2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2.
CONTENTS
1. Introduction ......................................................................................................................................................... 2
2. Project Scope ...................................................................................................................................................... 2
3. Project Status ...................................................................................................................................................... 3
4. Sustainability Commitment ................................................................................................................................. 4
5. T2T Sustainability Objectives ............................................................................................................................. 5
6. Policy Implementation and Key Result Areas ..................................................................................................... 5
7. KRA 4 Sustainability ........................................................................................................................................... 6
8. KRA 3 Stakeholders.......................................................................................................................................... 17
9. KRA 5 Workforce And Industry Participation .................................................................................................... 20
2 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2. 1. INTRODUCTION
This Torrens Road to River Torrens Project (T2T) Annual Sustainability Report sets out the social, environmental
and economic performance for the project for the 2018 – 2019 financial year. It also outlines the achievement of the
relevant Key Result Areas that are identified in the Project Alliance Agreement (PAA): Sustainability, Stakeholder
and Industry and Workforce Participation.
The Project was effectively completed in April 2019, and so data contained in this report does not extend to the end
of the 2018-2019 year.
2. PROJECT SCOPE
The Torrens Road to River Torrens Project has delivered a 4 km non-stop roadway (incorporating a 3 km lowered
motorway) between Ashwin Parade, Torrensville, and Royce Avenue, Croydon Park, providing significant travel time
savings to commuters and freight.
The Australian Government and the South Australian Government both committed $448 million to jointly fund a total
project cost of $896 million. The project commenced construction in August 2015 and was completed in April 2019.
The design includes:
• A four kilometre non-stop section of roadway (incorporating a lowered road section) between Royce Avenue,
Croydon Park, and Ashwin Parade, Torrensville
• A three kilometre section of lowered non-stop motorway from Overland Road, Croydon Park to Gawler
Avenue, West Hindmarsh
• Project corridor width of nominal 56 metres
• Parallel surface (at-grade) roads along the length of the lowered motorway to connect most local roads and
arterial roads to South Road
• An Outer Harbor rail line overpass and track renewal from Queen Street Croydon to Chief Street Hindmarsh
• Intersection upgrades at Pym Street, Torrens Road, Hawker/Hurtle Street, Port Road and Grange Road
• Road bridges over the lowered motorway at Hawker/Hurtle Street, Torrens Road, Grange Road and Port
Road
• Improved cycling and pedestrian facilities including a shared use bridge at Cedar Avenue and Chief Street
• Landscaping and noise barriers.
The lowered non-stop motorway provides three lanes in each direction, up to eight metres below the existing surface
of South Road. This design takes into consideration the future transport needs of Adelaide and allows for connection
to other parts of the non-stop North-South Corridor when the adjoining sections of South Road are upgraded in the
future.
3 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2. 3. PROJECT STATUS
The T2T Alliance mobilised to site in June 2015. All services have been relocated or installed new, surface roads
have been resurfaced or constructed new and the lowered motorway, the construction of which began in early 2017,
was opened on 29 September 2018. The remaining works, including landscaping, have been carried out with the
lowered motorway and surface roads in full operation.
The following key milestones have been met this financial year:
September 2018
•Detention basins and hard landscaping commenced
•Installation of signs and street lighting
•Community Celebration 23 September
•Lowered Motorway completed and opened
October 2018
•Surface Roads completed
•Final line marking and bicycle path delineation
•Linear Park Trail reopened
December 2018
•Commencement of irrigation, topsoiling and mulch placement
March 2019
•Commencement of landscape planting
April 2019
•Project Completion
4 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2. 4. SUSTAINABILITY COMMITMENT
Sustainable infrastructure is infrastructure that is designed, constructed and operated to optimise environmental,
social and economic outcomes over the long term. The T2T Alliance’s commitment to the sustainable design and
delivery of the Torrens Road to River Torrens Project is given in the Alliance’s Sustainability Policy:
5 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2. 5. T2T SUSTAINABILITY OBJECTIVES
The following project sustainability objectives were developed in collaboration with representatives of the community,
to align with the policy commitments and project scope and to achieve a positive triple bottom line that demonstrates
a sustainable project.
Environmental
Minimising energy and environmental harm including noise, vibration and air quality whilst maintaining and
enhancing the local ecological value.
Social
Minimising impact of the livelihood of the local community while improving the quality of life in the local area.
Using this project as a catalyst to rebuild and enhance the community and social relationships whilst nurturing
and respecting cultural and historical significance of the area.
Economic
Utilises opportunities to minimise energy, materials and resources while maintaining business within state
borders.
Governance
Ensuring decision making within leadership is compliant with current legislation and meets the environmental,
social and economic objectives.
6. POLICY IMPLEMENTATION AND KEY RESULT AREAS
The commitments within the T2T Alliance Sustainability Policy were delivered, in part, through the project’s Key
Result Areas (KRAs) that are relevant to sustainability and through the implementation of the Infrastructure
Sustainability Rating Scheme. Relevant KRAs include:
• KRA 4 Sustainability (encompassing environment, social and economic aspects of the project)
• KRA 3 Stakeholders (social)
• KRA 5 Workforce and Industry Participation (economic)
• KRA 7 Site Performance (environment)
6 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2. 7. KRA 4 SUSTAINABILITY
Sustainability Rating
T2T was registered for a rating under the Infrastructure Sustainability Council of
Australia’s (ISCA) IS Rating Scheme to drive sustainability initiatives and to optimise
environmental, social and economic outcomes for the project over the long term.
Ratings are given for the Design phase and the As Built (Design + Construction)
phase, and include, in rising order, Commended, Excellent and Leading.
An Excellent Rating was required under the project specification.
T2T has been awarded a Leading Rating for both the Design Phase and the As
Built Phases, exceeding the requirements for the project.
7 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2. Using Resources and Minimising Waste
The following graphs summarise the use of resources and minimisation of waste from the site for the reporting
period.
Figure 1: Electricity Consumption
Electricity consumption for this financial year progressively reduced as the works were completed and satellite
offices were closed.
0
20,000
40,000
60,000
80,000
100,000
120,000
Jul-
15
Au
g-1
5
Sep
-15
Oct
-15
No
v-1
5
De
c-15
Jan
-16
Feb
-16
Ma
r-16
Ap
r-1
6
Ma
y-1
6
Jun
-16
Jul-
16
Au
g-1
6
Sep
-16
Oct
-16
No
v-1
6
De
c-16
Jan
-17
Feb
-17
Ma
r-17
Ap
r-1
7
Ma
y-1
7
Jun
-17
Jul-
17
Au
g-1
7
Sep
-17
Oct
-17
No
v-1
7
De
c-17
Jan
-18
Feb
-18
Ma
r-18
Ap
r-1
8
Ma
y-1
8
Jun
-18
Jul-
18
Au
g-1
8
Sep
-18
Oct
-18
No
v-1
8
De
c-18
Jan
-19
Feb
-19
Ma
r-19
Elec
tric
ty C
on
sum
pti
on
[kW
h]
Total Electricity Consumption and GreenPower Proportion (kWh)
Greenpower Supply [kWh] Electricty Consumption [kWh] Target 50% GreenPower (kWh)
8 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2.
Figure 2: Fuel, Oil and Grease Use (Transport and Stationary).
Diesel was the principal fuel, used on site primarily for plant and vehicle use. Stationary source use, mainly
associated with light towers and generators, reduced once street lighting became operational. Consumption overall
in this financial year steadily reduced, reflecting the progressive completion of the works.
0
50
100
150
200
250
300
350
400
450
Thou
sand
s
Total Fuel, Oil and Grease Consumption
Transport Use – Diesel (L) Transport - Petrol (L) Stationary Use – Diesel (L)
Stationary Use - Petrol (L) Stationary Use - Greases (kg) Stationary Use - Oils (L)
9 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2.
Figure 3: Materials Use
The above figure represents the use of principal materials for the full construction period, compared with the Base
Case (5% or initial concept) and the completed (100%) design.
The amount of asphalt for the As-built aligns with the 100% Design; the marginal increase compared with the Base
Case is because of the building of an additional traffic lane. 94% of the asphalt used contained 20% Recycled
Aggregate Product.
Due to the innovative design of the retaining wall using soil nails, the use of concrete was substantially reduced
compared with the Base case and the 100% Design.
As-built quantities of quarry products were aligned with the Base case.
Steel quantities were aligned with the 100% Design, and were substantially reduced compared with the Base case,
due to the use of soil nails instead of piles.
10 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2.
Figure 4: Water consumption.
Use of recycled stormwater from the City of Charles Sturt Waterproofing the West system
(http://www.charlessturt.sa.gov.au/RecycledWater) ceased in June 2018.
During this financial year the water use remained at a low level until the close of works, due to a continued demand
from landscape-related earthworks and manual irrigation for planted vegetation.
0%
10%
20%
30%
40%
50%
60%
0
1000
2000
3000
4000
5000
6000
7000
8000
9000
Jul-
15
Au
g-1
5
Sep
-15
Oct
-15
No
v-1
5
De
c-1
5
Jan-
16
Feb
-16
Mar
-16
Ap
r-1
6
May
-16
Jun-
16
Jul-
16
Au
g-16
Sep
-16
Oct
-16
No
v-1
6
De
c-1
6
Jan
-17
Feb
-17
Mar
-17
Ap
r-1
7
May
-17
Jun
-17
Jul-
17
Au
g-1
7
Sep
-17
Oct
-17
No
v-1
7
De
c-1
7
Jan
-18
Feb
-18
Mar
-18
Ap
r-18
May
-18
Jun-
18
Jul-
18
Au
g-1
8
Sep
-18
Oct
-18
No
v-1
8
De
c-1
8
Jan-
19
Feb
-19
Mar
-19
Ap
r-1
9
Tho
usa
nd
s
Water Consumption (L)
Compaction and other works Compaction and other works - Recycled Dust Suppression Dust Suppression - Recycled
Vactruck Vactruck - Recycled Other/Road Cleanup Other/Road Cleanup - Recycled
Site Office % of Recycled Water Target % of Recycled Water
11 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2.
Figure 5: Spoil Disposal
During this financial year, the last remnants of T2T spoil was delivered to the Northern Connector project, as part of
DPTI’s North-South Connector. When access to the Northern Connector site was limited, spoil was exported to
Adelaide Resources Recovery (ARR) for commercial resale.
For the full construction period, 99.1% of spoil was reused and consequently diverted from landfill, exceeding the
target of 95% diversion. The residue was directed to landfill because of contamination.
12 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2.
Figure 6: Site Waste – Inert and Non-hazardous.
Site waste for this financial year has been predominantly asphalt and concrete, all of which has been recycled or
reused without processing, exceeding the 90% target. Approximately 97% of the remaining general mixed waste
has been diverted from landfill, through sorting and processing to create a waste-derived fuel for industrial use; also
above the target of 90%.
13 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2.
Figure 7: Office Waste.
Office Waste has been 100% diverted from landfill, exceeding the 60% target, through:
• Recycling of paper and container deposit items
• Composting of food waste/organics
• Sorting and processing of general waste to create a waste-derived fuel for industrial use.
14 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2. Initiatives
MCA (Multi-Criteria Analysis) Tool
The MCA Tool was developed by the T2T Alliance as a way to analyse differing options for major works and
evaluate the options against sustainable criteria. This allows the user to achieve a sustainability rating per dollar
spent to select the most sustainable option for the project.
While the tool was regularly used for decisions with sustainability implications throughout the project construction,
there was less of a requirement for its use in this financial year. It was used in the planning for the management of
contaminated materials.
Community Health
The William Street Park Community Initiative (Park Design) integrated the community’s wishes with regard to their
open space and recreation, and the design of the park was decided upon by those stakeholders and community
members in a meeting facilitated by the T2T Alliance Community Team.
The William Street park, the design of which was approved by Council, was created over the 2019 summer and will
be opened to the public in May 2019.
Noise – Nightworks Planning
Noise assessments were conducted by the Environment Team for all nightworks. The distance and level of the noise
was predicted from the source allowing this to be transposed onto a map of the work area, identifying the houses
that may be affected by the works and what noise levels would be heard by the residents. This approach benefited
the community, environment and construction teams where, by predicting the impacts from noisy works, we could
mitigate against those works early and notify the community in advance.
The nightworks process continued to be applied throughout this financial year. By the end of the works a total of 935
noise assessments had been carried out and associated permits approved.
Recycled Water
Recycled water was utilised on the project during 2017-2018, for dust management, construction and compaction
purposes. The water, sourced from ‘Waterproofing the West’ Scheme run by the City of Charles Sturt
(http://www.charlessturt.sa.gov.au/RecycledWater ), was treated stormwater that had been passed through swales,
wetlands and a filtration system prior to storage within the aquifer ready for use.
Access to the recycled water ceased in July 2018. However, an ongoing benefit of this initiative is that the standpipe
is now established for other parties to utilise the water source.
Ecology
Landscaping for the project and fauna habitat creation along the River Torrens Linear Park and adjacent park areas
will improve biodiversity in the area with a greater focus on local native species. The T2T Alliance design targeted
an increase of more than 20% above that of the original biodiversity, by planting over and above the usual one-for-
one replacement requirements.
Although the removal of trees was required for the project, four substantial Regulated trees originally intended to be
removed were retained through the detailed design process, either involving relocation or redesign of noise walls
15 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2. and/or services to avoid impacting the root zones of the trees. Establishment of Tree Protection Zones during
construction assisted the process by ensuring that access and works within these areas were strictly controlled
during this period of risk.
Environmental Discharges
During construction, there was a strong focus on minimising environmental discharges. Daily observations by site
supervisors and environment and community personnel were used to prompt the increased use of controls to
minimise impacts from the construction process.
• Water quality – The Water Sensitive Road Design methodology was used to ensure treatment of stormwater
in site-based wetlands prior to discharge, during the operations of the completed project. During
construction, impacts to water quality were avoided through the use of erosion and sediment controls, which
minimised spoil affecting local roads and dirty runoff entering the stormwater system, and the processing of
collected site water in an on-site sedimentation process. Street sweepers were used daily to keep the roads
clean.
• Air Quality – The project used low speed limits and hard stand haul roads throughout the site, but dust from
construction activities was principally controlled via water carts; between 4 and 8 carts were in use,
depending on the weather conditions, and reducing as the works were progressively completed. Dust levels
were continuously monitored by 5 loggers located along the length of the site. These loggers carried out real
time monitoring and automatic messaging to site personnel so that activities could be adjusted or additional
controls can be applied if required. Recorded levels did not exceed the project criterion for the daily
average.
• Noise – The project design includes noise walls and other mitigating treatments to reduce community
exposure to traffic noise from the operational project. As these were constructed early in the construction
program, these provided shielding for the community during the more disturbing works.
• Vibration – Construction impacts to properties, including 3 State and 2 Local heritage properties and the
SAPN sub station, were minimised.
• One of the major challenges on the project was the close proximity of properties to construction works.
Besides the heritage-listed properties, approximately half of the properties adjacent to the project are
classed as “contributory heritage” and were required to be treated as sensitive structures.
• To address vibration issues, a number of continuous loggers were installed throughout the project area.
These allowed for real time monitoring and messaging to site personnel to adjust their activities if required.
The monitors also allowed for more accurate observation and reporting which has helped ensure compliance
with standards and allowed the project team to provide a high level of reassurance to residents and
businesses.
• To minimise the effect of construction vibration across the project, a range of other measures have been
implemented including:
o Identification of buffer zones for vibratory plant that allow operation without a risk of exceeding the
vibration criteria.
16 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2. o Avoiding vibratory works within set distances of structures
o Operating equipment on the lowest effective vibration setting or employing static (non-vibratory)
methods for compaction
o Maintaining low speed limits for construction trucks and machinery
o Consideration of alternative construction methodologies where appropriate
o Providing advance notice to residents of any activities which may create noticeable vibration and the
expected duration of the activity.
17 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2. 8. KRA 3 STAKEHOLDERS
The T2T Alliance is committed to responding to the needs of the communities and other stakeholders affected by the
project. This includes a catchment area of approximately 13,000 properties with community members who are likely
to be affected or interested in the project.
Community engagement activities for the 2018-2019 period included:
• Community Liaison Group meetings
The Community Liaison Group (CLG) provided a forum for local residents, businesses, local government and
community groups to discuss and exchange information about the project. The group played an important
role in facilitating two-way communication between the T2T Alliance and key community stakeholders. While
the last meeting of CLG was in late 2018, the group were subsequently kept informed via email as the last of
the works were being completed.
• Community Perceptions surveys
In the 2018-2019-year one (November 2018) community perception survey was completed.
• Project enquiry line
1169 calls have been received in the 2018-2019 year.
• Project emails
1443 emails have been received via the project email address in the 2018-2019 year.
• Construction notifications
282 construction works notices have been issued in the 2018-2019 year.
• A community celebration was held in the lowered motorway on Sunday 23 September 2018. Approximately
5,000 people took the opportunity to experience the lowered motorway before it opened to the public.
Around 1,000 cyclists, walkers and runners participated in the morning community ‘ride’ before the main
celebrations commenced.
• One on one meetings with residents and businesses directly affected by construction works such as access
and detours were also ongoing. During the 2018-2019 year, 125 individual meetings with stakeholders were
held.
Community Perceptions Survey
In November 2018, the T2T Alliance conducted its six-monthly standard nine-question Community Perception
Survey, to gauge the effectiveness of communications and our relationship with the local community. The survey
was emailed to community members who had contacted the project in the last six months, and they were asked to
rate our performance based on their interaction. 66 people responded to the November 2018 survey.
The results of this sixth survey have shown that the T2T Alliance again exceeded the minimum measure of the
performance spectrum of 50%, as shown in the graph below:
18 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2.
The overall result of the last survey was lower than the previous surveys; the overall average rating score was 60.1%
compared with 78.6% for April 2018. It was noted that 27.2% of respondents rated T2T’s performance despite
having not had any correspondence via the project enquiry line, email address or in person throughout the survey
months (April – November 2018). Furthermore, the reduced result for November 2018 could be attributable to the
survey link being posted on the Tree 2 Tree Facebook page, the members of which were encouraged to voice their
opinions regarding changes to the landscaping design.
Respondents gave a lower overall rating for the process of dealing with the T2T Alliance than in the previous April
2018 survey: 61.7% rated the T2T Alliance between 61 and 100 for the process of dealing with the Alliance,
compared to 79.8% in April 2018. Likewise, 46.6% rated the T2T Alliance between 61 and 100 for the degree of
satisfaction with the outcome, compared to 65.0% in April 2018.
The areas with the more significant differences in scores are as follows:
• 63.3% of respondents were satisfied or very satisfied with the amount of information received, (compared to
81.9% in April 2018)
• 57.1% agreed or strongly agreed project information provided was meaningful and relevant (compared to
83.0% in April 2018)
• 68.7% agreed or strongly agreed project information provided as adequate to address the enquiry or issue
(compared to 87.5% in April 2018)
• 64.0% agreed or strongly agreed project information provided was factual / objective (compared to 78.8% in
April 2018)
19 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2.
Extract: December Construction Newsletter
20 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2. 9. KRA 5 WORKFORCE AND INDUSTRY PARTICIPATION
Workforce Participation
The project has a workforce participation target of 20% and stretch target of 28%, to increase the employment and
training of apprentices and trainees, Aboriginal people, displaced automotive industry workers, cadets and local
people with barriers to employment. Total target group hours were above estimate/forecast hours based on the
contractual total project hours, at 27.2%, as shown in the graph below:
Initiatives
The following initiatives were in place to assist in maximising the workforce participation target:
Retention
With the T2T Project ramping down and demobilising personnel the HR team spent time working with Supervisors to
assist with any required resourcing and retaining workers from the target group.
Pre-Employment Training Program
With the Landscaping package being the last remaining subcontract available to provide opportunities for
participation, the T2T Alliance worked with the Civil Contractors Federation (CCF) and the Landscaping contractor to
develop a Live Training Site where Certificate 2 in Civil Construction participants were provided on the job
experience and training to gain their qualification and receive exposure to a large construction site.
27.2%
0%
10%
20%
30%
40%
50%
Jun
-15
Au
g-1
5
Oct-
15
De
c-1
5
Fe
b-1
6
Ap
r-1
6
Jun
-16
Au
g-1
6
Oct-
16
De
c-1
6
Fe
b-1
7
Ap
r-1
7
Jun
-17
Au
g-1
7
Oct-
17
De
c-1
7
Fe
b-1
8
Ap
r-1
8
Jun
-18
Au
g-1
8
Oct-
18
De
c-1
8
Fe
b-1
9
Workforce Participation (% Contract Hours)
MCOS Target Stretch Target PTD % Month %
21 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2. Subcontractor Management
The T2T Alliance continued to hold subcontractor meetings to inform requirements, commitment and reporting with
regard to target group employment, and offering assistance to achieve the target group percentages.
Industry Participation
The T2T Alliance continued to commit to the South Australian Industry Participation Policy to provide full, fair and
reasonable opportunities for industry to participate in the Torrens Road to River Torrens Project.
Under the South Australian Industry Participation Policy the T2T Alliance continued to procure works in a manner
aimed at generating economic activity to build capability and grow the State’s economy.
The project’s Industry Participation commitments continued to be monitored by the Office of the Industry Advocate.
All procurement packages for T2T were assessed in line with the State's Government's Industry Participation Policy
and reviewed by the T2T SA Industry Advisory Committee. Membership of the Committee included external
representatives from the Office of the Industry Advocate, Civil Contractors Federation, Adelaide Business Hub and
the City of Charles Sturt, in addition to Department of Planning Transport and Infrastructure and T2T Alliance
representatives.
The project had an SA Industry participation target of 90%. Performance exceeded the 90% target for almost the full
construction period. In this financial year, the percentage was consistently around 92%.
The Project’s Industry Participation performance to end of Feb 2019 is set out below.
Item To end of Feb 2019 Economic Benefit to
SA to end of Feb 2019
Labour Directly engaged by the Alliance (excluding labour in
Work packages)
$79.79m $73.1m
Value of Work Packages Awarded by the Alliance* $220.28m $202.27m
Number of Work Packages Awarded by the Alliance** 265 No. 251 No.
Number of Work Packages listed on ICN*** 273 No.
Number of Work Packages / Tenders released to Industry 296 No.
*Value of Work Packages include labour, manufactured product and raw material supply **Multiple work packages can be awarded from a Tender ***ICN is the Industry Capability Network accessible through the Gateway
The above information was provided on the T2T Website each month.
22 of 22
2018 - 2019 ANNUAL SUSTAINABILITY REPORT
NUAL SUSTAINABILITY REPORT
2.
Initiatives
SA Industry Engagement
As the procurement process occurred subcontractors were made aware of the IPP - Industry Participation Plan
requirements through the EOI – Expression of Interests, RFP – Request for Proposal and Pre-award meetings. Once
awarded the contract a monitoring process through ongoing monthly reports etc. Continuing ongoing monthly contact
occurred with subcontractors that have been awarded work with the project.
A 15% weighting was applied in favour of local industry in the procurement evaluation process.
SA Advisory Committee
The SA Industry Advisory Committee for the Torrens Road to River Torrens Project was established to bring
valuable internal and external views on SA procurement and help to reach the broadest audience and optimise the
T2T Alliance’s processes to support and develop SA Industry. The SA Industry Advisory Committee sought to
support the T2T Alliance promote industry capability and maximise local industry participation in the project and
through procurement opportunities. The SA Industry Advisory Committee last met in January 2018, as the
requirement for new contracts was reduced as works progressed.
91.99%
70.00%
75.00%
80.00%
85.00%
90.00%
95.00%
100.00%
Jun
-15
Jul-
15
Au
g-1
5
Sep
-15
Oct
-15
No
v-1
5
De
c-1
5
Jan
-16
Feb
-16
Mar
-16
Ap
r-1
6
May
-16
Jun
-16
Jul-
16
Au
g-1
6
Sep
-16
Oct
-16
No
v-1
6
De
c-1
6
Jan
-17
Feb
-17
Mar
-17
Ap
r-1
7
May
-17
Jun
-17
Jul-
17
Au
g-1
7
Sep
-17
Oct
-17
No
v-1
7
De
c-1
7
Jan
-18
Feb
-18
Mar
-18
Ap
r-1
8
May
-18
Jun
-18
Jul-
18
Au
g-1
8
Sep
-18
Oct
-18
No
v-1
8
De
c-1
8
Jan
-19
Feb
-19
Industry Participation - $ Value Total
Percentage by Month Target Percentage Percentage by Project to Date