2017rps&compliance&report€¦ · rulemaking 15-02-020 mce – august 31, 2018 page 1 of 2...
TRANSCRIPT
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
Date:August 31, 2018 Name: Dawn Weisz
Title: Chief Executive OfficerEmail: [email protected] Phone: (415) 464-‐6020Fax: (415) 459-‐8095Address: 1125 Tamalpais Avenue, San Rafael, CA 94901First year of operation: Pre-‐2011 (Select one)
2017 RPS Compliance Report
Reporting RPS Compliance Status within Compliance Period 3 (2017-‐2020)
Order Instituting Rulemaking to Continue Implementation and
Administration of California Renewables Portfolio Standard Program.
Rulemaking 15-‐02-‐020(Filed February 26, 2015)
Marin Clean Energy (MCE)
Dawn Weisz, Chief Executive Officer
OFFICER VERIFICATION FORM
I declare under penalty of perjury that the foregoing is true and correct.
Executed on August 31, 2018 at San Rafael, California.
I am an officer of the reporting corporation herein, and am authorized to make this verification on its
behalf. The statements in the foregoing document are true of my own knowledge, except as to matters
which are therein stated on information or belief, and as to those matters I believe them to be true. The
spreadsheet format used to file this compliance report has not been altered from the version issued or
approved by Energy Division.
Rulemaking 15-02-020 MCE – August 31, 2018
Page 1 of 2
Marin Clean Energy
2017 RPS Compliance Report
Reporting RPS Compliance Status for the Third Compliance Period (2017-2020)
Narrative Reporting Requirements: 1. Development status update (siting and permitting) for eligible renewable energy resources, which have
not yet achieved commercial operation:
Generating Facility Technology MW Location Status Voyager II Wind 42 Mojave, CA Deliveries are expected to
commence in 2018; pertinent siting and permitting activities are being satisfied, per schedule
Antelope II Solar PV 105 Lancaster, CA Deliveries are expected to commence in 2019; pertinent siting and permitting activities are being satisfied, per schedule
Little Bear 1 Solar PV 40 Mendota, CA Deliveries are expected to commence in 2021; pertinent siting and permitting activities are being satisfied, per schedule
Little Bear 3 Solar PV 20 Mendota, CA Deliveries are expected to commence in 2021; pertinent siting and permitting activities are being satisfied, per schedule
Little Bear 4 Solar PV 50 Mendota, CA Deliveries are expected to commence in 2021; pertinent siting and permitting activities are being satisfied, per schedule
Little Bear 5 Solar PV 50 Mendota, CA Deliveries are expected to commence in 2021; pertinent siting and permitting activities are being satisfied, per schedule
Desert Harvest Solar PV 80 Riverside, CA Deliveries are expected to commence in 2021; pertinent siting and permitting activities are being satisfied, per schedule
Rulemaking 15-02-020 MCE – August 31, 2018
Page 2 of 2
2. Please see the following table for an inventory of all procurement (by MCE for use under California’s RPS
Program) during the 2017 calendar year from eligible renewable energy sources located outside of California but within WECC. Note that all volumes are expressed in megawatt hours (MWhs):
3. Please see the following table for an inventory of all unbundled renewable energy credits (RECs) that were procured by MCE for use under California’s RPS Program during the 2017 calendar year. Note that all volumes are expressed in megawatt hours (MWhs):
4. MCE has no specific recommendations at this time but encourages the Commission to promote clarity and consistency, while also reducing redundancy, in administering California’s RPS compliance reporting program.
Generating Facility City State VolumeBiglow Canyon Wind Farm - Biglow Phase 2 Sherman OR 11,908 Cape Scott Wind - Cape Scott Wind Port Hardy BC, Canada 13,058 Cedar Creek - Cedar Creek Weld CO 121,643 Cedar Creek II - Cedar Creek II Weld CO 118,184 Dokie Wind - Dokie Wind Chetwynd BC, Canada 19,629 Elkhorn Valley Wind Farm - Elkhorn Valley Wind Farm Union OR 53,092 Logan Wind Energy - Logan Logan CO 80,127 Meikle Wind Energy Limited Partnership Tumbler Ridge BC, Canada 20,458 Port Angeles Mill - CoGen No. 11/Nippon Paper Co-Generation Clallam WA 615 Quality Wind - Quality Wind Tumbler Ridge BC, Canada 21,526 Tucannon River 1 - Tucannon River Wind Farm Columbia WA 2,881 Tucannon River Wind Farm - Tucannon River 2 Columbia WA 15,211 Total 478,332
Generating Facility City State VolumeCGTEF - Calabasas Gas-to-Energy Facility Los Angeles CA 687TEF - GEN1 - Total Energy Facility Los Angeles CA 25062TEF - GEN2 - Total Energy Facility Los Angeles CA 23246TEF - GEN3 - Total Energy Facility Los Angeles CA 21821TEF - GEN4 - Total Energy Facility Los Angeles CA 19184Total 90000
Data Reported by:
Marin Clean Energy (MCE)
August 31, 2018
Compliance Summary and Charts
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Retail Sales (MWh) 185,493 570,144 1,110,487 1,254,794 1,695,274 2,125,091 2,804,277 4,565,481 5,275,252 5,306,098 5,339,682 5,377,627 5,422,939 5,475,612 5,537,608Annual % Target 20.0% 20.0% 20.0% 21.7% 23.3% 25.0% 27.0% 29.0% 31.0% 33.0% 34.8% 36.5% 38.3% 40.0% 41.7%Annual RPS Target 37,099 114,029 222,097 272,290 394,999 531,273 757,155 1,323,989 1,635,328 1,751,012 1,858,209 1,962,834 2,076,986 2,190,245 2,309,182Procurement Quantity Requirement
Resource Mix
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Total RPS Procurement 25,521 123,507 311,834 562,427 754,350 992,300 1,592,542 2,803,761 1,938,119 1,844,261 2,403,253 2,396,753 2,091,262 2,056,681 2,050,204Biomass 17,319 22,890 11,091 0 0 0 0 36,000 0 0 0 0 0 0 0
Biogas: Digester gas 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Biogas: Landfill gas 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Biodiesel 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Muni Solid Waste 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Bioenergy Subtotal 17,319 22,890 11,091 0 0 0 0 36,000 0 0 0 0 0 0 0Geothermal 0 0 0 51,280 27,244 0 340,692 188,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000Small Hydro 0 10,000 125,231 0 63,878 144,196 245,237 168,400 70,200 70,000 70,000 70,000 70,000 70,000 70,000
Conduit Hydro 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Water supply and conveyance 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Solar PV 0 165 1,807 2,964 95,959 195,736 173,632 483,361 827,819 898,161 1,478,153 1,471,653 1,466,162 1,460,681 1,454,204Solar Thermal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Wind 8,202 90,452 173,705 508,183 567,269 652,368 832,981 1,928,000 952,100 788,100 767,100 767,100 467,100 438,000 438,000Ocean wave 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Ocean thermal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Tidal current 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Fuel Cells 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Portfolio Content Category Mix
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
Category 0 RECs 39,119 39,238 92,576 0 0 0 0 0 0 0 0 0 0 0 0Category 1 RECs 6,203 69,553 114,693 171,634 467,921 781,561 1,201,208 1,922,761 1,658,119 1,924,261 2,483,253 2,476,753 2,171,262 2,136,681 2,130,204Category 2 RECs 6,203 32,731 62,094 120,282 164,801 311,000 458,046 925,000 360,000 0 0 0 0 0 0Category 3 RECs 0 25,000 95,000 354,703 233,643 68,059 90,000 36,000 0 0 0 0 0 0 0
373,225 1,198,562 5,467,485 8,088,274 7,305,931
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020
Portfolio Content Category Mix of RPS Procurement
0
500,000
1,000,000
1,500,000
2,000,000
2,500,000
3,000,000
1 2 3 4 5 6 7 8 9 10
Resource Mix of RPS Procurement
Other (Tidal/Fuel Cells) Wind Solar Thermal Solar PV Small Hydro Geothermal Biogas Biomass
2026 2027 2028 2029 2030
5,612,312 5,703,594 5,824,555 5,973,371 6,157,92543.3% 45.0% 46.7% 48.3% 50.0%
2,430,131 2,566,617 2,720,067 2,885,138 3,078,962
2026 2027 2028 2029 2030
1,974,737 1,880,277 1,874,624 1,867,180 1,861,7430 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0
88,000 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0
1,448,737 1,442,277 1,436,624 1,429,180 1,423,7430 0 0 0 0
438,000 438,000 438,000 438,000 438,0000 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0
2026 2027 2028 2029 2030
0 0 0 0 02,054,737 1,960,277 1,954,624 1,947,180 1,941,743
0 0 0 0 00 0 0 0 0
8,684,1677,305,931
RPS Compliance Report: 2014-‐2016 Compliance Period Summary
31-‐Aug-‐18
2014 2015 2016 CP 2 Total
RPS Summary Report MWh MWh MWh MWh % of Total Retail Sales
Total Retail Sales 1,254,794 1,695,274 2,125,091 5,075,159 n/a Annual RPS Targets and Compliance Period Procurement Requirement 272,290 394,999 531,273 1,198,562 23.6%Total RPS Eligible RECs Procured 646,619 866,365 1,160,620 2,673,604 52.7%Total RPS Eligible RECs Retired 689,834 869,181 1,160,620 2,719,635 53.6%
2014 2015 2016 CP 2 Total
RPS Procurement MWh MWh MWh MWh% of Total RPS Procurement
Biomass 0 0 0 0 0.0%Biogas: Digester gas 0 0 0 0 0.0%Biogas: Landfill gas 0 0 0 0 0.0%Biodiesel 0 0 0 0 0.0%Muni Solid Waste 0 0 0 0 0.0%Bioenergy Subtotal 0 0 0 0 0.0%
Geothermal 51,280 27,244 0 78,524 3.4%Small Hydro 0 63,878 144,196 208,074 9.0%Conduit Hydro 0 0 0 0 0.0%Water supply and conveyance 0 0 0 0 0.0%Solar PV 2,964 95,959 195,736 294,659 12.8%Solar Thermal 0 0 0 0 0.0%Wind 508,183 567,269 652,368 1,727,820 74.8%Ocean wave 0 0 0 0 0.0%Ocean thermal 0 0 0 0 0.0%Tidal current 0 0 0 0 0.0%Fuel Cells 0 0 0 0 0.0%
Total RPS Eligible Procurement 562,427 754,350 992,300 2,309,077
Claimed Portfolio Content Category of RPS Procurement
2014 2015 2016 CP 2 Total
Portfolio Content Category MWh MWh MWh MWh% of Total RPS Procurement
RECs Procured from PCC 0 Eligible Resources 0 0 0 0 0.0%RECs Procured from PCC 1 Eligible Resources 171,634 467,921 781,561 1,421,116 53.2%RECs Procured from PCC 2 Eligible Resources 120,282 164,801 311,000 596,083 22.3%RECs Procured from PCC 3 Eligible Resources 354,703 233,643 68,059 656,405 24.6%
Total 646,619 866,365 1,160,620 2,673,604
2014-‐16 Compliance Period
RPS Procurement Resource Mix
This amount representstotal procurement quantity requirement
This amount representsquantity of RECs retired for this compliance period
Annual RPS Compliance Report: Unique InputsData Reported by:
Marin Clean Energy (MCE) Input Required
August 31, 2018 Actual Data
Forecasted Data
Information is Hard Coded
Early Compliance Election (D.17-‐06-‐026) (Yes/No)
LSE Choice (Select One) No
Information from the 20% RPS Compliance Program (MWh) ActualTotal Retail Sales in 2010 91,219Net Surplus/(Deficit) from 20% RPS Closing Report 24,543
Retail Sales (MWh) 2011 2012 2013 2014 2015 2016 Annual Retail Sales 185,493 570,144 1,110,487 1,254,794 1,695,274 2,125,091
Excess Procurement Calculation (MWh)PCC 0 RECs applied to PQRLong-‐Term PCC 1 RECs applied to PQRShort-‐Term PCC 1 RECs applied to PQRLong-‐Term PCC 2 RECs applied to PQRShort-‐Term PCC 2 RECs applied to PQRLong-‐Term PCC 3 RECs applied to PQRShort-‐Term PCC 3 RECs applied to PQRExcess RECs Eligible for BankingExcess PCC 0 RECsExcess PCC 1 RECs Excess Long-‐Term PCC1 RECs Excess Short-‐Term PCC1 RECsExcess PCC 2 RECs
Remaining Excess RECs Eligible for Banking and Requiring a Category Assignment
Excess Procurement Bank (MWh)PCC 0 BankPCC 1 Bank Long-‐Term PCC1 Bank Short-‐Term PCC1 Bank
PCC 2 BankApplication of PCC 0 Banked RECsApplication of PCC 1 Banked RECs Application of Long-‐term PCC1 Banked RECs Application of Short-‐Term PCC1 Banked RECs
Application of PCC 2 Banked RECsCumulative PCC 0 BankCumulative PCC 1 Bank Cumulative Long-‐Term PCC1 Bank Cumulative Short-‐Term PCC1 Bank
Cumulative PCC 2 Bank
Applies to Compliance Period 1 ONLY Provisional 20% Closing ReportNet Surplus/(Deficit) from Provisional 20% RPS Closing ReportPCC 0 RECs applied to PQR Long-‐Term PCC 1 RECs applied to PQRShort-‐Term PCC 1 RECs applied to PQRLong-‐Term PCC 2 RECs applied to PQRShort-‐Term PCC 2 RECs applied to PQRLong-‐Term PCC 3 RECs applied to PQRShort-‐Term PCC 3 RECs applied to PQRApplication of PCC 0 RECs to 20% Closing Report DeficitApplication of Long-‐term PCC 1 RECs to 20% Closing Report DeficitApplication of Short-‐term PCC 1 RECs to 20% Closing Report DeficitApplication of Long-‐term PCC 2 RECs to 20% Closing Report DeficitApplication of Short-‐term PCC 2 RECs to 20% Closing Report DeficitApplication of Long-‐term PCC 3 RECs to 20% Closing Report DeficitApplication of Short-‐term PCC 3 RECs to 20% Closing Report DeficitCumulative Closing Report Deficit
2014-‐2016128,998 41,935
2011-‐2013
0
N/A
41,150145,203 1,001,728
0 0
423,484
101,028 596,083
N/AN/A
0 0
2011-‐2013 2014-‐2016
0 0
0 0
656,405
0
0
0 0120,000
N/A N/A
N/A
00
00
0
00
12,0150
20,365
24,543
2011-‐2013
24,543
00
N/A0 0
N/A
24,543
0 0
0
18,738
0
0 0
0
67,868
N/A
N/AN/A
N/A0 0
N/A
0
Compliance Period 1 Compliance Period 2
0 0
24,543
N/A
N/AN/A
N/A0
24,543
Compliance Period 1 Compliance Period 2
Annual RPS Compliance Report: Unique InputsData Reported by:
Marin Clean Energy (MCE)
August 31, 2018
Early Compliance Election (D.17-‐06-‐026)
LSE Choice (Select One)
Information from the 20% RPS Compliance Program (MWh)Total Retail Sales in 2010Net Surplus/(Deficit) from 20% RPS Closing Report
Retail Sales (MWh) Annual Retail Sales
Excess Procurement Calculation (MWh)PCC 0 RECs applied to PQRLong-‐Term PCC 1 RECs applied to PQRShort-‐Term PCC 1 RECs applied to PQRLong-‐Term PCC 2 RECs applied to PQRShort-‐Term PCC 2 RECs applied to PQRLong-‐Term PCC 3 RECs applied to PQRShort-‐Term PCC 3 RECs applied to PQRExcess RECs Eligible for BankingExcess PCC 0 RECsExcess PCC 1 RECs Excess Long-‐Term PCC1 RECs Excess Short-‐Term PCC1 RECsExcess PCC 2 RECs
Remaining Excess RECs Eligible for Banking and Requiring a Category Assignment
Excess Procurement Bank (MWh)PCC 0 BankPCC 1 Bank Long-‐Term PCC1 Bank Short-‐Term PCC1 Bank
PCC 2 BankApplication of PCC 0 Banked RECsApplication of PCC 1 Banked RECs Application of Long-‐term PCC1 Banked RECs Application of Short-‐Term PCC1 Banked RECs
Application of PCC 2 Banked RECsCumulative PCC 0 BankCumulative PCC 1 Bank Cumulative Long-‐Term PCC1 Bank Cumulative Short-‐Term PCC1 Bank
Cumulative PCC 2 Bank
Applies to Compliance Period 1 ONLY Provisional 20% Closing ReportNet Surplus/(Deficit) from Provisional 20% RPS Closing ReportPCC 0 RECs applied to PQR Long-‐Term PCC 1 RECs applied to PQRShort-‐Term PCC 1 RECs applied to PQRLong-‐Term PCC 2 RECs applied to PQRShort-‐Term PCC 2 RECs applied to PQRLong-‐Term PCC 3 RECs applied to PQRShort-‐Term PCC 3 RECs applied to PQRApplication of PCC 0 RECs to 20% Closing Report DeficitApplication of Long-‐term PCC 1 RECs to 20% Closing Report DeficitApplication of Short-‐term PCC 1 RECs to 20% Closing Report DeficitApplication of Long-‐term PCC 2 RECs to 20% Closing Report DeficitApplication of Short-‐term PCC 2 RECs to 20% Closing Report DeficitApplication of Long-‐term PCC 3 RECs to 20% Closing Report DeficitApplication of Short-‐term PCC 3 RECs to 20% Closing Report DeficitCumulative Closing Report Deficit
2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 20302,804,277 4,565,481 5,275,252 5,306,098 5,339,682 5,377,627 5,422,939 5,475,612 5,537,608 5,612,312 5,703,594 5,824,555 5,973,371 6,157,925
2017-‐2020
126,000
0
2,791,9230
3,836,339
1,743,046
Compliance Period 3
0
0
0
0
0
850,575
2021-‐2024
0
0
N/A
0
N/A 00
0
00
N/A
0
0
0
0
N/A
N/A
24,543
0
Compliance Period 4
0N/AN/A
0
N/A0
2017-‐2020
024,543
00
N/A
24,543
N/A 0
Compliance Period 32021-‐2024
0
N/A
850,575N/A
8,580,649687,300
00
Compliance Period 4
N/A 0
24,543
00
Annual RPS Compliance Report: Contract DetailsData Reported by: Input RequiredMarin Clean Energy (MCE) Actual DataAugust 31, 2018 Forecasted Data
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name 51,525 166,522 364,363 646,619 866,365 1,160,620 1,749,254 2,883,761 2,018,119 1,924,261 2,483,253 2,476,753 2,171,262 2,136,681 2,130,204 2,054,737 1,960,277 1,954,624
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Columbia Ridge Landfill Gas units 1-‐8 (60994A)19,801 16,348 7,430 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Nine Canyon Wind (60803A)1,999 0 1,285 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Sierra Pacific Burlington (60596A)17,319 22,890 11,091 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Eurus Combine Hills II LLC (60928A)0 0 72,770 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2010 G2 Energy Hay Road LLC -‐ Hay Road Landfill (Solano County, 61205C)0 0 5,964 11,527 11,271 973 11,386 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000NA 2010 G2 Energy Ostrom Road LLC -‐ Ostrom Road Landfill (Yuba County, 61206A)0 0 3,913 12,713 12,317 11,697 13,595 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000
NA 2011 Shell Energy North America, MEA Phase 2 -‐ CEC-‐Certified High Desert (61409A)6,203 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2011 Shell Energy North America, MEA Phase 2 -‐ Big Horn Wind (60776A)6,203 7,271 13,094 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2011 Shell Energy North America, MEA Phase 2 -‐ Nine Canyon Wind (60803A)0 9,460 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 1 Eligible (Portfolio)0 0 0 0 2,163 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 1 Eligible: Cabazon Wind Partners (60736A)0 0 0 2,626 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 1 Eligible: Roosevelt Biogas -‐ LFG Phase 2, Engines 7-‐9 (60974A)0 0 0 526 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible (Portfolio)0 0 0 0 5,801 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible: Juniper Canyon (61202A)0 0 0 2,452 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible: Leaning Juniper II (61200A)0 0 0 2,548 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible: White Creek Wind 1 (60721A)0 0 0 10,282 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2011 Cottonwood Solar, LLC (Goose Lake and Corcoran generating facilities)0 0 0 0 44,277 65,691 62,533 62,400 62,400 62,400 62,400 62,400 62,400 62,400 62,400 62,400 62,400 62,400NA 2011 Rio Solar 1, LLC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2012 Shell Energy North America, MEA Phase 2B -‐ PCC1, LFG Phase II Roosevelt Biogas -‐ LFG Phase 2, Engines 7-‐9 (60974A)0 7,279 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2012 Shell Energy North America, MEA Phase 2B -‐ White Creek Wind 1 (60721A)0 57,721 0 30,046 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2012 Shell Energy North America, MEA Phase 2B -‐ Tulloch Powerhouse (60071A)0 0 55,262 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2012 Shell Energy North America, MEA Phase 2B -‐ Beardsley Powerhouse (60072A)0 0 18,738 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2012 Shell Energy North America, MEA Phase 2B -‐ RPS Category 1 Eligible (Portfolio)0 0 0 0 19,000 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2012 Shell Energy North America, MEA Phase 2B -‐ RPS Category 1 Eligible: Cabazon Wind Partners (60736A)0 0 0 27,954 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2012 Shell Energy North America, MEA Phase 2B, RPS Category 2 Eligible -‐ Juniper Canyon (61202A)0 16,000 14,956 13,169 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2012 Shell Energy North America, MEA Phase 2B, RPS Category 2 Eligible -‐ Leaning Juniper II (61200A)0 0 34,044 21,831 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 GenPower, LLC (Lincoln Landfill Power Plant, Units 1-‐6; 61632A)0 4,388 29,009 31,998 26,427 27,591 27,340 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000NA 2012 RE Kansas (Recurrent) 0 0 0 1,437 49,984 53,739 53,386 0 0 0 0 0 0 0 0 0 0 0
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 1 Eligible (Portfolio)0 0 0 0 43,000 60,000 0 0 0 0 0 0 0 0 0 0 0 0
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 2 Eligible (Portfolio)0 0 0 0 47,000 51,000 0 0 0 0 0 0 0 0 0 0 0 0
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 2 Eligible: Leaning Juniper II (61200A)0 0 0 1,668 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 2 Eligible: Juniper Canyon (61202A)0 0 0 8,332 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 Middle Fork Irrigation District (61383A) 0 10,000 32,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
Annual RPS Compliance Report: Contract DetailsData Reported by: Input RequiredMarin Clean Energy (MCE) Actual DataAugust 31, 2018 Forecasted Data
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name 51,525 166,522 364,363 646,619 866,365 1,160,620 1,749,254 2,883,761 2,018,119 1,924,261 2,483,253 2,476,753 2,171,262 2,136,681 2,130,204 2,054,737 1,960,277 1,954,624
NA 2012 OneEnergy -‐ RPS Confirm #1 -‐ Total Energy Facility (TEF-‐GEN 1; 60633A)0 12,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy -‐ RPS Confirm #1 -‐ Puente Hills Gas-‐to-‐Energy Facility Phase II Gen3 (60632A)0 3,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Birch Creek Power (61378A) 0 0 5,802 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Double A Dairy Digester (61221A)0 0 6,213 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Dry Creek Project (61381A) 0 0 466 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Falls Creek Hydro (61375A) 0 0 12,039 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Glenrock III (60804A) 0 0 704 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Goodnoe Hills (60819A) 0 0 1,114 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ High Plains (60899A) 0 0 1,005 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Marsh Valley Project (61380A) 0 0 924 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Mountain Air Wind Project (62314A)0 0 18,747 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Nine Canyon Phase 3 (60803A)0 0 1,285 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Pilgrim Stage Station Wind Park (60923A)0 0 1,609 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Rolling Hills (60806A) 0 0 1,259 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Thousand Springs Wind Park (60925A)0 0 6,078 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Tuana Gulch Wind Park (60924A)0 0 4,869 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Wolverine Creek (60564A) 0 0 886 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 San Rafael Airport Solar Partners, LLC (MCE FIT, 62237A), PCC10 165 1,807 1,527 1,698 1,631 1,451 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650NA 2013 Calpine Geysers -‐ Short Term: Calpine Geothermal Unit #17 (60007A)0 0 0 26,280 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2014 Calpine Geysers -‐ Short Term #2: Calpine Geothermal Unit #18 (60008A)0 0 0 25,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 Calpine Geysers -‐ Long Term 0 0 0 0 0 0 87,600 88,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000 0 0
NA 2014 Exelon Generation Company, LLC -‐ Short Term PCC2b 0 0 0 0 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2014 Exelon Generation Company, LLC -‐ Short Term PCC2a: Alta 10 (62244A)0 0 0 60,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Confirm #3 0 0 0 0 86,967 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Campbell Hill -‐ Three Buttes (61017A)0 0 0 16,352 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Campbell Hill -‐ Dunlap 1 (61188A)0 0 0 3,513 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Glenrock I (60805A) 0 0 0 10,693 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Glenrock III (60804A) 0 0 0 4,210 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Golden Valley Wind Park (60917A)0 0 0 9,688 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Goodnoe Hills (60819A) 0 0 0 1,491 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Hay Canyon (60724A) 0 0 0 3,203 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ High Plains (60899A) 0 0 0 2,778 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Klondike Wind Power III LLC (60602A)0 0 0 8,113 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Marengo (60729A) 0 0 0 2,163 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Marengo 2 (60730A) 0 0 0 1,047 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ McFadden Ridge (60896A) 0 0 0 3,448 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Milner Dam Wind Park (60919A)0 0 0 1,676 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Mountain Air Wind Project (62314A)0 0 0 18,439 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Palouse Wind (62288A) 0 0 0 2,158 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Rolling Hills (60806A) 0 0 0 9,745 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Seven Mile Hill 1 (60807A) 0 0 0 7,335 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Seven Mile Hill 2 (60808A) 0 0 0 777 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Top of the World (61199A) 0 0 0 8,639 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Wild Horse (60746A) 0 0 0 23,035 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Wolverine Creek (60564A) 0 0 0 1,458 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Yahoo Creek Wind Park (60926A)0 0 0 39 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 Puget Sound Energy -‐ RPS Eligible, Short-‐Term Bucket 3: Wild Horse (60746A)0 0 0 167,203 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Hopkins Ridge (60745A) 0 0 0 7,500 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Lower Snake River (62044A) 0 0 0 15,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2012 Shell Energy North America, MEA Phase 2B -‐ RPS Category 2 Eligible (Portfolio)0 0 0 0 12,000 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 RE Mustang 4 LLC 0 0 0 0 0 0 0 86,000 86,000 86,000 86,000 86,000 86,000 86,000 86,000 86,000 86,000 86,000NA 2014 Rising Tree Wind Farm III, LLC, PCC1 0 0 0 0 166,662 297,919 335,562 338,000 0 0 0 0 0 0 0 0 0 0NA 2014 Cooley-‐Quarry 1 (MCE FIT), PCC1 0 0 0 0 0 0 869 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800NA 2015 East Bay Municipal Utility District (Pardee, 60536A and Comanche Reservoirs, 60535A)0 0 0 0 13,646 143,747 244,563 168,200 70,000 70,000 70,000 70,000 70,000 70,000 70,000 0 0 0
Annual RPS Compliance Report: Contract DetailsData Reported by: Input RequiredMarin Clean Energy (MCE) Actual DataAugust 31, 2018 Forecasted Data
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name 51,525 166,522 364,363 646,619 866,365 1,160,620 1,749,254 2,883,761 2,018,119 1,924,261 2,483,253 2,476,753 2,171,262 2,136,681 2,130,204 2,054,737 1,960,277 1,954,624
NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Wild Horse Phase II (60746A) 0 0 0 25,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2015 Calpine Geysers -‐ Short Term #3: Geothermal 0 0 0 0 27,244 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2015 Cedar Creek RECs, LLC -‐ RPS Category 3 Eligible 0 0 0 0 125,000 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2015 Direct Energy -‐ RPS Category 1 Eligible (Portfolio, small hydro)0 0 0 0 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2014 WM Renewable Energy, L.L.C. (Redwood Landfill) 0 0 0 0 0 0 14,391 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000NA 2017 MCE SolarOne, PCC1 (sPower, 2 facilities -‐ 2.0 MW + 8.5 MW)0 0 0 0 0 0 0 11,000 14,000 18,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000NA 2015 Cooley-‐Quarry 2 (MCE FIT), PCC1 0 0 0 0 0 0 0 900 900 900 900 900 900 900 900 900 900 900NA 2015 Cost-‐Plus (MCE FIT), PCC1 0 0 0 0 0 113 525 450 450 450 450 450 450 450 450 450 450 450NA 2016 Avangrid Renewables, LLC (Shiloh I Wind Project) 0 0 0 0 0 43,449 58,465 75,000 0 0 0 0 0 0 0 0 0 0
NA 2016 Parrey, LLC (61841C) 0 0 0 0 0 74,018 0 0 0 0 0 0 0 0 0 0 0 0
NA 2016 3Phases, PCC2 (Cedar Creek Wind Energy, 60822A; and Cedar Creek II, 61384A) -‐ Confirmation #20 0 0 0 0 140,000 0 0 0 0 0 0 0 0 0 0 0 0
NA 2016 Portland General Electric Company, PCC2 (Portfolio Supply Agreement)0 0 0 0 0 120,000 0 0 0 0 0 0 0 0 0 0 0 0NA 2016 Los Angeles County, Sanitation District No. 2, PCC3 -‐ Confirmation #10 0 0 0 0 68,059 0 0 0 0 0 0 0 0 0 0 0 0NA 2016 Los Angeles County, Sanitation District No. 2, PCC3 -‐ Confirmation #20 0 0 0 0 0 90,000 0 0 0 0 0 0 0 0 0 0 0
NA 2016 Powerex, PCC2 (Portfolio Supply Agreement) 0 0 0 0 0 0 25,000 75,000 125,000 0 0 0 0 0 0 0 0 0
NA 2016 Powerex, PCC1 (Portfolio Supply Agreement) 0 0 0 0 0 0 60,000 0 0 0 0 0 0 0 0 0 0 0
NA 2016 3Phases, PCC2 (Cedar Creek Wind Energy, 60822A; and Cedar Creek II, 61384A) -‐ Confirmation #30 0 0 0 0 0 85,000 0 0 0 0 0 0 0 0 0 0 0
NA 2015 3Phases, PCC2 (Cedar Creek Wind Energy, 60822A; and Cedar Creek II, 61384A) -‐ Confirmation #10 0 0 0 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2015 Rising Tree Wind Farm, PCC3 0 0 0 0 2,676 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2015 3Degrees, PCC3 0 0 0 0 19,000 0 0 0 0 0 0 0 0 0 0 0 0 0
NA 2011 Western Area Power Administration 0 0 0 0 232 449 674 200 200 0 0 0 0 0 0 0 0 0
NA 2016 City of Santa Clara, Silicon Valley Power, PCC1 0 0 0 0 0 0 200,000 0 0 0 0 0 0 0 0 0 0 0NA 2015 Northshore Solar Partners LLC (Freethy #1, MCE FIT), PCC1 0 0 0 0 0 260 1,821 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800NA 2015 Northshore Solar Partners LLC (Freethy #2, MCE FIT), PCC1 0 0 0 0 0 284 1,827 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800
NA 2016 3Phases, PCC2 (Portfolio Supply Agreement) 0 0 0 0 0 0 234,954 0 0 0 0 0 0 0 0 0 0 0
NA 2016 3Phases, PCC2 (Portfolio Supply Agreement) 0 0 0 0 0 0 53,092 0 0 0 0 0 0 0 0 0 0 0
NA 2017 3Phases, PCC2 (Portfolio Supply Agreement) 0 0 0 0 0 0 0 150,000 160,000 0 0 0 0 0 0 0 0 0
NA 2016 Powerex, PCC2 (Portfolio Supply Agreement) 0 0 0 0 0 0 30,000 0 0 0 0 0 0 0 0 0 0 0
NA 2016 NextEra Energy Power Marketing, LLC, PCC1 (Blythe Solar, various units)0 0 0 0 0 0 200,000 0 0 0 0 0 0 0 0 0 0 0NA 2016 Great Valley Solar I, PCC1 0 0 0 0 0 0 0 249,000 290,000 289,000 288,000 287,000 287,000 286,000 285,000 284,000 283,000 282,000NA 2016 Desert Harvest, LLC, PCC1 0 0 0 0 0 0 0 0 0 10,000 261,597 260,289 258,981 257,673 256,365 255,057 253,749 252,441NA 2016 Little Bear Solar 1, LLC, PCC 1 0 0 0 0 0 0 0 0 0 27,000 110,000 109,000 108,000 108,000 107,000 107,000 106,000 106,000NA 2016 Little Bear Solar 3, LLC, PCC 1 0 0 0 0 0 0 0 0 0 13,688 54,476 54,202 53,928 53,655 53,381 53,107 52,833 52,560NA 2016 Little Bear Solar 4, LLC, PCC 1 0 0 0 0 0 0 0 0 0 34,000 136,190 135,505 134,821 134,137 133,452 132,768 132,084 131,399NA 2016 Little Bear Solar 5, LLC, PCC 1 0 0 0 0 0 0 0 0 0 34,219 136,190 135,505 134,821 134,137 133,452 132,768 132,084 131,399NA 2016 Antelope Expansion 2, LLC, PCC 1 0 0 0 0 0 0 0 0 312,698 311,134 309,579 308,031 306,490 304,958 303,433 301,916 300,406 298,904NA 2016 Voyager Wind II, LLC, PCC 1 0 0 0 0 0 0 0 0 138,000 138,000 138,000 138,000 138,000 138,000 138,000 138,000 138,000 138,000
NA 2016 TGP Energy Management, LLC, PCC 1 0 0 0 0 0 0 0 300,000 300,000 300,000 300,000 300,000 0 0 0 0 0 0NA 2016 Los Banos Wind, LLC, PCC 1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2011 Cottonwood Solar -‐ Marin Carport (PCC1, Long-‐Term, Local) 0 0 0 0 0 0 1,220 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600
NA 2017 Exelon Generation Company (PCC1, ST SALE) 0 0 0 0 0 0 -‐150,000 0 0 0 0 0 0 0 0 0 0 0
Annual RPS Compliance Report: Contract DetailsData Reported by: Input RequiredMarin Clean Energy (MCE) Actual DataAugust 31, 2018 Forecasted Data
2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name 51,525 166,522 364,363 646,619 866,365 1,160,620 1,749,254 2,883,761 2,018,119 1,924,261 2,483,253 2,476,753 2,171,262 2,136,681 2,130,204 2,054,737 1,960,277 1,954,624
NA 2017 Lancaster Choice Energy (PCC1, ST SALE) 0 0 0 0 0 0 -‐11,000 0 0 0 0 0 0 0 0 0 0 0
NA 2017 Apple Valley Choice Energy (PCC1, ST SALE) 0 0 0 0 0 0 -‐15,000 0 0 0 0 0 0 0 0 0 0 0
NA 2017 Portland General Electric Company (PCC2, ST) 0 0 0 0 0 0 30,000 0 0 0 0 0 0 0 0 0 0 0
NA 2017 PowerEx April-‐Dec 2018_PCC1 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 0 0 0
NA 2017 PowerEx Jan-‐Dec 2018_PCC2 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 0 0 0
NA 2017 PowerEX Jan-‐Dec 2019_PCC2 0 0 0 0 0 0 0 0 75,000 0 0 0 0 0 0 0 0 0
NA 2017 PowerEx Jan2019-‐Dec 2020_PCC1 0 0 0 0 0 0 0 0 50,000 25,000 0 0 0 0 0 0 0 0
NA 2017 Morgan Stanley Apr 2018-‐Dec 2020_PCC1 0 0 0 0 0 0 0 75,000 75,000 75,000 0 0 0 0 0 0 0 0
NA 2017 NextEra Apr-‐Dec 2018_PCC1 0 0 0 0 0 0 0 27,000 0 0 0 0 0 0 0 0 0 0NA 2017 Energy Finance Associates (Dec 2018-‐Dec 2028_PCC1, Marin HQ)0 0 0 0 0 0 0 200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,000
NA 2017 NextEra Jan 2019 -‐ Dec 2023_PCC1 0 0 0 0 0 0 0 0 29,100 29,100 29,100 29,100 29,100 0 0 0 0 0
NA 2018 ConEd (Lost Hills) May 2018-‐Dec 2019_PCC1 0 0 0 0 0 0 0 37,000 50,000 0 0 0 0 0 0 0 0 0
NA 2018 SVP Apr-‐Dec2018_PCC1 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 0 0 0
NA 2018 Portland General Electric Jan-‐Dec2018_PCC2 0 0 0 0 0 0 0 150,000 0 0 0 0 0 0 0 0 0 0
NA 2018 Portland General Electric Jan-‐Dec2018_PCC2_2 0 0 0 0 0 0 0 150,000 0 0 0 0 0 0 0 0 0 0
NA 2017 Xcel Jan-‐Dec 2018_PCC2 0 0 0 0 0 0 0 250,000 0 0 0 0 0 0 0 0 0 0
NA 2018 Xcel Jan-‐Dec 2018_PCC2_2 0 0 0 0 0 0 0 50,000 0 0 0 0 0 0 0 0 0 0NA 2018 Oakley RV & Boat Storage July 2018-‐July 2038_PCC1 0 0 0 0 0 0 0 761 1,521 1,521 1,521 1,521 1,521 1,521 1,521 1,521 1,521 1,521NA 2018 BayWa Strauss Wind Project April 2020-‐April 2035_PCC1 0 0 0 0 0 0 0 0 0 221,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000
NA 2018 STX P-‐STX_PCC3 (2018) 0 0 0 0 0 0 0 36,000 0 0 0 0 0 0 0 0 0 0
NA 2018 3Phases Jul-‐Dec2018_PCC1 0 0 0 0 0 0 0 115,000 0 0 0 0 0 0 0 0 0 0
Annual RPS Compliance Report: Contract DetailsData Reported by:Marin Clean Energy (MCE)August 31, 2018
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Columbia Ridge Landfill Gas units 1-‐8 (60994A)
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Nine Canyon Wind (60803A)
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Sierra Pacific Burlington (60596A)
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Eurus Combine Hills II LLC (60928A)NA 2010 G2 Energy Hay Road LLC -‐ Hay Road Landfill (Solano County, 61205C)NA 2010 G2 Energy Ostrom Road LLC -‐ Ostrom Road Landfill (Yuba County, 61206A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ CEC-‐Certified High Desert (61409A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ Big Horn Wind (60776A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ Nine Canyon Wind (60803A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 1 Eligible (Portfolio)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 1 Eligible: Cabazon Wind Partners (60736A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 1 Eligible: Roosevelt Biogas -‐ LFG Phase 2, Engines 7-‐9 (60974A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible (Portfolio)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible: Juniper Canyon (61202A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible: Leaning Juniper II (61200A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible: White Creek Wind 1 (60721A)NA 2011 Cottonwood Solar, LLC (Goose Lake and Corcoran generating facilities)NA 2011 Rio Solar 1, LLC
NA 2012 Shell Energy North America, MEA Phase 2B -‐ PCC1, LFG Phase II Roosevelt Biogas -‐ LFG Phase 2, Engines 7-‐9 (60974A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ White Creek Wind 1 (60721A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ Tulloch Powerhouse (60071A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ Beardsley Powerhouse (60072A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ RPS Category 1 Eligible (Portfolio)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ RPS Category 1 Eligible: Cabazon Wind Partners (60736A)
NA 2012 Shell Energy North America, MEA Phase 2B, RPS Category 2 Eligible -‐ Juniper Canyon (61202A)
NA 2012 Shell Energy North America, MEA Phase 2B, RPS Category 2 Eligible -‐ Leaning Juniper II (61200A)NA 2012 GenPower, LLC (Lincoln Landfill Power Plant, Units 1-‐6; 61632A)NA 2012 RE Kansas (Recurrent)
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 1 Eligible (Portfolio)
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 2 Eligible (Portfolio)
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 2 Eligible: Leaning Juniper II (61200A)
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 2 Eligible: Juniper Canyon (61202A)NA 2012 Middle Fork Irrigation District (61383A)
2029 2030
1,947,180 1,941,743
0 0 executed -‐ no approval neededonline Landfill Gas PCC 0 Short-‐term 5 Bundled Arlington Oregon
0 0 executed -‐ no approval neededonline Wind PCC 0 Short-‐term 5 Bundled Kennewick Washington
0 0 executed -‐ no approval neededonline Biomass PCC 0 Short-‐term 5 Bundled Mt. Vernon Washington
0 0 executed -‐ no approval neededonline Wind PCC 0 Short-‐term 5 Bundled Milton-‐Freewater Oregon11,000 11,000 executed -‐ no approval neededonline Landfill Gas PCC 1 Long-‐term 20 Bundled Vacaville California12,000 12,000 executed -‐ no approval neededonline Landfill Gas PCC 1 Long-‐term 18 Bundled Wheatland California
0 0 executed -‐ no approval neededonlineBiomethane: Digester gas PCC 1 Short-‐term 4 Bundled Victorville California
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 4 Bundled Bickleton Washington
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 4 Bundled Highland Washington
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term 4 Bundled Various Various
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term 4 Bundled Cabazon California
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term 4 Bundled Roosevelt Washington
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 4 Bundled Various Out of State
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 4 Bundled Bickleton Washington
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 4 Bundled Arlington Oregon
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 4 Bundled Roosevelt Washington62,400 62,400 executed -‐ no approval neededonline Solar PV PCC 1 Long-‐term 20+ Bundled Various California
0 0 contract terminatedn/a -‐ contract terminatedSolar PV PCC 1 Long-‐term Bundled Bakersfield California
0 0 executed -‐ no approval neededonline Landfill Gas PCC 1 Short-‐term 3 Bundled Roosevelt Washington
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term 3 Bundled Roosevelt Washington
0 0 executed -‐ no approval neededonline Small Hydro PCC 1 Short-‐term 3 Bundled Knights Ferry California
0 0 executed -‐ no approval neededonline Small Hydro PCC 1 Short-‐term 3 Bundled Strawberry California
0 0 executed -‐ no approval neededonline Landfill Gas PCC 1 Short-‐term 3 Bundled Various Various
0 0 executed -‐ no approval neededonline Landfill Gas PCC 1 Short-‐term 3 Bundled Cabazon California
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 3 Bundled Bickleton Washington
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 3 Bundled Arlington Oregon27,000 27,000 executed -‐ no approval neededonline Landfill Gas PCC 1 Long-‐term 20 Bundled Lincoln California
0 0 executed -‐ no approval neededonline Solar PV PCC 1 Short-‐term 3 Bundled Stratford California
0 0 executed -‐ no approval neededonline Landfill Gas PCC 1 Short-‐term 3 Bundled Various Various
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 3 Bundled Various Out of State
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 3 Bundled Arlington Oregon
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 3 Bundled Bickleton Washington0 0 executed -‐ no approval neededonline Small Hydro PCC 3 Short-‐term 2 Unbundled Parkdale Oregon
Contract Lenth (Years)
Bundled/ Unbundled Facility Location (City) Facility Location (State)Contract Status Facility Status Resource Type Expected PCC Classification Contract Length
Annual RPS Compliance Report: Contract DetailsData Reported by:Marin Clean Energy (MCE)August 31, 2018
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name
NA 2012 OneEnergy -‐ RPS Confirm #1 -‐ Total Energy Facility (TEF-‐GEN 1; 60633A)NA 2012 OneEnergy -‐ RPS Confirm #1 -‐ Puente Hills Gas-‐to-‐Energy Facility Phase II Gen3 (60632A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Birch Creek Power (61378A)
NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Double A Dairy Digester (61221A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Dry Creek Project (61381A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Falls Creek Hydro (61375A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Glenrock III (60804A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Goodnoe Hills (60819A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ High Plains (60899A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Marsh Valley Project (61380A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Mountain Air Wind Project (62314A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Nine Canyon Phase 3 (60803A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Pilgrim Stage Station Wind Park (60923A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Rolling Hills (60806A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Thousand Springs Wind Park (60925A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Tuana Gulch Wind Park (60924A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Wolverine Creek (60564A)NA 2012 San Rafael Airport Solar Partners, LLC (MCE FIT, 62237A), PCC1NA 2013 Calpine Geysers -‐ Short Term: Calpine Geothermal Unit #17 (60007A)
NA 2014 Calpine Geysers -‐ Short Term #2: Calpine Geothermal Unit #18 (60008A)NA 2013 Calpine Geysers -‐ Long Term
NA 2014 Exelon Generation Company, LLC -‐ Short Term PCC2b
NA 2014 Exelon Generation Company, LLC -‐ Short Term PCC2a: Alta 10 (62244A)NA 2014 OneEnergy -‐ RPS Confirm #3NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Campbell Hill -‐ Three Buttes (61017A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Campbell Hill -‐ Dunlap 1 (61188A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Glenrock I (60805A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Glenrock III (60804A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Golden Valley Wind Park (60917A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Goodnoe Hills (60819A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Hay Canyon (60724A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ High Plains (60899A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Klondike Wind Power III LLC (60602A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Marengo (60729A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Marengo 2 (60730A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ McFadden Ridge (60896A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Milner Dam Wind Park (60919A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Mountain Air Wind Project (62314A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Palouse Wind (62288A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Rolling Hills (60806A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Seven Mile Hill 1 (60807A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Seven Mile Hill 2 (60808A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Top of the World (61199A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Wild Horse (60746A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Wolverine Creek (60564A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Yahoo Creek Wind Park (60926A)NA 2014 Puget Sound Energy -‐ RPS Eligible, Short-‐Term Bucket 3: Wild Horse (60746A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Hopkins Ridge (60745A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Lower Snake River (62044A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ RPS Category 2 Eligible (Portfolio)NA 2014 RE Mustang 4 LLCNA 2014 Rising Tree Wind Farm III, LLC, PCC1NA 2014 Cooley-‐Quarry 1 (MCE FIT), PCC1NA 2015 East Bay Municipal Utility District (Pardee, 60536A and Comanche Reservoirs, 60535A)
2029 2030
1,947,180 1,941,743
Contract Lenth (Years)
Bundled/ Unbundled Facility Location (City) Facility Location (State)Contract Status Facility Status Resource Type Expected PCC Classification Contract Length
0 0 executed -‐ no approval neededonlineBiomethane: Digester gas PCC 3 Short-‐term 2 Unbundled Carson California
0 0 executed -‐ no approval neededonline Landfill Gas PCC 3 Short-‐term 2 Unbundled City of Industry California0 0 executed -‐ no approval neededonline Small Hydro PCC 3 Short-‐term 2 Unbundled Monteview Idaho
0 0 executed -‐ no approval neededonlineBiomethane: Digester gas PCC 3 Short-‐term 2 Unbundled Jerome Idaho
0 0 executed -‐ no approval neededonline Small Hydro PCC 3 Short-‐term 2 Unbundled Howe Idaho0 0 executed -‐ no approval neededonline Small Hydro PCC 3 Short-‐term 2 Unbundled Outside Cascadia Oregon0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 1 Unbundled Glenrock Wyoming0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 1 Unbundled Goldendale Washington0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 1 Unbundled Rock River Wyoming0 0 executed -‐ no approval neededonline Small Hydro PCC 3 Short-‐term 2 Unbundled McCammon Idaho0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 1 Unbundled Glenns Ferry Idaho0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 1 Unbundled Kennewick Washington0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 2 Unbundled Hagerman Idaho0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 1 Unbundled Glenrock Wyoming0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 2 Unbundled Hagerman Idaho0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 2 Unbundled Hagerman Idaho0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 1 Unbundled Bingham County Idaho
1,650 1,650 executed -‐ no approval neededonline Solar PV PCC 1 Long-‐term 20 Bundled San Rafael California0 0 executed -‐ no approval neededonline Geothermal PCC 1 Short-‐term 1 Bundled Middletown California
0 0 executed -‐ no approval neededonline Geothermal PCC 1 Short-‐term Less than 1 Bundled Middletown California0 0 executed -‐ no approval neededonline Geothermal PCC 1 Long-‐term 10 Bundled Middletown California
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term Less than 1 Bundled Various Washington
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term Less than 1 Bundled Mojave California0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Various Various0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Glenrock Wyoming0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Medicine Bow Wyoming0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Glenrock Wyoming0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Glenrock Wyoming0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Burley Idaho0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Goldendale Washington0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Moro Oregon0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Rock River Wyoming0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Wasco Oregon0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Dayton Washington0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Dayton Washington0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Rock River Wyoming0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Burley Idaho0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Glenns Ferry Idaho0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Oakesdale Washington0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Glenrock Wyoming0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Medicine Bow Wyoming0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Medicine Bow Wyoming0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Glenrock Wyoming0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Ellensburg Washington0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Bingham County Idaho0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Hagerman Idaho0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term Less than 1 Unbundled Ellensburg Washington0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Dayton Washington0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Pomeroy Washington
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 3 Bundled Various Various86,000 86,000 executed -‐ no approval neededonline Solar PV PCC 1 Long-‐term 15 Bundled Lemoore California
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term 4 Bundled Mojave California1,800 1,800 executed -‐ no approval neededonline Solar PV PCC 1 Long-‐term 20 Bundled Novato California0 0 executed -‐ no approval neededonline Small Hydro PCC 1 Long-‐term 10 Bundled Valley Springs (Pardee) and Clements (Camanche)California
Annual RPS Compliance Report: Contract DetailsData Reported by:Marin Clean Energy (MCE)August 31, 2018
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name
NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Wild Horse Phase II (60746A)
NA 2015 Calpine Geysers -‐ Short Term #3: GeothermalNA 2015 Cedar Creek RECs, LLC -‐ RPS Category 3 Eligible
NA 2015 Direct Energy -‐ RPS Category 1 Eligible (Portfolio, small hydro)
NA 2014 WM Renewable Energy, L.L.C. (Redwood Landfill)NA 2017 MCE SolarOne, PCC1 (sPower, 2 facilities -‐ 2.0 MW + 8.5 MW)NA 2015 Cooley-‐Quarry 2 (MCE FIT), PCC1NA 2015 Cost-‐Plus (MCE FIT), PCC1NA 2016 Avangrid Renewables, LLC (Shiloh I Wind Project)
NA 2016 Parrey, LLC (61841C)
NA 2016 3Phases, PCC2 (Cedar Creek Wind Energy, 60822A; and Cedar Creek II, 61384A) -‐ Confirmation #2
NA 2016 Portland General Electric Company, PCC2 (Portfolio Supply Agreement)NA 2016 Los Angeles County, Sanitation District No. 2, PCC3 -‐ Confirmation #1NA 2016 Los Angeles County, Sanitation District No. 2, PCC3 -‐ Confirmation #2
NA 2016 Powerex, PCC2 (Portfolio Supply Agreement)
NA 2016 Powerex, PCC1 (Portfolio Supply Agreement)
NA 2016 3Phases, PCC2 (Cedar Creek Wind Energy, 60822A; and Cedar Creek II, 61384A) -‐ Confirmation #3
NA 2015 3Phases, PCC2 (Cedar Creek Wind Energy, 60822A; and Cedar Creek II, 61384A) -‐ Confirmation #1NA 2015 Rising Tree Wind Farm, PCC3NA 2015 3Degrees, PCC3
NA 2011 Western Area Power Administration
NA 2016 City of Santa Clara, Silicon Valley Power, PCC1NA 2015 Northshore Solar Partners LLC (Freethy #1, MCE FIT), PCC1NA 2015 Northshore Solar Partners LLC (Freethy #2, MCE FIT), PCC1
NA 2016 3Phases, PCC2 (Portfolio Supply Agreement)
NA 2016 3Phases, PCC2 (Portfolio Supply Agreement)
NA 2017 3Phases, PCC2 (Portfolio Supply Agreement)
NA 2016 Powerex, PCC2 (Portfolio Supply Agreement)
NA 2016 NextEra Energy Power Marketing, LLC, PCC1 (Blythe Solar, various units)NA 2016 Great Valley Solar I, PCC1NA 2016 Desert Harvest, LLC, PCC1NA 2016 Little Bear Solar 1, LLC, PCC 1NA 2016 Little Bear Solar 3, LLC, PCC 1NA 2016 Little Bear Solar 4, LLC, PCC 1NA 2016 Little Bear Solar 5, LLC, PCC 1NA 2016 Antelope Expansion 2, LLC, PCC 1NA 2016 Voyager Wind II, LLC, PCC 1
NA 2016 TGP Energy Management, LLC, PCC 1NA 2016 Los Banos Wind, LLC, PCC 1NA 2011 Cottonwood Solar -‐ Marin Carport (PCC1, Long-‐Term, Local)
NA 2017 Exelon Generation Company (PCC1, ST SALE)
2029 2030
1,947,180 1,941,743
Contract Lenth (Years)
Bundled/ Unbundled Facility Location (City) Facility Location (State)Contract Status Facility Status Resource Type Expected PCC Classification Contract Length
0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 3 Unbundled Ellensburg Washington
0 0 executed -‐ no approval neededonline Geothermal PCC 1 Short-‐term Less than 1 Bundled Middletown California0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 1 Unbundled Various In WECC
0 0 executed -‐ no approval neededonline Small Hydro PCC 1 Short-‐term Less than 1 Bundled Various California
30,000 30,000 executed -‐ no approval neededonlineBiomethane: Landfill gas PCC 1 Long-‐term 20 Bundled Novato California
21,000 21,000 executed -‐ no approval neededonline Solar PV PCC 1 Long-‐term 20 Bundled Richmond California900 900 executed -‐ no approval neededunder development -‐ on scheduleSolar PV PCC 1 Long-‐term 20 Bundled Novato California450 450 executed -‐ no approval neededonline Solar PV PCC 1 Long-‐term 20 Bundled Larkspur California0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term 3 Bundled Rio Vista California
0 0 executed -‐ no approval neededonline Solar PV PCC 1 Short-‐term Less than 1 Bundled Lemoore California
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term Less than 1 Bundled Grover and New Raymer Colorado
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term Less than 1 Bundled Various Oregon and Washington0 0 executed -‐ no approval neededonline Digester Gas PCC 3 Short-‐term Less than 1 Unbundled Various California0 0 executed -‐ no approval neededonline Digester Gas PCC 3 Short-‐term 1 Unbundled Various California
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 3 Bundled Various Various
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term 1 Bundled Various Various
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term Less than 1 Bundled Grover and New Raymer Colorado
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term Less than 1 Bundled Grover and New Raymer Colorado0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 1 Unbundled Mojave California0 0 executed -‐ no approval neededonline Wind PCC 3 Short-‐term 1 Unbundled Various Oregon and Idaho
0 0 executed -‐ no approval neededonline Small Hydro PCC 1 Short-‐term 5 Bundled Various California
0 0 executed -‐ no approval neededonline Geothermal PCC 1 Short-‐term 1 Bundled Various California1,800 1,800 executed -‐ no approval neededonline Solar PV PCC 1 Long-‐term 20 Bundled Richmond California1,800 1,800 executed -‐ no approval neededonline Solar PV PCC 1 Long-‐term 20 Bundled Richmond California
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 1 bundled Grover and New Raymer Colorado
0 0 executed -‐ no approval neededonline Geothermal PCC 2 Short-‐term 1 bundled Union and Vale Oregon
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 2 bundled TBD -‐ Portfolio Supply TBD -‐ Portfolio Supply
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 1 Bundled TBD -‐ Portfolio Supply TBD -‐ Portfolio Supply
0 0 executed -‐ no approval neededonline Solar PV PCC 1 Short-‐term 1 Bundled Blythe California281,000 280,000 executed -‐ no approval neededonline Solar PV PCC 1 Long-‐term 15 Bundled Fresno (County) California251,133 249,825 executed -‐ no approval neededunder development -‐ on scheduleSolar PV PCC 1 Long-‐term 20 Bundled Riverside (County) California105,000 105,000 executed -‐ no approval neededunder development -‐ on scheduleSolar PV PCC 1 Long-‐term 20 Bundled Mendota California52,286 52,012 executed -‐ no approval neededunder development -‐ on scheduleSolar PV PCC 1 Long-‐term 20 Bundled Mendota California130,715 130,031 executed -‐ no approval neededunder development -‐ on scheduleSolar PV PCC 1 Long-‐term 20 Bundled Mendota California130,715 130,031 executed -‐ no approval neededunder development -‐ on scheduleSolar PV PCC 1 Long-‐term 20 Bundled Mendota California297,410 295,923 executed -‐ no approval neededunder development -‐ on scheduleSolar PV PCC 1 Long-‐term 20 Bundled Lancaster California138,000 138,000 executed -‐ no approval neededunder development -‐ on scheduleWind PCC 1 Long-‐term 12 Bundled Mojave California
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term 5 Bundled Various California0 0 Contract terminatedN/A -‐ contract terminatedWind PCC 1 Long-‐term 12 Bundled Los Banos California
1,600 1,600 executed -‐ no approval neededonline Solar PV PCC 1 Long-‐term Bundled Novato California
0 0 executed -‐ no approval neededonline Solar PV PCC 1 Short-‐term Less than 1 Bundled Various Various
Annual RPS Compliance Report: Contract DetailsData Reported by:Marin Clean Energy (MCE)August 31, 2018
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name
NA 2017 Lancaster Choice Energy (PCC1, ST SALE)
NA 2017 Apple Valley Choice Energy (PCC1, ST SALE)
NA 2017 Portland General Electric Company (PCC2, ST)
NA 2017 PowerEx April-‐Dec 2018_PCC1
NA 2017 PowerEx Jan-‐Dec 2018_PCC2
NA 2017 PowerEX Jan-‐Dec 2019_PCC2
NA 2017 PowerEx Jan2019-‐Dec 2020_PCC1
NA 2017 Morgan Stanley Apr 2018-‐Dec 2020_PCC1
NA 2017 NextEra Apr-‐Dec 2018_PCC1NA 2017 Energy Finance Associates (Dec 2018-‐Dec 2028_PCC1, Marin HQ)
NA 2017 NextEra Jan 2019 -‐ Dec 2023_PCC1
NA 2018 ConEd (Lost Hills) May 2018-‐Dec 2019_PCC1
NA 2018 SVP Apr-‐Dec2018_PCC1
NA 2018 Portland General Electric Jan-‐Dec2018_PCC2
NA 2018 Portland General Electric Jan-‐Dec2018_PCC2_2
NA 2017 Xcel Jan-‐Dec 2018_PCC2
NA 2018 Xcel Jan-‐Dec 2018_PCC2_2NA 2018 Oakley RV & Boat Storage July 2018-‐July 2038_PCC1NA 2018 BayWa Strauss Wind Project April 2020-‐April 2035_PCC1
NA 2018 STX P-‐STX_PCC3 (2018)
NA 2018 3Phases Jul-‐Dec2018_PCC1
2029 2030
1,947,180 1,941,743
Contract Lenth (Years)
Bundled/ Unbundled Facility Location (City) Facility Location (State)Contract Status Facility Status Resource Type Expected PCC Classification Contract Length
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term Less than 1 Bundled Mojave California
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term Less than 1 Bundled Mojave California
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term Less than 1 Bundled Shermain, OR; Columbia, WAOR; WA
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term Less than 1 Bundled Multiple BC, Canada
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 1 Bundled Multiple U.S. and BC, Canada
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 1 Bundled Multiple U.S. and BC, Canada
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term 2 Bundled Multiple BC, Canada
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term 3 Bundled TBD -‐ Portfolio Supply California, Oregon
0 0 executed -‐ no approval neededonline Solar PV PCC 1 Short-‐term Less than 1 Bundled Blythe California0 0 executed -‐ no approval neededUnder development -‐ on scheduleSolar PV PCC 1 Long-‐term 10 Bundled San Rafael California
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term 5 Bundled TBD -‐ Portfolio Supply California
0 0 executed -‐ no approval neededonline Solar PV PCC 1 Short-‐term 2 Bundled TBD -‐ Portfolio Supply California
0 0 executed -‐ no approval neededonline Geothermal PCC 1 Short-‐term Less than 1 Bundled Sonoma/Lake Counties California
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term Less than 1 Bundled Shermain, OR; Columbia, WAOR; WA
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term Less than 1 Bundled Shermain, OR; Columbia, WAOR; WA
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 1 Bundled Various Cities Colorado
0 0 executed -‐ no approval neededonline Wind PCC 2 Short-‐term 1 Bundled TBD -‐ Portfolio Supply TBD -‐ Portfolio Supply1,521 1,521 executed -‐ no approval neededonline Solar PV PCC 1 Long-‐term 20 Bundled Oakley California300,000 300,000 executed -‐ no approval neededUnder development -‐ on scheduleWind PCC 1 Long-‐term 15 Bundled Santa Barbara County California
0 0 executed -‐ no approval neededonline Biomass PCC 3 Short-‐term Less than 1 Unbundled TBD -‐ Portfolio Supply California
0 0 executed -‐ no approval neededonline Wind PCC 1 Short-‐term Less than 1 Bundled TBD -‐ Portfolio Supply TBD -‐ Portfolio Supply
Annual RPS Compliance Report: Contract DetailsData Reported by:Marin Clean Energy (MCE)August 31, 2018
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Columbia Ridge Landfill Gas units 1-‐8 (60994A)
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Nine Canyon Wind (60803A)
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Sierra Pacific Burlington (60596A)
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Eurus Combine Hills II LLC (60928A)NA 2010 G2 Energy Hay Road LLC -‐ Hay Road Landfill (Solano County, 61205C)NA 2010 G2 Energy Ostrom Road LLC -‐ Ostrom Road Landfill (Yuba County, 61206A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ CEC-‐Certified High Desert (61409A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ Big Horn Wind (60776A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ Nine Canyon Wind (60803A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 1 Eligible (Portfolio)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 1 Eligible: Cabazon Wind Partners (60736A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 1 Eligible: Roosevelt Biogas -‐ LFG Phase 2, Engines 7-‐9 (60974A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible (Portfolio)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible: Juniper Canyon (61202A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible: Leaning Juniper II (61200A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible: White Creek Wind 1 (60721A)NA 2011 Cottonwood Solar, LLC (Goose Lake and Corcoran generating facilities)NA 2011 Rio Solar 1, LLC
NA 2012 Shell Energy North America, MEA Phase 2B -‐ PCC1, LFG Phase II Roosevelt Biogas -‐ LFG Phase 2, Engines 7-‐9 (60974A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ White Creek Wind 1 (60721A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ Tulloch Powerhouse (60071A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ Beardsley Powerhouse (60072A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ RPS Category 1 Eligible (Portfolio)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ RPS Category 1 Eligible: Cabazon Wind Partners (60736A)
NA 2012 Shell Energy North America, MEA Phase 2B, RPS Category 2 Eligible -‐ Juniper Canyon (61202A)
NA 2012 Shell Energy North America, MEA Phase 2B, RPS Category 2 Eligible -‐ Leaning Juniper II (61200A)NA 2012 GenPower, LLC (Lincoln Landfill Power Plant, Units 1-‐6; 61632A)NA 2012 RE Kansas (Recurrent)
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 1 Eligible (Portfolio)
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 2 Eligible (Portfolio)
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 2 Eligible: Leaning Juniper II (61200A)
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 2 Eligible: Juniper Canyon (61202A)NA 2012 Middle Fork Irrigation District (61383A)
03/18/10 05/07/10 06/05/15
03/18/10 05/07/10 06/05/15
03/18/10 05/07/10 06/05/15
03/18/10 05/07/10 06/05/1512/03/10 7/4/13 06/28/13 06/27/3312/03/10 8/24/13 09/11/13 09/10/31
05/17/11 05/17/11 06/05/15
05/17/11 05/17/11 06/05/15
05/17/11 05/17/11 06/05/15
05/17/11 05/17/11 06/05/15
05/17/11 05/17/11 06/05/15
05/17/11 05/17/11 06/05/15
05/17/11 05/17/11 06/05/15
05/17/11 05/17/11 06/05/15
05/17/11 05/17/11 06/05/15
05/17/11 05/17/11 06/05/1507/08/11 5/22/15 05/23/15 05/22/4011/09/11
02/02/12 02/02/12 06/05/15
02/02/12 02/02/12 06/05/15
02/02/12 02/02/12 06/05/15
02/02/12 02/02/12 06/05/15
02/02/12 02/02/12 06/05/15
02/02/12 02/02/12 06/05/15
02/02/12 02/02/12 06/05/15
02/02/12 02/02/12 06/05/1507/10/12 2/28/08 02/01/13 01/31/3308/03/12 12/18/14 12/26/14 12/31/17
10/10/12 10/10/12 12/31/16
10/10/12 10/10/12 12/31/16
10/10/12 10/10/12 12/31/16
10/10/12 10/10/12 12/31/1604/06/12 3/1/86 07/01/11 03/31/14
Commercial Online Date (COD) Delivery Term -‐ Start Date Delivery Term -‐ End DateDate of Most Recent Contract
AmendmentContract Execution Date Date of Most Recent Contract Extension
Annual RPS Compliance Report: Contract DetailsData Reported by:Marin Clean Energy (MCE)August 31, 2018
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name
NA 2012 OneEnergy -‐ RPS Confirm #1 -‐ Total Energy Facility (TEF-‐GEN 1; 60633A)NA 2012 OneEnergy -‐ RPS Confirm #1 -‐ Puente Hills Gas-‐to-‐Energy Facility Phase II Gen3 (60632A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Birch Creek Power (61378A)
NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Double A Dairy Digester (61221A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Dry Creek Project (61381A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Falls Creek Hydro (61375A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Glenrock III (60804A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Goodnoe Hills (60819A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ High Plains (60899A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Marsh Valley Project (61380A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Mountain Air Wind Project (62314A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Nine Canyon Phase 3 (60803A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Pilgrim Stage Station Wind Park (60923A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Rolling Hills (60806A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Thousand Springs Wind Park (60925A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Tuana Gulch Wind Park (60924A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Wolverine Creek (60564A)NA 2012 San Rafael Airport Solar Partners, LLC (MCE FIT, 62237A), PCC1NA 2013 Calpine Geysers -‐ Short Term: Calpine Geothermal Unit #17 (60007A)
NA 2014 Calpine Geysers -‐ Short Term #2: Calpine Geothermal Unit #18 (60008A)NA 2013 Calpine Geysers -‐ Long Term
NA 2014 Exelon Generation Company, LLC -‐ Short Term PCC2b
NA 2014 Exelon Generation Company, LLC -‐ Short Term PCC2a: Alta 10 (62244A)NA 2014 OneEnergy -‐ RPS Confirm #3NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Campbell Hill -‐ Three Buttes (61017A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Campbell Hill -‐ Dunlap 1 (61188A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Glenrock I (60805A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Glenrock III (60804A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Golden Valley Wind Park (60917A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Goodnoe Hills (60819A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Hay Canyon (60724A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ High Plains (60899A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Klondike Wind Power III LLC (60602A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Marengo (60729A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Marengo 2 (60730A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ McFadden Ridge (60896A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Milner Dam Wind Park (60919A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Mountain Air Wind Project (62314A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Palouse Wind (62288A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Rolling Hills (60806A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Seven Mile Hill 1 (60807A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Seven Mile Hill 2 (60808A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Top of the World (61199A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Wild Horse (60746A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Wolverine Creek (60564A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Yahoo Creek Wind Park (60926A)NA 2014 Puget Sound Energy -‐ RPS Eligible, Short-‐Term Bucket 3: Wild Horse (60746A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Hopkins Ridge (60745A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Lower Snake River (62044A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ RPS Category 2 Eligible (Portfolio)NA 2014 RE Mustang 4 LLCNA 2014 Rising Tree Wind Farm III, LLC, PCC1NA 2014 Cooley-‐Quarry 1 (MCE FIT), PCC1NA 2015 East Bay Municipal Utility District (Pardee, 60536A and Comanche Reservoirs, 60535A)
Commercial Online Date (COD) Delivery Term -‐ Start Date Delivery Term -‐ End DateDate of Most Recent Contract
AmendmentContract Execution Date Date of Most Recent Contract Extension
04/06/12 07/01/11 03/31/1404/06/12 07/01/11 03/31/1404/06/12 07/01/11 03/31/14
04/06/12 07/01/11 03/31/1404/06/12 07/01/11 03/31/1404/06/12 07/01/11 03/31/1412/13/13 01/01/13 12/31/1312/13/13 01/01/13 12/31/1312/13/13 01/01/13 12/31/1304/06/12 07/01/11 03/31/1412/13/13 01/01/13 12/31/1312/13/13 01/01/13 12/31/1304/06/12 07/01/11 03/31/1412/13/13 01/01/13 12/31/1304/06/12 07/01/11 03/31/1404/06/12 07/01/11 03/31/1412/13/13 01/01/13 12/31/1305/08/12 11/01/12 10/31/3207/11/13 01/01/14 12/31/14
04/29/14 04/29/14 12/31/1407/11/13 01/01/17 12/31/26
06/10/14 07/01/15 12/31/15
06/10/14 07/01/14 12/31/1404/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1611/06/14 01/01/14 06/30/1404/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/16
02/02/12 02/02/12 06/05/1510/03/14 6/2/16 06/02/16 06/01/3109/05/14 6/25/15 07/01/15 12/31/1810/07/14 7/3/17 07/03/17 07/02/3706/22/15 7/4/30 07/01/15 06/30/24
Annual RPS Compliance Report: Contract DetailsData Reported by:Marin Clean Energy (MCE)August 31, 2018
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name
NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Wild Horse Phase II (60746A)
NA 2015 Calpine Geysers -‐ Short Term #3: GeothermalNA 2015 Cedar Creek RECs, LLC -‐ RPS Category 3 Eligible
NA 2015 Direct Energy -‐ RPS Category 1 Eligible (Portfolio, small hydro)
NA 2014 WM Renewable Energy, L.L.C. (Redwood Landfill)NA 2017 MCE SolarOne, PCC1 (sPower, 2 facilities -‐ 2.0 MW + 8.5 MW)NA 2015 Cooley-‐Quarry 2 (MCE FIT), PCC1NA 2015 Cost-‐Plus (MCE FIT), PCC1NA 2016 Avangrid Renewables, LLC (Shiloh I Wind Project)
NA 2016 Parrey, LLC (61841C)
NA 2016 3Phases, PCC2 (Cedar Creek Wind Energy, 60822A; and Cedar Creek II, 61384A) -‐ Confirmation #2
NA 2016 Portland General Electric Company, PCC2 (Portfolio Supply Agreement)NA 2016 Los Angeles County, Sanitation District No. 2, PCC3 -‐ Confirmation #1NA 2016 Los Angeles County, Sanitation District No. 2, PCC3 -‐ Confirmation #2
NA 2016 Powerex, PCC2 (Portfolio Supply Agreement)
NA 2016 Powerex, PCC1 (Portfolio Supply Agreement)
NA 2016 3Phases, PCC2 (Cedar Creek Wind Energy, 60822A; and Cedar Creek II, 61384A) -‐ Confirmation #3
NA 2015 3Phases, PCC2 (Cedar Creek Wind Energy, 60822A; and Cedar Creek II, 61384A) -‐ Confirmation #1NA 2015 Rising Tree Wind Farm, PCC3NA 2015 3Degrees, PCC3
NA 2011 Western Area Power Administration
NA 2016 City of Santa Clara, Silicon Valley Power, PCC1NA 2015 Northshore Solar Partners LLC (Freethy #1, MCE FIT), PCC1NA 2015 Northshore Solar Partners LLC (Freethy #2, MCE FIT), PCC1
NA 2016 3Phases, PCC2 (Portfolio Supply Agreement)
NA 2016 3Phases, PCC2 (Portfolio Supply Agreement)
NA 2017 3Phases, PCC2 (Portfolio Supply Agreement)
NA 2016 Powerex, PCC2 (Portfolio Supply Agreement)
NA 2016 NextEra Energy Power Marketing, LLC, PCC1 (Blythe Solar, various units)NA 2016 Great Valley Solar I, PCC1NA 2016 Desert Harvest, LLC, PCC1NA 2016 Little Bear Solar 1, LLC, PCC 1NA 2016 Little Bear Solar 3, LLC, PCC 1NA 2016 Little Bear Solar 4, LLC, PCC 1NA 2016 Little Bear Solar 5, LLC, PCC 1NA 2016 Antelope Expansion 2, LLC, PCC 1NA 2016 Voyager Wind II, LLC, PCC 1
NA 2016 TGP Energy Management, LLC, PCC 1NA 2016 Los Banos Wind, LLC, PCC 1NA 2011 Cottonwood Solar -‐ Marin Carport (PCC1, Long-‐Term, Local)
NA 2017 Exelon Generation Company (PCC1, ST SALE)
Commercial Online Date (COD) Delivery Term -‐ Start Date Delivery Term -‐ End DateDate of Most Recent Contract
AmendmentContract Execution Date Date of Most Recent Contract Extension
04/21/14 07/01/13 03/31/16
05/04/15 05/04/15 12/31/1505/27/15 01/01/15 12/31/15
02/27/15 03/01/15 12/31/15
12/16/14 4/27/17 06/01/17 05/31/3605/30/17 12/18/17 12/18/17 12/17/3707/01/1504/16/15 9/1/16 09/01/16 08/31/3504/12/16 5/1/06 06/01/16 12/31/18
07/02/16 07/02/16 12/31/16
06/17/16 07/01/16 12/31/16
06/17/16 06/17/16 12/31/1605/25/16 06/01/16 12/31/1605/25/16 01/01/17 12/31/17
08/04/16 01/01/17 12/31/19
08/04/16 01/01/17 12/31/17
07/21/16 01/01/17 06/30/17
11/20/15 11/20/15 12/31/1512/29/15 01/01/15 12/31/1512/03/15 01/01/15 12/31/15
11/04/11 01/01/15 12/31/19
08/16/16 01/01/17 12/31/1709/04/15 10/6/16 10/06/16 10/05/3509/04/15 10/6/16 10/06/16 10/05/35
10/10/16 01/01/17 12/31/17
10/10/16 01/01/17 12/31/17
06/23/17 01/01/18 12/31/19
11/08/16 01/01/17 12/31/17
10/21/16 01/01/17 12/31/1709/15/16 4/14/18 04/14/18 04/13/3311/18/16 12/01/20 11/30/3909/23/16 09/01/20 08/31/3909/23/16 09/01/20 08/31/3909/23/16 09/01/20 08/31/3909/23/16 09/01/20 08/31/3911/15/16 09/01/18 08/31/3712/05/16 01/01/19 12/31/30
12/05/16 01/01/18 12/31/2212/05/16 01/01/21 12/31/2507/08/11 05/13/16 05/12/41
09/07/17 09/08/17 12/31/17
Annual RPS Compliance Report: Contract DetailsData Reported by:Marin Clean Energy (MCE)August 31, 2018
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name
NA 2017 Lancaster Choice Energy (PCC1, ST SALE)
NA 2017 Apple Valley Choice Energy (PCC1, ST SALE)
NA 2017 Portland General Electric Company (PCC2, ST)
NA 2017 PowerEx April-‐Dec 2018_PCC1
NA 2017 PowerEx Jan-‐Dec 2018_PCC2
NA 2017 PowerEX Jan-‐Dec 2019_PCC2
NA 2017 PowerEx Jan2019-‐Dec 2020_PCC1
NA 2017 Morgan Stanley Apr 2018-‐Dec 2020_PCC1
NA 2017 NextEra Apr-‐Dec 2018_PCC1NA 2017 Energy Finance Associates (Dec 2018-‐Dec 2028_PCC1, Marin HQ)
NA 2017 NextEra Jan 2019 -‐ Dec 2023_PCC1
NA 2018 ConEd (Lost Hills) May 2018-‐Dec 2019_PCC1
NA 2018 SVP Apr-‐Dec2018_PCC1
NA 2018 Portland General Electric Jan-‐Dec2018_PCC2
NA 2018 Portland General Electric Jan-‐Dec2018_PCC2_2
NA 2017 Xcel Jan-‐Dec 2018_PCC2
NA 2018 Xcel Jan-‐Dec 2018_PCC2_2NA 2018 Oakley RV & Boat Storage July 2018-‐July 2038_PCC1NA 2018 BayWa Strauss Wind Project April 2020-‐April 2035_PCC1
NA 2018 STX P-‐STX_PCC3 (2018)
NA 2018 3Phases Jul-‐Dec2018_PCC1
Commercial Online Date (COD) Delivery Term -‐ Start Date Delivery Term -‐ End DateDate of Most Recent Contract
AmendmentContract Execution Date Date of Most Recent Contract Extension
11/08/17 11/08/17 12/31/17
11/08/17 11/08/17 12/31/17
09/01/17 09/01/17 12/31/17
09/15/17 04/01/18 12/31/18
09/18/17 01/01/18 12/31/18
09/18/17 01/01/19 12/31/19
10/13/17 01/01/19 12/31/20
11/14/17 04/01/18 12/31/20
11/08/17 04/01/18 12/31/1802/02/17 12/01/18 12/01/28
11/08/17 01/01/19 12/31/23
03/06/18 05/01/18 12/31/19
02/28/18 04/01/18 12/31/18
01/31/18 01/30/18 12/31/18
01/31/18 01/30/18 12/31/18
10/16/17 01/01/18 12/31/18
01/29/18 01/01/18 12/31/1805/09/18 7/20/18 07/20/18 07/19/3806/01/18 04/01/20 03/31/35
03/18/18 01/01/18 12/31/18
06/29/18 07/01/18 12/31/18
Annual RPS Compliance Report: Contract DetailsData Reported by:Marin Clean Energy (MCE)August 31, 2018
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Columbia Ridge Landfill Gas units 1-‐8 (60994A)
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Nine Canyon Wind (60803A)
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Sierra Pacific Burlington (60596A)
NA 2010 Shell Energy North America, MEA Phase 1 -‐ Eurus Combine Hills II LLC (60928A)NA 2010 G2 Energy Hay Road LLC -‐ Hay Road Landfill (Solano County, 61205C)NA 2010 G2 Energy Ostrom Road LLC -‐ Ostrom Road Landfill (Yuba County, 61206A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ CEC-‐Certified High Desert (61409A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ Big Horn Wind (60776A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ Nine Canyon Wind (60803A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 1 Eligible (Portfolio)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 1 Eligible: Cabazon Wind Partners (60736A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 1 Eligible: Roosevelt Biogas -‐ LFG Phase 2, Engines 7-‐9 (60974A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible (Portfolio)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible: Juniper Canyon (61202A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible: Leaning Juniper II (61200A)
NA 2011 Shell Energy North America, MEA Phase 2 -‐ RPS Category 2 Eligible: White Creek Wind 1 (60721A)NA 2011 Cottonwood Solar, LLC (Goose Lake and Corcoran generating facilities)NA 2011 Rio Solar 1, LLC
NA 2012 Shell Energy North America, MEA Phase 2B -‐ PCC1, LFG Phase II Roosevelt Biogas -‐ LFG Phase 2, Engines 7-‐9 (60974A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ White Creek Wind 1 (60721A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ Tulloch Powerhouse (60071A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ Beardsley Powerhouse (60072A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ RPS Category 1 Eligible (Portfolio)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ RPS Category 1 Eligible: Cabazon Wind Partners (60736A)
NA 2012 Shell Energy North America, MEA Phase 2B, RPS Category 2 Eligible -‐ Juniper Canyon (61202A)
NA 2012 Shell Energy North America, MEA Phase 2B, RPS Category 2 Eligible -‐ Leaning Juniper II (61200A)NA 2012 GenPower, LLC (Lincoln Landfill Power Plant, Units 1-‐6; 61632A)NA 2012 RE Kansas (Recurrent)
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 1 Eligible (Portfolio)
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 2 Eligible (Portfolio)
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 2 Eligible: Leaning Juniper II (61200A)
NA 2012 Shell Energy North America, MEA Phase 3 -‐ RPS Category 2 Eligible: Juniper Canyon (61202A)NA 2012 Middle Fork Irrigation District (61383A)
43,579 Energy only contract; capacity not specified
3,284 Energy only contract; capacity not specified
51,300 Energy only contract; capacity not specified
72,770 Energy only contract; capacity not specified198,000 2216,000 2
6,203 Energy only contract; capacity not specified
26,568 Energy only contract; capacity not specified
9,460 Energy only contract; capacity not specified
4,006 Energy only contract; capacity not specified
3,152 Energy only contract; capacity not specified
3,152 Energy only contract; capacity not specified
16,876 Energy only contract; capacity not specified
16,876 Energy only contract; capacity not specified
16,876 Energy only contract; capacity not specified
10,282 Energy only contract; capacity not specified1,600,000 23
0 0
7,279 Energy only contract; capacity not specified
81,887 Energy only contract; capacity not specified
55,262 Energy only contract; capacity not specified
18,738 Energy only contract; capacity not specified
52,834 Energy only contract; capacity not specified
27,428 Energy only contract; capacity not specified
30,956 Energy only contract; capacity not specified
34,044 Energy only contract; capacity not specified580,000 5135,000 20
103,000 Energy only contract; capacity not specified
108,000 Energy only contract; capacity not specified
1,668 Energy only contract; capacity not specified
8,332 Energy only contract; capacity not specified42,000 REC only contract; capacity not specified
Contracted Capacity (Expected MW)Advice Letter # (if applicable) Contract Volume (MWh)
Annual RPS Compliance Report: Contract DetailsData Reported by:Marin Clean Energy (MCE)August 31, 2018
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name
NA 2012 OneEnergy -‐ RPS Confirm #1 -‐ Total Energy Facility (TEF-‐GEN 1; 60633A)NA 2012 OneEnergy -‐ RPS Confirm #1 -‐ Puente Hills Gas-‐to-‐Energy Facility Phase II Gen3 (60632A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Birch Creek Power (61378A)
NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Double A Dairy Digester (61221A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Dry Creek Project (61381A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Falls Creek Hydro (61375A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Glenrock III (60804A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Goodnoe Hills (60819A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ High Plains (60899A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Marsh Valley Project (61380A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Mountain Air Wind Project (62314A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Nine Canyon Phase 3 (60803A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Pilgrim Stage Station Wind Park (60923A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Rolling Hills (60806A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Thousand Springs Wind Park (60925A)NA 2012 OneEnergy -‐ RPS Eligible #1 -‐ Tuana Gulch Wind Park (60924A)NA 2013 OneEnergy -‐ RPS Eligible #2 -‐ Wolverine Creek (60564A)NA 2012 San Rafael Airport Solar Partners, LLC (MCE FIT, 62237A), PCC1NA 2013 Calpine Geysers -‐ Short Term: Calpine Geothermal Unit #17 (60007A)
NA 2014 Calpine Geysers -‐ Short Term #2: Calpine Geothermal Unit #18 (60008A)NA 2013 Calpine Geysers -‐ Long Term
NA 2014 Exelon Generation Company, LLC -‐ Short Term PCC2b
NA 2014 Exelon Generation Company, LLC -‐ Short Term PCC2a: Alta 10 (62244A)NA 2014 OneEnergy -‐ RPS Confirm #3NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Campbell Hill -‐ Three Buttes (61017A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Campbell Hill -‐ Dunlap 1 (61188A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Glenrock I (60805A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Glenrock III (60804A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Golden Valley Wind Park (60917A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Goodnoe Hills (60819A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Hay Canyon (60724A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ High Plains (60899A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Klondike Wind Power III LLC (60602A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Marengo (60729A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Marengo 2 (60730A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ McFadden Ridge (60896A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Milner Dam Wind Park (60919A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Mountain Air Wind Project (62314A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Palouse Wind (62288A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Rolling Hills (60806A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Seven Mile Hill 1 (60807A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Seven Mile Hill 2 (60808A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Top of the World (61199A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Wild Horse (60746A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Wolverine Creek (60564A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Yahoo Creek Wind Park (60926A)NA 2014 Puget Sound Energy -‐ RPS Eligible, Short-‐Term Bucket 3: Wild Horse (60746A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Hopkins Ridge (60745A)NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Lower Snake River (62044A)
NA 2012 Shell Energy North America, MEA Phase 2B -‐ RPS Category 2 Eligible (Portfolio)NA 2014 RE Mustang 4 LLCNA 2014 Rising Tree Wind Farm III, LLC, PCC1NA 2014 Cooley-‐Quarry 1 (MCE FIT), PCC1NA 2015 East Bay Municipal Utility District (Pardee, 60536A and Comanche Reservoirs, 60535A)
Contracted Capacity (Expected MW)Advice Letter # (if applicable) Contract Volume (MWh)
12,000 REC only contract; capacity not specified3,000 REC only contract; capacity not specified5,802 REC only contract; capacity not specified
6,203 REC only contract; capacity not specified466 REC only contract; capacity not specified
12,039 REC only contract; capacity not specified704 REC only contract; capacity not specified1,114 REC only contract; capacity not specified1,005 REC only contract; capacity not specified924 REC only contract; capacity not specified
18,747 REC only contract; capacity not specified1,285 REC only contract; capacity not specified1,609 REC only contract; capacity not specified1,259 REC only contract; capacity not specified6,078 REC only contract; capacity not specified4,869 REC only contract; capacity not specified886 REC only contract; capacity not specified
33,000 126,280 3
25,000 Energy only contract; capacity not specified880,000 10
50,000 Energy only contract; capacity not specified
60,000 Energy only contract; capacity not specified225,000 REC only contract; capacity not specified2,903 REC only contract; capacity not specified3,513 REC only contract; capacity not specified2,810 REC only contract; capacity not specified1,171 REC only contract; capacity not specified4,688 REC only contract; capacity not specified1,491 REC only contract; capacity not specified3,203 REC only contract; capacity not specified2,778 REC only contract; capacity not specified8,113 REC only contract; capacity not specified2,163 REC only contract; capacity not specified1,047 REC only contract; capacity not specified1,015 REC only contract; capacity not specified1,676 REC only contract; capacity not specified5,939 REC only contract; capacity not specified2,158 REC only contract; capacity not specified3,918 REC only contract; capacity not specified3,094 REC only contract; capacity not specified777 REC only contract; capacity not specified5,511 REC only contract; capacity not specified15,535 REC only contract; capacity not specified1,458 REC only contract; capacity not specified39 REC only contract; capacity not specified
195,000 REC only contract; capacity not specified7,500 REC only contract; capacity not specified15,000 REC only contract; capacity not specified
47,000 Energy only contract; capacity not specified1,260,000 301,200,000 9936,000 1800,000 34
Annual RPS Compliance Report: Contract DetailsData Reported by:Marin Clean Energy (MCE)August 31, 2018
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name
NA 2014 OneEnergy -‐ RPS Eligible #3 -‐ Wild Horse Phase II (60746A)
NA 2015 Calpine Geysers -‐ Short Term #3: GeothermalNA 2015 Cedar Creek RECs, LLC -‐ RPS Category 3 Eligible
NA 2015 Direct Energy -‐ RPS Category 1 Eligible (Portfolio, small hydro)
NA 2014 WM Renewable Energy, L.L.C. (Redwood Landfill)NA 2017 MCE SolarOne, PCC1 (sPower, 2 facilities -‐ 2.0 MW + 8.5 MW)NA 2015 Cooley-‐Quarry 2 (MCE FIT), PCC1NA 2015 Cost-‐Plus (MCE FIT), PCC1NA 2016 Avangrid Renewables, LLC (Shiloh I Wind Project)
NA 2016 Parrey, LLC (61841C)
NA 2016 3Phases, PCC2 (Cedar Creek Wind Energy, 60822A; and Cedar Creek II, 61384A) -‐ Confirmation #2
NA 2016 Portland General Electric Company, PCC2 (Portfolio Supply Agreement)NA 2016 Los Angeles County, Sanitation District No. 2, PCC3 -‐ Confirmation #1NA 2016 Los Angeles County, Sanitation District No. 2, PCC3 -‐ Confirmation #2
NA 2016 Powerex, PCC2 (Portfolio Supply Agreement)
NA 2016 Powerex, PCC1 (Portfolio Supply Agreement)
NA 2016 3Phases, PCC2 (Cedar Creek Wind Energy, 60822A; and Cedar Creek II, 61384A) -‐ Confirmation #3
NA 2015 3Phases, PCC2 (Cedar Creek Wind Energy, 60822A; and Cedar Creek II, 61384A) -‐ Confirmation #1NA 2015 Rising Tree Wind Farm, PCC3NA 2015 3Degrees, PCC3
NA 2011 Western Area Power Administration
NA 2016 City of Santa Clara, Silicon Valley Power, PCC1NA 2015 Northshore Solar Partners LLC (Freethy #1, MCE FIT), PCC1NA 2015 Northshore Solar Partners LLC (Freethy #2, MCE FIT), PCC1
NA 2016 3Phases, PCC2 (Portfolio Supply Agreement)
NA 2016 3Phases, PCC2 (Portfolio Supply Agreement)
NA 2017 3Phases, PCC2 (Portfolio Supply Agreement)
NA 2016 Powerex, PCC2 (Portfolio Supply Agreement)
NA 2016 NextEra Energy Power Marketing, LLC, PCC1 (Blythe Solar, various units)NA 2016 Great Valley Solar I, PCC1NA 2016 Desert Harvest, LLC, PCC1NA 2016 Little Bear Solar 1, LLC, PCC 1NA 2016 Little Bear Solar 3, LLC, PCC 1NA 2016 Little Bear Solar 4, LLC, PCC 1NA 2016 Little Bear Solar 5, LLC, PCC 1NA 2016 Antelope Expansion 2, LLC, PCC 1NA 2016 Voyager Wind II, LLC, PCC 1
NA 2016 TGP Energy Management, LLC, PCC 1NA 2016 Los Banos Wind, LLC, PCC 1NA 2011 Cottonwood Solar -‐ Marin Carport (PCC1, Long-‐Term, Local)
NA 2017 Exelon Generation Company (PCC1, ST SALE)
Contracted Capacity (Expected MW)Advice Letter # (if applicable) Contract Volume (MWh)
25,000 REC only contract; capacity not specified
30,000 Energy only contract; capacity not specified125,000 REC only contract; capacity not specified
50,000 Energy only contract; capacity not specified
600,000 4380,000 1118,000 09,000 0188,000 25
74,018 Energy only contract; capacity not specified
140,000 Energy only contract; capacity not specified
120,000 Energy only contract; capacity not specified68,000 REC only contract; capacity not specified90,000 REC only contract; capacity not specified
225,000 Energy only contract; capacity not specified
60,000 Energy only contract; capacity not specified
70,000 Energy only contract; capacity not specified
50,000 Energy only contract; capacity not specified2,676 REC only contract; capacity not specified19,000 REC only contract; capacity not specified
1,032 Energy only contract; capacity not specified
200,000 Energy only contract; capacity not specified36,000 136,000 1
220,000 Energy only contract; capacity not specified
50,000 Energy only contract; capacity not specified
310,000 Energy only contract; capacity not specified
30,000 Energy only contract; capacity not specified
200,000 Energy only contract; capacity not specified4,350,000 1005,000,000 802,000,000 401,000,000 202,600,000 502,600,000 505,800,000 1051,656,000 42
1,500,000 Energy only contract; capacity not specifiedTBD 125
40,000 1
-‐150,000 Energy only contract; capacity not specified
Annual RPS Compliance Report: Contract DetailsData Reported by:Marin Clean Energy (MCE)August 31, 2018
LSE ID (Optional)
CPUC ID Contract Execution Year
Contract Name/Facility Name
NA 2017 Lancaster Choice Energy (PCC1, ST SALE)
NA 2017 Apple Valley Choice Energy (PCC1, ST SALE)
NA 2017 Portland General Electric Company (PCC2, ST)
NA 2017 PowerEx April-‐Dec 2018_PCC1
NA 2017 PowerEx Jan-‐Dec 2018_PCC2
NA 2017 PowerEX Jan-‐Dec 2019_PCC2
NA 2017 PowerEx Jan2019-‐Dec 2020_PCC1
NA 2017 Morgan Stanley Apr 2018-‐Dec 2020_PCC1
NA 2017 NextEra Apr-‐Dec 2018_PCC1NA 2017 Energy Finance Associates (Dec 2018-‐Dec 2028_PCC1, Marin HQ)
NA 2017 NextEra Jan 2019 -‐ Dec 2023_PCC1
NA 2018 ConEd (Lost Hills) May 2018-‐Dec 2019_PCC1
NA 2018 SVP Apr-‐Dec2018_PCC1
NA 2018 Portland General Electric Jan-‐Dec2018_PCC2
NA 2018 Portland General Electric Jan-‐Dec2018_PCC2_2
NA 2017 Xcel Jan-‐Dec 2018_PCC2
NA 2018 Xcel Jan-‐Dec 2018_PCC2_2NA 2018 Oakley RV & Boat Storage July 2018-‐July 2038_PCC1NA 2018 BayWa Strauss Wind Project April 2020-‐April 2035_PCC1
NA 2018 STX P-‐STX_PCC3 (2018)
NA 2018 3Phases Jul-‐Dec2018_PCC1
Contracted Capacity (Expected MW)Advice Letter # (if applicable) Contract Volume (MWh)
-‐11,000 Energy only contract; capacity not specified
-‐15,000 Energy only contract; capacity not specified
30,000 Energy only contract; capacity not specified
100,000 Energy only contract; capacity not specified
100,000 Energy only contract; capacity not specified
75,000 Energy only contract; capacity not specified
75,000 Energy only contract; capacity not specified
225,000 Energy only contract; capacity not specified
27,000 Energy only contract; capacity not specified12,000 1
145,500 Energy only contract; capacity not specified
87,000 Energy only contract; capacity not specified
100,000 Energy only contract; capacity not specified
150,000 Energy only contract; capacity not specified
150,000 Energy only contract; capacity not specified
250,000 Energy only contract; capacity not specified
50,000 Energy only contract; capacity not specified30,420 1
4,500,000 100
36,000 Energy only contract; capacity not specified
115,000 Energy only contract; capacity not specified
Annual RPS Compliance Report: Compliance StatusData Reported by:
Marin Clean Energy (MCE)
August 31, 2018 From Unique Inputs Sheet
Actual Data
Forecasted Data
Information is Hard Coded
Marin Clean Energy (MCE)
Annual RPS Procurement and Percentages (MWh) 2011 2012 2013 2014 2015 2016Annual Retail Sales 185492.6871 570143.667 1110486.62 1254794.292 1695273.832 2125090.807Annual RPS Procurement 51,525 166,522 364,363 646,619 866,365 1,160,620Annual Percentage Targets 20.0% 20.0% 20.0% 21.7% 23.3% 25.0%Annual RPS Procurement Percentage 27.8% 29.2% 32.8% 51.5% 51.1% 54.6%
Procurement Quantity Requirement (MWh) 2011 2012 2013 2014 2015 2016Procurement Quantity Requirement (PQR)PCC 0 RECs Retired(Annual) 39,119 39,238 50,641 39,119 2,816 0Long-‐Term PCC 1 RECs Retired (Annual) 0 4,553 36,597 61,861 109,636 251,987Short-‐Term PCC 1 RECs Retired (Annual) 6,203 65,000 74,000 113,869 358,285 529,574Long-‐Term PCC 2 RECs Retired(Annual) 0 0 0 0 0 0Short-‐Term PCC 2 RECs Retired (Annual) 6,203 32,731 62,094 120,282 164,801 311,000Long-‐Term PCC 3 RECs Retired (Annual) 0 0 0 0 0 0Short-‐Term PCC 3 RECs Retired (Annual) 0 25,000 95,000 354,703 233,643 68,059Annual Percentage Targets 20.0% 20.0% 20.0% 21.7% 23.3% 25.0%RECs as Percentage of Retail Sales 27.8% 29.2% 28.7% 55.0% 51.3% 54.6%Total RECs (Compliance Period)
65% Long-‐Term Contracting requirement (MWh)PCC0 RECS Applied (Compliance Period)Long-‐Term PCC1 RECS Applied (Compliance Period)Short-‐Term PCC1 RECS Applied (Compliance Period)Long-‐Term PCC2 RECS Applied (Compliance Period)Short-‐Term PCCC2 RECS Applied (Compliance Period)Long-‐Term PCC3 RECS Applied (Compliance Period)Short-‐Term PCC3 RECS Applied (Compliance Period)Long-‐Term RECs RequirementExcess/(Shortfall) REC Retirements from Long-‐Term Contracts Eligible PCC 0 RECs (Compliance Period) Eligible Long-‐Term PCC 1 RECs (Compliance Period) Eligible Long-‐Term PCC 2 RECs (Compliance Period) Eligible Long-‐Term PCC 3 RECs (Compliance Period)Short-‐Term REC LimitEligible Short-‐Term RECs Eligible Short-‐Term PCC 1 RECs (Compliance Period) Eligible Short-‐Term PCC 2 RECs (Compliance Period) Eligible Short-‐Term PCC 3 RECs (Compliance Period)RECs Satisfying LT Contracting Requirement
Portfolio Balance Requirements (MWh) 2011-‐2013 PCC 1 RECs (Compliance Period) PCC 2 RECs (Compliance Period) PCC 3 RECs (Compliance Period)PCC 1 Balance RequirementExcess/(Shortfall) Retirements from PCC 1Calculated PCC 2 Balance LimitationIneligible Category 2PCC 3 Balance LimitationIneligible Category 3
Actual RPS Retirements (From 36 Month REC Retirement tabs)
N/AN/A
Compliance Period 1
373,225
536,379 2,719,635
Actual RPS Retirements (From 36 Month REC Retirement tabs)
1,198,562
Compliance Period 1
Compliance Period 2
Compliance Period 2
Compliance Period 1 Compliance Period 2
N/A
N/AN/A
N/AN/A
N/A
N/A
61,057
N/AN/A
186,353
122,113
58,943
101,028
N/A
120,000
39,971
N/AN/A N/A
482,911173,494
673,405
364,758
596,0831,425,212
Compliance Period 1
N/A
N/A N/A
N/A
2011-‐2013 2014-‐2016
N/A
Compliance Period 2
N/A
2014-‐2016
N/A
751,807
61,05764,240
231,325
656,405
N/A N/A
N/AN/AN/AN/A
N/AN/AN/A N/A
N/AN/A
N/AN/AN/A
N/A
Excess Procurement Calculation (MWh)Excess RECs Eligible for BankingExcess PCC 0 RECsExcess PCC 1 RECs Excess Long-‐Term PCC1 RECs Excess Short-‐Term PCC1 RECsExcess PCC 2 RECs
Remaining Excess RECs Eligible for Banking and Requiring a Category Assignment
Excess Procurement Bank (MWh)PCC 0 BankPCC 1 Bank Long-‐Term PCC1 Bank Short-‐Term PCC1 Bank
PCC 2 BankApplication of PCC 0 Banked RECsApplication of PCC 1 Banked RECs Application of Long-‐Term PCC1 Banked RECs Application of Short-‐Term PCC1 Banked RECs
Application of PCC 2 Banked RECsCumulative PCC 0 BankCumulative PCC 1 Bank Cumulative Long-‐Term PCC1 Bank Cumulative Short-‐Term PCC1 Bank
Cumulative PCC 2 Bank
RPS Compliance Status (MWh)Additional RECs required to meet RPS Procurement Quantity RequirementTotal RECs not in compliance with RPS Procurement Balance Requirement
RPS Penalty CalculationTotal Penalty (PQR/PBR)
Compliance Period 12011-‐2013
2011-‐2013
0
00
N/AN/A
0
Compliance Period 2
2014-‐2016Compliance Period 2
0
0
0
2014-‐2016
0
2014-‐201624,543
N/AN/A
0
Compliance Period 1
Compliance Period 1
0
24,543
$02014-‐2016
00 0
$0
Compliance Period 2
0
Compliance Period 12011-‐2013
24,5430
0
00
2011-‐2013
0
Compliance Period 2
N/AN/A
N/A
00
0
0
N/A
N/AN/AN/A0
0
N/A
N/AN/A
24,5430
00
N/AN/A
Annual RPS Compliance Report: Compliance StatusData Reported by:
Marin Clean Energy (MCE)
August 31, 2018
Marin Clean Energy (MCE)
Annual RPS Procurement and Percentages (MWh)Annual Retail SalesAnnual RPS ProcurementAnnual Percentage TargetsAnnual RPS Procurement Percentage
Procurement Quantity Requirement (MWh)Procurement Quantity Requirement (PQR)PCC 0 RECs Retired(Annual)Long-‐Term PCC 1 RECs Retired (Annual)Short-‐Term PCC 1 RECs Retired (Annual)Long-‐Term PCC 2 RECs Retired(Annual)Short-‐Term PCC 2 RECs Retired (Annual)Long-‐Term PCC 3 RECs Retired (Annual)Short-‐Term PCC 3 RECs Retired (Annual)Annual Percentage TargetsRECs as Percentage of Retail SalesTotal RECs (Compliance Period)
65% Long-‐Term Contracting requirement (MWh)PCC0 RECS Applied (Compliance Period)Long-‐Term PCC1 RECS Applied (Compliance Period)Short-‐Term PCC1 RECS Applied (Compliance Period)Long-‐Term PCC2 RECS Applied (Compliance Period)Short-‐Term PCCC2 RECS Applied (Compliance Period)Long-‐Term PCC3 RECS Applied (Compliance Period)Short-‐Term PCC3 RECS Applied (Compliance Period)Long-‐Term RECs RequirementExcess/(Shortfall) REC Retirements from Long-‐Term Contracts Eligible PCC 0 RECs (Compliance Period) Eligible Long-‐Term PCC 1 RECs (Compliance Period) Eligible Long-‐Term PCC 2 RECs (Compliance Period) Eligible Long-‐Term PCC 3 RECs (Compliance Period)Short-‐Term REC LimitEligible Short-‐Term RECs Eligible Short-‐Term PCC 1 RECs (Compliance Period) Eligible Short-‐Term PCC 2 RECs (Compliance Period) Eligible Short-‐Term PCC 3 RECs (Compliance Period)RECs Satisfying LT Contracting Requirement
Portfolio Balance Requirements (MWh) PCC 1 RECs (Compliance Period) PCC 2 RECs (Compliance Period) PCC 3 RECs (Compliance Period)PCC 1 Balance RequirementExcess/(Shortfall) Retirements from PCC 1Calculated PCC 2 Balance LimitationIneligible Category 2PCC 3 Balance LimitationIneligible Category 3
Actual RPS Retirements (From 36 Month REC Retirement tabs)
2017 2018 2019 20202804277.374 4565480.744 5275252.115 5306098.0261,749,254 2,883,761 2,018,119 1,924,26127.0% 29.0% 31.0% 33.0%62.4% 63.2% 38.3% 36.3%
2017 2018 2019 2020
0 0 0 0431,798 755,561 1,153,819 1,495,161691,323 1,167,200 504,300 429,100
0 0 0 0458,046 925,000 360,000 0
0 0 0 090,000 36,000 0 027.0% 29.0% 31.0% 33.0%59.6% 63.2% 38.3% 36.3%
8,497,308
N/A
N/AN/AN/AN/A
N/A
N/A
N/AN/A
Forecasted RPS Procurement (From the Procurement Details and Contract Details tabs)
Compliance Period 3
Compliance Period 3
5,467,485
Compliance Period 3
N/AN/A
N/A
N/AN/A
126,000
0
4,100,6142,527,648
2017-‐2020
N/AN/A
2017-‐2020
N/A
Compliance Period 3
N/A
N/A
1,743,046
502,1751,240,871
546,748
6,628,262
Excess Procurement Calculation (MWh)Excess RECs Eligible for BankingExcess PCC 0 RECsExcess PCC 1 RECs Excess Long-‐Term PCC1 RECs Excess Short-‐Term PCC1 RECsExcess PCC 2 RECs
Remaining Excess RECs Eligible for Banking and Requiring a Category Assignment
Excess Procurement Bank (MWh)PCC 0 BankPCC 1 Bank Long-‐Term PCC1 Bank Short-‐Term PCC1 Bank
PCC 2 BankApplication of PCC 0 Banked RECsApplication of PCC 1 Banked RECs Application of Long-‐Term PCC1 Banked RECs Application of Short-‐Term PCC1 Banked RECs
Application of PCC 2 Banked RECsCumulative PCC 0 BankCumulative PCC 1 Bank Cumulative Long-‐Term PCC1 Bank Cumulative Short-‐Term PCC1 Bank
Cumulative PCC 2 Bank
RPS Compliance Status (MWh)Additional RECs required to meet RPS Procurement Quantity RequirementTotal RECs not in compliance with RPS Procurement Balance Requirement
RPS Penalty CalculationTotal Penalty (PQR/PBR)
Compliance Period 3
2017-‐2020
00
0
2017-‐2020Compliance Period 3
0
$0
0
000
2017-‐2020
Compliance Period 3
0N/A
0
0
2017-‐2020
0
Compliance Period 3
N/A
24,543
N/AN/A
N/AN/A
024,543
0
N/AN/A
Annual RPS Compliance Report: Procurement DetailData Reported by:Marin Clean Energy (MCE)August 31, 2018 Actual Data
Forecasted Data
Procurement Summary (MWh) 2011 2012 2013 2014 2015Total Annual Procurement 51,525 166,522 364,363 646,619 866,365
PCC 0 RECs Procured 39,119 39,238 92,576 0 0PCC 1 RECs Procured 6,203 69,553 114,693 171,634 467,921PCC 2 RECs Procured 6,203 32,731 62,094 120,282 164,801PCC 3 RECs Procured 0 25,000 95,000 354,703 233,643
Procurement from Long-‐Term (>= 10 years) 0 4,553 40,693 57,765 109,636Procurement from Short-‐Term (< 10 years) 51,525 161,969 323,670 588,854 756,729
Long Term Contracting RequirementExpected Total RECs from long-‐term contracts 1,640,000 613,000 880,000 1,896,000 899,000Expected Total RECs from short-‐term contracts 114,483 806,418 51,280 1,877,500 276,676Long Term Contracting Requirement Shortfall
RPS-‐Eligible Procurement By Resource Type 2011 2012 2013 2014 2015Biomass 17,319 22,890 11,091 0 0Biogas: Digester Gas 0 0 0 0 0Biogas: Landfill Gas 0 0 0 0 0Biodiesel 0 0 0 0 0Muni Solid Waste 0 0 0 0 0Bioenergy subtotal 17,319 22,890 11,091 0 0
Geothermal 0 0 0 51,280 27,244Small Hydro 0 10,000 125,231 0 63,878Conduit Hydro 0 0 0 0 0Water Supply and Conveyance 0 0 0 0 0Solar PV 0 165 1,807 2,964 95,959Solar Thermal 0 0 0 0 0Wind 8,202 90,452 173,705 508,183 567,269Ocean Wave 0 0 0 0 0Ocean Thermal 0 0 0 0 0Tidal Current 0 0 0 0 0Fuel Cells 0 0 0 0 0
0
Actual MWh
0
228 4,665
Annual RPS Compliance Report: Procurement DetailData Reported by:Marin Clean Energy (MCE)August 31, 2018
Procurement Summary (MWh)Total Annual Procurement
PCC 0 RECs ProcuredPCC 1 RECs ProcuredPCC 2 RECs ProcuredPCC 3 RECs Procured
Procurement from Long-‐Term (>= 10 years)Procurement from Short-‐Term (< 10 years)
Long Term Contracting RequirementExpected Total RECs from long-‐term contractsExpected Total RECs from short-‐term contractsLong Term Contracting Requirement Shortfall
RPS-‐Eligible Procurement By Resource TypeBiomassBiogas: Digester Gas Biogas: Landfill Gas BiodieselMuni Solid WasteBioenergy subtotal
GeothermalSmall HydroConduit HydroWater Supply and Conveyance Solar PVSolar ThermalWindOcean Wave Ocean Thermal Tidal Current Fuel Cells
2016 2017 2018 2019 20201,160,620 1,749,254 2,883,761 2,018,119 1,924,261
0 0 0 0 0781,561 1,201,208 1,922,761 1,658,119 1,924,261311,000 458,046 925,000 360,000 068,059 90,000 36,000 0 0
251,987 469,121 755,561 1,153,819 1,495,161908,633 1,280,133 2,128,200 864,300 429,100
25,006,000 392,000 4,530,420 0 03,235,018 1,161,500 688,000 0 0
2016 2017 2018 2019 20200 0 36,000 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 36,000 0 00 340,692 188,000 88,000 88,000
144,196 245,237 168,400 70,200 70,0000 0 0 0 00 0 0 0 0
195,736 173,632 483,361 827,819 898,1610 0 0 0 0
652,368 832,981 1,928,000 952,100 788,1000 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0
Actual MWh Forecasted MWh
0 0
4,665 12,688
Annual RPS Compliance Report: Procurement DetailData Reported by:Marin Clean Energy (MCE)August 31, 2018
Procurement Summary (MWh)Total Annual Procurement
PCC 0 RECs ProcuredPCC 1 RECs ProcuredPCC 2 RECs ProcuredPCC 3 RECs Procured
Procurement from Long-‐Term (>= 10 years)Procurement from Short-‐Term (< 10 years)
Long Term Contracting RequirementExpected Total RECs from long-‐term contractsExpected Total RECs from short-‐term contractsLong Term Contracting Requirement Shortfall
RPS-‐Eligible Procurement By Resource TypeBiomassBiogas: Digester Gas Biogas: Landfill Gas BiodieselMuni Solid WasteBioenergy subtotal
GeothermalSmall HydroConduit HydroWater Supply and Conveyance Solar PVSolar ThermalWindOcean Wave Ocean Thermal Tidal Current Fuel Cells
2021 2022 2023 2024 20252,483,253 2,476,753 2,171,262 2,136,681 2,130,204
0 0 0 0 02,483,253 2,476,753 2,171,262 2,136,681 2,130,204
0 0 0 0 00 0 0 0 0
2,154,153 2,147,653 2,142,162 2,136,681 2,130,204329,100 329,100 29,100 0 0
N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A
2021 2022 2023 2024 20250 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0
88,000 88,000 88,000 88,000 88,00070,000 70,000 70,000 70,000 70,000
0 0 0 0 00 0 0 0 0
1,478,153 1,471,653 1,466,162 1,460,681 1,454,2040 0 0 0 0
767,100 767,100 467,100 438,000 438,0000 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0
Forecasted MWh
N/A N/A
N/AN/A
Annual RPS Compliance Report: Procurement DetailData Reported by:Marin Clean Energy (MCE)August 31, 2018
Procurement Summary (MWh)Total Annual Procurement
PCC 0 RECs ProcuredPCC 1 RECs ProcuredPCC 2 RECs ProcuredPCC 3 RECs Procured
Procurement from Long-‐Term (>= 10 years)Procurement from Short-‐Term (< 10 years)
Long Term Contracting RequirementExpected Total RECs from long-‐term contractsExpected Total RECs from short-‐term contractsLong Term Contracting Requirement Shortfall
RPS-‐Eligible Procurement By Resource TypeBiomassBiogas: Digester Gas Biogas: Landfill Gas BiodieselMuni Solid WasteBioenergy subtotal
GeothermalSmall HydroConduit HydroWater Supply and Conveyance Solar PVSolar ThermalWindOcean Wave Ocean Thermal Tidal Current Fuel Cells
2026 2027 2028 2029 20302,054,737 1,960,277 1,954,624 1,947,180 1,941,743
0 0 0 0 02,054,737 1,960,277 1,954,624 1,947,180 1,941,743
0 0 0 0 00 0 0 0 0
2,054,737 1,960,277 1,954,624 1,947,180 1,941,7430 0 0 0 0
N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A
2026 2027 2028 2029 20300 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0
88,000 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0
1,448,737 1,442,277 1,436,624 1,429,180 1,423,7430 0 0 0 0
438,000 438,000 438,000 438,000 438,0000 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0
Forecasted MWh
N/A N/A
N/A N/A
Annual RPS Compliance Report: (2011) 36 Month RetirementData Reported by:Marin Clean Energy (MCE) Input RequiredAugust 31, 2018 Information is Hard Coded (No Input Required)
CPUC ID RPS ID WREGIS_ID Facility Name Expected PCC Classification Contract Year Contract Length Short Term Contract Eligibility Vintage Month/Year Retirement Date (MM/DD/YYYY)
60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 01/2010 12/19/1260596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 02/2010 2/4/1360596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 03/2010 2/11/1360596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 04/2010 3/21/1360596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 05/2010 4/11/1360596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 06/2010 5/21/1360596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 07/2010 6/26/1360994A W1388 Columbia Ridge -‐ Columbia Ridge 4 PCC 0 2010 Short-‐term Eligible Short-‐term 08/2010 7/24/1360994A W1389 Columbia Ridge -‐ Columbia Ridge 5 PCC 0 2010 Short-‐term Eligible Short-‐term 08/2010 7/24/1360994A W1390 Columbia Ridge -‐ Columbia Ridge 6 PCC 0 2010 Short-‐term Eligible Short-‐term 08/2010 7/24/1360994A W1391 Columbia Ridge -‐ Columbia Ridge 7 PCC 0 2010 Short-‐term Eligible Short-‐term 08/2010 7/24/1360994A W1392 Columbia Ridge -‐ Columbia Ridge 8 PCC 0 2010 Short-‐term Eligible Short-‐term 08/2010 7/24/1360803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 0 2010 Short-‐term Eligible Short-‐term 08/2010 7/24/1360994A W1361 Columbia Ridge -‐ Columbia Ridge 1 PCC 0 2010 Short-‐term Eligible Short-‐term 09/2010 7/26/1360994A W1385 Columbia Ridge -‐ Columbia Ridge 2 PCC 0 2010 Short-‐term Eligible Short-‐term 09/2010 7/26/1360994A W1387 Columbia Ridge -‐ Columbia Ridge 3 PCC 0 2010 Short-‐term Eligible Short-‐term 09/2010 7/26/1360994A W1388 Columbia Ridge -‐ Columbia Ridge 4 PCC 0 2010 Short-‐term Eligible Short-‐term 09/2010 7/26/1360994A W1389 Columbia Ridge -‐ Columbia Ridge 5 PCC 0 2010 Short-‐term Eligible Short-‐term 09/2010 7/26/1360994A W1390 Columbia Ridge -‐ Columbia Ridge 6 PCC 0 2010 Short-‐term Eligible Short-‐term 09/2010 7/26/1360994A W1391 Columbia Ridge -‐ Columbia Ridge 7 PCC 0 2010 Short-‐term Eligible Short-‐term 09/2010 7/26/1360994A W1392 Columbia Ridge -‐ Columbia Ridge 8 PCC 0 2010 Short-‐term Eligible Short-‐term 09/2010 7/26/1360994A W1361 Columbia Ridge -‐ Columbia Ridge 1 PCC 0 2010 Short-‐term Eligible Short-‐term 10/2010 7/26/1360994A W1385 Columbia Ridge -‐ Columbia Ridge 2 PCC 0 2010 Short-‐term Eligible Short-‐term 10/2010 7/26/1360994A W1387 Columbia Ridge -‐ Columbia Ridge 3 PCC 0 2010 Short-‐term Eligible Short-‐term 10/2010 7/26/1360994A W1388 Columbia Ridge -‐ Columbia Ridge 4 PCC 0 2010 Short-‐term Eligible Short-‐term 10/2010 7/26/1360994A W1389 Columbia Ridge -‐ Columbia Ridge 5 PCC 0 2010 Short-‐term Eligible Short-‐term 10/2010 7/26/1360994A W1390 Columbia Ridge -‐ Columbia Ridge 6 PCC 0 2010 Short-‐term Eligible Short-‐term 10/2010 7/26/1360994A W1391 Columbia Ridge -‐ Columbia Ridge 7 PCC 0 2010 Short-‐term Eligible Short-‐term 10/2010 7/26/1360994A W1392 Columbia Ridge -‐ Columbia Ridge 8 PCC 0 2010 Short-‐term Eligible Short-‐term 10/2010 7/26/1360994A W1361 Columbia Ridge -‐ Columbia Ridge 1 PCC 0 2010 Short-‐term Eligible Short-‐term 11/2010 7/26/1360994A W1385 Columbia Ridge -‐ Columbia Ridge 2 PCC 0 2010 Short-‐term Eligible Short-‐term 11/2010 7/26/1360994A W1387 Columbia Ridge -‐ Columbia Ridge 3 PCC 0 2010 Short-‐term Eligible Short-‐term 11/2010 7/26/1360994A W1388 Columbia Ridge -‐ Columbia Ridge 4 PCC 0 2010 Short-‐term Eligible Short-‐term 11/2010 7/26/1360994A W1389 Columbia Ridge -‐ Columbia Ridge 5 PCC 0 2010 Short-‐term Eligible Short-‐term 11/2010 7/26/1360994A W1390 Columbia Ridge -‐ Columbia Ridge 6 PCC 0 2010 Short-‐term Eligible Short-‐term 11/2010 7/26/1360994A W1391 Columbia Ridge -‐ Columbia Ridge 7 PCC 0 2010 Short-‐term Eligible Short-‐term 11/2010 7/26/1360994A W1392 Columbia Ridge -‐ Columbia Ridge 8 PCC 0 2010 Short-‐term Eligible Short-‐term 11/2010 7/26/1360994A W1361 Columbia Ridge -‐ Columbia Ridge 1 PCC 0 2010 Short-‐term Eligible Short-‐term 12/2010 7/26/1360994A W1385 Columbia Ridge -‐ Columbia Ridge 2 PCC 0 2010 Short-‐term Eligible Short-‐term 12/2010 7/26/1360994A W1387 Columbia Ridge -‐ Columbia Ridge 3 PCC 0 2010 Short-‐term Eligible Short-‐term 12/2010 7/26/1360994A W1388 Columbia Ridge -‐ Columbia Ridge 4 PCC 0 2010 Short-‐term Eligible Short-‐term 12/2010 7/26/1360994A W1389 Columbia Ridge -‐ Columbia Ridge 5 PCC 0 2010 Short-‐term Eligible Short-‐term 12/2010 7/26/1360994A W1390 Columbia Ridge -‐ Columbia Ridge 6 PCC 0 2010 Short-‐term Eligible Short-‐term 12/2010 7/26/1360994A W1391 Columbia Ridge -‐ Columbia Ridge 7 PCC 0 2010 Short-‐term Eligible Short-‐term 12/2010 7/26/1360994A W1392 Columbia Ridge -‐ Columbia Ridge 8 PCC 0 2010 Short-‐term Eligible Short-‐term 12/2010 7/26/1360803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 0 2010 Short-‐term Eligible Short-‐term 10/2010 7/26/1360803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 0 2010 Short-‐term Eligible Short-‐term 11/2010 7/26/1360803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 0 2010 Short-‐term Eligible Short-‐term 12/2010 7/26/1360776A W240 Big Horn -‐ Big Horn Wind Project LLC PCC 2 2011 Short-‐term Eligible Short-‐term 01/2011 7/26/1360994A W1361 Columbia Ridge -‐ Columbia Ridge 1 PCC 0 2010 Short-‐term Eligible Short-‐term 01/2011 7/26/1360994A W1385 Columbia Ridge -‐ Columbia Ridge 2 PCC 0 2010 Short-‐term Eligible Short-‐term 01/2011 7/26/1361409A W1912 High Desert Power Plant -‐ High Desert Power Plant PCC 1 2011 Short-‐term Eligible Short-‐term 08/2011 7/26/13
Note : Please create one line per combination of REC vintage and REC retirement date. For example RECs that have the same vintage are retired on two separate dates, please include one line per retirement date. Likewise if RECs of different vintages (e.g. Juneare retired on the same date, please include one line per vintage.
Last Month to Retire REC (Month/Year)
Do RECs "Pass" or "Fail" Requirements of 36 Month
Rule: MWh REC Quantity Retired
Dec-2012 PASS 3,224 Jan-2013 PASS 2,778 Feb-2013 PASS 3,027 Mar-2013 PASS 2,034 Apr-2013 PASS 2,699 May-2013 PASS 2,955 Jun-2013 PASS 602 Jul-2013 PASS 275 Jul-2013 PASS 553 Jul-2013 PASS 551 Jul-2013 PASS 551 Jul-2013 PASS 478 Jul-2013 PASS 662 Aug-2013 PASS 434 Aug-2013 PASS 456 Aug-2013 PASS 432 Aug-2013 PASS 457 Aug-2013 PASS 405 Aug-2013 PASS 440 Aug-2013 PASS 446 Aug-2013 PASS 454 Sep-2013 PASS 550 Sep-2013 PASS 574 Sep-2013 PASS 577 Sep-2013 PASS 581 Sep-2013 PASS 580 Sep-2013 PASS 580 Sep-2013 PASS 548 Sep-2013 PASS 578 Oct-2013 PASS 529 Oct-2013 PASS 542 Oct-2013 PASS 532 Oct-2013 PASS 518 Oct-2013 PASS 535 Oct-2013 PASS 538 Oct-2013 PASS 561 Oct-2013 PASS 535 Nov-2013 PASS 525 Nov-2013 PASS 512 Nov-2013 PASS 490 Nov-2013 PASS 502 Nov-2013 PASS 517 Nov-2013 PASS 516 Nov-2013 PASS 527 Nov-2013 PASS 498 Sep-2013 PASS 592 Oct-2013 PASS 701 Nov-2013 PASS 44 Dec-2013 PASS 6,203 Dec-2013 PASS 582 Dec-2013 PASS 342 Jul-2014 PASS 6,203
date. For example RECs that have the same vintage are retired on two separate dates, please include one line per retirement date. Likewise if RECs of different vintages (e.g. June2011 and July 2011)
Annual RPS Compliance Report: (2012) 36 Month RetirementData Reported by:Marin Clean Energy (MCE) Input RequiredAugust 31, 2018 Information is Hard Coded (No Input Required)
CPUC ID RPS ID WREGIS_ID Facility Name Expected PCC Classification Contract Year Contract Length Short Term Contract Eligibility Vintage Month/Year Retirement Date (MM/DD/YYYY)
Last Month to Retire REC (Month/Year)
Do RECs "Pass" or "Fail" Requirements of 36 Month
Rule: MWh REC Quantity Retired
60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 07/2010 6/26/13 Jun-2013 PASS 2,858 60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 08/2010 7/26/13 Jul-2013 PASS 3,182 60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 09/2010 7/30/13 Aug-2013 PASS 3,005 60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 10/2010 7/30/13 Sep-2013 PASS 2,459 60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 11/2010 7/30/13 Oct-2013 PASS 2,551 60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 12/2010 7/30/13 Nov-2013 PASS 2,998 60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 01/2011 7/30/13 Dec-2013 PASS 3,070 60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 02/2011 7/30/13 Jan-2014 PASS 2,736 60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 03/2011 7/30/13 Feb-2014 PASS 31 60776A W240 Big Horn -‐ Big Horn Wind Project LLC PCC 2 2011 Short-‐term Eligible Short-‐term 01/2011 7/30/13 Dec-2013 PASS 5,877 60776A W240 Big Horn -‐ Big Horn Wind Project LLC PCC 2 2011 Short-‐term Eligible Short-‐term 04/2011 7/30/13 Mar-2014 PASS 1,394 60994A W1385 Columbia Ridge -‐ Columbia Ridge 2 PCC 0 2010 Short-‐term Eligible Short-‐term 01/2011 7/30/13 Dec-2013 PASS 237 60994A W1387 Columbia Ridge -‐ Columbia Ridge 3 PCC 0 2010 Short-‐term Eligible Short-‐term 01/2011 7/30/13 Dec-2013 PASS 582 60994A W1388 Columbia Ridge -‐ Columbia Ridge 4 PCC 0 2010 Short-‐term Eligible Short-‐term 01/2011 7/30/13 Dec-2013 PASS 581 60994A W1389 Columbia Ridge -‐ Columbia Ridge 5 PCC 0 2010 Short-‐term Eligible Short-‐term 01/2011 7/30/13 Dec-2013 PASS 583 60994A W1390 Columbia Ridge -‐ Columbia Ridge 6 PCC 0 2010 Short-‐term Eligible Short-‐term 01/2011 7/30/13 Dec-2013 PASS 579 60994A W1391 Columbia Ridge -‐ Columbia Ridge 7 PCC 0 2010 Short-‐term Eligible Short-‐term 01/2011 7/30/13 Dec-2013 PASS 582 60994A W1392 Columbia Ridge -‐ Columbia Ridge 8 PCC 0 2010 Short-‐term Eligible Short-‐term 01/2011 7/30/13 Dec-2013 PASS 580 60994A W1361 Columbia Ridge -‐ Columbia Ridge 1 PCC 0 2010 Short-‐term Eligible Short-‐term 02/2011 7/30/13 Jan-2014 PASS 527 60994A W1385 Columbia Ridge -‐ Columbia Ridge 2 PCC 0 2010 Short-‐term Eligible Short-‐term 02/2011 7/30/13 Jan-2014 PASS 525 60994A W1387 Columbia Ridge -‐ Columbia Ridge 3 PCC 0 2010 Short-‐term Eligible Short-‐term 02/2011 7/30/13 Jan-2014 PASS 528 60994A W1388 Columbia Ridge -‐ Columbia Ridge 4 PCC 0 2010 Short-‐term Eligible Short-‐term 02/2011 7/30/13 Jan-2014 PASS 527 60994A W1389 Columbia Ridge -‐ Columbia Ridge 5 PCC 0 2010 Short-‐term Eligible Short-‐term 02/2011 7/30/13 Jan-2014 PASS 528 60994A W1390 Columbia Ridge -‐ Columbia Ridge 6 PCC 0 2010 Short-‐term Eligible Short-‐term 02/2011 7/30/13 Jan-2014 PASS 525 60994A W1391 Columbia Ridge -‐ Columbia Ridge 7 PCC 0 2010 Short-‐term Eligible Short-‐term 02/2011 7/30/13 Jan-2014 PASS 528 60994A W1392 Columbia Ridge -‐ Columbia Ridge 8 PCC 0 2010 Short-‐term Eligible Short-‐term 02/2011 7/30/13 Jan-2014 PASS 527 60994A W1361 Columbia Ridge -‐ Columbia Ridge 1 PCC 0 2010 Short-‐term Eligible Short-‐term 03/2011 7/30/13 Feb-2014 PASS 398 60994A W1385 Columbia Ridge -‐ Columbia Ridge 2 PCC 0 2010 Short-‐term Eligible Short-‐term 03/2011 7/30/13 Feb-2014 PASS 596 60994A W1387 Columbia Ridge -‐ Columbia Ridge 3 PCC 0 2010 Short-‐term Eligible Short-‐term 03/2011 7/30/13 Feb-2014 PASS 593 60994A W1388 Columbia Ridge -‐ Columbia Ridge 4 PCC 0 2010 Short-‐term Eligible Short-‐term 03/2011 7/30/13 Feb-2014 PASS 599 60994A W1389 Columbia Ridge -‐ Columbia Ridge 5 PCC 0 2010 Short-‐term Eligible Short-‐term 03/2011 7/30/13 Feb-2014 PASS 575 60994A W1390 Columbia Ridge -‐ Columbia Ridge 6 PCC 0 2010 Short-‐term Eligible Short-‐term 03/2011 7/30/13 Feb-2014 PASS 554 60994A W1391 Columbia Ridge -‐ Columbia Ridge 7 PCC 0 2010 Short-‐term Eligible Short-‐term 03/2011 7/30/13 Feb-2014 PASS 599 60994A W1392 Columbia Ridge -‐ Columbia Ridge 8 PCC 0 2010 Short-‐term Eligible Short-‐term 03/2011 7/30/13 Feb-2014 PASS 599 60994A W1361 Columbia Ridge -‐ Columbia Ridge 1 PCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 7/30/13 Mar-2014 PASS 284 60994A W1385 Columbia Ridge -‐ Columbia Ridge 2 PCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 7/30/13 Mar-2014 PASS 350 60994A W1387 Columbia Ridge -‐ Columbia Ridge 3 PCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 7/30/13 Mar-2014 PASS 514 60994A W1388 Columbia Ridge -‐ Columbia Ridge 4 PCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 7/30/13 Mar-2014 PASS 514 60994A W1389 Columbia Ridge -‐ Columbia Ridge 5 PCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 7/30/13 Mar-2014 PASS 502 60994A W1390 Columbia Ridge -‐ Columbia Ridge 6 PCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 7/30/13 Mar-2014 PASS 512 60994A W1391 Columbia Ridge -‐ Columbia Ridge 7 PCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 7/30/13 Mar-2014 PASS 281 60994A W1392 Columbia Ridge -‐ Columbia Ridge 8 PCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 7/30/13 Mar-2014 PASS 15 60994A W1387 Columbia Ridge -‐ Columbia Ridge 3 PCC 0 2010 Short-‐term Eligible Short-‐term 05/2011 7/30/13 Apr-2014 PASS 20 60994A W1388 Columbia Ridge -‐ Columbia Ridge 4 PCC 0 2010 Short-‐term Eligible Short-‐term 05/2011 7/30/13 Apr-2014 PASS 408 60994A W1389 Columbia Ridge -‐ Columbia Ridge 5 PCC 0 2010 Short-‐term Eligible Short-‐term 05/2011 7/30/13 Apr-2014 PASS 405 60994A W1390 Columbia Ridge -‐ Columbia Ridge 6 PCC 0 2010 Short-‐term Eligible Short-‐term 05/2011 7/30/13 Apr-2014 PASS 91 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2012 7/30/13 Sep-2015 PASS 112 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2012 7/30/13 Oct-2015 PASS 1,219 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2012 7/30/13 Sep-2015 PASS 56 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2012 7/30/13 Oct-2015 PASS 609 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2012 7/30/13 Sep-2015 PASS 31 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2012 7/30/13 Oct-2015 PASS 79 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2012 7/30/13 Nov-2015 PASS 55 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro system PCC 3 2012 Short-‐term Eligible Short-‐term 01/2012 7/30/13 Dec-2014 PASS 2,067 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro system PCC 3 2012 Short-‐term Eligible Short-‐term 02/2012 7/30/13 Jan-2015 PASS 2,124 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro system PCC 3 2012 Short-‐term Eligible Short-‐term 03/2012 7/30/13 Feb-2015 PASS 2,261 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro system PCC 3 2012 Short-‐term Eligible Short-‐term 04/2012 7/30/13 Mar-2015 PASS 2,193 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro system PCC 3 2012 Short-‐term Eligible Short-‐term 05/2012 7/30/13 Apr-2015 PASS 1,355 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 2 2011 Short-‐term Eligible Short-‐term 01/2011 7/30/13 Dec-2013 PASS 1,024 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 2 2011 Short-‐term Eligible Short-‐term 02/2011 7/30/13 Jan-2014 PASS 917 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 2 2011 Short-‐term Eligible Short-‐term 03/2011 7/30/13 Feb-2014 PASS 915 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 2 2011 Short-‐term Eligible Short-‐term 04/2011 7/30/13 Mar-2014 PASS 916 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 2 2011 Short-‐term Eligible Short-‐term 05/2011 7/30/13 Apr-2014 PASS 814 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 2 2011 Short-‐term Eligible Short-‐term 06/2011 7/30/13 May-2014 PASS 934 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 2 2011 Short-‐term Eligible Short-‐term 07/2011 7/30/13 Jun-2014 PASS 587 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 2 2011 Short-‐term Eligible Short-‐term 08/2011 7/30/13 Jul-2014 PASS 669 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 2 2011 Short-‐term Eligible Short-‐term 09/2011 7/30/13 Aug-2014 PASS 496 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 2 2011 Short-‐term Eligible Short-‐term 10/2011 7/30/13 Sep-2014 PASS 698 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 2 2011 Short-‐term Eligible Short-‐term 11/2011 7/30/13 Oct-2014 PASS 974 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 2 2011 Short-‐term Eligible Short-‐term 12/2011 7/30/13 Nov-2014 PASS 516 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2012 Short-‐term Eligible Short-‐term 01/2012 7/30/13 Dec-2014 PASS 3,693 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2012 Short-‐term Eligible Short-‐term 02/2012 7/30/13 Jan-2015 PASS 952 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2012 Short-‐term Eligible Short-‐term 01/2012 7/30/13 Dec-2014 PASS 3,678 60633A W868 Total Energy Facility -‐ TEF -‐ GEN3 PCC 3 2012 Short-‐term Eligible Short-‐term 01/2012 7/30/13 Dec-2014 PASS 3,677 60632A W858 Puente Hills Energy Recovery -‐ Puente Hills Gas-‐to-‐Energy Facility Phase II Gen3PCC 3 2012 Short-‐term Eligible Short-‐term 01/2012 7/30/13 Dec-2014 PASS 1,226
Note : Please create one line per combination of REC vintage and REC retirement date. For example RECs that have the same vintage are retired on two separate dates, please include one line per retirement date. Likewise if RECs of different vintages (e.g. June2012 and July 2012) are retired on the same date, please include one line per vintage.
CPUC ID RPS ID WREGIS_ID Facility Name Expected PCC Classification Contract Year Contract Length Short Term Contract Eligibility Vintage Month/Year Retirement Date (MM/DD/YYYY)
Last Month to Retire REC (Month/Year)
Do RECs "Pass" or "Fail" Requirements of 36 Month
Rule: MWh REC Quantity Retired
60632A W859 Puente Hills Energy Recovery -‐ Puente Hills Gas-‐to-‐Energy Facility Phase II Gen4PCC 3 2012 Short-‐term Eligible Short-‐term 01/2012 7/30/13 Dec-2014 PASS 1,155 60632A W860 Puente Hills Energy Recovery -‐ Puente Hills Gas-‐to-‐Energy Facility Phase II Gen5PCC 3 2012 Short-‐term Eligible Short-‐term 01/2012 7/30/13 Dec-2014 PASS 619 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2012 Short-‐term Eligible Short-‐term 07/2012 7/30/13 Jun-2015 PASS 8,287 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2012 Short-‐term Eligible Short-‐term 08/2012 7/30/13 Jul-2015 PASS 10,144 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2012 Short-‐term Eligible Short-‐term 09/2012 7/30/13 Aug-2015 PASS 4,822 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2012 Short-‐term Eligible Short-‐term 10/2012 7/30/13 Sep-2015 PASS 7,174 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2012 Short-‐term Eligible Short-‐term 11/2012 7/30/13 Oct-2015 PASS 5,002 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2012 Short-‐term Eligible Short-‐term 12/2012 7/30/13 Nov-2015 PASS 10,908 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2012 Short-‐term Eligible Short-‐term 01/2013 7/30/13 Dec-2015 PASS 7,687 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2012 Short-‐term Eligible Short-‐term 02/2013 7/30/13 Jan-2016 PASS 3,697 60974A W2398 Roosevelt Biogas 1 -‐ LFG Engines 7-‐9 -‐ LFG Phase II PCC 1 2012 Short-‐term Eligible Short-‐term 08/2012 7/30/13 Jul-2015 PASS 1,444 60974A W2398 Roosevelt Biogas 1 -‐ LFG Engines 7-‐9 -‐ LFG Phase II PCC 1 2012 Short-‐term Eligible Short-‐term 09/2012 7/30/13 Aug-2015 PASS 1,424 60974A W2398 Roosevelt Biogas 1 -‐ LFG Engines 7-‐9 -‐ LFG Phase II PCC 1 2012 Short-‐term Eligible Short-‐term 10/2012 7/30/13 Sep-2015 PASS 1,486 60974A W2398 Roosevelt Biogas 1 -‐ LFG Engines 7-‐9 -‐ LFG Phase II PCC 1 2012 Short-‐term Eligible Short-‐term 11/2012 7/30/13 Oct-2015 PASS 1,438 60974A W2398 Roosevelt Biogas 1 -‐ LFG Engines 7-‐9 -‐ LFG Phase II PCC 1 2012 Short-‐term Eligible Short-‐term 12/2012 7/30/13 Nov-2015 PASS 1,487 61202A W1690 Juniper Canyon -‐ Juniper Canyon PCC 2 2012 Short-‐term Eligible Short-‐term 10/2012 7/30/13 Sep-2015 PASS 16,000 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2012 7/30/13 Nov-2015 PASS 795 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2012 7/30/13 Nov-2015 PASS 397 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5 & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2012 7/30/13 Nov-2015 PASS 1,200
Annual RPS Compliance Report: (2013) 36 Month RetirementData Reported by:Marin Clean Energy (MCE) Input Required Input RequiredAugust 31, 2018 Information is Hard Coded (No Input Required) Information is Hard Coded (No Input Required)
CPUC ID RPS ID WREGIS_ID Facility Name Expected PCC Classification Contract Year Contract Length Short Term Contract Eligibility Vintage Month/Year Retirement Date (MM/DD/YYYY)
Last Month to Retire REC (Month/Year)
Do RECs "Pass" or "Fail" Requirements of 36 Month
Rule: MWh REC Quantity Retired
61221A W2775 AgPower Jerome, LLC -‐ Double A Dairy Digester PCC 3 2012 Short-‐term Eligible Short-‐term 01/2013 6/4/14 Dec-2015 PASS 1,553 61221A W2775 AgPower Jerome, LLC -‐ Double A Dairy Digester PCC 3 2012 Short-‐term Eligible Short-‐term 05/2013 6/4/14 Apr-2016 PASS 2,385 61221A W2775 AgPower Jerome, LLC -‐ Double A Dairy Digester PCC 3 2012 Short-‐term Eligible Short-‐term 06/2013 6/4/14 May-2016 PASS 2,275 60072A W787 Beardsley -‐ Beardsley PCC 1 2012 Short-‐term Eligible Short-‐term 01/2013 6/9/13 Dec-2015 PASS 3,934 60072A W787 Beardsley -‐ Beardsley PCC 1 2012 Short-‐term Eligible Short-‐term 02/2013 6/9/13 Jan-2016 PASS 3,156 60072A W787 Beardsley -‐ Beardsley PCC 1 2012 Short-‐term Eligible Short-‐term 03/2013 6/9/13 Feb-2016 PASS 2,707 60072A W787 Beardsley -‐ Beardsley PCC 1 2012 Short-‐term Eligible Short-‐term 04/2013 6/9/13 Mar-2016 PASS 2,931 60072A W787 Beardsley -‐ Beardsley PCC 1 2012 Short-‐term Eligible Short-‐term 05/2013 6/9/13 Apr-2016 PASS 3,304 60072A W787 Beardsley -‐ Beardsley PCC 1 2012 Short-‐term Eligible Short-‐term 06/2013 6/9/13 May-2016 PASS 2,706 60776A W240 Big Horn -‐ Big Horn Wind Project LLC PCC 2 2011 Short-‐term Eligible Short-‐term 01/2011 12/6/13 Dec-2013 PASS 6,303 60776A W240 Big Horn -‐ Big Horn Wind Project LLC PCC 2 2011 Short-‐term Eligible Short-‐term 02/2011 1/16/14 Jan-2014 PASS 5,699 60776A W240 Big Horn -‐ Big Horn Wind Project LLC PCC 2 2011 Short-‐term Eligible Short-‐term 02/2011 1/27/14 Jan-2014 PASS 1,092 61378A W1952 Birch Creek Power -‐ Birch Creek Power PCC 3 2012 Short-‐term Eligible Short-‐term 01/2013 6/4/14 Dec-2015 PASS 17 61378A W1952 Birch Creek Power -‐ Birch Creek Power PCC 3 2012 Short-‐term Eligible Short-‐term 02/2013 6/4/14 Jan-2016 PASS 810 61378A W1952 Birch Creek Power -‐ Birch Creek Power PCC 3 2012 Short-‐term Eligible Short-‐term 03/2013 6/4/14 Feb-2016 PASS 1,310 61378A W1952 Birch Creek Power -‐ Birch Creek Power PCC 3 2012 Short-‐term Eligible Short-‐term 04/2013 6/4/14 Mar-2016 PASS 1,300 61378A W1952 Birch Creek Power -‐ Birch Creek Power PCC 3 2012 Short-‐term Eligible Short-‐term 05/2013 6/4/14 Apr-2016 PASS 1,281 61378A W1952 Birch Creek Power -‐ Birch Creek Power PCC 3 2012 Short-‐term Eligible Short-‐term 06/2013 6/4/14 May-2016 PASS 1,084 60994A W1361 Columbia Ridge -‐ Columbia Ridge 1 PCC 0 2010 Short-‐term Eligible Short-‐term 05/2011 4/25/14 Apr-2014 PASS 399 60994A W1361 Columbia Ridge -‐ Columbia Ridge 1 PCC 0 2010 Short-‐term Eligible Short-‐term 06/2011 4/25/14 May-2014 PASS 547 60994A W1385 Columbia Ridge -‐ Columbia Ridge 2 PCC 0 2010 Short-‐term Eligible Short-‐term 05/2011 4/25/14 Apr-2014 PASS 405 60994A W1385 Columbia Ridge -‐ Columbia Ridge 2 PCC 0 2010 Short-‐term Eligible Short-‐term 06/2011 4/25/14 May-2014 PASS 540 60994A W1387 Columbia Ridge -‐ Columbia Ridge 3 PCC 0 2010 Short-‐term Eligible Short-‐term 05/2011 4/25/14 Apr-2014 PASS 382 60994A W1387 Columbia Ridge -‐ Columbia Ridge 3 PCC 0 2010 Short-‐term Eligible Short-‐term 06/2011 4/25/14 May-2014 PASS 540 60994A W1388 Columbia Ridge -‐ Columbia Ridge 4 PCC 0 2010 Short-‐term Eligible Short-‐term 06/2011 4/25/14 May-2014 PASS 558 60994A W1389 Columbia Ridge -‐ Columbia Ridge 5 PCC 0 2010 Short-‐term Eligible Short-‐term 06/2011 4/25/14 May-2014 PASS 560 60994A W1390 Columbia Ridge -‐ Columbia Ridge 6 PCC 0 2010 Short-‐term Eligible Short-‐term 05/2011 4/25/14 Apr-2014 PASS 315 60994A W1390 Columbia Ridge -‐ Columbia Ridge 6 PCC 0 2010 Short-‐term Eligible Short-‐term 06/2011 4/25/14 May-2014 PASS 556 60994A W1391 Columbia Ridge -‐ Columbia Ridge 7 PCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 3/25/14 Mar-2014 PASS 251 60994A W1391 Columbia Ridge -‐ Columbia Ridge 7 PCC 0 2010 Short-‐term Eligible Short-‐term 05/2011 4/25/14 Apr-2014 PASS 401 60994A W1391 Columbia Ridge -‐ Columbia Ridge 7 PCC 0 2010 Short-‐term Eligible Short-‐term 06/2011 4/25/14 May-2014 PASS 548 60994A W1392 Columbia Ridge -‐ Columbia Ridge 8 PCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 3/25/14 Mar-2014 PASS 512 60994A W1392 Columbia Ridge -‐ Columbia Ridge 8 PCC 0 2010 Short-‐term Eligible Short-‐term 05/2011 4/25/14 Apr-2014 PASS 409 60994A W1392 Columbia Ridge -‐ Columbia Ridge 8 PCC 0 2010 Short-‐term Eligible Short-‐term 06/2011 4/25/14 May-2014 PASS 507 60928A W1379 Combine Hills II -‐ Eurus Combine Hills II LLC PCC 0 2010 Short-‐term Eligible Short-‐term 01/2011 11/25/13 Dec-2013 PASS 17,225 60928A W1379 Combine Hills II -‐ Eurus Combine Hills II LLC PCC 0 2010 Short-‐term Eligible Short-‐term 02/2011 1/16/14 Jan-2014 PASS 15,457 60928A W1379 Combine Hills II -‐ Eurus Combine Hills II LLC PCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 3/25/14 Mar-2014 PASS 1,219 61381A W2011 Dry Creek Project -‐ Dry Creek Project PCC 3 2012 Short-‐term Eligible Short-‐term 01/2013 6/4/14 Dec-2015 PASS 281 61381A W2011 Dry Creek Project -‐ Dry Creek Project PCC 3 2012 Short-‐term Eligible Short-‐term 02/2013 6/4/14 Jan-2016 PASS 185 61375A W225 Falls Creek Hydro -‐ Falls Creek Hydro PCC 3 2012 Short-‐term Eligible Short-‐term 01/2013 6/4/14 Dec-2015 PASS 1,644 61375A W225 Falls Creek Hydro -‐ Falls Creek Hydro PCC 3 2012 Short-‐term Eligible Short-‐term 02/2013 6/4/14 Jan-2016 PASS 1,160 61375A W225 Falls Creek Hydro -‐ Falls Creek Hydro PCC 3 2012 Short-‐term Eligible Short-‐term 03/2013 6/4/14 Feb-2016 PASS 2,375 61375A W225 Falls Creek Hydro -‐ Falls Creek Hydro PCC 3 2012 Short-‐term Eligible Short-‐term 04/2013 6/4/14 Mar-2016 PASS 3,194 61375A W225 Falls Creek Hydro -‐ Falls Creek Hydro PCC 3 2012 Short-‐term Eligible Short-‐term 05/2013 6/4/14 Apr-2016 PASS 2,684 61375A W225 Falls Creek Hydro -‐ Falls Creek Hydro PCC 3 2012 Short-‐term Eligible Short-‐term 06/2013 6/4/14 May-2016 PASS 853 61375A W225 Falls Creek Hydro -‐ Falls Creek Hydro PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/4/14 Jun-2016 PASS 111 61375A W225 Falls Creek Hydro -‐ Falls Creek Hydro PCC 3 2012 Short-‐term Eligible Short-‐term 08/2013 6/4/14 Jul-2016 PASS 18 61205A W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 11/2013 6/20/14 Oct-2016 PASS 880 61205A W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2013 6/20/14 Nov-2016 PASS 988 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 09/2013 6/9/14 Aug-2016 PASS 1,031 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2013 6/9/14 Sep-2016 PASS 35 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2013 6/20/14 Sep-2016 PASS 1,003 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 11/2013 6/20/14 Oct-2016 PASS 874 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2013 6/20/14 Nov-2016 PASS 970 60804A W965 Glenrock III -‐ Glenrock III PCC 3 2013 Short-‐term Eligible Short-‐term 01/2013 6/4/14 Dec-2015 PASS 704 60819A W536 Goodnoe Hills -‐ Goodnoe Hills PCC 3 2013 Short-‐term Eligible Short-‐term 02/2013 6/4/14 Jan-2016 PASS 1,114 60899A W1334 High Plains -‐ High Plains PCC 3 2013 Short-‐term Eligible Short-‐term 02/2013 6/4/14 Jan-2016 PASS 1,005 61202A W1690 Juniper Canyon -‐ Juniper Canyon PCC 2 2012 Short-‐term Eligible Short-‐term 06/2013 5/21/14 May-2016 PASS 10,649 61202A W1690 Juniper Canyon -‐ Juniper Canyon PCC 2 2012 Short-‐term Eligible Short-‐term 07/2013 5/27/14 Jun-2016 PASS 4,307 61200A W1689 Leaning Juniper II -‐ Leaning Juniper II PCC 2 2012 Short-‐term Eligible Short-‐term 06/2013 5/27/14 May-2016 PASS 9,016 61200A W1689 Leaning Juniper II -‐ Leaning Juniper II PCC 2 2012 Short-‐term Eligible Short-‐term 07/2013 5/27/14 Jun-2016 PASS 25,028 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2013 6/9/14 Dec-2015 PASS 435 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2013 6/9/14 Jan-2016 PASS 427 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2013 6/9/14 Feb-2016 PASS 475 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2013 6/9/14 Mar-2016 PASS 445 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2013 6/9/14 Apr-2016 PASS 440 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2013 6/9/14 May-2016 PASS 404 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2013 6/9/14 Jun-2016 PASS 394 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2013 6/9/14 Jul-2016 PASS 388 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2013 6/9/14 Aug-2016 PASS 367 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2013 6/9/14 Sep-2016 PASS 327 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2013 6/9/14 Oct-2016 PASS 299 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2013 6/9/14 Nov-2016 PASS 420 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2013 6/9/14 Dec-2015 PASS 868 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2013 6/9/14 Jan-2016 PASS 855
Note : Please create one line per combination of REC vintage and REC retirement date. For example RECs that have the same vintage are retired on two separate dates, please include one line per retirement date. Likewise if RECs of different vintages (e.g. June2013 and July 2013) are retired on the same date, please include one line per vintage.
61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2013 6/9/14 Feb-2016 PASS 949 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2013 6/9/14 Mar-2016 PASS 890 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2013 6/9/14 Apr-2016 PASS 881 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2013 6/9/14 May-2016 PASS 807 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2013 6/9/14 Jun-2016 PASS 788 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2013 6/9/14 Jul-2016 PASS 777 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2013 6/9/14 Aug-2016 PASS 734 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2013 6/9/14 Sep-2016 PASS 654 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2013 6/9/14 Oct-2016 PASS 597 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2013 6/9/14 Nov-2016 PASS 840 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2013 6/9/14 Dec-2015 PASS 1,309 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2013 6/9/14 Jan-2016 PASS 1,291 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2013 6/9/14 Feb-2016 PASS 1,431 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2013 6/9/14 Mar-2016 PASS 1,345 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2013 6/9/14 Apr-2016 PASS 1,329 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2013 6/9/14 May-2016 PASS 1,218 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2013 6/9/14 Jun-2016 PASS 1,189 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2013 6/9/14 Jul-2016 PASS 1,173 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2013 6/9/14 Aug-2016 PASS 1,108 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2013 6/9/14 Sep-2016 PASS 987 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2013 6/9/14 Oct-2016 PASS 901 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2013 6/9/14 Nov-2016 PASS 1,267 61380A W2009 Marsh Valley Project -‐ Marsh Valley Project PCC 3 2012 Short-‐term Eligible Short-‐term 01/2013 6/4/14 Dec-2015 PASS 443 61380A W2009 Marsh Valley Project -‐ Marsh Valley Project PCC 3 2012 Short-‐term Eligible Short-‐term 02/2013 6/4/14 Jan-2016 PASS 481 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 05/2012 6/4/14 Apr-2015 PASS 961 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 06/2012 6/4/14 May-2015 PASS 2,137 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 07/2012 6/4/14 Jun-2015 PASS 2,031 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 08/2012 6/4/14 Jul-2015 PASS 2,043 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 09/2012 6/4/14 Aug-2015 PASS 2,041 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 10/2012 6/4/14 Sep-2015 PASS 787 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 01/2013 6/4/14 Dec-2015 PASS 2,364 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 02/2013 6/4/14 Jan-2016 PASS 2,130 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 03/2013 6/4/14 Feb-2016 PASS 2,355 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 04/2013 6/4/14 Mar-2016 PASS 2,304 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 05/2013 6/4/14 Apr-2016 PASS 1,847 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 06/2013 6/4/14 May-2016 PASS 2,100 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/4/14 Jun-2016 PASS 2,001 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 08/2013 6/4/14 Jul-2016 PASS 1,854 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 09/2013 6/4/14 Aug-2016 PASS 11 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 10/2013 6/4/14 Sep-2016 PASS 2,149 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 11/2013 6/4/14 Oct-2016 PASS 2,319 61383A W1877 Middle Fork Irrigation District -‐ Hydro system -‐ Middle Fork Irrigation District -‐ Hydro systemPCC 3 2012 Short-‐term Eligible Short-‐term 12/2013 6/4/14 Nov-2016 PASS 566 62314A W2869 Mountain Air Wind Projects -‐ Mountain Air Wind Projects PCC 3 2013 Short-‐term Eligible Short-‐term 06/2013 6/4/14 May-2016 PASS 18,747 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 0 2010 Short-‐term Eligible Short-‐term 09/2010 7/28/13 Aug-2013 PASS 623 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 0 2010 Short-‐term Eligible Short-‐term 12/2010 8/14/13 Nov-2013 PASS 662 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 3 2013 Short-‐term Eligible Short-‐term 03/2013 6/4/14 Feb-2016 PASS 1,152 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3 PCC 3 2013 Short-‐term Eligible Short-‐term 06/2013 6/4/14 May-2016 PASS 133 60923A W1884 Pilgrim Stage Station Wind Park, LLC -‐ Pilgrim Stage Station Wind ParkPCC 3 2012 Short-‐term Eligible Short-‐term 01/2013 6/4/14 Dec-2015 PASS 1,609 60806A W928 Rolling Hills -‐ Rolling Hills PCC 3 2013 Short-‐term Eligible Short-‐term 01/2013 6/4/14 Dec-2015 PASS 1,259 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2013 6/9/14 Dec-2015 PASS 88 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2013 6/9/14 Jan-2016 PASS 113 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2013 6/9/14 Feb-2016 PASS 144 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2013 6/9/14 Mar-2016 PASS 190 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2013 6/9/14 Apr-2016 PASS 203 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2013 6/9/14 May-2016 PASS 203 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2013 6/9/14 Jun-2016 PASS 209 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2013 6/9/14 Jul-2016 PASS 197 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2013 6/9/14 Aug-2016 PASS 159 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2013 6/9/14 Sep-2016 PASS 134 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2013 6/9/14 Oct-2016 PASS 85 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2013 6/9/14 Nov-2016 PASS 82 60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 3/25/14 Mar-2014 PASS 3,170 60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 05/2011 4/25/14 Apr-2014 PASS 2,048 60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific Burlington PCC 0 2010 Short-‐term Eligible Short-‐term 06/2011 4/25/14 May-2014 PASS 2,807 60925A W1881 Thousand Springs Wind Park, LLC -‐ Thousand Springs Wind Park PCC 3 2012 Short-‐term Eligible Short-‐term 01/2013 6/4/14 Dec-2015 PASS 2,755 60925A W1881 Thousand Springs Wind Park, LLC -‐ Thousand Springs Wind Park PCC 3 2012 Short-‐term Eligible Short-‐term 02/2013 6/4/14 Jan-2016 PASS 3,323 60924A W1883 Tuana Gulch Wind Park, LLC -‐ Tuana Gulch Wind Park PCC 3 2012 Short-‐term Eligible Short-‐term 01/2013 6/4/14 Dec-2015 PASS 2,221 60924A W1883 Tuana Gulch Wind Park, LLC -‐ Tuana Gulch Wind Park PCC 3 2012 Short-‐term Eligible Short-‐term 02/2013 6/4/14 Jan-2016 PASS 2,648 60071A W788 Tulloch -‐ Tulloch PCC 1 2012 Short-‐term Eligible Short-‐term 01/2013 6/9/14 Dec-2015 PASS 1,888 60071A W788 Tulloch -‐ Tulloch PCC 1 2012 Short-‐term Eligible Short-‐term 02/2013 6/9/14 Jan-2016 PASS 6,948 60071A W788 Tulloch -‐ Tulloch PCC 1 2012 Short-‐term Eligible Short-‐term 03/2013 6/9/14 Feb-2016 PASS 9,790 60071A W788 Tulloch -‐ Tulloch PCC 1 2012 Short-‐term Eligible Short-‐term 04/2013 6/9/14 Mar-2016 PASS 12,447 60071A W788 Tulloch -‐ Tulloch PCC 1 2012 Short-‐term Eligible Short-‐term 05/2013 6/9/14 Apr-2016 PASS 14,330 60071A W788 Tulloch -‐ Tulloch PCC 1 2012 Short-‐term Eligible Short-‐term 06/2013 6/9/14 May-2016 PASS 7,300 60071A W3091 Tulloch -‐ Tulloch -‐ Unit 3 PCC 1 2012 Short-‐term Eligible Short-‐term 03/2013 6/9/14 Feb-2016 PASS 515 60071A W3091 Tulloch -‐ Tulloch -‐ Unit 3 PCC 1 2012 Short-‐term Eligible Short-‐term 04/2013 6/9/14 Mar-2016 PASS 655 60071A W3091 Tulloch -‐ Tulloch -‐ Unit 3 PCC 1 2012 Short-‐term Eligible Short-‐term 05/2013 6/9/14 Apr-2016 PASS 754 60071A W3091 Tulloch -‐ Tulloch -‐ Unit 3 PCC 1 2012 Short-‐term Eligible Short-‐term 06/2013 6/9/14 May-2016 PASS 635 60564A W188 Wolverine Creek -‐ Wolverine Creek PCC 3 2013 Short-‐term Eligible Short-‐term 02/2013 6/4/14 Jan-2016 PASS 886
Annual RPS Compliance Report: (2014) 36 Month RetirementData Reported by:Marin Clean Energy (MCE) Input RequiredAugust 31, 2018 Information is Hard Coded (No Input Required)
CPUC ID RPS ID WREGIS_ID Facility Name Expected PCC Classification Contract Year Contract Length Short Term Contract Eligibility Vintage Month/Year Retirement Date (MM/DD/YYYY)
Last Month to Retire REC (Month/Year)
Do RECs "Pass" or "Fail" Requirements of 36 Month
Rule: MWh REC Quantity Retired
62244A W3537 Alta 10 PCC 2 2014 Short-‐term Eligible Short-‐term 07/2014 6/29/15 Jun-2017 PASS 22,950 62244A W3537 Alta 10 PCC 2 2014 Short-‐term Eligible Short-‐term 08/2014 5/13/15 Jul-2017 PASS 7,704 62244A W3537 Alta 10 PCC 2 2014 Short-‐term Eligible Short-‐term 08/2014 6/29/15 Jul-2017 PASS 9,185 62244A W3537 Alta 10 PCC 2 2014 Short-‐term Eligible Short-‐term 09/2014 6/29/15 Aug-2017 PASS 7,140 62244A W3537 Alta 10 PCC 2 2014 Short-‐term Eligible Short-‐term 10/2014 6/29/15 Sep-2017 PASS 812 62244A W3537 Alta 10 PCC 2 2014 Short-‐term Eligible Short-‐term 11/2014 6/29/15 Oct-2017 PASS 12,209 60736A W834 Cabazon Wind Partners PCC 1 2012 Short-‐term Eligible Short-‐term 01/2014 6/29/15 Dec-2016 PASS 5,530 60736A W834 Cabazon Wind Partners PCC 1 2012 Short-‐term Eligible Short-‐term 02/2014 6/29/15 Jan-2017 PASS 7,649 60736A W834 Cabazon Wind Partners PCC 1 2012 Short-‐term Eligible Short-‐term 03/2014 6/29/15 Feb-2017 PASS 9,646 60736A W834 Cabazon Wind Partners PCC 1 2012 Short-‐term Eligible Short-‐term 04/2014 6/29/15 Mar-2017 PASS 7,755 61017A W1383 Campbell Hill PCC 3 2014 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 1,746 61017A W1383 Campbell Hill PCC 3 2014 Short-‐term Eligible Short-‐term 08/2013 6/22/15 Jul-2016 PASS 7,202 61017A W1383 Campbell Hill PCC 3 2014 Short-‐term Eligible Short-‐term 07/2014 6/22/15 Jun-2017 PASS 7,404 61188A W1687 Dunlap 1 PCC 3 2014 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 3,513 60928A W1379 Combine Hills II -‐ Eurus Combine Hills II LLCPCC 0 2010 Short-‐term Eligible Short-‐term 03/2011 2/24/14 Feb-2014 PASS 20,492 60928A W1379 Combine Hills II -‐ Eurus Combine Hills II LLCPCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 3/25/14 Mar-2014 PASS 15,561 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 07/2013 6/23/15 Jun-2016 PASS 910 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 08/2013 6/23/15 Jul-2016 PASS 1,060 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 09/2013 6/23/15 Aug-2016 PASS 1,046 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2013 6/23/15 Sep-2016 PASS 1,080 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 01/2014 6/23/15 Dec-2016 PASS 457 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 02/2014 6/23/15 Jan-2017 PASS 968 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 03/2014 6/23/15 Feb-2017 PASS 1,085 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 04/2014 6/23/15 Mar-2017 PASS 1,043 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 05/2014 6/23/15 Apr-2017 PASS 1,033 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 06/2014 6/23/15 May-2017 PASS 916 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 07/2014 6/23/15 Jun-2017 PASS 1,053 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 08/2014 6/23/15 Jul-2017 PASS 1,051 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 09/2014 6/23/15 Aug-2017 PASS 698 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2014 6/23/15 Sep-2017 PASS 1,054 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 11/2014 6/23/15 Oct-2017 PASS 1,077 61205C W3547 G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2014 6/23/15 Nov-2017 PASS 1,092 61206A W1565 G2 Energy Ostrom Rd PCC 1 2010 Long-‐term Long-‐term -‐ N/A 01/2014 6/23/15 Dec-2016 PASS 27 61206A W1565 G2 Energy Ostrom Rd PCC 1 2010 Long-‐term Long-‐term -‐ N/A 05/2014 6/23/15 Apr-2017 PASS 102 61206A W1565 G2 Energy Ostrom Rd PCC 1 2010 Long-‐term Long-‐term -‐ N/A 06/2014 6/23/15 May-2017 PASS 70 61206A W1565 G2 Energy Ostrom Rd PCC 1 2010 Long-‐term Long-‐term -‐ N/A 07/2014 6/23/15 Jun-2017 PASS 210 61206A W1565 G2 Energy Ostrom Rd PCC 1 2010 Long-‐term Long-‐term -‐ N/A 08/2014 6/23/15 Jul-2017 PASS 70 61206A W1565 G2 Energy Ostrom Rd PCC 1 2010 Long-‐term Long-‐term -‐ N/A 09/2014 6/23/15 Aug-2017 PASS 14 61206A W1565 G2 Energy Ostrom Rd PCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2014 6/23/15 Sep-2017 PASS 145 61206A W1565 G2 Energy Ostrom Rd PCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2014 6/23/15 Nov-2017 PASS 2 61206A W3932 G2 Energy Ostrom Rd Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 01/2014 6/23/15 Dec-2016 PASS 1,071 61206A W3932 G2 Energy Ostrom Rd Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 02/2014 6/23/15 Jan-2017 PASS 969 61206A W3932 G2 Energy Ostrom Rd Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 03/2014 6/23/15 Feb-2017 PASS 1,104 61206A W3932 G2 Energy Ostrom Rd Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 04/2014 6/23/15 Mar-2017 PASS 1,053 61206A W3932 G2 Energy Ostrom Rd Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 05/2014 6/23/15 Apr-2017 PASS 988 61206A W3932 G2 Energy Ostrom Rd Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 06/2014 6/23/15 May-2017 PASS 979 61206A W3932 G2 Energy Ostrom Rd Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 07/2014 6/23/15 Jun-2017 PASS 862 61206A W3932 G2 Energy Ostrom Rd Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 08/2014 6/23/15 Jul-2017 PASS 992 61206A W3932 G2 Energy Ostrom Rd Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 09/2014 6/23/15 Aug-2017 PASS 938 61206A W3932 G2 Energy Ostrom Rd Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2014 6/23/15 Sep-2017 PASS 955 61206A W3932 G2 Energy Ostrom Rd Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 11/2014 6/23/15 Oct-2017 PASS 1,058 61206A W3932 G2 Energy Ostrom Rd Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2014 6/23/15 Nov-2017 PASS 1,104 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2013 Short-‐term Eligible Short-‐term 01/2014 6/29/15 Dec-2016 PASS 2,232 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2013 Short-‐term Eligible Short-‐term 02/2014 6/29/15 Jan-2017 PASS 2,016 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2013 Short-‐term Eligible Short-‐term 03/2014 6/29/15 Feb-2017 PASS 2,229 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2013 Short-‐term Eligible Short-‐term 04/2014 6/29/15 Mar-2017 PASS 2,160 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2013 Short-‐term Eligible Short-‐term 05/2014 6/29/15 Apr-2017 PASS 2,232 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2013 Short-‐term Eligible Short-‐term 06/2014 6/29/15 May-2017 PASS 2,160 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2013 Short-‐term Eligible Short-‐term 07/2014 6/29/15 Jun-2017 PASS 2,232 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2013 Short-‐term Eligible Short-‐term 08/2014 6/29/15 Jul-2017 PASS 2,232 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2013 Short-‐term Eligible Short-‐term 09/2014 6/29/15 Aug-2017 PASS 2,160 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2013 Short-‐term Eligible Short-‐term 10/2014 6/29/15 Sep-2017 PASS 2,232 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2013 Short-‐term Eligible Short-‐term 11/2014 6/29/15 Oct-2017 PASS 2,163 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2013 Short-‐term Eligible Short-‐term 12/2014 6/29/15 Nov-2017 PASS 2,232 60008A W125 Geysers Power Plant -‐ Calpine Geothermal Unit 18PCC 1 2014 Short-‐term Eligible Short-‐term 07/2014 6/29/15 Jun-2017 PASS 11,074 60008A W125 Geysers Power Plant -‐ Calpine Geothermal Unit 18PCC 1 2014 Short-‐term Eligible Short-‐term 08/2014 6/29/15 Jul-2017 PASS 8,924 60008A W125 Geysers Power Plant -‐ Calpine Geothermal Unit 18PCC 1 2014 Short-‐term Eligible Short-‐term 09/2014 6/29/15 Aug-2017 PASS 5,002 60805A W964 Glenrock I PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 2,025 60805A W964 Glenrock I PCC 3 2012 Short-‐term Eligible Short-‐term 08/2013 6/22/15 Jul-2016 PASS 785
Note : Please create one line per combination of REC vintage and REC retirement date. For example RECs that have the same vintage are retired on two separate dates, please include one line per retirement date. Likewise if RECs of different vintages (e.g. June 2014 and July 2014) are retired on the same date, please include one line per vintage.
CPUC ID RPS ID WREGIS_ID Facility Name Expected PCC Classification Contract Year Contract Length Short Term Contract Eligibility Vintage Month/Year Retirement Date (MM/DD/YYYY)
Last Month to Retire REC (Month/Year)
Do RECs "Pass" or "Fail" Requirements of 36 Month
Rule: MWh REC Quantity Retired
60805A W964 Glenrock I PCC 3 2012 Short-‐term Eligible Short-‐term 07/2014 6/22/15 Jun-2017 PASS 7,883 60804A W965 Glenrock III PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 639 60804A W965 Glenrock III PCC 3 2012 Short-‐term Eligible Short-‐term 08/2013 6/22/15 Jul-2016 PASS 532 60804A W965 Glenrock III PCC 3 2012 Short-‐term Eligible Short-‐term 07/2014 6/22/15 Jun-2017 PASS 3,039 60917A W1862 Golden Valley Wind Park PCC 3 2012 Short-‐term Eligible Short-‐term 11/2013 6/22/15 Oct-2016 PASS 2,216 60917A W1862 Golden Valley Wind Park PCC 3 2012 Short-‐term Eligible Short-‐term 12/2013 6/22/15 Nov-2016 PASS 2,472 60917A W1862 Golden Valley Wind Park PCC 3 2012 Short-‐term Eligible Short-‐term 01/2014 6/22/15 Dec-2016 PASS 2,646 60917A W1862 Golden Valley Wind Park PCC 3 2012 Short-‐term Eligible Short-‐term 02/2014 6/22/15 Jan-2017 PASS 2,354 60819A W536 Goodnoe Hills PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 1,491 60724A W978 Hay Canyon PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 2,754 60724A W978 Hay Canyon PCC 3 2012 Short-‐term Eligible Short-‐term 09/2013 6/22/15 Aug-2016 PASS 449 60899A W1334 High Plains PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 2,778 60745A W184 Hopkins Ridge PCC 3 2012 Short-‐term Eligible Short-‐term 08/2013 6/22/15 Jul-2016 PASS 5,000 60745A W184 Hopkins Ridge PCC 3 2012 Short-‐term Eligible Short-‐term 09/2013 6/22/15 Aug-2016 PASS 2,500 61202A W1690 Juniper Canyon PCC 2 2012 Short-‐term Eligible Short-‐term 03/2014 2/9/15 Feb-2017 PASS 7,180 61202A W1690 Juniper Canyon PCC 2 2012 Short-‐term Eligible Short-‐term 04/2014 2/9/15 Mar-2017 PASS 878 61202A W1690 Juniper Canyon PCC 2 2012 Short-‐term Eligible Short-‐term 05/2014 2/9/15 Apr-2017 PASS 13,178 61202A W1690 Juniper Canyon PCC 2 2012 Short-‐term Eligible Short-‐term 06/2014 2/9/15 May-2017 PASS 2,717 61263A W4192 Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 12/2014 6/23/15 Nov-2017 PASS 1,437 60602A W237 Klondike Wind Power III LLC PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 8,113 61200A W1689 Leaning Juniper II PCC 2 2012 Short-‐term Eligible Short-‐term 03/2014 2/9/15 Feb-2017 PASS 7,435 61200A W1689 Leaning Juniper II PCC 2 2012 Short-‐term Eligible Short-‐term 04/2014 2/9/15 Mar-2017 PASS 12,785 61200A W1689 Leaning Juniper II PCC 2 2012 Short-‐term Eligible Short-‐term 05/2014 2/9/15 Apr-2017 PASS 5,827 60974A W2398 LFG Phase II -‐ LFG Engines 7-‐9 (Roosevelt Biogas 1)PCC 1 2011 Short-‐term Eligible Short-‐term 01/2014 6/29/15 Dec-2016 PASS 526 61632A W2318 Lincoln Landfill Power Plant, Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2014 6/29/15 Dec-2016 PASS 760 61632A W2318 Lincoln Landfill Power Plant, Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2014 6/29/15 Jan-2017 PASS 793 61632A W2318 Lincoln Landfill Power Plant, Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2014 6/29/15 Feb-2017 PASS 932 61632A W2318 Lincoln Landfill Power Plant, Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2014 6/29/15 Mar-2017 PASS 965 61632A W2318 Lincoln Landfill Power Plant, Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2014 6/29/15 Apr-2017 PASS 862 61632A W2318 Lincoln Landfill Power Plant, Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2014 6/29/15 May-2017 PASS 1,032 61632A W2318 Lincoln Landfill Power Plant, Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2014 6/29/15 Jun-2017 PASS 1,061 61632A W2318 Lincoln Landfill Power Plant, Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2014 6/29/15 Jul-2017 PASS 799 61632A W2318 Lincoln Landfill Power Plant, Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2014 6/29/15 Aug-2017 PASS 697 61632A W2318 Lincoln Landfill Power Plant, Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2014 6/29/15 Sep-2017 PASS 943 61632A W2318 Lincoln Landfill Power Plant, Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2014 6/29/15 Oct-2017 PASS 970 61632A W2318 Lincoln Landfill Power Plant, Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2014 6/29/15 Nov-2017 PASS 819 61632A W2319 Lincoln Landfill Power Plant, Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2014 6/23/15 Dec-2016 PASS 380 61632A W2319 Lincoln Landfill Power Plant, Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2014 6/23/15 Jan-2017 PASS 396 61632A W2319 Lincoln Landfill Power Plant, Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2014 6/23/15 Feb-2017 PASS 466 61632A W2319 Lincoln Landfill Power Plant, Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2014 6/23/15 Mar-2017 PASS 483 61632A W2319 Lincoln Landfill Power Plant, Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2014 6/23/15 Apr-2017 PASS 431 61632A W2319 Lincoln Landfill Power Plant, Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2014 6/23/15 May-2017 PASS 516 61632A W2319 Lincoln Landfill Power Plant, Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2014 6/23/15 Jun-2017 PASS 530 61632A W2319 Lincoln Landfill Power Plant, Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2014 6/23/15 Jul-2017 PASS 400 61632A W2319 Lincoln Landfill Power Plant, Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2014 6/23/15 Aug-2017 PASS 348 61632A W2319 Lincoln Landfill Power Plant, Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2014 6/23/15 Sep-2017 PASS 472 61632A W2319 Lincoln Landfill Power Plant, Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2014 6/23/15 Oct-2017 PASS 485 61632A W2319 Lincoln Landfill Power Plant, Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2014 6/23/15 Nov-2017 PASS 409 61632A W3188 Lincoln Landfill Power Plant, Units 4, 5 &6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2014 6/29/15 Dec-2016 PASS 1,148 61632A W3188 Lincoln Landfill Power Plant, Units 4, 5 &6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2014 6/29/15 Jan-2017 PASS 1,196 61632A W3188 Lincoln Landfill Power Plant, Units 4, 5 &6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2014 6/29/15 Feb-2017 PASS 1,407 61632A W3188 Lincoln Landfill Power Plant, Units 4, 5 &6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2014 6/29/15 Mar-2017 PASS 1,456 61632A W3188 Lincoln Landfill Power Plant, Units 4, 5 &6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2014 6/29/15 Apr-2017 PASS 1,301 61632A W3188 Lincoln Landfill Power Plant, Units 4, 5 &6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2014 6/29/15 May-2017 PASS 1,557 61632A W3188 Lincoln Landfill Power Plant, Units 4, 5 &6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2014 6/29/15 Jun-2017 PASS 1,602 61632A W3188 Lincoln Landfill Power Plant, Units 4, 5 &6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2014 6/29/15 Jul-2017 PASS 1,205 61632A W3188 Lincoln Landfill Power Plant, Units 4, 5 &6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2014 6/29/15 Aug-2017 PASS 1,052 61632A W3188 Lincoln Landfill Power Plant, Units 4, 5 &6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2014 6/29/15 Sep-2017 PASS 1,424 61632A W3188 Lincoln Landfill Power Plant, Units 4, 5 &6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2014 6/29/15 Oct-2017 PASS 1,463 61632A W3188 Lincoln Landfill Power Plant, Units 4, 5 &6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2014 6/29/15 Nov-2017 PASS 1,238 62044A W2670 Lower Snake River (LSR) -‐ Phalen GulchPCC 3 2012 Short-‐term Eligible Short-‐term 08/2013 6/22/15 Jul-2016 PASS 1,721 62044A W2670 Lower Snake River (LSR) -‐ Phalen GulchPCC 3 2012 Short-‐term Eligible Short-‐term 09/2013 6/22/15 Aug-2016 PASS 13,279 60729A W185 Marengo PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 2,163 60730A W772 Marengo 2 PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 1,047 60896A W1341 McFadden Ridge PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 1,015 60896A W1341 McFadden Ridge PCC 3 2012 Short-‐term Eligible Short-‐term 07/2014 6/22/15 Jun-2017 PASS 2,433 60919A W1863 Milner Dam Wind Park PCC 3 2012 Short-‐term Eligible Short-‐term 11/2013 6/22/15 Oct-2016 PASS 681 60919A W1863 Milner Dam Wind Park PCC 3 2012 Short-‐term Eligible Short-‐term 12/2013 6/22/15 Nov-2016 PASS 995 62314A W2869 Mountain Air Wind Projects PCC 3 2012 Short-‐term Eligible Short-‐term 10/2013 6/22/15 Sep-2016 PASS 5,939 62314A W2869 Mountain Air Wind Projects PCC 3 2012 Short-‐term Eligible Short-‐term 12/2014 6/22/15 Nov-2017 PASS 12,500 62288A W2906 Palouse Wind PCC 3 2012 Short-‐term Eligible Short-‐term 11/2013 6/22/15 Oct-2016 PASS 666 62288A W2906 Palouse Wind PCC 3 2012 Short-‐term Eligible Short-‐term 12/2013 6/22/15 Nov-2016 PASS 1,492 60806A W928 Rolling Hills PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 3,918 60806A W928 Rolling Hills PCC 3 2012 Short-‐term Eligible Short-‐term 08/2013 6/22/15 Jul-2016 PASS 5,827 62237A W2969 San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2014 6/23/15 Dec-2016 PASS 83
CPUC ID RPS ID WREGIS_ID Facility Name Expected PCC Classification Contract Year Contract Length Short Term Contract Eligibility Vintage Month/Year Retirement Date (MM/DD/YYYY)
Last Month to Retire REC (Month/Year)
Do RECs "Pass" or "Fail" Requirements of 36 Month
Rule: MWh REC Quantity Retired
62237A W2969 San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2014 6/23/15 Jan-2017 PASS 80 62237A W2969 San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2014 6/23/15 Feb-2017 PASS 131 62237A W2969 San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2014 6/23/15 Mar-2017 PASS 143 62237A W2969 San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2014 6/23/15 Apr-2017 PASS 148 62237A W2969 San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2014 6/23/15 May-2017 PASS 196 62237A W2969 San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2014 6/23/15 Jun-2017 PASS 193 62237A W2969 San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2014 6/23/15 Jul-2017 PASS 154 62237A W2969 San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2014 6/23/15 Aug-2017 PASS 153 62237A W2969 San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2014 6/23/15 Sep-2017 PASS 119 62237A W2969 San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2014 6/23/15 Oct-2017 PASS 79 62237A W2969 San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2014 6/23/15 Nov-2017 PASS 48 60807A W975 Seven Mile Hill 1 PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 2,270 60807A W975 Seven Mile Hill 1 PCC 3 2012 Short-‐term Eligible Short-‐term 08/2013 6/22/15 Jul-2016 PASS 824 60807A W975 Seven Mile Hill 1 PCC 3 2012 Short-‐term Eligible Short-‐term 07/2014 6/22/15 Jun-2017 PASS 4,241 60808A W976 Seven Mile Hill 2 PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 678 60808A W976 Seven Mile Hill 2 PCC 3 2012 Short-‐term Eligible Short-‐term 08/2013 6/22/15 Jul-2016 PASS 99 60596A W1491 Sierra Pacific Burlington -‐ Sierra Pacific BurlingtonPCC 0 2010 Short-‐term Eligible Short-‐term 03/2011 2/24/14 Feb-2014 PASS 3,066 61199A W1749 Top of the World PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 8,639 60721A W360 White Creek Wind 1 PCC 1 2012 Short-‐term Eligible Short-‐term 03/2013 6/29/15 Feb-2016 PASS 10,818 60721A W360 White Creek Wind 1 PCC 1 2012 Short-‐term Eligible Short-‐term 04/2013 6/29/15 Mar-2016 PASS 15,744 60721A W360 White Creek Wind 1 PCC 1 2012 Short-‐term Eligible Short-‐term 05/2013 6/29/15 Apr-2016 PASS 3,484 60721A W360 White Creek Wind 1 PCC 2 2012 Short-‐term Eligible Short-‐term 01/2014 2/9/15 Dec-2016 PASS 1,700 60721A W360 White Creek Wind 1 PCC 2 2012 Short-‐term Eligible Short-‐term 02/2014 2/9/15 Jan-2017 PASS 2,507 60721A W360 White Creek Wind 1 PCC 2 2012 Short-‐term Eligible Short-‐term 03/2014 2/9/15 Feb-2017 PASS 4,410 60721A W360 White Creek Wind 1 PCC 2 2012 Short-‐term Eligible Short-‐term 04/2014 2/9/15 Mar-2017 PASS 1,665 60746A W183 Wild Horse PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 15,535 60746A W183 Wild Horse PCC 3 2012 Short-‐term Eligible Short-‐term 01/2014 6/22/15 Dec-2016 PASS 7,500 60746A W183 Wild Horse PCC 3 2014 Short-‐term Eligible Short-‐term 01/2014 6/22/15 Dec-2016 PASS 991 60746A W183 Wild Horse PCC 3 2014 Short-‐term Eligible Short-‐term 02/2014 6/22/15 Jan-2017 PASS 39,394 60746A W183 Wild Horse PCC 3 2014 Short-‐term Eligible Short-‐term 04/2014 6/22/15 Mar-2017 PASS 66,150 60746A W183 Wild Horse PCC 3 2014 Short-‐term Eligible Short-‐term 05/2014 6/22/15 Apr-2017 PASS 48,537 60746A W183 Wild Horse PCC 3 2014 Short-‐term Eligible Short-‐term 06/2014 6/22/15 May-2017 PASS 12,131 60746A W1364 Wild Horse -‐ Phase II PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 8,048 60746A W1364 Wild Horse -‐ Phase II PCC 3 2012 Short-‐term Eligible Short-‐term 08/2013 6/22/15 Jul-2016 PASS 4,733 60746A W1364 Wild Horse -‐ Phase II PCC 3 2012 Short-‐term Eligible Short-‐term 09/2013 6/22/15 Aug-2016 PASS 7,637 60746A W1364 Wild Horse -‐ Phase II PCC 3 2012 Short-‐term Eligible Short-‐term 10/2013 6/22/15 Sep-2016 PASS 4,582 60564E W188 Wolverine Creek PCC 3 2012 Short-‐term Eligible Short-‐term 07/2013 6/22/15 Jun-2016 PASS 1,458 60926A W1874 Yahoo Creek Wind Park PCC 3 2012 Short-‐term Eligible Short-‐term 10/2013 6/22/15 Sep-2016 PASS 39
Annual RPS Compliance Report: (2015) 36 Month RetirementData Reported by:Marin Clean Energy (MCE) Input RequiredAugust 31, 2018 Information is Hard Coded (No Input Required)
CPUC ID RPS ID WREGIS_ID Facility Name Expected PCC Classification Contract Year Contract Length Short Term Contract Eligibility Vintage Month/Year Retirement Date (MM/DD/YYYY)
Last Month to Retire REC (Month/Year)
Do RECs "Pass" or "Fail" Requirements of 36 Month
Rule: MWh REC Quantity Retired
60928A W1379 Combine Hills II -‐ Eurus Combine Hills II LLCPCC 0 2010 Short-‐term Eligible Short-‐term 04/2011 3/25/14 Mar-2014 PASS 2,816 61221A W2775 AgPower Jerome, LLC -‐ Double A Dairy DigesterPCC 3 2015 Short-‐term Eligible Short-‐term 02/2015 6/14/16 Jan-2018 PASS 1,494 61221A W2775 AgPower Jerome, LLC -‐ Double A Dairy DigesterPCC 3 2015 Short-‐term Eligible Short-‐term 04/2015 6/14/16 Mar-2018 PASS 816 61221A W2775 AgPower Jerome, LLC -‐ Double A Dairy DigesterPCC 3 2015 Short-‐term Eligible Short-‐term 05/2015 6/14/16 Apr-2018 PASS 1,802 61221A W2775 AgPower Jerome, LLC -‐ Double A Dairy DigesterPCC 3 2015 Short-‐term Eligible Short-‐term 06/2015 6/14/16 May-2018 PASS 1,493 61221A W2775 AgPower Jerome, LLC -‐ Double A Dairy DigesterPCC 3 2015 Short-‐term Eligible Short-‐term 07/2015 6/14/16 Jun-2018 PASS 1,615 60916A W1875 Camp Reed Wind Park -‐ Camp Reed Wind ParkPCC 3 2014 Short-‐term Eligible Short-‐term 12/2014 6/14/16 Nov-2017 PASS 2,500 61017A W1383 Campbell Hill -‐ Campbell Hill PCC 3 2014 Short-‐term Eligible Short-‐term 07/2014 6/14/16 Jun-2017 PASS 280 61017A W1383 Campbell Hill -‐ Campbell Hill PCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 8,792 61017A W1383 Campbell Hill -‐ Campbell Hill PCC 3 2014 Short-‐term Eligible Short-‐term 09/2014 6/14/16 Aug-2017 PASS 10,050 61017A W1383 Campbell Hill -‐ Campbell Hill PCC 3 2014 Short-‐term Eligible Short-‐term 10/2014 6/14/16 Sep-2017 PASS 12,921 61017A W1383 Campbell Hill -‐ Campbell Hill PCC 3 2014 Short-‐term Eligible Short-‐term 11/2014 6/14/16 Oct-2017 PASS 6,694 60822A W892 Cedar Creek -‐ Cedar Creek PCC 2 2015 Short-‐term Eligible Short-‐term 12/2015 5/12/16 Nov-2018 PASS 50,000 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 04/2015 6/27/16 Mar-2018 PASS 160 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 05/2015 6/27/16 Apr-2018 PASS 3,435 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 06/2015 6/27/16 May-2018 PASS 2,454 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 07/2015 6/27/16 Jun-2018 PASS 3,673 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 08/2015 6/27/16 Jul-2018 PASS 3,390 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 09/2015 6/27/16 Aug-2018 PASS 2,566 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 10/2015 6/27/16 Sep-2018 PASS 2,253 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 11/2015 6/27/16 Oct-2018 PASS 1,673 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 12/2015 6/27/16 Nov-2018 PASS 1,168 60622A W471 Corona -‐ MWD Corona PCC 1 2015 Short-‐term Eligible Short-‐term 03/2015 6/27/16 Feb-2018 PASS 441 60622A W471 Corona -‐ MWD Corona PCC 1 2015 Short-‐term Eligible Short-‐term 04/2015 6/27/16 Mar-2018 PASS 1,099 60622A W471 Corona -‐ MWD Corona PCC 1 2015 Short-‐term Eligible Short-‐term 05/2015 6/27/16 Apr-2018 PASS 1,076 60622A W471 Corona -‐ MWD Corona PCC 1 2015 Short-‐term Eligible Short-‐term 06/2015 6/27/16 May-2018 PASS 1,863 60622A W471 Corona -‐ MWD Corona PCC 1 2015 Short-‐term Eligible Short-‐term 07/2015 6/27/16 Jun-2018 PASS 1,878 60622A W471 Corona -‐ MWD Corona PCC 1 2015 Short-‐term Eligible Short-‐term 08/2015 6/27/16 Jul-2018 PASS 1,875 60622A W471 Corona -‐ MWD Corona PCC 1 2015 Short-‐term Eligible Short-‐term 09/2015 6/27/16 Aug-2018 PASS 1,308 60622A W471 Corona -‐ MWD Corona PCC 1 2015 Short-‐term Eligible Short-‐term 10/2015 6/27/16 Sep-2018 PASS 1,486 60622A W471 Corona -‐ MWD Corona PCC 1 2015 Short-‐term Eligible Short-‐term 11/2015 6/27/16 Oct-2018 PASS 1,672 60622A W471 Corona -‐ MWD Corona PCC 1 2015 Short-‐term Eligible Short-‐term 12/2015 6/27/16 Nov-2018 PASS 87 60901A W1287 Diamond Valley Lake Hydroelectric Plant -‐ MWD DVLPCC 1 2015 Short-‐term Eligible Short-‐term 03/2015 6/27/16 Feb-2018 PASS 390 60901A W1287 Diamond Valley Lake Hydroelectric Plant -‐ MWD DVLPCC 1 2015 Short-‐term Eligible Short-‐term 04/2015 6/27/16 Mar-2018 PASS 1,141 60901A W1287 Diamond Valley Lake Hydroelectric Plant -‐ MWD DVLPCC 1 2015 Short-‐term Eligible Short-‐term 05/2015 6/27/16 Apr-2018 PASS 1,619 60901A W1287 Diamond Valley Lake Hydroelectric Plant -‐ MWD DVLPCC 1 2015 Short-‐term Eligible Short-‐term 06/2015 6/27/16 May-2018 PASS 3,721 60901A W1287 Diamond Valley Lake Hydroelectric Plant -‐ MWD DVLPCC 1 2015 Short-‐term Eligible Short-‐term 07/2015 6/27/16 Jun-2018 PASS 427 61188A W1687 Dunlap I -‐ Dunlap I PCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 490 61188A W1687 Dunlap I -‐ Dunlap I PCC 3 2014 Short-‐term Eligible Short-‐term 09/2014 6/14/16 Aug-2017 PASS 490 61188A W1687 Dunlap I -‐ Dunlap I PCC 3 2014 Short-‐term Eligible Short-‐term 10/2014 6/14/16 Sep-2017 PASS 2,786 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 01/2015 6/27/16 Dec-2017 PASS 1,043 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 02/2015 6/27/16 Jan-2018 PASS 842 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 03/2015 6/27/16 Feb-2018 PASS 1,085 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 04/2015 6/27/16 Mar-2018 PASS 870 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 05/2015 6/27/16 Apr-2018 PASS 899 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 06/2015 6/27/16 May-2018 PASS 549 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 07/2015 6/27/16 Jun-2018 PASS 997 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 08/2015 6/27/16 Jul-2018 PASS 1,061 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 09/2015 6/27/16 Aug-2018 PASS 974 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2015 6/27/16 Sep-2018 PASS 852 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 11/2015 6/27/16 Oct-2018 PASS 1,000 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2015 6/27/16 Nov-2018 PASS 1,099 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 01/2015 6/27/16 Dec-2017 PASS 43 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 04/2015 6/27/16 Mar-2018 PASS 43 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 05/2015 6/27/16 Apr-2018 PASS 40 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 06/2015 6/27/16 May-2018 PASS 476 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 07/2015 6/27/16 Jun-2018 PASS 15 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 08/2015 6/27/16 Jul-2018 PASS 16 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2015 6/27/16 Sep-2018 PASS 53 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 11/2015 6/27/16 Oct-2018 PASS 462 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2015 6/27/16 Nov-2018 PASS 513 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 01/2015 6/27/16 Dec-2017 PASS 1,051 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 02/2015 6/27/16 Jan-2018 PASS 962 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 03/2015 6/27/16 Feb-2018 PASS 985 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 04/2015 6/27/16 Mar-2018 PASS 1,015 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 05/2015 6/27/16 Apr-2018 PASS 978 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 06/2015 6/27/16 May-2018 PASS 483 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 07/2015 6/27/16 Jun-2018 PASS 1,040 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 08/2015 6/27/16 Jul-2018 PASS 1,073
Note : Please create one line per combination of REC vintage and REC retirement date. For example RECs that have the same vintage are retired on two separate dates, please include one line per retirement date. Likewise if RECs of different vintages (e.g. June 2015 and July 2015) are retired on the same date, please include one line per vintage.
61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 09/2015 6/27/16 Aug-2018 PASS 1,068 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2015 6/27/16 Sep-2018 PASS 1,026 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 11/2015 6/27/16 Oct-2018 PASS 462 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2015 6/27/16 Nov-2018 PASS 513 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2015 Short-‐term Eligible Short-‐term 05/2015 6/27/16 Apr-2018 PASS 6,950 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2015 Short-‐term Eligible Short-‐term 06/2015 6/27/16 May-2018 PASS 3,800 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2015 Short-‐term Eligible Short-‐term 07/2015 6/27/16 Jun-2018 PASS 7,200 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2015 Short-‐term Eligible Short-‐term 09/2015 6/27/16 Aug-2018 PASS 345 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2015 Short-‐term Eligible Short-‐term 10/2015 6/27/16 Sep-2018 PASS 5,578 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2015 Short-‐term Eligible Short-‐term 11/2015 6/27/16 Oct-2018 PASS 888 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17PCC 1 2015 Short-‐term Eligible Short-‐term 12/2015 6/27/16 Nov-2018 PASS 2,483 60805A W964 Glenrock I -‐ Glenrock I PCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 353 60805A W964 Glenrock I -‐ Glenrock I PCC 3 2014 Short-‐term Eligible Short-‐term 09/2014 6/14/16 Aug-2017 PASS 450 60805A W964 Glenrock I -‐ Glenrock I PCC 3 2014 Short-‐term Eligible Short-‐term 10/2014 6/14/16 Sep-2017 PASS 2,099 60804A W965 Glenrock III -‐ Glenrock III PCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 148 60804A W965 Glenrock III -‐ Glenrock III PCC 3 2014 Short-‐term Eligible Short-‐term 09/2014 6/14/16 Aug-2017 PASS 233 60804A W965 Glenrock III -‐ Glenrock III PCC 3 2014 Short-‐term Eligible Short-‐term 10/2014 6/14/16 Sep-2017 PASS 694 60819A W536 Goodnoe Hills -‐ Goodnoe Hills PCC 3 2014 Short-‐term Eligible Short-‐term 07/2014 6/14/16 Jun-2017 PASS 345 60819A W536 Goodnoe Hills -‐ Goodnoe Hills PCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 454 60819A W536 Goodnoe Hills -‐ Goodnoe Hills PCC 3 2014 Short-‐term Eligible Short-‐term 09/2014 6/14/16 Aug-2017 PASS 5 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 05/2015 6/27/16 Apr-2018 PASS 2,931 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 06/2015 5/25/16 May-2018 PASS 3,287 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 07/2015 5/25/16 Jun-2018 PASS 4,134 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 08/2015 5/25/16 Jul-2018 PASS 3,048 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 08/2015 6/27/16 Jul-2018 PASS 950 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 09/2015 6/27/16 Aug-2018 PASS 2,828 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 10/2015 6/27/16 Sep-2018 PASS 2,725 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 11/2015 6/27/16 Oct-2018 PASS 1,962 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 12/2015 6/27/16 Nov-2018 PASS 1,640 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 1 2012 Short-‐term Eligible Short-‐term 01/2014 5/23/16 Dec-2016 PASS 3,418 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 1 2012 Short-‐term Eligible Short-‐term 02/2014 5/23/16 Jan-2017 PASS 1,465 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 1 2012 Short-‐term Eligible Short-‐term 03/2014 5/23/16 Feb-2017 PASS 4,757 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 1 2012 Short-‐term Eligible Short-‐term 04/2014 5/23/16 Mar-2017 PASS 5,160 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 1 2012 Short-‐term Eligible Short-‐term 05/2014 5/23/16 Apr-2017 PASS 6,264 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 1 2012 Short-‐term Eligible Short-‐term 06/2014 5/23/16 May-2017 PASS 6,964 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 1 2012 Short-‐term Eligible Short-‐term 07/2014 5/23/16 Jun-2017 PASS 5,051 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 1 2012 Short-‐term Eligible Short-‐term 08/2014 5/23/16 Jul-2017 PASS 4,472 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 1 2012 Short-‐term Eligible Short-‐term 09/2014 5/23/16 Aug-2017 PASS 4,504 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 1 2012 Short-‐term Eligible Short-‐term 10/2014 5/23/16 Sep-2017 PASS 945 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 2 2011 Short-‐term Eligible Short-‐term 01/2015 3/22/16 Dec-2017 PASS 1,983 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 2 2011 Short-‐term Eligible Short-‐term 02/2015 3/22/16 Jan-2018 PASS 3,382 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 2 2012 Short-‐term Eligible Short-‐term 03/2015 3/22/16 Feb-2018 PASS 3,637 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 2 2012 Short-‐term Eligible Short-‐term 04/2015 3/22/16 Mar-2018 PASS 4,402 60899A W1334 High Plains -‐ High Plains PCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 394 60899A W1334 High Plains -‐ High Plains PCC 3 2014 Short-‐term Eligible Short-‐term 09/2014 6/14/16 Aug-2017 PASS 1,987 60899A W1334 High Plains -‐ High Plains PCC 3 2014 Short-‐term Eligible Short-‐term 10/2014 6/14/16 Sep-2017 PASS 619 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 01/2015 6/27/16 Dec-2017 PASS 1,676 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 02/2015 6/27/16 Jan-2018 PASS 2,813 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 03/2015 6/27/16 Feb-2018 PASS 4,798 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 04/2015 6/27/16 Mar-2018 PASS 5,618 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 05/2015 6/27/16 Apr-2018 PASS 6,039 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 06/2015 6/27/16 May-2018 PASS 6,381 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 07/2015 6/27/16 Jun-2018 PASS 6,122 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 08/2015 6/27/16 Jul-2018 PASS 6,014 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 09/2015 6/27/16 Aug-2018 PASS 4,667 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 10/2015 6/27/16 Sep-2018 PASS 2,935 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 11/2015 6/27/16 Oct-2018 PASS 764 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 12/2015 6/27/16 Nov-2018 PASS 2,157 60602A W237 Klondike III -‐ Klondike Wind Power III LLCPCC 2 2011 Short-‐term Eligible Short-‐term 01/2015 3/22/16 Dec-2017 PASS 436 60602A W237 Klondike III -‐ Klondike Wind Power III LLCPCC 2 2012 Short-‐term Eligible Short-‐term 01/2015 3/22/16 Dec-2017 PASS 1,269 60602A W237 Klondike III -‐ Klondike Wind Power III LLCPCC 2 2012 Short-‐term Eligible Short-‐term 02/2015 3/22/16 Jan-2018 PASS 4,053 60602A W237 Klondike III -‐ Klondike Wind Power III LLCPCC 2 2012 Short-‐term Eligible Short-‐term 03/2015 3/22/16 Feb-2018 PASS 3,213 60602A W237 Klondike III -‐ Klondike Wind Power III LLCPCC 2 2012 Short-‐term Eligible Short-‐term 04/2015 3/22/16 Mar-2018 PASS 5,899 60602A W237 Klondike III -‐ Klondike Wind Power III LLCPCC 2 2012 Short-‐term Eligible Short-‐term 05/2015 3/22/16 Apr-2018 PASS 5,993 60562A W200 Leaning Juniper I -‐ Leaning Juniper I PCC 3 2014 Short-‐term Eligible Short-‐term 07/2014 6/14/16 Jun-2017 PASS 504 60562A W200 Leaning Juniper I -‐ Leaning Juniper I PCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 429 60562A W200 Leaning Juniper I -‐ Leaning Juniper I PCC 3 2014 Short-‐term Eligible Short-‐term 09/2014 6/14/16 Aug-2017 PASS 24 60562A W200 Leaning Juniper I -‐ Leaning Juniper I PCC 3 2014 Short-‐term Eligible Short-‐term 06/2015 6/14/16 May-2018 PASS 3,389 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2015 6/27/16 Dec-2017 PASS 882 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2015 6/27/16 Jan-2018 PASS 728 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2015 6/27/16 Feb-2018 PASS 977 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2015 6/27/16 Mar-2018 PASS 817 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2015 6/27/16 Apr-2018 PASS 867 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2015 6/27/16 May-2018 PASS 587 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2015 6/27/16 Jun-2018 PASS 515 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2015 6/27/16 Jul-2018 PASS 518 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2015 6/27/16 Aug-2018 PASS 504 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2015 6/27/16 Sep-2018 PASS 780 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2015 6/27/16 Oct-2018 PASS 713 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2015 6/27/16 Nov-2018 PASS 894
61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2015 6/27/16 Dec-2017 PASS 441 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2015 6/27/16 Jan-2018 PASS 364 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2015 6/27/16 Feb-2018 PASS 489 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2015 6/27/16 Mar-2018 PASS 408 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2015 6/27/16 Apr-2018 PASS 434 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2015 6/27/16 May-2018 PASS 293 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2015 6/27/16 Jun-2018 PASS 258 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2015 6/27/16 Jul-2018 PASS 259 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2015 6/27/16 Aug-2018 PASS 252 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2015 6/27/16 Sep-2018 PASS 390 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2015 6/27/16 Oct-2018 PASS 356 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2015 6/27/16 Nov-2018 PASS 447 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2015 6/27/16 Dec-2017 PASS 1,330 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2015 6/27/16 Jan-2018 PASS 1,099 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2015 6/27/16 Feb-2018 PASS 1,474 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2015 6/27/16 Mar-2018 PASS 1,234 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2015 6/27/16 Apr-2018 PASS 1,309 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2015 6/27/16 May-2018 PASS 885 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2015 6/27/16 Jun-2018 PASS 777 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2015 6/27/16 Jul-2018 PASS 783 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2015 6/27/16 Aug-2018 PASS 760 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2015 6/27/16 Sep-2018 PASS 1,177 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2015 6/27/16 Oct-2018 PASS 1,075 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2015 6/27/16 Nov-2018 PASS 1,351 62044A W2670 Lower Snake River -‐ Phalen Gulch -‐ LSR-‐Phalen GulchPCC 3 2014 Short-‐term Eligible Short-‐term 07/2014 6/14/16 Jun-2017 PASS 2,700 60729A W185 Marengo -‐ Marengo PCC 3 2014 Short-‐term Eligible Short-‐term 07/2014 6/14/16 Jun-2017 PASS 529 60729A W185 Marengo -‐ Marengo PCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 490 60729A W185 Marengo -‐ Marengo PCC 3 2014 Short-‐term Eligible Short-‐term 09/2014 6/14/16 Aug-2017 PASS 565 60729A W185 Marengo -‐ Marengo PCC 3 2014 Short-‐term Eligible Short-‐term 10/2014 6/14/16 Sep-2017 PASS 618 60730A W772 Marengo II -‐ Marengo II PCC 3 2014 Short-‐term Eligible Short-‐term 07/2014 6/14/16 Jun-2017 PASS 254 60730A W772 Marengo II -‐ Marengo II PCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 221 60730A W772 Marengo II -‐ Marengo II PCC 3 2014 Short-‐term Eligible Short-‐term 09/2014 6/14/16 Aug-2017 PASS 265 60730A W772 Marengo II -‐ Marengo II PCC 3 2014 Short-‐term Eligible Short-‐term 10/2014 6/14/16 Sep-2017 PASS 330 60896A W1341 McFadden Ridge -‐ McFadden RidgePCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 191 60896A W1341 McFadden Ridge -‐ McFadden RidgePCC 3 2014 Short-‐term Eligible Short-‐term 09/2014 6/14/16 Aug-2017 PASS 883 62006A W3186 Meadow Creek Wind Farm -‐ Five Pine ProjectPCC 3 2015 Short-‐term Eligible Short-‐term 04/2015 6/14/16 Mar-2018 PASS 2,551 62006A W3186 Meadow Creek Wind Farm -‐ Five Pine ProjectPCC 3 2015 Short-‐term Eligible Short-‐term 05/2015 6/14/16 Apr-2018 PASS 5,763 62006A W3185 Meadow Creek Wind Farm -‐ Five Pine ProjectPCC 3 2015 Short-‐term Eligible Short-‐term 06/2015 6/14/16 May-2018 PASS 6,192 62006A W3185 Meadow Creek Wind Farm -‐ Five Pine ProjectPCC 3 2015 Short-‐term Eligible Short-‐term 10/2015 6/14/16 Sep-2018 PASS 7,184 62006A W3185 Meadow Creek Wind Farm -‐ Five Pine ProjectPCC 3 2015 Short-‐term Eligible Short-‐term 11/2015 6/14/16 Oct-2018 PASS 6,333 62006A W3185 Meadow Creek Wind Farm -‐ North Point Wind FarmPCC 3 2015 Short-‐term Eligible Short-‐term 04/2015 6/14/16 Mar-2018 PASS 20,605 62006A W3185 Meadow Creek Wind Farm -‐ North Point Wind FarmPCC 3 2015 Short-‐term Eligible Short-‐term 05/2015 6/14/16 Apr-2018 PASS 12,904 62006A W3185 Meadow Creek Wind Farm -‐ North Point Wind FarmPCC 3 2015 Short-‐term Eligible Short-‐term 06/2015 6/14/16 May-2018 PASS 14,212 62006A W3185 Meadow Creek Wind Farm -‐ North Point Wind FarmPCC 3 2015 Short-‐term Eligible Short-‐term 07/2015 6/14/16 Jun-2018 PASS 273 62006A W3186 Meadow Creek Wind Farm -‐ North Point Wind FarmPCC 3 2015 Short-‐term Eligible Short-‐term 09/2015 6/14/16 Aug-2018 PASS 13,200 62006A W3186 Meadow Creek Wind Farm -‐ North Point Wind FarmPCC 3 2015 Short-‐term Eligible Short-‐term 10/2015 6/14/16 Sep-2018 PASS 17,194 62006A W3186 Meadow Creek Wind Farm -‐ North Point Wind FarmPCC 3 2015 Short-‐term Eligible Short-‐term 11/2015 6/14/16 Oct-2018 PASS 18,589 62314A W2869 Mountain Air Wind Projects -‐ Mountain Air Wind ProjectsPCC 3 2014 Short-‐term Eligible Short-‐term 03/2015 6/14/16 Feb-2018 PASS 4,054 62314A W2869 Mountain Air Wind Projects -‐ Mountain Air Wind ProjectsPCC 3 2015 Short-‐term Eligible Short-‐term 03/2015 6/14/16 Feb-2018 PASS 109 62314A W2869 Mountain Air Wind Projects -‐ Mountain Air Wind ProjectsPCC 3 2015 Short-‐term Eligible Short-‐term 05/2015 6/14/16 Apr-2018 PASS 4,337 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 01/2015 6/27/16 Dec-2017 PASS 13 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 02/2015 6/27/16 Jan-2018 PASS 12 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 03/2015 6/27/16 Feb-2018 PASS 9 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 04/2015 6/27/16 Mar-2018 PASS 7 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 05/2015 6/27/16 Apr-2018 PASS 22 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 06/2015 6/27/16 May-2018 PASS 34 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 07/2015 6/27/16 Jun-2018 PASS 45 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 08/2015 6/27/16 Jul-2018 PASS 34 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 09/2015 6/27/16 Aug-2018 PASS 13 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 10/2015 6/27/16 Sep-2018 PASS 8 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 11/2015 6/27/16 Oct-2018 PASS 5 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 12/2015 6/27/16 Nov-2018 PASS 5 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3PCC 3 2014 Short-‐term Eligible Short-‐term 10/2014 6/14/16 Sep-2017 PASS 1,233 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3PCC 3 2014 Short-‐term Eligible Short-‐term 11/2014 6/14/16 Oct-2017 PASS 1,646 60803A W697 Nine Canyon Wind Project -‐ Nine Canyon Phase 3PCC 3 2014 Short-‐term Eligible Short-‐term 12/2014 6/14/16 Nov-2017 PASS 1,288 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2015 6/27/16 Jun-2018 PASS 1,047 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2015 6/27/16 Jul-2018 PASS 1,007 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2015 6/27/16 Aug-2018 PASS 2,285 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2015 6/27/16 Jun-2018 PASS 707 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2015 6/27/16 Jul-2018 PASS 1,106 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2015 6/27/16 Aug-2018 PASS 2,507 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2015 6/27/16 Jun-2018 PASS 1,203 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2015 6/27/16 Jul-2018 PASS 1,158 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2015 6/27/16 Aug-2018 PASS 2,626 60625A W473 Red Mountain -‐ MWD Red MountainPCC 1 2015 Short-‐term Eligible Short-‐term 03/2015 6/27/16 Feb-2018 PASS 774 60625A W473 Red Mountain -‐ MWD Red MountainPCC 1 2015 Short-‐term Eligible Short-‐term 04/2015 6/27/16 Mar-2018 PASS 206 60625A W473 Red Mountain -‐ MWD Red MountainPCC 1 2015 Short-‐term Eligible Short-‐term 05/2015 6/27/16 Apr-2018 PASS 1,293 60625A W473 Red Mountain -‐ MWD Red MountainPCC 1 2015 Short-‐term Eligible Short-‐term 07/2015 6/27/16 Jun-2018 PASS 171 60625A W473 Red Mountain -‐ MWD Red MountainPCC 1 2015 Short-‐term Eligible Short-‐term 08/2015 6/27/16 Jul-2018 PASS 3,117 60625A W473 Red Mountain -‐ MWD Red MountainPCC 1 2015 Short-‐term Eligible Short-‐term 09/2015 6/27/16 Aug-2018 PASS 2,776
60625A W473 Red Mountain -‐ MWD Red MountainPCC 1 2015 Short-‐term Eligible Short-‐term 10/2015 6/27/16 Sep-2018 PASS 3,066 60625A W473 Red Mountain -‐ MWD Red MountainPCC 1 2015 Short-‐term Eligible Short-‐term 11/2015 6/27/16 Oct-2018 PASS 2,247 62426A W4445 Rising Tree Wind Farm II LLC -‐ Rising Tree Wind Farm II LLCPCC 3 2015 Short-‐term Eligible Short-‐term 01/2015 6/14/16 Dec-2017 PASS 362 62426A W4445 Rising Tree Wind Farm II LLC -‐ Rising Tree Wind Farm II LLCPCC 3 2015 Short-‐term Eligible Short-‐term 02/2015 6/14/16 Jan-2018 PASS 40 62426A W4445 Rising Tree Wind Farm II LLC -‐ Rising Tree Wind Farm II LLCPCC 3 2015 Short-‐term Eligible Short-‐term 03/2015 6/14/16 Feb-2018 PASS 92 62426A W4445 Rising Tree Wind Farm II LLC -‐ Rising Tree Wind Farm II LLCPCC 3 2015 Short-‐term Eligible Short-‐term 04/2015 6/14/16 Mar-2018 PASS 16 62426A W4445 Rising Tree Wind Farm II LLC -‐ Rising Tree Wind Farm II LLCPCC 3 2015 Short-‐term Eligible Short-‐term 05/2015 6/14/16 Apr-2018 PASS 24 62426A W4445 Rising Tree Wind Farm II LLC -‐ Rising Tree Wind Farm II LLCPCC 3 2015 Short-‐term Eligible Short-‐term 06/2015 6/14/16 May-2018 PASS 11 62426A W4445 Rising Tree Wind Farm II LLC -‐ Rising Tree Wind Farm II LLCPCC 3 2015 Short-‐term Eligible Short-‐term 07/2015 6/14/16 Jun-2018 PASS 58 62426A W4445 Rising Tree Wind Farm II LLC -‐ Rising Tree Wind Farm II LLCPCC 3 2015 Short-‐term Eligible Short-‐term 08/2015 6/14/16 Jul-2018 PASS 2 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 04/2015 6/27/16 Mar-2018 PASS 4 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 05/2015 6/27/16 Apr-2018 PASS 7,675 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 06/2015 6/27/16 May-2018 PASS 14,840 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 07/2015 6/27/16 Jun-2018 PASS 29,640 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 08/2015 6/27/16 Jul-2018 PASS 38,275 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 09/2015 6/27/16 Aug-2018 PASS 20,529 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 10/2015 6/27/16 Sep-2018 PASS 18,490 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 11/2015 6/27/16 Oct-2018 PASS 14,417 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 12/2015 6/27/16 Nov-2018 PASS 22,792 62425A W4444 Rising Tree Wind Farm LLC -‐ Rising Tree Wind Farm LLCPCC 3 2015 Short-‐term Eligible Short-‐term 01/2015 6/14/16 Dec-2017 PASS 1,015 62425A W4444 Rising Tree Wind Farm LLC -‐ Rising Tree Wind Farm LLCPCC 3 2015 Short-‐term Eligible Short-‐term 02/2015 6/14/16 Jan-2018 PASS 236 62425A W4444 Rising Tree Wind Farm LLC -‐ Rising Tree Wind Farm LLCPCC 3 2015 Short-‐term Eligible Short-‐term 03/2015 6/14/16 Feb-2018 PASS 356 62425A W4444 Rising Tree Wind Farm LLC -‐ Rising Tree Wind Farm LLCPCC 3 2015 Short-‐term Eligible Short-‐term 04/2015 6/14/16 Mar-2018 PASS 119 62425A W4444 Rising Tree Wind Farm LLC -‐ Rising Tree Wind Farm LLCPCC 3 2015 Short-‐term Eligible Short-‐term 05/2015 6/14/16 Apr-2018 PASS 88 62425A W4444 Rising Tree Wind Farm LLC -‐ Rising Tree Wind Farm LLCPCC 3 2015 Short-‐term Eligible Short-‐term 07/2015 6/14/16 Jun-2018 PASS 255 62425A W4444 Rising Tree Wind Farm LLC -‐ Rising Tree Wind Farm LLCPCC 3 2015 Short-‐term Eligible Short-‐term 08/2015 6/14/16 Jul-2018 PASS 1 62425A W4444 Rising Tree Wind Farm LLC -‐ Rising Tree Wind Farm LLCPCC 3 2015 Short-‐term Eligible Short-‐term 10/2015 6/14/16 Sep-2018 PASS 1 60806A W928 Rolling Hills -‐ Rolling Hills PCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 217 60927A W1885 Salmon Falls Wind Park, LLC -‐ Salmon Falls Wind ParkPCC 3 2014 Short-‐term Eligible Short-‐term 06/2015 6/14/16 May-2018 PASS 3,727 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2015 5/19/16 Dec-2017 PASS 78 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2015 5/19/16 Jan-2018 PASS 93 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2015 5/19/16 Feb-2018 PASS 147 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2015 5/19/16 Mar-2018 PASS 185 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2015 5/19/16 Apr-2018 PASS 197 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2015 5/19/16 May-2018 PASS 209 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2015 5/19/16 Jun-2018 PASS 198 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2015 5/19/16 Jul-2018 PASS 185 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2015 5/19/16 Aug-2018 PASS 143 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2015 5/19/16 Sep-2018 PASS 115 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2015 5/19/16 Oct-2018 PASS 90 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2015 5/19/16 Nov-2018 PASS 58 61090A W2045 Seneca Sustainable Energy -‐ Seneca Sustainable EnergyPCC 2 2012 Short-‐term Eligible Short-‐term 01/2015 3/22/16 Dec-2017 PASS 7,819 61090A W2045 Seneca Sustainable Energy -‐ Seneca Sustainable EnergyPCC 2 2012 Short-‐term Eligible Short-‐term 02/2015 3/22/16 Jan-2018 PASS 7,206 61090A W2045 Seneca Sustainable Energy -‐ Seneca Sustainable EnergyPCC 2 2012 Short-‐term Eligible Short-‐term 03/2015 3/22/16 Feb-2018 PASS 7,812 61090A W2045 Seneca Sustainable Energy -‐ Seneca Sustainable EnergyPCC 2 2012 Short-‐term Eligible Short-‐term 04/2015 3/22/16 Mar-2018 PASS 7,697 60807A W975 Seven Mile Hill I -‐ Seven Mile Hill I PCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 390 60807A W975 Seven Mile Hill I -‐ Seven Mile Hill I PCC 3 2014 Short-‐term Eligible Short-‐term 09/2014 6/14/16 Aug-2017 PASS 2,723 60808A W976 Seven Mile Hill II -‐ Seven Mile Hill IIPCC 3 2014 Short-‐term Eligible Short-‐term 07/2014 6/14/16 Jun-2017 PASS 1,004 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 01/2015 6/27/16 Dec-2017 PASS 2 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 02/2015 6/27/16 Jan-2018 PASS 2 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 03/2015 6/27/16 Feb-2018 PASS 2 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 04/2015 6/27/16 Mar-2018 PASS 2 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 05/2015 6/27/16 Apr-2018 PASS 3 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 06/2015 6/27/16 May-2018 PASS 2 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 07/2015 6/27/16 Jun-2018 PASS 2 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 08/2015 6/27/16 Jul-2018 PASS 2 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 09/2015 6/27/16 Aug-2018 PASS 2 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 10/2015 6/27/16 Sep-2018 PASS 2 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 11/2015 6/27/16 Oct-2018 PASS 2 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 12/2015 6/27/16 Nov-2018 PASS 2 60621A W475 Temescal -‐ MWD Temescal PCC 1 2015 Short-‐term Eligible Short-‐term 03/2015 6/27/16 Feb-2018 PASS 1,945 60621A W475 Temescal -‐ MWD Temescal PCC 1 2015 Short-‐term Eligible Short-‐term 04/2015 6/27/16 Mar-2018 PASS 1,920 60621A W475 Temescal -‐ MWD Temescal PCC 1 2015 Short-‐term Eligible Short-‐term 05/2015 6/27/16 Apr-2018 PASS 1,783 60621A W475 Temescal -‐ MWD Temescal PCC 1 2015 Short-‐term Eligible Short-‐term 06/2015 6/27/16 May-2018 PASS 1,972 60621A W475 Temescal -‐ MWD Temescal PCC 1 2015 Short-‐term Eligible Short-‐term 07/2015 6/27/16 Jun-2018 PASS 1,990 60621A W475 Temescal -‐ MWD Temescal PCC 1 2015 Short-‐term Eligible Short-‐term 08/2015 6/27/16 Jul-2018 PASS 1,935 60621A W475 Temescal -‐ MWD Temescal PCC 1 2015 Short-‐term Eligible Short-‐term 09/2015 6/27/16 Aug-2018 PASS 1,336 60621A W475 Temescal -‐ MWD Temescal PCC 1 2015 Short-‐term Eligible Short-‐term 10/2015 6/27/16 Sep-2018 PASS 1,616 60621A W475 Temescal -‐ MWD Temescal PCC 1 2015 Short-‐term Eligible Short-‐term 11/2015 6/27/16 Oct-2018 PASS 1,770 61199A W1749 Top of the World -‐ Top of the World PCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 762 61199A W1749 Top of the World -‐ Top of the World PCC 3 2014 Short-‐term Eligible Short-‐term 09/2014 6/14/16 Aug-2017 PASS 6,685 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2012 Short-‐term Eligible Short-‐term 05/2013 12/26/15 Apr-2016 PASS 9,204 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2012 Short-‐term Eligible Short-‐term 06/2013 12/26/15 May-2016 PASS 8,709 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2012 Short-‐term Eligible Short-‐term 07/2013 12/26/15 Jun-2016 PASS 1,087 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2011 Short-‐term Eligible Short-‐term 05/2013 12/26/15 Apr-2016 PASS 865 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2011 Short-‐term Eligible Short-‐term 06/2013 12/26/15 May-2016 PASS 1,298 60721A W360 White Creek Wind 1 -‐ White Creek PCC 2 2014 Short-‐term Eligible Short-‐term 05/2015 4/6/16 Apr-2018 PASS 13,132 60721A W360 White Creek Wind 1 -‐ White Creek PCC 2 2014 Short-‐term Eligible Short-‐term 06/2015 4/6/16 May-2018 PASS 12,920 60721A W360 White Creek Wind 1 -‐ White Creek PCC 2 2014 Short-‐term Eligible Short-‐term 07/2015 4/6/16 Jun-2018 PASS 14,570 60721A W360 White Creek Wind 1 -‐ White Creek PCC 2 2014 Short-‐term Eligible Short-‐term 08/2015 4/6/16 Jul-2018 PASS 7,216
60721A W360 White Creek Wind 1 -‐ White Creek PCC 2 2014 Short-‐term Eligible Short-‐term 09/2015 4/6/16 Aug-2018 PASS 2,162 60564A W188 Wolverine Creek -‐ Wolverine Creek PCC 3 2014 Short-‐term Eligible Short-‐term 07/2014 6/14/16 Jun-2017 PASS 287 60564A W188 Wolverine Creek -‐ Wolverine Creek PCC 3 2014 Short-‐term Eligible Short-‐term 08/2014 6/14/16 Jul-2017 PASS 287 60564A W188 Wolverine Creek -‐ Wolverine Creek PCC 3 2014 Short-‐term Eligible Short-‐term 09/2014 6/14/16 Aug-2017 PASS 1,490 60926A W1874 Yahoo Creek Wind Park -‐ Yahoo Creek Wind ParkPCC 3 2014 Short-‐term Eligible Short-‐term 05/2015 6/14/16 Apr-2018 PASS 515 60926A W1874 Yahoo Creek Wind Park -‐ Yahoo Creek Wind ParkPCC 3 2014 Short-‐term Eligible Short-‐term 06/2015 6/14/16 May-2018 PASS 3,817
Annual RPS Compliance Report: (2016) 36 Month RetirementData Reported by:Marin Clean Energy (MCE) Input RequiredAugust 31, 2018 Information is Hard Coded (No Input Required)
CPUC ID RPS ID WREGIS_ID Facility Name Expected PCC Classification Contract Year Contract Length Short Term Contract Eligibility Vintage Month/Year Retirement Date (MM/DD/YYYY)
Last Month to Retire REC (Month/Year)
Do RECs "Pass" or "Fail" Requirements of 36 Month
Rule: MWh REC Quantity Retired
63056A W1588 Biglow Canyon Wind Farm -‐ Biglow Canyon 3PCC 2 2016 Short-‐term Eligible Short-‐term 08/2016 5/17/17 Jul-2019 PASS 34,363 63055A W1268 Biglow Canyon Wind Farm -‐ Biglow Phase 2PCC 2 2016 Short-‐term Eligible Short-‐term 08/2016 5/17/17 Jul-2019 PASS 15,896 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEFPCC 3 2016 Short-‐term Eligible Short-‐term 07/2016 6/8/17 Jun-2019 PASS 77 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEFPCC 3 2016 Short-‐term Eligible Short-‐term 06/2016 6/8/17 May-2019 PASS 72 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEFPCC 3 2016 Short-‐term Eligible Short-‐term 09/2016 6/8/17 Aug-2019 PASS 81 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEFPCC 3 2016 Short-‐term Eligible Short-‐term 10/2016 6/8/17 Sep-2019 PASS 77 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEFPCC 3 2016 Short-‐term Eligible Short-‐term 08/2016 6/8/17 Jul-2019 PASS 63 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEFPCC 3 2016 Short-‐term Eligible Short-‐term 11/2016 6/8/17 Oct-2019 PASS 69 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEFPCC 3 2016 Short-‐term Eligible Short-‐term 12/2016 6/8/17 Nov-2019 PASS 78 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2016 6/9/17 Jul-2019 PASS 1,108 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2016 6/9/17 Aug-2019 PASS 370 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 10/2016 6/9/17 Sep-2019 PASS 1,006 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2016 6/9/17 Nov-2019 PASS 4,906 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2016 6/9/17 Oct-2019 PASS 1,255 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 04/2016 6/9/17 Mar-2019 PASS 1,192 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 05/2016 6/9/17 Apr-2019 PASS 1,812 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 06/2016 6/9/17 May-2019 PASS 2,256 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2016 6/9/17 Jun-2019 PASS 1,221 60822A W892 Cedar Creek -‐ Cedar Creek PCC 2 2016 Short-‐term Eligible Short-‐term 07/2016 5/22/17 Jun-2019 PASS 32,533 60822A W892 Cedar Creek -‐ Cedar Creek PCC 2 2016 Short-‐term Eligible Short-‐term 12/2016 5/22/17 Nov-2019 PASS 1,507 60822A W892 Cedar Creek -‐ Cedar Creek PCC 2 2016 Short-‐term Eligible Short-‐term 10/2016 5/22/17 Sep-2019 PASS 10,400 60822A W892 Cedar Creek -‐ Cedar Creek PCC 2 2016 Short-‐term Eligible Short-‐term 09/2016 5/22/17 Aug-2019 PASS 39,987 60822A W892 Cedar Creek -‐ Cedar Creek PCC 2 2016 Short-‐term Eligible Short-‐term 08/2016 5/22/17 Jul-2019 PASS 34,322 61384A W1900 Cedar Creek II -‐ Cedar Creek II PCC 2 2016 Short-‐term Eligible Short-‐term 08/2016 5/22/17 Jul-2019 PASS 4,669 61384A W1900 Cedar Creek II -‐ Cedar Creek II PCC 2 2016 Short-‐term Eligible Short-‐term 09/2016 5/22/17 Aug-2019 PASS 6,115 61384A W1900 Cedar Creek II -‐ Cedar Creek II PCC 2 2016 Short-‐term Eligible Short-‐term 07/2016 5/22/17 Jun-2019 PASS 10,467 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 12/2016 6/9/17 Nov-2019 PASS 1,092 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 10/2016 6/9/17 Sep-2019 PASS 1,709 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 11/2016 6/9/17 Oct-2019 PASS 1,537 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 08/2016 6/9/17 Jul-2019 PASS 3,355 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 09/2016 6/9/17 Aug-2019 PASS 2,592 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 06/2016 6/9/17 May-2019 PASS 3,736 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 05/2016 6/9/17 Apr-2019 PASS 3,504 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 07/2016 6/9/17 Jun-2019 PASS 3,815 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 04/2016 6/9/17 Mar-2019 PASS 2,985 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 03/2016 6/9/17 Feb-2019 PASS 2,587 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 01/2016 6/9/17 Dec-2018 PASS 909 62355A W4150 City of Corcoran Solar -‐ City of Corcoran SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 02/2016 6/9/17 Jan-2019 PASS 1,839 60533A W128 Clearwater Paper Corporation -‐ #3 turbine generatorPCC 3 2016 Short-‐term Eligible Short-‐term 09/2016 6/8/17 Aug-2019 PASS 2,700 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2016 6/8/17 Aug-2019 PASS 36 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2016 6/8/17 Oct-2019 PASS 27 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 10/2016 6/8/17 Sep-2019 PASS 28 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2016 6/8/17 Nov-2019 PASS 22 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2016 6/8/17 Nov-2019 PASS 75 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1PCC 1 2015 Long-‐term Long-‐term -‐ N/A 10/2016 6/8/17 Sep-2019 PASS 88 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2016 6/8/17 Oct-2019 PASS 97 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2016 6/8/17 Oct-2019 PASS 102 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2PCC 1 2015 Long-‐term Long-‐term -‐ N/A 10/2016 6/8/17 Sep-2019 PASS 104 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2016 6/8/17 Nov-2019 PASS 78 61205A W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2016 6/8/17 Nov-2019 PASS 973 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2016 6/9/17 Nov-2019 PASS 1,119 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 11/2016 6/9/17 Oct-2019 PASS 993 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 03/2016 6/9/17 Feb-2019 PASS 809 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2016 6/9/17 Sep-2019 PASS 1,092 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 09/2016 6/9/17 Aug-2019 PASS 1,008 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 08/2016 6/9/17 Jul-2019 PASS 1,133 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 04/2016 6/9/17 Mar-2019 PASS 1,102 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 07/2016 6/9/17 Jun-2019 PASS 1,060 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 05/2016 6/9/17 Apr-2019 PASS 1,098 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RDPCC 1 2010 Long-‐term Long-‐term -‐ N/A 06/2016 6/9/17 May-2019 PASS 1,074 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 05/2016 6/9/17 Apr-2019 PASS 170 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 06/2016 6/9/17 May-2019 PASS 43 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 07/2016 6/9/17 Jun-2019 PASS 28 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 03/2016 6/9/17 Feb-2019 PASS 92 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 04/2016 6/9/17 Mar-2019 PASS 112 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 01/2016 6/9/17 Dec-2018 PASS 442 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 08/2016 6/9/17 Jul-2019 PASS 65 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 11/2016 6/9/17 Oct-2019 PASS 12 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2016 6/9/17 Sep-2019 PASS 158
Note : Please create one line per combination of REC vintage and REC retirement date. For example RECs that have the same vintage are retired on two separate dates, please include one line per retirement date. Likewise if RECs of different vintages (e.g. June 2016 and July 2016) are retired on the same date, please include one line per vintage.
61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2PCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2016 6/9/17 Nov-2019 PASS 87 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 12/2016 6/9/17 Nov-2019 PASS 1,450 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 10/2016 6/9/17 Sep-2019 PASS 2,479 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 05/2016 6/9/17 Apr-2019 PASS 1,062 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 11/2016 6/9/17 Oct-2019 PASS 1,973 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 08/2016 6/9/17 Jul-2019 PASS 3,829 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 09/2016 6/9/17 Aug-2019 PASS 3,200 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 02/2016 5/24/17 Jan-2019 PASS 2,447 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 01/2016 5/24/17 Dec-2018 PASS 1,263 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 03/2016 5/24/17 Feb-2019 PASS 3,062 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 04/2016 5/24/17 Mar-2019 PASS 3,097 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 07/2016 6/9/17 Jun-2019 PASS 4,350 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 05/2016 5/24/17 Apr-2019 PASS 2,812 62357A W4151 Goose Lake Solar -‐ Goose Lake SolarPCC 1 2011 Long-‐term Long-‐term -‐ N/A 06/2016 6/9/17 May-2019 PASS 4,182 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 1 2012 Short-‐term Eligible Short-‐term 11/2014 3/13/17 Oct-2017 PASS 5,892 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 1 2012 Short-‐term Eligible Short-‐term 12/2014 3/13/17 Nov-2017 PASS 3,701 60857A W1306 Harvest Wind -‐ Harvest Wind PCC 1 2012 Short-‐term Eligible Short-‐term 10/2014 3/13/17 Sep-2017 PASS 2,291 61841A W5056 Henrietta Solar Plant -‐ Parrey, LLC PCC 1 2016 Short-‐term Eligible Short-‐term 07/2016 6/9/17 Jun-2019 PASS 24,975 61841A W5056 Henrietta Solar Plant -‐ Parrey, LLC PCC 1 2016 Short-‐term Eligible Short-‐term 09/2016 6/9/17 Aug-2019 PASS 20,842 61841A W5056 Henrietta Solar Plant -‐ Parrey, LLC PCC 1 2016 Short-‐term Eligible Short-‐term 08/2016 6/9/17 Jul-2019 PASS 28,201 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 01/2016 6/9/17 Dec-2018 PASS 1,715 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 02/2016 6/9/17 Jan-2019 PASS 3,555 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 04/2016 6/9/17 Mar-2019 PASS 5,105 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 03/2016 6/9/17 Feb-2019 PASS 4,766 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 06/2016 6/9/17 May-2019 PASS 6,563 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 05/2016 6/9/17 Apr-2019 PASS 6,208 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 07/2016 6/9/17 Jun-2019 PASS 6,474 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 09/2016 6/9/17 Aug-2019 PASS 4,952 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 08/2016 6/9/17 Jul-2019 PASS 5,708 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 11/2016 6/9/17 Oct-2019 PASS 2,988 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 10/2016 6/9/17 Sep-2019 PASS 3,488 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 12/2016 6/9/17 Nov-2019 PASS 2,217 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 11/2016 6/9/17 Oct-2019 PASS 2 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 12/2016 6/9/17 Nov-2019 PASS 2 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 09/2016 6/9/17 Aug-2019 PASS 2 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 08/2016 6/9/17 Jul-2019 PASS 2 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 10/2016 6/9/17 Sep-2019 PASS 2 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 07/2016 6/9/17 Jun-2019 PASS 2 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 06/2016 6/9/17 May-2019 PASS 2 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 03/2016 6/9/17 Feb-2019 PASS 2 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 05/2016 6/9/17 Apr-2019 PASS 1 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 04/2016 6/9/17 Mar-2019 PASS 2 62246A W3157 Limon Wind -‐ Limon Wind I PCC 2 2012 Short-‐term Eligible Short-‐term 03/2016 5/9/17 Feb-2019 PASS 10,782 62246A W3157 Limon Wind -‐ Limon Wind I PCC 2 2012 Short-‐term Eligible Short-‐term 01/2016 5/9/17 Dec-2018 PASS 8,880 62859A W4269 Limon Wind III, LLC -‐ Limon Wind III, LLCPCC 2 2012 Short-‐term Eligible Short-‐term 07/2016 5/9/17 Jun-2019 PASS 8,600 62859A W4269 Limon Wind III, LLC -‐ Limon Wind III, LLCPCC 2 2012 Short-‐term Eligible Short-‐term 09/2016 5/9/17 Aug-2019 PASS 8,000 62859A W4269 Limon Wind III, LLC -‐ Limon Wind III, LLCPCC 2 2012 Short-‐term Eligible Short-‐term 08/2016 5/9/17 Jul-2019 PASS 7,800 62859A W4269 Limon Wind III, LLC -‐ Limon Wind III, LLCPCC 2 2012 Short-‐term Eligible Short-‐term 10/2016 5/9/17 Sep-2019 PASS 6,938 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2016 6/9/17 Jun-2019 PASS 327 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2016 6/9/17 Apr-2019 PASS 394 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2016 6/9/17 May-2019 PASS 344 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2016 6/9/17 Mar-2019 PASS 452 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2016 6/9/17 Dec-2018 PASS 499 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2016 6/9/17 Jan-2019 PASS 260 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2016 6/9/17 Feb-2019 PASS 340 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2016 6/9/17 Jul-2019 PASS 381 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2016 6/9/17 Sep-2019 PASS 418 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2016 6/9/17 Aug-2019 PASS 413 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2016 6/9/17 Oct-2019 PASS 411 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2016 6/9/17 Nov-2019 PASS 346 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2016 6/9/17 Nov-2019 PASS 691 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2016 6/9/17 Oct-2019 PASS 823 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2016 6/9/17 Aug-2019 PASS 825 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2016 6/9/17 Sep-2019 PASS 836 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2016 6/9/17 Jul-2019 PASS 762 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2016 6/9/17 Feb-2019 PASS 679 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2016 6/9/17 Jan-2019 PASS 520 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2016 6/9/17 Dec-2018 PASS 998 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2016 6/9/17 Mar-2019 PASS 905 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2016 6/9/17 Apr-2019 PASS 787 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2016 6/9/17 May-2019 PASS 688 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2016 6/9/17 Jun-2019 PASS 655 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2016 6/9/17 Jun-2019 PASS 988 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2016 6/9/17 May-2019 PASS 1,039 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2016 6/9/17 Apr-2019 PASS 1,188 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2016 6/9/17 Mar-2019 PASS 1,366 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2016 6/9/17 Feb-2019 PASS 1,024 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2016 6/9/17 Dec-2018 PASS 1,506 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2016 6/9/17 Jan-2019 PASS 785 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2016 6/9/17 Jul-2019 PASS 1,150
61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2016 6/9/17 Sep-2019 PASS 1,261 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2016 6/9/17 Aug-2019 PASS 1,246 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2016 6/9/17 Nov-2019 PASS 1,042 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2016 6/9/17 Oct-2019 PASS 1,242 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 10/2016 6/9/17 Sep-2019 PASS 89 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 08/2016 6/9/17 Jul-2019 PASS 177 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 09/2016 6/9/17 Aug-2019 PASS 153 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 07/2016 6/9/17 Jun-2019 PASS 181 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 06/2016 6/9/17 May-2019 PASS 147 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 05/2016 6/9/17 Apr-2019 PASS 78 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 06/2016 6/9/17 May-2019 PASS 57 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 07/2016 6/9/17 Jun-2019 PASS 69 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 04/2016 6/9/17 Mar-2019 PASS 33 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 05/2016 6/9/17 Apr-2019 PASS 44 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 03/2016 6/9/17 Feb-2019 PASS 27 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 01/2016 6/9/17 Dec-2018 PASS 7 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 02/2016 6/9/17 Jan-2019 PASS 28 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 10/2016 6/9/17 Sep-2019 PASS 17 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 09/2016 6/9/17 Aug-2019 PASS 26 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 08/2016 6/9/17 Jul-2019 PASS 49 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 12/2016 6/9/17 Nov-2019 PASS 33 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2)PCC 1 2011 Short-‐term Eligible Short-‐term 11/2016 6/9/17 Oct-2019 PASS 16 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2016 6/9/17 Nov-2019 PASS 5,829 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2016 6/9/17 Oct-2019 PASS 1,640 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 10/2016 6/9/17 Sep-2019 PASS 1,115 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2016 6/9/17 Aug-2019 PASS 420 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 05/2016 6/9/17 Apr-2019 PASS 6,910 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 04/2016 6/9/17 Mar-2019 PASS 6,696 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 02/2016 6/9/17 Jan-2019 PASS 2,665 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 03/2016 6/9/17 Feb-2019 PASS 6,798 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2016 6/9/17 Jul-2019 PASS 734 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2016 6/9/17 Jun-2019 PASS 318 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 06/2016 6/9/17 May-2019 PASS 5,626 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 06/2016 6/9/17 May-2019 PASS 6,170 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2016 6/9/17 Jun-2019 PASS 458 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2016 6/9/17 Jul-2019 PASS 1,551 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 03/2016 6/9/17 Feb-2019 PASS 7,413 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 02/2016 6/9/17 Jan-2019 PASS 2,574 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 04/2016 6/9/17 Mar-2019 PASS 7,344 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 05/2016 6/9/17 Apr-2019 PASS 7,579 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2016 6/9/17 Aug-2019 PASS 858 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 10/2016 6/9/17 Sep-2019 PASS 2,507 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2016 6/9/17 Oct-2019 PASS 3,220 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2016 6/9/17 Nov-2019 PASS 6,102 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2016 6/9/17 Nov-2019 PASS 6,684 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2016 6/9/17 Oct-2019 PASS 1,881 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 10/2016 6/9/17 Sep-2019 PASS 1,277 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2016 6/9/17 Aug-2019 PASS 482 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 05/2016 6/9/17 Apr-2019 PASS 7,801 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 04/2016 6/9/17 Mar-2019 PASS 7,560 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 02/2016 6/9/17 Jan-2019 PASS 3,063 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 03/2016 6/9/17 Feb-2019 PASS 7,787 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2016 6/9/17 Jul-2019 PASS 842 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2016 6/9/17 Jun-2019 PASS 365 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 06/2016 6/9/17 May-2019 PASS 6,352 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 09/2016 6/9/17 Aug-2019 PASS 23,676 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 08/2016 6/9/17 Jul-2019 PASS 39,620 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 10/2016 6/9/17 Sep-2019 PASS 20,636 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 11/2016 6/9/17 Oct-2019 PASS 14,555 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 02/2016 6/9/17 Jan-2019 PASS 4,391 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 12/2016 6/9/17 Nov-2019 PASS 19,654 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 07/2016 6/9/17 Jun-2019 PASS 42,898 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 05/2016 6/9/17 Apr-2019 PASS 34,744 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 06/2016 6/9/17 May-2019 PASS 40,714 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 03/2016 6/9/17 Feb-2019 PASS 32,850 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 04/2016 6/9/17 Mar-2019 PASS 24,181 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2016 6/8/17 Mar-2019 PASS 169 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2016 6/8/17 Jan-2019 PASS 103 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2016 6/8/17 Feb-2019 PASS 121 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2016 6/8/17 Dec-2018 PASS 52 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2016 6/8/17 May-2019 PASS 205 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2016 6/8/17 Apr-2019 PASS 190 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2016 6/8/17 Jun-2019 PASS 215 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2016 6/8/17 Nov-2019 PASS 64 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2016 6/8/17 Oct-2019 PASS 80 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2016 6/8/17 Aug-2019 PASS 152 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2016 6/8/17 Sep-2019 PASS 96 62237A W2969 San Rafael Airport -‐ San Rafael AirportPCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2016 6/8/17 Jul-2019 PASS 184 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLCPCC 1 2016 Short-‐term Eligible Short-‐term 09/2016 6/9/17 Aug-2019 PASS 6,772 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLCPCC 1 2016 Short-‐term Eligible Short-‐term 10/2016 6/9/17 Sep-2019 PASS 3,129
60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLCPCC 1 2016 Short-‐term Eligible Short-‐term 11/2016 6/9/17 Oct-2019 PASS 1,283 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLCPCC 1 2016 Short-‐term Eligible Short-‐term 12/2016 6/9/17 Nov-2019 PASS 2,724 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLCPCC 1 2016 Short-‐term Eligible Short-‐term 08/2016 6/9/17 Jul-2019 PASS 11,238 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLCPCC 1 2016 Short-‐term Eligible Short-‐term 06/2016 6/9/17 May-2019 PASS 8,369 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLCPCC 1 2016 Short-‐term Eligible Short-‐term 07/2016 6/9/17 Jun-2019 PASS 9,934 61842A W2756 Solano Wind Phase 3 -‐ Solano Wind Phase 3PCC 1 2012 Short-‐term Eligible Short-‐term 04/2016 6/8/17 Mar-2019 PASS 31,203 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 05/2016 6/9/17 Apr-2019 PASS 4 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 06/2016 6/9/17 May-2019 PASS 7 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 01/2016 6/9/17 Dec-2018 PASS 1 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 02/2016 6/9/17 Jan-2019 PASS 1 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 03/2016 6/9/17 Feb-2019 PASS 1 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 04/2016 6/9/17 Mar-2019 PASS 1 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 07/2016 6/9/17 Jun-2019 PASS 7 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 09/2016 6/9/17 Aug-2019 PASS 1 61046A W1177 Stampede Powerplant -‐ Stampede (2)PCC 1 2011 Short-‐term Eligible Short-‐term 08/2016 6/9/17 Jul-2019 PASS 1 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 08/2016 6/8/17 Jul-2019 PASS 3,071 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 09/2016 6/8/17 Aug-2019 PASS 3,159 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 10/2016 6/8/17 Sep-2019 PASS 3,127 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 12/2016 6/8/17 Nov-2019 PASS 3,159 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 11/2016 6/8/17 Oct-2019 PASS 2,859 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 07/2016 6/8/17 Jun-2019 PASS 3,214 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 06/2016 6/8/17 May-2019 PASS 2,798 60633A W3412 Total Energy Facility -‐ TEF -‐ GEN 4 PCC 3 2016 Short-‐term Eligible Short-‐term 06/2016 6/8/17 May-2019 PASS 2,460 60633A W3412 Total Energy Facility -‐ TEF -‐ GEN 4 PCC 3 2016 Short-‐term Eligible Short-‐term 11/2016 6/8/17 Oct-2019 PASS 2,513 60633A W3412 Total Energy Facility -‐ TEF -‐ GEN 4 PCC 3 2016 Short-‐term Eligible Short-‐term 12/2016 6/8/17 Nov-2019 PASS 2,775 60633A W3412 Total Energy Facility -‐ TEF -‐ GEN 4 PCC 3 2016 Short-‐term Eligible Short-‐term 10/2016 6/8/17 Sep-2019 PASS 2,749 60633A W3412 Total Energy Facility -‐ TEF -‐ GEN 4 PCC 3 2016 Short-‐term Eligible Short-‐term 09/2016 6/8/17 Aug-2019 PASS 2,772 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2016 Short-‐term Eligible Short-‐term 10/2016 6/8/17 Sep-2019 PASS 3,127 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2016 Short-‐term Eligible Short-‐term 09/2016 6/8/17 Aug-2019 PASS 3,155 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2016 Short-‐term Eligible Short-‐term 11/2016 6/8/17 Oct-2019 PASS 2,860 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2016 Short-‐term Eligible Short-‐term 12/2016 6/8/17 Nov-2019 PASS 3,159 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2016 Short-‐term Eligible Short-‐term 06/2016 6/8/17 May-2019 PASS 2,796 60633A W868 Total Energy Facility -‐ TEF -‐ GEN3 PCC 3 2016 Short-‐term Eligible Short-‐term 06/2016 6/8/17 May-2019 PASS 2,793 60633A W868 Total Energy Facility -‐ TEF -‐ GEN3 PCC 3 2016 Short-‐term Eligible Short-‐term 12/2016 6/8/17 Nov-2019 PASS 3,159 60633A W868 Total Energy Facility -‐ TEF -‐ GEN3 PCC 3 2016 Short-‐term Eligible Short-‐term 11/2016 6/8/17 Oct-2019 PASS 2,858 60633A W868 Total Energy Facility -‐ TEF -‐ GEN3 PCC 3 2016 Short-‐term Eligible Short-‐term 09/2016 6/8/17 Aug-2019 PASS 3,152 60633A W868 Total Energy Facility -‐ TEF -‐ GEN3 PCC 3 2016 Short-‐term Eligible Short-‐term 10/2016 6/8/17 Sep-2019 PASS 3,127 63027A W4482 Tucannon River Wind Farm -‐ Tucannon River 1PCC 2 2016 Short-‐term Eligible Short-‐term 08/2016 5/17/17 Jul-2019 PASS 21,346 63027A W4482 Tucannon River Wind Farm -‐ Tucannon River 1PCC 2 2016 Short-‐term Eligible Short-‐term 07/2016 5/17/17 Jun-2019 PASS 28,221 63027A W4483 Tucannon River Wind Farm -‐ Tucannon River 2PCC 2 2016 Short-‐term Eligible Short-‐term 07/2016 5/17/17 Jun-2019 PASS 20,174 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2012 Short-‐term Eligible Short-‐term 11/2014 3/13/17 Oct-2017 PASS 14,044 60721A W360 White Creek Wind 1 -‐ White Creek PCC 1 2012 Short-‐term Eligible Short-‐term 12/2014 3/13/17 Nov-2017 PASS 2,869
Annual RPS Compliance Report: (2017) 36 Month RetirementData Reported by:Marin Clean Energy (MCE) Input RequiredAugust 31, 2018 Information is Hard Coded (No Input Required)
CPUC ID RPS ID WREGIS_ID Facility Name Expected PCC Classification Contract Year Contract Length Short Term Contract Eligibility Vintage Month/Year Retirement Date (MM/DD/YYYY)
Last Month to Retire REC (Month/Year)
Do RECs "Pass" or "Fail" Requirements of 36 Month
Rule: MWh REC Quantity Retired
NA 63055A W1268 Biglow Canyon Wind Farm -‐ Biglow Phase 2 PCC 2 2017 Short-‐term Eligible Short-‐term 09/2017 4/30/18 Aug-2020 PASS 11,908 NA 60878A W4880 Blythe Solar 110, LLC -‐ BLY110-‐B01 Block 1 PCC 1 2016 Short-‐term Eligible Short-‐term 01/2017 6/14/18 Dec-2019 PASS 5,615 NA 60878A W4880 Blythe Solar 110, LLC -‐ BLY110-‐B01 Block 1 PCC 1 2016 Short-‐term Eligible Short-‐term 02/2017 6/14/18 Jan-2020 PASS 5,581 NA 60878A W4880 Blythe Solar 110, LLC -‐ BLY110-‐B01 Block 1 PCC 1 2016 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 9,093 NA 60878A W4880 Blythe Solar 110, LLC -‐ BLY110-‐B01 Block 1 PCC 1 2016 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 8,989 NA 60878A W4880 Blythe Solar 110, LLC -‐ BLY110-‐B01 Block 1 PCC 1 2016 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 11,721 NA 60878A W4880 Blythe Solar 110, LLC -‐ BLY110-‐B01 Block 1 PCC 1 2016 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 11,240 NA 60878A W4880 Blythe Solar 110, LLC -‐ BLY110-‐B01 Block 1 PCC 1 2016 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 10,869 NA 60878A W4880 Blythe Solar 110, LLC -‐ BLY110-‐B01 Block 1 PCC 1 2016 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 9,776 NA 60878A W4953 Blythe Solar 110, LLC -‐ BLY110-‐B02 Block 02 PCC 1 2016 Short-‐term Eligible Short-‐term 01/2017 6/14/18 Dec-2019 PASS 5,326 NA 60878A W4953 Blythe Solar 110, LLC -‐ BLY110-‐B02 Block 02 PCC 1 2016 Short-‐term Eligible Short-‐term 02/2017 6/14/18 Jan-2020 PASS 5,295 NA 60878A W4953 Blythe Solar 110, LLC -‐ BLY110-‐B02 Block 02 PCC 1 2016 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 8,600 NA 60878A W4953 Blythe Solar 110, LLC -‐ BLY110-‐B02 Block 02 PCC 1 2016 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 8,527 NA 60878A W4953 Blythe Solar 110, LLC -‐ BLY110-‐B02 Block 02 PCC 1 2016 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 11,118 NA 60878A W4953 Blythe Solar 110, LLC -‐ BLY110-‐B02 Block 02 PCC 1 2016 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 10,661 NA 60878A W4953 Blythe Solar 110, LLC -‐ BLY110-‐B02 Block 02 PCC 1 2016 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 10,310 NA 60878A W4953 Blythe Solar 110, LLC -‐ BLY110-‐B02 Block 02 PCC 1 2016 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 9,272 NA 60878A W4954 Blythe Solar 110, LLC -‐ BLY110-‐B03 Block 03 PCC 1 2016 Short-‐term Eligible Short-‐term 01/2017 6/14/18 Dec-2019 PASS 4,198 NA 60878A W4954 Blythe Solar 110, LLC -‐ BLY110-‐B03 Block 03 PCC 1 2016 Short-‐term Eligible Short-‐term 02/2017 6/14/18 Jan-2020 PASS 4,172 NA 60878A W4954 Blythe Solar 110, LLC -‐ BLY110-‐B03 Block 03 PCC 1 2016 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 6,881 NA 60878A W4954 Blythe Solar 110, LLC -‐ BLY110-‐B03 Block 03 PCC 1 2016 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 6,720 NA 60878A W4954 Blythe Solar 110, LLC -‐ BLY110-‐B03 Block 03 PCC 1 2016 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 8,762 NA 60878A W4954 Blythe Solar 110, LLC -‐ BLY110-‐B03 Block 03 PCC 1 2016 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 8,402 NA 60878A W4954 Blythe Solar 110, LLC -‐ BLY110-‐B03 Block 03 PCC 1 2016 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 8,126 NA 60878A W4954 Blythe Solar 110, LLC -‐ BLY110-‐B03 Block 03 PCC 1 2016 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 7,307 NA 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17 PCC 1 2013 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 7,430 NA 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17 PCC 1 2013 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 7,440 NA 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17 PCC 1 2013 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 7,200 NA 60007A W124 Geysers Power Plant -‐ Calpine Geothermal Unit 17 PCC 1 2013 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 1,804 NA 60008A W125 Geysers Power Plant -‐ Calpine Geothermal Unit 18 PCC 1 2013 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 7,440 NA 60008A W125 Geysers Power Plant -‐ Calpine Geothermal Unit 18 PCC 1 2013 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 6,720 NA 60008A W125 Geysers Power Plant -‐ Calpine Geothermal Unit 18 PCC 1 2013 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 7,200 NA 60008A W125 Geysers Power Plant -‐ Calpine Geothermal Unit 18 PCC 1 2013 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 7,200 NA 60008A W125 Geysers Power Plant -‐ Calpine Geothermal Unit 18 PCC 1 2013 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 7,440 NA 60009A W126 Geysers Power Plant -‐ Calpine Geothermal Unit 20 PCC 1 2013 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 7,440 NA 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 6,406 NA 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 5,394 NA 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 5,191 NA 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 6,608 NA 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 7,190 NA 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 6,828 NA 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 6,809 NA 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 3,913 NA 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 2,847 NA 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 2,902 NA 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 2,227 NA 60535A W243 Camanche -‐ Camanche 1,2,&3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 2,050 NA 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 6,977 NA 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 6,331 NA 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 7,035 NA 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 6,672 NA 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 7,006 NA 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 6,941 NA 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 5,133 NA 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 3,182 NA 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 2,618 NA 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 2,373 NA 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 3,385 NA 60536A W233 Pardee -‐ Pardee 1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 3,629 NA 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 7,528 NA 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 6,793 NA 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 7,615 NA 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 7,276 NA 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 7,655 NA 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 7,363 NA 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 5,439 NA 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 850 NA 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 270 NA 60536A W241 Pardee -‐ Pardee 2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 3,857 NA 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 8,001 NA 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 7,260 NA 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 8,066 NA 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 7,651
Note : Please create one line per combination of REC vintage and REC retirement date. For example RECs that have the same vintage are retired on two separate dates, please include one line per retirement date. Likewise if RECs of different vintages (e.g. June 2017 and July 2017) are retired on the same date, please include one line per vintage.
NA 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 8,033 NA 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 7,958 NA 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 5,885 NA 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 3,649 NA 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 3,003 NA 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 2,721 NA 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 3,881 NA 60536A W242 Pardee -‐ Pardee 3 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 4,162 NA 60600A W3959 Cape Scott Wind -‐ Cape Scott Wind PCC 2 2016 Short-‐term Eligible Short-‐term 01/2017 4/26/18 Dec-2019 PASS 9,681 NA 60600A W3959 Cape Scott Wind -‐ Cape Scott Wind PCC 1 2016 Short-‐term Eligible Short-‐term 09/2017 6/14/18 Aug-2020 PASS 3,377 NA 60822A W892 Cedar Creek -‐ Cedar Creek PCC 2 2016 Short-‐term Eligible Short-‐term 02/2017 5/9/18 Jan-2020 PASS 43,183 NA 60822A W892 Cedar Creek -‐ Cedar Creek PCC 2 2016 Short-‐term Eligible Short-‐term 05/2017 5/9/18 Apr-2020 PASS 17,671 NA 60822A W892 Cedar Creek -‐ Cedar Creek PCC 2 2016 Short-‐term Eligible Short-‐term 06/2017 5/9/18 May-2020 PASS 19,523 NA 60822A W892 Cedar Creek -‐ Cedar Creek PCC 2 2016 Short-‐term Eligible Short-‐term 07/2017 5/9/18 Jun-2020 PASS 23,068 NA 60822A W892 Cedar Creek -‐ Cedar Creek PCC 2 2016 Short-‐term Eligible Short-‐term 08/2017 5/9/18 Jul-2020 PASS 18,198 NA 61384A W1900 Cedar Creek II -‐ Cedar Creek II PCC 2 2016 Short-‐term Eligible Short-‐term 01/2017 5/9/18 Dec-2019 PASS 50,508 NA 61384A W1900 Cedar Creek II -‐ Cedar Creek II PCC 2 2016 Short-‐term Eligible Short-‐term 03/2017 5/9/18 Feb-2020 PASS 55,715 NA 61384A W1900 Cedar Creek II -‐ Cedar Creek II PCC 2 2016 Short-‐term Eligible Short-‐term 07/2017 5/9/18 Jun-2020 PASS 11,961 NA 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEF PCC 3 2016 Short-‐term Eligible Short-‐term 01/2017 6/14/18 Dec-2019 PASS 78 NA 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEF PCC 3 2016 Short-‐term Eligible Short-‐term 02/2017 6/14/18 Jan-2020 PASS 71 NA 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEF PCC 3 2016 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 76 NA 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEF PCC 3 2016 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 74 NA 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEF PCC 3 2016 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 74 NA 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEF PCC 3 2016 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 71 NA 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEF PCC 3 2016 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 79 NA 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEF PCC 3 2016 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 85 NA 60866A W1376 Calabasas Gas-‐to-‐Energy Facility -‐ CGTEF PCC 3 2016 Short-‐term Eligible Short-‐term 09/2017 6/14/18 Aug-2020 PASS 79 NA 62355A W4150 City of Corcoran Solar -‐ City of Corcoran Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 01/2017 5/23/18 Dec-2019 PASS 991 NA 62355A W4150 City of Corcoran Solar -‐ City of Corcoran Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 02/2017 5/23/18 Jan-2020 PASS 1,374 NA 62355A W4150 City of Corcoran Solar -‐ City of Corcoran Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 03/2017 5/23/18 Feb-2020 PASS 2,545 NA 62355A W4150 City of Corcoran Solar -‐ City of Corcoran Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 04/2017 5/23/18 Mar-2020 PASS 2,505 NA 62355A W4150 City of Corcoran Solar -‐ City of Corcoran Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 05/2017 5/23/18 Apr-2020 PASS 2,938 NA 62355A W4150 City of Corcoran Solar -‐ City of Corcoran Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 06/2017 5/23/18 May-2020 PASS 3,501 NA 62355A W4150 City of Corcoran Solar -‐ City of Corcoran Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 07/2017 5/23/18 Jun-2020 PASS 3,401 NA 62355A W4150 City of Corcoran Solar -‐ City of Corcoran Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 08/2017 5/23/18 Jul-2020 PASS 2,745 NA 62355A W4150 City of Corcoran Solar -‐ City of Corcoran Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 357 NA 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 01/2017 5/23/18 Dec-2019 PASS 23 NA 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 02/2017 5/23/18 Jan-2020 PASS 22 NA 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 03/2017 5/23/18 Feb-2020 PASS 44 NA 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 04/2017 5/23/18 Mar-2020 PASS 48 NA 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 05/2017 5/23/18 Apr-2020 PASS 65 NA 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 06/2017 5/23/18 May-2020 PASS 62 NA 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2017 5/23/18 Jun-2020 PASS 66 NA 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2017 5/23/18 Jul-2020 PASS 56 NA 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2017 5/23/18 Aug-2020 PASS 47 NA 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 10/2017 5/23/18 Sep-2020 PASS 43 NA 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2017 5/23/18 Oct-2020 PASS 24 NA 62742A W5192 Cost Plus Plaza -‐ Cost Plus Plaza PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2017 5/23/18 Nov-2020 PASS 25 NA 61360A W1992 Dokie Wind -‐ Dokie Wind PCC 2 2016 Short-‐term Eligible Short-‐term 01/2017 4/26/18 Dec-2019 PASS 11,260 NA 61360A W1992 Dokie Wind -‐ Dokie Wind PCC 1 2016 Short-‐term Eligible Short-‐term 09/2017 6/14/18 Aug-2020 PASS 8,369 NA 62709A W5654 DRES Quarry 1 -‐ DRES Quarry 1 PCC 1 2014 Long-‐term Long-‐term -‐ N/A 07/2017 5/23/18 Jun-2020 PASS 95 NA 62709A W5654 DRES Quarry 1 -‐ DRES Quarry 1 PCC 1 2014 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 137 NA 62709A W5654 DRES Quarry 1 -‐ DRES Quarry 1 PCC 1 2014 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 143 NA 62709A W5654 DRES Quarry 1 -‐ DRES Quarry 1 PCC 1 2014 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 110 NA 62709A W5654 DRES Quarry 1 -‐ DRES Quarry 1 PCC 1 2014 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 127 NA 61034A W186 Elkhorn Valley Wind Farm -‐ Elkhorn Valley Wind Farm PCC 2 2016 Short-‐term Eligible Short-‐term 01/2017 5/9/18 Dec-2019 PASS 14,541 NA 61034A W186 Elkhorn Valley Wind Farm -‐ Elkhorn Valley Wind Farm PCC 2 2016 Short-‐term Eligible Short-‐term 02/2017 5/9/18 Jan-2020 PASS 26,840 NA 61034A W186 Elkhorn Valley Wind Farm -‐ Elkhorn Valley Wind Farm PCC 2 2016 Short-‐term Eligible Short-‐term 03/2017 5/9/18 Feb-2020 PASS 11,711 NA 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 86 NA 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 89 NA 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 166 NA 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 173 NA 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 215 NA 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 212 NA 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 210 NA 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 170 NA 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 152 NA 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 162 NA 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 95 NA 63035A W5190 Freethy Industrial Park -‐ Freethy Industrial Park Unit #1 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 91 NA 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 88 NA 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 95 NA 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 176 NA 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 165 NA 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 220 NA 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 205 NA 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 202 NA 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 166 NA 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 153 NA 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 164 NA 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 99 NA 63036A W5191 Freethy Industrial Park -‐ Freethy Industrial Park Unit #2 PCC 1 2015 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 94 NA 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 1,060
NA 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 864 NA 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 1,042 NA 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 880 NA 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 332 NA 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 972 NA 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 1,038 NA 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 913 NA 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 1,058 NA 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 1,076 NA 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 1,038 NA 61205C W3547 G2 Energy Hay Road -‐ G2 Hay Road PCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 1,113 NA 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 1,048 NA 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 907 NA 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 1,028 NA 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 648 NA 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 1,121 NA 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 1,082 NA 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 866 NA 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 1,089 NA 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 1,098 NA 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 1,150 NA 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 1,005 NA 61206A W1565 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom RD PCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 1,157 NA 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 148 NA 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 102 NA 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 121 NA 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 331 NA 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 182 NA 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 75 NA 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 44 NA 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 74 NA 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 59 NA 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 60 NA 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 169 NA 61206A W3932 G2 Energy Ostrom Rd -‐ G2 Energy Ostrom Rd. Unit 2 PCC 1 2010 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 31 NA 60908A W1254 Geothermal 1_Unit 1 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 8,484 NA 60908A W1254 Geothermal 1_Unit 1 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 8,593 NA 60908A W1254 Geothermal 1_Unit 1 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 8,808 NA 60908A W1254 Geothermal 1_Unit 1 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 8,330 NA 60908A W1254 Geothermal 1_Unit 1 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 8,763 NA 60908A W1254 Geothermal 1_Unit 1 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 8,657 NA 60908A W1254 Geothermal 1_Unit 1 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 09/2017 6/14/18 Aug-2020 PASS 8,309 NA 60908A W1254 Geothermal 1_Unit 1 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 10/2017 6/14/18 Sep-2020 PASS 3,728 NA 60908A W1255 Geothermal 1_Unit 2 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 8,506 NA 60908A W1255 Geothermal 1_Unit 2 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 8,459 NA 60908A W1255 Geothermal 1_Unit 2 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 8,002 NA 60908A W1255 Geothermal 1_Unit 2 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 7,472 NA 60908A W1255 Geothermal 1_Unit 2 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 7,525 NA 60908A W1255 Geothermal 1_Unit 2 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 7,779 NA 60908A W1255 Geothermal 1_Unit 2 -‐ Geothermal 1 PCC 1 2016 Short-‐term Eligible Short-‐term 09/2017 6/14/18 Aug-2020 PASS 7,670 NA 60911A W1257 Geothermal 2_Unit 4 -‐ Geothermal 2 PCC 1 2016 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 7,010 NA 60911A W1257 Geothermal 2_Unit 4 -‐ Geothermal 2 PCC 1 2016 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 11,820 NA 60911A W1257 Geothermal 2_Unit 4 -‐ Geothermal 2 PCC 1 2016 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 12,398 NA 60911A W1257 Geothermal 2_Unit 4 -‐ Geothermal 2 PCC 1 2016 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 12,278 NA 60911A W1257 Geothermal 2_Unit 4 -‐ Geothermal 2 PCC 1 2016 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 12,728 NA 60911A W1257 Geothermal 2_Unit 4 -‐ Geothermal 2 PCC 1 2016 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 12,580 NA 60911A W1257 Geothermal 2_Unit 4 -‐ Geothermal 2 PCC 1 2016 Short-‐term Eligible Short-‐term 09/2017 6/14/18 Aug-2020 PASS 12,101 NA 62357A W4151 Goose Lake Solar -‐ Goose Lake Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 1,333 NA 62357A W4151 Goose Lake Solar -‐ Goose Lake Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 1,655 NA 62357A W4151 Goose Lake Solar -‐ Goose Lake Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 3,101 NA 62357A W4151 Goose Lake Solar -‐ Goose Lake Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 3,342 NA 62357A W4151 Goose Lake Solar -‐ Goose Lake Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 3,894 NA 62357A W4151 Goose Lake Solar -‐ Goose Lake Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 4,270 NA 62357A W4151 Goose Lake Solar -‐ Goose Lake Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 4,124 NA 62357A W4151 Goose Lake Solar -‐ Goose Lake Solar PCC 1 2011 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 3,677 NA 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 01/2017 5/23/18 Dec-2019 PASS 1,902 NA 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 02/2017 5/23/18 Jan-2020 PASS 2,451 NA 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 03/2017 5/23/18 Feb-2020 PASS 2,457 NA 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 2,140 NA 61263A W4192 Kansas -‐ Kansas PCC 1 2012 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 5,835 NA 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 01/2017 6/14/18 Dec-2019 PASS 3 NA 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 02/2017 6/14/18 Jan-2020 PASS 3 NA 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 3 NA 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 3 NA 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 3 NA 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 3 NA 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 1 NA 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 3 NA 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 09/2017 6/14/18 Aug-2020 PASS 3 NA 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 10/2017 6/14/18 Sep-2020 PASS 3 NA 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 11/2017 6/14/18 Oct-2020 PASS 3 NA 61044A W1108 Lewiston Powerplant -‐ Lewiston PCC 1 2011 Short-‐term Eligible Short-‐term 12/2017 6/14/18 Nov-2020 PASS 3 NA 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 290
NA 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 356 NA 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 442 NA 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 435 NA 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 417 NA 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 416 NA 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 339 NA 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 373 NA 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 313 NA 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 385 NA 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 388 NA 61632A W2319 Lincoln Landfill Power Plant -‐ Unit 3 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 388 NA 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 580 NA 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 713 NA 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 884 NA 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 870 NA 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 833 NA 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 833 NA 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 678 NA 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 746 NA 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 625 NA 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 771 NA 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 775 NA 61632A W2318 Lincoln Landfill Power Plant -‐ Units 1 & 2 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 777 NA 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2017 6/14/18 Dec-2019 PASS 876 NA 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2017 6/14/18 Jan-2020 PASS 1,076 NA 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 1,335 NA 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 1,313 NA 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 1,256 NA 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 1,258 NA 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 1,023 NA 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 1,126 NA 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 943 NA 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 1,165 NA 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 1,168 NA 61632A W3188 Lincoln Landfill Power Plant -‐ Units 4, 5, & 6 PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 1,174 NA 60817A W893 Logan Wind Energy -‐ Logan PCC 2 2016 Short-‐term Eligible Short-‐term 04/2017 5/9/18 Mar-2020 PASS 51,550 NA 60817A W893 Logan Wind Energy -‐ Logan PCC 2 2016 Short-‐term Eligible Short-‐term 07/2017 5/9/18 Jun-2020 PASS 7,971 NA 60817A W893 Logan Wind Energy -‐ Logan PCC 2 2016 Short-‐term Eligible Short-‐term 12/2017 5/9/18 Nov-2020 PASS 20,606 NA 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 03/2017 6/14/18 Feb-2020 PASS 18 NA 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 04/2017 6/14/18 Mar-2020 PASS 80 NA 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 05/2017 6/14/18 Apr-2020 PASS 207 NA 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 206 NA 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 182 NA 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 170 NA 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 126 NA 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 105 NA 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 64 NA 63219A W4903 Marin Carport -‐ Buck Institute -‐ Marin Carport -‐ Buck InstitutePCC 1 2011 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 62 NA 63268A W5189 Meikle Wind -‐ Meikle Wind PCC 2 2016 Short-‐term Eligible Short-‐term 01/2017 4/26/18 Dec-2019 PASS 11,271 NA 63268A W5189 Meikle Wind -‐ Meikle Wind PCC 2 2016 Short-‐term Eligible Short-‐term 03/2017 4/26/18 Feb-2020 PASS 9,187 NA 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2) PCC 1 2011 Short-‐term Eligible Short-‐term 01/2017 6/14/18 Dec-2019 PASS 60 NA 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2) PCC 1 2011 Short-‐term Eligible Short-‐term 02/2017 6/14/18 Jan-2020 PASS 19 NA 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2) PCC 1 2011 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 14 NA 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2) PCC 1 2011 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 42 NA 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2) PCC 1 2011 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 74 NA 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2) PCC 1 2011 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 55 NA 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2) PCC 1 2011 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 66 NA 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2) PCC 1 2011 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 63 NA 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2) PCC 1 2011 Short-‐term Eligible Short-‐term 09/2017 6/14/18 Aug-2020 PASS 54 NA 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2) PCC 1 2011 Short-‐term Eligible Short-‐term 10/2017 6/14/18 Sep-2020 PASS 43 NA 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2) PCC 1 2011 Short-‐term Eligible Short-‐term 11/2017 6/14/18 Oct-2020 PASS 35 NA 61045A W1161 Nimbus Powerplant -‐ Nimbus Plant (2) PCC 1 2011 Short-‐term Eligible Short-‐term 12/2017 6/14/18 Nov-2020 PASS 54 NA 61252A W3746 Port Angeles Mill -‐ CoGen No. 11 PCC 2 2016 Short-‐term Eligible Short-‐term 01/2017 4/26/18 Dec-2019 PASS 615 NA 62247A W3160 Quality Wind -‐ Quality Wind PCC 1 2016 Short-‐term Eligible Short-‐term 09/2017 6/14/18 Aug-2020 PASS 8,540 NA 62247A W3160 Quality Wind -‐ Quality Wind PCC 2 2016 Short-‐term Eligible Short-‐term 01/2017 4/26/18 Dec-2019 PASS 12,986 NA 63651A W5551 Redwood Renewable Energy Facility -‐ Waste Management Landfill Redwood LGGTEPCC 1 2014 Long-‐term Long-‐term -‐ N/A 06/2017 6/14/18 May-2020 PASS 308 NA 63651A W5551 Redwood Renewable Energy Facility -‐ Waste Management Landfill Redwood LGGTEPCC 1 2014 Long-‐term Long-‐term -‐ N/A 07/2017 6/14/18 Jun-2020 PASS 1,488 NA 63651A W5551 Redwood Renewable Energy Facility -‐ Waste Management Landfill Redwood LGGTEPCC 1 2014 Long-‐term Long-‐term -‐ N/A 08/2017 6/14/18 Jul-2020 PASS 2,631 NA 63651A W5551 Redwood Renewable Energy Facility -‐ Waste Management Landfill Redwood LGGTEPCC 1 2014 Long-‐term Long-‐term -‐ N/A 09/2017 6/14/18 Aug-2020 PASS 2,440 NA 63651A W5551 Redwood Renewable Energy Facility -‐ Waste Management Landfill Redwood LGGTEPCC 1 2014 Long-‐term Long-‐term -‐ N/A 10/2017 6/14/18 Sep-2020 PASS 2,370 NA 63651A W5551 Redwood Renewable Energy Facility -‐ Waste Management Landfill Redwood LGGTEPCC 1 2014 Long-‐term Long-‐term -‐ N/A 11/2017 6/14/18 Oct-2020 PASS 2,631 NA 63651A W5551 Redwood Renewable Energy Facility -‐ Waste Management Landfill Redwood LGGTEPCC 1 2014 Long-‐term Long-‐term -‐ N/A 12/2017 6/14/18 Nov-2020 PASS 2,523 NA 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 5,399 NA 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 35,892 NA 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 39,724 NA 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 44,854 NA 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 45,850 NA 62469A W4612 Rising Tree Wind Farm III LLC -‐ Rising Tree Wind Farm III LLCPCC 1 2014 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 33,435 NA 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 01/2017 5/23/18 Dec-2019 PASS 66 NA 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 02/2017 5/23/18 Jan-2020 PASS 71 NA 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 03/2017 5/23/18 Feb-2020 PASS 137 NA 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 04/2017 5/23/18 Mar-2020 PASS 149 NA 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 05/2017 5/23/18 Apr-2020 PASS 207
NA 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 06/2017 5/23/18 May-2020 PASS 206 NA 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 07/2017 5/23/18 Jun-2020 PASS 88 NA 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 08/2017 5/23/18 Jul-2020 PASS 136 NA 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 09/2017 5/23/18 Aug-2020 PASS 135 NA 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 10/2017 5/23/18 Sep-2020 PASS 115 NA 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 11/2017 5/23/18 Oct-2020 PASS 69 NA 62237A W2969 San Rafael Airport -‐ San Rafael Airport PCC 1 2012 Long-‐term Long-‐term -‐ N/A 12/2017 5/23/18 Nov-2020 PASS 72 NA 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLC PCC 1 2016 Short-‐term Eligible Short-‐term 01/2017 6/14/18 Dec-2019 PASS 3,019 NA 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLC PCC 1 2016 Short-‐term Eligible Short-‐term 02/2017 6/14/18 Jan-2020 PASS 2,869 NA 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLC PCC 1 2016 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 2,577 NA 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLC PCC 1 2016 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 3,552 NA 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLC PCC 1 2016 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 7,570 NA 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLC PCC 1 2016 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 8,458 NA 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLC PCC 1 2016 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 8,424 NA 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLC PCC 1 2016 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 10,249 NA 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLC PCC 1 2016 Short-‐term Eligible Short-‐term 09/2017 6/14/18 Aug-2020 PASS 5,400 NA 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLC PCC 1 2016 Short-‐term Eligible Short-‐term 11/2017 6/14/18 Oct-2020 PASS 1,325 NA 60488A W231 Shiloh I Wind Project -‐ Shiloh I Wind Project LLC PCC 1 2016 Short-‐term Eligible Short-‐term 12/2017 6/14/18 Nov-2020 PASS 420 NA 61046A W1177 Stampede Powerplant -‐ Stampede (2) PCC 1 2011 Short-‐term Eligible Short-‐term 02/2017 6/14/18 Jan-2020 PASS 4 NA 61046A W1177 Stampede Powerplant -‐ Stampede (2) PCC 1 2011 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 9 NA 61046A W1177 Stampede Powerplant -‐ Stampede (2) PCC 1 2011 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 9 NA 61046A W1177 Stampede Powerplant -‐ Stampede (2) PCC 1 2011 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 9 NA 61046A W1177 Stampede Powerplant -‐ Stampede (2) PCC 1 2011 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 1 NA 61046A W1177 Stampede Powerplant -‐ Stampede (2) PCC 1 2011 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 6 NA 61046A W1177 Stampede Powerplant -‐ Stampede (2) PCC 1 2011 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 6 NA 61046A W1177 Stampede Powerplant -‐ Stampede (2) PCC 1 2011 Short-‐term Eligible Short-‐term 09/2017 6/14/18 Aug-2020 PASS 3 NA 61046A W1177 Stampede Powerplant -‐ Stampede (2) PCC 1 2011 Short-‐term Eligible Short-‐term 10/2017 6/14/18 Sep-2020 PASS 7 NA 61046A W1177 Stampede Powerplant -‐ Stampede (2) PCC 1 2011 Short-‐term Eligible Short-‐term 11/2017 6/14/18 Oct-2020 PASS 5 NA 61046A W1177 Stampede Powerplant -‐ Stampede (2) PCC 1 2011 Short-‐term Eligible Short-‐term 12/2017 6/14/18 Nov-2020 PASS 2 NA 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 01/2017 6/14/18 Dec-2019 PASS 3,108 NA 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 02/2017 6/14/18 Jan-2020 PASS 2,902 NA 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 3,178 NA 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 3,072 NA 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 3,257 NA 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 3,109 NA 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 3,204 NA 60633A W866 Total Energy Facility -‐ TEF -‐ GEN 1 PCC 3 2016 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 3,232 NA 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2016 Short-‐term Eligible Short-‐term 01/2017 6/14/18 Dec-2019 PASS 3,108 NA 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2016 Short-‐term Eligible Short-‐term 02/2017 6/14/18 Jan-2020 PASS 2,902 NA 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2016 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 3,178 NA 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2016 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 3,072 NA 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2016 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 3,257 NA 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2016 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 3,113 NA 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2016 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 3,201 NA 60633A W867 Total Energy Facility -‐ TEF -‐ GEN2 PCC 3 2016 Short-‐term Eligible Short-‐term 08/2017 6/14/18 Jul-2020 PASS 1,415 NA 60633A W868 Total Energy Facility -‐ TEF -‐ GEN3 PCC 3 2016 Short-‐term Eligible Short-‐term 01/2017 6/14/18 Dec-2019 PASS 3,105 NA 60633A W868 Total Energy Facility -‐ TEF -‐ GEN3 PCC 3 2016 Short-‐term Eligible Short-‐term 02/2017 6/14/18 Jan-2020 PASS 2,902 NA 60633A W868 Total Energy Facility -‐ TEF -‐ GEN3 PCC 3 2016 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 3,178 NA 60633A W868 Total Energy Facility -‐ TEF -‐ GEN3 PCC 3 2016 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 3,072 NA 60633A W868 Total Energy Facility -‐ TEF -‐ GEN3 PCC 3 2016 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 3,254 NA 60633A W868 Total Energy Facility -‐ TEF -‐ GEN3 PCC 3 2016 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 3,112 NA 60633A W868 Total Energy Facility -‐ TEF -‐ GEN3 PCC 3 2016 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 3,198 NA 60633A W3412 Total Energy Facility -‐ TEF -‐ GEN 4 PCC 3 2016 Short-‐term Eligible Short-‐term 01/2017 6/14/18 Dec-2019 PASS 2,731 NA 60633A W3412 Total Energy Facility -‐ TEF -‐ GEN 4 PCC 3 2016 Short-‐term Eligible Short-‐term 02/2017 6/14/18 Jan-2020 PASS 2,550 NA 60633A W3412 Total Energy Facility -‐ TEF -‐ GEN 4 PCC 3 2016 Short-‐term Eligible Short-‐term 03/2017 6/14/18 Feb-2020 PASS 2,793 NA 60633A W3412 Total Energy Facility -‐ TEF -‐ GEN 4 PCC 3 2016 Short-‐term Eligible Short-‐term 04/2017 6/14/18 Mar-2020 PASS 2,699 NA 60633A W3412 Total Energy Facility -‐ TEF -‐ GEN 4 PCC 3 2016 Short-‐term Eligible Short-‐term 05/2017 6/14/18 Apr-2020 PASS 2,864 NA 60633A W3412 Total Energy Facility -‐ TEF -‐ GEN 4 PCC 3 2016 Short-‐term Eligible Short-‐term 06/2017 6/14/18 May-2020 PASS 2,734 NA 60633A W3412 Total Energy Facility -‐ TEF -‐ GEN 4 PCC 3 2016 Short-‐term Eligible Short-‐term 07/2017 6/14/18 Jun-2020 PASS 2,813 NA 63027A W4482 Tucannon River Wind Farm -‐ Tucannon River 1 PCC 2 2017 Short-‐term Eligible Short-‐term 09/2017 4/30/18 Aug-2020 PASS 2,881 NA 63027A W4483 Tucannon River Wind Farm -‐ Tucannon River 2 PCC 2 2017 Short-‐term Eligible Short-‐term 09/2017 4/30/18 Aug-2020 PASS 15,211
Dec-1902 PASSDec-1902 PASSDec-1902 PASSDec-1902 PASSDec-1902 PASSDec-1902 PASS
Revised 2/11/2011
August 31, 2018 Name: Dawn WeiszTitle: Chief Executive OfficerEmail: [email protected]: (415) 464-‐6020Fax: (415) 459-‐8095Address: 1125 Tamalpais Avenue, San Rafael, CA 94901
2017 Static Contract Informaiton
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
Order Instituting Rulemaking to Continue Implementation and
Administration of California Renewables Portfolio Standard Program.
Rulemaking 15-‐02-‐020(Filed February 26, 2015)
Marin Clean Energy (MCE)
Initial Reporting Year Facility Name Technology Technology Sub-‐Type Expected PCC Classification Facility Status Contract Execution Date Contract Start Date
2018 Exelon Sept-Dec 2017_PCC1 Wind/Solar/Geothermal PCC1 online 9/7/17 9/8/172018 PowerEx April-Dec 2018_PCC1 Wind PCC1 online 9/15/17 4/1/182018 PowerEx Jan-Dec 2018_PCC2 Wind PCC2 online 9/18/17 1/1/182018 PowerEX Jan-Dec 2019_PCC2 Wind PCC2 online 9/18/17 1/1/192018 PowerEx Jan2019-Dec 2020_PCC1 Wind PCC1 online 10/13/17 1/1/192018 Morgan Stanley Apr 2018-Dec 2020_PCC1 Wind PCC1 online 11/14/17 4/1/182018 NextEra Apr-Dec 2018_PCC1 Solar PV PCC1 online 11/8/17 4/1/182018 Energy Finance Associates Dec 2018 - Dec 2028_PCC1 (Marin HQ) Solar PV PCC1 under development - on schedule 2/2/17 12/1/182018 sPower MCE Solar One Dec 2017-Dec 2037_PCC1 Solar PV PCC1 online 5/30/17 12/18/172018 NextEra Jan 2019 - Dec 2023_PCC1 Wind PCC1 online 11/8/17 1/1/192018 ConEd May 2018-Dec 2019_PCC1 Solar PV PCC1 online 3/6/18 5/1/182018 SVP Apr-Dec2018_PCC1 Geothermal PCC1 online 2/28/18 4/1/182018 City of Lancaster Nov-Dec2017_PCC1 Wind PCC1 online 11/8/17 11/8/172017 3Phases Jan 2018 - Dec 2019_PCC2 Wind PCC2 online 6/23/17 1/1/182018 Portland General Electric Sep-Dec2017_PCC2 Wind PCC2 online 9/1/17 9/1/172018 Portland General Electric Jan-Dec2018_PCC2 Wind PCC2 online 1/31/18 1/31/182018 Portland General Electric Jan-Dec2018_PCC2_2 Wind PCC2 online 1/31/18 1/31/182018 Xcel Jan-Dec 2018_PCC2 Wind PCC2 online 10/16/17 1/1/182018 Xcel Jan-Dec 2018_PCC2_2 Wind PCC2 online 1/29/18 1/1/182018 Apple Valley Nov-Dec2017_PCC1 Wind PCC1 online 11/8/17 11/8/172018 Oakley RV & Boat Storage July 2018-July 2038_PCC1 Solar PV PCC1 online 5/9/18 7/20/182018 BayWa Strauss Wind Project April 2020-April 2035_PCC1 Wind PCC1 under development - on schedule 6/1/18 4/1/202018 STX P-STX_PCC3 Biomass PCC3 online 3/18/18 7/1/182018 3Phases Jul-Dec2018_PCC1 Various PCC1 online 6/29/18 7/1/18
RPS Static Contract Information
Contract Term Contract End Date Contract Termination Date Share (%) or Fixed Contract Amount of Total Generation CPUC ID Number WREGIS ID RPS ID Owner/Seller Scheduling Coordinator Facility Location:
County 4 Months 12/31/17 Fixed Contracted Amount N/A 62469A, 60878A, 60488, 60025A, 60004AExelon (fka Constellation)9 Months 12/31/18 Fixed Contracted Amount N/A 613604, 622474, 60600A, 63268APowerex Corp.12 Months 12/31/18 Fixed Contracted Amount N/A 61360A, 62247A, 60600A, 63268A, 60721APowerex Corp.12 Months 12/31/19 Fixed Contracted Amount N/A 61360A, 62247A, 60600A, 63268A, 60721APowerex Corp.2 Years 12/31/20 Fixed Contracted Amount N/A 61360A, 62247A, 60600A, 63268APowerex Corp.2 Year, 9 Months 12/31/20 Fixed Contracted Amount N/A 60857A, 60602A Morgan Stanley Capital Group Inc.9 Months 12/31/18 Fixed Contracted Amount N/A 60878A NextEra10 Years 12/1/28 Shared (%) N/A Energy Finance Associates Marin20 Years 12/17/37 Shared (%) N/A MCE Solar One, LLC Contra Costa5 Years 12/31/23 Shared (%) N/A 55396 NextEra19 Months 12/31/19 Fixed Contracted Amount N/A 62516, 60585 CED Lost Hills Solar, LLC9 Months 12/31/18 Fixed Contracted Amount N/A Various City of Santa Clara dba Silicon Valley Power)2 Months 12/31/17 Fixed Contracted Amount N/A 62469A, 60878A, 60488, 60025A, 60004A, 60025A, 60004A, 60535A, 63282CCity of Lancaster2 years 12/31/19 Fixed Contracted Amount N/A 60858, 60092A, 60107, 60385, 603863Phases4 Months 12/31/17 Fixed Contracted Amount N/A 63027A, 63056A Portland General Electric11 Months 12/31/18 Fixed Contracted Amount N/A 63027A, 630564 Portland General Electric11 Months 12/31/18 Fixed Contracted Amount N/A 63027A, 63055A, 63056APortland General Electric12 Months 12/31/18 Fixed Contracted Amount N/A 62246A, 62246A, 62859AXcel12 Months 12/31/18 Fixed Contracted Amount N/A 62246A, 62246A, 62859A, 60822A, 60822AXcel2 Months 12/31/17 Fixed Contracted Amount N/A 62469Á, 60878A, 60488, 60025A, 60004A, 60535A, 63282CApple Valley Choice Energy20 Years 7/19/38 Shared (%) N/A Hayworth-Fabian, LLC Contra Costa15 Years 3/31/35 Shared (%) N/A Strauss Wind, LLC Santa Barbara County6 Months 12/31/18 Fixed Contracted Amount N/A Various STX Services B.V.6 Months 12/31/18 Fixed Contracted Amount N/A 60858, 60092A, 60107, 60385, 603863 Phases Renewables Inc.
RPS Static Contract Information
Facility Location: State
Facility Location: Country
Facility Location: Longitude
Facility Location: Latitude
Facility(ies) Directly Interconnected to a CBA CBA(s) of Interconnection Execution Date for Substitute Energy Agreement (PCC 2 Only) Duration of Substitute Energy
Agreement (PCC 2 Only) Resale Agreement Notes (Optional)
California United States resale – seller Portfolio dealCanada not resale Portfolio dealUnited States, Canada not resale Portfolio dealUnited States, Canada not resale Portfolio dealCanada not resale Portfolio deal
California, Oregon United States not resale Portfolio dealCalifornia United States not resaleCalifornia United States not resaleCalifornia United States not resaleCalifornia United States not resaleCalifornia United States not resale Portfolio dealCalifornia United States not resale Portfolio dealCalifornia United States resale – seller Portfolio deal
not resale Portfolio dealUnited States not resale Portfolio dealUnited States not resale Portfolio dealUnited States not resale Portfolio deal
Colorado United States not resale Portfolio dealColorado United States not resale Portfolio dealCalifornia United States resale – seller Portfolio dealCalifornia United States not resaleCalifornia United States not resaleCalifornia United States not resale Portfolio deal
not resale Portfolio deal
RPS Static Contract Information
_____________________________________________
Dawn Weisz, Chief Executtive Officer
OFFICER VERIFICATION FORM
I am an officer of the reporting corporation herein, and am authorized to make this verification
on its behalf. The statements in the foregoing document are true of my own knowledge, except
as to matters which are therein stated on information or belief, and as to those matters I believe
them to be true. The spreadsheet format used to file this RPS Hourly e-Tag Summary Report
has not [has] been altered from the version issued or approved by Energy Division [, with the
alterations described in this report].
I declare under penalty of perjury that the foregoing is true and correct.
Executed on August 29, 2018 at San Rafael, California.
Revised 2/11/2011
August 31, 2018 Name: Dawn WeiszTitle: Chief Executive OfficerEmail: [email protected] Phone: (415) 464-‐6020Fax: (415) 459-‐8095Address: 1125 Tamalpais Avenue, San Rafael, CA 94901
2017 Hourly Meter and e-‐Tag Reconciliation Report
BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA
Order Instituting Rulemaking to Continue Implementation and
Administration of California Renewables Portfolio Standard
Program.
Rulemaking 15-‐02-‐020(Filed February 26, 2015)
Marin Clean Energy (MCE)
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
9/20/17 1 BCHA_PWX01Y053376_CISO 21.0 27.0340 100% 78% n/a 21.00009/20/17 2 BCHA_PWX01Y053385_CISO 27.0 38.6400 100% 70% n/a 27.00009/20/17 3 BCHA_PWX01Y053401_CISO 32.0 48.2580 100% 66% n/a 32.00009/20/17 4 BCHA_PWX01Y053415_CISO 48.0 61.1380 100% 79% n/a 48.00009/20/17 5 BCHA_PWX01Y053428_CISO 50.0 51.9120 100% 96% n/a 50.00009/20/17 6 BCHA_PWX01Y053440_CISO 65.0 51.2960 100% 100% n/a 51.29609/20/17 7 BCHA_PWX01Y053452_CISO 36.0 56.7140 100% 88% n/a 36.00009/20/17 7 BCHA_PWX01Y053454_CISO 7.0 56.7140 100% 88% n/a 7.00009/20/17 7 BCHA_PWX01Y053455_CISO 7.0 56.7140 100% 88% n/a 7.00009/20/17 8 BCHA_PWX01Y053465_CISO 53.0 58.6040 100% 90% n/a 53.00009/20/17 9 BCHA_PWX01Y053476_CISO 64.0 50.8620 100% 100% n/a 50.86209/20/17 18 BCHA_PWX01Y053718_CISO 29.0 42.3360 100% 71% n/a 29.00009/20/17 18 BCHA_PWX01Y053719_CISO 1.0 42.3360 100% 71% n/a 1.00009/20/17 19 BCHA_PWX01Y053735_CISO 27.0 58.4080 100% 55% n/a 27.00009/20/17 19 BCHA_PWX01Y053736_CISO 5.0 58.4080 100% 55% n/a 5.00009/20/17 20 BCHA_PWX01Y053760_CISO 40.0 64.2040 100% 62% n/a 40.00009/20/17 21 BCHA_PWX01Y053773_CISO 73.0 45.7520 100% 100% n/a 45.75209/20/17 22 BCHA_PWX01Y053796_CISO 53.0 39.8720 100% 100% n/a 39.87209/20/17 23 BCHA_PWX01Y053816_CISO 49.0 46.4240 100% 100% n/a 46.42409/20/17 24 BCHA_PWX01Y053836_CISO 41.0 38.5700 100% 100% n/a 38.57009/21/17 1 BCHA_PWX01Y053851_CISO 43.0 47.1380 100% 91% n/a 43.00009/21/17 2 BCHA_PWX01Y053856_CISO 39.0 58.2680 100% 67% n/a 39.00009/21/17 3 BCHA_PWX01Y053875_CISO 62.0 49.9380 100% 100% n/a 49.93809/21/17 4 BCHA_PWX01Y053896_CISO 54.0 41.7900 100% 100% n/a 41.79009/21/17 5 BCHA_PWX01Y053911_CISO 45.0 33.6420 100% 100% n/a 33.64209/21/17 6 BCHA_PWX01Y053930_CISO 39.0 33.7540 100% 100% n/a 33.75409/21/17 7 BCHA_PWX01Y053945_CISO 30.0 37.8840 100% 79% n/a 30.00009/21/17 8 BCHA_PWX01Y053967_CISO 19.0 36.4560 100% 100% n/a 19.00009/21/17 8 BCHA_PWX01Y053968_CISO 4.0 36.4560 100% 100% n/a 4.00009/21/17 8 BCHA_PWX01Y053970_CISO 7.0 36.4560 100% 100% n/a 7.00009/21/17 8 BCHA_PWX01Y053973_CISO 7.0 36.4560 100% 100% n/a 6.45609/21/17 9 BCHA_PWX01Y053984_CISO 13.0 17.1220 100% 100% n/a 13.00009/21/17 9 BCHA_PWX01Y053985_CISO 29.0 17.1220 100% 100% n/a 4.12209/21/17 10 BCHA_PWX01Y054012_CISO 30.0 16.2540 100% 100% n/a 16.25409/21/17 11 BCHA_PWX01Y054036_CISO 17.0 14.6160 100% 100% n/a 14.61609/21/17 12 BCHA_PWX01Y054176_CISO 14.0 4.8300 100% 100% n/a 4.83009/21/17 14 BCHA_PWX01Y054243_CISO 1.0 5.5160 100% 18% n/a 1.00009/21/17 15 BCHA_PWX01Y054269_CISO 5.0 7.8960 100% 63% n/a 5.00009/21/17 18 BCHA_PWX01Y054291_CISO 17.0 19.3340 100% 88% n/a 17.00009/21/17 19 BCHA_PWX01Y054297_CISO 15.0 24.7240 100% 61% n/a 15.00009/21/17 20 BCHA_PWX01Y054310_CISO 21.0 27.6780 100% 76% n/a 21.00009/21/17 21 BCHA_PWX01Y054317_CISO 23.0 32.5500 100% 71% n/a 23.00009/21/17 22 BCHA_PWX01Y054328_CISO 32.0 33.2640 100% 96% n/a 32.00009/21/17 23 BCHA_PWX01Y054341_CISO 34.0 35.6580 100% 95% n/a 34.00009/21/17 24 BCHA_PWX01Y054350_CISO 32.0 37.6040 100% 85% n/a 32.00009/22/17 1 BCHA_PWX01Y054379_CISO 37.0 33.2640 100% 100% n/a 33.26409/22/17 2 BCHA_PWX01Y054390_CISO 39.0 16.6740 100% 100% n/a 16.67409/22/17 3 BCHA_PWX01Y054394_CISO 11.0 12.9780 100% 100% n/a 11.00009/22/17 3 BCHA_PWX01Y054395_CISO 10.0 12.9780 100% 100% n/a 1.97809/22/17 4 BCHA_PWX01Y054407_CISO 8.0 10.1080 100% 100% n/a 8.00009/22/17 4 BCHA_PWX01Y054408_CISO 8.0 10.1080 100% 100% n/a 2.10809/22/17 5 BCHA_PWX01Y054419_CISO 6.0 2.8140 100% 100% n/a 2.81409/22/17 5 BCHA_PWX01Y054420_CISO 6.0 2.8140 100% 100% n/a 0.00009/22/17 6 BCHA_PWX01Y054435_CISO 6.0 8.1340 100% 74% n/a 6.00009/22/17 7 BCHA_PWX01Y054451_CISO 2.0 8.4280 100% 47% n/a 2.00009/22/17 7 BCHA_PWX01Y054452_CISO 2.0 8.4280 100% 47% n/a 2.00009/22/17 8 BCHA_PWX01Y054464_CISO 10.0 11.4520 100% 87% n/a 10.00009/22/17 9 BCHA_PWX01Y054484_CISO 10.0 11.3260 100% 88% n/a 10.0000
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
9/22/17 18 BCHA_PWX01Y054756_CISO 8.0 5.6980 100% 100% n/a 5.69809/22/17 19 BCHA_PWX01Y054762_CISO 3.0 0.2520 100% 100% n/a 0.25209/22/17 19 BCHA_PWX01Y054767_CISO 1.0 0.2520 100% 100% n/a 0.00009/22/17 21 BCHA_PWX01Y054788_CISO 1.0 0.0000 100% 0% n/a 0.00009/22/17 22 BCHA_PWX01Y054800_CISO 1.0 0.0000 100% 0% n/a 0.00009/22/17 23 BCHA_PWX01Y054810_CISO 1.0 0.0980 100% 100% n/a 0.09809/23/17 2 BCHA_PWX01Y054854_CISO 1.0 0.0000 100% 0% n/a 0.00009/23/17 4 BCHA_PWX01Y054887_CISO 1.0 0.0000 100% 0% n/a 0.00009/23/17 5 BCHA_PWX01Y054907_CISO 1.0 0.0000 100% 0% n/a 0.00009/23/17 6 BCHA_PWX01Y054922_CISO 1.0 0.0000 100% 0% n/a 0.00009/23/17 7 BCHA_PWX01Y054935_CISO 1.0 0.0000 100% 0% n/a 0.00009/23/17 8 BCHA_PWX01Y054957_CISO 1.0 0.0000 100% 0% n/a 0.00009/23/17 18 BCHA_PWX01Y055040_CISO 1.0 3.3740 100% 30% n/a 1.00009/23/17 19 BCHA_PWX01Y055049_CISO 4.0 0.7420 100% 100% n/a 0.74209/23/17 20 BCHA_PWX01Y055055_CISO 3.0 0.1400 100% 100% n/a 0.14009/23/17 22 BCHA_PWX01Y055079_CISO 1.0 0.1400 100% 100% n/a 0.14009/23/17 24 BCHA_PWX01Y055104_CISO 1.0 2.9820 100% 34% n/a 1.00009/24/17 1 BCHA_PWX01Y055105_CISO 1.0 4.3540 100% 23% n/a 1.00009/24/17 2 BCHA_PWX01Y055119_CISO 1.0 9.7160 100% 10% n/a 1.00009/24/17 3 BCHA_PWX01Y055133_CISO 8.0 19.9780 100% 40% n/a 8.00009/24/17 4 BCHA_PWX01Y055151_CISO 11.0 32.7040 100% 34% n/a 11.00009/24/17 5 BCHA_PWX01Y055164_CISO 22.0 48.2300 100% 46% n/a 22.00009/24/17 6 BCHA_PWX01Y055175_CISO 46.0 47.6980 100% 96% n/a 46.00009/24/17 7 BCHA_PWX01Y055182_CISO 59.0 44.6600 100% 100% n/a 44.66009/24/17 8 BCHA_PWX01Y055196_CISO 36.0 42.3780 100% 85% n/a 36.00009/24/17 18 BCHA_PWX01Y055267_CISO 57.0 57.5540 100% 99% n/a 57.00009/24/17 19 BCHA_PWX01Y055272_CISO 60.0 52.0520 100% 100% n/a 52.05209/24/17 20 BCHA_PWX01Y055283_CISO 59.0 48.8880 100% 100% n/a 48.88809/24/17 21 BCHA_PWX01Y055298_CISO 44.0 53.8860 100% 82% n/a 44.00009/24/17 22 BCHA_PWX01Y055320_CISO 48.0 67.9560 100% 71% n/a 48.00009/24/17 23 BCHA_PWX01Y055331_CISO 34.0 63.1680 100% 90% n/a 34.00009/24/17 23 BCHA_PWX01Y055339_CISO 23.0 63.1680 100% 90% n/a 23.00009/24/17 24 BCHA_PWX01Y055348_CISO 32.0 53.0880 100% 100% n/a 32.00009/24/17 24 BCHA_PWX01Y055359_CISO 51.0 53.0880 100% 100% n/a 21.08809/25/17 1 BCHA_PWX01Y055375_CISO 15.0 58.4920 100% 96% n/a 15.00009/25/17 1 BCHA_PWX01Y055378_CISO 41.0 58.4920 100% 96% n/a 41.00009/25/17 2 BCHA_PWX01Y055389_CISO 57.0 65.8420 100% 87% n/a 57.00009/25/17 3 BCHA_PWX01Y055404_CISO 12.0 56.9940 100% 100% n/a 12.00009/25/17 3 BCHA_PWX01Y055407_CISO 25.0 56.9940 100% 100% n/a 25.00009/25/17 3 BCHA_PWX01Y055409_CISO 2.0 56.9940 100% 100% n/a 2.00009/25/17 3 BCHA_PWX01Y055410_CISO 1.0 56.9940 100% 100% n/a 1.00009/25/17 3 BCHA_PWX01Y055411_CISO 20.0 56.9940 100% 100% n/a 16.99409/25/17 4 BCHA_PWX01Y055428_CISO 31.0 55.4540 100% 100% n/a 31.00009/25/17 4 BCHA_PWX01Y055429_CISO 17.0 55.4540 100% 100% n/a 17.00009/25/17 4 BCHA_PWX01Y055430_CISO 12.0 55.4540 100% 100% n/a 7.45409/25/17 4 BCHA_PWX01Y055431_CISO 4.0 55.4540 100% 100% n/a 0.00009/25/17 5 BCHA_PWX01Y055450_CISO 59.0 59.9480 100% 98% n/a 59.00009/25/17 6 BCHA_PWX01Y055471_CISO 55.0 54.0540 100% 100% n/a 54.05409/25/17 7 BCHA_PWX01Y055492_CISO 61.0 60.1160 100% 100% n/a 60.11609/25/17 8 BCHA_PWX01Y055502_CISO 7.0 71.5260 100% 81% n/a 7.00009/25/17 8 BCHA_PWX01Y055503_CISO 51.0 71.5260 100% 81% n/a 51.00009/25/17 15 BCHA_PWX01Y055726_CISO 13.0 25.5360 100% 51% n/a 13.00009/25/17 16 BCHA_PWX01Y055737_CISO 20.0 24.1500 100% 83% n/a 20.00009/25/17 17 BCHA_PWX01Y055742_CISO 35.0 10.6960 100% 100% n/a 10.69609/25/17 18 BCHA_PWX01Y055758_CISO 12.0 11.7040 100% 100% n/a 11.70409/25/17 19 BCHA_PWX01Y055770_CISO 9.0 12.8800 100% 70% n/a 9.00009/25/17 20 BCHA_PWX01Y055788_CISO 14.0 13.6360 100% 100% n/a 13.63609/25/17 21 BCHA_PWX01Y055806_CISO 11.0 22.3860 100% 49% n/a 11.0000
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
9/25/17 22 BCHA_PWX01Y055817_CISO 16.0 20.9720 100% 76% n/a 16.00009/25/17 23 BCHA_PWX01Y055833_CISO 22.0 15.1480 100% 100% n/a 15.14809/25/17 24 BCHA_PWX01Y055866_CISO 21.0 13.5940 100% 100% n/a 13.59409/26/17 1 BCHA_PWX01Y055886_CISO 11.0 9.4780 100% 100% n/a 9.47809/26/17 2 BCHA_PWX01Y055891_CISO 11.0 11.2140 100% 98% n/a 11.00009/26/17 3 BCHA_PWX01Y055904_CISO 11.0 2.9820 100% 100% n/a 2.98209/26/17 4 BCHA_PWX01Y055912_CISO 3.0 2.0020 100% 100% n/a 2.00209/26/17 5 BCHA_PWX01Y055923_CISO 5.0 3.3740 100% 100% n/a 3.37409/26/17 6 BCHA_PWX01Y055935_CISO 4.0 4.8720 100% 82% n/a 4.00009/26/17 7 BCHA_PWX01Y055957_CISO 7.0 1.6660 100% 100% n/a 1.66609/26/17 9 BCHA_PWX01Y055979_CISO 3.0 5.1660 100% 58% n/a 3.00009/26/17 10 BCHA_PWX01Y055993_CISO 4.0 8.2460 100% 49% n/a 4.00009/26/17 15 BCHA_PWX01Y056160_CISO 9.0 3.9060 100% 100% n/a 3.90609/26/17 16 BCHA_PWX01Y056171_CISO 4.0 2.2400 100% 100% n/a 2.24009/26/17 17 BCHA_PWX01Y056194_CISO 4.0 2.4640 100% 100% n/a 2.46409/26/17 18 BCHA_PWX01Y056214_CISO 2.0 0.0420 100% 100% n/a 0.04209/26/17 19 BCHA_PWX01Y056226_CISO 1.0 0.0000 100% 0% n/a 0.00009/26/17 20 BCHA_PWX01Y056245_CISO 1.0 1.2740 100% 78% n/a 1.00009/26/17 21 BCHA_PWX01Y056265_CISO 1.0 0.0000 100% 0% n/a 0.00009/26/17 23 BCHA_PWX01Y056288_CISO 1.0 0.0000 100% 0% n/a 0.00009/26/17 24 BCHA_PWX01Y056305_CISO 1.0 0.0000 100% 0% n/a 0.00009/27/17 2 BCHA_PWX01Y056336_CISO 1.0 0.0420 100% 100% n/a 0.04209/27/17 3 BCHA_PWX01Y056348_CISO 1.0 1.6240 100% 62% n/a 1.00009/27/17 5 BCHA_PWX01Y056366_CISO 3.0 1.6520 100% 100% n/a 1.65209/27/17 6 BCHA_PWX01Y056385_CISO 3.0 0.0140 100% 100% n/a 0.01409/27/17 8 BCHA_PWX01Y056414_CISO 1.0 0.0000 100% 0% n/a 0.00009/27/17 12 BCHA_PWX01Y056511_CISO 1.0 0.0000 100% 0% n/a 0.00009/27/17 15 BCHA_PWX01Y056622_CISO 1.0 0.0000 100% 0% n/a 0.00009/27/17 21 BCHA_PWX01Y056717_CISO 1.0 0.0000 100% 0% n/a 0.00009/27/17 22 BCHA_PWX01Y056734_CISO 1.0 0.5040 100% 100% n/a 0.50409/27/17 24 BCHA_PWX01Y056758_CISO 1.0 0.7840 100% 100% n/a 0.78409/28/17 1 BCHA_PWX01Y056780_CISO 2.0 0.2100 100% 100% n/a 0.21009/28/17 2 BCHA_PWX01Y056785_CISO 1.0 8.6100 100% 12% n/a 1.00009/28/17 3 BCHA_PWX01Y056799_CISO 1.0 13.1320 100% 8% n/a 1.00009/28/17 4 BCHA_PWX01Y056807_CISO 16.0 4.4800 100% 100% n/a 4.48009/28/17 5 BCHA_PWX01Y056822_CISO 7.0 6.6640 100% 100% n/a 6.66409/28/17 6 BCHA_PWX01Y056832_CISO 5.0 9.3240 100% 54% n/a 5.00009/28/17 7 BCHA_PWX01Y056844_CISO 11.0 6.3140 100% 100% n/a 6.31409/28/17 8 BCHA_PWX01Y056857_CISO 6.0 7.6580 100% 78% n/a 6.00009/28/17 9 BCHA_PWX01Y056877_CISO 7.0 2.6320 100% 100% n/a 2.63209/28/17 17 BCHA_PWX01Y057288_CISO 5.0 6.2580 100% 80% n/a 5.00009/28/17 18 BCHA_PWX01Y057310_CISO 5.0 14.8680 100% 34% n/a 5.00009/28/17 19 BCHA_PWX01Y057325_CISO 6.0 45.2760 100% 13% n/a 6.00009/28/17 20 BCHA_PWX01Y057339_CISO 20.0 40.2220 100% 50% n/a 20.00009/28/17 21 BCHA_PWX01Y057347_CISO 63.0 26.2920 100% 100% n/a 26.29209/28/17 22 BCHA_PWX01Y057362_CISO 36.0 21.7280 100% 100% n/a 21.72809/28/17 23 BCHA_PWX01Y057376_CISO 29.0 9.5620 100% 100% n/a 9.56209/28/17 24 BCHA_PWX01Y057385_CISO 8.0 15.2040 100% 53% n/a 8.00009/29/17 1 BCHA_PWX01Y057396_CISO 16.0 17.8360 100% 90% n/a 16.00009/29/17 2 BCHA_PWX01Y057406_CISO 13.0 18.4520 100% 100% n/a 13.00009/29/17 2 BCHA_PWX01Y057410_CISO 6.0 18.4520 100% 100% n/a 5.45209/29/17 3 BCHA_PWX01Y057415_CISO 20.0 18.8160 100% 100% n/a 18.81609/29/17 4 BCHA_PWX01Y057429_CISO 17.0 36.9180 100% 46% n/a 17.00009/29/17 5 BCHA_PWX01Y057443_CISO 25.0 52.4440 100% 48% n/a 25.00009/29/17 6 BCHA_PWX01Y057452_CISO 29.0 56.3500 100% 76% n/a 29.00009/29/17 6 BCHA_PWX01Y057457_CISO 14.0 56.3500 100% 76% n/a 14.00009/29/17 7 BCHA_PWX01Y057474_CISO 14.0 40.0120 100% 100% n/a 14.00009/29/17 7 BCHA_PWX01Y057475_CISO 47.0 40.0120 100% 100% n/a 26.0120
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
9/29/17 8 BCHA_PWX01Y057494_CISO 8.0 19.0540 100% 100% n/a 8.00009/29/17 8 BCHA_PWX01Y057495_CISO 52.0 19.0540 100% 100% n/a 11.05409/29/17 8 BCHA_PWX01Y057496_CISO 1.0 19.0540 100% 100% n/a 0.00009/29/17 9 BCHA_PWX01Y057511_CISO 29.0 6.4400 100% 100% n/a 6.44009/29/17 10 BCHA_PWX01Y057538_CISO 11.0 0.2940 100% 100% n/a 0.29409/29/17 16 BCHA_PWX01Y057744_CISO 1.0 2.5900 100% 39% n/a 1.00009/29/17 17 BCHA_PWX01Y057756_CISO 1.0 5.9640 100% 17% n/a 1.00009/29/17 18 BCHA_PWX01Y057775_CISO 2.0 18.0040 100% 11% n/a 2.00009/29/17 19 BCHA_PWX01Y057799_CISO 14.0 21.8120 100% 64% n/a 14.00009/29/17 20 BCHA_PWX01Y057818_CISO 17.0 26.5860 100% 64% n/a 17.00009/29/17 21 BCHA_PWX01Y057837_CISO 29.0 27.2720 100% 100% n/a 27.27209/29/17 22 BCHA_PWX01Y057852_CISO 21.0 14.7840 100% 100% n/a 14.78409/29/17 23 BCHA_PWX01Y057868_CISO 10.0 25.2280 100% 75% n/a 10.00009/29/17 23 BCHA_PWX01Y057869_CISO 9.0 25.2280 100% 75% n/a 9.00009/29/17 24 BCHA_PWX01Y057882_CISO 0.0 28.3920 100% 67% n/a 0.00009/29/17 24 BCHA_PWX01Y057898_CISO 19.0 28.3920 100% 67% n/a 19.00009/30/17 1 BCHA_PWX01Y057914_CISO 29.0 31.8080 100% 91% n/a 29.00009/30/17 2 BCHA_PWX01Y057930_CISO 31.0 23.3380 100% 100% n/a 23.33809/30/17 3 BCHA_PWX01Y057941_CISO 16.0 35.7700 100% 92% n/a 16.00009/30/17 3 BCHA_PWX01Y057951_CISO 17.0 35.7700 100% 92% n/a 17.00009/30/17 4 BCHA_PWX01Y057963_CISO 32.0 38.2620 100% 84% n/a 32.00009/30/17 5 BCHA_PWX01Y057973_CISO 20.0 25.5080 100% 78% n/a 20.00009/30/17 6 BCHA_PWX01Y057991_CISO 24.0 32.6480 100% 74% n/a 24.00009/30/17 7 BCHA_PWX01Y058011_CISO 38.0 4.9700 100% 100% n/a 4.97009/30/17 8 BCHA_PWX01Y058017_CISO 21.0 5.7120 100% 100% n/a 5.71209/30/17 18 BCHA_PWX01Y058145_CISO 34.0 32.9560 100% 100% n/a 32.95609/30/17 19 BCHA_PWX01Y058153_CISO 30.0 62.3840 100% 48% n/a 30.00009/30/17 20 BCHA_PWX01Y058177_CISO 33.0 61.0400 100% 54% n/a 33.00009/30/17 21 BCHA_PWX01Y058196_CISO 74.0 40.9220 100% 100% n/a 40.92209/30/17 22 BCHA_PWX01Y058202_CISO 49.0 42.5740 100% 100% n/a 42.57409/30/17 23 BCHA_PWX01Y058221_CISO 9.0 50.8760 100% 79% n/a 9.00009/30/17 23 BCHA_PWX01Y058228_CISO 31.0 50.8760 100% 79% n/a 31.00009/30/17 24 BCHA_PWX01Y058234_CISO 35.0 63.4480 100% 73% n/a 35.00009/30/17 24 BCHA_PWX01Y058247_CISO 11.0 63.4480 100% 73% n/a 11.0000
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
9/20/17 1 BCHA_PWX01Y053369_CISO 100.0 122.4867 100% 98% n/a 100.00009/20/17 1 BCHA_PWX01Y053372_CISO 20.0 122.4867 100% 98% n/a 20.00009/20/17 2 BCHA_PWX01Y053391_CISO 121.0 126.8638 100% 95% n/a 121.00009/20/17 3 BCHA_PWX01Y053409_CISO 124.0 125.3584 100% 99% n/a 124.00009/20/17 4 BCHA_PWX01Y053421_CISO 131.0 120.5050 100% 100% n/a 120.50509/20/17 5 BCHA_PWX01Y053434_CISO 117.0 113.8376 100% 100% n/a 113.83769/20/17 6 BCHA_PWX01Y053447_CISO 114.0 111.5764 100% 100% n/a 111.57649/20/17 7 BCHA_PWX01Y053463_CISO 104.0 109.0452 100% 95% n/a 104.00009/20/17 8 BCHA_PWX01Y053466_CISO 45.0 111.9831 100% 100% n/a 45.00009/20/17 8 BCHA_PWX01Y053467_CISO 18.0 111.9831 100% 100% n/a 18.00009/20/17 8 BCHA_PWX01Y053469_CISO 54.0 111.9831 100% 100% n/a 48.98319/20/17 9 BCHA_PWX01Y053477_CISO 51.0 109.4001 100% 47% n/a 51.00009/20/17 16 BCHA_PWX01Y053695_CISO 49.0 108.9755 100% 45% n/a 49.00009/20/17 17 BCHA_PWX01Y053698_CISO 25.0 105.2752 100% 24% n/a 25.00009/20/17 18 BCHA_PWX01Y053708_CISO 95.0 105.0819 100% 95% n/a 95.00009/20/17 18 BCHA_PWX01Y053717_CISO 5.0 105.0819 100% 95% n/a 5.00009/20/17 19 BCHA_PWX01Y053726_CISO 75.0 97.6629 100% 100% n/a 75.00009/20/17 19 BCHA_PWX01Y053728_CISO 33.0 97.6629 100% 100% n/a 22.66299/20/17 20 BCHA_PWX01Y053755_CISO 26.0 106.5238 100% 89% n/a 26.00009/20/17 20 BCHA_PWX01Y053756_CISO 69.0 106.5238 100% 89% n/a 69.00009/20/17 21 BCHA_PWX01Y053774_CISO 107.0 103.0980 100% 100% n/a 103.09809/20/17 22 BCHA_PWX01Y053798_CISO 109.0 107.6464 100% 100% n/a 107.64649/20/17 23 BCHA_PWX01Y053805_CISO 102.0 103.7119 100% 100% n/a 102.00009/20/17 23 BCHA_PWX01Y053806_CISO 4.0 103.7119 100% 100% n/a 1.71199/20/17 24 BCHA_PWX01Y053832_CISO 106.0 101.1916 100% 100% n/a 101.19169/21/17 1 BCHA_PWX01Y053850_CISO 105.0 82.6411 100% 100% n/a 82.64119/21/17 2 BCHA_PWX01Y053860_CISO 92.0 73.1853 100% 100% n/a 73.18539/21/17 3 BCHA_PWX01Y053885_CISO 74.0 63.8413 100% 100% n/a 63.84139/21/17 4 BCHA_PWX01Y053904_CISO 59.0 40.7690 100% 100% n/a 40.76909/21/17 4 BCHA_PWX01Y053905_CISO 5.0 40.7690 100% 100% n/a 0.00009/21/17 5 BCHA_PWX01Y053912_CISO 54.0 29.3502 100% 100% n/a 29.35029/21/17 6 BCHA_PWX01Y053931_CISO 24.0 33.8793 100% 71% n/a 24.00009/21/17 7 BCHA_PWX01Y053949_CISO 39.0 33.9354 100% 100% n/a 33.93549/21/17 8 BCHA_PWX01Y053965_CISO 35.0 27.8178 100% 100% n/a 27.81789/21/17 9 BCHA_PWX01Y053986_CISO 21.0 11.8282 100% 100% n/a 11.82829/21/17 9 BCHA_PWX01Y053987_CISO 13.0 11.8282 100% 100% n/a 0.00009/21/17 10 BCHA_PWX01Y054008_CISO 17.0 9.8731 100% 100% n/a 9.87319/21/17 11 BCHA_PWX01Y054034_CISO 7.0 16.9200 100% 41% n/a 7.00009/21/17 12 BCHA_PWX01Y054173_CISO 9.0 19.1893 100% 83% n/a 9.00009/21/17 12 BCHA_PWX01Y054174_CISO 7.0 19.1893 100% 83% n/a 7.00009/21/17 14 BCHA_PWX01Y054244_CISO 21.0 8.6564 100% 100% n/a 8.65649/21/17 15 BCHA_PWX01Y054270_CISO 6.0 5.7221 100% 100% n/a 5.72219/21/17 18 BCHA_PWX01Y054289_CISO 3.0 0.0000 100% 0% n/a 0.00009/22/17 5 BCHA_PWX01Y054423_CISO 3.0 8.2112 100% 85% n/a 3.00009/22/17 5 BCHA_PWX01Y054424_CISO 4.0 8.2112 100% 85% n/a 4.00009/22/17 6 BCHA_PWX01Y054433_CISO 7.0 12.0397 100% 58% n/a 7.00009/22/17 7 BCHA_PWX01Y054447_CISO 5.0 13.4289 100% 67% n/a 5.00009/22/17 7 BCHA_PWX01Y054449_CISO 4.0 13.4289 100% 67% n/a 4.00009/22/17 8 BCHA_PWX01Y054461_CISO 15.0 14.6684 100% 100% n/a 14.66849/22/17 9 BCHA_PWX01Y054485_CISO 13.0 13.0638 100% 100% n/a 13.00009/22/17 18 BCHA_PWX01Y054753_CISO 43.0 27.5831 100% 100% n/a 27.58319/22/17 19 BCHA_PWX01Y054763_CISO 33.0 28.1267 100% 100% n/a 28.12679/22/17 20 BCHA_PWX01Y054773_CISO 20.0 28.6276 100% 70% n/a 20.00009/22/17 21 BCHA_PWX01Y054785_CISO 28.0 20.4776 100% 100% n/a 20.47769/22/17 22 BCHA_PWX01Y054798_CISO 21.0 11.4232 100% 100% n/a 11.42329/22/17 23 BCHA_PWX01Y054807_CISO 16.0 15.7845 100% 100% n/a 15.78459/22/17 24 BCHA_PWX01Y054828_CISO 11.0 13.1375 100% 84% n/a 11.00009/23/17 1 BCHA_PWX01Y054842_CISO 15.0 12.2038 100% 100% n/a 12.20389/23/17 2 BCHA_PWX01Y054856_CISO 12.0 11.2635 100% 100% n/a 11.2635
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
9/23/17 3 BCHA_PWX01Y054868_CISO 5.0 10.6889 100% 94% n/a 5.00009/23/17 3 BCHA_PWX01Y054869_CISO 5.0 10.6889 100% 94% n/a 5.00009/23/17 4 BCHA_PWX01Y054885_CISO 5.0 12.5733 100% 87% n/a 5.00009/23/17 4 BCHA_PWX01Y054886_CISO 6.0 12.5733 100% 87% n/a 6.00009/23/17 5 BCHA_PWX01Y054904_CISO 5.0 11.5650 100% 86% n/a 5.00009/23/17 5 BCHA_PWX01Y054908_CISO 5.0 11.5650 100% 86% n/a 5.00009/23/17 6 BCHA_PWX01Y054920_CISO 6.0 7.6180 100% 100% n/a 6.00009/23/17 6 BCHA_PWX01Y054921_CISO 6.0 7.6180 100% 100% n/a 1.61809/23/17 7 BCHA_PWX01Y054940_CISO 10.0 9.3815 100% 100% n/a 9.38159/23/17 8 BCHA_PWX01Y054951_CISO 10.0 11.6660 100% 86% n/a 10.00009/23/17 13 BCHA_PWX01Y054993_CISO 7.0 13.1534 100% 53% n/a 7.00009/23/17 14 BCHA_PWX01Y055000_CISO 5.0 16.8780 100% 30% n/a 5.00009/23/17 15 BCHA_PWX01Y055005_CISO 8.0 20.9637 100% 38% n/a 8.00009/23/17 18 BCHA_PWX01Y055039_CISO 48.0 42.9273 100% 100% n/a 42.92739/23/17 19 BCHA_PWX01Y055046_CISO 38.0 32.4113 100% 100% n/a 32.41139/23/17 20 BCHA_PWX01Y055054_CISO 40.0 46.4220 100% 86% n/a 40.00009/23/17 21 BCHA_PWX01Y055061_CISO 38.0 57.3533 100% 66% n/a 38.00009/23/17 22 BCHA_PWX01Y055072_CISO 27.0 69.6233 100% 85% n/a 27.00009/23/17 22 BCHA_PWX01Y055076_CISO 32.0 69.6233 100% 85% n/a 32.00009/23/17 23 BCHA_PWX01Y055087_CISO 59.0 86.0264 100% 69% n/a 59.00009/23/17 24 BCHA_PWX01Y055094_CISO 41.0 96.8509 100% 84% n/a 41.00009/23/17 24 BCHA_PWX01Y055095_CISO 14.0 96.8509 100% 84% n/a 14.00009/23/17 24 BCHA_PWX01Y055103_CISO 26.0 96.8509 100% 84% n/a 26.00009/24/17 1 BCHA_PWX01Y055107_CISO 95.0 85.2733 100% 100% n/a 85.27339/24/17 2 BCHA_PWX01Y055120_CISO 86.0 69.8455 100% 100% n/a 69.84559/24/17 2 BCHA_PWX01Y055122_CISO 1.0 69.8455 100% 100% n/a 0.00009/24/17 3 BCHA_PWX01Y055134_CISO 41.0 77.3941 100% 97% n/a 41.00009/24/17 3 BCHA_PWX01Y055139_CISO 18.0 77.3941 100% 97% n/a 18.00009/24/17 3 BCHA_PWX01Y055128_CISO 16.0 77.3941 100% 97% n/a 16.00009/24/17 4 BCHA_PWX01Y055150_CISO 72.0 85.4676 100% 84% n/a 72.00009/24/17 5 BCHA_PWX01Y055161_CISO 13.0 77.4610 100% 100% n/a 13.00009/24/17 5 BCHA_PWX01Y055166_CISO 78.0 77.4610 100% 100% n/a 64.46109/24/17 6 BCHA_PWX01Y055170_CISO 54.0 77.8515 100% 100% n/a 54.00009/24/17 6 BCHA_PWX01Y055179_CISO 26.0 77.8515 100% 100% n/a 23.85159/24/17 7 BCHA_PWX01Y055181_CISO 41.0 73.4325 100% 100% n/a 41.00009/24/17 7 BCHA_PWX01Y055183_CISO 5.0 73.4325 100% 100% n/a 5.00009/24/17 7 BCHA_PWX01Y055191_CISO 29.0 73.4325 100% 100% n/a 27.43259/24/17 8 BCHA_PWX01Y055198_CISO 74.0 69.9122 100% 100% n/a 69.91229/24/17 18 BCHA_PWX01Y055259_CISO 62.0 63.4320 100% 100% n/a 62.00009/24/17 18 BCHA_PWX01Y055263_CISO 9.0 63.4320 100% 100% n/a 1.43209/24/17 19 BCHA_PWX01Y055269_CISO 67.0 69.1979 100% 97% n/a 67.00009/24/17 20 BCHA_PWX01Y055286_CISO 64.0 48.5874 100% 100% n/a 48.58749/24/17 21 BCHA_PWX01Y055302_CISO 74.0 37.3584 100% 100% n/a 37.35849/24/17 22 BCHA_PWX01Y055316_CISO 25.0 65.0216 100% 38% n/a 25.00009/24/17 23 BCHA_PWX01Y055332_CISO 56.0 69.6776 100% 80% n/a 56.00009/24/17 24 BCHA_PWX01Y055350_CISO 67.0 57.8645 100% 100% n/a 57.86459/25/17 1 BCHA_PWX01Y055373_CISO 61.0 54.5642 100% 100% n/a 54.56429/25/17 2 BCHA_PWX01Y055391_CISO 43.0 57.9476 100% 74% n/a 43.00009/25/17 3 BCHA_PWX01Y055403_CISO 9.0 49.1786 100% 100% n/a 9.00009/25/17 3 BCHA_PWX01Y055412_CISO 60.0 49.1786 100% 100% n/a 40.17869/25/17 4 BCHA_PWX01Y055425_CISO 19.0 66.8520 100% 66% n/a 19.00009/25/17 4 BCHA_PWX01Y055433_CISO 25.0 66.8520 100% 66% n/a 25.00009/25/17 5 BCHA_PWX01Y055448_CISO 47.0 61.1167 100% 77% n/a 47.00009/25/17 6 BCHA_PWX01Y055462_CISO 12.0 54.9347 100% 100% n/a 12.00009/25/17 6 BCHA_PWX01Y055463_CISO 11.0 54.9347 100% 100% n/a 11.00009/25/17 6 BCHA_PWX01Y055464_CISO 20.0 54.9347 100% 100% n/a 20.00009/25/17 6 BCHA_PWX01Y055465_CISO 14.0 54.9347 100% 100% n/a 11.93479/25/17 6 BCHA_PWX01Y055469_CISO 20.0 54.9347 100% 100% n/a 0.00009/25/17 7 BCHA_PWX01Y055483_CISO 11.0 58.4318 100% 84% n/a 11.0000
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
9/25/17 7 BCHA_PWX01Y055486_CISO 37.0 58.4318 100% 84% n/a 37.00009/25/17 7 BCHA_PWX01Y055490_CISO 1.0 58.4318 100% 84% n/a 1.00009/25/17 8 BCHA_PWX01Y055501_CISO 55.0 51.1386 100% 100% n/a 51.13869/25/17 9 BCHA_PWX01Y055519_CISO 28.0 46.6023 100% 60% n/a 28.00009/25/17 15 BCHA_PWX01Y055719_CISO 30.0 53.8586 100% 56% n/a 30.00009/25/17 16 BCHA_PWX01Y055734_CISO 68.0 43.5307 100% 100% n/a 43.53079/25/17 17 BCHA_PWX01Y055741_CISO 30.0 51.4384 100% 78% n/a 30.00009/25/17 17 BCHA_PWX01Y055744_CISO 10.0 51.4384 100% 78% n/a 10.00009/25/17 18 BCHA_PWX01Y055754_CISO 54.0 57.6745 100% 94% n/a 54.00009/25/17 19 BCHA_PWX01Y055769_CISO 45.0 73.4738 100% 61% n/a 45.00009/25/17 20 BCHA_PWX01Y055786_CISO 21.0 67.9652 100% 100% n/a 21.00009/25/17 20 BCHA_PWX01Y055793_CISO 55.0 67.9652 100% 100% n/a 46.96529/25/17 21 BCHA_PWX01Y055800_CISO 60.0 59.3807 100% 100% n/a 59.38079/25/17 21 BCHA_PWX01Y055803_CISO 11.0 59.3807 100% 100% n/a 0.00009/25/17 22 BCHA_PWX01Y055818_CISO 4.0 42.0955 100% 100% n/a 4.00009/25/17 22 BCHA_PWX01Y055823_CISO 28.0 42.0955 100% 100% n/a 28.00009/25/17 22 BCHA_PWX01Y055824_CISO 40.0 42.0955 100% 100% n/a 10.09559/25/17 23 BCHA_PWX01Y055837_CISO 22.0 41.2628 100% 100% n/a 22.00009/25/17 23 BCHA_PWX01Y055841_CISO 30.0 41.2628 100% 100% n/a 19.26289/25/17 24 BCHA_PWX01Y055863_CISO 28.0 23.6777 100% 100% n/a 23.67779/26/17 1 BCHA_PWX01Y055877_CISO 25.0 16.6021 100% 100% n/a 16.60219/26/17 1 BCHA_PWX01Y055880_CISO 5.0 16.6021 100% 100% n/a 0.00009/26/17 2 BCHA_PWX01Y055892_CISO 16.0 18.0869 100% 88% n/a 16.00009/26/17 3 BCHA_PWX01Y055902_CISO 20.0 9.6826 100% 100% n/a 9.68269/26/17 4 BCHA_PWX01Y055916_CISO 14.0 12.0187 100% 100% n/a 12.01879/26/17 5 BCHA_PWX01Y055924_CISO 11.0 5.2507 100% 100% n/a 5.25079/26/17 6 BCHA_PWX01Y055936_CISO 11.0 11.1319 100% 99% n/a 11.00009/26/17 7 BCHA_PWX01Y055958_CISO 7.0 29.2123 100% 24% n/a 7.00009/26/17 8 BCHA_PWX01Y055973_CISO 20.0 53.0389 100% 38% n/a 20.00009/26/17 9 BCHA_PWX01Y055985_CISO 36.0 44.3934 100% 81% n/a 36.00009/26/17 10 BCHA_PWX01Y055995_CISO 55.0 28.0346 100% 100% n/a 28.03469/26/17 15 BCHA_PWX01Y056156_CISO 92.0 106.3696 100% 86% n/a 92.00009/26/17 16 BCHA_PWX01Y056167_CISO 11.0 105.7248 100% 100% n/a 11.00009/26/17 16 BCHA_PWX01Y056172_CISO 92.0 105.7248 100% 100% n/a 92.00009/26/17 16 BCHA_PWX01Y056173_CISO 8.0 105.7248 100% 100% n/a 2.72489/26/17 17 BCHA_PWX01Y056192_CISO 110.0 92.1508 100% 100% n/a 92.15089/26/17 18 BCHA_PWX01Y056213_CISO 105.0 85.6154 100% 100% n/a 85.61549/26/17 19 BCHA_PWX01Y056228_CISO 45.0 70.0509 100% 100% n/a 45.00009/26/17 19 BCHA_PWX01Y056229_CISO 50.0 70.0509 100% 100% n/a 25.05099/26/17 20 BCHA_PWX01Y056242_CISO 78.0 31.2123 100% 100% n/a 31.21239/26/17 21 BCHA_PWX01Y056260_CISO 30.0 35.9949 100% 83% n/a 30.00009/26/17 22 BCHA_PWX01Y056278_CISO 31.0 53.4660 100% 58% n/a 31.00009/26/17 23 BCHA_PWX01Y056292_CISO 36.0 62.5898 100% 58% n/a 36.00009/26/17 24 BCHA_PWX01Y056303_CISO 50.0 55.4546 100% 90% n/a 50.00009/27/17 1 BCHA_PWX01Y056315_CISO 37.0 62.6402 100% 86% n/a 37.00009/27/17 1 BCHA_PWX01Y056317_CISO 17.0 62.6402 100% 86% n/a 17.00009/27/17 2 BCHA_PWX01Y056327_CISO 2.0 62.8375 100% 88% n/a 2.00009/27/17 2 BCHA_PWX01Y056331_CISO 53.0 62.8375 100% 88% n/a 53.00009/27/17 3 BCHA_PWX01Y056339_CISO 10.0 58.2499 100% 100% n/a 10.00009/27/17 3 BCHA_PWX01Y056340_CISO 16.0 58.2499 100% 100% n/a 16.00009/27/17 3 BCHA_PWX01Y056341_CISO 16.0 58.2499 100% 100% n/a 16.00009/27/17 3 BCHA_PWX01Y056342_CISO 29.0 58.2499 100% 100% n/a 16.24999/27/17 4 BCHA_PWX01Y056353_CISO 26.0 55.6278 100% 92% n/a 26.00009/27/17 4 BCHA_PWX01Y056354_CISO 25.0 55.6278 100% 92% n/a 25.00009/27/17 5 BCHA_PWX01Y056363_CISO 60.0 41.4278 100% 100% n/a 41.42789/27/17 6 BCHA_PWX01Y056371_CISO 18.0 52.7486 100% 100% n/a 18.00009/27/17 6 BCHA_PWX01Y056372_CISO 18.0 52.7486 100% 100% n/a 18.00009/27/17 6 BCHA_PWX01Y056382_CISO 9.0 52.7486 100% 100% n/a 9.00009/27/17 6 BCHA_PWX01Y056384_CISO 8.0 52.7486 100% 100% n/a 7.7486
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
9/27/17 7 BCHA_PWX01Y056395_CISO 20.0 58.3372 100% 74% n/a 20.00009/27/17 7 BCHA_PWX01Y056396_CISO 22.0 58.3372 100% 74% n/a 22.00009/27/17 7 BCHA_PWX01Y056399_CISO 1.0 58.3372 100% 74% n/a 1.00009/27/17 8 BCHA_PWX01Y056404_CISO 29.0 69.5074 100% 94% n/a 29.00009/27/17 8 BCHA_PWX01Y056405_CISO 29.0 69.5074 100% 94% n/a 29.00009/27/17 8 BCHA_PWX01Y056412_CISO 7.0 69.5074 100% 94% n/a 7.00009/27/17 10 BCHA_PWX01Y056431_CISO 23.0 29.4985 100% 100% n/a 23.00009/27/17 10 BCHA_PWX01Y056454_CISO 61.0 29.4985 100% 100% n/a 6.49859/27/17 11 BCHA_PWX01Y056456_CISO 28.0 28.5882 100% 100% n/a 28.00009/27/17 11 BCHA_PWX01Y056461_CISO 6.0 28.5882 100% 100% n/a 0.58829/27/17 11 BCHA_PWX01Y056464_CISO 10.0 28.5882 100% 100% n/a 0.00009/27/17 12 BCHA_PWX01Y056513_CISO 24.0 49.4527 100% 49% n/a 24.00009/27/17 13 BCHA_PWX01Y056584_CISO 6.0 61.9584 100% 44% n/a 6.00009/27/17 13 BCHA_PWX01Y056586_CISO 21.0 61.9584 100% 44% n/a 21.00009/27/17 14 BCHA_PWX01Y056602_CISO 57.0 57.7723 100% 100% n/a 57.00009/27/17 14 BCHA_PWX01Y056605_CISO 6.0 57.7723 100% 100% n/a 0.77239/27/17 15 BCHA_PWX01Y056618_CISO 62.0 40.0743 100% 100% n/a 40.07439/27/17 16 BCHA_PWX01Y056632_CISO 44.0 31.4321 100% 100% n/a 31.43219/27/17 16 BCHA_PWX01Y056633_CISO 1.0 31.4321 100% 100% n/a 0.00009/27/17 17 BCHA_PWX01Y056659_CISO 24.0 26.7499 100% 100% n/a 24.00009/27/17 17 BCHA_PWX01Y056660_CISO 13.0 26.7499 100% 100% n/a 2.74999/27/17 18 BCHA_PWX01Y056674_CISO 25.0 28.1798 100% 89% n/a 25.00009/27/17 19 BCHA_PWX01Y056685_CISO 30.0 21.4854 100% 100% n/a 21.48549/27/17 20 BCHA_PWX01Y056705_CISO 28.0 26.0963 100% 100% n/a 26.09639/27/17 21 BCHA_PWX01Y056720_CISO 24.0 20.7336 100% 100% n/a 20.73369/27/17 22 BCHA_PWX01Y056731_CISO 18.0 29.8135 100% 60% n/a 18.00009/27/17 23 BCHA_PWX01Y056751_CISO 28.0 37.5468 100% 75% n/a 28.00009/27/17 24 BCHA_PWX01Y056757_CISO 28.0 30.3460 100% 92% n/a 28.00009/28/17 1 BCHA_PWX01Y056776_CISO 19.0 22.0376 100% 100% n/a 19.00009/28/17 1 BCHA_PWX01Y056777_CISO 19.0 22.0376 100% 100% n/a 3.03769/28/17 2 BCHA_PWX01Y056786_CISO 11.0 25.8575 100% 100% n/a 11.00009/28/17 2 BCHA_PWX01Y056787_CISO 11.0 25.8575 100% 100% n/a 11.00009/28/17 2 BCHA_PWX01Y056789_CISO 8.0 25.8575 100% 100% n/a 3.85759/28/17 3 BCHA_PWX01Y056800_CISO 25.0 19.8949 100% 100% n/a 19.89499/28/17 4 BCHA_PWX01Y056809_CISO 22.0 15.1954 100% 100% n/a 15.19549/28/17 5 BCHA_PWX01Y056821_CISO 16.0 19.0827 100% 84% n/a 16.00009/28/17 6 BCHA_PWX01Y056828_CISO 20.0 24.9980 100% 80% n/a 20.00009/28/17 7 BCHA_PWX01Y056843_CISO 17.0 28.8639 100% 59% n/a 17.00009/28/17 8 BCHA_PWX01Y056856_CISO 29.0 46.7834 100% 62% n/a 29.00009/28/17 9 BCHA_PWX01Y056872_CISO 16.0 41.6583 100% 77% n/a 16.00009/28/17 9 BCHA_PWX01Y056873_CISO 16.0 41.6583 100% 77% n/a 16.00009/28/17 10 BCHA_PWX01Y056894_CISO 25.0 49.4491 100% 89% n/a 25.00009/28/17 10 BCHA_PWX01Y056902_CISO 9.0 49.4491 100% 89% n/a 9.00009/28/17 10 BCHA_PWX01Y056903_CISO 10.0 49.4491 100% 89% n/a 10.00009/28/17 12 BCHA_PWX01Y057091_CISO 42.0 60.0216 100% 70% n/a 42.00009/28/17 16 BCHA_PWX01Y057273_CISO 48.0 42.1562 100% 100% n/a 42.15629/28/17 16 BCHA_PWX01Y057279_CISO 20.0 42.1562 100% 100% n/a 0.00009/28/17 17 BCHA_PWX01Y057285_CISO 33.0 37.9395 100% 87% n/a 33.00009/28/17 18 BCHA_PWX01Y057308_CISO 39.0 48.8471 100% 80% n/a 39.00009/28/17 19 BCHA_PWX01Y057321_CISO 40.0 43.3479 100% 92% n/a 40.00009/28/17 20 BCHA_PWX01Y057337_CISO 54.0 23.8461 100% 100% n/a 23.84619/28/17 21 BCHA_PWX01Y057349_CISO 36.0 18.0094 100% 100% n/a 18.00949/28/17 22 BCHA_PWX01Y057358_CISO 14.0 26.6454 100% 53% n/a 14.00009/28/17 23 BCHA_PWX01Y057370_CISO 26.0 28.4644 100% 91% n/a 26.00009/28/17 24 BCHA_PWX01Y057383_CISO 24.0 20.3314 100% 100% n/a 20.33149/29/17 1 BCHA_PWX01Y057394_CISO 26.0 20.6331 100% 100% n/a 20.63319/29/17 2 BCHA_PWX01Y057403_CISO 9.0 23.9169 100% 79% n/a 9.00009/29/17 2 BCHA_PWX01Y057404_CISO 10.0 23.9169 100% 79% n/a 10.00009/29/17 3 BCHA_PWX01Y057417_CISO 19.0 29.2082 100% 65% n/a 19.0000
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
9/29/17 4 BCHA_PWX01Y057427_CISO 9.0 16.5127 100% 100% n/a 9.00009/29/17 4 BCHA_PWX01Y057432_CISO 20.0 16.5127 100% 100% n/a 7.51279/29/17 5 BCHA_PWX01Y057441_CISO 10.0 18.7669 100% 53% n/a 10.00009/29/17 6 BCHA_PWX01Y057450_CISO 6.0 18.8530 100% 95% n/a 6.00009/29/17 6 BCHA_PWX01Y057451_CISO 5.0 18.8530 100% 95% n/a 5.00009/29/17 6 BCHA_PWX01Y057461_CISO 7.0 18.8530 100% 95% n/a 7.00009/29/17 7 BCHA_PWX01Y057467_CISO 21.0 33.0076 100% 64% n/a 21.00009/29/17 8 BCHA_PWX01Y057484_CISO 8.0 73.0302 100% 23% n/a 8.00009/29/17 8 BCHA_PWX01Y057485_CISO 9.0 73.0302 100% 23% n/a 9.00009/29/17 9 BCHA_PWX01Y057513_CISO 53.0 100.7292 100% 53% n/a 53.00009/29/17 10 BCHA_PWX01Y057534_CISO 22.0 105.7156 100% 81% n/a 22.00009/29/17 10 BCHA_PWX01Y057537_CISO 64.0 105.7156 100% 81% n/a 64.00009/29/17 11 BCHA_PWX01Y057548_CISO 32.0 83.8752 100% 38% n/a 32.00009/29/17 14 BCHA_PWX01Y057688_CISO 8.0 28.3274 100% 100% n/a 8.00009/29/17 14 BCHA_PWX01Y057690_CISO 27.0 28.3274 100% 100% n/a 20.32749/29/17 14 BCHA_PWX01Y057702_CISO 8.0 28.3274 100% 100% n/a 0.00009/29/17 15 BCHA_PWX01Y057721_CISO 25.0 24.4209 100% 100% n/a 24.42099/29/17 16 BCHA_PWX01Y057743_CISO 25.0 16.7136 100% 100% n/a 16.71369/29/17 17 BCHA_PWX01Y057755_CISO 20.0 58.7515 100% 34% n/a 20.00009/29/17 18 BCHA_PWX01Y057774_CISO 7.0 83.9608 100% 26% n/a 7.00009/29/17 18 BCHA_PWX01Y057777_CISO 15.0 83.9608 100% 26% n/a 15.00009/29/17 19 BCHA_PWX01Y057798_CISO 95.0 53.0393 100% 100% n/a 53.03939/29/17 20 BCHA_PWX01Y057815_CISO 75.0 42.4416 100% 100% n/a 42.44169/29/17 21 BCHA_PWX01Y057836_CISO 39.0 59.6885 100% 65% n/a 39.00009/29/17 22 BCHA_PWX01Y057847_CISO 8.0 79.0838 100% 47% n/a 8.00009/29/17 22 BCHA_PWX01Y057851_CISO 29.0 79.0838 100% 47% n/a 29.00009/29/17 23 BCHA_PWX01Y057863_CISO 84.0 71.8316 100% 100% n/a 71.83169/29/17 24 BCHA_PWX01Y057884_CISO 0.0 71.2483 100% 94% n/a 0.00009/29/17 24 BCHA_PWX01Y057889_CISO 67.0 71.2483 100% 94% n/a 67.00009/30/17 1 BCHA_PWX01Y057912_CISO 22.0 86.8181 100% 67% n/a 22.00009/30/17 1 BCHA_PWX01Y057916_CISO 36.0 86.8181 100% 67% n/a 36.00009/30/17 2 BCHA_PWX01Y057924_CISO 8.0 124.2653 100% 44% n/a 8.00009/30/17 2 BCHA_PWX01Y057929_CISO 4.0 124.2653 100% 44% n/a 4.00009/30/17 2 BCHA_PWX01Y057927_CISO 43.0 124.2653 100% 44% n/a 43.00009/30/17 3 BCHA_PWX01Y057943_CISO 121.0 116.7387 100% 100% n/a 116.73879/30/17 4 BCHA_PWX01Y057962_CISO 119.0 113.5379 100% 100% n/a 113.53799/30/17 5 BCHA_PWX01Y057968_CISO 100.0 119.9023 100% 83% n/a 100.00009/30/17 6 BCHA_PWX01Y057983_CISO 35.0 104.2130 100% 100% n/a 35.00009/30/17 6 BCHA_PWX01Y057989_CISO 83.0 104.2130 100% 100% n/a 69.21309/30/17 7 BCHA_PWX01Y058004_CISO 25.0 83.4525 100% 100% n/a 25.00009/30/17 7 BCHA_PWX01Y058005_CISO 25.0 83.4525 100% 100% n/a 25.00009/30/17 7 BCHA_PWX01Y058002_CISO 44.0 83.4525 100% 100% n/a 33.45259/30/17 7 BCHA_PWX01Y058006_CISO 22.0 83.4525 100% 100% n/a 0.00009/30/17 8 BCHA_PWX01Y058018_CISO 45.0 70.5539 100% 100% n/a 45.00009/30/17 8 BCHA_PWX01Y058019_CISO 5.0 70.5539 100% 100% n/a 5.00009/30/17 8 BCHA_PWX01Y058020_CISO 1.0 70.5539 100% 100% n/a 1.00009/30/17 8 BCHA_PWX01Y058021_CISO 28.0 70.5539 100% 100% n/a 19.55399/30/17 8 BCHA_PWX01Y058029_CISO 19.0 70.5539 100% 100% n/a 0.00009/30/17 18 BCHA_PWX01Y058142_CISO 84.0 42.8324 100% 100% n/a 42.83249/30/17 19 BCHA_PWX01Y058152_CISO 53.0 23.5790 100% 100% n/a 23.57909/30/17 20 BCHA_PWX01Y058178_CISO 34.0 20.9895 100% 100% n/a 20.98959/30/17 21 BCHA_PWX01Y058192_CISO 26.0 9.8868 100% 100% n/a 9.88689/30/17 22 BCHA_PWX01Y058205_CISO 24.0 2.0157 100% 100% n/a 2.01579/30/17 24 BCHA_PWX01Y058239_CISO 19.0 0.0000 100% 0% n/a 0.0000
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
9/20/17 1 BCHA_PWX01Y053370_CISO 44.0 88.0512 100% 50% n/a 44.00009/20/17 2 BCHA_PWX01Y053384_CISO 31.0 96.1344 100% 80% n/a 31.00009/20/17 2 BCHA_PWX01Y053392_CISO 46.0 96.1344 100% 80% n/a 46.00009/20/17 3 BCHA_PWX01Y053403_CISO 2.0 82.6752 100% 100% n/a 2.00009/20/17 3 BCHA_PWX01Y053410_CISO 108.0 82.6752 100% 100% n/a 80.67529/20/17 4 BCHA_PWX01Y053416_CISO 50.0 95.8464 100% 77% n/a 50.00009/20/17 4 BCHA_PWX01Y053417_CISO 2.0 95.8464 100% 77% n/a 2.00009/20/17 4 BCHA_PWX01Y053423_CISO 22.0 95.8464 100% 77% n/a 22.00009/20/17 5 BCHA_PWX01Y053435_CISO 93.0 105.6384 100% 88% n/a 93.00009/20/17 6 BCHA_PWX01Y053441_CISO 67.0 109.4016 100% 89% n/a 67.00009/20/17 6 BCHA_PWX01Y053448_CISO 30.0 109.4016 100% 89% n/a 30.00009/20/17 7 BCHA_PWX01Y053456_CISO 69.0 108.5760 100% 100% n/a 69.00009/20/17 7 BCHA_PWX01Y053464_CISO 42.0 108.5760 100% 100% n/a 39.57609/20/17 8 BCHA_PWX01Y053470_CISO 111.0 105.8688 100% 100% n/a 105.86889/20/17 17 BCHA_PWX01Y053699_CISO 25.0 76.3008 100% 33% n/a 25.00009/20/17 18 BCHA_PWX01Y053716_CISO 77.0 77.2800 100% 100% n/a 77.00009/20/17 19 BCHA_PWX01Y053725_CISO 73.0 78.1632 100% 93% n/a 73.00009/20/17 20 BCHA_PWX01Y053759_CISO 75.0 93.6000 100% 80% n/a 75.00009/20/17 21 BCHA_PWX01Y053775_CISO 86.0 92.2176 100% 93% n/a 86.00009/20/17 22 BCHA_PWX01Y053797_CISO 13.0 94.6752 100% 99% n/a 13.00009/20/17 22 BCHA_PWX01Y053800_CISO 81.0 94.6752 100% 99% n/a 81.00009/20/17 23 BCHA_PWX01Y053812_CISO 90.0 83.5776 100% 100% n/a 83.57769/20/17 24 BCHA_PWX01Y053834_CISO 87.0 69.1968 100% 100% n/a 69.19689/21/17 1 BCHA_PWX01Y053847_CISO 72.0 65.1264 100% 100% n/a 65.12649/21/17 1 BCHA_PWX01Y053849_CISO 2.0 65.1264 100% 100% n/a 0.00009/21/17 2 BCHA_PWX01Y053857_CISO 61.0 65.3952 100% 95% n/a 61.00009/21/17 2 BCHA_PWX01Y053862_CISO 1.0 65.3952 100% 95% n/a 1.00009/21/17 3 BCHA_PWX01Y053883_CISO 67.0 67.4688 100% 99% n/a 67.00009/21/17 4 BCHA_PWX01Y053894_CISO 10.0 74.4192 100% 90% n/a 10.00009/21/17 4 BCHA_PWX01Y053903_CISO 57.0 74.4192 100% 90% n/a 57.00009/21/17 5 BCHA_PWX01Y053913_CISO 68.0 63.7632 100% 100% n/a 63.76329/21/17 5 BCHA_PWX01Y053916_CISO 9.0 63.7632 100% 100% n/a 0.00009/21/17 6 BCHA_PWX01Y053929_CISO 16.0 58.5600 100% 100% n/a 16.00009/21/17 6 BCHA_PWX01Y053935_CISO 6.0 58.5600 100% 100% n/a 6.00009/21/17 6 BCHA_PWX01Y053937_CISO 44.0 58.5600 100% 100% n/a 36.56009/21/17 7 BCHA_PWX01Y053947_CISO 0.0 58.5408 100% 97% n/a 0.00009/21/17 7 BCHA_PWX01Y053948_CISO 13.0 58.5408 100% 97% n/a 13.00009/21/17 7 BCHA_PWX01Y053950_CISO 21.0 58.5408 100% 97% n/a 21.00009/21/17 7 BCHA_PWX01Y053951_CISO 23.0 58.5408 100% 97% n/a 23.00009/21/17 8 BCHA_PWX01Y053966_CISO 50.0 62.1888 100% 100% n/a 50.00009/21/17 8 BCHA_PWX01Y053969_CISO 13.0 62.1888 100% 100% n/a 12.18889/21/17 9 BCHA_PWX01Y053982_CISO 28.0 51.2256 100% 100% n/a 28.00009/21/17 9 BCHA_PWX01Y053983_CISO 26.0 51.2256 100% 100% n/a 23.22569/21/17 9 BCHA_PWX01Y053999_CISO 11.0 51.2256 100% 100% n/a 0.00009/21/17 10 BCHA_PWX01Y054011_CISO 57.0 31.2192 100% 100% n/a 31.21929/21/17 11 BCHA_PWX01Y054035_CISO 25.0 22.1760 100% 100% n/a 22.17609/21/17 11 BCHA_PWX01Y054037_CISO 17.0 22.1760 100% 100% n/a 0.00009/21/17 12 BCHA_PWX01Y054175_CISO 27.0 26.9184 100% 100% n/a 26.91849/21/17 14 BCHA_PWX01Y054240_CISO 42.0 22.1952 100% 100% n/a 22.19529/21/17 15 BCHA_PWX01Y054272_CISO 23.0 21.2736 100% 100% n/a 21.27369/21/17 18 BCHA_PWX01Y054288_CISO 16.0 15.6288 100% 100% n/a 15.62889/21/17 19 BCHA_PWX01Y054300_CISO 10.0 9.1200 100% 100% n/a 9.12009/21/17 19 BCHA_PWX01Y054301_CISO 9.0 9.1200 100% 100% n/a 0.00009/21/17 20 BCHA_PWX01Y054307_CISO 12.0 2.1120 100% 100% n/a 2.11209/21/17 21 BCHA_PWX01Y054320_CISO 4.0 0.0000 100% 0% n/a 0.00009/22/17 1 BCHA_PWX01Y054375_CISO 1.0 0.9408 100% 100% n/a 0.94089/22/17 2 BCHA_PWX01Y054389_CISO 1.0 0.1728 100% 100% n/a 0.17289/22/17 3 BCHA_PWX01Y054398_CISO 1.0 0.2688 100% 100% n/a 0.2688
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
9/22/17 6 BCHA_PWX01Y054434_CISO 1.0 3.2640 100% 31% n/a 1.00009/22/17 7 BCHA_PWX01Y054445_CISO 1.0 2.8224 100% 35% n/a 1.00009/22/17 8 BCHA_PWX01Y054467_CISO 2.0 1.9008 100% 100% n/a 1.90089/22/17 9 BCHA_PWX01Y054483_CISO 3.0 5.4144 100% 55% n/a 3.00009/22/17 18 BCHA_PWX01Y054754_CISO 1.0 2.2080 100% 45% n/a 1.00009/22/17 19 BCHA_PWX01Y054764_CISO 3.0 10.6944 100% 28% n/a 3.00009/22/17 20 BCHA_PWX01Y054772_CISO 3.0 8.9856 100% 33% n/a 3.00009/22/17 21 BCHA_PWX01Y054783_CISO 8.0 7.6800 100% 100% n/a 7.68009/22/17 22 BCHA_PWX01Y054795_CISO 5.0 6.5856 100% 76% n/a 5.00009/22/17 23 BCHA_PWX01Y054806_CISO 10.0 8.5056 100% 100% n/a 8.50569/22/17 24 BCHA_PWX01Y054827_CISO 6.0 10.3104 100% 58% n/a 6.00009/23/17 1 BCHA_PWX01Y054844_CISO 10.0 12.3648 100% 81% n/a 10.00009/23/17 2 BCHA_PWX01Y054855_CISO 9.0 14.5152 100% 62% n/a 9.00009/23/17 3 BCHA_PWX01Y054870_CISO 7.0 13.0752 100% 100% n/a 7.00009/23/17 3 BCHA_PWX01Y054871_CISO 7.0 13.0752 100% 100% n/a 6.07529/23/17 4 BCHA_PWX01Y054888_CISO 6.0 21.7536 100% 55% n/a 6.00009/23/17 4 BCHA_PWX01Y054889_CISO 6.0 21.7536 100% 55% n/a 6.00009/23/17 5 BCHA_PWX01Y054900_CISO 10.0 18.4128 100% 100% n/a 10.00009/23/17 5 BCHA_PWX01Y054901_CISO 9.0 18.4128 100% 100% n/a 8.41289/23/17 6 BCHA_PWX01Y054926_CISO 10.0 14.7456 100% 100% n/a 10.00009/23/17 6 BCHA_PWX01Y054927_CISO 9.0 14.7456 100% 100% n/a 4.74569/23/17 7 BCHA_PWX01Y054939_CISO 16.0 10.9824 100% 100% n/a 10.98249/23/17 8 BCHA_PWX01Y054950_CISO 10.0 20.4672 100% 49% n/a 10.00009/23/17 13 BCHA_PWX01Y054992_CISO 10.0 21.1200 100% 47% n/a 10.00009/23/17 14 BCHA_PWX01Y055001_CISO 12.0 22.6752 100% 53% n/a 12.00009/23/17 15 BCHA_PWX01Y055004_CISO 19.0 22.3680 100% 85% n/a 19.00009/23/17 18 BCHA_PWX01Y055035_CISO 13.0 49.9200 100% 46% n/a 13.00009/23/17 18 BCHA_PWX01Y055038_CISO 10.0 49.9200 100% 46% n/a 10.00009/23/17 19 BCHA_PWX01Y055044_CISO 42.0 56.9088 100% 74% n/a 42.00009/23/17 20 BCHA_PWX01Y055052_CISO 49.0 37.5552 100% 100% n/a 37.55529/23/17 21 BCHA_PWX01Y055063_CISO 51.0 52.8576 100% 96% n/a 51.00009/23/17 22 BCHA_PWX01Y055075_CISO 2.0 54.8544 100% 73% n/a 2.00009/23/17 22 BCHA_PWX01Y055077_CISO 38.0 54.8544 100% 73% n/a 38.00009/23/17 23 BCHA_PWX01Y055088_CISO 63.0 38.7072 100% 100% n/a 38.70729/23/17 24 BCHA_PWX01Y055102_CISO 42.0 52.7616 100% 80% n/a 42.00009/24/17 1 BCHA_PWX01Y055113_CISO 28.0 51.7056 100% 62% n/a 28.00009/24/17 1 BCHA_PWX01Y055108_CISO 4.0 51.7056 100% 62% n/a 4.00009/24/17 2 BCHA_PWX01Y055124_CISO 43.0 51.7056 100% 100% n/a 43.00009/24/17 2 BCHA_PWX01Y055121_CISO 12.0 51.7056 100% 100% n/a 8.70569/24/17 3 BCHA_PWX01Y055135_CISO 33.0 60.9408 100% 75% n/a 33.00009/24/17 3 BCHA_PWX01Y055137_CISO 13.0 60.9408 100% 75% n/a 13.00009/24/17 4 BCHA_PWX01Y055152_CISO 58.0 70.3296 100% 82% n/a 58.00009/24/17 5 BCHA_PWX01Y055163_CISO 55.0 86.7456 100% 63% n/a 55.00009/24/17 6 BCHA_PWX01Y055171_CISO 4.0 92.5632 100% 100% n/a 4.00009/24/17 6 BCHA_PWX01Y055172_CISO 44.0 92.5632 100% 100% n/a 44.00009/24/17 6 BCHA_PWX01Y055173_CISO 21.0 92.5632 100% 100% n/a 21.00009/24/17 6 BCHA_PWX01Y055174_CISO 22.0 92.5632 100% 100% n/a 22.00009/24/17 6 BCHA_PWX01Y055178_CISO 4.0 92.5632 100% 100% n/a 1.56329/24/17 7 BCHA_PWX01Y055184_CISO 1.0 108.0000 100% 80% n/a 1.00009/24/17 7 BCHA_PWX01Y055185_CISO 37.0 108.0000 100% 80% n/a 37.00009/24/17 7 BCHA_PWX01Y055186_CISO 24.0 108.0000 100% 80% n/a 24.00009/24/17 7 BCHA_PWX01Y055187_CISO 24.0 108.0000 100% 80% n/a 24.00009/24/17 8 BCHA_PWX01Y055197_CISO 11.0 103.7568 100% 97% n/a 11.00009/24/17 8 BCHA_PWX01Y055199_CISO 74.0 103.7568 100% 97% n/a 74.00009/24/17 8 BCHA_PWX01Y055200_CISO 5.0 103.7568 100% 97% n/a 5.00009/24/17 8 BCHA_PWX01Y055194_CISO 11.0 103.7568 100% 97% n/a 11.00009/24/17 9 BCHA_PWX01Y055205_CISO 16.0 78.0096 100% 21% n/a 16.00009/24/17 18 BCHA_PWX01Y055264_CISO 58.0 72.8256 100% 80% n/a 58.0000
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
9/24/17 19 BCHA_PWX01Y055270_CISO 63.0 61.2480 100% 100% n/a 61.24809/24/17 20 BCHA_PWX01Y055289_CISO 60.0 59.6352 100% 100% n/a 59.63529/24/17 21 BCHA_PWX01Y055300_CISO 55.0 61.4592 100% 89% n/a 55.00009/24/17 22 BCHA_PWX01Y055321_CISO 45.0 45.3888 100% 100% n/a 45.00009/24/17 22 BCHA_PWX01Y055315_CISO 21.0 45.3888 100% 100% n/a 0.38889/24/17 23 BCHA_PWX01Y055330_CISO 48.0 47.4624 100% 100% n/a 47.46249/24/17 24 BCHA_PWX01Y055349_CISO 42.0 46.0608 100% 91% n/a 42.00009/25/17 1 BCHA_PWX01Y055370_CISO 40.0 43.6800 100% 92% n/a 40.00009/25/17 2 BCHA_PWX01Y055392_CISO 60.0 60.7296 100% 99% n/a 60.00009/25/17 3 BCHA_PWX01Y055413_CISO 36.0 66.2592 100% 54% n/a 36.00009/25/17 4 BCHA_PWX01Y055434_CISO 62.0 90.9120 100% 68% n/a 62.00009/25/17 5 BCHA_PWX01Y055444_CISO 52.0 86.2656 100% 83% n/a 52.00009/25/17 5 BCHA_PWX01Y055449_CISO 20.0 86.2656 100% 83% n/a 20.00009/25/17 6 BCHA_PWX01Y055470_CISO 96.0 60.9024 100% 100% n/a 60.90249/25/17 7 BCHA_PWX01Y055485_CISO 53.0 41.1264 100% 100% n/a 41.12649/25/17 7 BCHA_PWX01Y055488_CISO 3.0 41.1264 100% 100% n/a 0.00009/25/17 7 BCHA_PWX01Y055489_CISO 10.0 41.1264 100% 100% n/a 0.00009/25/17 7 BCHA_PWX01Y055491_CISO 16.0 41.1264 100% 100% n/a 0.00009/25/17 8 BCHA_PWX01Y055504_CISO 8.0 53.7600 100% 82% n/a 8.00009/25/17 8 BCHA_PWX01Y055513_CISO 36.0 53.7600 100% 82% n/a 36.00009/25/17 9 BCHA_PWX01Y055518_CISO 28.0 55.9680 100% 50% n/a 28.00009/25/17 10 BCHA_PWX01Y055534_CISO 23.0 44.9472 100% 51% n/a 23.00009/25/17 12 BCHA_PWX01Y055631_CISO 9.0 78.1248 100% 12% n/a 9.00009/25/17 15 BCHA_PWX01Y055717_CISO 22.0 69.2160 100% 75% n/a 22.00009/25/17 15 BCHA_PWX01Y055718_CISO 30.0 69.2160 100% 75% n/a 30.00009/25/17 16 BCHA_PWX01Y055733_CISO 56.0 73.6320 100% 76% n/a 56.00009/25/17 17 BCHA_PWX01Y055743_CISO 84.0 54.6432 100% 100% n/a 54.64329/25/17 18 BCHA_PWX01Y055755_CISO 63.0 36.2880 100% 100% n/a 36.28809/25/17 19 BCHA_PWX01Y055768_CISO 45.0 31.6800 100% 100% n/a 31.68009/25/17 19 BCHA_PWX01Y055775_CISO 11.0 31.6800 100% 100% n/a 0.00009/25/17 20 BCHA_PWX01Y055790_CISO 21.0 40.0704 100% 52% n/a 21.00009/25/17 21 BCHA_PWX01Y055805_CISO 39.0 43.6416 100% 92% n/a 39.00009/25/17 21 BCHA_PWX01Y055811_CISO 1.0 43.6416 100% 92% n/a 1.00009/25/17 22 BCHA_PWX01Y055819_CISO 15.0 30.7008 100% 100% n/a 15.00009/25/17 22 BCHA_PWX01Y055820_CISO 35.0 30.7008 100% 100% n/a 15.70089/25/17 22 BCHA_PWX01Y055825_CISO 3.0 30.7008 100% 100% n/a 0.00009/25/17 23 BCHA_PWX01Y055836_CISO 31.0 28.1088 100% 100% n/a 28.10889/25/17 24 BCHA_PWX01Y055864_CISO 30.0 11.8272 100% 100% n/a 11.82729/26/17 1 BCHA_PWX01Y055881_CISO 16.0 23.9232 100% 67% n/a 16.00009/26/17 2 BCHA_PWX01Y055893_CISO 14.0 23.2128 100% 82% n/a 14.00009/26/17 2 BCHA_PWX01Y055894_CISO 5.0 23.2128 100% 82% n/a 5.00009/26/17 3 BCHA_PWX01Y055901_CISO 31.0 18.3360 100% 100% n/a 18.33609/26/17 4 BCHA_PWX01Y055915_CISO 18.0 17.1648 100% 100% n/a 17.16489/26/17 5 BCHA_PWX01Y055926_CISO 21.0 14.1696 100% 100% n/a 14.16969/26/17 6 BCHA_PWX01Y055942_CISO 17.0 14.5152 100% 100% n/a 14.51529/26/17 7 BCHA_PWX01Y055960_CISO 14.0 14.9568 100% 94% n/a 14.00009/26/17 8 BCHA_PWX01Y055972_CISO 16.0 6.2400 100% 100% n/a 6.24009/26/17 9 BCHA_PWX01Y055983_CISO 10.0 1.7472 100% 100% n/a 1.74729/26/17 10 BCHA_PWX01Y055996_CISO 2.0 9.5232 100% 21% n/a 2.00009/26/17 15 BCHA_PWX01Y056159_CISO 91.0 105.3120 100% 86% n/a 91.00009/26/17 16 BCHA_PWX01Y056168_CISO 105.0 113.5680 100% 92% n/a 105.00009/26/17 17 BCHA_PWX01Y056191_CISO 118.0 117.8688 100% 100% n/a 117.86889/26/17 18 BCHA_PWX01Y056212_CISO 122.0 101.2224 100% 100% n/a 101.22249/26/17 19 BCHA_PWX01Y056230_CISO 118.0 71.8848 100% 100% n/a 71.88489/26/17 20 BCHA_PWX01Y056243_CISO 88.0 77.0688 100% 100% n/a 77.06889/26/17 21 BCHA_PWX01Y056261_CISO 75.0 79.7568 100% 94% n/a 75.00009/26/17 22 BCHA_PWX01Y056277_CISO 46.0 82.7328 100% 93% n/a 46.00009/26/17 22 BCHA_PWX01Y056279_CISO 31.0 82.7328 100% 93% n/a 31.0000
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
9/26/17 23 BCHA_PWX01Y056289_CISO 33.0 58.7904 100% 100% n/a 33.00009/26/17 23 BCHA_PWX01Y056290_CISO 67.0 58.7904 100% 100% n/a 25.79049/26/17 24 BCHA_PWX01Y056304_CISO 61.0 87.5712 100% 70% n/a 61.00009/27/17 1 BCHA_PWX01Y056314_CISO 29.0 81.9840 100% 66% n/a 29.00009/27/17 1 BCHA_PWX01Y056318_CISO 25.0 81.9840 100% 66% n/a 25.00009/27/17 2 BCHA_PWX01Y056330_CISO 94.0 81.9648 100% 100% n/a 81.96489/27/17 3 BCHA_PWX01Y056343_CISO 24.0 64.8000 100% 100% n/a 24.00009/27/17 3 BCHA_PWX01Y056344_CISO 50.0 64.8000 100% 100% n/a 40.80009/27/17 4 BCHA_PWX01Y056356_CISO 11.0 80.1216 100% 80% n/a 11.00009/27/17 4 BCHA_PWX01Y056357_CISO 53.0 80.1216 100% 80% n/a 53.00009/27/17 5 BCHA_PWX01Y056364_CISO 63.0 90.1824 100% 70% n/a 63.00009/27/17 6 BCHA_PWX01Y056375_CISO 5.0 87.0912 100% 93% n/a 5.00009/27/17 6 BCHA_PWX01Y056376_CISO 5.0 87.0912 100% 93% n/a 5.00009/27/17 6 BCHA_PWX01Y056381_CISO 45.0 87.0912 100% 93% n/a 45.00009/27/17 6 BCHA_PWX01Y056386_CISO 26.0 87.0912 100% 93% n/a 26.00009/27/17 7 BCHA_PWX01Y056391_CISO 28.0 90.3168 100% 100% n/a 28.00009/27/17 7 BCHA_PWX01Y056393_CISO 27.0 90.3168 100% 100% n/a 27.00009/27/17 7 BCHA_PWX01Y056398_CISO 40.0 90.3168 100% 100% n/a 35.31689/27/17 8 BCHA_PWX01Y056408_CISO 15.0 87.3600 100% 84% n/a 15.00009/27/17 8 BCHA_PWX01Y056409_CISO 58.0 87.3600 100% 84% n/a 58.00009/27/17 9 BCHA_PWX01Y056417_CISO 30.0 92.3328 100% 100% n/a 30.00009/27/17 9 BCHA_PWX01Y056418_CISO 40.0 92.3328 100% 100% n/a 40.00009/27/17 9 BCHA_PWX01Y056419_CISO 30.0 92.3328 100% 100% n/a 22.33289/27/17 10 BCHA_PWX01Y056428_CISO 40.0 97.8624 100% 86% n/a 40.00009/27/17 10 BCHA_PWX01Y056432_CISO 16.0 97.8624 100% 86% n/a 16.00009/27/17 10 BCHA_PWX01Y056434_CISO 13.0 97.8624 100% 86% n/a 13.00009/27/17 10 BCHA_PWX01Y056435_CISO 15.0 97.8624 100% 86% n/a 15.00009/27/17 11 BCHA_PWX01Y056457_CISO 28.0 51.6480 100% 100% n/a 28.00009/27/17 11 BCHA_PWX01Y056462_CISO 34.0 51.6480 100% 100% n/a 23.64809/27/17 11 BCHA_PWX01Y056463_CISO 34.0 51.6480 100% 100% n/a 0.00009/27/17 12 BCHA_PWX01Y056510_CISO 14.0 60.4992 100% 100% n/a 14.00009/27/17 12 BCHA_PWX01Y056516_CISO 17.0 60.4992 100% 100% n/a 17.00009/27/17 12 BCHA_PWX01Y056517_CISO 66.0 60.4992 100% 100% n/a 29.49929/27/17 12 BCHA_PWX01Y056520_CISO 9.0 60.4992 100% 100% n/a 0.00009/27/17 13 BCHA_PWX01Y056580_CISO 10.0 48.5952 100% 60% n/a 10.00009/27/17 13 BCHA_PWX01Y056581_CISO 19.0 48.5952 100% 60% n/a 19.00009/27/17 14 BCHA_PWX01Y056601_CISO 14.0 47.5200 100% 29% n/a 14.00009/27/17 15 BCHA_PWX01Y056620_CISO 4.0 40.7232 100% 10% n/a 4.00009/27/17 16 BCHA_PWX01Y056631_CISO 25.0 39.6864 100% 100% n/a 25.00009/27/17 16 BCHA_PWX01Y056641_CISO 20.0 39.6864 100% 100% n/a 14.68649/27/17 17 BCHA_PWX01Y056662_CISO 36.0 45.4272 100% 100% n/a 36.00009/27/17 17 BCHA_PWX01Y056664_CISO 11.0 45.4272 100% 100% n/a 9.42729/27/17 18 BCHA_PWX01Y056676_CISO 33.0 23.1936 100% 100% n/a 23.19369/27/17 19 BCHA_PWX01Y056686_CISO 37.0 8.4096 100% 100% n/a 8.40969/27/17 20 BCHA_PWX01Y056704_CISO 11.0 11.1744 100% 98% n/a 11.00009/27/17 21 BCHA_PWX01Y056719_CISO 5.0 26.6304 100% 19% n/a 5.00009/27/17 22 BCHA_PWX01Y056732_CISO 20.0 28.4736 100% 70% n/a 20.00009/27/17 23 BCHA_PWX01Y056749_CISO 17.0 22.4832 100% 100% n/a 17.00009/27/17 23 BCHA_PWX01Y056750_CISO 18.0 22.4832 100% 100% n/a 5.48329/27/17 24 BCHA_PWX01Y056759_CISO 17.0 27.3408 100% 100% n/a 17.00009/27/17 24 BCHA_PWX01Y056764_CISO 12.0 27.3408 100% 100% n/a 10.34089/28/17 1 BCHA_PWX01Y056779_CISO 26.0 34.4256 100% 76% n/a 26.00009/28/17 2 BCHA_PWX01Y056788_CISO 34.0 26.1696 100% 100% n/a 26.16969/28/17 3 BCHA_PWX01Y056801_CISO 32.0 22.0224 100% 100% n/a 22.02249/28/17 4 BCHA_PWX01Y056811_CISO 23.0 34.2336 100% 67% n/a 23.00009/28/17 5 BCHA_PWX01Y056820_CISO 26.0 28.9920 100% 90% n/a 26.00009/28/17 6 BCHA_PWX01Y056829_CISO 35.0 34.5792 100% 100% n/a 34.57929/28/17 7 BCHA_PWX01Y056846_CISO 31.0 37.0368 100% 84% n/a 31.0000
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
9/28/17 8 BCHA_PWX01Y056859_CISO 36.0 45.7344 100% 79% n/a 36.00009/28/17 9 BCHA_PWX01Y056870_CISO 1.0 44.2176 100% 86% n/a 1.00009/28/17 9 BCHA_PWX01Y056871_CISO 2.0 44.2176 100% 86% n/a 2.00009/28/17 9 BCHA_PWX01Y056878_CISO 35.0 44.2176 100% 86% n/a 35.00009/28/17 10 BCHA_PWX01Y056895_CISO 25.0 37.2864 100% 100% n/a 25.00009/28/17 10 BCHA_PWX01Y056904_CISO 30.0 37.2864 100% 100% n/a 12.28649/28/17 16 BCHA_PWX01Y057274_CISO 14.0 14.5344 100% 100% n/a 14.00009/28/17 16 BCHA_PWX01Y057278_CISO 7.0 14.5344 100% 100% n/a 0.53449/28/17 17 BCHA_PWX01Y057287_CISO 18.0 4.1280 100% 100% n/a 4.12809/28/17 18 BCHA_PWX01Y057312_CISO 8.0 5.0304 100% 100% n/a 5.03049/28/17 19 BCHA_PWX01Y057320_CISO 4.0 13.9776 100% 29% n/a 4.00009/28/17 20 BCHA_PWX01Y057336_CISO 6.0 12.4992 100% 48% n/a 6.00009/28/17 21 BCHA_PWX01Y057348_CISO 25.0 2.8800 100% 100% n/a 2.88009/28/17 22 BCHA_PWX01Y057360_CISO 5.0 3.7632 100% 100% n/a 3.76329/28/17 23 BCHA_PWX01Y057374_CISO 2.0 8.4672 100% 24% n/a 2.00009/28/17 24 BCHA_PWX01Y057382_CISO 5.0 12.3840 100% 40% n/a 5.00009/29/17 1 BCHA_PWX01Y057393_CISO 12.0 15.2448 100% 79% n/a 12.00009/29/17 2 BCHA_PWX01Y057401_CISO 13.0 24.0192 100% 54% n/a 13.00009/29/17 3 BCHA_PWX01Y057418_CISO 22.0 36.7872 100% 60% n/a 22.00009/29/17 4 BCHA_PWX01Y057428_CISO 24.0 42.5088 100% 56% n/a 24.00009/29/17 5 BCHA_PWX01Y057442_CISO 29.0 61.7088 100% 47% n/a 29.00009/29/17 6 BCHA_PWX01Y057460_CISO 50.0 59.2320 100% 84% n/a 50.00009/29/17 7 BCHA_PWX01Y057469_CISO 47.0 52.4544 100% 100% n/a 47.00009/29/17 7 BCHA_PWX01Y057470_CISO 6.0 52.4544 100% 100% n/a 5.45449/29/17 7 BCHA_PWX01Y057471_CISO 8.0 52.4544 100% 100% n/a 0.00009/29/17 8 BCHA_PWX01Y057491_CISO 23.0 39.9360 100% 100% n/a 23.00009/29/17 8 BCHA_PWX01Y057492_CISO 22.0 39.9360 100% 100% n/a 16.93609/29/17 9 BCHA_PWX01Y057507_CISO 15.0 30.3936 100% 100% n/a 15.00009/29/17 9 BCHA_PWX01Y057509_CISO 45.0 30.3936 100% 100% n/a 15.39369/29/17 9 BCHA_PWX01Y057508_CISO 4.0 30.3936 100% 100% n/a 0.00009/29/17 10 BCHA_PWX01Y057536_CISO 25.0 14.2464 100% 100% n/a 14.24649/29/17 14 BCHA_PWX01Y057689_CISO 40.0 59.1552 100% 79% n/a 40.00009/29/17 14 BCHA_PWX01Y057701_CISO 7.0 59.1552 100% 79% n/a 7.00009/29/17 15 BCHA_PWX01Y057720_CISO 17.0 36.9984 100% 100% n/a 17.00009/29/17 15 BCHA_PWX01Y057724_CISO 49.0 36.9984 100% 100% n/a 19.99849/29/17 16 BCHA_PWX01Y057738_CISO 42.0 24.3072 100% 100% n/a 24.30729/29/17 17 BCHA_PWX01Y057753_CISO 40.0 70.1184 100% 57% n/a 40.00009/29/17 18 BCHA_PWX01Y057773_CISO 13.0 105.7728 100% 12% n/a 13.00009/29/17 19 BCHA_PWX01Y057792_CISO 125.0 74.4000 100% 100% n/a 74.40009/29/17 20 BCHA_PWX01Y057814_CISO 79.0 42.6240 100% 100% n/a 42.62409/29/17 21 BCHA_PWX01Y057833_CISO 62.0 55.4112 100% 100% n/a 55.41129/29/17 22 BCHA_PWX01Y057848_CISO 25.0 109.4208 100% 23% n/a 25.00009/29/17 23 BCHA_PWX01Y057865_CISO 96.0 84.7488 100% 100% n/a 84.74889/29/17 24 BCHA_PWX01Y057879_CISO 0.0 71.2512 100% 100% n/a 0.00009/29/17 24 BCHA_PWX01Y057880_CISO 0.0 71.2512 100% 100% n/a 0.00009/29/17 24 BCHA_PWX01Y057881_CISO 0.0 71.2512 100% 100% n/a 0.00009/29/17 24 BCHA_PWX01Y057885_CISO 0.0 71.2512 100% 100% n/a 0.00009/29/17 24 BCHA_PWX01Y057890_CISO 23.0 71.2512 100% 100% n/a 23.00009/29/17 24 BCHA_PWX01Y057899_CISO 81.0 71.2512 100% 100% n/a 48.25129/30/17 1 BCHA_PWX01Y057915_CISO 57.0 83.7504 100% 68% n/a 57.00009/30/17 2 BCHA_PWX01Y057926_CISO 78.0 114.3168 100% 68% n/a 78.00009/30/17 3 BCHA_PWX01Y057942_CISO 102.0 117.9072 100% 87% n/a 102.00009/30/17 4 BCHA_PWX01Y057954_CISO 29.0 121.2864 100% 63% n/a 29.00009/30/17 4 BCHA_PWX01Y057958_CISO 47.0 121.2864 100% 63% n/a 47.00009/30/17 5 BCHA_PWX01Y057970_CISO 47.0 117.0432 100% 75% n/a 47.00009/30/17 5 BCHA_PWX01Y057971_CISO 41.0 117.0432 100% 75% n/a 41.00009/30/17 6 BCHA_PWX01Y057988_CISO 121.0 114.1632 100% 100% n/a 114.16329/30/17 7 BCHA_PWX01Y058007_CISO 113.0 122.9184 100% 92% n/a 113.0000
DateHour Ending
E-‐Tag ID NumberHourly Final Schedule (MWh)
Hourly Meter Data (MWh)
Percent Share of Final
Schedule (%)
Percent Share of Facility Generation
Output (%)Contract ID
Preliminary Estimate of Eligible PCC 1 Volume
(MWh)
Annual Hourly Comparison for PCC 1 Claims Scheduled into a CBA
9/30/17 8 BCHA_PWX01Y058028_CISO 120.0 115.4496 100% 100% n/a 115.44969/30/17 18 BCHA_PWX01Y058137_CISO 24.0 73.6320 100% 100% n/a 24.00009/30/17 18 BCHA_PWX01Y058140_CISO 63.0 73.6320 100% 100% n/a 49.63209/30/17 19 BCHA_PWX01Y058161_CISO 91.0 62.9760 100% 100% n/a 62.97609/30/17 20 BCHA_PWX01Y058176_CISO 62.0 90.0864 100% 69% n/a 62.00009/30/17 21 BCHA_PWX01Y058190_CISO 66.0 70.9440 100% 93% n/a 66.00009/30/17 22 BCHA_PWX01Y058204_CISO 21.0 63.2448 100% 100% n/a 21.00009/30/17 22 BCHA_PWX01Y058206_CISO 4.0 63.2448 100% 100% n/a 4.00009/30/17 22 BCHA_PWX01Y058208_CISO 66.0 63.2448 100% 100% n/a 38.24489/30/17 23 BCHA_PWX01Y058222_CISO 62.0 34.4640 100% 100% n/a 34.46409/30/17 24 BCHA_PWX01Y058240_CISO 46.0 48.1536 100% 96% n/a 46.0000
_____________________________________________
Dawn Weisz, Chief Executive Officer, Marin Clean Energy
OFFICER VERIFICATION FORM
I am an officer of the reporting corporation herein, and am authorized to make this
verification on its behalf. The statements in the foregoing document are true of my
own knowledge, except as to matters which are therein stated on information or
belief, and as to those matters I believe them to be true. The spreadsheet format
used to file this 2017 Meter and e-Tag Reconciliation Report has not been altered
from the version issued or approved by Energy Division.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on August 29, 2018 at San Rafael, CA.