILE E OF SCHILLER

AVE (CS 1138G) 056C00083N

CN

Project Cost:

UT

RW

DN

PL

BR 497,000

0 497,000 0

1070

JEFFERSON CR-1001 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

NORTHERN DITCH ON GRADE LANE (CR 1001G)

0.34 MI S OF KY 1747 (FERN VALLEY ROAD)

(056C00064N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BR

20,000

50,000

850,000

0 70,000 850,000

1077

JEFFERSON CR-1001 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

GOOSE CREEK ON RIVER ROAD (CR 1001B) 0.2

MI N OF LIME KILN ROAD (CR 1002B)

(056C00130N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

315,000

917,000

0 315,000 917,000

1079

JEFFERSON US-60 TRANSP ENHANCEMENT(P) NORTHEAST LOUISVILLE LOOP MET SECTION 1

BECKLEY WOODS TO BECKLEY STATION.

CONSTRUCT A SHARED USE PATH ALONG US 60

FROM BECKLEY WOODS TO BECKLEY STATION,

0.5 MILE. (2016BOP)CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

50,000

700,000

750,000 0 0

3030.1

JEFFERSON US-60 TRANSP ENHANCEMENT(P) NORTHEAST LOUISVILLE LOOP MET SECTION 2

BECKLEY STATION TO BIRCHAM ROAD.

CONSTRUCT A SHARED USE PATH ALONG US 60

FROM BECKLEY STATION TO BIRCHAM ROAD.

0.7 MILE (2016BOP)CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

300,000

200,000

800,000

300,000 1,000,000 0

3030.2

Page 97 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON US-60 TRANSP ENHANCEMENT(P) NORTHEAST LOUISVILLE LOOP MET SECTION 3

BIRCHAM ROAD TO BECKLEY CREEK PARK.

CONSTRUCT A SHARED USE PATH ALONG US 60

FROM BIRCHAM ROAD TO BECKLEY CREEK

PARK, 0.5 MILE. (2016BOP)CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

50,000

75,000

2,000,000

125,000 2,000,000 0

3030.3

JEFFERSON US-60 TRANSP ENHANCEMENT(P) NORTHEAST LOUISVILLE LOOP MET SECTION 4

BECKLEY CREEK PARK TO EASTWOOD CUTOFF.

CONSTRUCT A SHARED USE PATH ALONG US 60

FROM BECKLEY CREEK PARK TO EASTWOOD

CUT OFF, 0.6 MILE. (2016BOP)CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

350,000

150,000

350,000 150,000 0

3030.4

JEFFERSON CS-1073 TRANSP ENHANCEMENT(P) WATTERSON TRAIL PHASE I- IMPROVE

STREETSCAPE, RECONSTRUCT SIDEWALKS AND

ENHANCE LANDSCAPING FROM MAPLE ROAD

TO OLD TAYLORSVILLE ROAD IN

JEFFERSONTOWN. (BOPC2012)CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

792,000

1,856,800

792,000 1,856,800 0

3031

JEFFERSON CS-1367 BIKE/PED FACIL(O) CONSTRUCT SIDEWALKS ALONG KRATZ LANE

FOR .35 MILES BETWEEN SHELBYVILLE RD. AND

OLD SHELBYVILLE RD./MAIN ST., INCLUDING

SOME DRAINAGE IMPROVEMENTS (2016BOP).

CN

Project Cost:

UT

RW

DN

PL

SLO 234,382

234,382 0 0

3039

JEFFERSON CS-2048 BIKE/PED FACIL(O) CONSTRUCT A SIDEWALK ALONG CANNONS

LANE BETWEEN WILLIS AVE. AND BOWMAN

FIELD (SENECA LOOP), 1.0 MILES (2016BOP)

CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

100,000

100,000

100,000 100,000 0

3212

Page 98 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON I-265 TRANSP ENHANCEMENT(P) ERECT SOUND WALL ON NORTH SIDE OF GENE

SNYDER FREEWAY FROM MP 15.3 TO MP 16.1.

(14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 3,000,000

0 3,000,000 0

8855

JEFFERSON I-71 TRANSP ENHANCEMENT(P) DESIGN AND CONSTRUCT A SOUND BARRIER

WALL ON THE NORTH SIDE OF I-71 FROM MP 7.5

TO MP 8.7 FOR APPROX. 6400 FEET. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 2,304,000

0 0 2,304,000

8860

JEFFERSON KY-155 MINOR WIDENING(O) WIDEN TAYLORSVILLE RD. TO 3 LANES FROM

I-265 TO KY-148

CN

Project Cost:

UT

RW

DN

PL SPP

SPP

915,000

1,495,000

0 915,000 1,495,000

8908

JEFFERSON I-64 SPOT IMPROVEMENTS(O) DESIGN AND CONSTRUCT A SOUND BARRIER

WALL ON I-64 WESTBOUND BETWEEN

MILEPOINTS 13.7 AND 14.2

CN

Project Cost:

UT

RW

DN

PL

SPP 2,100,000

0 2,100,000 0

8951

JEFFERSON US-60 MINOR WIDENING(O) WIDEN US-60 TO THREE LANES FROM

EASTWOOD CUTOFF (MP 14.7) TO ROCKCREST

WAY (MP 15.1). (16CCN) (LOCALS WILL DO

DESIGN FOR $330,000)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

410,000

460,000

0 410,000 460,000

8952

Page 99 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON I-265 SPOT IMPROVEMENTS(O) DESIGN AND BUILD A NOISE BARRIER WALL ON

THE NORTH SIDE OF I-265 BETWEEN MP 15.3

AND MP 16.1 FOR APPROXIMATELY 4700 FEET.

CN

Project Cost:

UT

RW

DN

PL

SPP 250,000

250,000 0 0

8957

JEFFERSON CR-1004 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CLARK STATION RD

BRIDGE OVER S LONG RUN. (056C00091N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

280,000

350,000

0 280,000 350,000

10007

JEFFERSON CS-1079 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD WESTPORT RD

BRIDGE OVER GOOSE CREEK. (056C00113N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

301,000

0 175,000 301,000

10008

JEFFERSON CR-1007 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PENDLETON RD

BRIDGE OVER POND CREEK. (056C00118N)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

1,106,000

0 245,000 1,106,000

10009

JEFFERSON CR-1005 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF S WATTERSON TRL

BRIDGE OVER FERN CREEK. (056C00159N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

301,000

0 245,000 301,000

10010

Page 100 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON CS-1096 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF STONEBRIDGE RD

BRIDGE OVER TRIB MUDDY FK BEARGRASS.

(056C00240N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

266,000

0 210,000 266,000

10011

JEFFERSON I-64 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON I-64 RIVERSIDE

EXPRESSWAY BRIDGES.

(056B00298N,056B00299N,056B00300N,056B00

301N,056B00302N,056B00285N,056B00292N,05

6B00293N,056B00142N)(SD)CN

Project Cost:

UT

RW

DN

PL

BR

BR

350,000

4,600,000

0 4,950,000 0

10015

JEFFERSON US-31 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 31E BRIDGE

OVER S FK BEARGRASS CREEK. (056B00137N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

350,000

966,000

0 350,000 966,000

10018

JEFFERSON CS-1003 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SCENIC LOOP

BRIDGE OVER MID FK BEARGRASS CREEK.

(056C00027N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

406,000

0 140,000 406,000

10019

JEFFERSON CS-3396 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PARK BOUNDARY

RD BRIDGE OVER MID FK BEARGRASS CREEK.

(056C00033N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

441,000

0 140,000 441,000

10020

Page 101 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON CR-1021 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CHAMPIONS TRACE

LN BRIDGE OVER S FK BEARGRASS CREEK.

(056C00096N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

280,000

1,190,000

0 280,000 1,190,000

10021

JEFFERSON CS-1004 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OLD CLARK

STATION BRIDGE OVER BRUSH RUN.

(056C00167N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

357,000

0 140,000 357,000

10022

JEFFERSON CS-1325 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KIMBERLY WAY

BRIDGE OVER LITTLE CEDAR CREEK.

(056C00182N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

217,000

0 140,000 217,000

10023

JEFFERSON I-64 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-064 CARDINAL DIRECTION(S)

FROM MILEPOINT 0.65 TO MILEPOINT 0.828

CN

Project Cost:

UT

RW

DN

PL

PM

PM

10,000

100,000

0 110,000 0

20010

JEFFERSON I-65 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-065 BOTH

DIRECTION(S) FROM MILEPOINT 128.13 TO

MILEPOINT 131.24

CN

Project Cost:

UT

RW

DN

PL

PM

PM

620,000

6,200,000

0 0 6,820,000

20012

Page 102 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON I-264 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-264

CARDINAL DIRECTION(S) FROM MILEPOINT 0 TO

MILEPOINT 0.46

CN

Project Cost:

UT

RW

DN

PL

PM

PM

30,000

300,000

0 330,000 0

20015

JEFFERSON I-264 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-264 BOTH DIRECTION(S) FROM

MILEPOINT 0.46 TO MILEPOINT 12.7

CN

Project Cost:

UT

RW

DN

PL

PM

PM

1,220,000

12,200,000

0 0 13,420,000

20018

JEFFERSON I-265 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT ON I-265 BOTH DIRECTION(S) FROM

MILEPOINT 18.8 TO MILEPOINT 23.364

CN

Project Cost:

UT

RW

DN

PL

PM

PM

460,000

4,600,000

0 5,060,000 0

20020

JEFFERSON KY-864 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

325,000

3,250,000

0 3,575,000 0

20023

JEFFERSON KY-1065 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

200,000

2,000,000

0 2,200,000 0

20026

Page 103 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON US-31 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

75,000

750,000

0 0 825,000

20032

JEFFERSON KY-1531 NEW INTERCHANGE(O) EASTWOOD FISHERSVILLE CONNECTOR TO I-64

CN

Project Cost:

UT

RW

DN

PL SPP 750,000

750,000 0 0

80000

JEFFERSON US-60 MAJOR WIDENING(O) WIDEN US-60 TO 6 LANES FROM OLD

SHELBYVILLE RD. TO NORTH ENGLISH STATION

RD.

CN

Project Cost:

UT

RW

DN

PL

SPP 1,255,000

0 1,255,000 0

80001

JEFFERSON AIR QUALITY(P) EXTEND PLANTSIDE DRIVE FROM REHL ROAD

TO TAYLORSVILLE ROAD

CN

Project Cost:

UT

RW

DN

PL

SPP 750,000

0 0 750,000

80003

JEFFERSON US-31E SAFETY(P) RECONSTRUCT EAST MARKET (US-31E) FROM

FIRST ST TO JOHNSON ST TO IMPROVE

PEDESTRIAN SAFETY AND ENHANCE ECONOMIC

DEVELOPMENT

CN

Project Cost:

UT

RW

DN

PL

STP 5,000,000

0 5,000,000 0

80053

Page 104 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JEFFERSON US-31E SAFETY(P) RECONSTRUCT EAST MARKET (US-31E) FROM

FIRST ST TO JOHNSON ST TO IMPROVE

PEDESTRIAN SAFETY AND ENHANCE ECONOMIC

DEVELOPMENT

CN

Project Cost:

UT

RW

DN

PL

STP 5,000,000

0 0 5,000,000

80053.1

Total for JEFFERSON county PL

Total Amounts:

CN

UT

RW

DN

36,910,182 87,614,745 84,313,854

9,431,000 8,090,000 4,360,000

1,456,000 3,915,000

13,647,333 2,150,000 3,080,000

4,259,000 11,641,000 4,080,000

65,703,515 113,410,745 95,833,854

JESSAMINE KY-1980 SAFETY(P) IMPROVE ROADWAY GEOMETRICS, TYPICAL

SECTION, AND ROADWAY HAZARDS ON KY

1980 (BRANNON RD) FROM US 68

(HARRODSBURG RD) TO US 27

(NICHOLASVILLE RD)(12CCR) - BEGIN RIGHT OF CN

Project Cost:

UT

RW

DN

PL

SPP 2,000,000

0 0 2,000,000

414.1

JESSAMINE US-68 SAFETY(P) IMPROVE INTERSECTION OF KY-29 NORTH OF

WILMORE.(16CCR)

CN

Project Cost:

UT

RW

DN

PL

STP

STP

650,000

1,080,000

0 650,000 1,080,000

915

JESSAMINE KY-39 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

HICKMAN CREEK AT BLACK BRIDGE ON KY 39

1.3 MI N OF KY 1268. (057B00002N)(EBRP)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

350,000

1,365,000

0 350,000 1,365,000

1136

Page 105 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JESSAMINE CR-1238 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1238

(0.88) OVER NS SYSTEM. 057R00605N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

260,000

805,000

0 260,000 805,000

1144

JESSAMINE KY-169 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RAILROAD BRIDGE

ON KY 169 (NORTH 3RD STREET) BETWEEN

MEADOWLARK LANE & ILHARDT AVENUE.

(057R00603N)(14CCN)(16CCR)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 1,500,000

0 0 1,500,000

8851

JESSAMINE KY-1268 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1268 BRIDGE

OVER HICKMAN CREEK. (057B00022N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

308,000

1,232,000

0 308,000 1,232,000

10011

Total for JESSAMINE county PL

Total Amounts:

CN

UT

RW

DN

5,982,000

918,000

2,000,000

650,000

0 1,568,000 7,982,000

JOHNSON KY-172 RECONSTRUCTION(O) FEDERAL HIGHWAY FUNDS DEDICATED TO

RECONSTRUCT STONE COAL ROAD IN

JOHNSON COUNTY. ("KYD" FUNDS NOT

AVAILABLE FOR ADDITIONAL AMOUNT NEEDED

TO COVER COST)CN

Project Cost:

UT

RW

DN

PL

KYD 203,005

203,005 0 0

134.02

Page 106 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

JOHNSON KY-40 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 40

OVER BRANCH OF LITTLE PAINT CREEK 0.38

MILE NE OF JOHNSON/MAGOFFIN COUNTY LINE

058B00012N

CN

Project Cost:

UT

RW

DN

PL

BR 665,000

665,000 0 0

1114

Total for JOHNSON county PL

Total Amounts:

CN

UT

RW

DN

868,005

868,005 0 0

KENTON I-75 AM-BRIDGE (P) KY 143 HPP EARMARK "ADDRESS DEFICIENCIES

OF BRENT SPENCE BRIDGE, KENTON COUNTY,

KENTUCKY". (2005HPP-KY143)(SEE 6-17.04 FOR

ADDITIONAL 2005HPP FUNDING)(SD)

CN

Project Cost:

UT

RW

DN

PL

HPP 1,439,840

1,439,840 0 0

17.05

KENTON I-75 AM-BRIDGE (P) BRENT SPENCE BRIDGE PROJECT (ADDITIONAL

PROJECT FUNDS FOR MAINTENANCE, REPAIR

AND PAINTING). (10CCR)(12CCR)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 30,000,000

0 30,000,000 0

17.09

KENTON KY-536 RECONSTRUCTION(O) IMPROVE SAFETY AND REDUCE CONGESTION

ON KY-536 FROM THE WEST END OF THE NS

RAILROAD BRIDGE (B91) TO KY-1303 (PRIORITY

SECTION 1). DESIGN PHASE UNDER PARENT

NO. 6-162.01. (16CCN)CN

Project Cost:

UT

RW

DN

PL

STP

STP

1,000,000

5,410,000

0 1,000,000 5,410,000

162.2

Page 107 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

KENTON KY-536 AIR QUALITY(P) IMPROVE SAFETY AND REDUCE CONGESTION

ON KY-536 FROM KY 1303 TO WILLIAMSWOOD

ROAD/CALVARY DRIVE (PRIORITY SECTION 2).

DESIGN PHASE UNDER PARENT NO. 6-162.01

(2012BOP)CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

3,000,000

1,500,000

0 0 4,500,000

162.3

KENTON CR-1316 MATCHED FED FUNDS(O) PHASE I MULTI-USE PATH ALONG BROMLEY

CRESCENT SPRINGS RD FROM ANDERSON

ROAD TO AMSTERDAM ROAD. (2012BOP)

CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

400,000

800,000

4,045,000

1,200,000 4,045,000 0

419

KENTON CS-3806 MATCHED FED FUNDS(O) PHASE 2 BROMLEY CRESCENT SPRINGS ROAD

BETWEEN THE TWO SEGMENTS OF AMSTERDAM

ROAD. RECONSTRUCT BROMLEY CRESCENT

SPRINGS ROAD AND IMPROVE INTERSECTION

WITH ST. JOHNS ROAD.CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

SNK

269,600

504,000

560,000

276,000

269,600 1,064,000 276,000

419.01

KENTON CS-4128 RESURFACING(P) RESURFACE & STABILIZE DUDLEY ROAD FROM

WINDING TRAILS TO THOMAS MORE PARKWAY

(PHASE 1). (2014BOPC)(MOA WITH CITY OF

EDGEWOOD).

CN

Project Cost:

UT

RW

DN

PL

SNK 1,044,000

1,044,000 0 0

428.1

KENTON CS-4128 RESURFACING(P) RESURFACE & STABILIZE DUDLEY ROAD FROM

THOMAS MORE PARKWAY TO CATHERINE DRIVE

(PHASE 2). (2014BOPC)(MOA WITH CITY OF

EDGEWOOD).

CN

Project Cost:

UT

RW

DN

PL

SNK 924,000

924,000 0 0

428.2

Page 108 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

KENTON CS-4128 RESURFACING(P) DUDLEY ROAD PHASE 3. ROADWAY

RESURFACING AND STABILIZATION. CONSTRUCT

CONSISTENT 11' TRAVEL LANE IN EACH

DIRECTION FROM CATHERINE DRIVE TO THE

SUMMIT HILLS COUNTRY CLUB ENTRANCE.CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

178,000

1,080,000

178,000 1,080,000 0

428.3

KENTON CS-4128 RESURFACING(P) DUDLEY ROAD PHASE 4. ROADWAY

RESURFACING AND STABILIZATION. CONSTRUCT

CONSISTENT 11' TRAVEL LANE IN EACH

DIRECTION FROM SUMMIT HILLS COUNTRY CLUB

ENTRANCE TO DIXIE HIGHWAY.CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

271,000

1,636,800

0 271,000 1,636,800

428.4

KENTON CS-2023 RECONSTRUCTION(O) WIDEN SIDEWALK FOR ADA COMPLIANCE AND

ROADWAY RECONSTRUCTION ON JOHNSON ST

& W RIVERCENTER BLVD FROM 3RD STREET TO

THE EXISTING CONCRETE SECTION HEADING

TOWARDS MADISON AVENUE IN COVINGTON. CN

Project Cost:

UT

RW

DN

PL

SNK 677,800

677,800 0 0

430

KENTON US-25 SAFETY(P) CONSTRUCT LEFT TURN LANE ON NB

APPROACH AT THE INTERSECTION OF US 25

AND BEECHWOOD RD JUST S OF I-75. (FUNDING

SUBJECT TO FISCAL CONSTRAINT PENDING MPO

TIP) (2014BOP)CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

100,000

250,000

1,600,000

1,950,000 0 0

432

KENTON -0 MATCHED FED FUNDS(O) LUDLOW RIVERFRONT COMMONS TRAIL-

CONSTRUCT A ONE-MILE MULTI-USE PATH

ALONG THE OHIO RIVER FROM HOOPER STREET

TO ASH STREET IN THE CITY OF LUDLOW

(2016BOP).CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

5,000

240,133

245,133 0 0

435

Page 109 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

KENTON CS-6142 SAFETY(P) IMPROVE SAFETY, TRAFFIC FLOW AND

DRAINAGE ISSUES ALONG BUTTERMILK PIKE

(CS 6142) FROM ROGERS ROAD TO COLLINS

ROAD IN THE CITY OF VILLA HILLS. A DISTANCE

OF 0.527 MILES (2016BOP).CN

Project Cost:

UT

RW

DN

PL

SNK 313,857

313,857 0 0

437

KENTON CS-9004 RECONSTRUCTION(O) RECONSTRUCT AMSTERDAM ROAD FROM

GENERAL DRIVE TO REDWOOD DRIVE WITH

CURB, GUTTER, STORM SEWERS AND

SIDEWALK (2016BOP).

CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

56,000

32,000

2,080,000

88,000 2,080,000 0

438

KENTON KY-17 CONGESTION MITIGTN(O) IMPROVE SAFETY AND REDUCE CONGESTION

ON KY-17 AT THE I-275 INTERCHANGE.

CN

Project Cost:

UT

RW

DN

PL

STP

STP

STP

450,000

200,000

350,000

0 450,000 550,000

449

KENTON KY-1303 CONGESTION MITIGTN(O) IMPROVE SAFETY AND REDUCE CONGESTION

ALONG KY-1303 (TURKEYFOOT RD) FROM

DUDLEY RD TO US-25 (DIXIE HWY).

CN

Project Cost:

UT

RW

DN

PL

STP

STP

STP

1,500,000

2,000,000

1,000,000

0 3,500,000 1,000,000

450

KENTON CS-1560 RESURFACING(P) ADELA AVENUE. CURB-LINE MILLING, ASPHALT

RESURFACING, REPLACE SIDEWALK/CURBING

AND NEW SIDEWALK AS NEEDED FROM KY 1072

(SLEEPY HOLLOW ROAD/DEVERILL STREET) TO

KY 8 (ELM STREET).CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

35,000

20,000

200,000

255,000 0 0

454

Page 110 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

KENTON CS-1045 DRAINAGE IMPROVE(P) CODY ROAD. REPLACE CULVERT FOR

BANKLICK CREEK. MILL AND OVERLAY WITH

NEW ASPHALT FROM BANKLICK CREEK TO

INDEPENDENCE STATION ROAD.

CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

57,000

120,000

346,000

57,000 466,000 0

455

KENTON -0 TRANSP ENHANCEMENT(P) MADISON AVENUE. UNDERGROUND UTILITIES,

STREET TREES, MAST ARM POLES,

STREETLIGHTS, RESURFACING, SIGNAL

IMPROVEMENTS FROM 11TH STREET TO 8TH

STREET.CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

280,000

240,000

1,650,000

280,000 1,890,000 0

456

KENTON CS-2217 TRANSP ENHANCEMENT(P) 7TH STREET. SIDEWALK REPLACEMENT,

UNDERGROUND UTILITIES, STREET TREES, MAST

ARM TRAFFIC SIGNALS, LIGHTING,

RESURFACING FROM WASHINGTON STREET TO

GREENUP STREET.CN

Project Cost:

UT

RW

DN

PL

SNK

SNK

SNK

280,000

240,000

2,450,000

280,000 2,690,000 0

457

KENTON CS-2097 AM-BRIDGE (P) WEST 15TH STREET; ADDRESS DEFICIENCIES OF

BRIDGE AND APPROACHES OVER CSX RR IN

COVINGTON. (059C00029N)(12CCR)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BR

830,000

550,000

2,110,000

3,490,000 0 0

1070

KENTON KY-1120 AM-BRIDGE (P) EVALUATE BRIDGE ON KY-1120 (MP 0.621)

OVER CSX RAILROAD; 11TH ST E OF RUSSELL

ST; 059B00083N

CN

Project Cost:

UT

RW

DN

PL

BR 520,000

520,000 0 0

1075

Page 111 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

KENTON KY-1501 RECONSTRUCTION(O) IMPROVE HANDS PIKE (KY-1501) FROM KY-17

TO CRYSTAL LAKE DRIVE.(12CCR)(14CCR)

(16CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 8,010,000

0 8,010,000 0

8307.1

KENTON NEW ROUTE(O) EXTEND HOUSTON ROAD TO CINEMA PROPERTY

CN

Project Cost:

UT

RW

DN

PL

SPP 250,000

0 250,000 0

8916

KENTON US-25 REALIGNMENT IMPROVE EXISTING ALIGNMENT WITH

BUTTERMILK PIKE, ORPHANAGE ROAD, AND US

25. FT. MITCHELL WILL PAY $50,000 TOWARD

DESIGN.

CN

Project Cost:

UT

RW

DN

PL

SPP 250,000

0 250,000 0

8951

KENTON KY-17 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON JOHN A. ROEBLING

BRIDGE OVER OHIO RIVER. (059B00048N)

(BSBP)

CN

Project Cost:

UT

RW

DN

PL

BR 1,200,000

0 1,200,000 0

10005

KENTON US-25 AM-BRIDGE (P) JOINT REPLACEMENT AND PREVENTIVE

MAINTENANCE ON CLAY WADE BAILEY BRIDGE

OVER THE OHIO RIVER. JOINT PROJECT WITH

OHIO. (059B00049N)

CN

Project Cost:

UT

RW

DN

PL

BR 350,000

350,000 0 0

10006

Page 112 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

KENTON KY-177 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 177 BRIDGE

OVER BOWMAN CREEK. (059B00011N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

420,000

2,695,000

0 420,000 2,695,000

10011

KENTON KY-2045 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2045 BRIDGE

OVER BRUSHY CREEK. (059B00025N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

350,000

3,605,000

0 350,000 3,605,000

10012

KENTON I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075

NON-CARDINAL DIRECTION(S) FROM MILEPOINT

190.68 TO MILEPOINT 191.22

CN

Project Cost:

UT

RW

DN

PL

PM

PM

30,000

300,000

0 330,000 0

20033

KENTON I-275 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION ON PCC

PAVEMENT ON I-275 BOTH DIRECTION(S) FROM

MILEPOINT 0 TO MILEPOINT 1.582 (1.05

NON-CARDINAL)

CN

Project Cost:

UT

RW

DN

PL

PM

PM

1,420,000

14,200,000

0 15,620,000 0

20035

KENTON I-275 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION ON PCC

PAVEMENT ON I-275 BOTH DIRECTION(S) FROM

MILEPOINT 82.475 TO MILEPOINT 83.78

CN

Project Cost:

UT

RW

DN

PL

PM

PM

200,000

2,000,000

0 2,200,000 0

20039

Page 113 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

KENTON KY 236 AIR QUALITY(P) RECONSTRUCT KY 236 (STEVENSON ROAD)

FROM ALICE STREET TO JACQUELINE DRIVE

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

800,000

1,000,000

0 800,000 1,000,000

80002

Total for KENTON county PL

Total Amounts:

CN

UT

RW

DN

9,419,630 67,361,000 13,622,800

1,104,600 5,941,000

1,406,000 2,504,000 4,200,000

1,632,000 2,160,000 2,850,000

13,562,230 77,966,000 20,672,800

KNOTT CR-1008 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON

FISHTRAP RD (KY 1441) OVER RACCOON

CREEK AT INTERSECTION WITH COON CREEK (CR

1371) (060C00006N)

CN

Project Cost:

UT

RW

DN

PL

BR 420,000

420,000 0 0

1116

KNOTT CS-1016 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER RIGHT

FORK TROUBLESOME CREEK ON FIELDWOOD

DRIVE (CS1016) IN HINDMAN (060C00060N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

455,000

0 210,000 455,000

1124

KNOTT KY-3209 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

BALLS FORK ON KY 3209. (16CCN) 060B00053N

CN

Project Cost:

UT

RW

DN

PL

BR 700,000

700,000 0 0

8904

Page 114 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

KNOTT KY-1098 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1098 BRIDGE

OVER LAUREL FK OF QUICKSAND C.

(060B00035N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

680,000

0 175,000 680,000

10001

KNOTT CR-1130 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF COLLINS BRANCH

RD BRIDGE OVER CARR FORK. (060C00029N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

398,650

0 157,500 398,650

10002

KNOTT CR-1565 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF FRANKIE JANE DR

BRIDGE OVER CANEY CREEK. (060C00071N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

337,890

0 175,000 337,890

10015

Total for KNOTT county PL

Total Amounts:

CN

UT

RW

DN

1,120,000 1,871,540

717,500

1,120,000 717,500 1,871,540

KNOX US-25 MAJOR WIDENING(O) IMPROVE SAFETY AND ACCESS MANAGEMENT,

AND REDUCE CONGESTION ON US-25E FROM

CORBIN BYPASS TO KNOX/LAUREL COUNTY

LINE.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

NH 2,300,000

0 0 2,300,000

188

Page 115 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

KNOX CR-1325 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON OLD

HWY 25 (CR 1325) JUST WEST OF US 25E.

061C00063N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

350,000

0 175,000 350,000

1102

KNOX CR-1353 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SPIDER CREEK RD

BRIDGE OVER EAST FORK LYNN CAMP CREEK.

(061C00048N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

192,500

469,000

0 192,500 469,000

10021

KNOX CR-1162 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DETHERAGE

CEMETERY BRIDGE OVER BRUSH CREEK.

(061C00056N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

367,500

0 157,500 367,500

10022

KNOX CR-1065 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BURTON BRANCH

RD BRIDGE OVER BURTON BRANCH.

(061C00086N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

360,000

0 175,000 360,000

10023

KNOX KY-6 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

30,000

300,000

0 0 330,000

20007

Page 116 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

KNOX US-25 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

125,000

1,250,000

0 1,375,000 0

20008

KNOX US 25E AIR QUALITY(P) US 25E VARIOUS TURNING LANES.

CROSSOVER AND TURNING LANE AT THE

PALLET STORE. LEFT TURNING LANE AT THE

SAWMILL AT THE KNOX/BELL COUNTY LINE.

RIGHT TURNING LANE AT DOLLAR GENERAL. CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

30,000

270,000

0 300,000 0

80000

KNOX US 25E AIR QUALITY(P) CONDUCT A TRAFFIC SAFETY STUDY ON US

25E AT HEIDRICK, KY IN KNOX COUNTY

CN

Project Cost:

UT

RW

DN

PL SPP 50,000

0 50,000 0

80009

Total for KNOX county PL

Total Amounts:

CN

UT

RW

DN

1,520,000 4,146,500

855,000 30,000

50,000

0 2,425,000 4,176,500

LARUE KY-222 CONGESTION MITIGTN(O) CONNECTOR IMPROVEMENTS HODGENVILLE TO

I-65

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

SPP

125,000

50,000

100,000

400,000

0 175,000 500,000

8909

Page 117 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

LARUE KY-84 SPOT IMPROVEMENTS(O) SPOT IMPROVEMENTS ON KY 84 FROM

HODGENVILLE TO I-65.

CN

Project Cost:

UT

RW

DN

PL

PM

PM

50,000

450,000

0 0 500,000

8911

LARUE KY-61 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-61 BRIDGE OVER

SOUTH FORK BRANCH. (062B00008N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

87,500

605,500

0 87,500 605,500

10002

Total for LARUE county PL

Total Amounts:

CN

UT

RW

DN

1,455,500

212,500 50,000

50,000

100,000

0 262,500 1,605,500

LAUREL I-75 MAJOR WIDENING(O) IMPROVE I-75 FROM US-25E TO THE LITTLE

LAUREL RIVER (16CCR)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

70,000

50,000

10,000,000

0 120,000 10,000,000

9.1

LAUREL KY-363 MAJOR WIDENING(O) ADDRESS SAFETY, CAPACITY, AND ACCESS

MANAGEMENT ON KY-363 FROM KY-1006 TO

KY-192. (06CCR)(2006BOPC).(10CCR)(14CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 3,000,000

3,000,000 0 0

147.1

Page 118 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

LAUREL US-25 MAJOR WIDENING(O) IMPROVE SAFETY, IMPROVE ACCESS

MANAGEMENT, AND REDUCE CONGESTION ON

US-25E FROM THE KNOX/LAUREL COUNTY LINE

TO KY-770 (12CCR)(16CCR)

CN

Project Cost:

UT

RW

DN

PL

NH 4,580,000

0 0 4,580,000

185

LAUREL KY-192 MAJOR WIDENING(O) IMPROVE SAFETY, ACCESS MANAGEMENT, AND

FREIGHT MOBILITY; AND REDUCE CONGESTION

ON KY-192 NEAR KY-1006 TO US-25 IN

LONDON. (12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

1,000,000

2,500,000

3,500,000 0 0

187

LAUREL CR-1341 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON DOG

BRANCH SCHOOL RD (CR 1341) OVER SINKING

CREEK 0.56 MILE NW OF SINKING CREEK RD (FD

781) 063C00025N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

770,000

0 175,000 770,000

1094

LAUREL KY-312 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

CRAIG CREEK ON KY 312 1.8 MILE SE OF KY

192. (063B00053N)(14CCR)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 1,200,000

1,200,000 0 0

1096

LAUREL I-75 AM-BRIDGE (P) REHAB BRIDGE ON I-75 AT MILEPOST 30.5 OVER

LAUREL RIVER (SR 34.1) (B00043R AND

B00043L)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 2,800,000

2,800,000 0 0

1105.01

Page 119 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

LAUREL US-25 DESIGN ENGINEERING(O) IMPROVE CONNECTIVITY BETWEEN CORBIN AND

LONDON FROM KY-1006 TO US-25E. (08CCN)

CN

Project Cost:

UT

RW

DN

PL STP 500,000

0 0 500,000

8515

LAUREL CR-1221 BRIDGE REPLACEMENT(P) REPLACE BRIDGE LOCATED ON LILY ROAD (CR

1221) (MP 1.045) (AREA ADJACENT TO

FARISTON INDUSTRIAL PARK WITH NEW

ROADWAY ALIGNMENT). (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 1,343,900

0 1,343,900 0

8811

LAUREL KY-1223 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1223 BRIDGE

OVER HORSE CREEK. (063B00007N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

378,000

0 175,000 378,000

10024

LAUREL KY-80 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-80 BRIDGE OVER

LICK FORK CREEK. (063B00013N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

525,000

0 210,000 525,000

10025

LAUREL KY-80 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-80 BRIDGE OVER

HOOPPOLE CREEK. (063B00017N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

507,500

0 175,000 507,500

10026

Page 120 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

LAUREL KY-490 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 490 BRIDGE

OVER ROCKCASTLE RIVER. (063B00004N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

2,492,000

0 245,000 2,492,000

10042

LAUREL KY-638 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 638 BRIDGE

OVER BIG RACCOON CREEK. (063B00061N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

192,500

829,500

0 192,500 829,500

10043

LAUREL HR-9006 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF HAL

ROGERS DANIEL BOONE PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 0 TO MILEPOINT

3.877

CN

Project Cost:

UT

RW

DN

PL

PM

PM

310,000

3,100,000

0 3,410,000 0

20009

LAUREL I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION ON PCC

PAVEMENT ON I-075 CARDINAL DIRECTION(S)

FROM MILEPOINT 32.485 TO MILEPOINT 32.9

CN

Project Cost:

UT

RW

DN

PL

PM

PM

120,000

1,200,000

0 1,320,000 0

20011

LAUREL I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 50.524 (49.87

NON-CARDINAL) TO MILEPOINT 50.714

CN

Project Cost:

UT

RW

DN

PL

PM

PM

100,000

1,000,000

0 1,100,000 0

20013

Page 121 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for LAUREL county PL

Total Amounts:

CN

UT

RW

DN

7,000,000 6,643,900 20,082,000

1,702,500

500,000

1,000,000 70,000

2,500,000 50,000

10,500,000 8,466,400 20,582,000

LAWRENCE KY-2565 RECONSTRUCTION(O) RECONSTRUCT KY 2565 FROM APPROX. 550'

NW OF CR 1529/KY2565/KY2563 INTERSECTION

TO APPROX. 1150' SE OF THE INTERSECTION

(SECTION 2). (2014BOP)

CN

Project Cost:

UT

RW

DN

PL

SPP 790,000

790,000 0 0

196.1

LAWRENCE CR-1044 SPOT IMPROVEMENTS(O) SPOT IMPROVEMENTS ON SPANKEM BRANCH

ROAD (CR 1044).

CN

Project Cost:

UT

RW

DN

PL

SPP 500,000

0 500,000 0

8951

LAWRENCE CR-1234 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MAXIE BRANCH RD

BRIDGE OVER RT FORK-BLAINE CREEK.

(064C00076N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

478,000

0 140,000 478,000

10003

LAWRENCE KY-644 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 644 BRIDGE

OVER LEVISA FORK OF BIG SANDY.

(064B00038N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

560,000

2,880,500

0 560,000 2,880,500

10016

Page 122 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for LAWRENCE county PL

Total Amounts:

CN

UT

RW

DN

790,000 500,000 3,358,500

700,000

790,000 1,200,000 3,358,500

LEE CR-1124 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GOOSE CREEK RD

BRIDGE OVER CSX RAILROAD. (065R00604N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

770,000

0 245,000 770,000

10013

Total for LEE county PL

Total Amounts:

CN

UT

RW

DN

770,000

245,000

0 245,000 770,000

LESLIE US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND

APPROACHES ON US-421 OVER STINNET CREEK

0.028 MILE SOUTH OF KY-406 NEAR

STINNETT(10CCR)(066B00008N)

CN

Project Cost:

UT

RW

DN

PL

BR 2,128,000

0 2,128,000 0

1078

LESLIE US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

MUNCY CREEK ON US 421 0.5 MILE SOUTH OF

TAYLOR MORGAN ROAD (CR 1090).

(066B00006N)

CN

Project Cost:

UT

RW

DN

PL

BR 612,500

0 0 612,500

1095

Page 123 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

LESLIE CR-1528 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER WOLF

CREEK ON COON CREEK ROAD (CR 1528) AT

JCT WITH KY 3427 (066C00039N) (EBRP)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

123,000

445,000

0 123,000 445,000

1100

LESLIE CR-1219 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON MILE

BRANCH RD (CR 1219) (MP 0.022) OVER BEECH

FORK. 066C00048N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

613,000

0 245,000 613,000

1104

LESLIE CR-1207 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON

WILLIAMS BRANCH RD (CR-1207) (0.028) OVER

MIDDLE FORK KENTUCKY RIVER. 066C00020N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

560,000

0 245,000 560,000

1106

LESLIE KY-1780 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1780 BRIDGE

OVER BEECH FORK. (066B00027N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

857,500

0 210,000 857,500

10027

LESLIE KY-699 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-699 BRIDGE

OVER MAGGARDS BRANCH. (066B00031N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

525,000

0 175,000 525,000

10028

Page 124 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

LESLIE CR-1006 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1006 BRIDGE

OVER RACCOON CREEK. (066C00002N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

192,500

451,500

0 192,500 451,500

10030

LESLIE CR-1271 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CR-1271 BRIDGE

OVER MIDDLE FK KENTUCKY RVR.

(066C00023N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

525,000

0 210,000 525,000

10031

Total for LESLIE county PL

Total Amounts:

CN

UT

RW

DN

2,128,000 4,589,500

1,400,500

0 3,528,500 4,589,500

LETCHER US-119 RECONSTRUCTION(O) IMPROVE US-119 FROM NORTH OF KY-15 TO

THE KY 2034/COUGAR DRIVE INTERSECTION.

(16CCN)(SEE 12-199.10 FOR D, R, U)

CN

Project Cost:

UT

RW

DN

PL

NH 1,000,000

1,000,000 0 0

199.11

LETCHER KY-2034 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY

2034C OVER N FORK KY RIVER 0.02 E OF US

119 067B00121N

CN

Project Cost:

UT

RW

DN

PL

BR 973,000

973,000 0 0

1113

Page 125 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

LETCHER KY-3404 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER POOR

FORK OF CUMBERLAND RIVER ON KY 3404 100

FT SOUTH OF US 119. (067B00114N)

CN

Project Cost:

UT

RW

DN

PL

BR 420,000

0 0 420,000

1120

LETCHER CR-1226 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON

HAMPTON BRANCH (CR 1226) (MP 0.01) OVER

COWAN CREEK. 067C00021N

CN

Project Cost:

UT

RW

DN

PL

BR 385,000

0 0 385,000

1125

LETCHER CR-1225 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1225

(0.034) OVER COWAN CREEK. 067C00020N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

420,000

385,000

0 420,000 385,000

1126

LETCHER KY-805 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-805 BRIDGE

OVER POTTERS FORK. (067B00022N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

616,840

0 210,000 616,840

10004

LETCHER KY-2034 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2034 BRIDGE

OVER CRAFTS COLLY CREEK. (067B00069N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

406,105

0 140,000 406,105

10005

Page 126 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

LETCHER CR-1433 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CORNFIELD DR

BRIDGE OVER BOONE FORK. (067C00004N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

427,840

0 140,000 427,840

10006

LETCHER CR-1386 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF TURKEY CRK

BRIDGE OVER TURKEY CREEK. (067C00050N)

(SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

697,000

0 175,000 697,000

10007

LETCHER KY-7 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 7 BRIDGE OVER

CSX RR & N FK KY RIVER. (067B00038N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

525,000

4,900,000

0 525,000 4,900,000

10017

LETCHER KY-343 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 343 BRIDGE

OVER WRIGHT FORK. (067B00078N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

378,560

0 175,000 378,560

10018

LETCHER CS-3000 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF E POTTER RD

BRIDGE OVER YONTS FORK. (067C00007N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

372,400

0 157,500 372,400

10019

Page 127 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

LETCHER CR-1149 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HOLBROOK TOWN

BRIDGE OVER N.FK.KENTUCKY RVR.

(067C00017N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

516,810

0 210,000 516,810

10020

LETCHER CR-1799 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PARADISE LN

BRIDGE OVER KINGDOM COME CREEK.

(067C00051N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

269,500

0 140,000 269,500

10021

LETCHER CR-1737 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ORCHARD RD

BRIDGE OVER NORTH FORK KY RIVER.

(067C00065N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

655,900

0 210,000 655,900

10022

Total for LETCHER county PL

Total Amounts:

CN

UT

RW

DN

1,973,000 10,430,955

2,502,500

1,973,000 2,502,500 10,430,955

LEWIS KY-1068 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

LAUREL FORK ON KY 1068 30 FT S OF DEEP

HOLE BRANCH ROAD (CR 1125).(068B00057N)

(16CCR)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BR

75,000

75,000

900,000

150,000 900,000 0

1090

Page 128 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

LEWIS KY-57 AM-BRIDGE (P) CONSTRUCT A NEW BRIDGE CROSSING THE

NORTH FORK OF THE LICKING RIVER AT THE

LEWIS-FLEMING COUNTY LINE. (08CCN):

(068B00027N)

CN

Project Cost:

UT

RW

DN

PL

BR 3,640,000

0 3,640,000 0

8507

LEWIS KY-344 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-344 BRIDGE

OVER GRASSY BRANCH. (068B00015N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

350,000

1,540,000

0 350,000 1,540,000

10010

LEWIS KY-1021 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1021 BRIDGE

OVER BRIERY CREEK. (068B00075N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

315,000

857,500

0 315,000 857,500

10023

Total for LEWIS county PL

Total Amounts:

CN

UT

RW

DN

4,540,000 2,397,500

665,000

75,000

75,000

150,000 5,205,000 2,397,500

LINCOLN US-27 MAJOR WIDENING(O) IMPROVE US-27 FROM KY-590 TO BELL STREET

IN STANFORD. (INCLUDES NEW GOSHEN

CUT-OFF ROAD)(2005HPP-KY115)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

1,400,000

1,100,000

3,250,000

0 2,500,000 3,250,000

196

Page 129 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

LINCOLN KY-1247 AM-BRIDGE (P) REPLACE BRIDGE ON KY 1247 OVER ST. ASAPH

CREEK 0.044 S OF KY 78(SR 45.4) 069B00055N

CN

Project Cost:

UT

RW

DN

PL

BR 567,000

567,000 0 0

1055

LINCOLN CR-1043 AM-BRIDGE (P) REPLACE BRIDGE ON CR-1043 (0.643) OVER

LOGAN CREEK. (SR=20.2) 069C00008N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

497,000

0 175,000 497,000

1066

LINCOLN US 127 NEW INTERCHANGE(O) NEW TURNING LANE AT ARCADIA VIEW DRIVE

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

SPP

100,000

50,000

50,000

800,000

0 1,000,000 0

80000

LINCOLN US 150 NEW INTERCHANGE(O) US 150 NEW TURNING LANE NEAR HOBBLE

ROAD AND CRAWFORD LANE

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

100,000

50,000

350,000

500,000 0 0

80001

LINCOLN US 127 NEW INTERCHANGE(O) US 127 NEW TURNING LANE AT KY 1194

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

SPP

100,000

50,000

50,000

800,000

0 1,000,000 0

80002

Page 130 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

LINCOLN US 150 AIR QUALITY(P) ADD A TURNING LANE ON US 150 AT

WILDERNESS TRAIL ROAD

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

100,000

50,000

350,000

0 500,000 0

80008

Total for LINCOLN county PL

Total Amounts:

CN

UT

RW

DN

917,000 1,950,000 3,747,000

100,000 475,000

1,500,000

50,000 1,250,000

1,067,000 5,175,000 3,747,000

LIVINGSTON US-60 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 60

OVER THE CUMBERLAND RIVER 0.27 MILE N OF

KY 70 070B00017N.

CN

Project Cost:

UT

RW

DN

PL

BR 16,000,000

0 16,000,000 0

1142

LIVINGSTON US-60 PREFINANCD CONVRSN(O) ADDRESS DEFICIENCIES OF BRIDGE ON US 60

OVER THE CUMBERLAND RIVER 0.27 MILE N OF

KY 70 (SR 32.7) 070B00017N (ADDITIONAL

FUNDING FOR C PHASE)

CN

Project Cost:

UT

RW

DN

PL

BR 16,000,000

0 0 16,000,000

1142.01

Total for LIVINGSTON county PL

Total Amounts:

CN

UT

RW

DN

16,000,000 16,000,000

0 16,000,000 16,000,000

Page 131 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

LOGAN US-79 AM-BRIDGE (P) IMPROVE SAFETY AND BRIDGE CONDITION ON

WHIPPORWILL CREEK BRIDGE NEAR KY-1151.

BRIDGE ID 071B00025 (SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

250,000

1,715,000

0 250,000 1,715,000

10010

Total for LOGAN county PL

Total Amounts:

CN

UT

RW

DN

1,715,000

250,000

0 250,000 1,715,000

LYON US-641 RELOCATION(O) RELOCATE US-641 FROM US-62 NEAR

EDDYVILLE TO SOUTH OF THE LYON/CALDWELL

COUNTY LINE.

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

2,500,000

2,000,000

500,000

0 2,500,000 2,500,000

187.5

LYON US-641 RELOCATION(O) RELOCATE US-641 FROM SOUTH OF THE

LYON/CALDWELL COUNTY LINE TO FREDONIA,

4.5 MILES.

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

1,800,000

2,000,000

800,000

0 1,800,000 2,800,000

187.6

LYON I-24 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-024

CARDINAL DIRECTION(S) FROM MILEPOINT

45.133 TO MILEPOINT 51.886

CN

Project Cost:

UT

RW

DN

PL

PM

PM

270,000

2,700,000

0 0 2,970,000

20009

Page 132 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for LYON county PL

Total Amounts:

CN

UT

RW

DN

2,700,000

4,300,000 270,000

4,000,000

1,300,000

0 4,300,000 8,270,000

MADISON -0 NEW ROUTE(O) CONSTRUCT 4-LANE BEREA BYPASS SECTION

2; FROM 150' EAST OF US-25, SE TO KY-21.

(2004BOPC)(08CCR)(12CCR) PHASE 1 - BEREA

BYPASS FROM US-25 TO KY-1016.

CN

Project Cost:

UT

RW

DN

PL

SPP 12,000,000

0 12,000,000 0

192.2

MADISON KY-52 RECONSTRUCTION(O) IMPROVE KY-52 FROM WALLACE MILL ROAD TO

INTERSTATE 75 AT THE DUNCANNON ROAD

INTERCHANGE. (02CCR)(12CCN)(14CCR)

(DESIGN/BUILD)(16CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

4,000,000

4,000,000

4,000,000

0 4,000,000 8,000,000

235

MADISON KY-595 SCOPING STUDY(O) COMPREHENSIVE TRAFFIC STUDY FOR

INTERSECTION OF MAIN STREET AND BEREA

COLLEGE CAMPUS, BEREA. (2005HPP-KY112)

(MOA WITH BEREA). (16CCR)(LET BY CITY)

CN

Project Cost:

UT

RW

DN

PL

HPP 266,952

266,952 0 0

236

MADISON US-25 MAJOR WIDENING(O) WIDEN US-25 FROM US-421 NORTH TO KY-876.

STATE TO PROVIDE DESIGN AND PLANS, AND

FUNDS FOR THIS PROJECT ARE REQUESTED TO

BE PAID TO THE MADISON COUNTY FISCAL

COURT, WHICH SHALL COORDINATE THE CN

Project Cost:

UT

RW

DN

PL

HPP 719,921

719,921 0 0

251.01

Page 133 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MADISON US-421 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON

BATTLEFIELD MEMORIAL HWY (US 421) OVER

COWBELL CREEK AT JCT WITH HIGHWAY 21 E

(KY 21)076B00021

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BR

90,000

90,000

625,000

805,000 0 0

1130

MADISON CR-1158 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON OLD

HAYS FORK LN (CR 1158) OVER BRANCH OF

HAYS FORK 0.2 MILE SE OF BATTLEFIELD

MEMORIAL HWY (US 421) 076C00023N

CN

Project Cost:

UT

RW

DN

PL

BR 336,000

0 336,000 0

1131

MADISON KY-3376 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

TERRILL BRANCH ROAD ON KY 3376 IN BEREA

200 FT N OF PEACHTREE DRIVE (CS 2072).

(076B00085N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

857,500

0 210,000 857,500

1137

MADISON CR-1017 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1017

(3.405) OVER MUDDY CREEK. 076C00004N (SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

190,000

420,000

0 190,000 420,000

1142

MADISON CR-1044 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1044

(0.007) OVER BR OF MUDDY CREEK.

076C00066N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

455,000

0 210,000 455,000

1143

Page 134 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MADISON KY-627 MAJOR WIDENING(O) IMPROVE SAFETY AND REDUCE CONGESTION AT

THE KY-627 BRIDGE OVER I-75. (INCLUDES

7-8400) (B40)(08CCN)(10CCR)(14CCR)(16CCR)

CN

Project Cost:

UT

RW

DN

PL

NH 5,000,000

5,000,000 0 0

8403

MADISON KY-627 PREFINANCD CONVRSN(O) IMPROVE SAFETY AND REDUCE CONGESTION AT

THE KY-627 BRIDGE OVER I-75. (INCLUDES

7-8400) (B40)(08CCN)(10CCR)(14CCR)(16CCR)

CN

Project Cost:

UT

RW

DN

PL

NH 5,000,000

0 5,000,000 0

8403.01

MADISON US-25 SAFETY(P) IMPROVE ROADWAY, SIDEWALKS, AND BIKE

PATHS ON US-25 BETWEEN ELLIPSE STREET TO

GLADES ROAD AND THEN CONTINUES ON TO

THE BEREA BYPASS. (08CCN)(10CCR)(12CCR)

(LET BY KYTC)CN

Project Cost:

UT

RW

DN

PL

SPP 7,200,000

7,200,000 0 0

8505

MADISON KY-2881 SPOT IMPROVEMENTS(O) PROPOSED ROADWAY IMPROVEMENTS FROM

DUNCANNON RD TO THE MADISON CO AIRPORT

TO INCLUDE CALEAST RD (KY 2881 MP.783-MP

2.780), JOHN BALLARD RD (KY 2877 MP

0-MP.806 & CR 1236 MP0-MP.429) FROM CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

1,000,000

500,000

0 1,000,000 500,000

8853

MADISON KY-1984 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1984 BRIDGE

OVER TATES CREEK. (076B00071N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

665,000

0 210,000 665,000

10001

Page 135 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MADISON CR-1056 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PEACOCK ROAD

BRIDGE OVER E. FK. OTTER CREEK.

(076C00011N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

665,000

0 210,000 665,000

10002

Total for MADISON county PL

Total Amounts:

CN

UT

RW

DN

13,811,873 17,336,000 7,062,500

2,030,000

90,000 4,000,000 500,000

90,000 4,000,000

13,991,873 23,366,000 11,562,500

MAGOFFIN KY-9009 MAJOR WIDENING(O) MOUNTAIN PARKWAY CORRIDOR: WIDEN THE

MOUNTAIN PARKWAY TO 4 LANES FROM 0.3MI

W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE

FORK LICKING RIVER BRIDGE (69.6). (2012BOP)

(14CCR)(16CCR)CN

Project Cost:

UT

RW

DN

PL

NH 15,000,000

0 15,000,000 0

126.4

MAGOFFIN KY-9009 PREFINANCD CONVRSN(O) MOUNTAIN PARKWAY CORRIDOR: WIDEN THE

MOUNTAIN PARKWAY TO 4 LANES FROM 0.3MI

W OF KY 3047 (65.0) TO 0.7 MI W OF MIDDLE

FORK LICKING RIVER BRIDGE (69.6). (2012BOP)

(14CCR)(16CCN)CN

Project Cost:

UT

RW

DN

PL

NH 10,000,000

0 0 10,000,000

126.41

MAGOFFIN KY-1635 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1635 BRIDGE

OVER OAKLEY CREEK. (077B00029N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

595,000

0 140,000 595,000

10002

Page 136 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MAGOFFIN KY-30 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-30 BRIDGE OVER

LICKING RIVER. (077B00059N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

945,000

0 175,000 945,000

10003

MAGOFFIN KY-3049 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3049 BRIDGE

OVER JOHNSON CREEK. (077B00069N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

402,500

0 175,000 402,500

10014

MAGOFFIN CR-1032 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WHITE BRANCH

BRIDGE OVER STATE ROAD FORK.

(077C00036N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

437,500

0 175,000 437,500

10015

MAGOFFIN KY-9009 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF BERT T.

COMBS MOUNTAIN PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 63.123 TO

MILEPOINT 69.98

CN

Project Cost:

UT

RW

DN

PL

PM

PM

400,000

4,000,000

0 0 4,400,000

20000

Total for MAGOFFIN county PL

Total Amounts:

CN

UT

RW

DN

15,000,000 16,380,000

665,000 400,000

0 15,665,000 16,780,000

Page 137 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MARION KY-49 SPOT IMPROVEMENTS(O) SPOT IMPROVEMENTS ON KY-49 (MP 20.900 TO

MP 21.830) AS PER THE KY-49 PLANNING

STUDY. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 800,000

0 0 800,000

8802

MARION KY-49 SPOT IMPROVEMENTS(O) IMPROVE SAFETY, MOBILITY AND GEOMETRICS

ON KY-49 NEAR SOUTHERN KY-52

INTERSECTION. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 3,300,000

0 0 3,300,000

8803

MARION KY-84 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 84

OVER HARDINS CREEK. (16CCN)(078B00025N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

94,500

616,000

94,500 616,000 0

8914

MARION KY-55 RECONSTRUCTION(O) HEARTLAND PARKWAY: IMPROVE MOBILITY

FROM THE LEBANON BYPASS TO BOOKER

ROAD (CR 1214) NEAR SPRINGFIELD. (16CCN)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

350,000

350,000

0 700,000 0

8916

MARION CR-1127 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WHITE OAK CRK RD

BRIDGE OVER WHITE OAK CREEK.

(078C00035N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

98,000

217,000

0 98,000 217,000

10003

Page 138 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for MARION county PL

Total Amounts:

CN

UT

RW

DN

616,000 3,517,000

94,500 98,000

350,000 800,000

350,000

94,500 1,414,000 4,317,000

MARSHALL KY-1949 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1949 BRIDGE

OVER SMITH CREEK. (079B00110N)

CN

Project Cost:

UT

RW

DN

PL

BR 250,000

0 250,000 0

10003

MARSHALL US-641 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

75,000

750,000

0 825,000 0

20016

Total for MARSHALL county PL

Total Amounts:

CN

UT

RW

DN

750,000

325,000

0 1,075,000 0

MARTIN CR-1324 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND

APPROACHES ON PR-1015 OVER ROCKCASTLE

CREEK (C26) 275 FEET WEST JCT. KY-3 JUST

SOUTH OF CROOKED RUN ROAD.

(080C00026N)CN

Project Cost:

UT

RW

DN

PL

BR 60,000

60,000 0 0

1092

Page 139 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MARTIN CR-1120 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WILLIS DIALS RD

BRIDGE OVER PIGEONROOST FORK.

(080C00053N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

467,880

0 157,500 467,880

10023

Total for MARTIN county PL

Total Amounts:

CN

UT

RW

DN

60,000 467,880

157,500

60,000 157,500 467,880

MASON US-68 AM-BRIDGE (P) REPAIR BRIDGE ON US 68 OVER LAWRENCE

CREEK 0.13 MI SW OF KY 3056. (081B00067N)

(16CCR)

CN

Project Cost:

UT

RW

DN

PL

BR 1,400,000

1,400,000 0 0

1095

MASON KY-3056 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 3056

OVER SOUTH FORK LAWRENCE CREEK.

(16CCN)(081B00020N)

CN

Project Cost:

UT

RW

DN

PL

BR 1,120,000

0 0 1,120,000

8906

MASON CR-1124 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF THE BRIDGE ON

DAVIS LANE. (16CCN)(081C00022N)

CN

Project Cost:

UT

RW

DN

PL

BR 875,000

0 0 875,000

8910

Page 140 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MASON CR-1019 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF THE BRIDGE ON

KENNEDY CREEK ROAD. (16CCN)(081C00009N)

CN

Project Cost:

UT

RW

DN

PL

BR 560,000

0 0 560,000

8911

MASON CR-1122 AM-BRIDGE (P) REPAIR BRIDGE (081C00018N) ON DIXIE PIKE.

(16CCN)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 60,000

60,000 0 0

8916

MASON US-68 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON WILLIAM HARSHA

BRIDGE OVER THE OHIO RIVER. JOINT PROJECT

WITH OHIO. (081B00069N)(BSBP)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

100,000

2,800,000

0 100,000 2,800,000

10013

MASON US-68 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

825,000

8,250,000

0 0 9,075,000

20011

Total for MASON county PL

Total Amounts:

CN

UT

RW

DN

1,460,000 13,605,000

100,000 825,000

1,460,000 100,000 14,430,000

Page 141 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MCCRACKEN I-24 AM-BRIDGE (P) I-24 BRIDGE OVER THE OHIO RIVER @ PADUCAH

(B100); JOINT PROJECT WITH ILLINOIS TO

MITIGATE SCOUR (073B00100N)(BSBP)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 260,000

0 0 260,000

2

MCCRACKEN US-60 MAJOR WIDENING(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM

BETHEL CHURCH ROAD TO KY-1154 (MARTIN

MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).

(10CCR)(12CCR)

CN

Project Cost:

UT

RW

DN

PL

NH 1,320,000

0 1,320,000 0

115.1

MCCRACKEN US-60 PREFINANCD CONVRSN(O) PADUCAH-WICKLIFFE RD: IMPROVE US-60 FROM

BETHEL CHURCH ROAD TO KY-1154 (MARTIN

MARIETTA) (04CCR) (TO BE LET WITH 1-115.00).

(10CCR)(12CCR)

CN

Project Cost:

UT

RW

DN

PL

NH 1,320,000

0 1,320,000 0

115.11

MCCRACKEN US-62 MAJOR WIDENING(O) MAJOR WIDENING OF US-62 FROM KY-998 TO

PADUCAH INFORMATION AGE PARK. (12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 2,340,000

0 2,340,000 0

152

MCCRACKEN KY-1286 RECONSTRUCTION(O) IMPROVE KY-1286 (FRIENDSHIP ROAD) FROM

MP 3.6 TO MP 6.4 IN PADUCAH. (PRELIMINARY

ENGINEERING) (12CCR)(14CCR)(16CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

1,500,000

2,480,000

0 1,500,000 2,480,000

153

Page 142 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MCCRACKEN US-60 I-CHANGE RECONST(O) CONSTRUCT A DOUBLE-CROSSOVER DIAMOND

INTERCHANGE ON US-60 AT THE I-24

INTERCHANGE NEAR KENTUCKY OAKS MALL.

CN

Project Cost:

UT

RW

DN

PL

NH 3,960,000

0 3,960,000 0

154

MCCRACKEN KY-1954 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

BOTTOM DITCH ON KY 1954 0.7 MILE NORTH OF

KY 348 (073B00096N) .

CN

Project Cost:

UT

RW

DN

PL

BR 574,000

0 0 574,000

1152

MCCRACKEN KY-994 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

BRANCH OF BOTTOM DITCH ON KY 994 0.8 MI

NW OF KY 348 (073B00015N)(EBRP)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

168,000

791,000

0 168,000 791,000

1154

MCCRACKEN I-24 AM-BRIDGE (P) ADDRESS DEFICIENCIES ON I-24 BRIDGE OVER

OHIO RIVER. JOINT PROJECT WITH ILLINOIS.

(073B00100N)(BSBP)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 2,000,000

0 0 2,000,000

10006

MCCRACKEN I-24 AM-BRIDGE (P) ADDRESS DEFICIENCIES WITH BRIDGE LIGHTING

ON I-24 BRIDGE OVER THE OHIO RIVER. JOINT

PROJECT WITH ILLINOIS. (073B000100N)(BSBP)

(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 375,000

0 375,000 0

10007

Page 143 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MCCRACKEN KY-339 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 339 BRIDGE

OVER MASSAC CREEK. (073B00058N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

892,500

0 210,000 892,500

10012

MCCRACKEN US-45 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

100,000

1,000,000

0 1,100,000 0

20019

Total for MCCRACKEN county PL

Total Amounts:

CN

UT

RW

DN

5,335,000 4,517,500

1,978,000

2,640,000 2,480,000

2,340,000

0 12,293,000 6,997,500

MCCREARY KY-92 RELOCATION(O) IMPROVE KY-92 FROM WEST OF KY-592 TO

EAST OF THE WHITLEY/MCCREARY COUNTY

LINE (SECTION 2).(2014BOP)(SAME AS

11-184.20)

CN

Project Cost:

UT

RW

DN

PL

STP 8,000,000

0 8,000,000 0

261.3

MCCREARY KY-92 PREFINANCD CONVRSN(O) IMPROVE KY-92 FROM WEST OF KY-592 TO

EAST OF THE WHITLEY/MCCREARY COUNTY

LINE (SECTION 2).(2014BOP)(SAME AS

11-184.20)

CN

Project Cost:

UT

RW

DN

PL

STP 7,000,000

0 0 7,000,000

261.31

Page 144 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MCCREARY CR-1239 AM-BRIDGE (P) BRIDGE OVER ROCK CREEK ON OLD

FIDELITY-BELL FARM ROAD (CR 1239) 0.25 MI W

OF ROCK CREEK ROAD (CR 1236) (074C00008N)

(SR=22)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

196,000

448,000

0 196,000 448,000

1065

MCCREARY KY-1044 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1044 BRIDGE

OVER MARSH CREEK. (074B00023N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

451,500

0 175,000 451,500

10002

MCCREARY KY-700 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-700 BRIDGE

OVER INDIAN CREEK. (074B00026N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

1,155,000

0 210,000 1,155,000

10003

MCCREARY KY-478 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-478 BRIDGE

OVER MARSH CREEK. (074B00027N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

521,500

0 175,000 521,500

10004

Total for MCCREARY county PL

Total Amounts:

CN

UT

RW

DN

8,000,000 9,576,000

756,000

0 8,756,000 9,576,000

Page 145 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MCLEAN US-431 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OVERFLOW

STRUCTURE ON US-431 AT THE

MUHLENBERG-MCLEAN CO LINE B00056N.

CN

Project Cost:

UT

RW

DN

PL

BR 2,500,000

2,500,000 0 0

1078

MCLEAN KY-2385 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

BRANCH OF POND DRAIN CREEK ON KY 2385

0.9 MI SW OF KY 81 (075B00066N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

308,000

784,000

0 308,000 784,000

1090

MCLEAN US-431 SPOT IMPROVEMENTS(O) SPOT IMPROVEMENTS AT THE INTERSECTION OF

US-431 AND KY-250. (08CCN)(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

200,000

180,000

500,000

0 380,000 500,000

8400

MCLEAN KY-56 RECONSTRUCTION(O) CORRECT LINE OF SIGHT WITH INTERSECTION

OF KY 56 & KY 1233. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 450,000

0 0 450,000

8852

MCLEAN US-431 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US-431 BRIDGE

OVER DRAIN TO CYPRESS CREEK.

(075B00019N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

280,000

3,010,000

0 280,000 3,010,000

10007

Page 146 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MCLEAN KY-81 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-81 BRIDGE OVER

SLOUGH. (075B00026N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

892,500

0 245,000 892,500

10008

Total for MCLEAN county PL

Total Amounts:

CN

UT

RW

DN

2,500,000 5,636,500

833,000

200,000

180,000

2,500,000 1,213,000 5,636,500

MEADE KY-823 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CULVERT OVER

UNNAMED STREAM ON KY 823 0.5 MILE WEST

OF KY 2734.(082B00008N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

105,000

560,000

0 105,000 560,000

1088

Total for MEADE county PL

Total Amounts:

CN

UT

RW

DN

560,000

105,000

0 105,000 560,000

MENIFEE KY-77 FOREST HIGHWAY(P) RESURFACING AND WIDENING EXISTING GRAVEL

PARKING PULL-OFFS AND INSTALLATION OF

GUARDRAIL ALONG KY 77 AND KY 715 IN THE

RED RIVER GORGE AREA IN MENIFEE, POWELL,

AND WOLFE COUNTIES. (2016BOP)CN

Project Cost:

UT

RW

DN

PL

FH 765,000

765,000 0 0

371

Page 147 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MENIFEE KY-1274 FOREST HIGHWAY(P) ROCKFALL/SLOPE IMPROVEMENTS ALONG KY

1274 NORTH OF THE LONG BOW BOAT RAMP IN

MENIFEE COUNTY. (2016BOP)

CN

Project Cost:

UT

RW

DN

PL

FH

FH

FH

100,000

100,000

2,625,000

2,825,000 0 0

372

MENIFEE KY-1274 FOREST HIGHWAY(P) ROCKFALL/SLOPE IMPROVEMENTS ALONG KY

1274 SOUTH OF THE MENIFEE/ROWAN COUNTY

LINE. (2016BOP)

CN

Project Cost:

UT

RW

DN

PL

FH

FH

FH

250,000

250,000

4,010,000

4,510,000 0 0

373

MENIFEE US-460 SAFETY(P) IMPROVE SAFETY AND GEOMETRICS ON US-460

FROM THE END OF ROTHWELL HILL

IMPROVEMENTS TO THE BRIDGE OVER BEAVER

CREEK. (14CCN)(16CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

2,180,000

1,000,000

0 0 3,180,000

8802

Total for MENIFEE county PL

Total Amounts:

CN

UT

RW

DN

7,400,000

350,000 2,180,000

350,000 1,000,000

8,100,000 0 3,180,000

MERCER US-127 SAFETY(P) SAFETY IMPROVEMENTS ON US 127 IN

SALVISA. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 200,000

0 200,000 0

8858

Page 148 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MERCER KY-1941 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1941 BRIDGE

OVER CHAPLIN RIVER. (084B00030N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

300,000

682,000

0 300,000 682,000

10003

MERCER CR-1322 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF STRATTON RD

BRIDGE OVER BRUSH CREEK. (084C00029N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

192,500

595,000

0 192,500 595,000

10004

Total for MERCER county PL

Total Amounts:

CN

UT

RW

DN

1,277,000

692,500

0 692,500 1,277,000

METCALFE KY-496 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER OIL

WELL BRANCH ON KY 496 0.5 MILE SE OF KY

533.(085B00025N) EBRP)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

287,000

0 175,000 287,000

1087

METCALFE KY-163 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE AND

APPROACHES OVER ROGERS CREEK AT MP

7.307. (DESIGN HANDLED UNDER 3-8506.00)

085B00010N (2014BOP)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 3,000,000

3,000,000 0 0

8506.2

Page 149 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

METCALFE KY-163 RECONSTRUCTION(O) RECONSTRUCT KY 163 AS A NEW ROUTE ON

THE WEST SIDE OF EDMONTON FROM KY 163 AT

GARY BELL RD (MP 10.0) S OF EDMONTON,

CROSSING US 68 (STOCKTON ST) 2000 FT

WEST OF THE COURTHOUSE SQ, TO US 68 CN

Project Cost:

UT

RW

DN

PL

SPP 1,000,000

0 0 1,000,000

8859

METCALFE KY-1243 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1243 BRIDGE

OVER KNOB LICK SPRINGS. (085B00034N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

262,500

0 157,500 262,500

10005

METCALFE CR-1108 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MOSBY RIDGE RD

BRIDGE OVER E FORK LITTLE BARREN RVR.

(085C00005N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

896,000

0 210,000 896,000

10006

Total for METCALFE county PL

Total Amounts:

CN

UT

RW

DN

3,000,000 1,445,500

542,500 1,000,000

3,000,000 542,500 2,445,500

MONROE KY-214 FERRY OPERATION(P) OPERATION OF TURKEY NECK BEND FERRY FOR

FY 2019.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 444,000

0 444,000 0

128.1

Page 150 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MONROE KY-214 FERRY OPERATION(P) OPERATION OF TURKEY NECK BEND FERRY FOR

FY 2020.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 444,000

0 0 444,000

128.11

MONROE -0 NEW ROUTE(O) CONSTRUCT NEW ROUTE FOR THE EAST

TOMPKINSVILLE BYPASS "SURFACING ONLY".

(98CCN)(02CCR) (2002BOPC)(DESIGN "STP"

FUNDING SHALL BE SUPPLEMENTAL TO THE

AUTHORIZED AMOUNT ALREADY EXPENDED ON CN

Project Cost:

UT

RW

DN

PL

STP 730,000

0 730,000 0

7020.17

MONROE -0 PREFINANCD CONVRSN(O) CONSTRUCT NEW ROUTE FOR THE EAST

TOMPKINSVILLE BYPASS "SURFACING ONLY".

(98CCN)(02CCR) (2002BOPC)(DESIGN "STP"

FUNDING SHALL BE SUPPLEMENTAL TO THE

AUTHORIZED AMOUNT ALREADY EXPENDED ON CN

Project Cost:

UT

RW

DN

PL

STP 6,580,000

0 0 6,580,000

7020.18

MONROE KY-100 BRIDGE REPLACEMENT(P) REPLACE BRIDGE ON KY-100 BETWEEN MP 14.7

AND 14.9

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

250,000

150,000

500,000

0 250,000 650,000

80003

Total for MONROE county PL

Total Amounts:

CN

UT

RW

DN

1,174,000 7,024,000

250,000

150,000

500,000

0 1,424,000 7,674,000

Page 151 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MONTGOMERY KY-1991 MAJOR WIDENING(O) WIDEN KY 1991 FROM MAYSVILLE ROAD TO

MIDLAND TRAIL INDUSTRIAL PARK,

MONTGOMERY COUNTY (SEE 7-8501.00 FOR

"SPB" FUNDS)(2005HPP-KY129)

CN

Project Cost:

UT

RW

DN

PL

HPP 559,899

559,899 0 0

240.01

MONTGOMERY US-460 RECONSTRUCTION(O) IMPROVE US-460 AT LUCKY STOP HILL. (12CCR)

CN

Project Cost:

UT

RW

DN

PL

NH 9,450,000

9,450,000 0 0

250.1

MONTGOMERY KY-1991 MINOR WIDENING(O) UPGRADE HINKSTON PIKE IN MT. STERLING

FROM NEW MIDLAND TRAIL TO THE NEW

INDUSTRIAL PARK ENTRANCE (INCLUDES

EXTENSION OF INDUSTRIAL ACCESS ROAD TO

HINKSTON PIKE). (12CCR)CN

Project Cost:

UT

RW

DN

PL

SPP 4,010,000

0 4,010,000 0

411

MONTGOMERY US-60 MAJOR WIDENING(O) WIDEN EXISTING PAVEMENT AND IMPROVE

VERTICAL AND HORIZONTAL CURVES FROM

EXISTING MOUNT STERLING BYPASS (KY 686)

TO 500' WEST OF BENTBROOK SUBDIVISION.

ADD FULL WIDTH SHOULDERS AND A CENTER CN

Project Cost:

UT

RW

DN

PL

SPP 800,000

0 0 800,000

8810

Total for MONTGOMERY county PL

Total Amounts:

CN

UT

RW

DN

10,009,899 4,010,000

800,000

10,009,899 4,010,000 800,000

Page 152 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

MORGAN KY-7 RECONSTRUCTION(O) RECONSTRUCT/WIDENING OF MAIN ST (KY 7) IN

WEST LIBERTY BEGINNING AT RIVERSIDE DR.

(CS 1058) AND EXTENDING NORTH TO 0.159

MILES NORTH OF INTERSECTION WITH CEDAR

RD (CS 1053). (2014BOP)(D,R,U COMPLETED CN

Project Cost:

UT

RW

DN

PL

STP 3,300,000

3,300,000 0 0

293.1

MORGAN US-460 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER WHITE

OAK CREEK ON US 460 0.5 MILE NW OF KY

1000. (088B00021N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

224,000

1,239,000

0 224,000 1,239,000

1111

MORGAN KY-191 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 191

OVER CANEY CREEK .5 MILES WEST OF KY

1162. (16CCN)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

182,000

756,000

0 182,000 756,000

8902

MORGAN US-460 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 460 BRIDGE

OVER BIG SPRING BRANCH. (088B00022N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

472,500

0 175,000 472,500

10016

MORGAN KY-9009 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF BERT T.

COMBS MOUNTAIN PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 57.72 TO

MILEPOINT 63.08

CN

Project Cost:

UT

RW

DN

PL

PM

PM

210,000

2,100,000

0 2,310,000 0

20001

Page 153 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for MORGAN county PL

Total Amounts:

CN

UT

RW

DN

3,300,000 2,100,000 2,467,500

791,000

3,300,000 2,891,000 2,467,500

MUHLENBERG US-62 MAJOR WIDENING(O) WIDEN US-62 FROM WAL-MART TO US-431.

(08CCN)(10CCR)(12CCR)(14CCR)(INCLUDES

2-8301)

CN

Project Cost:

UT

RW

DN

PL

SPP 7,500,000

7,500,000 0 0

8506

MUHLENBERG KY-181 MINOR WIDENING(O) WIDEN KY-181 BY FOUR FEET ON EACH SIDE

FROM INTERSECTION 601 TO WENDELL FORD

CENTER. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 530,000

0 0 530,000

8802

MUHLENBERG KY-2533 RECONSTRUCTION(O) STRAIGHTEN DEAN ROAD INTERSECTION OF 189

BYPASS TO KY 181 NORTH NEAR THE

INTERSECTION WITH THE WKY PARKWAY,

WENDELL FORD NATIONAL GUARD CENTER,

AND JOB CORP. (14CCN)CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

780,000

500,000

0 780,000 500,000

8803

MUHLENBERG CR-1141 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF UNION RIDGE RD

BRIDGE OVER ROCKY CREEK. (089C00004N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

647,500

0 175,000 647,500

10009

Page 154 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for MUHLENBERG county PL

Total Amounts:

CN

UT

RW

DN

7,500,000 647,500

955,000

1,030,000

7,500,000 955,000 1,677,500

NELSON US-150 RECONSTRUCTION(O) IMPROVE SAFETY, MOBILITY, AND GEOMETRICS

ON US-150 FROM THE BLUEGRASS PARKWAY

TO THE NELSON/WASHINGTON COUNTY LINE.

(2016BOP)

CN

Project Cost:

UT

RW

DN

PL

STP 600,000

0 0 600,000

396.1

NELSON US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGES ON US 62

(HINKLE CREEK) AND KY 48 IN BLOOMFIELD

090B00096N (SR 28.2) 090B00095N (12CCR)

CN

Project Cost:

UT

RW

DN

PL

BR 1,260,000

1,260,000 0 0

1078

NELSON KY-509 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

FROMAN CREEK ON KY 509 0.9 MI W OF US 31E

(090B00068N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

105,000

756,000

0 105,000 756,000

1089

NELSON US-150 MAJOR WIDENING(O) IMPROVE US-150 FROM WEST OF KY-245

THROUGH THE BLUEGRASS PARKWAY

INTERCHANGE TO EAST OF LESLIE BALLARD LN

(CR 1110). (06CCN)(2006BOPC)(12CCR)(14CCR)

(16CCR)CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

1,000,000

4,000,000

0 1,000,000 4,000,000

8309.1

Page 155 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

NELSON -0 NEW ROUTE(O) NEW ROUTE BETWEEN US 62 AND KY 245 WEST

OF BARDSTOWN.

CN

Project Cost:

UT

RW

DN

PL

SPP 500,000

0 0 500,000

8809

NELSON KY-52 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-52 BRIDGE OVER

MONKS CREEK. (090B00033N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

105,000

1,015,000

0 105,000 1,015,000

10004

NELSON CS-4003 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DEPOT ST BRIDGE

OVER SIMPSON CREEK. (090C00045N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

98,000

406,000

0 98,000 406,000

10005

NELSON CR-1128 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF POTTERSHOP LOOP

BRIDGE OVER ROWAN CREEK. (090C00021N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

91,000

227,500

0 91,000 227,500

10014

NELSON BG-9002 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF MARTHA

LAYNE COLLINS BLUEGRASS PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 8.837 TO

MILEPOINT 10.172

CN

Project Cost:

UT

RW

DN

PL

PM

PM

110,000

1,100,000

0 1,210,000 0

20023

Page 156 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

NELSON US-62 CONGESTION MITIGTN(O) CONSTRUCT A ROUNDABOUT AT THE

INTERSECTION OF US-31E AND US-62. (NELSON

COUNTY FISCAL COURT WILL DO DESIGN AND

BUILD ROUNDABOUT)

CN

Project Cost:

UT

RW

DN

PL

SPP 1,500,000

0 0 1,500,000

80050

Total for NELSON county PL

Total Amounts:

CN

UT

RW

DN

1,260,000 1,100,000 7,904,500

509,000 1,100,000

1,000,000

1,260,000 2,609,000 9,004,500

NICHOLAS KY-36 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-36 BRIDGE OVER

BRUSHY FORK. (091B00018N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

525,000

1,610,000

0 525,000 1,610,000

10011

NICHOLAS CS-1096 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DORSEY AVE

BRIDGE OVER BRUSH FORK. (091C00029N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

280,000

595,000

0 280,000 595,000

10012

Total for NICHOLAS county PL

Total Amounts:

CN

UT

RW

DN

2,205,000

805,000

0 805,000 2,205,000

Page 157 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

OHIO US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON US 62

OVER BRANCH OF THREE LICK FORK 0.23 MILE

E OF GREEN MEADOWS DR (CS

6068)092B00032 (SD)

CN

Project Cost:

UT

RW

DN

PL

BR 1,148,000

1,148,000 0 0

1083

OHIO US-62 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

THREELICK FORK ON US 62 0.4 MILE E OF

GREEN MEADOWS DRIVE (CS 6068) IN BEAVER

DAM. (092B00033N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

308,000

1,029,000

0 308,000 1,029,000

1091

OHIO WN-9007 I-CHANGE RECONST(O) I-65 SPUR CORRIDOR; RECONSTRUCT THE

EXISTING NATCHER PARKWAY/KY-69

INTERCHANGE (EXIT 50) IN OHIO COUNTY.

(2016BOP)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

1,350,000

1,250,000

0 2,600,000 0

2092.2

OHIO KY-85 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-85 BRIDGE OVER

BR OF W FK LEWIS CREEK. (092B00053N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

962,500

0 210,000 962,500

10010

OHIO CR-1003 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WEST HALLS CREEK

R BRIDGE OVER BRANCH OF HALLS CREEK.

(092C00001N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

630,000

0 175,000 630,000

10011

Page 158 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

OHIO CR-1067 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SUNNYDALE RD

BRIDGE OVER BRANCH OF ROUGH RIVER.

(092C00020N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

630,000

0 175,000 630,000

10012

OHIO CR-1036 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RAILROAD BED RD

BRIDGE OVER WFK ADAMS CREEK.

(092C00067N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

735,000

0 210,000 735,000

10013

OHIO CR-1414 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF JOHNSON SCHOOL

RD BRIDGE OVER BARASS DITCH.

(092C00080N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

647,500

0 175,000 647,500

10014

OHIO CR-1083 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ROCK CREEK LN

BRIDGE OVER BR-S.FK PANTHER CK.

(092C00097N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

840,000

0 210,000 840,000

10015

OHIO CR-1510 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF QUARTERHORSE LN

BRIDGE OVER N FK PANTHER CREEK.

(092C00133N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

892,500

0 245,000 892,500

10016

Page 159 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

OHIO WK-9001 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 65.68 TO

MILEPOINT 83.3

CN

Project Cost:

UT

RW

DN

PL

PM 16,596,000

0 0 16,596,000

20039

OHIO WK-9001 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WENDELL

H. FORD WESTERN KY PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 83.3 TO

MILEPOINT 87.544

CN

Project Cost:

UT

RW

DN

PL

PM 4,282,000

0 0 4,282,000

20040

OHIO WN-9007 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WILLIAM H.

NATCHER PARKWAY BOTH DIRECTION(S) FROM

MILEPOINT 49.8 TO MILEPOINT 59.86 (61.553

NON-CARDINAL)

CN

Project Cost:

UT

RW

DN

PL

PM 11,064,000

0 0 11,064,000

20041

Total for OHIO county PL

Total Amounts:

CN

UT

RW

DN

1,148,000 38,308,500

1,708,000

1,350,000

1,250,000

1,148,000 4,308,000 38,308,500

OLDHAM -0 BIKE/PED FACIL(O) OLDHAM COUNTY BICYCLE & PEDESTRIAN

TRAIL - OLD LAGRANGE RD. CONSTRUCT A

BICYCLE AND PEDESTRIAN TRAIL ALONG OLD

LAGRANGE ROAD FROM KY 146 TO THE

INTERSECTION WITH KY 329 BYPASS. (FUNDING CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

250,000

500,000

0 250,000 500,000

410.01

Page 160 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

OLDHAM CR-1002 SAFETY(P) CONSTRUCT A 4-LANE UNINTERRUPTED RAIL

UNDERPASS WEST OF LAGRANGE. (LOCAL

MATCH)(ALL WORK BY OLDHAM COUNTY)

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP). (14CCR)CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

100,000

10,000,000

100,000 10,000,000 0

434

OLDHAM KY-1793 SAFETY(P) CONSTRUCT SIDEWALKS ON KY 1793 FROM

RIDGEVIEW DRIVE TO SETTLERS POINT TRAIL.

(FUNDING SUBJECT TO FISCAL CONSTRAINT

PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SLO 100,000

100,000 0 0

440.1

OLDHAM US-42 RECONSTRUCTION(O) RECONSTRUCT US 42 AND WIDEN FROM 2

LANES TO 3 LANES (3RD LANE WILL BE A

CENTER TURN LANE) FROM

JEFFERSON/OLDHAM COUNTY LINE TO

RIDGEMOOR DRIVE. PROJECT WILL INCLUDE THE CN

Project Cost:

UT

RW

DN

PL

SLO 5,320,000

5,320,000 0 0

441.01

OLDHAM KY-22 RECONSTRUCTION(O) INTERSECTION IMPROVEMENT AT KY 22 AND KY

329 IN CRESTWOOD. (ALL WORK BY KYTC)

(2006BOPC)(FUNDING SUBJECT TO FISCAL

CONSTRAINT PENDING MPO TIP)

CN

Project Cost:

UT

RW

DN

PL

SLO 300,000

300,000 0 0

449

OLDHAM CS-2102 CONGESTION MITIGTN(O) CONSTRUCTION OF A PARK AND RIDE FACILITY

INCLUDING A PARKING LOT, SHELTER,

PLAYGROUND, BIKE LOCKERS, WALKWAYS,

AND A 1000' ACCESS ROAD LOCATED ON APPLE

PATCH WAY OFF OF KY-329 NEAR I-71 EXIT 14 CN

Project Cost:

UT

RW

DN

PL

SLO 1,174,800

1,174,800 0 0

468.1

Page 161 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

OLDHAM I-71 MAJOR WIDENING(O) WIDEN I-71 FROM FOUR TO SIX LANES FROM

KY-329 (MP 14.1) TO KY-393 (MP 18.0). (16CCN)

CN

Project Cost:

UT

RW

DN

PL

NH 3,500,000

0 3,500,000 0

483.1

OLDHAM I-71 NEW INTERCHANGE(O) CONSTRUCT NEW I-71 INTERCHANGE BETWEEN

KY-393 AND KY-53 TO RELIEVE CONGESTION IN

LAGRANGE.

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

NH

1,500,000

3,000,000

1,900,000

6,000,000

1,500,000 4,900,000 6,000,000

483.3

OLDHAM CR-1209 SAFETY-HAZARD ELIM(P) OLD FLOYDSBURG ROAD SAFETY

IMPROVEMENTS: REPLACE NARROW ONE-LANE

CULVERT CROSSING; CLEAR TREES AND

VEGETATION OUT OF RIGHT-OF-WAY; ADD

SHOULDER TO THE ROAD, AND ADD SIGNAGE CN

Project Cost:

UT

RW

DN

PL

SLO 700,000

700,000 0 0

494

OLDHAM KY-329 RECONSTRUCTION(O) INTERSECTION REALIGNMENT/RECONSTRUCTION

AT KY 329 AND KY 329 BYPASS (2016BOP).

CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

120,000

100,000

100,000

120,000 100,000 100,000

542

OLDHAM -0 NEW ROUTE(O) CONSTRUCTION OF A NEW CONNECTION FROM

OLD LAGRANGE ROAD TO KY 393 AT

BUCKNER. LPA CONTRACT. (BOP2012)

CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

SLO

714,500

228,000

2,300,000

714,500 2,528,000 0

754

Page 162 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

OLDHAM CS-2030 BIKE/PED FACIL(O) CONSTRUCT 5' CONCRETE SIDEWALKS IN THE

EXISTING RIGHT-OF-WAY ALONG BOTH SIDES

OF SPRING HILL TRACE FROM KY 329 TO THE

END OF THE EXISTING SUBDIVISION, SLIGHTLY

BEYOND SPRING HILL COURT (2014BOP).CN

Project Cost:

UT

RW

DN

PL

SLO

SLO

75,000

445,000

75,000 445,000 0

757

OLDHAM KY-1488 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1488 BRIDGE

OVER ORGAN CREEK. (093B00048N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

280,000

343,000

0 280,000 343,000

10012

OLDHAM KY 329 AIR QUALITY(P) IMPROVE THE INTERCHANGE OF I 71 AND KY

329

CN

Project Cost:

UT

RW

DN

PL

SPP 250,000

0 250,000 0

80005

Total for OLDHAM county PL

Total Amounts:

CN

UT

RW

DN

7,594,800 12,745,000 6,343,000

1,720,000 4,280,000

714,500 3,100,000 500,000

75,000 2,128,000 100,000

10,104,300 22,253,000 6,943,000

OWEN KY-22 RECONSTRUCTION(O) IMPROVE SAFETY ON KY-22 FROM KY-227 TO

KY-845. (06CCR)(08CCN)(12CCR)(14CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 3,500,000

0 0 3,500,000

198

Page 163 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

OWEN CR-1214 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

CEDAR CREEK ON SAWDRIDGE CREEK W ROAD

(CR 1214) 0.2 MI N OF US 127 (094C00011N)

CN

Project Cost:

UT

RW

DN

PL

BR 672,000

0 0 672,000

1088

OWEN KY-3102 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3102 BRIDGE

OVER BRUSH CREEK. (094B00034N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

280,000

1,942,500

0 280,000 1,942,500

10013

Total for OWEN county PL

Total Amounts:

CN

UT

RW

DN

6,114,500

280,000

0 280,000 6,114,500

OWSLEY KY-30 RECONSTRUCTION(O) IMPROVE KY-30 FROM KY-847 IN OWSLEY

COUNTY TO JACKSON COUNTY LINE.(LET W/

JACKSON CO. SECTION UNDER 11-278.30)(SEE

10-279.60 FOR PE & ENVIR)(AR/W)(14CCR)

(16CCR)CN

Project Cost:

UT

RW

DN

PL

STP 14,500,000

0 14,500,000 0

279.61

Total for OWSLEY county PL

Total Amounts:

CN

UT

RW

DN

14,500,000

0 14,500,000 0

Page 164 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

PENDLETON US-27 MAJOR WIDENING(O) IMPROVE SAFETY ON US-27 FROM BUTLER IN

PENDLETON COUNTY TO SOUTH OF KY-154 IN

CAMPBELL COUNTY.(12CCN)(14CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 5,000,000

0 0 5,000,000

8706

PENDLETON KY-159 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-159 BRIDGE

OVER NORTH LITTLE KINCAID CRE.

(096B00006N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

490,000

0 210,000 490,000

10004

Total for PENDLETON county PL

Total Amounts:

CN

UT

RW

DN

5,490,000

210,000

0 210,000 5,490,000

PERRY KY-15 RECONSTRUCTION(O) IMPROVE SAFETY, UPGRADE GEOMETRICS, AND

ADDRESS CAPACITY ISSUES FOR KY-15 IN

PERRY COUNTY FROM MORTON BOULEVARD

TO KY-15 BYPASS

CN

Project Cost:

UT

RW

DN

PL

NH 47,000,000

47,000,000 0 0

158

PERRY CR-1114 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

NORTH FORK KENTUCKY RIVER ON KENMONT

ROAD (CR 1114) 380 FT SE OF KY 7

(097C00005N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

224,000

1,400,000

0 224,000 1,400,000

1113

Page 165 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

PERRY CR-1140 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

STRAIGHT FORK ON LITTLE LEATHERWOOD

CREEK ROAD (CR 1140) AT JCT WITH KY 3348

(097C00013N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

182,000

504,000

0 182,000 504,000

1114

PERRY HR-9006 NEW INTERCHANGE(O) NEW INTERCHANGE OFF OF A NEW EXIT 55 HAL

ROGERS PARKWAY

CN

Project Cost:

UT

RW

DN

PL

STP

STP

1,200,000

320,000

0 1,200,000 320,000

8903

PERRY KY-80 SAFETY(P) SAFETY IMPROVEMENTS ON KY-80 FROM

LESLIE COUNTY LINE TO KY-451. (16CCN)

CN

Project Cost:

UT

RW

DN

PL

STP

STP

STP

700,000

350,000

280,000

0 700,000 630,000

8906

PERRY KY-1166 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-1166

OVER RT. FK. MACES CREEK. (16CCN)

097B00110N

CN

Project Cost:

UT

RW

DN

PL

BR 938,000

0 0 938,000

8910

PERRY KY-1166 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 1166

OVER MACES CREEK. (16CCN) 097B00072N

(SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

BR

155,000

103,000

742,000

155,000 103,000 742,000

8913

Page 166 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

PERRY CR-1150 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

LEATHERWOOD CREEK. (16CCN) 097C00021N

CN

Project Cost:

UT

RW

DN

PL

BR 455,000

0 0 455,000

8915

PERRY CR-1115 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF GEORGES BRANCH

RD BRIDGE OVER GEORGES BRANCH.

(097C00007N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

390,000

0 140,000 390,000

10004

PERRY CR-1145 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF OWENS BR RD

BRIDGE OVER OWENS BRANCH. (097C00018N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

340,000

0 140,000 340,000

10005

PERRY CR-1083 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HALL OLD HOME

PLACE BRIDGE OVER BIG CREEK. (097C00084N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

613,000

0 175,000 613,000

10006

PERRY KY-476 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 476 BRIDGE

OVER BALL FORK. (097B00007N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

840,000

0 210,000 840,000

10017

Page 167 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

PERRY KY-80 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF PCC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

100,000

100,000

0 200,000 0

20003

Total for PERRY county PL

Total Amounts:

CN

UT

RW

DN

47,000,000 100,000 6,222,000

1,871,000

155,000 1,200,000 350,000

103,000 600,000

47,155,000 3,274,000 7,172,000

PIKE -0 NEW ROUTE(O) MARION BRANCH INDUSTRIAL PARK ACCESS

ROAD.

CN

Project Cost:

UT

RW

DN

PL

SPP 7,000,000

0 7,000,000 0

347

PIKE -0 PREFINANCD CONVRSN(O) MARION BRANCH INDUSTRIAL PARK ACCESS

ROAD. (ADDITIONAL FUNDING FOR 12-347.00)

CN

Project Cost:

UT

RW

DN

PL

SPP 7,000,000

0 0 7,000,000

347.01

PIKE KY-610 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-610

(MP 8.146) OVER LONG FORK; .1 MI S OF JCT

KY-1469; (AR/W)098B00069N

CN

Project Cost:

UT

RW

DN

PL

BR 770,000

770,000 0 0

1104

Page 168 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

PIKE KY-1441 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON

FISHTRAP RD (KY 1441) OVER RACCOON

CREEK AT INTERSECTION WITH COON CREEK (CR

1371) 098B00093N

CN

Project Cost:

UT

RW

DN

PL

BR 665,000

665,000 0 0

1115

PIKE CR-1181 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

LEVISA FORK ON SOUTH RIVER ROAD

CONNECTOR (CR 1181-70) AT JCT WITH US 460

NEAR VIRGINIA STATE LN (098C00088N)

CN

Project Cost:

UT

RW

DN

PL

BR 980,000

0 980,000 0

1122

PIKE CR-1801 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER

BLACKBERRY CREEK ON BIG BLUE SPRINGS

ROAD (CR 1801) AT JCT WITH KY 1056

(098C00028N)

CN

Project Cost:

UT

RW

DN

PL

BR 210,000

0 210,000 0

1123

PIKE KY-199 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-199 BRIDGE

OVER PINSONS CREEK. (098B00032N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

484,400

0 175,000 484,400

10008

PIKE KY-199 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-199 BRIDGE

OVER POND CREEK. (098B00036N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

331,100

0 140,000 331,100

10009

Page 169 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

PIKE KY-3419 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-3419 BRIDGE

OVER LEFT FK BLACKBERRY CR. (098B00180N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

618,450

0 210,000 618,450

10010

PIKE CR-1517 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PIGEON ROOST RD

BRIDGE OVER BIG CREEK. (098C00005N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

389,200

0 157,500 389,200

10011

PIKE CR-1545 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MULLEN FRK BRIDGE

OVER POND CREEK. (098C00021N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

567,280

0 140,000 567,280

10012

PIKE CR-1906 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BEEFHIDE CRK

BRIDGE OVER BEEFHIDE CREEK. (098C00119N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

506,100

0 175,000 506,100

10013

PIKE CR-1789 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ELWOOD RD BRIDGE

OVER SHELBY CREEK. (098C00080N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

192,500

930,580

0 192,500 930,580

10024

Page 170 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

PIKE CR-1360 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RIGHT FORK OF

BRUS BRIDGE OVER LEFT FK.BRUSHY FORK.

(098C00091N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

444,500

0 157,500 444,500

10025

PIKE CR-1911 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CANEY HWY #1

BRIDGE OVER CANEY CREEK. (098C00113N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

530,250

0 140,000 530,250

10026

PIKE CR-1460 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DESKINS RD BRIDGE

OVER JOHNS CREEK. (098C00170N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

227,500

875,000

0 227,500 875,000

10027

PIKE US-23 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

525,000

5,250,000

0 0 5,775,000

20002

Total for PIKE county PL

Total Amounts:

CN

UT

RW

DN

1,435,000 8,190,000 17,926,860

1,715,000 525,000

1,435,000 9,905,000 18,451,860

Page 171 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

POWELL KY-213 SAFETY(P) IMPROVE SAFETY AND GEOMETRICS, AND

REDUCE CONGESTION KY-213 FROM KY-11 TO

BOTTOM OF MOUNTAIN. (12CCR)(16CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

4,000,000

1,100,000

2,000,000

0 5,100,000 2,000,000

163

POWELL KY-2026 RECONSTRUCTION(O) CORRECT FLOODING ISSUES ON KY-2026 FROM

KY-11 TO THE RED RIVER IN CLAY CITY.

CN

Project Cost:

UT

RW

DN

PL

STP

STP

STP

500,000

200,000

150,000

0 500,000 350,000

211

POWELL KY-599 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-599 BRIDGE

OVER CANE CREEK. (099B00069N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

770,000

0 175,000 770,000

10007

POWELL KY-2026 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2026 BRIDGE

OVER RED RIVER. (099B00090N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

1,120,000

0 210,000 1,120,000

10008

POWELL KY-3354 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 3354 BRIDGE

OVER CAT CREEK. (099B00081N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

560,000

0 175,000 560,000

10018

Page 172 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

POWELL KY-9000 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF BERT T.

COMBS MOUNTAIN PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 22.307 TO

MILEPOINT 27.376

CN

Project Cost:

UT

RW

DN

PL

PM

PM

410,000

4,100,000

0 4,510,000 0

20006

POWELL KY-9000 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF BERT T.

COMBS MOUNTAIN PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 27.376 TO

MILEPOINT 32.788

CN

Project Cost:

UT

RW

DN

PL

PM 5,416,000

0 0 5,416,000

20007

Total for POWELL county PL

Total Amounts:

CN

UT

RW

DN

4,100,000 9,866,000

1,470,000

4,000,000 200,000

1,100,000 150,000

0 10,670,000 10,216,000

PULASKI KY-461 MAJOR WIDENING(O) IMPROVE KY-461 FROM KY-80 TO BUCK CREEK

BRIDGE, INCLUDING INTERCHANGE AT KY-80.

CN

Project Cost:

UT

RW

DN

PL

NH

NH

3,000,000

1,500,000

0 3,000,000 1,500,000

59.25

PULASKI KY-461 PREFINANCD CONVRSN(O) IMPROVE KY-461 FROM KY-80 TO BUCK CREEK

BRIDGE, INCLUDING INTERCHANGE AT KY-80.

CN

Project Cost:

UT

RW

DN

PL

NH

NH

3,000,000

1,500,000

0 3,000,000 1,500,000

59.26

Page 173 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

PULASKI KY-635 SAFETY-RR SEPARATN(P) SAFETY PROJECT TO RECONSTRUCT KY 635 TO

ELIMINATE AT GRADE RAILROAD CROSSING AND

REPLACE WITH RAILROAD SEPARATION

CROSSING AT SCIENCE HILL, KENTUCKY IN

PULASKI COUNTY. (2016BOP)CN

Project Cost:

UT

RW

DN

PL

RRS

RRS

1,800,000

1,300,000

0 0 3,100,000

9010

Total for PULASKI county PL

Total Amounts:

CN

UT

RW

DN

6,000,000 1,800,000

4,300,000

0 6,000,000 6,100,000

ROBERTSON KY-616 RECONSTRUCTION(O) IMPROVE CURVE ON KY 616 AND IMPROVE

ROADWAY FROM THE NEW ROBERTSON

COUNTY SCHOOL TO MT OLIVET. (12CCN)

(14CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

250,000

210,000

0 0 460,000

8711

Total for ROBERTSON county PL

Total Amounts:

CN

UT

RW

DN

250,000

210,000

0 0 460,000

ROCKCASTLE I-75 MAJOR WIDENING(O) TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 6

LANES FROM 1MI N SAND HILL ROAD

UNDERPASS N TO 1.1 MILES N OF THE US-25

I-CHNG AT MT. VERNON. (16CCR)

CN

Project Cost:

UT

RW

DN

PL

NH 41,110,000

41,110,000 0 0

6.1

Page 174 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ROCKCASTLE KY-461 RECONSTRUCTION(O) IMPROVE KY-461 FROM US-150 TO THE

EXISTING FOUR LANE APPROACH AT US-25.

(16CCN)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

1,200,000

1,450,000

0 1,200,000 1,450,000

8952

ROCKCASTLE KY-1326 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1326 BRIDGE

OVER LITTLE RENFRO CREEK. (102B00026N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

70,000

210,000

0 70,000 210,000

10010

ROCKCASTLE I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 52.05 TO

MILEPOINT 55.295

CN

Project Cost:

UT

RW

DN

PL

PM

PM

390,000

3,900,000

0 4,290,000 0

20003

ROCKCASTLE I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 71.668 TO

MILEPOINT 73.408

CN

Project Cost:

UT

RW

DN

PL

PM

PM

210,000

2,100,000

0 0 2,310,000

20004

ROCKCASTLE US-25 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION

CN

Project Cost:

UT

RW

DN

PL

PM

PM

175,000

1,750,000

0 0 1,925,000

20005

Page 175 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for ROCKCASTLE county PL

Total Amounts:

CN

UT

RW

DN

41,110,000 3,900,000 4,060,000

1,660,000 385,000

1,450,000

41,110,000 5,560,000 5,895,000

ROWAN KY-32 RECONSTRUCTION(O) IMPROVE KY-32 FROM PARK HILLS DRIVE TO

VIKING DRIVE NORTH. (12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 5,500,000

0 0 5,500,000

204

ROWAN US-60 SAFETY(P) CONSTRUCT TURN LANES INTO LAKESIDE

CHRISTIAN ACADEMY TO IMPROVE SAFETY.

(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 520,000

520,000 0 0

227

ROWAN KY-377 RECONSTRUCTION(O) IMPROVE SAFETY AND CONNECTIVITY AND

REDUCE CONGESTION ON KY-377 FROM KY-32

TO NORTH OF KY-799. (08CCN)(10CCR)(16CCR)

CN

Project Cost:

UT

RW

DN

PL

STP 2,600,000

0 0 2,600,000

8406

ROWAN CR-1025 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON LITTLE

PERRY ROAD OVER TRIPLETT CREEK.(16CCN)

CN

Project Cost:

UT

RW

DN

PL

BR 822,500

0 0 822,500

8914

Page 176 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ROWAN KY-801 MAJOR WIDENING(O) WIDEN KY 801 FROM NEAR MMRC REGIONAL

PARK TO KY 158 IN FLEMING CO.

CN

Project Cost:

UT

RW

DN

PL STP 100,000

0 100,000 0

8915

Total for ROWAN county PL

Total Amounts:

CN

UT

RW

DN

520,000 822,500

100,000

8,100,000

520,000 100,000 8,922,500

RUSSELL LN-9008 NEW INTERCHANGE(O) CONSTRUCT A NEW INTERCHANGE AT THE

CUMBERLAND PARKWAY INTERSECTION WITH

KY-910 AT WINDSOR. (08CCN)(10CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 6,740,000

6,740,000 0 0

8502

RUSSELL US-127 RELOCATION(O) RELOCATE US-127 FROM EAST OF THE KY-1730

AND MANNTOWN RD INTERSECTION, AND

EXTENDING NORTHERLY TO NORTH BANK OF

CUMBERLAND RIVER. POTENTIAL DESIGN

BUILD. (SEE 8-108&8-115 FOR PE/PH.2)(12CCR)CN

Project Cost:

UT

RW

DN

PL

NH 9,320,000

0 9,320,000 0

8601.21

RUSSELL US-127 PREFINANCD CONVRSN(O) RELOCATE US-127 FROM EAST OF THE KY-1730

AND MANNTOWN RD INTERSECTION, AND

EXTENDING NORTHERLY TO NORTH BANK OF

CUMBERLAND RIVER (SEE 8-108&8-115 FOR

PE/PH.2)(12CCR)(14CCR)CN

Project Cost:

UT

RW

DN

PL

NH 8,280,000

0 0 8,280,000

8601.23

Page 177 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

RUSSELL US 127 AIR QUALITY(P) ADD A RIGHT TURNING ON US 127

SOUTHBOUND BEGINNING AT THE EASTBOUND

EXIT OF THE CUMBERLAND PARKWAY FOR 0.2

MILES

CN

Project Cost:

UT

RW

DN

PL

SPP 400,000

0 400,000 0

80007

Total for RUSSELL county PL

Total Amounts:

CN

UT

RW

DN

6,740,000 9,720,000 8,280,000

6,740,000 9,720,000 8,280,000

SCOTT -0 BYPASS(O) GEORGETOWN NORTHWEST BYPASS: IMPROVE

CONNECTIVITY AND MOBILITY NORTHWEST

AROUND GEORGETOWN FROM KY-32 TO I-75.

(04CCR)(2004BOPC)(SEE 7-102.01 FOR "HPP"

COMPONENT)(10CCR)(12CCR)(16CCR)CN

Project Cost:

UT

RW

DN

PL

STP 5,000,000

0 0 5,000,000

102.5

SCOTT KY-1689 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 1689

OVER LECOMPTES RUN 0.46 MILE W OF KY

227105B00038N

CN

Project Cost:

UT

RW

DN

PL

BR 462,000

462,000 0 0

1127

SCOTT CR-1022 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER NS

(CNO&TP)RR ON FIELDS ROAD (CR 1022) AT

SCOTT/HARRISON CO LINE (105R00607N)

(EBRP)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

1,120,000

210,000 1,120,000 0

1139

Page 178 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

SCOTT KY-227 RECONSTRUCTION(O) RECONSTRUCT KY-227 FROM MP 2.98 TO MP

3.34 TO IMPROVE HORIZONTAL CURVE. (16CCN)

CN

Project Cost:

UT

RW

DN

PL

STP 200,000

200,000 0 0

8907

SCOTT KY-620 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-620 BRIDGE

OVER ROGERS GAP CREEK. (105B00095N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

665,000

0 210,000 665,000

10005

SCOTT CS-1010 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF LEMONS MILL RD

BRIDGE OVER NS (CNO&TP) SYSTEM.

(105C00112N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

350,000

1,295,000

0 350,000 1,295,000

10006

SCOTT KY-1689 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1689 BRIDGE

OVER LOCUST FORK. (105B00039N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

133,000

308,000

0 133,000 308,000

10012

SCOTT CR-1020 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HINTON RD BRIDGE

OVER NS (CNO&TP) SYSTEM. (105R00605N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

238,000

511,000

0 238,000 511,000

10013

Page 179 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

SCOTT I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 120.792 TO

MILEPOINT 121.117

CN

Project Cost:

UT

RW

DN

PL

PM

PM

40,000

400,000

0 0 440,000

20019

Total for SCOTT county PL

Total Amounts:

CN

UT

RW

DN

662,000 1,120,000 8,179,000

210,000 931,000 40,000

872,000 2,051,000 8,219,000

SHELBY I-64 MAJOR WIDENING(O) WIDEN I-64 TO 6-LANES FROM 0.458 MILE EAST

OF THE KY-55 INTERCHANGE TO THE KY-1790

UNDERPASS. (2006BOPC)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

2,000,000

2,000,000

0 2,000,000 2,000,000

65.4

SHELBY KY-53 RECONSTRUCTION(O) WIDEN KY-53 TO FOUR LANES FROM I-64 TO

US-60.(08CCN)(10CCN) (12CCR)(14CCR)

(16CCR)

CN

Project Cost:

UT

RW

DN

PL

STP 3,000,000

0 3,000,000 0

8511

SHELBY KY-53 PREFINANCD CONVRSN(O) WIDEN KY-53 TO FOUR LANES FROM I-64 TO

US-60.(08CCN)(10CCN) (12CCR)(14CCR)

(16CCR)

CN

Project Cost:

UT

RW

DN

PL

STP 7,700,000

0 0 7,700,000

8511.01

Page 180 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

SHELBY CR-1007 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF MOODY PIKE BRIDGE

OVER FOX RUN CREEK. (106C00004N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

217,000

0 140,000 217,000

10024

SHELBY CR-1009 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF CLORE JACKSON RD

BRIDGE OVER FOX RUN CREEK. (106C00007N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

406,000

0 140,000 406,000

10025

SHELBY KY 55X AIR QUALITY(P) FOUR RIGHT TURNING LANES AT THE

INTERSECTION OF KY 55X AND KY 43 AND TWO

LEFT TURNING LANES FROM KY 55X ONTO KY

43.

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

SPP

150,000

22,000

22,000

500,000

0 194,000 500,000

80004

Total for SHELBY county PL

Total Amounts:

CN

UT

RW

DN

3,000,000 8,823,000

2,430,000

22,000

22,000 2,000,000

0 5,474,000 10,823,000

SIMPSON -0 NEW ROUTE(O) GARVIN LANE EXTENSION TO HENDERSON

INDUSTRIAL PARK. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 300,000

0 300,000 0

8810

Page 181 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

SIMPSON KY-621 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-621 BRIDGE

OVER SINKING CREEK. (107B00018N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

332,500

0 157,500 332,500

10007

SIMPSON CR-1126 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF PLEASANT HILL

ROAD BRIDGE OVER MAYS BRANCH.

(107C00011N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

280,000

0 157,500 280,000

10008

Total for SIMPSON county PL

Total Amounts:

CN

UT

RW

DN

300,000 612,500

315,000

0 615,000 612,500

SPENCER KY-1169 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE OVER BUCK

CREEK ON KY 1169 75 FT EAST OF YODER

TIPTON ROAD (CR 1142). (108B00022N)(EBRP)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

497,000

0 245,000 497,000

1076

SPENCER KY-1169 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1169 BRIDGE

OVER ELK CREEK. (108B00040N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

490,000

0 210,000 490,000

10013

Page 182 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

SPENCER CR-1128 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WASHBURN LANE

BRIDGE OVER ELK CREEK. (108B00017N)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

192,500

248,500

0 192,500 248,500

10014

SPENCER CR-1155 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF FEATHERBED HOLW

RD BRIDGE OVER LITTLE PLUM CREEK.

(108C00019N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

567,000

0 777,000 0

10026

Total for SPENCER county PL

Total Amounts:

CN

UT

RW

DN

567,000 1,235,500

857,500

0 1,424,500 1,235,500

TAYLOR KY-555 PREFINANCD CONVRSN(O) HEARTLAND PARKWAY: IMPROVE MOBILITY

AND CONNECTIVITY VIA NEW CAMPBELLSVILLE

BYPASS FROM KY-55 SOUTH OF

CAMPBELLSVILLE TO KY-70. SECTION 1.

(2010BOP)(14CCR)(16CCR)CN

Project Cost:

UT

RW

DN

PL

NH 7,600,000

0 0 7,600,000

142.21

TAYLOR KY-555 NEW ROUTE(O) HEARTLAND PARKWAY: IMPROVE MOBILITY

AND CONNECTIVITY VIA NEW CAMPBELLSVILLE

BYPASS FROM KY-70 TO US-68 EAST OF

CAMPBELLSVILLE. SECTION 2. (2010BOP)

(16CCR)CN

Project Cost:

UT

RW

DN

PL

NH 1,000,000

0 1,000,000 0

142.3

Page 183 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

TAYLOR KY-55 RECONSTRUCTION(O) HEARTLAND PARKWAY: IMPROVE MOBILITY ON

KY-55 FROM SOUTH OF THE TAYLOR/ADAIR

COUNTY LINE TO THE CAMPBELLSVILLE

BYPASS. (16CCN)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

500,000

1,000,000

1,000,000

0 1,500,000 1,000,000

8920

TAYLOR KY-55 PREFINANCD CONVRSN(O) HEARTLAND PARKWAY: IMPROVE MOBILITY ON

KY-55 FROM SOUTH OF THE TAYLOR/ADAIR

COUNTY LINE TO THE CAMPBELLSVILLE

BYPASS. (16CCN)

CN

Project Cost:

UT

RW

DN

PL

NH 7,000,000

0 0 7,000,000

8920.01

TAYLOR KY-323 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF WEST MAIN STREET

BRIDGE OVER BUCKHORN CRK.. (109B00051N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

805,000

0 157,500 805,000

10006

TAYLOR CS-1241 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF SOUTH JACKSON ST

BRIDGE OVER BUCKHORN CREEK.

(109C00028N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

105,000

367,500

0 105,000 367,500

10007

Total for TAYLOR county PL

Total Amounts:

CN

UT

RW

DN

16,772,500

262,500

500,000

2,000,000

0 2,762,500 16,772,500

Page 184 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

TODD CR-1333 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RATTLESNAKE RD

BRIDGE OVER BUCK FORK. (110C00059N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

192,500

294,000

0 192,500 294,000

10009

TODD CR-1233 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF ROGER Q MILL RD.

BRIDGE OVER RED RIVER W FORK BRANCH.

(110C00061N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

385,000

0 157,500 385,000

10013

TODD US 79 AIR QUALITY(P) US 79 WIDENING FROM MP 0 TO MP 3

CN

Project Cost:

UT

RW

DN

PL

SPP 1,200,000

0 1,200,000 0

80001

Total for TODD county PL

Total Amounts:

CN

UT

RW

DN

679,000

1,550,000

0 1,550,000 679,000

TRIGG CR-1380 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1380

(0.014) OVER DYERS CREEK 111C00027N

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

381,500

0 140,000 381,500

1160

Page 185 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

TRIGG I-24 AM-BRIDGE (P) OVERLAY BRIDGE DECK AND ADDRESS

DEFICIENCIES OF EXPANSION JOINTS ON

EASTBOUND I-24 BRIDGE OVER TRW RAILROAD

EAST OF US 68 AT (MP 66.515). (111B00027R)

(2012BOP)(SD)CN

Project Cost:

UT

RW

DN

PL

BR 250,000

250,000 0 0

2039

TRIGG KY-139 REALIGNMENT REALIGN KY 124 APPROACH TO KY 139 TO

IMPROVE INTERSECTION ANGLE AND SIGHT

DISTANCE

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

SPP

200,000

150,000

150,000

600,000

0 200,000 900,000

8951

TRIGG KY-139 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-139 BRIDGE

OVER BURGE CREEK. (111B00012N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

280,000

997,500

0 280,000 997,500

10005

Total for TRIGG county PL

Total Amounts:

CN

UT

RW

DN

250,000 1,979,000

620,000

150,000

150,000

250,000 620,000 2,279,000

UNION KY-359 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-359

(MP 0.971) OVER LOST CREEK; .95 MI N.E. OF

JCT US-60; 113B00006N (LET W/ 2-1074)

CN

Project Cost:

UT

RW

DN

PL

BR 434,000

434,000 0 0

1073

Page 186 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

UNION KY-359 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY-359

(MP 1.193) OVER SINKING CREEK; 1.1 MI N.E. OF

JCT US-60; 113B00007N (LET W/ 2-1073)

CN

Project Cost:

UT

RW

DN

PL

BR 511,000

511,000 0 0

1074

UNION US-60 RECONSTRUCTION(O) IMPROVE ROADWAY TO REDUCE FLOODING ON

US-60 FROM EAST OF HOUSE BRIDGE ROAD

(CR-1027) TO UNION/HENDERSON COUNTY LINE.

(16CCN)

CN

Project Cost:

UT

RW

DN

PL

STP 300,000

0 300,000 0

8955

UNION KY-359 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-359 BRIDGE

OVER LITTLE MASON CREEK. (113B00008N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

682,500

0 210,000 682,500

10017

UNION KY-492 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 492 BRIDGE

OVER WASH CREEK. (113B00054N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

70,000

350,000

0 70,000 350,000

10026

Total for UNION county PL

Total Amounts:

CN

UT

RW

DN

945,000 1,032,500

580,000

945,000 580,000 1,032,500

Page 187 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

WARREN KY-185 RECONSTRUCTION(O) IMPROVE KY-185 FROM NORTH OF THE

JUNCTION WITH KY-263 NEAR RICHARDSVILLE

TO THE BUTLER COUNTY LINE. (02CCR)(04CCR)

(06CCR)(10CCR)(14CCR)

CN

Project Cost:

UT

RW

DN

PL

STP 5,000,000

0 0 5,000,000

110

WARREN KY-526 MINOR WIDENING(O) IMPROVE KY-526 FROM NEAR KY-2630 TO

US-31W. (2014BOP)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

70,000

180,000

160,000

0 250,000 160,000

322

WARREN WN-9007 SIGNING(P) I-65 SPUR CORRIDOR SIGNING; EXISTING

NATCHER PARKWAY FROM I-65 INTERCHANGE

(EXIT 2) IN WARREN CO. EXTENDING NORTH TO

THE US 60 INTERCHANGE IN DAVIESS CO. TO

MEET INTERSTATE STANDARDS. (2016BOP)CN

Project Cost:

UT

RW

DN

PL

NH 2,150,000

0 2,150,000 0

2042.11

WARREN US-231 MAJOR WIDENING(O) IMPROVE US-231 FROM PASCOE BLVD. TO

NORTH OF CAVE MILL ROAD. (12CCN)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

2,500,000

2,600,000

2,500,000 2,600,000 0

8702

WARREN KY-884 NEW ROUTE(O) THREE SPRINGS ROAD EXTENSION FROM

FLEALAND TO THE NATCHER PARKWAY

INCLUDING BRIDGE OVER PARKWAY. (14CCN)

CN

Project Cost:

UT

RW

DN

PL

SPP 4,000,000

0 4,000,000 0

8818

Page 188 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

WARREN US-31 MAJOR WIDENING(O) IMPROVE US-31W FROM CAMPBELL LANE

(US-231) TO UNIVERSITY BOULEVARD

(US-231X). (14CCN)(16CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

1,750,000

2,000,000

0 3,750,000 0

8857

WARREN US-31W MINOR WIDENING(O) WIDEN US-31W FROM PARK AVE. TO FAIRVIEW

AVE MP 13.7-14.25

CN

Project Cost:

UT

RW

DN

PL

STP

STP

STP

500,000

1,500,000

1,750,000

0 500,000 3,250,000

8904.1

WARREN US-31 RECONSTRUCTION(O) IMPROVE MOBILITY AND REDUCE CONGESTION

ON US-31W FROM US-68 TO MIZPAH. (16CCN)

CN

Project Cost:

UT

RW

DN

PL

STP

STP

STP

800,000

900,000

400,000

0 0 2,100,000

8905

WARREN KY-2632 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF HAMMET HILL ROAD

BRIDGE OVER SALT LICK CREEK. (114B00071N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

157,500

350,000

0 157,500 350,000

10014

WARREN KY-1435 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1435 BRIDGE

OVER GASPER RIVER. (114B00074N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

280,000

1,172,500

0 280,000 1,172,500

10015

Page 189 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

WARREN I-65 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-065 BOTH

DIRECTION(S) FROM MILEPOINT 35.616 TO

MILEPOINT 42.89

CN

Project Cost:

UT

RW

DN

PL

PM

PM

870,000

8,700,000

0 9,570,000 0

20017

WARREN WN-9007 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WILLIAM H.

NATCHER PARKWAY BOTH DIRECTION(S) FROM

MILEPOINT 0 TO MILEPOINT 2.473

CN

Project Cost:

UT

RW

DN

PL

PM

PM

200,000

2,000,000

0 200,000 2,000,000

20018

WARREN WN-9007 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF WILLIAM H.

NATCHER PARKWAY BOTH DIRECTION(S) FROM

MILEPOINT 9.2 TO MILEPOINT 20.246

CN

Project Cost:

UT

RW

DN

PL

PM 11,083,000

0 0 11,083,000

20019

WARREN US-68 NEW ROUTE(O) SOUTHWEST PARKWAY - NEW CONSTRUCTION

FROM US-68 TO A CONNECTION AT KOBE WAY

IN BOWLING GREEN

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

SPP

200,000

280,000

200,000

3,870,000

0 4,550,000 0

80000

WARREN KY 242 AIR QUALITY(P) ADD LEFT TURNING LANE ON KY 242 INTO

RICHPOND ELEMENTARY SCHOOL AT MP 3.8 TO

3.95

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

SPP

50,000

125,000

250,000

200,000

0 50,000 575,000

80005

Page 190 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

WARREN KY-3225 SAFETY(P) SAFETY IMPROVEMENTS AND REHABILITATION

ON KY-3225. KEEP EXISTING FOOTPRINT BY

REPLACING CURBLINE IN SAME LOCATION FROM

MP 0 TO MP 1

CN

Project Cost:

UT

RW

DN

PL

SPP 200,000

0 0 200,000

80051

Total for WARREN county PL

Total Amounts:

CN

UT

RW

DN

17,320,000 19,965,500

2,257,500 1,000,000

6,100,000 2,525,000

2,500,000 2,380,000 2,400,000

2,500,000 28,057,500 25,890,500

WASHINGTON US-150 RECONSTRUCTION(O) IMPROVE US-150 FROM SPRINGFIELD TO

BARDSTOWN.

CN

Project Cost:

UT

RW

DN

PL

STP 3,000,000

0 0 3,000,000

396

WASHINGTON KY-528 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON KY 528

(MP 1.437) OVER ROAD RUN BRANCH.

(115B00043N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

1,302,000

0 175,000 1,302,000

1094

WASHINGTON CR-1140 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON

TEXAS-MACKVILLE ROAD (CR 1140) AT MP

0.349 OVER LONG LICK CREEK.(115C00039)

(16CCN)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 175,000

0 0 175,000

8957

Page 191 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

WASHINGTON US-150 SAFETY(P) ADDRESS SAFETY, MOBILITY, AND GEOMETRIC

ISSUES ALONG US 150 IN WASHINGTON

COUNTY FROM 400 FEET WEST OF OLD

FREDERICKTOWN-BARDSTOWN ROAD (KY

1872) TO 0.7 MILES EAST OF GRUNDY HOME CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

700,000

900,000

0 700,000 900,000

8958

WASHINGTON KY-55 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-55 BRIDGE OVER

SEIBERT CREEK. (115B00026N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

87,500

511,000

0 87,500 511,000

10008

WASHINGTON KY-1920 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 1920 BRIDGE

OVER DEEP CREEK. (115B00061N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

87,500

262,500

0 87,500 262,500

10015

Total for WASHINGTON county PL

Total Amounts:

CN

UT

RW

DN

2,250,500

1,050,000 3,000,000

900,000

0 1,050,000 6,150,500

WAYNE KY-90 SAFETY(P) IMPROVE KY-90 FROM OLD MILL SPRINGS ROAD

TO THE BRIDGE AT MP 19.5. (12CCR)(16CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 4,220,000

0 0 4,220,000

109.1

Page 192 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

WAYNE CR-1136 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BRIDGE ON CR-1136

(MP 0.225) OVER LITTLE SOUTH FORK RIVER;

0.25 MI SE OF JCT CR-5137; 116C00007N

CN

Project Cost:

UT

RW

DN

PL

BR 455,000

0 455,000 0

1050

WAYNE CR-1016 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF DODSON HOLLOW

RD BRIDGE OVER MEADOW CREEK.

(116C00028N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

466,000

0 175,000 466,000

10005

WAYNE KY-92 PLANNING-OKI(O) PRELIMINARY ENGINEERING AND

ENVIRONMENTAL CORRIDOR STUDY FOR

IMPROVING SAFETY AND MAKING KY-92 A

SCENIC ROUTE FROM MONTICELLO TO STEARNS

(FLEXIBLE SOLUTIONS)CN

Project Cost:

UT

RW

DN

PL SPP 1,500,000

0 0 1,500,000

80004

WAYNE KY 1275 AIR QUALITY(P) IMPROVE CURVE ON KY 1275 AT KY

833/ROGERS GROVE ROAD AND RESURFACE

FROM KY 1275 FROM BELL LANE TO KY

833/ROGERS GROVE ROAD

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

SPP

60,000

3,500

60,000

200,000

0 123,500 200,000

80005

WAYNE KY 1275 AIR QUALITY(P) WIDEN KY 1275 TO FOUR LANES WITH FOUR

FOOT SHOULDERS AND FIVE FOOT SIDEWALKS

FROM KY 90 TO BELL LANE

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

490,000

200,000

500,000

0 490,000 700,000

80006

Page 193 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Total for WAYNE county PL

Total Amounts:

CN

UT

RW

DN

455,000 4,886,000

725,000

1,500,000

3,500 200,000

60,000 500,000

0 1,243,500 7,086,000

WEBSTER KY-138 RECONSTRUCTION(O) RECONSTRUCT BETWEEN KY 120 AND RR

BRIDGE AT SLAUGHTERS TO ALLEVIATE

FLOODING. (12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP

SPP

SPP

100,000

250,000

1,200,000

0 350,000 1,200,000

228

WEBSTER KY-1835 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-1835 BRIDGE

OVER SUGAR CAMP CREEK. (117B00023N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

210,000

665,000

0 210,000 665,000

10018

WEBSTER KY-132 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-132 BRIDGE

OVER NALL DITCH. (117B00064N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

1,102,500

0 245,000 1,102,500

10019

Total for WEBSTER county PL

Total Amounts:

CN

UT

RW

DN

2,967,500

455,000

100,000

250,000

0 805,000 2,967,500

Page 194 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

WHITLEY I-75 MAJOR WIDENING(O) TENN. STATE LINE-LEXINGTON; WIDEN I-75 TO 8

LANES FROM MP 20.2 IN WHITLEY COUNTY TO

MP 28.85, US-25E NORTH OF CORBIN

(C-COST=$87,500,000)

CN

Project Cost:

UT

RW

DN

PL

NH

NH

NH

500,000

500,000

10,000,000

0 1,000,000 10,000,000

14.8

WHITLEY KY-92 RELOCATION(O) RECONSTRUCT KY-92 FROM 500 FT WEST OF

THE WHITLEY/MCCREARY COUNTY LINE TO

1200 FT EAST OF OLD JELLICO CREEK ROAD.

(SECTION 1)(14CCR)

CN

Project Cost:

UT

RW

DN

PL

STP 10,000,000

0 10,000,000 0

184.1

WHITLEY I-75 AM-BRIDGE (P) REHAB BRIDGE ON I-75 AT MILEPOINT 27.9 OVER

LYNN CAMP CREEK (SR 34.1) (B00063R AND

B00063L)(SD)

CN

Project Cost:

UT

RW

DN

PL

BR 2,800,000

2,800,000 0 0

1105

WHITLEY KY-904 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-904 BRIDGE

OVER TYES FK OF BENNETTS BR. (118B00070N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

493,500

0 175,000 493,500

10032

WHITLEY KY-779 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-779 BRIDGE

OVER BROWNS CREEK. (118B00079N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

448,000

0 175,000 448,000

10033

Page 195 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

WHITLEY KY-204 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-204 BRIDGE

OVER YOUNGS CREEK. (118B00084N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

262,500

910,000

0 262,500 910,000

10034

WHITLEY KY-2996 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-2996 BRIDGE

OVER WOLF CREEK. (118B00101N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

455,000

0 175,000 455,000

10035

WHITLEY CR-1275 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF BETHEL ROAD

BRIDGE OVER PATTERSON CREEK.

(118C00029N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

140,000

315,000

0 140,000 315,000

10036

WHITLEY CR-1461 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF RIVER ROAD BRIDGE

OVER SANDERS CREEK. (118C00039N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

406,000

0 175,000 406,000

10037

WHITLEY US-25 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 25W BRIDGE

OVER CLEAR FORK RVR. (118B00041N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

1,890,000

0 245,000 1,890,000

10044

Page 196 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

WHITLEY US-25 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF US 25W BRIDGE

OVER CLEAR FORK RIVER. (118B00042N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

245,000

1,645,000

0 245,000 1,645,000

10045

WHITLEY I-75 AM-PAVEMENT (INT)(P) ADDRESS PAVEMENT CONDITION OF I-075 BOTH

DIRECTION(S) FROM MILEPOINT 23.0 (25.26

NON-CARDINAL) TO MILEPOINT 28.872

CN

Project Cost:

UT

RW

DN

PL

PM

PM

340,000

3,400,000

0 3,740,000 0

20019

WHITLEY KY 204 AIR QUALITY(P) INSTALL GUARDRAIL ON KY 204 BETWEEN MP

10.7 AND 10.8

CN

Project Cost:

UT

RW

DN

PL

SPP 15,000

0 15,000 0

80001

Total for WHITLEY county PL

Total Amounts:

CN

UT

RW

DN

2,800,000 13,415,000 16,562,500

1,932,500

500,000

500,000

2,800,000 16,347,500 16,562,500

WOLFE KY-191 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY-191 BRIDGE

OVER LACEY CREEK. (119B00001N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

150,000

564,000

0 150,000 564,000

10009

Page 197 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

WOLFE KY-2491 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF KY 2491 BRIDGE

OVER SWANGO FORK. (119B00058N)

CN

Project Cost:

UT

RW

DN

PL

BR

BR

175,000

525,000

0 175,000 525,000

10019

WOLFE KY-9009 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF BERT T.

COMBS MOUNTAIN PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 55.434 TO

MILEPOINT 57.72

CN

Project Cost:

UT

RW

DN

PL

PM

PM

90,000

900,000

0 990,000 0

20012

Total for WOLFE county PL

Total Amounts:

CN

UT

RW

DN

900,000 1,089,000

415,000

0 1,315,000 1,089,000

WOODFORD CR-1015 AM-BRIDGE (P) ADDRESS DEFICIENCIES OF THE WEISENBURG

MILL ROAD BRIDGE AT THE WOODFORD/SCOTT

COUNTY LINE. (10CCN)(120C00006N)

CN

Project Cost:

UT

RW

DN

PL

BR 966,000

0 0 966,000

8642

WOODFORD US-60 CONGESTION MITIGTN(O) ACCESS MANAGEMENT IMPROVEMENTS ON US

60 FROM LEXINGTON ROAD AT WOODFORD

FEED TO MARSAILLES DRIVE (MP 9.38 TO MP

9.70)

CN

Project Cost:

UT

RW

DN

PL

SPP 400,000

0 0 400,000

8905

Page 198 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

WOODFORD BG-9002 AM-PAVEMENT (PKY)(P) ADDRESS PAVEMENT CONDITION OF MARTHA

LAYNE COLLINS BLUEGRASS PARKWAY BOTH

DIRECTION(S) FROM MILEPOINT 61.95 (62.05

NON-CARDINAL) TO MILEPOINT 70.70 (70.91

NON-CARDINAL)CN

Project Cost:

UT

RW

DN

PL

PM

PM

700,000

7,000,000

0 7,700,000 0

20022

WOODFORD US-60 AM-PAVEMENT (PRI)(P) ADDRESS PAVEMENT CONDITION OF AC

PAVEMENT

CN

Project Cost:

UT

RW

DN

PL

PM

PM

350,000

3,500,000

0 0 3,850,000

20023

Total for WOODFORD county PL

Total Amounts:

CN

UT

RW

DN

7,000,000 4,466,000

700,000 750,000

0 7,700,000 5,216,000

ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY

2018. (2009BOPP)

CN

Project Cost:

UT

RW

DN

PL

BR 2,000,000

2,000,000 0 0

65.15

ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY

2019.

CN

Project Cost:

UT

RW

DN

PL

BR 2,000,000

0 2,000,000 0

65.16

Page 199 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ZVARIOUS -0 AM-BRIDGE (P) BRIDGE REPAIRS ON VARIOUS BRIDGES FOR FY

2020.

CN

Project Cost:

UT

RW

DN

PL

BR 2,000,000

0 0 2,000,000

65.17

ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN

KENTUCKY FOR FY 2018.

CN

Project Cost:

UT

RW

DN

PL

NH 2,000,000

2,000,000 0 0

66.13

ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN

KENTUCKY FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

NH 2,000,000

0 2,000,000 0

66.14

ZVARIOUS -0 ITS(P) ITS' ACTIVITIES ON VARIOUS NHS ROUTES IN

KENTUCKY FOR FY 2020.

CN

Project Cost:

UT

RW

DN

PL

NH 2,000,000

0 0 2,000,000

66.15

ZVARIOUS -0 TRANSP ENHANCEMENT(P) STATEWIDE TRANSPORTATION ENHANCEMENT

FOR FY 2018. (98CCR)

CN

Project Cost:

UT

RW

DN

PL

TE 12,800,000

12,800,000 0 0

195.14

Page 200 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ZVARIOUS -0 TRANSP ENHANCEMENT(P) STATEWIDE TRANSPORTATION ENHANCEMENT

FOR FY 2019. (98CCR)

CN

Project Cost:

UT

RW

DN

PL

TE 13,700,000

0 13,700,000 0

195.15

ZVARIOUS -0 TRANSP ENHANCEMENT(P) STATEWIDE TRANSPORTATION ENHANCEMENT

FOR FY 2020 (98CCR)

CN

Project Cost:

UT

RW

DN

PL

TE 13,700,000

0 0 13,700,000

195.16

ZVARIOUS -0 CONGESTION MITIGTN(O) NON-ATTAINMENT AREAS STATEWIDE CMAQ

FUNDED PROJECTS FOR FY 2018.

CN

Project Cost:

UT

RW

DN

PL

CM 13,100,000

13,100,000 0 0

219.16

ZVARIOUS -0 CONGESTION MITIGTN(O) NON-ATTAINMENT AREAS STATEWIDE CMAQ

FUNDED PROJECTS FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

CM 13,100,000

0 13,100,000 0

219.17

ZVARIOUS -0 CONGESTION MITIGTN(O) NON-ATTAINMENT AREAS STATEWIDE CMAQ

FUNDED PROJECTS FOR FY 2020.

CN

Project Cost:

UT

RW

DN

PL

CM 13,100,000

0 0 13,100,000

219.18

Page 201 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ZVARIOUS -0 AM-PAVEMENT (PRI)(P) PAVEMENT REHAB ON STATE (NON RS) SYSTEM

ROUTES IN KENTUCKY FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

PM 2,000,000

0 2,000,000 0

224.13

ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE BRIDGE INSPECTION FOR FY 2018.

CN

Project Cost:

UT

RW

DN

PL

BR 2,600,000

2,600,000 0 0

327.14

ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE BRIDGE INSPECTION FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

BR 2,600,000

0 2,600,000 0

327.15

ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE BRIDGE INSPECTION FOR FY 2020.

CN

Project Cost:

UT

RW

DN

PL

BR 2,600,000

0 0 2,600,000

327.16

ZVARIOUS -0 AM-PAVEMENT (INT)(P) STATEWIDE I-STATE ROUTES FOR FY 2019.

(14CCR)

CN

Project Cost:

UT

RW

DN

PL

PM 2,000,000

0 2,000,000 0

337.14

Page 202 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE OFF-SYSTEM BRIDGE INSPECTION

FOR FY 2018

CN

Project Cost:

UT

RW

DN

PL

BR 1,100,000

1,100,000 0 0

346.14

ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE OFF-SYSTEM BRIDGE INSPECTION

FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

BR 1,100,000

0 1,100,000 0

346.15

ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE OFF-SYSTEM BRIDGE INSPECTION

FOR FY 2020.

CN

Project Cost:

UT

RW

DN

PL

BR 1,100,000

0 0 1,100,000

346.16

ZVARIOUS -0 SAFETY-RR PROTECTN(P) RAIL PROTECTION ON VARIOUS ROUTES FOR

FY 2018.

CN

Project Cost:

UT

RW

DN

PL

RRP 3,600,000

3,600,000 0 0

352.14

ZVARIOUS -0 SAFETY-RR PROTECTN(P) RAIL PROTECTION ON VARIOUS ROUTES FOR

FY 2019.

CN

Project Cost:

UT

RW

DN

PL

RRP 3,600,000

0 3,600,000 0

352.15

Page 203 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ZVARIOUS -0 SAFETY-RR PROTECTN(P) RAIL PROTECTION ON VARIOUS ROUTES FOR

FY 2020.

CN

Project Cost:

UT

RW

DN

PL

RRP 3,600,000

0 0 3,600,000

352.16

ZVARIOUS -0 AM-PAVEMENT (PRI)(P) PAVEMENT REHABILITATION FOR VARIOUS NHS

ROUTES IN KENTUCKY FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

PM 2,000,000

0 2,000,000 0

369.09

ZVARIOUS -0 BRIDGE INSPECTION(P) OHIO RIVER BRIDGES FRACTURE CRITICAL FOR

FY 2018. (12CCR)

CN

Project Cost:

UT

RW

DN

PL

BR 1,600,000

1,600,000 0 0

388.08

ZVARIOUS -0 BRIDGE INSPECTION(P) OHIO RIVER BRIDGES FRACTURE CRITICAL FOR

FY 2019.

CN

Project Cost:

UT

RW

DN

PL

BR 1,600,000

0 1,600,000 0

388.09

ZVARIOUS -0 BRIDGE INSPECTION(P) OHIO RIVER BRIDGES FRACTURE CRITICAL FOR

FY 2020.

CN

Project Cost:

UT

RW

DN

PL

BR 1,600,000

0 0 1,600,000

388.1

Page 204 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ZVARIOUS -0 DESIGN ENGINEERING(O) STATEWIDE STP HIGHWAY PROJECT ACTIVITIES.

CN

Project Cost:

UT

RW

DN

PL

STP 2,000,000

0 2,000,000 0

391.04

ZVARIOUS -0 AM-PAVEMENT (INT)(P) PAVEMENT REPAIR AT INTERSECTIONS FOR

VARIOUS ROADWAYS FOR FY 2019.(12CCR)

CN

Project Cost:

UT

RW

DN

PL

PM 2,000,000

0 2,000,000 0

395.07

ZVARIOUS -0 LIGHTING(P) UPGRADE NAVIGATIONAL LIGHTING FOR

BRIDGES OVER MAJOR STREAMS AND

WATERWAYS FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

SPP 1,000,000

0 1,000,000 0

400.06

ZVARIOUS -0 AM-BRIDGE (P) HONORING BORDER STATES COMMITMENTS FOR

EXISTING BRIDGES(CANNOT BE MOVED).

CN

Project Cost:

UT

RW

DN

PL

BR 3,500,000

0 3,500,000 0

510.03

ZVARIOUS -0 LANDSLIDE REPAIR(P) STATEWIDE CORRECTIONS OF ROCK FALL OR

EMBANKMENT STABILIZATION FOR FY 2018.

CN

Project Cost:

UT

RW

DN

PL

STP 5,000,000

5,000,000 0 0

511.02

Page 205 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ZVARIOUS -0 LANDSLIDE REPAIR(P) STATEWIDE CORRECTIONS OF ROCK FALL OR

EMBANKMENT STABILIZATION FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

STP 2,000,000

0 2,000,000 0

511.03

ZVARIOUS -0 LANDSLIDE REPAIR(P) STATEWIDE CORRECTIONS OF ROCK FALL OR

EMBANKMENT STABILIZATION FOR FY 2020.

CN

Project Cost:

UT

RW

DN

PL

STP 1,000,000

0 0 1,000,000

511.04

ZVARIOUS -0 AM-BRIDGE (P) PREVENTATIVE MAINTENANCE FOR BRIDGE

STRUCTURES FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

BR 3,000,000

0 3,000,000 0

514

ZVARIOUS -0 LANDSLIDE REPAIR(P) STATEWIDE CORRECTIONS OF ROCKFALL OR

EMBANKMENT STABILIZATION ON NH ROUTES

FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

NH 6,000,000

0 6,000,000 0

518

ZVARIOUS -0 LANDSLIDE REPAIR(P) STATEWIDE CORRECTIONS OF ROCKFALL OR

EMBANKMENT STABILIZATION ON NH ROUTES

FOR FY 2020.

CN

Project Cost:

UT

RW

DN

PL

NH 1,000,000

0 0 1,000,000

518.01

Page 206 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ZVARIOUS -0 SAFETY-HAZARD ELIM(P) STATEWIDE SAFETY PROGRAM FOR FY 2019.

(HSIP)

CN

Project Cost:

UT

RW

DN

PL

SAF 38,500,000

0 38,500,000 0

911.08

ZVARIOUS -0 SAFETY-HAZARD ELIM(P) STATEWIDE SAFETY PROGRAM FOR FY 2020.

(HSIP)

CN

Project Cost:

UT

RW

DN

PL

SAF 38,500,000

0 0 38,500,000

911.09

ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE UNDERWATER BRIDGE INSPECTION

FOR FY 2018

CN

Project Cost:

UT

RW

DN

PL

BR 500,000

500,000 0 0

1063.14

ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE UNDERWATER BRIDGE INSPECTION

FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

BR 500,000

0 500,000 0

1063.15

ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE UNDERWATER BRIDGE INSPECTION

FOR FY 2020.

CN

Project Cost:

UT

RW

DN

PL

BR 500,000

0 0 500,000

1063.16

Page 207 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE PROGRAM TO FUND BRIDGE SCOUR

COUNTER-MEASURES FOR STATE-MAINTAINED

BRIDGES FOR FY 2018.

CN

Project Cost:

UT

RW

DN

PL

SPP 1,500,000

1,500,000 0 0

1071.06

ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE PROGRAM TO FUND BRIDGE SCOUR

COUNTER-MEASURES FOR STATE-MAINTAINED

BRIDGES FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

SPP 1,500,000

0 1,500,000 0

1071.07

ZVARIOUS -0 BRIDGE INSPECTION(P) STATEWIDE PROGRAM TO FUND BRIDGE SCOUR

COUNTER-MEASURES FOR STATE-MAINTAINED

BRIDGES FOR FY 2020.

CN

Project Cost:

UT

RW

DN

PL

SPP 1,500,000

0 0 1,500,000

1071.08

ZVARIOUS -0 AM-BRIDGE (P) STATEWIDE BRIDGE REPLACEMENT PROGRAM

FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

BR 3,000,000

0 3,000,000 0

1074.07

ZVARIOUS -0 ECONOMIC DEVEL(O) ECONOMIC DEVELOPMENT TRANSPORTATION

IMPROVEMENT FACILITIES.

CN

Project Cost:

UT

RW

DN

PL

SPP 1,000,000

0 0 1,000,000

1084

Page 208 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ZVARIOUS -0 AM-PAVEMENT (PRI)(P) PAVEMENT PREVENTATIVE MAINTENANCE

PROGRAM FOR FY 2019.

CN

Project Cost:

UT

RW

DN

PL

PM 2,000,000

0 2,000,000 0

2700.13

ZVARIOUS -0 AM-PAVEMENT (PRI)(P) PAVEMENT PREVENTATIVE MAINTENANCE

PROGRAM FOR FY 2020.

CN

Project Cost:

UT

RW

DN

PL

PM 2,000,000

0 0 2,000,000

2700.14

ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA)

TRANSITION PLAN IMPLEMENTATION PROJECTS.

CN

Project Cost:

UT

RW

DN

PL

STP 1,000,000

0 1,000,000 0

3011

ZVARIOUS -0 SAFETY(P) AMERICANS WITH DISABILITIES ACT (ADA)

TRANSITION PLAN IMPLEMENTATION PROJECTS.

CN

Project Cost:

UT

RW

DN

PL

STP 1,000,000

0 0 1,000,000

3011.01

ZVARIOUS -0 SAFETY(P) SCHOOL TURN LANE PROJECTS. (08CCN)

(12CCR)

CN

Project Cost:

UT

RW

DN

PL

SPP 4,700,000

0 4,700,000 0

8500.15

Page 209 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ZVARIOUS -0 MAJOR WIDENING(O) GARVEE BOND DEBT SERVICE FOR I-65; I-75;

AND I-64 FOR FY 2018. (JM03-FD53 "IM"

COMPONENT)

CN

Project Cost:

UT

RW

DN

PL

NH 44,500,000

44,500,000 0 0

9050.08

ZVARIOUS -0 MAJOR WIDENING(O) GARVEE BOND DEBT SERVICE FOR I-65; I-75;

AND I-64 FOR FY 2019. (JM03-FD53 "IM"

COMPONENT)

CN

Project Cost:

UT

RW

DN

PL

NH 44,500,000

0 44,500,000 0

9050.1

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (NH) FOR

FY 2018. (079B00023N, 111B00020N)

CN

Project Cost:

UT

RW

DN

PL

NH 9,100,000

9,100,000 0 0

9068.03

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (NH) FOR

FY 2019. (079B00023N, 111B00020N)

CN

Project Cost:

UT

RW

DN

PL

NH 9,100,000

0 9,100,000 0

9068.05

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (NH) FOR

FY 2020. (12CCR)

CN

Project Cost:

UT

RW

DN

PL

NH 9,100,000

0 0 9,100,000

9068.61

Page 210 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (STP) FOR

FY 2018.

CN

Project Cost:

UT

RW

DN

PL

STP 9,100,000

9,100,000 0 0

9068.64

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (STP) FOR

FY 2019.

CN

Project Cost:

UT

RW

DN

PL

STP 9,100,000

0 9,100,000 0

9068.65

ZVARIOUS US-68 AM-BRIDGE (P) US 68/KY 80 LAKE BARKLEY AND KENTUCKY

LAKE GARVEE BOND DEBT SERVICE (STP) FOR

FY 2020.

CN

Project Cost:

UT

RW

DN

PL

STP 9,100,000

0 0 9,100,000

9068.66

ZVARIOUS -0 RECONSTRUCTION(O) GARVEE BOND DEBT SERVICE FOR LOUISVILLE

BRIDGES PROJECT FOR FY 2018. (JZ1-FD53

"NH" COMPONENT)

CN

Project Cost:

UT

RW

DN

PL

NH 34,300,000

34,300,000 0 0

9659.18

ZVARIOUS -0 RECONSTRUCTION(O) GARVEE BOND DEBT SERVICE FOR LOUISVILLE

BRIDGES PROJECT FOR FY 2019. (JZ1-FD53

"NH" COMPONENT)

CN

Project Cost:

UT

RW

DN

PL

NH 34,300,000

0 34,300,000 0

9659.21

Page 211 of 214

County Item No. Route Type of Work Description Phase Fund FY 2018 FY 2019 FY 2020

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

ZVARIOUS -0 RECONSTRUCTION(O) GARVEE BOND DEBT SERVICE FOR LOUISVILLE

BRIDGES PROJECT FOR FY 2020. (JZ1-FD53

"NH" COMPONENT)

CN

Project Cost:

UT

RW

DN

PL

NH 62,800,000

0 0 62,800,000

9659.23

Total for ZVARIOUS county PL

Total Amounts:

CN

UT

RW

DN

142,800,000 211,400,000 167,200,000

2,000,000

142,800,000 213,400,000 167,200,000

Page 212 of 214

Biennium Fund SummaryDescriptionFund FY 2019 FY 2020 Total

BR FEDERAL BRIDGE REPLACEMENT 178,066,500 315,800,085 493,866,585

BR2 BRAC BOND PROJECTS SECOND PROGRAM 4,950,000 14,500,000 19,450,000

CM FEDERAL CONGESTION MITIGATION FUNDS 13,100,000 13,100,000 26,200,000

NH FEDERAL NATIONAL HIGHWAY SYSTEM FUNDS 247,370,000 226,060,000 473,430,000

PM PAVEMENT MANAGEMENT 180,456,000 176,043,000 356,499,000

RRP SAFETY-RAILROAD PROTECTION 3,600,000 3,600,000 7,200,000

RRS SAFETY-RAILROAD SEPARATION 0 3,100,000 3,100,000

SAF FEDERAL SAFETY FUNDS 38,500,000 38,500,000 77,000,000

SAH FEDERAL STP FUNDS DEDICATED TO ASHLAND 1,724,000 1,200,000 2,924,000

SHN FEDERAL STP FUNDS DEDICATED TO HENDERSON 1,800,000 700,000 2,500,000

SLO FEDERAL STP FUNDS DEDICATED TO LOUISVILLE 53,511,745 15,311,854 68,823,599

SLX FEDERAL STP FUNDS DEDICATED TO LEXINGTON 21,656,000 8,956,000 30,612,000

SNK FEDERAL STP FUNDS DEDICATED TO NORTHERN KENTUCKY 27,157,409 13,757,200 40,914,609

SPP STATE CONSTRUCTION HIGH PRIORITY PROJECTS 123,907,800 162,970,400 286,878,200

STP FEDERAL STATEWIDE TRANSPORTATION PROGRAM FUNDS 94,460,000 85,840,000 180,300,000

TE FEDERAL TRANSPORTATION ENHANCEMENT PROGRAM FUNDS 14,900,000 13,700,000 28,600,000

Total Amount 1,005,159,454 1,093,138,539 2,098,297,993

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Page 213 of 214

Fund Summary

2018-2020 BIENNIAL HIGHWAY CONSTRUCTION PLAN

Fund Description FY 2018 FY 2019 FY 2020 Total 54,023,500 178,066,500 315,800,085 547,890,085BR FEDERAL BRIDGE REPLACEMENT

0 4,950,000 14,500,000 19,450,000BR2 BRAC BOND PROJECTS SECOND PROGRAM

13,100,000 13,100,000 13,100,000 39,300,000CM FEDERAL CONGESTION MITIGATION FUNDS

8,100,000 0 0 8,100,000FH FEDERAL FOREST HIGHWAY FUNDS

9,924,170 0 0 9,924,170HPP HIGH PRIORITY PROJECTS

1,771,005 0 0 1,771,005KYD FEDERAL DEMONSTRATION FUNDS ALLOCATED TO KENTUCKY

235,170,000 247,370,000 226,060,000 708,600,000NH FEDERAL NATIONAL HIGHWAY SYSTEM FUNDS

0 180,456,000 176,043,000 356,499,000PM PAVEMENT MANAGEMENT

3,600,000 3,600,000 3,600,000 10,800,000RRP SAFETY-RAILROAD PROTECTION

0 0 3,100,000 3,100,000RRS SAFETY-RAILROAD SEPARATION

0 38,500,000 38,500,000 77,000,000SAF FEDERAL SAFETY FUNDS

6,867,000 1,724,000 1,200,000 9,791,000SAH FEDERAL STP FUNDS DEDICATED TO ASHLAND

3,460,000 1,800,000 700,000 5,960,000SHN FEDERAL STP FUNDS DEDICATED TO HENDERSON

65,396,815 53,511,745 15,311,854 134,220,414SLO FEDERAL STP FUNDS DEDICATED TO LOUISVILLE

16,367,000 21,656,000 8,956,000 46,979,000SLX FEDERAL STP FUNDS DEDICATED TO LEXINGTON

57,934,140 27,157,409 13,757,200 98,848,749SNK FEDERAL STP FUNDS DEDICATED TO NORTHERN KENTUCKY

54,210,000 123,907,800 162,970,400 341,088,200SPP STATE CONSTRUCTION HIGH PRIORITY PROJECTS

42,780,000 94,460,000 85,840,000 223,080,000STP FEDERAL STATEWIDE TRANSPORTATION PROGRAM FUNDS

12,800,000 14,900,000 13,700,000 41,400,000TE FEDERAL TRANSPORTATION ENHANCEMENT PROGRAM FUNDS

Totals 585,503,630 1,005,159,454 1,093,138,539 2,683,801,623