Page 1:  · 2018-11-14 · South Island quay wall. The concrete from level —5,0 to —1,7 was cast under water. This mass of concrete stabilized the cofferdam, which was then drained. The
Page 2:  · 2018-11-14 · South Island quay wall. The concrete from level —5,0 to —1,7 was cast under water. This mass of concrete stabilized the cofferdam, which was then drained. The
Page 3:  · 2018-11-14 · South Island quay wall. The concrete from level —5,0 to —1,7 was cast under water. This mass of concrete stabilized the cofferdam, which was then drained. The
Page 4:  · 2018-11-14 · South Island quay wall. The concrete from level —5,0 to —1,7 was cast under water. This mass of concrete stabilized the cofferdam, which was then drained. The
Page 5:  · 2018-11-14 · South Island quay wall. The concrete from level —5,0 to —1,7 was cast under water. This mass of concrete stabilized the cofferdam, which was then drained. The