BEFORE THE PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA Date: August 31, 2018 Name: Dawn Weisz Title: Chief Executive Officer Email: [email protected] Phone: (415) 4646020 Fax: (415) 4598095 Address: 1125 Tamalpais Avenue, San Rafael, CA 94901 First year of operation: Pre2011 (Select one) 2017 RPS Compliance Report Reporting RPS Compliance Status within Compliance Period 3 (20172020) Order Instituting Rulemaking to Continue Implementation and Administration of California Renewables Portfolio Standard Program. Rulemaking 1502020 (Filed February 26, 2015) Marin Clean Energy (MCE)

Upload: others

Post on 14-Oct-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

 

BEFORE  THE  PUBLIC  UTILITIES  COMMISSION  OF  THE  STATE  OF  CALIFORNIA

Date:August  31,  2018 Name: Dawn  Weisz

Title: Chief  Executive  OfficerEmail: [email protected]  Phone: (415)  464-­‐6020Fax: (415)  459-­‐8095Address: 1125  Tamalpais  Avenue,  San  Rafael,  CA  94901First  year  of  operation: Pre-­‐2011 (Select  one)

2017  RPS  Compliance  Report

Reporting  RPS  Compliance  Status  within  Compliance  Period  3  (2017-­‐2020)

Order  Instituting  Rulemaking  to  Continue  Implementation  and  

Administration  of  California  Renewables  Portfolio  Standard  Program.

Rulemaking  15-­‐02-­‐020(Filed  February  26,  2015)

Marin  Clean  Energy  (MCE)

gmo_404
Typewritten Text
Firm-and-shape RECs (PCC2)
gmo_404
Typewritten Text
Biglow Canyon Wind P. 52 of 7811,908 MWh
gmo_404
Typewritten Text
Cape Scott WindP. 53 of 78 9,681 MWh
gmo_404
Typewritten Text
Cedar Creek P. 53 of 78121,643 MWh
gmo_404
Typewritten Text
gmo_404
Line
gmo_404
Typewritten Text
Cedar Creek II P.53 of 78 118,184 MWh
gmo_404
Typewritten Text
Dokie Wind P. 53 of 78 11,260 MWh
gmo_404
Typewritten Text
Elkhorn Vall. Wind P. 53 of 78 53,092 MWh
gmo_404
Typewritten Text
Logan Wind P. 55 of 78 80,127 MWh
gmo_404
Typewritten Text
Meikle WindP. 55 of 78 20,458 MWh
gmo_404
Typewritten Text
Port Angeles MillP. 55 of 78 615 MWh
gmo_404
Typewritten Text
Quality WindP. 55 of 78 12,986 MWh
gmo_404
Typewritten Text
Tucannon River Wind P. 56 of 78 2,881 MWh
gmo_404
Typewritten Text
Tucannon River Wind II P. 56 of 78 15,211 MWh
gmo_404
Line
gmo_404
Typewritten Text
TOTAL PCC2 (firm-and-shape RECs)
gmo_404
Typewritten Text
458,046 MWh
gmo_404
Line
gmo_404
Line
Page 2: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Dawn  Weisz,  Chief  Executive  Officer

OFFICER  VERIFICATION  FORM  

I  declare  under  penalty  of  perjury  that  the  foregoing  is  true  and  correct.

Executed  on  August  31,  2018  at  San  Rafael,  California.

I  am  an  officer  of  the  reporting  corporation  herein,  and  am  authorized  to  make  this  verification  on  its  

behalf.  The  statements  in  the  foregoing  document  are  true  of  my  own  knowledge,  except  as  to  matters  

which  are  therein  stated  on  information  or  belief,  and  as  to  those  matters  I  believe  them  to  be  true.  The  

spreadsheet  format  used  to  file  this  compliance  report  has  not  been  altered  from  the  version  issued  or  

approved  by  Energy  Division.

Page 3: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Rulemaking 15-02-020 MCE – August 31, 2018

Page 1 of 2

Marin Clean Energy

2017 RPS Compliance Report

Reporting RPS Compliance Status for the Third Compliance Period (2017-2020)

Narrative Reporting Requirements: 1. Development status update (siting and permitting) for eligible renewable energy resources, which have

not yet achieved commercial operation:

Generating Facility Technology MW Location Status Voyager II Wind 42 Mojave, CA Deliveries are expected to

commence in 2018; pertinent siting and permitting activities are being satisfied, per schedule

Antelope II Solar PV 105 Lancaster, CA Deliveries are expected to commence in 2019; pertinent siting and permitting activities are being satisfied, per schedule

Little Bear 1 Solar PV 40 Mendota, CA Deliveries are expected to commence in 2021; pertinent siting and permitting activities are being satisfied, per schedule

Little Bear 3 Solar PV 20 Mendota, CA Deliveries are expected to commence in 2021; pertinent siting and permitting activities are being satisfied, per schedule

Little Bear 4 Solar PV 50 Mendota, CA Deliveries are expected to commence in 2021; pertinent siting and permitting activities are being satisfied, per schedule

Little Bear 5 Solar PV 50 Mendota, CA Deliveries are expected to commence in 2021; pertinent siting and permitting activities are being satisfied, per schedule

Desert Harvest Solar PV 80 Riverside, CA Deliveries are expected to commence in 2021; pertinent siting and permitting activities are being satisfied, per schedule

gmo_404
Oval
gmo_404
Oval
gmo_404
Oval
gmo_404
Oval
gmo_404
Oval
gmo_404
Oval
Page 4: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Rulemaking 15-02-020 MCE – August 31, 2018

Page 2 of 2

2. Please see the following table for an inventory of all procurement (by MCE for use under California’s RPS

Program) during the 2017 calendar year from eligible renewable energy sources located outside of California but within WECC. Note that all volumes are expressed in megawatt hours (MWhs):

3. Please see the following table for an inventory of all unbundled renewable energy credits (RECs) that were procured by MCE for use under California’s RPS Program during the 2017 calendar year. Note that all volumes are expressed in megawatt hours (MWhs):

4. MCE has no specific recommendations at this time but encourages the Commission to promote clarity and consistency, while also reducing redundancy, in administering California’s RPS compliance reporting program.

Generating Facility City State VolumeBiglow Canyon Wind Farm - Biglow Phase 2 Sherman OR 11,908 Cape Scott Wind - Cape Scott Wind Port Hardy BC, Canada 13,058 Cedar Creek - Cedar Creek Weld CO 121,643 Cedar Creek II - Cedar Creek II Weld CO 118,184 Dokie Wind - Dokie Wind Chetwynd BC, Canada 19,629 Elkhorn Valley Wind Farm - Elkhorn Valley Wind Farm Union OR 53,092 Logan Wind Energy - Logan Logan CO 80,127 Meikle Wind Energy Limited Partnership Tumbler Ridge BC, Canada 20,458 Port Angeles Mill - CoGen No. 11/Nippon Paper Co-Generation Clallam WA 615 Quality Wind - Quality Wind Tumbler Ridge BC, Canada 21,526 Tucannon River 1 - Tucannon River Wind Farm Columbia WA 2,881 Tucannon River Wind Farm - Tucannon River 2 Columbia WA 15,211 Total 478,332

Generating Facility City State VolumeCGTEF - Calabasas Gas-to-Energy Facility Los Angeles CA 687TEF - GEN1 - Total Energy Facility Los Angeles CA 25062TEF - GEN2 - Total Energy Facility Los Angeles CA 23246TEF - GEN3 - Total Energy Facility Los Angeles CA 21821TEF - GEN4 - Total Energy Facility Los Angeles CA 19184Total 90000

gmo_404
Line
gmo_404
Line
gmo_404
Line
Page 5: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Data  Reported  by:

Marin  Clean  Energy  (MCE)

August  31,  2018

Compliance  Summary  and  Charts

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Retail  Sales  (MWh) 185,493 570,144 1,110,487 1,254,794 1,695,274 2,125,091 2,804,277 4,565,481 5,275,252 5,306,098 5,339,682 5,377,627 5,422,939 5,475,612 5,537,608Annual  %  Target 20.0% 20.0% 20.0% 21.7% 23.3% 25.0% 27.0% 29.0% 31.0% 33.0% 34.8% 36.5% 38.3% 40.0% 41.7%Annual  RPS  Target 37,099 114,029 222,097 272,290 394,999 531,273 757,155 1,323,989 1,635,328 1,751,012 1,858,209 1,962,834 2,076,986 2,190,245 2,309,182Procurement  Quantity  Requirement

Resource  Mix

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Total  RPS  Procurement 25,521 123,507 311,834 562,427 754,350 992,300 1,592,542 2,803,761 1,938,119 1,844,261 2,403,253 2,396,753 2,091,262 2,056,681 2,050,204Biomass 17,319 22,890 11,091 0 0 0 0 36,000 0 0 0 0 0 0 0

Biogas:  Digester  gas   0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Biogas:  Landfill  gas   0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Biodiesel 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Muni  Solid  Waste 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Bioenergy  Subtotal 17,319 22,890 11,091 0 0 0 0 36,000 0 0 0 0 0 0 0Geothermal 0 0 0 51,280 27,244 0 340,692 188,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000Small  Hydro 0 10,000 125,231 0 63,878 144,196 245,237 168,400 70,200 70,000 70,000 70,000 70,000 70,000 70,000

Conduit  Hydro 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Water  supply  and  conveyance   0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Solar  PV 0 165 1,807 2,964 95,959 195,736 173,632 483,361 827,819 898,161 1,478,153 1,471,653 1,466,162 1,460,681 1,454,204Solar  Thermal 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Wind 8,202 90,452 173,705 508,183 567,269 652,368 832,981 1,928,000 952,100 788,100 767,100 767,100 467,100 438,000 438,000Ocean  wave   0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Ocean  thermal   0 0 0 0 0 0 0 0 0 0 0 0 0 0 0Tidal  current   0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Fuel  Cells 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Portfolio  Content  Category  Mix

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

Category  0  RECs 39,119 39,238 92,576 0 0 0 0 0 0 0 0 0 0 0 0Category  1  RECs 6,203 69,553 114,693 171,634 467,921 781,561 1,201,208 1,922,761 1,658,119 1,924,261 2,483,253 2,476,753 2,171,262 2,136,681 2,130,204Category  2  RECs 6,203 32,731 62,094 120,282 164,801 311,000 458,046 925,000 360,000 0 0 0 0 0 0Category  3  RECs 0 25,000 95,000 354,703 233,643 68,059 90,000 36,000 0 0 0 0 0 0 0

373,225 1,198,562 5,467,485 8,088,274 7,305,931

0%

10%

20%

30%

40%

50%

60%

70%

80%

90%

100%

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020

Portfolio  Content  Category  Mix  of  RPS  Procurement

0

500,000

1,000,000

1,500,000

2,000,000

2,500,000

3,000,000

1 2 3 4 5 6 7 8 9 10

Resource  Mix  of  RPS  Procurement

Other  (Tidal/Fuel  Cells) Wind Solar  Thermal Solar  PV Small  Hydro Geothermal Biogas Biomass

gmo_404
Line
gmo_404
Line
gmo_404
Typewritten Text
Firm and shape RECs
gmo_404
Typewritten Text
Unbundled RECs
gmo_404
Typewritten Text
aka "PCC2"
gmo_404
Typewritten Text
aka "PCC3"
gmo_404
Rectangle
Page 6: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

2026 2027 2028 2029 2030

5,612,312 5,703,594 5,824,555 5,973,371 6,157,92543.3% 45.0% 46.7% 48.3% 50.0%

2,430,131 2,566,617 2,720,067 2,885,138 3,078,962

2026 2027 2028 2029 2030

1,974,737 1,880,277 1,874,624 1,867,180 1,861,7430 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0

88,000 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0

1,448,737 1,442,277 1,436,624 1,429,180 1,423,7430 0 0 0 0

438,000 438,000 438,000 438,000 438,0000 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0

2026 2027 2028 2029 2030

0 0 0 0 02,054,737 1,960,277 1,954,624 1,947,180 1,941,743

0 0 0 0 00 0 0 0 0

8,684,1677,305,931

Page 7: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

RPS  Compliance  Report:  2014-­‐2016  Compliance  Period  Summary

31-­‐Aug-­‐18

2014 2015 2016 CP  2  Total

RPS  Summary    Report     MWh MWh MWh MWh %  of  Total  Retail  Sales

Total  Retail  Sales 1,254,794 1,695,274 2,125,091 5,075,159 n/a  Annual  RPS  Targets  and  Compliance  Period  Procurement  Requirement 272,290 394,999 531,273 1,198,562 23.6%Total  RPS  Eligible  RECs  Procured 646,619 866,365 1,160,620 2,673,604 52.7%Total  RPS  Eligible  RECs  Retired 689,834 869,181 1,160,620 2,719,635 53.6%

2014 2015 2016 CP  2  Total

RPS  Procurement MWh MWh MWh MWh%  of  Total  RPS  Procurement

Biomass 0 0 0 0 0.0%Biogas:  Digester  gas   0 0 0 0 0.0%Biogas:  Landfill  gas   0 0 0 0 0.0%Biodiesel 0 0 0 0 0.0%Muni  Solid  Waste 0 0 0 0 0.0%Bioenergy  Subtotal 0 0 0 0 0.0%

Geothermal 51,280 27,244 0 78,524 3.4%Small  Hydro 0 63,878 144,196 208,074 9.0%Conduit  Hydro 0 0 0 0 0.0%Water  supply  and  conveyance   0 0 0 0 0.0%Solar  PV 2,964 95,959 195,736 294,659 12.8%Solar  Thermal 0 0 0 0 0.0%Wind 508,183 567,269 652,368 1,727,820 74.8%Ocean  wave   0 0 0 0 0.0%Ocean  thermal   0 0 0 0 0.0%Tidal  current   0 0 0 0 0.0%Fuel  Cells 0 0 0 0 0.0%

Total  RPS  Eligible  Procurement 562,427 754,350 992,300 2,309,077

Claimed  Portfolio  Content  Category  of  RPS  Procurement

2014 2015 2016 CP  2  Total

Portfolio  Content  Category MWh MWh MWh MWh%  of  Total  RPS  Procurement

RECs  Procured  from  PCC  0  Eligible  Resources 0 0 0 0 0.0%RECs  Procured  from  PCC  1  Eligible  Resources 171,634 467,921 781,561 1,421,116 53.2%RECs  Procured  from  PCC  2  Eligible  Resources 120,282 164,801 311,000 596,083 22.3%RECs  Procured  from  PCC  3  Eligible  Resources 354,703 233,643 68,059 656,405 24.6%

Total 646,619 866,365 1,160,620 2,673,604

2014-­‐16  Compliance  Period

RPS  Procurement  Resource  Mix

This  amount  representstotal  procurement  quantity  requirement  

This  amount  representsquantity  of  RECs  retired  for  this  compliance  period

gmo_404
Oval
Page 8: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Unique  InputsData  Reported  by:

Marin  Clean  Energy  (MCE) Input  Required

August  31,  2018 Actual  Data

Forecasted  Data

Information  is  Hard  Coded

Early  Compliance  Election  (D.17-­‐06-­‐026)  (Yes/No)

LSE  Choice  (Select  One) No

Information  from  the  20%  RPS  Compliance  Program  (MWh) ActualTotal  Retail  Sales  in  2010 91,219Net  Surplus/(Deficit)  from  20%  RPS  Closing  Report 24,543

Retail  Sales  (MWh) 2011 2012 2013 2014 2015 2016        Annual  Retail  Sales 185,493 570,144 1,110,487 1,254,794 1,695,274 2,125,091

Excess  Procurement  Calculation  (MWh)PCC  0  RECs  applied  to  PQRLong-­‐Term  PCC  1  RECs  applied  to  PQRShort-­‐Term  PCC  1  RECs  applied  to  PQRLong-­‐Term  PCC  2  RECs  applied  to  PQRShort-­‐Term  PCC  2  RECs  applied  to  PQRLong-­‐Term  PCC  3  RECs  applied  to  PQRShort-­‐Term  PCC  3  RECs  applied  to  PQRExcess  RECs  Eligible  for  BankingExcess  PCC  0  RECsExcess  PCC  1  RECs          Excess  Long-­‐Term  PCC1  RECs          Excess  Short-­‐Term  PCC1  RECsExcess  PCC  2  RECs

Remaining  Excess  RECs  Eligible  for  Banking  and  Requiring  a  Category  Assignment

Excess  Procurement  Bank  (MWh)PCC  0  BankPCC  1  Bank          Long-­‐Term  PCC1  Bank          Short-­‐Term  PCC1  Bank

PCC  2  BankApplication  of  PCC  0  Banked  RECsApplication  of  PCC  1  Banked  RECs          Application  of  Long-­‐term  PCC1  Banked  RECs          Application  of  Short-­‐Term  PCC1  Banked  RECs

Application  of  PCC  2  Banked  RECsCumulative  PCC  0  BankCumulative  PCC  1  Bank          Cumulative  Long-­‐Term  PCC1  Bank          Cumulative  Short-­‐Term  PCC1  Bank

Cumulative  PCC  2  Bank

Applies  to  Compliance  Period  1  ONLY  Provisional  20%  Closing  ReportNet  Surplus/(Deficit)  from  Provisional  20%  RPS  Closing  ReportPCC  0  RECs  applied  to  PQR  Long-­‐Term  PCC  1  RECs  applied  to  PQRShort-­‐Term  PCC  1  RECs  applied  to  PQRLong-­‐Term  PCC  2  RECs  applied  to  PQRShort-­‐Term  PCC  2  RECs  applied  to  PQRLong-­‐Term  PCC  3  RECs  applied  to  PQRShort-­‐Term  PCC  3  RECs  applied  to  PQRApplication  of  PCC  0  RECs  to  20%  Closing  Report  DeficitApplication  of  Long-­‐term  PCC  1  RECs  to  20%  Closing  Report  DeficitApplication  of  Short-­‐term  PCC  1  RECs  to  20%  Closing  Report  DeficitApplication  of  Long-­‐term  PCC  2  RECs  to  20%  Closing  Report  DeficitApplication  of  Short-­‐term  PCC  2  RECs  to  20%  Closing  Report  DeficitApplication  of  Long-­‐term  PCC  3  RECs  to  20%  Closing  Report  DeficitApplication  of  Short-­‐term  PCC  3  RECs  to  20%  Closing  Report  DeficitCumulative  Closing  Report  Deficit

2014-­‐2016128,998 41,935

2011-­‐2013

0

N/A

41,150145,203 1,001,728

0 0

423,484

101,028 596,083

N/AN/A

0 0

2011-­‐2013 2014-­‐2016

0 0

0 0

656,405

0

0

0 0120,000

N/A N/A

N/A

00

00

0

00

12,0150

20,365

24,543

2011-­‐2013

24,543

00

N/A0 0

N/A

24,543

0 0

0

18,738

0

0 0

0

67,868

N/A

N/AN/A

N/A0 0

N/A

0

Compliance  Period  1 Compliance  Period  2

0 0

24,543

N/A

N/AN/A

N/A0

24,543

Compliance  Period  1 Compliance  Period  2

Page 9: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Unique  InputsData  Reported  by:

Marin  Clean  Energy  (MCE)

August  31,  2018

Early  Compliance  Election  (D.17-­‐06-­‐026)

LSE  Choice  (Select  One)

Information  from  the  20%  RPS  Compliance  Program  (MWh)Total  Retail  Sales  in  2010Net  Surplus/(Deficit)  from  20%  RPS  Closing  Report

Retail  Sales  (MWh)        Annual  Retail  Sales

Excess  Procurement  Calculation  (MWh)PCC  0  RECs  applied  to  PQRLong-­‐Term  PCC  1  RECs  applied  to  PQRShort-­‐Term  PCC  1  RECs  applied  to  PQRLong-­‐Term  PCC  2  RECs  applied  to  PQRShort-­‐Term  PCC  2  RECs  applied  to  PQRLong-­‐Term  PCC  3  RECs  applied  to  PQRShort-­‐Term  PCC  3  RECs  applied  to  PQRExcess  RECs  Eligible  for  BankingExcess  PCC  0  RECsExcess  PCC  1  RECs          Excess  Long-­‐Term  PCC1  RECs          Excess  Short-­‐Term  PCC1  RECsExcess  PCC  2  RECs

Remaining  Excess  RECs  Eligible  for  Banking  and  Requiring  a  Category  Assignment

Excess  Procurement  Bank  (MWh)PCC  0  BankPCC  1  Bank          Long-­‐Term  PCC1  Bank          Short-­‐Term  PCC1  Bank

PCC  2  BankApplication  of  PCC  0  Banked  RECsApplication  of  PCC  1  Banked  RECs          Application  of  Long-­‐term  PCC1  Banked  RECs          Application  of  Short-­‐Term  PCC1  Banked  RECs

Application  of  PCC  2  Banked  RECsCumulative  PCC  0  BankCumulative  PCC  1  Bank          Cumulative  Long-­‐Term  PCC1  Bank          Cumulative  Short-­‐Term  PCC1  Bank

Cumulative  PCC  2  Bank

Applies  to  Compliance  Period  1  ONLY  Provisional  20%  Closing  ReportNet  Surplus/(Deficit)  from  Provisional  20%  RPS  Closing  ReportPCC  0  RECs  applied  to  PQR  Long-­‐Term  PCC  1  RECs  applied  to  PQRShort-­‐Term  PCC  1  RECs  applied  to  PQRLong-­‐Term  PCC  2  RECs  applied  to  PQRShort-­‐Term  PCC  2  RECs  applied  to  PQRLong-­‐Term  PCC  3  RECs  applied  to  PQRShort-­‐Term  PCC  3  RECs  applied  to  PQRApplication  of  PCC  0  RECs  to  20%  Closing  Report  DeficitApplication  of  Long-­‐term  PCC  1  RECs  to  20%  Closing  Report  DeficitApplication  of  Short-­‐term  PCC  1  RECs  to  20%  Closing  Report  DeficitApplication  of  Long-­‐term  PCC  2  RECs  to  20%  Closing  Report  DeficitApplication  of  Short-­‐term  PCC  2  RECs  to  20%  Closing  Report  DeficitApplication  of  Long-­‐term  PCC  3  RECs  to  20%  Closing  Report  DeficitApplication  of  Short-­‐term  PCC  3  RECs  to  20%  Closing  Report  DeficitCumulative  Closing  Report  Deficit

2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 20302,804,277 4,565,481 5,275,252 5,306,098 5,339,682 5,377,627 5,422,939 5,475,612 5,537,608 5,612,312 5,703,594 5,824,555 5,973,371 6,157,925

2017-­‐2020

126,000

0

2,791,9230

3,836,339

1,743,046

Compliance  Period  3

0

0

0

0

0

850,575

2021-­‐2024

0

0

N/A

0

N/A 00

0

00

N/A

0

0

0

0

N/A

N/A

24,543

0

Compliance  Period  4

0N/AN/A

0

N/A0

2017-­‐2020

024,543

00

N/A

24,543

N/A 0

Compliance  Period  32021-­‐2024

0

N/A

850,575N/A

8,580,649687,300

00

Compliance  Period  4

N/A 0

24,543

00

Page 10: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:  Input  RequiredMarin  Clean  Energy  (MCE) Actual  DataAugust  31,  2018  Forecasted  Data

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name 51,525 166,522 364,363 646,619 866,365 1,160,620 1,749,254 2,883,761 2,018,119 1,924,261 2,483,253 2,476,753 2,171,262 2,136,681 2,130,204 2,054,737 1,960,277 1,954,624

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Columbia  Ridge  Landfill  Gas  units  1-­‐8  (60994A)19,801 16,348 7,430 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Nine  Canyon  Wind  (60803A)1,999 0 1,285 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Sierra  Pacific  Burlington  (60596A)17,319 22,890 11,091 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Eurus  Combine  Hills  II  LLC  (60928A)0 0 72,770 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2010 G2  Energy  Hay  Road  LLC  -­‐  Hay  Road  Landfill  (Solano  County,  61205C)0 0 5,964 11,527 11,271 973 11,386 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000 11,000NA 2010 G2  Energy  Ostrom  Road  LLC  -­‐  Ostrom  Road  Landfill  (Yuba  County,  61206A)0 0 3,913 12,713 12,317 11,697 13,595 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000 12,000

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  CEC-­‐Certified  High  Desert  (61409A)6,203 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  Big  Horn  Wind  (60776A)6,203 7,271 13,094 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  Nine  Canyon  Wind  (60803A)0 9,460 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  1  Eligible  (Portfolio)0 0 0 0 2,163 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  1  Eligible:  Cabazon  Wind  Partners  (60736A)0 0 0 2,626 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  1  Eligible:  Roosevelt  Biogas  -­‐  LFG  Phase  2,  Engines  7-­‐9  (60974A)0 0 0 526 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible  (Portfolio)0 0 0 0 5,801 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible:  Juniper  Canyon  (61202A)0 0 0 2,452 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible:  Leaning  Juniper  II  (61200A)0 0 0 2,548 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible:  White  Creek  Wind  1  (60721A)0 0 0 10,282 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2011 Cottonwood  Solar,  LLC  (Goose  Lake  and  Corcoran  generating  facilities)0 0 0 0 44,277 65,691 62,533 62,400 62,400 62,400 62,400 62,400 62,400 62,400 62,400 62,400 62,400 62,400NA 2011 Rio  Solar  1,  LLC 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  PCC1,  LFG  Phase  II  Roosevelt  Biogas  -­‐  LFG  Phase  2,  Engines  7-­‐9  (60974A)0 7,279 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  White  Creek  Wind  1  (60721A)0 57,721 0 30,046 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  Tulloch  Powerhouse  (60071A)0 0 55,262 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  Beardsley  Powerhouse  (60072A)0 0 18,738 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  RPS  Category  1  Eligible  (Portfolio)0 0 0 0 19,000 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  RPS  Category  1  Eligible:  Cabazon  Wind  Partners  (60736A)0 0 0 27,954 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B,  RPS  Category  2  Eligible  -­‐  Juniper  Canyon  (61202A)0 16,000 14,956 13,169 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B,  RPS  Category  2  Eligible  -­‐  Leaning  Juniper  II  (61200A)0 0 34,044 21,831 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 GenPower,  LLC  (Lincoln  Landfill  Power  Plant,  Units  1-­‐6;  61632A)0 4,388 29,009 31,998 26,427 27,591 27,340 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000 27,000NA 2012 RE  Kansas  (Recurrent) 0 0 0 1,437 49,984 53,739 53,386 0 0 0 0 0 0 0 0 0 0 0

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  1  Eligible  (Portfolio)0 0 0 0 43,000 60,000 0 0 0 0 0 0 0 0 0 0 0 0

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  2  Eligible  (Portfolio)0 0 0 0 47,000 51,000 0 0 0 0 0 0 0 0 0 0 0 0

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  2  Eligible:  Leaning  Juniper  II  (61200A)0 0 0 1,668 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  2  Eligible:  Juniper  Canyon  (61202A)0 0 0 8,332 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 Middle  Fork  Irrigation  District  (61383A) 0 10,000 32,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

Page 11: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:  Input  RequiredMarin  Clean  Energy  (MCE) Actual  DataAugust  31,  2018  Forecasted  Data

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name 51,525 166,522 364,363 646,619 866,365 1,160,620 1,749,254 2,883,761 2,018,119 1,924,261 2,483,253 2,476,753 2,171,262 2,136,681 2,130,204 2,054,737 1,960,277 1,954,624

NA 2012 OneEnergy  -­‐  RPS  Confirm  #1  -­‐  Total  Energy  Facility  (TEF-­‐GEN  1;  60633A)0 12,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy  -­‐  RPS  Confirm  #1  -­‐  Puente  Hills  Gas-­‐to-­‐Energy  Facility  Phase  II  Gen3  (60632A)0 3,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Birch  Creek  Power  (61378A) 0 0 5,802 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Double  A  Dairy  Digester  (61221A)0 0 6,213 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Dry  Creek  Project  (61381A) 0 0 466 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Falls  Creek  Hydro  (61375A) 0 0 12,039 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Glenrock  III  (60804A) 0 0 704 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Goodnoe  Hills  (60819A) 0 0 1,114 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  High  Plains  (60899A) 0 0 1,005 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Marsh  Valley  Project  (61380A) 0 0 924 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Mountain  Air  Wind  Project  (62314A)0 0 18,747 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Nine  Canyon  Phase  3  (60803A)0 0 1,285 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Pilgrim  Stage  Station  Wind  Park  (60923A)0 0 1,609 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Rolling  Hills  (60806A) 0 0 1,259 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Thousand  Springs  Wind  Park  (60925A)0 0 6,078 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Tuana  Gulch  Wind  Park  (60924A)0 0 4,869 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Wolverine  Creek  (60564A) 0 0 886 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2012 San  Rafael  Airport  Solar  Partners,  LLC  (MCE  FIT,  62237A),  PCC10 165 1,807 1,527 1,698 1,631 1,451 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650 1,650NA 2013 Calpine  Geysers  -­‐  Short  Term:  Calpine  Geothermal  Unit  #17  (60007A)0 0 0 26,280 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2014 Calpine  Geysers  -­‐  Short  Term  #2:  Calpine  Geothermal  Unit  #18  (60008A)0 0 0 25,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2013 Calpine  Geysers  -­‐  Long  Term 0 0 0 0 0 0 87,600 88,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000 88,000 0 0

NA 2014 Exelon  Generation  Company,  LLC  -­‐  Short  Term  PCC2b 0 0 0 0 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2014 Exelon  Generation  Company,  LLC  -­‐  Short  Term  PCC2a:  Alta  10  (62244A)0 0 0 60,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Confirm  #3 0 0 0 0 86,967 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Campbell  Hill  -­‐  Three  Buttes  (61017A)0 0 0 16,352 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Campbell  Hill  -­‐  Dunlap  1  (61188A)0 0 0 3,513 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Glenrock  I  (60805A) 0 0 0 10,693 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Glenrock  III  (60804A) 0 0 0 4,210 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Golden  Valley  Wind  Park  (60917A)0 0 0 9,688 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Goodnoe  Hills  (60819A) 0 0 0 1,491 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Hay  Canyon  (60724A) 0 0 0 3,203 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  High  Plains  (60899A) 0 0 0 2,778 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Klondike  Wind  Power  III  LLC  (60602A)0 0 0 8,113 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Marengo  (60729A) 0 0 0 2,163 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Marengo  2  (60730A) 0 0 0 1,047 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  McFadden  Ridge  (60896A) 0 0 0 3,448 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Milner  Dam  Wind  Park  (60919A)0 0 0 1,676 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Mountain  Air  Wind  Project  (62314A)0 0 0 18,439 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Palouse  Wind  (62288A) 0 0 0 2,158 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Rolling  Hills  (60806A) 0 0 0 9,745 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Seven  Mile  Hill  1  (60807A) 0 0 0 7,335 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Seven  Mile  Hill  2  (60808A) 0 0 0 777 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Top  of  the  World  (61199A) 0 0 0 8,639 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Wild  Horse  (60746A) 0 0 0 23,035 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Wolverine  Creek  (60564A) 0 0 0 1,458 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Yahoo  Creek  Wind  Park  (60926A)0 0 0 39 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 Puget  Sound  Energy  -­‐  RPS  Eligible,  Short-­‐Term  Bucket  3:  Wild  Horse  (60746A)0 0 0 167,203 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Hopkins  Ridge  (60745A) 0 0 0 7,500 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Lower  Snake  River  (62044A) 0 0 0 15,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  RPS  Category  2  Eligible  (Portfolio)0 0 0 0 12,000 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2014 RE  Mustang  4  LLC 0 0 0 0 0 0 0 86,000 86,000 86,000 86,000 86,000 86,000 86,000 86,000 86,000 86,000 86,000NA 2014 Rising  Tree  Wind  Farm  III,  LLC,  PCC1 0 0 0 0 166,662 297,919 335,562 338,000 0 0 0 0 0 0 0 0 0 0NA 2014 Cooley-­‐Quarry  1  (MCE  FIT),  PCC1 0 0 0 0 0 0 869 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800NA 2015 East  Bay  Municipal  Utility  District  (Pardee,    60536A  and  Comanche  Reservoirs,  60535A)0 0 0 0 13,646 143,747 244,563 168,200 70,000 70,000 70,000 70,000 70,000 70,000 70,000 0 0 0

Page 12: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:  Input  RequiredMarin  Clean  Energy  (MCE) Actual  DataAugust  31,  2018  Forecasted  Data

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name 51,525 166,522 364,363 646,619 866,365 1,160,620 1,749,254 2,883,761 2,018,119 1,924,261 2,483,253 2,476,753 2,171,262 2,136,681 2,130,204 2,054,737 1,960,277 1,954,624

NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Wild  Horse  Phase  II  (60746A) 0 0 0 25,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2015 Calpine  Geysers  -­‐  Short  Term  #3:  Geothermal 0 0 0 0 27,244 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2015 Cedar  Creek  RECs,  LLC  -­‐  RPS  Category  3  Eligible 0 0 0 0 125,000 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2015 Direct  Energy  -­‐  RPS  Category  1  Eligible  (Portfolio,  small  hydro)0 0 0 0 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2014 WM  Renewable  Energy,  L.L.C.  (Redwood  Landfill) 0 0 0 0 0 0 14,391 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000 30,000NA 2017 MCE  SolarOne,  PCC1  (sPower,  2  facilities  -­‐  2.0  MW  +  8.5  MW)0 0 0 0 0 0 0 11,000 14,000 18,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000 21,000NA 2015 Cooley-­‐Quarry  2  (MCE  FIT),  PCC1 0 0 0 0 0 0 0 900 900 900 900 900 900 900 900 900 900 900NA 2015 Cost-­‐Plus  (MCE  FIT),  PCC1 0 0 0 0 0 113 525 450 450 450 450 450 450 450 450 450 450 450NA 2016 Avangrid  Renewables,  LLC  (Shiloh  I  Wind  Project) 0 0 0 0 0 43,449 58,465 75,000 0 0 0 0 0 0 0 0 0 0

NA 2016 Parrey,  LLC  (61841C) 0 0 0 0 0 74,018 0 0 0 0 0 0 0 0 0 0 0 0

NA 2016 3Phases,  PCC2  (Cedar  Creek  Wind  Energy,  60822A;  and  Cedar  Creek  II,  61384A)  -­‐  Confirmation  #20 0 0 0 0 140,000 0 0 0 0 0 0 0 0 0 0 0 0

NA 2016 Portland  General  Electric  Company,  PCC2  (Portfolio  Supply  Agreement)0 0 0 0 0 120,000 0 0 0 0 0 0 0 0 0 0 0 0NA 2016 Los  Angeles  County,  Sanitation  District  No.  2,  PCC3  -­‐  Confirmation  #10 0 0 0 0 68,059 0 0 0 0 0 0 0 0 0 0 0 0NA 2016 Los  Angeles  County,  Sanitation  District  No.  2,  PCC3  -­‐  Confirmation  #20 0 0 0 0 0 90,000 0 0 0 0 0 0 0 0 0 0 0

NA 2016 Powerex,  PCC2  (Portfolio  Supply  Agreement) 0 0 0 0 0 0 25,000 75,000 125,000 0 0 0 0 0 0 0 0 0

NA 2016 Powerex,  PCC1  (Portfolio  Supply  Agreement) 0 0 0 0 0 0 60,000 0 0 0 0 0 0 0 0 0 0 0

NA 2016 3Phases,  PCC2  (Cedar  Creek  Wind  Energy,  60822A;  and  Cedar  Creek  II,  61384A)  -­‐  Confirmation  #30 0 0 0 0 0 85,000 0 0 0 0 0 0 0 0 0 0 0

NA 2015 3Phases,  PCC2  (Cedar  Creek  Wind  Energy,  60822A;  and  Cedar  Creek  II,  61384A)  -­‐  Confirmation  #10 0 0 0 50,000 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2015 Rising  Tree  Wind  Farm,  PCC3 0 0 0 0 2,676 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2015 3Degrees,  PCC3 0 0 0 0 19,000 0 0 0 0 0 0 0 0 0 0 0 0 0

NA 2011 Western  Area  Power  Administration 0 0 0 0 232 449 674 200 200 0 0 0 0 0 0 0 0 0

NA 2016 City  of  Santa  Clara,  Silicon  Valley  Power,  PCC1 0 0 0 0 0 0 200,000 0 0 0 0 0 0 0 0 0 0 0NA 2015 Northshore  Solar  Partners  LLC  (Freethy  #1,  MCE  FIT),  PCC1 0 0 0 0 0 260 1,821 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800NA 2015 Northshore  Solar  Partners  LLC  (Freethy  #2,  MCE  FIT),  PCC1 0 0 0 0 0 284 1,827 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800 1,800

NA 2016 3Phases,  PCC2  (Portfolio  Supply  Agreement) 0 0 0 0 0 0 234,954 0 0 0 0 0 0 0 0 0 0 0

NA 2016 3Phases,  PCC2  (Portfolio  Supply  Agreement) 0 0 0 0 0 0 53,092 0 0 0 0 0 0 0 0 0 0 0

NA 2017 3Phases,  PCC2  (Portfolio  Supply  Agreement) 0 0 0 0 0 0 0 150,000 160,000 0 0 0 0 0 0 0 0 0

NA 2016 Powerex,  PCC2  (Portfolio  Supply  Agreement) 0 0 0 0 0 0 30,000 0 0 0 0 0 0 0 0 0 0 0

NA 2016 NextEra  Energy  Power  Marketing,  LLC,  PCC1  (Blythe  Solar,  various  units)0 0 0 0 0 0 200,000 0 0 0 0 0 0 0 0 0 0 0NA 2016 Great  Valley  Solar  I,  PCC1 0 0 0 0 0 0 0 249,000 290,000 289,000 288,000 287,000 287,000 286,000 285,000 284,000 283,000 282,000NA 2016 Desert  Harvest,  LLC,  PCC1 0 0 0 0 0 0 0 0 0 10,000 261,597 260,289 258,981 257,673 256,365 255,057 253,749 252,441NA 2016 Little  Bear  Solar  1,  LLC,  PCC  1 0 0 0 0 0 0 0 0 0 27,000 110,000 109,000 108,000 108,000 107,000 107,000 106,000 106,000NA 2016 Little  Bear  Solar  3,  LLC,  PCC  1 0 0 0 0 0 0 0 0 0 13,688 54,476 54,202 53,928 53,655 53,381 53,107 52,833 52,560NA 2016 Little  Bear  Solar  4,  LLC,  PCC  1 0 0 0 0 0 0 0 0 0 34,000 136,190 135,505 134,821 134,137 133,452 132,768 132,084 131,399NA 2016 Little  Bear  Solar  5,  LLC,  PCC  1 0 0 0 0 0 0 0 0 0 34,219 136,190 135,505 134,821 134,137 133,452 132,768 132,084 131,399NA 2016 Antelope  Expansion  2,  LLC,  PCC  1 0 0 0 0 0 0 0 0 312,698 311,134 309,579 308,031 306,490 304,958 303,433 301,916 300,406 298,904NA 2016 Voyager  Wind  II,  LLC,  PCC  1 0 0 0 0 0 0 0 0 138,000 138,000 138,000 138,000 138,000 138,000 138,000 138,000 138,000 138,000

NA 2016 TGP  Energy  Management,  LLC,  PCC  1 0 0 0 0 0 0 0 300,000 300,000 300,000 300,000 300,000 0 0 0 0 0 0NA 2016 Los  Banos  Wind,  LLC,  PCC  1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0NA 2011 Cottonwood  Solar  -­‐  Marin  Carport  (PCC1,  Long-­‐Term,  Local) 0 0 0 0 0 0 1,220 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600 1,600

NA 2017 Exelon  Generation  Company  (PCC1,  ST  SALE) 0 0 0 0 0 0 -­‐150,000 0 0 0 0 0 0 0 0 0 0 0

Page 13: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:  Input  RequiredMarin  Clean  Energy  (MCE) Actual  DataAugust  31,  2018  Forecasted  Data

2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name 51,525 166,522 364,363 646,619 866,365 1,160,620 1,749,254 2,883,761 2,018,119 1,924,261 2,483,253 2,476,753 2,171,262 2,136,681 2,130,204 2,054,737 1,960,277 1,954,624

NA 2017 Lancaster  Choice  Energy  (PCC1,  ST  SALE) 0 0 0 0 0 0 -­‐11,000 0 0 0 0 0 0 0 0 0 0 0

NA 2017 Apple  Valley  Choice  Energy  (PCC1,  ST  SALE) 0 0 0 0 0 0 -­‐15,000 0 0 0 0 0 0 0 0 0 0 0

NA 2017 Portland  General  Electric  Company  (PCC2,  ST) 0 0 0 0 0 0 30,000 0 0 0 0 0 0 0 0 0 0 0

NA 2017 PowerEx  April-­‐Dec  2018_PCC1 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 0 0 0

NA 2017 PowerEx  Jan-­‐Dec  2018_PCC2 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 0 0 0

NA 2017 PowerEX  Jan-­‐Dec  2019_PCC2 0 0 0 0 0 0 0 0 75,000 0 0 0 0 0 0 0 0 0

NA 2017 PowerEx  Jan2019-­‐Dec  2020_PCC1 0 0 0 0 0 0 0 0 50,000 25,000 0 0 0 0 0 0 0 0

NA 2017 Morgan  Stanley  Apr  2018-­‐Dec  2020_PCC1 0 0 0 0 0 0 0 75,000 75,000 75,000 0 0 0 0 0 0 0 0

NA 2017 NextEra  Apr-­‐Dec  2018_PCC1 0 0 0 0 0 0 0 27,000 0 0 0 0 0 0 0 0 0 0NA 2017 Energy  Finance  Associates  (Dec  2018-­‐Dec  2028_PCC1,  Marin  HQ)0 0 0 0 0 0 0 200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,200 1,000

NA 2017 NextEra  Jan  2019  -­‐  Dec  2023_PCC1 0 0 0 0 0 0 0 0 29,100 29,100 29,100 29,100 29,100 0 0 0 0 0

NA 2018 ConEd  (Lost  Hills)  May  2018-­‐Dec  2019_PCC1 0 0 0 0 0 0 0 37,000 50,000 0 0 0 0 0 0 0 0 0

NA 2018 SVP  Apr-­‐Dec2018_PCC1 0 0 0 0 0 0 0 100,000 0 0 0 0 0 0 0 0 0 0

NA 2018 Portland  General  Electric  Jan-­‐Dec2018_PCC2 0 0 0 0 0 0 0 150,000 0 0 0 0 0 0 0 0 0 0

NA 2018 Portland  General  Electric  Jan-­‐Dec2018_PCC2_2 0 0 0 0 0 0 0 150,000 0 0 0 0 0 0 0 0 0 0

NA 2017 Xcel  Jan-­‐Dec  2018_PCC2 0 0 0 0 0 0 0 250,000 0 0 0 0 0 0 0 0 0 0

NA 2018 Xcel  Jan-­‐Dec  2018_PCC2_2 0 0 0 0 0 0 0 50,000 0 0 0 0 0 0 0 0 0 0NA 2018 Oakley  RV  &  Boat  Storage  July  2018-­‐July  2038_PCC1 0 0 0 0 0 0 0 761 1,521 1,521 1,521 1,521 1,521 1,521 1,521 1,521 1,521 1,521NA 2018 BayWa  Strauss  Wind  Project  April  2020-­‐April  2035_PCC1 0 0 0 0 0 0 0 0 0 221,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000 300,000

NA 2018 STX  P-­‐STX_PCC3  (2018) 0 0 0 0 0 0 0 36,000 0 0 0 0 0 0 0 0 0 0

NA 2018 3Phases  Jul-­‐Dec2018_PCC1 0 0 0 0 0 0 0 115,000 0 0 0 0 0 0 0 0 0 0

Page 14: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Columbia  Ridge  Landfill  Gas  units  1-­‐8  (60994A)

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Nine  Canyon  Wind  (60803A)

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Sierra  Pacific  Burlington  (60596A)

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Eurus  Combine  Hills  II  LLC  (60928A)NA 2010 G2  Energy  Hay  Road  LLC  -­‐  Hay  Road  Landfill  (Solano  County,  61205C)NA 2010 G2  Energy  Ostrom  Road  LLC  -­‐  Ostrom  Road  Landfill  (Yuba  County,  61206A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  CEC-­‐Certified  High  Desert  (61409A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  Big  Horn  Wind  (60776A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  Nine  Canyon  Wind  (60803A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  1  Eligible  (Portfolio)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  1  Eligible:  Cabazon  Wind  Partners  (60736A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  1  Eligible:  Roosevelt  Biogas  -­‐  LFG  Phase  2,  Engines  7-­‐9  (60974A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible  (Portfolio)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible:  Juniper  Canyon  (61202A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible:  Leaning  Juniper  II  (61200A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible:  White  Creek  Wind  1  (60721A)NA 2011 Cottonwood  Solar,  LLC  (Goose  Lake  and  Corcoran  generating  facilities)NA 2011 Rio  Solar  1,  LLC

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  PCC1,  LFG  Phase  II  Roosevelt  Biogas  -­‐  LFG  Phase  2,  Engines  7-­‐9  (60974A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  White  Creek  Wind  1  (60721A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  Tulloch  Powerhouse  (60071A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  Beardsley  Powerhouse  (60072A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  RPS  Category  1  Eligible  (Portfolio)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  RPS  Category  1  Eligible:  Cabazon  Wind  Partners  (60736A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B,  RPS  Category  2  Eligible  -­‐  Juniper  Canyon  (61202A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B,  RPS  Category  2  Eligible  -­‐  Leaning  Juniper  II  (61200A)NA 2012 GenPower,  LLC  (Lincoln  Landfill  Power  Plant,  Units  1-­‐6;  61632A)NA 2012 RE  Kansas  (Recurrent)

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  1  Eligible  (Portfolio)

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  2  Eligible  (Portfolio)

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  2  Eligible:  Leaning  Juniper  II  (61200A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  2  Eligible:  Juniper  Canyon  (61202A)NA 2012 Middle  Fork  Irrigation  District  (61383A)

2029 2030

1,947,180 1,941,743

0 0 executed  -­‐  no  approval  neededonline Landfill  Gas PCC  0 Short-­‐term 5 Bundled Arlington Oregon

0 0 executed  -­‐  no  approval  neededonline Wind PCC  0 Short-­‐term 5 Bundled Kennewick Washington

0 0 executed  -­‐  no  approval  neededonline Biomass PCC  0 Short-­‐term 5 Bundled Mt.  Vernon Washington

0 0 executed  -­‐  no  approval  neededonline Wind PCC  0 Short-­‐term 5 Bundled Milton-­‐Freewater Oregon11,000 11,000 executed  -­‐  no  approval  neededonline Landfill  Gas PCC  1 Long-­‐term 20 Bundled Vacaville California12,000 12,000 executed  -­‐  no  approval  neededonline Landfill  Gas PCC  1 Long-­‐term 18 Bundled Wheatland California

0 0 executed  -­‐  no  approval  neededonlineBiomethane:  Digester  gas   PCC  1 Short-­‐term 4 Bundled Victorville California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 4 Bundled Bickleton Washington

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 4 Bundled Highland Washington

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term 4 Bundled Various Various

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term 4 Bundled Cabazon California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term 4 Bundled Roosevelt Washington

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 4 Bundled Various Out  of  State

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 4 Bundled Bickleton Washington

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 4 Bundled Arlington Oregon

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 4 Bundled Roosevelt Washington62,400 62,400 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Long-­‐term 20+ Bundled Various California

0 0 contract  terminatedn/a  -­‐  contract  terminatedSolar  PV PCC  1 Long-­‐term Bundled Bakersfield California

0 0 executed  -­‐  no  approval  neededonline Landfill  Gas PCC  1 Short-­‐term 3 Bundled Roosevelt Washington

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term 3 Bundled Roosevelt Washington

0 0 executed  -­‐  no  approval  neededonline Small  Hydro PCC  1 Short-­‐term 3 Bundled Knights  Ferry California

0 0 executed  -­‐  no  approval  neededonline Small  Hydro PCC  1 Short-­‐term 3 Bundled Strawberry California

0 0 executed  -­‐  no  approval  neededonline Landfill  Gas PCC  1 Short-­‐term 3 Bundled Various Various

0 0 executed  -­‐  no  approval  neededonline Landfill  Gas PCC  1 Short-­‐term 3 Bundled Cabazon California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 3 Bundled Bickleton Washington

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 3 Bundled Arlington Oregon27,000 27,000 executed  -­‐  no  approval  neededonline Landfill  Gas PCC  1 Long-­‐term 20 Bundled Lincoln California

0 0 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Short-­‐term 3 Bundled Stratford California

0 0 executed  -­‐  no  approval  neededonline Landfill  Gas PCC  1 Short-­‐term 3 Bundled Various Various

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 3 Bundled Various Out  of  State

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 3 Bundled Arlington Oregon

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 3 Bundled Bickleton Washington0 0 executed  -­‐  no  approval  neededonline Small  Hydro PCC  3 Short-­‐term 2 Unbundled Parkdale Oregon

Contract  Lenth  (Years)

Bundled/  Unbundled Facility  Location  (City) Facility  Location  (State)Contract  Status Facility  Status Resource  Type Expected  PCC  Classification Contract  Length

Page 15: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name

NA 2012 OneEnergy  -­‐  RPS  Confirm  #1  -­‐  Total  Energy  Facility  (TEF-­‐GEN  1;  60633A)NA 2012 OneEnergy  -­‐  RPS  Confirm  #1  -­‐  Puente  Hills  Gas-­‐to-­‐Energy  Facility  Phase  II  Gen3  (60632A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Birch  Creek  Power  (61378A)

NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Double  A  Dairy  Digester  (61221A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Dry  Creek  Project  (61381A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Falls  Creek  Hydro  (61375A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Glenrock  III  (60804A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Goodnoe  Hills  (60819A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  High  Plains  (60899A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Marsh  Valley  Project  (61380A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Mountain  Air  Wind  Project  (62314A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Nine  Canyon  Phase  3  (60803A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Pilgrim  Stage  Station  Wind  Park  (60923A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Rolling  Hills  (60806A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Thousand  Springs  Wind  Park  (60925A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Tuana  Gulch  Wind  Park  (60924A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Wolverine  Creek  (60564A)NA 2012 San  Rafael  Airport  Solar  Partners,  LLC  (MCE  FIT,  62237A),  PCC1NA 2013 Calpine  Geysers  -­‐  Short  Term:  Calpine  Geothermal  Unit  #17  (60007A)

NA 2014 Calpine  Geysers  -­‐  Short  Term  #2:  Calpine  Geothermal  Unit  #18  (60008A)NA 2013 Calpine  Geysers  -­‐  Long  Term

NA 2014 Exelon  Generation  Company,  LLC  -­‐  Short  Term  PCC2b

NA 2014 Exelon  Generation  Company,  LLC  -­‐  Short  Term  PCC2a:  Alta  10  (62244A)NA 2014 OneEnergy  -­‐  RPS  Confirm  #3NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Campbell  Hill  -­‐  Three  Buttes  (61017A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Campbell  Hill  -­‐  Dunlap  1  (61188A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Glenrock  I  (60805A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Glenrock  III  (60804A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Golden  Valley  Wind  Park  (60917A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Goodnoe  Hills  (60819A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Hay  Canyon  (60724A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  High  Plains  (60899A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Klondike  Wind  Power  III  LLC  (60602A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Marengo  (60729A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Marengo  2  (60730A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  McFadden  Ridge  (60896A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Milner  Dam  Wind  Park  (60919A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Mountain  Air  Wind  Project  (62314A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Palouse  Wind  (62288A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Rolling  Hills  (60806A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Seven  Mile  Hill  1  (60807A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Seven  Mile  Hill  2  (60808A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Top  of  the  World  (61199A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Wild  Horse  (60746A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Wolverine  Creek  (60564A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Yahoo  Creek  Wind  Park  (60926A)NA 2014 Puget  Sound  Energy  -­‐  RPS  Eligible,  Short-­‐Term  Bucket  3:  Wild  Horse  (60746A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Hopkins  Ridge  (60745A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Lower  Snake  River  (62044A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  RPS  Category  2  Eligible  (Portfolio)NA 2014 RE  Mustang  4  LLCNA 2014 Rising  Tree  Wind  Farm  III,  LLC,  PCC1NA 2014 Cooley-­‐Quarry  1  (MCE  FIT),  PCC1NA 2015 East  Bay  Municipal  Utility  District  (Pardee,    60536A  and  Comanche  Reservoirs,  60535A)

2029 2030

1,947,180 1,941,743

Contract  Lenth  (Years)

Bundled/  Unbundled Facility  Location  (City) Facility  Location  (State)Contract  Status Facility  Status Resource  Type Expected  PCC  Classification Contract  Length

0 0 executed  -­‐  no  approval  neededonlineBiomethane:  Digester  gas   PCC  3 Short-­‐term 2 Unbundled Carson California

0 0 executed  -­‐  no  approval  neededonline Landfill  Gas PCC  3 Short-­‐term 2 Unbundled City  of  Industry California0 0 executed  -­‐  no  approval  neededonline Small  Hydro PCC  3 Short-­‐term 2 Unbundled Monteview Idaho

0 0 executed  -­‐  no  approval  neededonlineBiomethane:  Digester  gas   PCC  3 Short-­‐term 2 Unbundled Jerome Idaho

0 0 executed  -­‐  no  approval  neededonline Small  Hydro PCC  3 Short-­‐term 2 Unbundled Howe Idaho0 0 executed  -­‐  no  approval  neededonline Small  Hydro PCC  3 Short-­‐term 2 Unbundled Outside  Cascadia Oregon0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 1 Unbundled Glenrock Wyoming0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 1 Unbundled Goldendale Washington0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 1 Unbundled Rock  River Wyoming0 0 executed  -­‐  no  approval  neededonline Small  Hydro PCC  3 Short-­‐term 2 Unbundled McCammon Idaho0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 1 Unbundled Glenns  Ferry Idaho0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 1 Unbundled Kennewick Washington0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 2 Unbundled Hagerman Idaho0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 1 Unbundled Glenrock Wyoming0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 2 Unbundled Hagerman Idaho0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 2 Unbundled Hagerman Idaho0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 1 Unbundled Bingham  County Idaho

1,650 1,650 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Long-­‐term 20 Bundled San  Rafael California0 0 executed  -­‐  no  approval  neededonline Geothermal PCC  1 Short-­‐term 1 Bundled Middletown California

0 0 executed  -­‐  no  approval  neededonline Geothermal PCC  1 Short-­‐term Less  than  1 Bundled Middletown California0 0 executed  -­‐  no  approval  neededonline Geothermal PCC  1 Long-­‐term 10 Bundled Middletown California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term Less  than  1 Bundled Various Washington

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term Less  than  1 Bundled Mojave California0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Various Various0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Glenrock Wyoming0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Medicine  Bow Wyoming0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Glenrock Wyoming0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Glenrock Wyoming0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Burley Idaho0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Goldendale Washington0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Moro Oregon0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Rock  River Wyoming0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Wasco Oregon0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Dayton Washington0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Dayton Washington0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Rock  River Wyoming0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Burley Idaho0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Glenns  Ferry Idaho0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Oakesdale Washington0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Glenrock Wyoming0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Medicine  Bow Wyoming0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Medicine  Bow Wyoming0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Glenrock Wyoming0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Ellensburg Washington0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Bingham  County Idaho0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Hagerman Idaho0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term Less  than  1 Unbundled Ellensburg Washington0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Dayton Washington0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Pomeroy Washington

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 3 Bundled Various Various86,000 86,000 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Long-­‐term 15 Bundled Lemoore California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term 4 Bundled Mojave California1,800 1,800 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Long-­‐term 20 Bundled Novato California0 0 executed  -­‐  no  approval  neededonline Small  Hydro PCC  1 Long-­‐term 10 Bundled Valley  Springs  (Pardee)  and  Clements  (Camanche)California

Page 16: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name

NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Wild  Horse  Phase  II  (60746A)

NA 2015 Calpine  Geysers  -­‐  Short  Term  #3:  GeothermalNA 2015 Cedar  Creek  RECs,  LLC  -­‐  RPS  Category  3  Eligible

NA 2015 Direct  Energy  -­‐  RPS  Category  1  Eligible  (Portfolio,  small  hydro)

NA 2014 WM  Renewable  Energy,  L.L.C.  (Redwood  Landfill)NA 2017 MCE  SolarOne,  PCC1  (sPower,  2  facilities  -­‐  2.0  MW  +  8.5  MW)NA 2015 Cooley-­‐Quarry  2  (MCE  FIT),  PCC1NA 2015 Cost-­‐Plus  (MCE  FIT),  PCC1NA 2016 Avangrid  Renewables,  LLC  (Shiloh  I  Wind  Project)

NA 2016 Parrey,  LLC  (61841C)

NA 2016 3Phases,  PCC2  (Cedar  Creek  Wind  Energy,  60822A;  and  Cedar  Creek  II,  61384A)  -­‐  Confirmation  #2

NA 2016 Portland  General  Electric  Company,  PCC2  (Portfolio  Supply  Agreement)NA 2016 Los  Angeles  County,  Sanitation  District  No.  2,  PCC3  -­‐  Confirmation  #1NA 2016 Los  Angeles  County,  Sanitation  District  No.  2,  PCC3  -­‐  Confirmation  #2

NA 2016 Powerex,  PCC2  (Portfolio  Supply  Agreement)

NA 2016 Powerex,  PCC1  (Portfolio  Supply  Agreement)

NA 2016 3Phases,  PCC2  (Cedar  Creek  Wind  Energy,  60822A;  and  Cedar  Creek  II,  61384A)  -­‐  Confirmation  #3

NA 2015 3Phases,  PCC2  (Cedar  Creek  Wind  Energy,  60822A;  and  Cedar  Creek  II,  61384A)  -­‐  Confirmation  #1NA 2015 Rising  Tree  Wind  Farm,  PCC3NA 2015 3Degrees,  PCC3

NA 2011 Western  Area  Power  Administration

NA 2016 City  of  Santa  Clara,  Silicon  Valley  Power,  PCC1NA 2015 Northshore  Solar  Partners  LLC  (Freethy  #1,  MCE  FIT),  PCC1NA 2015 Northshore  Solar  Partners  LLC  (Freethy  #2,  MCE  FIT),  PCC1

NA 2016 3Phases,  PCC2  (Portfolio  Supply  Agreement)

NA 2016 3Phases,  PCC2  (Portfolio  Supply  Agreement)

NA 2017 3Phases,  PCC2  (Portfolio  Supply  Agreement)

NA 2016 Powerex,  PCC2  (Portfolio  Supply  Agreement)

NA 2016 NextEra  Energy  Power  Marketing,  LLC,  PCC1  (Blythe  Solar,  various  units)NA 2016 Great  Valley  Solar  I,  PCC1NA 2016 Desert  Harvest,  LLC,  PCC1NA 2016 Little  Bear  Solar  1,  LLC,  PCC  1NA 2016 Little  Bear  Solar  3,  LLC,  PCC  1NA 2016 Little  Bear  Solar  4,  LLC,  PCC  1NA 2016 Little  Bear  Solar  5,  LLC,  PCC  1NA 2016 Antelope  Expansion  2,  LLC,  PCC  1NA 2016 Voyager  Wind  II,  LLC,  PCC  1

NA 2016 TGP  Energy  Management,  LLC,  PCC  1NA 2016 Los  Banos  Wind,  LLC,  PCC  1NA 2011 Cottonwood  Solar  -­‐  Marin  Carport  (PCC1,  Long-­‐Term,  Local)

NA 2017 Exelon  Generation  Company  (PCC1,  ST  SALE)

2029 2030

1,947,180 1,941,743

Contract  Lenth  (Years)

Bundled/  Unbundled Facility  Location  (City) Facility  Location  (State)Contract  Status Facility  Status Resource  Type Expected  PCC  Classification Contract  Length

0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 3 Unbundled Ellensburg Washington

0 0 executed  -­‐  no  approval  neededonline Geothermal PCC  1 Short-­‐term Less  than  1 Bundled Middletown California0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 1 Unbundled Various In  WECC

0 0 executed  -­‐  no  approval  neededonline Small  Hydro PCC  1 Short-­‐term Less  than  1 Bundled Various California

30,000 30,000 executed  -­‐  no  approval  neededonlineBiomethane:  Landfill  gas   PCC  1 Long-­‐term 20 Bundled Novato California

21,000 21,000 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Long-­‐term 20 Bundled Richmond California900 900 executed  -­‐  no  approval  neededunder  development  -­‐  on  scheduleSolar  PV PCC  1 Long-­‐term 20 Bundled Novato California450 450 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Long-­‐term 20 Bundled Larkspur California0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term 3 Bundled Rio  Vista California

0 0 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Short-­‐term Less  than  1 Bundled Lemoore California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term Less  than  1 Bundled Grover  and  New  Raymer Colorado

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term Less  than  1 Bundled Various Oregon  and  Washington0 0 executed  -­‐  no  approval  neededonline Digester  Gas PCC  3 Short-­‐term Less  than  1 Unbundled Various California0 0 executed  -­‐  no  approval  neededonline Digester  Gas PCC  3 Short-­‐term 1 Unbundled Various California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 3 Bundled Various Various

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term 1 Bundled Various Various

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term Less  than  1 Bundled Grover  and  New  Raymer Colorado

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term Less  than  1 Bundled Grover  and  New  Raymer Colorado0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 1 Unbundled Mojave California0 0 executed  -­‐  no  approval  neededonline Wind PCC  3 Short-­‐term 1 Unbundled Various Oregon  and  Idaho

0 0 executed  -­‐  no  approval  neededonline Small  Hydro PCC  1 Short-­‐term 5 Bundled Various California

0 0 executed  -­‐  no  approval  neededonline Geothermal PCC  1 Short-­‐term 1 Bundled Various California1,800 1,800 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Long-­‐term 20 Bundled Richmond California1,800 1,800 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Long-­‐term 20 Bundled Richmond California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 1 bundled Grover  and  New  Raymer Colorado

0 0 executed  -­‐  no  approval  neededonline Geothermal PCC  2 Short-­‐term 1 bundled Union  and  Vale Oregon

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 2 bundled TBD  -­‐  Portfolio  Supply TBD  -­‐  Portfolio  Supply

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 1 Bundled TBD  -­‐  Portfolio  Supply TBD  -­‐  Portfolio  Supply

0 0 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Short-­‐term 1 Bundled Blythe California281,000 280,000 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Long-­‐term 15 Bundled Fresno  (County) California251,133 249,825 executed  -­‐  no  approval  neededunder  development  -­‐  on  scheduleSolar  PV PCC  1 Long-­‐term 20 Bundled Riverside  (County) California105,000 105,000 executed  -­‐  no  approval  neededunder  development  -­‐  on  scheduleSolar  PV PCC  1 Long-­‐term 20 Bundled Mendota California52,286 52,012 executed  -­‐  no  approval  neededunder  development  -­‐  on  scheduleSolar  PV PCC  1 Long-­‐term 20 Bundled Mendota California130,715 130,031 executed  -­‐  no  approval  neededunder  development  -­‐  on  scheduleSolar  PV PCC  1 Long-­‐term 20 Bundled Mendota California130,715 130,031 executed  -­‐  no  approval  neededunder  development  -­‐  on  scheduleSolar  PV PCC  1 Long-­‐term 20 Bundled Mendota California297,410 295,923 executed  -­‐  no  approval  neededunder  development  -­‐  on  scheduleSolar  PV PCC  1 Long-­‐term 20 Bundled Lancaster California138,000 138,000 executed  -­‐  no  approval  neededunder  development  -­‐  on  scheduleWind PCC  1 Long-­‐term 12 Bundled Mojave California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term 5 Bundled Various California0 0 Contract  terminatedN/A  -­‐  contract  terminatedWind PCC  1 Long-­‐term 12 Bundled Los  Banos California

1,600 1,600 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Long-­‐term Bundled Novato California

0 0 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Short-­‐term Less  than  1 Bundled Various Various

Page 17: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name

NA 2017 Lancaster  Choice  Energy  (PCC1,  ST  SALE)

NA 2017 Apple  Valley  Choice  Energy  (PCC1,  ST  SALE)

NA 2017 Portland  General  Electric  Company  (PCC2,  ST)

NA 2017 PowerEx  April-­‐Dec  2018_PCC1

NA 2017 PowerEx  Jan-­‐Dec  2018_PCC2

NA 2017 PowerEX  Jan-­‐Dec  2019_PCC2

NA 2017 PowerEx  Jan2019-­‐Dec  2020_PCC1

NA 2017 Morgan  Stanley  Apr  2018-­‐Dec  2020_PCC1

NA 2017 NextEra  Apr-­‐Dec  2018_PCC1NA 2017 Energy  Finance  Associates  (Dec  2018-­‐Dec  2028_PCC1,  Marin  HQ)

NA 2017 NextEra  Jan  2019  -­‐  Dec  2023_PCC1

NA 2018 ConEd  (Lost  Hills)  May  2018-­‐Dec  2019_PCC1

NA 2018 SVP  Apr-­‐Dec2018_PCC1

NA 2018 Portland  General  Electric  Jan-­‐Dec2018_PCC2

NA 2018 Portland  General  Electric  Jan-­‐Dec2018_PCC2_2

NA 2017 Xcel  Jan-­‐Dec  2018_PCC2

NA 2018 Xcel  Jan-­‐Dec  2018_PCC2_2NA 2018 Oakley  RV  &  Boat  Storage  July  2018-­‐July  2038_PCC1NA 2018 BayWa  Strauss  Wind  Project  April  2020-­‐April  2035_PCC1

NA 2018 STX  P-­‐STX_PCC3  (2018)

NA 2018 3Phases  Jul-­‐Dec2018_PCC1

2029 2030

1,947,180 1,941,743

Contract  Lenth  (Years)

Bundled/  Unbundled Facility  Location  (City) Facility  Location  (State)Contract  Status Facility  Status Resource  Type Expected  PCC  Classification Contract  Length

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term Less  than  1 Bundled Mojave California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term Less  than  1 Bundled Mojave California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term Less  than  1 Bundled Shermain,  OR;  Columbia,  WAOR;  WA

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term Less  than  1 Bundled Multiple BC,  Canada

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 1 Bundled Multiple U.S.  and  BC,  Canada

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 1 Bundled Multiple U.S.  and  BC,  Canada

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term 2 Bundled Multiple BC,  Canada

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term 3 Bundled TBD  -­‐  Portfolio  Supply California,  Oregon

0 0 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Short-­‐term Less  than  1 Bundled Blythe California0 0 executed  -­‐  no  approval  neededUnder  development  -­‐  on  scheduleSolar  PV PCC  1 Long-­‐term 10 Bundled San  Rafael California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term 5 Bundled TBD  -­‐  Portfolio  Supply California

0 0 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Short-­‐term 2 Bundled TBD  -­‐  Portfolio  Supply California

0 0 executed  -­‐  no  approval  neededonline Geothermal PCC  1 Short-­‐term Less  than  1 Bundled Sonoma/Lake  Counties California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term Less  than  1 Bundled Shermain,  OR;  Columbia,  WAOR;  WA

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term Less  than  1 Bundled Shermain,  OR;  Columbia,  WAOR;  WA

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 1 Bundled Various  Cities Colorado

0 0 executed  -­‐  no  approval  neededonline Wind PCC  2 Short-­‐term 1 Bundled TBD  -­‐  Portfolio  Supply TBD  -­‐  Portfolio  Supply1,521 1,521 executed  -­‐  no  approval  neededonline Solar  PV PCC  1 Long-­‐term 20 Bundled Oakley California300,000 300,000 executed  -­‐  no  approval  neededUnder  development  -­‐  on  scheduleWind PCC  1 Long-­‐term 15 Bundled Santa  Barbara  County California

0 0 executed  -­‐  no  approval  neededonline Biomass PCC  3 Short-­‐term Less  than  1 Unbundled TBD  -­‐  Portfolio  Supply California

0 0 executed  -­‐  no  approval  neededonline Wind PCC  1 Short-­‐term Less  than  1 Bundled TBD  -­‐  Portfolio  Supply TBD  -­‐  Portfolio  Supply

Page 18: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Columbia  Ridge  Landfill  Gas  units  1-­‐8  (60994A)

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Nine  Canyon  Wind  (60803A)

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Sierra  Pacific  Burlington  (60596A)

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Eurus  Combine  Hills  II  LLC  (60928A)NA 2010 G2  Energy  Hay  Road  LLC  -­‐  Hay  Road  Landfill  (Solano  County,  61205C)NA 2010 G2  Energy  Ostrom  Road  LLC  -­‐  Ostrom  Road  Landfill  (Yuba  County,  61206A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  CEC-­‐Certified  High  Desert  (61409A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  Big  Horn  Wind  (60776A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  Nine  Canyon  Wind  (60803A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  1  Eligible  (Portfolio)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  1  Eligible:  Cabazon  Wind  Partners  (60736A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  1  Eligible:  Roosevelt  Biogas  -­‐  LFG  Phase  2,  Engines  7-­‐9  (60974A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible  (Portfolio)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible:  Juniper  Canyon  (61202A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible:  Leaning  Juniper  II  (61200A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible:  White  Creek  Wind  1  (60721A)NA 2011 Cottonwood  Solar,  LLC  (Goose  Lake  and  Corcoran  generating  facilities)NA 2011 Rio  Solar  1,  LLC

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  PCC1,  LFG  Phase  II  Roosevelt  Biogas  -­‐  LFG  Phase  2,  Engines  7-­‐9  (60974A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  White  Creek  Wind  1  (60721A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  Tulloch  Powerhouse  (60071A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  Beardsley  Powerhouse  (60072A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  RPS  Category  1  Eligible  (Portfolio)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  RPS  Category  1  Eligible:  Cabazon  Wind  Partners  (60736A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B,  RPS  Category  2  Eligible  -­‐  Juniper  Canyon  (61202A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B,  RPS  Category  2  Eligible  -­‐  Leaning  Juniper  II  (61200A)NA 2012 GenPower,  LLC  (Lincoln  Landfill  Power  Plant,  Units  1-­‐6;  61632A)NA 2012 RE  Kansas  (Recurrent)

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  1  Eligible  (Portfolio)

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  2  Eligible  (Portfolio)

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  2  Eligible:  Leaning  Juniper  II  (61200A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  2  Eligible:  Juniper  Canyon  (61202A)NA 2012 Middle  Fork  Irrigation  District  (61383A)

03/18/10 05/07/10 06/05/15

03/18/10 05/07/10 06/05/15

03/18/10 05/07/10 06/05/15

03/18/10 05/07/10 06/05/1512/03/10 7/4/13 06/28/13 06/27/3312/03/10 8/24/13 09/11/13 09/10/31

05/17/11 05/17/11 06/05/15

05/17/11 05/17/11 06/05/15

05/17/11 05/17/11 06/05/15

05/17/11 05/17/11 06/05/15

05/17/11 05/17/11 06/05/15

05/17/11 05/17/11 06/05/15

05/17/11 05/17/11 06/05/15

05/17/11 05/17/11 06/05/15

05/17/11 05/17/11 06/05/15

05/17/11 05/17/11 06/05/1507/08/11 5/22/15 05/23/15 05/22/4011/09/11

02/02/12 02/02/12 06/05/15

02/02/12 02/02/12 06/05/15

02/02/12 02/02/12 06/05/15

02/02/12 02/02/12 06/05/15

02/02/12 02/02/12 06/05/15

02/02/12 02/02/12 06/05/15

02/02/12 02/02/12 06/05/15

02/02/12 02/02/12 06/05/1507/10/12 2/28/08 02/01/13 01/31/3308/03/12 12/18/14 12/26/14 12/31/17

10/10/12 10/10/12 12/31/16

10/10/12 10/10/12 12/31/16

10/10/12 10/10/12 12/31/16

10/10/12 10/10/12 12/31/1604/06/12 3/1/86 07/01/11 03/31/14

Commercial  Online  Date  (COD)   Delivery  Term  -­‐  Start  Date   Delivery  Term  -­‐  End  DateDate  of  Most  Recent  Contract  

AmendmentContract  Execution  Date Date  of  Most  Recent  Contract  Extension  

Page 19: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name

NA 2012 OneEnergy  -­‐  RPS  Confirm  #1  -­‐  Total  Energy  Facility  (TEF-­‐GEN  1;  60633A)NA 2012 OneEnergy  -­‐  RPS  Confirm  #1  -­‐  Puente  Hills  Gas-­‐to-­‐Energy  Facility  Phase  II  Gen3  (60632A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Birch  Creek  Power  (61378A)

NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Double  A  Dairy  Digester  (61221A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Dry  Creek  Project  (61381A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Falls  Creek  Hydro  (61375A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Glenrock  III  (60804A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Goodnoe  Hills  (60819A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  High  Plains  (60899A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Marsh  Valley  Project  (61380A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Mountain  Air  Wind  Project  (62314A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Nine  Canyon  Phase  3  (60803A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Pilgrim  Stage  Station  Wind  Park  (60923A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Rolling  Hills  (60806A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Thousand  Springs  Wind  Park  (60925A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Tuana  Gulch  Wind  Park  (60924A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Wolverine  Creek  (60564A)NA 2012 San  Rafael  Airport  Solar  Partners,  LLC  (MCE  FIT,  62237A),  PCC1NA 2013 Calpine  Geysers  -­‐  Short  Term:  Calpine  Geothermal  Unit  #17  (60007A)

NA 2014 Calpine  Geysers  -­‐  Short  Term  #2:  Calpine  Geothermal  Unit  #18  (60008A)NA 2013 Calpine  Geysers  -­‐  Long  Term

NA 2014 Exelon  Generation  Company,  LLC  -­‐  Short  Term  PCC2b

NA 2014 Exelon  Generation  Company,  LLC  -­‐  Short  Term  PCC2a:  Alta  10  (62244A)NA 2014 OneEnergy  -­‐  RPS  Confirm  #3NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Campbell  Hill  -­‐  Three  Buttes  (61017A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Campbell  Hill  -­‐  Dunlap  1  (61188A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Glenrock  I  (60805A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Glenrock  III  (60804A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Golden  Valley  Wind  Park  (60917A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Goodnoe  Hills  (60819A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Hay  Canyon  (60724A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  High  Plains  (60899A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Klondike  Wind  Power  III  LLC  (60602A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Marengo  (60729A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Marengo  2  (60730A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  McFadden  Ridge  (60896A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Milner  Dam  Wind  Park  (60919A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Mountain  Air  Wind  Project  (62314A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Palouse  Wind  (62288A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Rolling  Hills  (60806A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Seven  Mile  Hill  1  (60807A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Seven  Mile  Hill  2  (60808A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Top  of  the  World  (61199A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Wild  Horse  (60746A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Wolverine  Creek  (60564A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Yahoo  Creek  Wind  Park  (60926A)NA 2014 Puget  Sound  Energy  -­‐  RPS  Eligible,  Short-­‐Term  Bucket  3:  Wild  Horse  (60746A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Hopkins  Ridge  (60745A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Lower  Snake  River  (62044A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  RPS  Category  2  Eligible  (Portfolio)NA 2014 RE  Mustang  4  LLCNA 2014 Rising  Tree  Wind  Farm  III,  LLC,  PCC1NA 2014 Cooley-­‐Quarry  1  (MCE  FIT),  PCC1NA 2015 East  Bay  Municipal  Utility  District  (Pardee,    60536A  and  Comanche  Reservoirs,  60535A)

Commercial  Online  Date  (COD)   Delivery  Term  -­‐  Start  Date   Delivery  Term  -­‐  End  DateDate  of  Most  Recent  Contract  

AmendmentContract  Execution  Date Date  of  Most  Recent  Contract  Extension  

04/06/12 07/01/11 03/31/1404/06/12 07/01/11 03/31/1404/06/12 07/01/11 03/31/14

04/06/12 07/01/11 03/31/1404/06/12 07/01/11 03/31/1404/06/12 07/01/11 03/31/1412/13/13 01/01/13 12/31/1312/13/13 01/01/13 12/31/1312/13/13 01/01/13 12/31/1304/06/12 07/01/11 03/31/1412/13/13 01/01/13 12/31/1312/13/13 01/01/13 12/31/1304/06/12 07/01/11 03/31/1412/13/13 01/01/13 12/31/1304/06/12 07/01/11 03/31/1404/06/12 07/01/11 03/31/1412/13/13 01/01/13 12/31/1305/08/12 11/01/12 10/31/3207/11/13 01/01/14 12/31/14

04/29/14 04/29/14 12/31/1407/11/13 01/01/17 12/31/26

06/10/14 07/01/15 12/31/15

06/10/14 07/01/14 12/31/1404/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/1611/06/14 01/01/14 06/30/1404/21/14 07/01/13 03/31/1604/21/14 07/01/13 03/31/16

02/02/12 02/02/12 06/05/1510/03/14 6/2/16 06/02/16 06/01/3109/05/14 6/25/15 07/01/15 12/31/1810/07/14 7/3/17 07/03/17 07/02/3706/22/15 7/4/30 07/01/15 06/30/24

Page 20: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name

NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Wild  Horse  Phase  II  (60746A)

NA 2015 Calpine  Geysers  -­‐  Short  Term  #3:  GeothermalNA 2015 Cedar  Creek  RECs,  LLC  -­‐  RPS  Category  3  Eligible

NA 2015 Direct  Energy  -­‐  RPS  Category  1  Eligible  (Portfolio,  small  hydro)

NA 2014 WM  Renewable  Energy,  L.L.C.  (Redwood  Landfill)NA 2017 MCE  SolarOne,  PCC1  (sPower,  2  facilities  -­‐  2.0  MW  +  8.5  MW)NA 2015 Cooley-­‐Quarry  2  (MCE  FIT),  PCC1NA 2015 Cost-­‐Plus  (MCE  FIT),  PCC1NA 2016 Avangrid  Renewables,  LLC  (Shiloh  I  Wind  Project)

NA 2016 Parrey,  LLC  (61841C)

NA 2016 3Phases,  PCC2  (Cedar  Creek  Wind  Energy,  60822A;  and  Cedar  Creek  II,  61384A)  -­‐  Confirmation  #2

NA 2016 Portland  General  Electric  Company,  PCC2  (Portfolio  Supply  Agreement)NA 2016 Los  Angeles  County,  Sanitation  District  No.  2,  PCC3  -­‐  Confirmation  #1NA 2016 Los  Angeles  County,  Sanitation  District  No.  2,  PCC3  -­‐  Confirmation  #2

NA 2016 Powerex,  PCC2  (Portfolio  Supply  Agreement)

NA 2016 Powerex,  PCC1  (Portfolio  Supply  Agreement)

NA 2016 3Phases,  PCC2  (Cedar  Creek  Wind  Energy,  60822A;  and  Cedar  Creek  II,  61384A)  -­‐  Confirmation  #3

NA 2015 3Phases,  PCC2  (Cedar  Creek  Wind  Energy,  60822A;  and  Cedar  Creek  II,  61384A)  -­‐  Confirmation  #1NA 2015 Rising  Tree  Wind  Farm,  PCC3NA 2015 3Degrees,  PCC3

NA 2011 Western  Area  Power  Administration

NA 2016 City  of  Santa  Clara,  Silicon  Valley  Power,  PCC1NA 2015 Northshore  Solar  Partners  LLC  (Freethy  #1,  MCE  FIT),  PCC1NA 2015 Northshore  Solar  Partners  LLC  (Freethy  #2,  MCE  FIT),  PCC1

NA 2016 3Phases,  PCC2  (Portfolio  Supply  Agreement)

NA 2016 3Phases,  PCC2  (Portfolio  Supply  Agreement)

NA 2017 3Phases,  PCC2  (Portfolio  Supply  Agreement)

NA 2016 Powerex,  PCC2  (Portfolio  Supply  Agreement)

NA 2016 NextEra  Energy  Power  Marketing,  LLC,  PCC1  (Blythe  Solar,  various  units)NA 2016 Great  Valley  Solar  I,  PCC1NA 2016 Desert  Harvest,  LLC,  PCC1NA 2016 Little  Bear  Solar  1,  LLC,  PCC  1NA 2016 Little  Bear  Solar  3,  LLC,  PCC  1NA 2016 Little  Bear  Solar  4,  LLC,  PCC  1NA 2016 Little  Bear  Solar  5,  LLC,  PCC  1NA 2016 Antelope  Expansion  2,  LLC,  PCC  1NA 2016 Voyager  Wind  II,  LLC,  PCC  1

NA 2016 TGP  Energy  Management,  LLC,  PCC  1NA 2016 Los  Banos  Wind,  LLC,  PCC  1NA 2011 Cottonwood  Solar  -­‐  Marin  Carport  (PCC1,  Long-­‐Term,  Local)

NA 2017 Exelon  Generation  Company  (PCC1,  ST  SALE)

Commercial  Online  Date  (COD)   Delivery  Term  -­‐  Start  Date   Delivery  Term  -­‐  End  DateDate  of  Most  Recent  Contract  

AmendmentContract  Execution  Date Date  of  Most  Recent  Contract  Extension  

04/21/14 07/01/13 03/31/16

05/04/15 05/04/15 12/31/1505/27/15 01/01/15 12/31/15

02/27/15 03/01/15 12/31/15

12/16/14 4/27/17 06/01/17 05/31/3605/30/17 12/18/17 12/18/17 12/17/3707/01/1504/16/15 9/1/16 09/01/16 08/31/3504/12/16 5/1/06 06/01/16 12/31/18

07/02/16 07/02/16 12/31/16

06/17/16 07/01/16 12/31/16

06/17/16 06/17/16 12/31/1605/25/16 06/01/16 12/31/1605/25/16 01/01/17 12/31/17

08/04/16 01/01/17 12/31/19

08/04/16 01/01/17 12/31/17

07/21/16 01/01/17 06/30/17

11/20/15 11/20/15 12/31/1512/29/15 01/01/15 12/31/1512/03/15 01/01/15 12/31/15

11/04/11 01/01/15 12/31/19

08/16/16 01/01/17 12/31/1709/04/15 10/6/16 10/06/16 10/05/3509/04/15 10/6/16 10/06/16 10/05/35

10/10/16 01/01/17 12/31/17

10/10/16 01/01/17 12/31/17

06/23/17 01/01/18 12/31/19

11/08/16 01/01/17 12/31/17

10/21/16 01/01/17 12/31/1709/15/16 4/14/18 04/14/18 04/13/3311/18/16 12/01/20 11/30/3909/23/16 09/01/20 08/31/3909/23/16 09/01/20 08/31/3909/23/16 09/01/20 08/31/3909/23/16 09/01/20 08/31/3911/15/16 09/01/18 08/31/3712/05/16 01/01/19 12/31/30

12/05/16 01/01/18 12/31/2212/05/16 01/01/21 12/31/2507/08/11 05/13/16 05/12/41

09/07/17 09/08/17 12/31/17

Page 21: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name

NA 2017 Lancaster  Choice  Energy  (PCC1,  ST  SALE)

NA 2017 Apple  Valley  Choice  Energy  (PCC1,  ST  SALE)

NA 2017 Portland  General  Electric  Company  (PCC2,  ST)

NA 2017 PowerEx  April-­‐Dec  2018_PCC1

NA 2017 PowerEx  Jan-­‐Dec  2018_PCC2

NA 2017 PowerEX  Jan-­‐Dec  2019_PCC2

NA 2017 PowerEx  Jan2019-­‐Dec  2020_PCC1

NA 2017 Morgan  Stanley  Apr  2018-­‐Dec  2020_PCC1

NA 2017 NextEra  Apr-­‐Dec  2018_PCC1NA 2017 Energy  Finance  Associates  (Dec  2018-­‐Dec  2028_PCC1,  Marin  HQ)

NA 2017 NextEra  Jan  2019  -­‐  Dec  2023_PCC1

NA 2018 ConEd  (Lost  Hills)  May  2018-­‐Dec  2019_PCC1

NA 2018 SVP  Apr-­‐Dec2018_PCC1

NA 2018 Portland  General  Electric  Jan-­‐Dec2018_PCC2

NA 2018 Portland  General  Electric  Jan-­‐Dec2018_PCC2_2

NA 2017 Xcel  Jan-­‐Dec  2018_PCC2

NA 2018 Xcel  Jan-­‐Dec  2018_PCC2_2NA 2018 Oakley  RV  &  Boat  Storage  July  2018-­‐July  2038_PCC1NA 2018 BayWa  Strauss  Wind  Project  April  2020-­‐April  2035_PCC1

NA 2018 STX  P-­‐STX_PCC3  (2018)

NA 2018 3Phases  Jul-­‐Dec2018_PCC1

Commercial  Online  Date  (COD)   Delivery  Term  -­‐  Start  Date   Delivery  Term  -­‐  End  DateDate  of  Most  Recent  Contract  

AmendmentContract  Execution  Date Date  of  Most  Recent  Contract  Extension  

11/08/17 11/08/17 12/31/17

11/08/17 11/08/17 12/31/17

09/01/17 09/01/17 12/31/17

09/15/17 04/01/18 12/31/18

09/18/17 01/01/18 12/31/18

09/18/17 01/01/19 12/31/19

10/13/17 01/01/19 12/31/20

11/14/17 04/01/18 12/31/20

11/08/17 04/01/18 12/31/1802/02/17 12/01/18 12/01/28

11/08/17 01/01/19 12/31/23

03/06/18 05/01/18 12/31/19

02/28/18 04/01/18 12/31/18

01/31/18 01/30/18 12/31/18

01/31/18 01/30/18 12/31/18

10/16/17 01/01/18 12/31/18

01/29/18 01/01/18 12/31/1805/09/18 7/20/18 07/20/18 07/19/3806/01/18 04/01/20 03/31/35

03/18/18 01/01/18 12/31/18

06/29/18 07/01/18 12/31/18

Page 22: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Columbia  Ridge  Landfill  Gas  units  1-­‐8  (60994A)

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Nine  Canyon  Wind  (60803A)

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Sierra  Pacific  Burlington  (60596A)

NA 2010 Shell  Energy  North  America,  MEA  Phase  1  -­‐  Eurus  Combine  Hills  II  LLC  (60928A)NA 2010 G2  Energy  Hay  Road  LLC  -­‐  Hay  Road  Landfill  (Solano  County,  61205C)NA 2010 G2  Energy  Ostrom  Road  LLC  -­‐  Ostrom  Road  Landfill  (Yuba  County,  61206A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  CEC-­‐Certified  High  Desert  (61409A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  Big  Horn  Wind  (60776A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  Nine  Canyon  Wind  (60803A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  1  Eligible  (Portfolio)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  1  Eligible:  Cabazon  Wind  Partners  (60736A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  1  Eligible:  Roosevelt  Biogas  -­‐  LFG  Phase  2,  Engines  7-­‐9  (60974A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible  (Portfolio)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible:  Juniper  Canyon  (61202A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible:  Leaning  Juniper  II  (61200A)

NA 2011 Shell  Energy  North  America,  MEA  Phase  2  -­‐  RPS  Category  2  Eligible:  White  Creek  Wind  1  (60721A)NA 2011 Cottonwood  Solar,  LLC  (Goose  Lake  and  Corcoran  generating  facilities)NA 2011 Rio  Solar  1,  LLC

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  PCC1,  LFG  Phase  II  Roosevelt  Biogas  -­‐  LFG  Phase  2,  Engines  7-­‐9  (60974A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  White  Creek  Wind  1  (60721A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  Tulloch  Powerhouse  (60071A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  Beardsley  Powerhouse  (60072A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  RPS  Category  1  Eligible  (Portfolio)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  RPS  Category  1  Eligible:  Cabazon  Wind  Partners  (60736A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B,  RPS  Category  2  Eligible  -­‐  Juniper  Canyon  (61202A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B,  RPS  Category  2  Eligible  -­‐  Leaning  Juniper  II  (61200A)NA 2012 GenPower,  LLC  (Lincoln  Landfill  Power  Plant,  Units  1-­‐6;  61632A)NA 2012 RE  Kansas  (Recurrent)

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  1  Eligible  (Portfolio)

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  2  Eligible  (Portfolio)

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  2  Eligible:  Leaning  Juniper  II  (61200A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  3  -­‐  RPS  Category  2  Eligible:  Juniper  Canyon  (61202A)NA 2012 Middle  Fork  Irrigation  District  (61383A)

43,579 Energy  only  contract;  capacity  not  specified

3,284 Energy  only  contract;  capacity  not  specified

51,300 Energy  only  contract;  capacity  not  specified

72,770 Energy  only  contract;  capacity  not  specified198,000 2216,000 2

6,203 Energy  only  contract;  capacity  not  specified

26,568 Energy  only  contract;  capacity  not  specified

9,460 Energy  only  contract;  capacity  not  specified

4,006 Energy  only  contract;  capacity  not  specified

3,152 Energy  only  contract;  capacity  not  specified

3,152 Energy  only  contract;  capacity  not  specified

16,876 Energy  only  contract;  capacity  not  specified

16,876 Energy  only  contract;  capacity  not  specified

16,876 Energy  only  contract;  capacity  not  specified

10,282 Energy  only  contract;  capacity  not  specified1,600,000 23

0 0

7,279 Energy  only  contract;  capacity  not  specified

81,887 Energy  only  contract;  capacity  not  specified

55,262 Energy  only  contract;  capacity  not  specified

18,738 Energy  only  contract;  capacity  not  specified

52,834 Energy  only  contract;  capacity  not  specified

27,428 Energy  only  contract;  capacity  not  specified

30,956 Energy  only  contract;  capacity  not  specified

34,044 Energy  only  contract;  capacity  not  specified580,000 5135,000 20

103,000 Energy  only  contract;  capacity  not  specified

108,000 Energy  only  contract;  capacity  not  specified

1,668 Energy  only  contract;  capacity  not  specified

8,332 Energy  only  contract;  capacity  not  specified42,000 REC  only  contract;  capacity  not  specified

Contracted  Capacity  (Expected  MW)Advice  Letter  #  (if  applicable) Contract  Volume  (MWh)

Page 23: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name

NA 2012 OneEnergy  -­‐  RPS  Confirm  #1  -­‐  Total  Energy  Facility  (TEF-­‐GEN  1;  60633A)NA 2012 OneEnergy  -­‐  RPS  Confirm  #1  -­‐  Puente  Hills  Gas-­‐to-­‐Energy  Facility  Phase  II  Gen3  (60632A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Birch  Creek  Power  (61378A)

NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Double  A  Dairy  Digester  (61221A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Dry  Creek  Project  (61381A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Falls  Creek  Hydro  (61375A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Glenrock  III  (60804A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Goodnoe  Hills  (60819A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  High  Plains  (60899A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Marsh  Valley  Project  (61380A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Mountain  Air  Wind  Project  (62314A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Nine  Canyon  Phase  3  (60803A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Pilgrim  Stage  Station  Wind  Park  (60923A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Rolling  Hills  (60806A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Thousand  Springs  Wind  Park  (60925A)NA 2012 OneEnergy  -­‐  RPS  Eligible  #1  -­‐  Tuana  Gulch  Wind  Park  (60924A)NA 2013 OneEnergy  -­‐  RPS  Eligible  #2  -­‐  Wolverine  Creek  (60564A)NA 2012 San  Rafael  Airport  Solar  Partners,  LLC  (MCE  FIT,  62237A),  PCC1NA 2013 Calpine  Geysers  -­‐  Short  Term:  Calpine  Geothermal  Unit  #17  (60007A)

NA 2014 Calpine  Geysers  -­‐  Short  Term  #2:  Calpine  Geothermal  Unit  #18  (60008A)NA 2013 Calpine  Geysers  -­‐  Long  Term

NA 2014 Exelon  Generation  Company,  LLC  -­‐  Short  Term  PCC2b

NA 2014 Exelon  Generation  Company,  LLC  -­‐  Short  Term  PCC2a:  Alta  10  (62244A)NA 2014 OneEnergy  -­‐  RPS  Confirm  #3NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Campbell  Hill  -­‐  Three  Buttes  (61017A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Campbell  Hill  -­‐  Dunlap  1  (61188A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Glenrock  I  (60805A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Glenrock  III  (60804A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Golden  Valley  Wind  Park  (60917A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Goodnoe  Hills  (60819A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Hay  Canyon  (60724A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  High  Plains  (60899A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Klondike  Wind  Power  III  LLC  (60602A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Marengo  (60729A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Marengo  2  (60730A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  McFadden  Ridge  (60896A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Milner  Dam  Wind  Park  (60919A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Mountain  Air  Wind  Project  (62314A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Palouse  Wind  (62288A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Rolling  Hills  (60806A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Seven  Mile  Hill  1  (60807A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Seven  Mile  Hill  2  (60808A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Top  of  the  World  (61199A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Wild  Horse  (60746A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Wolverine  Creek  (60564A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Yahoo  Creek  Wind  Park  (60926A)NA 2014 Puget  Sound  Energy  -­‐  RPS  Eligible,  Short-­‐Term  Bucket  3:  Wild  Horse  (60746A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Hopkins  Ridge  (60745A)NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Lower  Snake  River  (62044A)

NA 2012 Shell  Energy  North  America,  MEA  Phase  2B  -­‐  RPS  Category  2  Eligible  (Portfolio)NA 2014 RE  Mustang  4  LLCNA 2014 Rising  Tree  Wind  Farm  III,  LLC,  PCC1NA 2014 Cooley-­‐Quarry  1  (MCE  FIT),  PCC1NA 2015 East  Bay  Municipal  Utility  District  (Pardee,    60536A  and  Comanche  Reservoirs,  60535A)

Contracted  Capacity  (Expected  MW)Advice  Letter  #  (if  applicable) Contract  Volume  (MWh)

12,000 REC  only  contract;  capacity  not  specified3,000 REC  only  contract;  capacity  not  specified5,802 REC  only  contract;  capacity  not  specified

6,203 REC  only  contract;  capacity  not  specified466 REC  only  contract;  capacity  not  specified

12,039 REC  only  contract;  capacity  not  specified704 REC  only  contract;  capacity  not  specified1,114 REC  only  contract;  capacity  not  specified1,005 REC  only  contract;  capacity  not  specified924 REC  only  contract;  capacity  not  specified

18,747 REC  only  contract;  capacity  not  specified1,285 REC  only  contract;  capacity  not  specified1,609 REC  only  contract;  capacity  not  specified1,259 REC  only  contract;  capacity  not  specified6,078 REC  only  contract;  capacity  not  specified4,869 REC  only  contract;  capacity  not  specified886 REC  only  contract;  capacity  not  specified

33,000 126,280 3

25,000 Energy  only  contract;  capacity  not  specified880,000 10

50,000 Energy  only  contract;  capacity  not  specified

60,000 Energy  only  contract;  capacity  not  specified225,000 REC  only  contract;  capacity  not  specified2,903 REC  only  contract;  capacity  not  specified3,513 REC  only  contract;  capacity  not  specified2,810 REC  only  contract;  capacity  not  specified1,171 REC  only  contract;  capacity  not  specified4,688 REC  only  contract;  capacity  not  specified1,491 REC  only  contract;  capacity  not  specified3,203 REC  only  contract;  capacity  not  specified2,778 REC  only  contract;  capacity  not  specified8,113 REC  only  contract;  capacity  not  specified2,163 REC  only  contract;  capacity  not  specified1,047 REC  only  contract;  capacity  not  specified1,015 REC  only  contract;  capacity  not  specified1,676 REC  only  contract;  capacity  not  specified5,939 REC  only  contract;  capacity  not  specified2,158 REC  only  contract;  capacity  not  specified3,918 REC  only  contract;  capacity  not  specified3,094 REC  only  contract;  capacity  not  specified777 REC  only  contract;  capacity  not  specified5,511 REC  only  contract;  capacity  not  specified15,535 REC  only  contract;  capacity  not  specified1,458 REC  only  contract;  capacity  not  specified39 REC  only  contract;  capacity  not  specified

195,000 REC  only  contract;  capacity  not  specified7,500 REC  only  contract;  capacity  not  specified15,000 REC  only  contract;  capacity  not  specified

47,000 Energy  only  contract;  capacity  not  specified1,260,000 301,200,000 9936,000 1800,000 34

Page 24: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name

NA 2014 OneEnergy  -­‐  RPS  Eligible  #3  -­‐  Wild  Horse  Phase  II  (60746A)

NA 2015 Calpine  Geysers  -­‐  Short  Term  #3:  GeothermalNA 2015 Cedar  Creek  RECs,  LLC  -­‐  RPS  Category  3  Eligible

NA 2015 Direct  Energy  -­‐  RPS  Category  1  Eligible  (Portfolio,  small  hydro)

NA 2014 WM  Renewable  Energy,  L.L.C.  (Redwood  Landfill)NA 2017 MCE  SolarOne,  PCC1  (sPower,  2  facilities  -­‐  2.0  MW  +  8.5  MW)NA 2015 Cooley-­‐Quarry  2  (MCE  FIT),  PCC1NA 2015 Cost-­‐Plus  (MCE  FIT),  PCC1NA 2016 Avangrid  Renewables,  LLC  (Shiloh  I  Wind  Project)

NA 2016 Parrey,  LLC  (61841C)

NA 2016 3Phases,  PCC2  (Cedar  Creek  Wind  Energy,  60822A;  and  Cedar  Creek  II,  61384A)  -­‐  Confirmation  #2

NA 2016 Portland  General  Electric  Company,  PCC2  (Portfolio  Supply  Agreement)NA 2016 Los  Angeles  County,  Sanitation  District  No.  2,  PCC3  -­‐  Confirmation  #1NA 2016 Los  Angeles  County,  Sanitation  District  No.  2,  PCC3  -­‐  Confirmation  #2

NA 2016 Powerex,  PCC2  (Portfolio  Supply  Agreement)

NA 2016 Powerex,  PCC1  (Portfolio  Supply  Agreement)

NA 2016 3Phases,  PCC2  (Cedar  Creek  Wind  Energy,  60822A;  and  Cedar  Creek  II,  61384A)  -­‐  Confirmation  #3

NA 2015 3Phases,  PCC2  (Cedar  Creek  Wind  Energy,  60822A;  and  Cedar  Creek  II,  61384A)  -­‐  Confirmation  #1NA 2015 Rising  Tree  Wind  Farm,  PCC3NA 2015 3Degrees,  PCC3

NA 2011 Western  Area  Power  Administration

NA 2016 City  of  Santa  Clara,  Silicon  Valley  Power,  PCC1NA 2015 Northshore  Solar  Partners  LLC  (Freethy  #1,  MCE  FIT),  PCC1NA 2015 Northshore  Solar  Partners  LLC  (Freethy  #2,  MCE  FIT),  PCC1

NA 2016 3Phases,  PCC2  (Portfolio  Supply  Agreement)

NA 2016 3Phases,  PCC2  (Portfolio  Supply  Agreement)

NA 2017 3Phases,  PCC2  (Portfolio  Supply  Agreement)

NA 2016 Powerex,  PCC2  (Portfolio  Supply  Agreement)

NA 2016 NextEra  Energy  Power  Marketing,  LLC,  PCC1  (Blythe  Solar,  various  units)NA 2016 Great  Valley  Solar  I,  PCC1NA 2016 Desert  Harvest,  LLC,  PCC1NA 2016 Little  Bear  Solar  1,  LLC,  PCC  1NA 2016 Little  Bear  Solar  3,  LLC,  PCC  1NA 2016 Little  Bear  Solar  4,  LLC,  PCC  1NA 2016 Little  Bear  Solar  5,  LLC,  PCC  1NA 2016 Antelope  Expansion  2,  LLC,  PCC  1NA 2016 Voyager  Wind  II,  LLC,  PCC  1

NA 2016 TGP  Energy  Management,  LLC,  PCC  1NA 2016 Los  Banos  Wind,  LLC,  PCC  1NA 2011 Cottonwood  Solar  -­‐  Marin  Carport  (PCC1,  Long-­‐Term,  Local)

NA 2017 Exelon  Generation  Company  (PCC1,  ST  SALE)

Contracted  Capacity  (Expected  MW)Advice  Letter  #  (if  applicable) Contract  Volume  (MWh)

25,000 REC  only  contract;  capacity  not  specified

30,000 Energy  only  contract;  capacity  not  specified125,000 REC  only  contract;  capacity  not  specified

50,000 Energy  only  contract;  capacity  not  specified

600,000 4380,000 1118,000 09,000 0188,000 25

74,018 Energy  only  contract;  capacity  not  specified

140,000 Energy  only  contract;  capacity  not  specified

120,000 Energy  only  contract;  capacity  not  specified68,000 REC  only  contract;  capacity  not  specified90,000 REC  only  contract;  capacity  not  specified

225,000 Energy  only  contract;  capacity  not  specified

60,000 Energy  only  contract;  capacity  not  specified

70,000 Energy  only  contract;  capacity  not  specified

50,000 Energy  only  contract;  capacity  not  specified2,676 REC  only  contract;  capacity  not  specified19,000 REC  only  contract;  capacity  not  specified

1,032 Energy  only  contract;  capacity  not  specified

200,000 Energy  only  contract;  capacity  not  specified36,000 136,000 1

220,000 Energy  only  contract;  capacity  not  specified

50,000 Energy  only  contract;  capacity  not  specified

310,000 Energy  only  contract;  capacity  not  specified

30,000 Energy  only  contract;  capacity  not  specified

200,000 Energy  only  contract;  capacity  not  specified4,350,000 1005,000,000 802,000,000 401,000,000 202,600,000 502,600,000 505,800,000 1051,656,000 42

1,500,000 Energy  only  contract;  capacity  not  specifiedTBD 125

40,000 1

-­‐150,000 Energy  only  contract;  capacity  not  specified

Page 25: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Contract  DetailsData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

LSE  ID  (Optional)

CPUC  ID Contract  Execution  Year

Contract  Name/Facility  Name

NA 2017 Lancaster  Choice  Energy  (PCC1,  ST  SALE)

NA 2017 Apple  Valley  Choice  Energy  (PCC1,  ST  SALE)

NA 2017 Portland  General  Electric  Company  (PCC2,  ST)

NA 2017 PowerEx  April-­‐Dec  2018_PCC1

NA 2017 PowerEx  Jan-­‐Dec  2018_PCC2

NA 2017 PowerEX  Jan-­‐Dec  2019_PCC2

NA 2017 PowerEx  Jan2019-­‐Dec  2020_PCC1

NA 2017 Morgan  Stanley  Apr  2018-­‐Dec  2020_PCC1

NA 2017 NextEra  Apr-­‐Dec  2018_PCC1NA 2017 Energy  Finance  Associates  (Dec  2018-­‐Dec  2028_PCC1,  Marin  HQ)

NA 2017 NextEra  Jan  2019  -­‐  Dec  2023_PCC1

NA 2018 ConEd  (Lost  Hills)  May  2018-­‐Dec  2019_PCC1

NA 2018 SVP  Apr-­‐Dec2018_PCC1

NA 2018 Portland  General  Electric  Jan-­‐Dec2018_PCC2

NA 2018 Portland  General  Electric  Jan-­‐Dec2018_PCC2_2

NA 2017 Xcel  Jan-­‐Dec  2018_PCC2

NA 2018 Xcel  Jan-­‐Dec  2018_PCC2_2NA 2018 Oakley  RV  &  Boat  Storage  July  2018-­‐July  2038_PCC1NA 2018 BayWa  Strauss  Wind  Project  April  2020-­‐April  2035_PCC1

NA 2018 STX  P-­‐STX_PCC3  (2018)

NA 2018 3Phases  Jul-­‐Dec2018_PCC1

Contracted  Capacity  (Expected  MW)Advice  Letter  #  (if  applicable) Contract  Volume  (MWh)

-­‐11,000 Energy  only  contract;  capacity  not  specified

-­‐15,000 Energy  only  contract;  capacity  not  specified

30,000 Energy  only  contract;  capacity  not  specified

100,000 Energy  only  contract;  capacity  not  specified

100,000 Energy  only  contract;  capacity  not  specified

75,000 Energy  only  contract;  capacity  not  specified

75,000 Energy  only  contract;  capacity  not  specified

225,000 Energy  only  contract;  capacity  not  specified

27,000 Energy  only  contract;  capacity  not  specified12,000 1

145,500 Energy  only  contract;  capacity  not  specified

87,000 Energy  only  contract;  capacity  not  specified

100,000 Energy  only  contract;  capacity  not  specified

150,000 Energy  only  contract;  capacity  not  specified

150,000 Energy  only  contract;  capacity  not  specified

250,000 Energy  only  contract;  capacity  not  specified

50,000 Energy  only  contract;  capacity  not  specified30,420 1

4,500,000 100

36,000 Energy  only  contract;  capacity  not  specified

115,000 Energy  only  contract;  capacity  not  specified

Page 26: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Compliance  StatusData  Reported  by:

Marin  Clean  Energy  (MCE)

August  31,  2018 From  Unique  Inputs  Sheet

Actual  Data

Forecasted  Data

Information  is  Hard  Coded

Marin  Clean  Energy  (MCE)

 Annual  RPS  Procurement  and  Percentages  (MWh) 2011 2012 2013 2014 2015 2016Annual  Retail  Sales 185492.6871 570143.667 1110486.62 1254794.292 1695273.832 2125090.807Annual  RPS  Procurement 51,525 166,522 364,363 646,619 866,365 1,160,620Annual  Percentage  Targets 20.0% 20.0% 20.0% 21.7% 23.3% 25.0%Annual  RPS  Procurement  Percentage 27.8% 29.2% 32.8% 51.5% 51.1% 54.6%

Procurement  Quantity  Requirement  (MWh) 2011 2012 2013 2014 2015 2016Procurement  Quantity  Requirement  (PQR)PCC  0  RECs  Retired(Annual) 39,119 39,238 50,641 39,119 2,816 0Long-­‐Term  PCC  1  RECs  Retired  (Annual) 0 4,553 36,597 61,861 109,636 251,987Short-­‐Term  PCC  1  RECs  Retired  (Annual) 6,203 65,000 74,000 113,869 358,285 529,574Long-­‐Term  PCC  2  RECs  Retired(Annual) 0 0 0 0 0 0Short-­‐Term  PCC  2  RECs  Retired  (Annual) 6,203 32,731 62,094 120,282 164,801 311,000Long-­‐Term  PCC  3  RECs  Retired  (Annual) 0 0 0 0 0 0Short-­‐Term  PCC  3  RECs  Retired  (Annual) 0 25,000 95,000 354,703 233,643 68,059Annual  Percentage  Targets 20.0% 20.0% 20.0% 21.7% 23.3% 25.0%RECs  as  Percentage  of  Retail  Sales 27.8% 29.2% 28.7% 55.0% 51.3% 54.6%Total  RECs  (Compliance  Period)

65%  Long-­‐Term  Contracting  requirement  (MWh)PCC0  RECS  Applied  (Compliance  Period)Long-­‐Term  PCC1  RECS  Applied  (Compliance  Period)Short-­‐Term  PCC1  RECS  Applied  (Compliance  Period)Long-­‐Term  PCC2  RECS  Applied  (Compliance  Period)Short-­‐Term  PCCC2  RECS  Applied  (Compliance  Period)Long-­‐Term  PCC3  RECS  Applied  (Compliance  Period)Short-­‐Term  PCC3  RECS  Applied  (Compliance  Period)Long-­‐Term  RECs  RequirementExcess/(Shortfall)  REC  Retirements  from  Long-­‐Term  Contracts          Eligible  PCC  0  RECs  (Compliance  Period)          Eligible  Long-­‐Term  PCC  1  RECs  (Compliance  Period)          Eligible  Long-­‐Term  PCC  2  RECs  (Compliance  Period)          Eligible  Long-­‐Term  PCC  3  RECs  (Compliance  Period)Short-­‐Term  REC  LimitEligible  Short-­‐Term  RECs          Eligible  Short-­‐Term  PCC  1  RECs  (Compliance  Period)          Eligible  Short-­‐Term  PCC  2  RECs  (Compliance  Period)          Eligible  Short-­‐Term  PCC  3  RECs  (Compliance  Period)RECs  Satisfying  LT  Contracting  Requirement

Portfolio  Balance  Requirements  (MWh) 2011-­‐2013  PCC  1  RECs  (Compliance  Period)  PCC  2  RECs  (Compliance  Period)  PCC  3  RECs  (Compliance  Period)PCC  1  Balance  RequirementExcess/(Shortfall)  Retirements  from  PCC  1Calculated  PCC  2  Balance  LimitationIneligible  Category  2PCC  3  Balance  LimitationIneligible  Category  3

Actual  RPS  Retirements  (From  36  Month  REC  Retirement  tabs)

N/AN/A

Compliance  Period  1

373,225

536,379 2,719,635

Actual  RPS  Retirements  (From  36  Month  REC  Retirement  tabs)

1,198,562

Compliance  Period  1

Compliance  Period  2

Compliance  Period  2

Compliance  Period  1 Compliance  Period  2

N/A

N/AN/A

N/AN/A

N/A

N/A

61,057

N/AN/A

186,353

122,113

58,943

101,028

N/A

120,000

39,971

N/AN/A N/A

482,911173,494

673,405

364,758

596,0831,425,212

Compliance  Period  1

N/A

N/A N/A

N/A

2011-­‐2013 2014-­‐2016

N/A

Compliance  Period  2

N/A

2014-­‐2016

N/A

751,807

61,05764,240

231,325

656,405

N/A N/A

N/AN/AN/AN/A

N/AN/AN/A N/A

N/AN/A

N/AN/AN/A

N/A

Page 27: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Excess  Procurement  Calculation  (MWh)Excess  RECs  Eligible  for  BankingExcess  PCC  0  RECsExcess  PCC  1  RECs          Excess  Long-­‐Term  PCC1  RECs          Excess  Short-­‐Term  PCC1  RECsExcess  PCC  2  RECs

Remaining  Excess  RECs  Eligible  for  Banking  and  Requiring  a  Category  Assignment

Excess  Procurement  Bank  (MWh)PCC  0  BankPCC  1  Bank          Long-­‐Term  PCC1  Bank          Short-­‐Term  PCC1  Bank

PCC  2  BankApplication  of  PCC  0  Banked  RECsApplication  of  PCC  1  Banked  RECs          Application  of  Long-­‐Term  PCC1  Banked  RECs          Application  of  Short-­‐Term  PCC1  Banked  RECs

Application  of  PCC  2  Banked  RECsCumulative  PCC  0  BankCumulative  PCC  1  Bank          Cumulative  Long-­‐Term  PCC1  Bank          Cumulative  Short-­‐Term  PCC1  Bank

Cumulative  PCC  2  Bank

RPS  Compliance  Status  (MWh)Additional  RECs  required  to  meet  RPS  Procurement  Quantity  RequirementTotal  RECs  not  in  compliance  with    RPS  Procurement  Balance  Requirement

RPS  Penalty  CalculationTotal  Penalty  (PQR/PBR)

Compliance  Period  12011-­‐2013

2011-­‐2013

0

00

N/AN/A

0

Compliance  Period  2

2014-­‐2016Compliance  Period  2

0

0

0

2014-­‐2016

0

2014-­‐201624,543

N/AN/A

0

Compliance  Period  1

Compliance  Period  1

0

24,543

$02014-­‐2016

00 0

$0

Compliance  Period  2

0

Compliance  Period  12011-­‐2013

24,5430

0

00

2011-­‐2013

0

Compliance  Period  2

N/AN/A

N/A

00

0

0

N/A

N/AN/AN/A0

0

N/A

N/AN/A

24,5430

00

N/AN/A

Page 28: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Compliance  StatusData  Reported  by:

Marin  Clean  Energy  (MCE)

August  31,  2018

Marin  Clean  Energy  (MCE)

 Annual  RPS  Procurement  and  Percentages  (MWh)Annual  Retail  SalesAnnual  RPS  ProcurementAnnual  Percentage  TargetsAnnual  RPS  Procurement  Percentage

Procurement  Quantity  Requirement  (MWh)Procurement  Quantity  Requirement  (PQR)PCC  0  RECs  Retired(Annual)Long-­‐Term  PCC  1  RECs  Retired  (Annual)Short-­‐Term  PCC  1  RECs  Retired  (Annual)Long-­‐Term  PCC  2  RECs  Retired(Annual)Short-­‐Term  PCC  2  RECs  Retired  (Annual)Long-­‐Term  PCC  3  RECs  Retired  (Annual)Short-­‐Term  PCC  3  RECs  Retired  (Annual)Annual  Percentage  TargetsRECs  as  Percentage  of  Retail  SalesTotal  RECs  (Compliance  Period)

65%  Long-­‐Term  Contracting  requirement  (MWh)PCC0  RECS  Applied  (Compliance  Period)Long-­‐Term  PCC1  RECS  Applied  (Compliance  Period)Short-­‐Term  PCC1  RECS  Applied  (Compliance  Period)Long-­‐Term  PCC2  RECS  Applied  (Compliance  Period)Short-­‐Term  PCCC2  RECS  Applied  (Compliance  Period)Long-­‐Term  PCC3  RECS  Applied  (Compliance  Period)Short-­‐Term  PCC3  RECS  Applied  (Compliance  Period)Long-­‐Term  RECs  RequirementExcess/(Shortfall)  REC  Retirements  from  Long-­‐Term  Contracts          Eligible  PCC  0  RECs  (Compliance  Period)          Eligible  Long-­‐Term  PCC  1  RECs  (Compliance  Period)          Eligible  Long-­‐Term  PCC  2  RECs  (Compliance  Period)          Eligible  Long-­‐Term  PCC  3  RECs  (Compliance  Period)Short-­‐Term  REC  LimitEligible  Short-­‐Term  RECs          Eligible  Short-­‐Term  PCC  1  RECs  (Compliance  Period)          Eligible  Short-­‐Term  PCC  2  RECs  (Compliance  Period)          Eligible  Short-­‐Term  PCC  3  RECs  (Compliance  Period)RECs  Satisfying  LT  Contracting  Requirement

Portfolio  Balance  Requirements  (MWh)  PCC  1  RECs  (Compliance  Period)  PCC  2  RECs  (Compliance  Period)  PCC  3  RECs  (Compliance  Period)PCC  1  Balance  RequirementExcess/(Shortfall)  Retirements  from  PCC  1Calculated  PCC  2  Balance  LimitationIneligible  Category  2PCC  3  Balance  LimitationIneligible  Category  3

Actual  RPS  Retirements  (From  36  Month  REC  Retirement  tabs)

2017 2018 2019 20202804277.374 4565480.744 5275252.115 5306098.0261,749,254 2,883,761 2,018,119 1,924,26127.0% 29.0% 31.0% 33.0%62.4% 63.2% 38.3% 36.3%

2017 2018 2019 2020

0 0 0 0431,798 755,561 1,153,819 1,495,161691,323 1,167,200 504,300 429,100

0 0 0 0458,046 925,000 360,000 0

0 0 0 090,000 36,000 0 027.0% 29.0% 31.0% 33.0%59.6% 63.2% 38.3% 36.3%

8,497,308

N/A

N/AN/AN/AN/A

N/A

N/A

N/AN/A

Forecasted  RPS  Procurement  (From  the  Procurement  Details  and  Contract  Details  tabs)

Compliance  Period  3

Compliance  Period  3

5,467,485

Compliance  Period  3

N/AN/A

N/A

N/AN/A

126,000

0

4,100,6142,527,648

2017-­‐2020

N/AN/A

2017-­‐2020

N/A

Compliance  Period  3

N/A

N/A

1,743,046

502,1751,240,871

546,748

6,628,262

Page 29: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Excess  Procurement  Calculation  (MWh)Excess  RECs  Eligible  for  BankingExcess  PCC  0  RECsExcess  PCC  1  RECs          Excess  Long-­‐Term  PCC1  RECs          Excess  Short-­‐Term  PCC1  RECsExcess  PCC  2  RECs

Remaining  Excess  RECs  Eligible  for  Banking  and  Requiring  a  Category  Assignment

Excess  Procurement  Bank  (MWh)PCC  0  BankPCC  1  Bank          Long-­‐Term  PCC1  Bank          Short-­‐Term  PCC1  Bank

PCC  2  BankApplication  of  PCC  0  Banked  RECsApplication  of  PCC  1  Banked  RECs          Application  of  Long-­‐Term  PCC1  Banked  RECs          Application  of  Short-­‐Term  PCC1  Banked  RECs

Application  of  PCC  2  Banked  RECsCumulative  PCC  0  BankCumulative  PCC  1  Bank          Cumulative  Long-­‐Term  PCC1  Bank          Cumulative  Short-­‐Term  PCC1  Bank

Cumulative  PCC  2  Bank

RPS  Compliance  Status  (MWh)Additional  RECs  required  to  meet  RPS  Procurement  Quantity  RequirementTotal  RECs  not  in  compliance  with    RPS  Procurement  Balance  Requirement

RPS  Penalty  CalculationTotal  Penalty  (PQR/PBR)

Compliance  Period  3

2017-­‐2020

00

0

2017-­‐2020Compliance  Period  3

0

$0

0

000

2017-­‐2020

Compliance  Period  3

0N/A

0

0

2017-­‐2020

0

Compliance  Period  3

N/A

24,543

N/AN/A

N/AN/A

024,543

0

N/AN/A

Page 30: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Procurement  DetailData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018 Actual  Data

 Forecasted  Data

Procurement  Summary  (MWh) 2011 2012 2013 2014 2015Total  Annual  Procurement 51,525 166,522 364,363 646,619 866,365

PCC  0  RECs  Procured 39,119 39,238 92,576 0 0PCC  1  RECs  Procured 6,203 69,553 114,693 171,634 467,921PCC  2  RECs  Procured 6,203 32,731 62,094 120,282 164,801PCC  3  RECs  Procured 0 25,000 95,000 354,703 233,643

Procurement  from  Long-­‐Term  (>=  10  years) 0 4,553 40,693 57,765 109,636Procurement  from  Short-­‐Term      (<  10  years) 51,525 161,969 323,670 588,854 756,729

Long  Term  Contracting  RequirementExpected  Total  RECs  from  long-­‐term  contracts 1,640,000 613,000 880,000 1,896,000 899,000Expected  Total  RECs  from  short-­‐term  contracts 114,483 806,418 51,280 1,877,500 276,676Long  Term  Contracting  Requirement  Shortfall

RPS-­‐Eligible  Procurement  By  Resource  Type 2011 2012 2013 2014 2015Biomass 17,319 22,890 11,091 0 0Biogas:  Digester  Gas   0 0 0 0 0Biogas:  Landfill  Gas   0 0 0 0 0Biodiesel 0 0 0 0 0Muni  Solid  Waste 0 0 0 0 0Bioenergy  subtotal 17,319 22,890 11,091 0 0

Geothermal 0 0 0 51,280 27,244Small  Hydro 0 10,000 125,231 0 63,878Conduit  Hydro 0 0 0 0 0Water  Supply  and  Conveyance   0 0 0 0 0Solar  PV 0 165 1,807 2,964 95,959Solar  Thermal 0 0 0 0 0Wind 8,202 90,452 173,705 508,183 567,269Ocean  Wave   0 0 0 0 0Ocean  Thermal   0 0 0 0 0Tidal  Current   0 0 0 0 0Fuel  Cells 0 0 0 0 0

0

Actual  MWh

0

228 4,665

Page 31: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Procurement  DetailData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

Procurement  Summary  (MWh)Total  Annual  Procurement

PCC  0  RECs  ProcuredPCC  1  RECs  ProcuredPCC  2  RECs  ProcuredPCC  3  RECs  Procured

Procurement  from  Long-­‐Term  (>=  10  years)Procurement  from  Short-­‐Term      (<  10  years)

Long  Term  Contracting  RequirementExpected  Total  RECs  from  long-­‐term  contractsExpected  Total  RECs  from  short-­‐term  contractsLong  Term  Contracting  Requirement  Shortfall

RPS-­‐Eligible  Procurement  By  Resource  TypeBiomassBiogas:  Digester  Gas  Biogas:  Landfill  Gas  BiodieselMuni  Solid  WasteBioenergy  subtotal

GeothermalSmall  HydroConduit  HydroWater  Supply  and  Conveyance  Solar  PVSolar  ThermalWindOcean  Wave  Ocean  Thermal  Tidal  Current  Fuel  Cells

2016 2017 2018 2019 20201,160,620 1,749,254 2,883,761 2,018,119 1,924,261

0 0 0 0 0781,561 1,201,208 1,922,761 1,658,119 1,924,261311,000 458,046 925,000 360,000 068,059 90,000 36,000 0 0

251,987 469,121 755,561 1,153,819 1,495,161908,633 1,280,133 2,128,200 864,300 429,100

25,006,000 392,000 4,530,420 0 03,235,018 1,161,500 688,000 0 0

2016 2017 2018 2019 20200 0 36,000 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 36,000 0 00 340,692 188,000 88,000 88,000

144,196 245,237 168,400 70,200 70,0000 0 0 0 00 0 0 0 0

195,736 173,632 483,361 827,819 898,1610 0 0 0 0

652,368 832,981 1,928,000 952,100 788,1000 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0

Actual  MWh Forecasted  MWh

0 0

4,665 12,688

Page 32: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Procurement  DetailData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

Procurement  Summary  (MWh)Total  Annual  Procurement

PCC  0  RECs  ProcuredPCC  1  RECs  ProcuredPCC  2  RECs  ProcuredPCC  3  RECs  Procured

Procurement  from  Long-­‐Term  (>=  10  years)Procurement  from  Short-­‐Term      (<  10  years)

Long  Term  Contracting  RequirementExpected  Total  RECs  from  long-­‐term  contractsExpected  Total  RECs  from  short-­‐term  contractsLong  Term  Contracting  Requirement  Shortfall

RPS-­‐Eligible  Procurement  By  Resource  TypeBiomassBiogas:  Digester  Gas  Biogas:  Landfill  Gas  BiodieselMuni  Solid  WasteBioenergy  subtotal

GeothermalSmall  HydroConduit  HydroWater  Supply  and  Conveyance  Solar  PVSolar  ThermalWindOcean  Wave  Ocean  Thermal  Tidal  Current  Fuel  Cells

2021 2022 2023 2024 20252,483,253 2,476,753 2,171,262 2,136,681 2,130,204

0 0 0 0 02,483,253 2,476,753 2,171,262 2,136,681 2,130,204

0 0 0 0 00 0 0 0 0

2,154,153 2,147,653 2,142,162 2,136,681 2,130,204329,100 329,100 29,100 0 0

N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A

2021 2022 2023 2024 20250 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0

88,000 88,000 88,000 88,000 88,00070,000 70,000 70,000 70,000 70,000

0 0 0 0 00 0 0 0 0

1,478,153 1,471,653 1,466,162 1,460,681 1,454,2040 0 0 0 0

767,100 767,100 467,100 438,000 438,0000 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0

Forecasted  MWh

N/A N/A

N/AN/A

Page 33: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  Procurement  DetailData  Reported  by:Marin  Clean  Energy  (MCE)August  31,  2018

Procurement  Summary  (MWh)Total  Annual  Procurement

PCC  0  RECs  ProcuredPCC  1  RECs  ProcuredPCC  2  RECs  ProcuredPCC  3  RECs  Procured

Procurement  from  Long-­‐Term  (>=  10  years)Procurement  from  Short-­‐Term      (<  10  years)

Long  Term  Contracting  RequirementExpected  Total  RECs  from  long-­‐term  contractsExpected  Total  RECs  from  short-­‐term  contractsLong  Term  Contracting  Requirement  Shortfall

RPS-­‐Eligible  Procurement  By  Resource  TypeBiomassBiogas:  Digester  Gas  Biogas:  Landfill  Gas  BiodieselMuni  Solid  WasteBioenergy  subtotal

GeothermalSmall  HydroConduit  HydroWater  Supply  and  Conveyance  Solar  PVSolar  ThermalWindOcean  Wave  Ocean  Thermal  Tidal  Current  Fuel  Cells

2026 2027 2028 2029 20302,054,737 1,960,277 1,954,624 1,947,180 1,941,743

0 0 0 0 02,054,737 1,960,277 1,954,624 1,947,180 1,941,743

0 0 0 0 00 0 0 0 0

2,054,737 1,960,277 1,954,624 1,947,180 1,941,7430 0 0 0 0

N/A N/A N/A N/A N/AN/A N/A N/A N/A N/A

2026 2027 2028 2029 20300 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0

88,000 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0

1,448,737 1,442,277 1,436,624 1,429,180 1,423,7430 0 0 0 0

438,000 438,000 438,000 438,000 438,0000 0 0 0 00 0 0 0 00 0 0 0 00 0 0 0 0

Forecasted  MWh

N/A N/A

N/A N/A

Page 34: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  (2011)  36  Month  RetirementData  Reported  by:Marin  Clean  Energy  (MCE) Input  RequiredAugust  31,  2018 Information  is  Hard  Coded  (No  Input  Required)

CPUC  ID RPS  ID WREGIS_ID Facility  Name Expected  PCC  Classification Contract  Year Contract  Length Short  Term  Contract  Eligibility Vintage  Month/Year Retirement  Date  (MM/DD/YYYY)

60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 01/2010 12/19/1260596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 02/2010 2/4/1360596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 03/2010 2/11/1360596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2010 3/21/1360596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 05/2010 4/11/1360596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 06/2010 5/21/1360596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 07/2010 6/26/1360994A W1388 Columbia  Ridge  -­‐  Columbia  Ridge  4 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 08/2010 7/24/1360994A W1389 Columbia  Ridge  -­‐  Columbia  Ridge  5 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 08/2010 7/24/1360994A W1390 Columbia  Ridge  -­‐  Columbia  Ridge  6 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 08/2010 7/24/1360994A W1391 Columbia  Ridge  -­‐  Columbia  Ridge  7 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 08/2010 7/24/1360994A W1392 Columbia  Ridge  -­‐  Columbia  Ridge  8 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 08/2010 7/24/1360803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 08/2010 7/24/1360994A W1361 Columbia  Ridge  -­‐  Columbia  Ridge  1 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 09/2010 7/26/1360994A W1385 Columbia  Ridge  -­‐  Columbia  Ridge  2 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 09/2010 7/26/1360994A W1387 Columbia  Ridge  -­‐  Columbia  Ridge  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 09/2010 7/26/1360994A W1388 Columbia  Ridge  -­‐  Columbia  Ridge  4 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 09/2010 7/26/1360994A W1389 Columbia  Ridge  -­‐  Columbia  Ridge  5 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 09/2010 7/26/1360994A W1390 Columbia  Ridge  -­‐  Columbia  Ridge  6 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 09/2010 7/26/1360994A W1391 Columbia  Ridge  -­‐  Columbia  Ridge  7 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 09/2010 7/26/1360994A W1392 Columbia  Ridge  -­‐  Columbia  Ridge  8 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 09/2010 7/26/1360994A W1361 Columbia  Ridge  -­‐  Columbia  Ridge  1 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 10/2010 7/26/1360994A W1385 Columbia  Ridge  -­‐  Columbia  Ridge  2 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 10/2010 7/26/1360994A W1387 Columbia  Ridge  -­‐  Columbia  Ridge  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 10/2010 7/26/1360994A W1388 Columbia  Ridge  -­‐  Columbia  Ridge  4 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 10/2010 7/26/1360994A W1389 Columbia  Ridge  -­‐  Columbia  Ridge  5 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 10/2010 7/26/1360994A W1390 Columbia  Ridge  -­‐  Columbia  Ridge  6 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 10/2010 7/26/1360994A W1391 Columbia  Ridge  -­‐  Columbia  Ridge  7 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 10/2010 7/26/1360994A W1392 Columbia  Ridge  -­‐  Columbia  Ridge  8 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 10/2010 7/26/1360994A W1361 Columbia  Ridge  -­‐  Columbia  Ridge  1 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 11/2010 7/26/1360994A W1385 Columbia  Ridge  -­‐  Columbia  Ridge  2 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 11/2010 7/26/1360994A W1387 Columbia  Ridge  -­‐  Columbia  Ridge  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 11/2010 7/26/1360994A W1388 Columbia  Ridge  -­‐  Columbia  Ridge  4 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 11/2010 7/26/1360994A W1389 Columbia  Ridge  -­‐  Columbia  Ridge  5 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 11/2010 7/26/1360994A W1390 Columbia  Ridge  -­‐  Columbia  Ridge  6 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 11/2010 7/26/1360994A W1391 Columbia  Ridge  -­‐  Columbia  Ridge  7 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 11/2010 7/26/1360994A W1392 Columbia  Ridge  -­‐  Columbia  Ridge  8 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 11/2010 7/26/1360994A W1361 Columbia  Ridge  -­‐  Columbia  Ridge  1 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 12/2010 7/26/1360994A W1385 Columbia  Ridge  -­‐  Columbia  Ridge  2 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 12/2010 7/26/1360994A W1387 Columbia  Ridge  -­‐  Columbia  Ridge  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 12/2010 7/26/1360994A W1388 Columbia  Ridge  -­‐  Columbia  Ridge  4 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 12/2010 7/26/1360994A W1389 Columbia  Ridge  -­‐  Columbia  Ridge  5 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 12/2010 7/26/1360994A W1390 Columbia  Ridge  -­‐  Columbia  Ridge  6 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 12/2010 7/26/1360994A W1391 Columbia  Ridge  -­‐  Columbia  Ridge  7 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 12/2010 7/26/1360994A W1392 Columbia  Ridge  -­‐  Columbia  Ridge  8 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 12/2010 7/26/1360803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 10/2010 7/26/1360803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 11/2010 7/26/1360803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 12/2010 7/26/1360776A W240 Big  Horn  -­‐  Big  Horn  Wind  Project  LLC PCC  2 2011 Short-­‐term Eligible  Short-­‐term 01/2011 7/26/1360994A W1361 Columbia  Ridge  -­‐  Columbia  Ridge  1 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 01/2011 7/26/1360994A W1385 Columbia  Ridge  -­‐  Columbia  Ridge  2 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 01/2011 7/26/1361409A W1912 High  Desert  Power  Plant  -­‐  High  Desert  Power  Plant PCC  1 2011 Short-­‐term Eligible  Short-­‐term 08/2011 7/26/13

Note : Please  create  one  line  per  combination  of  REC  vintage  and    REC retirement  date.    For  example  RECs  that  have  the  same  vintage  are  retired  on  two  separate   dates,  please   include  one  line  per  retirement  date.  Likewise  if  RECs  of  different  vintages  (e.g.  Juneare  retired  on  the  same  date,  please   include  one  line  per  vintage.

Page 35: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Last  Month  to  Retire  REC  (Month/Year)

Do  RECs  "Pass"  or  "Fail"  Requirements  of  36  Month  

Rule:  MWh  REC  Quantity  Retired

Dec-­2012 PASS 3,224                                                                                                    Jan-­2013 PASS 2,778                                                                                                    Feb-­2013 PASS 3,027                                                                                                    Mar-­2013 PASS 2,034                                                                                                    Apr-­2013 PASS 2,699                                                                                                    May-­2013 PASS 2,955                                                                                                    Jun-­2013 PASS 602                                                                                                            Jul-­2013 PASS 275                                                                                                            Jul-­2013 PASS 553                                                                                                            Jul-­2013 PASS 551                                                                                                            Jul-­2013 PASS 551                                                                                                            Jul-­2013 PASS 478                                                                                                            Jul-­2013 PASS 662                                                                                                            Aug-­2013 PASS 434                                                                                                            Aug-­2013 PASS 456                                                                                                            Aug-­2013 PASS 432                                                                                                            Aug-­2013 PASS 457                                                                                                            Aug-­2013 PASS 405                                                                                                            Aug-­2013 PASS 440                                                                                                            Aug-­2013 PASS 446                                                                                                            Aug-­2013 PASS 454                                                                                                            Sep-­2013 PASS 550                                                                                                            Sep-­2013 PASS 574                                                                                                            Sep-­2013 PASS 577                                                                                                            Sep-­2013 PASS 581                                                                                                            Sep-­2013 PASS 580                                                                                                            Sep-­2013 PASS 580                                                                                                            Sep-­2013 PASS 548                                                                                                            Sep-­2013 PASS 578                                                                                                            Oct-­2013 PASS 529                                                                                                            Oct-­2013 PASS 542                                                                                                            Oct-­2013 PASS 532                                                                                                            Oct-­2013 PASS 518                                                                                                            Oct-­2013 PASS 535                                                                                                            Oct-­2013 PASS 538                                                                                                            Oct-­2013 PASS 561                                                                                                            Oct-­2013 PASS 535                                                                                                            Nov-­2013 PASS 525                                                                                                            Nov-­2013 PASS 512                                                                                                            Nov-­2013 PASS 490                                                                                                            Nov-­2013 PASS 502                                                                                                            Nov-­2013 PASS 517                                                                                                            Nov-­2013 PASS 516                                                                                                            Nov-­2013 PASS 527                                                                                                            Nov-­2013 PASS 498                                                                                                            Sep-­2013 PASS 592                                                                                                            Oct-­2013 PASS 701                                                                                                            Nov-­2013 PASS 44                                                                                                                Dec-­2013 PASS 6,203                                                                                                    Dec-­2013 PASS 582                                                                                                            Dec-­2013 PASS 342                                                                                                            Jul-­2014 PASS 6,203                                                                                                    

date.    For  example  RECs  that  have  the  same  vintage  are  retired  on  two  separate   dates,  please   include  one  line  per  retirement  date.  Likewise  if  RECs  of  different  vintages  (e.g.  June2011  and  July  2011)  

Page 36: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  (2012)  36  Month  RetirementData  Reported  by:Marin  Clean  Energy  (MCE) Input  RequiredAugust  31,  2018 Information  is  Hard  Coded  (No  Input  Required)

CPUC  ID RPS  ID WREGIS_ID Facility  Name Expected  PCC  Classification Contract  Year Contract  Length Short  Term  Contract  Eligibility Vintage  Month/Year Retirement  Date  (MM/DD/YYYY)

Last  Month  to  Retire  REC  (Month/Year)

Do  RECs  "Pass"  or  "Fail"  Requirements  of  36  Month  

Rule:  MWh  REC  Quantity  Retired

60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 07/2010 6/26/13 Jun-­2013 PASS 2,858                                                                                                    60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 08/2010 7/26/13 Jul-­2013 PASS 3,182                                                                                                    60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 09/2010 7/30/13 Aug-­2013 PASS 3,005                                                                                                    60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 10/2010 7/30/13 Sep-­2013 PASS 2,459                                                                                                    60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 11/2010 7/30/13 Oct-­2013 PASS 2,551                                                                                                    60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 12/2010 7/30/13 Nov-­2013 PASS 2,998                                                                                                    60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 01/2011 7/30/13 Dec-­2013 PASS 3,070                                                                                                    60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 02/2011 7/30/13 Jan-­2014 PASS 2,736                                                                                                    60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 03/2011 7/30/13 Feb-­2014 PASS 31                                                                                                                60776A W240 Big  Horn  -­‐  Big  Horn  Wind  Project  LLC PCC  2 2011 Short-­‐term Eligible  Short-­‐term 01/2011 7/30/13 Dec-­2013 PASS 5,877                                                                                                    60776A W240 Big  Horn  -­‐  Big  Horn  Wind  Project  LLC PCC  2 2011 Short-­‐term Eligible  Short-­‐term 04/2011 7/30/13 Mar-­2014 PASS 1,394                                                                                                    60994A W1385 Columbia  Ridge  -­‐  Columbia  Ridge  2 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 01/2011 7/30/13 Dec-­2013 PASS 237                                                                                                            60994A W1387 Columbia  Ridge  -­‐  Columbia  Ridge  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 01/2011 7/30/13 Dec-­2013 PASS 582                                                                                                            60994A W1388 Columbia  Ridge  -­‐  Columbia  Ridge  4 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 01/2011 7/30/13 Dec-­2013 PASS 581                                                                                                            60994A W1389 Columbia  Ridge  -­‐  Columbia  Ridge  5 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 01/2011 7/30/13 Dec-­2013 PASS 583                                                                                                            60994A W1390 Columbia  Ridge  -­‐  Columbia  Ridge  6 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 01/2011 7/30/13 Dec-­2013 PASS 579                                                                                                            60994A W1391 Columbia  Ridge  -­‐  Columbia  Ridge  7 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 01/2011 7/30/13 Dec-­2013 PASS 582                                                                                                            60994A W1392 Columbia  Ridge  -­‐  Columbia  Ridge  8 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 01/2011 7/30/13 Dec-­2013 PASS 580                                                                                                            60994A W1361 Columbia  Ridge  -­‐  Columbia  Ridge  1 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 02/2011 7/30/13 Jan-­2014 PASS 527                                                                                                            60994A W1385 Columbia  Ridge  -­‐  Columbia  Ridge  2 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 02/2011 7/30/13 Jan-­2014 PASS 525                                                                                                            60994A W1387 Columbia  Ridge  -­‐  Columbia  Ridge  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 02/2011 7/30/13 Jan-­2014 PASS 528                                                                                                            60994A W1388 Columbia  Ridge  -­‐  Columbia  Ridge  4 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 02/2011 7/30/13 Jan-­2014 PASS 527                                                                                                            60994A W1389 Columbia  Ridge  -­‐  Columbia  Ridge  5 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 02/2011 7/30/13 Jan-­2014 PASS 528                                                                                                            60994A W1390 Columbia  Ridge  -­‐  Columbia  Ridge  6 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 02/2011 7/30/13 Jan-­2014 PASS 525                                                                                                            60994A W1391 Columbia  Ridge  -­‐  Columbia  Ridge  7 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 02/2011 7/30/13 Jan-­2014 PASS 528                                                                                                            60994A W1392 Columbia  Ridge  -­‐  Columbia  Ridge  8 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 02/2011 7/30/13 Jan-­2014 PASS 527                                                                                                            60994A W1361 Columbia  Ridge  -­‐  Columbia  Ridge  1 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 03/2011 7/30/13 Feb-­2014 PASS 398                                                                                                            60994A W1385 Columbia  Ridge  -­‐  Columbia  Ridge  2 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 03/2011 7/30/13 Feb-­2014 PASS 596                                                                                                            60994A W1387 Columbia  Ridge  -­‐  Columbia  Ridge  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 03/2011 7/30/13 Feb-­2014 PASS 593                                                                                                            60994A W1388 Columbia  Ridge  -­‐  Columbia  Ridge  4 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 03/2011 7/30/13 Feb-­2014 PASS 599                                                                                                            60994A W1389 Columbia  Ridge  -­‐  Columbia  Ridge  5 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 03/2011 7/30/13 Feb-­2014 PASS 575                                                                                                            60994A W1390 Columbia  Ridge  -­‐  Columbia  Ridge  6 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 03/2011 7/30/13 Feb-­2014 PASS 554                                                                                                            60994A W1391 Columbia  Ridge  -­‐  Columbia  Ridge  7 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 03/2011 7/30/13 Feb-­2014 PASS 599                                                                                                            60994A W1392 Columbia  Ridge  -­‐  Columbia  Ridge  8 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 03/2011 7/30/13 Feb-­2014 PASS 599                                                                                                            60994A W1361 Columbia  Ridge  -­‐  Columbia  Ridge  1 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 7/30/13 Mar-­2014 PASS 284                                                                                                            60994A W1385 Columbia  Ridge  -­‐  Columbia  Ridge  2 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 7/30/13 Mar-­2014 PASS 350                                                                                                            60994A W1387 Columbia  Ridge  -­‐  Columbia  Ridge  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 7/30/13 Mar-­2014 PASS 514                                                                                                            60994A W1388 Columbia  Ridge  -­‐  Columbia  Ridge  4 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 7/30/13 Mar-­2014 PASS 514                                                                                                            60994A W1389 Columbia  Ridge  -­‐  Columbia  Ridge  5 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 7/30/13 Mar-­2014 PASS 502                                                                                                            60994A W1390 Columbia  Ridge  -­‐  Columbia  Ridge  6 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 7/30/13 Mar-­2014 PASS 512                                                                                                            60994A W1391 Columbia  Ridge  -­‐  Columbia  Ridge  7 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 7/30/13 Mar-­2014 PASS 281                                                                                                            60994A W1392 Columbia  Ridge  -­‐  Columbia  Ridge  8 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 7/30/13 Mar-­2014 PASS 15                                                                                                                60994A W1387 Columbia  Ridge  -­‐  Columbia  Ridge  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 05/2011 7/30/13 Apr-­2014 PASS 20                                                                                                                60994A W1388 Columbia  Ridge  -­‐  Columbia  Ridge  4 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 05/2011 7/30/13 Apr-­2014 PASS 408                                                                                                            60994A W1389 Columbia  Ridge  -­‐  Columbia  Ridge  5 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 05/2011 7/30/13 Apr-­2014 PASS 405                                                                                                            60994A W1390 Columbia  Ridge  -­‐  Columbia  Ridge  6 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 05/2011 7/30/13 Apr-­2014 PASS 91                                                                                                                61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2012 7/30/13 Sep-­2015 PASS 112                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2012 7/30/13 Oct-­2015 PASS 1,219                                                                                                    61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3   PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2012 7/30/13 Sep-­2015 PASS 56                                                                                                                61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3   PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2012 7/30/13 Oct-­2015 PASS 609                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport   PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2012 7/30/13 Sep-­2015 PASS 31                                                                                                                62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport   PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2012 7/30/13 Oct-­2015 PASS 79                                                                                                                62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport   PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2012 7/30/13 Nov-­2015 PASS 55                                                                                                                61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  system  PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2012 7/30/13 Dec-­2014 PASS 2,067                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  system  PCC  3 2012 Short-­‐term Eligible  Short-­‐term 02/2012 7/30/13 Jan-­2015 PASS 2,124                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  system  PCC  3 2012 Short-­‐term Eligible  Short-­‐term 03/2012 7/30/13 Feb-­2015 PASS 2,261                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  system  PCC  3 2012 Short-­‐term Eligible  Short-­‐term 04/2012 7/30/13 Mar-­2015 PASS 2,193                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  system  PCC  3 2012 Short-­‐term Eligible  Short-­‐term 05/2012 7/30/13 Apr-­2015 PASS 1,355                                                                                                    60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  2 2011 Short-­‐term Eligible  Short-­‐term 01/2011 7/30/13 Dec-­2013 PASS 1,024                                                                                                    60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  2 2011 Short-­‐term Eligible  Short-­‐term 02/2011 7/30/13 Jan-­2014 PASS 917                                                                                                            60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  2 2011 Short-­‐term Eligible  Short-­‐term 03/2011 7/30/13 Feb-­2014 PASS 915                                                                                                            60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  2 2011 Short-­‐term Eligible  Short-­‐term 04/2011 7/30/13 Mar-­2014 PASS 916                                                                                                            60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  2 2011 Short-­‐term Eligible  Short-­‐term 05/2011 7/30/13 Apr-­2014 PASS 814                                                                                                            60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  2 2011 Short-­‐term Eligible  Short-­‐term 06/2011 7/30/13 May-­2014 PASS 934                                                                                                            60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  2 2011 Short-­‐term Eligible  Short-­‐term 07/2011 7/30/13 Jun-­2014 PASS 587                                                                                                            60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  2 2011 Short-­‐term Eligible  Short-­‐term 08/2011 7/30/13 Jul-­2014 PASS 669                                                                                                            60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  2 2011 Short-­‐term Eligible  Short-­‐term 09/2011 7/30/13 Aug-­2014 PASS 496                                                                                                            60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  2 2011 Short-­‐term Eligible  Short-­‐term 10/2011 7/30/13 Sep-­2014 PASS 698                                                                                                            60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  2 2011 Short-­‐term Eligible  Short-­‐term 11/2011 7/30/13 Oct-­2014 PASS 974                                                                                                            60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  2 2011 Short-­‐term Eligible  Short-­‐term 12/2011 7/30/13 Nov-­2014 PASS 516                                                                                                            60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2012 7/30/13 Dec-­2014 PASS 3,693                                                                                                    60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2012 Short-­‐term Eligible  Short-­‐term 02/2012 7/30/13 Jan-­2015 PASS 952                                                                                                            60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2012 7/30/13 Dec-­2014 PASS 3,678                                                                                                    60633A W868 Total  Energy  Facility  -­‐  TEF  -­‐  GEN3 PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2012 7/30/13 Dec-­2014 PASS 3,677                                                                                                    60632A W858 Puente  Hills  Energy  Recovery  -­‐  Puente  Hills  Gas-­‐to-­‐Energy  Facility  Phase  II  Gen3PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2012 7/30/13 Dec-­2014 PASS 1,226                                                                                                    

Note : Please  create  one  line  per  combination  of  REC  vintage  and    REC retirement  date.    For  example  RECs  that  have  the  same  vintage  are  retired  on  two  separate   dates,  please   include  one  line  per  retirement  date.  Likewise  if  RECs  of  different  vintages  (e.g.  June2012  and  July  2012)  are  retired  on  the  same  date,  please  include  one  line  per  vintage.

Page 37: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

CPUC  ID RPS  ID WREGIS_ID Facility  Name Expected  PCC  Classification Contract  Year Contract  Length Short  Term  Contract  Eligibility Vintage  Month/Year Retirement  Date  (MM/DD/YYYY)

Last  Month  to  Retire  REC  (Month/Year)

Do  RECs  "Pass"  or  "Fail"  Requirements  of  36  Month  

Rule:  MWh  REC  Quantity  Retired

60632A W859 Puente  Hills  Energy  Recovery  -­‐  Puente  Hills  Gas-­‐to-­‐Energy  Facility  Phase  II  Gen4PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2012 7/30/13 Dec-­2014 PASS 1,155                                                                                                    60632A W860 Puente  Hills  Energy  Recovery  -­‐  Puente  Hills  Gas-­‐to-­‐Energy  Facility  Phase  II  Gen5PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2012 7/30/13 Dec-­2014 PASS 619                                                                                                            60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2012 Short-­‐term Eligible  Short-­‐term 07/2012 7/30/13 Jun-­2015 PASS 8,287                                                                                                    60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2012 Short-­‐term Eligible  Short-­‐term 08/2012 7/30/13 Jul-­2015 PASS 10,144                                                                                                60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2012 Short-­‐term Eligible  Short-­‐term 09/2012 7/30/13 Aug-­2015 PASS 4,822                                                                                                    60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2012 Short-­‐term Eligible  Short-­‐term 10/2012 7/30/13 Sep-­2015 PASS 7,174                                                                                                    60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2012 Short-­‐term Eligible  Short-­‐term 11/2012 7/30/13 Oct-­2015 PASS 5,002                                                                                                    60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2012 Short-­‐term Eligible  Short-­‐term 12/2012 7/30/13 Nov-­2015 PASS 10,908                                                                                                60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2012 Short-­‐term Eligible  Short-­‐term 01/2013 7/30/13 Dec-­2015 PASS 7,687                                                                                                    60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2012 Short-­‐term Eligible  Short-­‐term 02/2013 7/30/13 Jan-­2016 PASS 3,697                                                                                                    60974A W2398 Roosevelt  Biogas  1  -­‐  LFG  Engines  7-­‐9  -­‐  LFG  Phase  II PCC  1 2012 Short-­‐term Eligible  Short-­‐term 08/2012 7/30/13 Jul-­2015 PASS 1,444                                                                                                    60974A W2398 Roosevelt  Biogas  1  -­‐  LFG  Engines  7-­‐9  -­‐  LFG  Phase  II PCC  1 2012 Short-­‐term Eligible  Short-­‐term 09/2012 7/30/13 Aug-­2015 PASS 1,424                                                                                                    60974A W2398 Roosevelt  Biogas  1  -­‐  LFG  Engines  7-­‐9  -­‐  LFG  Phase  II PCC  1 2012 Short-­‐term Eligible  Short-­‐term 10/2012 7/30/13 Sep-­2015 PASS 1,486                                                                                                    60974A W2398 Roosevelt  Biogas  1  -­‐  LFG  Engines  7-­‐9  -­‐  LFG  Phase  II PCC  1 2012 Short-­‐term Eligible  Short-­‐term 11/2012 7/30/13 Oct-­2015 PASS 1,438                                                                                                    60974A W2398 Roosevelt  Biogas  1  -­‐  LFG  Engines  7-­‐9  -­‐  LFG  Phase  II PCC  1 2012 Short-­‐term Eligible  Short-­‐term 12/2012 7/30/13 Nov-­2015 PASS 1,487                                                                                                    61202A W1690 Juniper  Canyon  -­‐  Juniper  Canyon PCC  2 2012 Short-­‐term Eligible  Short-­‐term 10/2012 7/30/13 Sep-­2015 PASS 16,000                                                                                                61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2012 7/30/13 Nov-­2015 PASS 795                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3   PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2012 7/30/13 Nov-­2015 PASS 397                                                                                                            61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2012 7/30/13 Nov-­2015 PASS 1,200                                                                                                    

Page 38: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  (2013)  36  Month  RetirementData  Reported  by:Marin  Clean  Energy  (MCE) Input  Required Input  RequiredAugust  31,  2018 Information  is  Hard  Coded  (No  Input  Required) Information  is  Hard  Coded  (No  Input  Required)

CPUC  ID RPS  ID WREGIS_ID Facility  Name Expected  PCC  Classification Contract  Year Contract  Length Short  Term  Contract  Eligibility Vintage  Month/Year Retirement  Date  (MM/DD/YYYY)

Last  Month  to  Retire  REC  (Month/Year)

Do  RECs  "Pass"  or  "Fail"  Requirements  of  36  Month  

Rule:  MWh  REC  Quantity  Retired

61221A W2775 AgPower  Jerome,  LLC  -­‐  Double  A  Dairy  Digester PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2013 6/4/14 Dec-­2015 PASS 1,553                                                                                                    61221A W2775 AgPower  Jerome,  LLC  -­‐  Double  A  Dairy  Digester PCC  3 2012 Short-­‐term Eligible  Short-­‐term 05/2013 6/4/14 Apr-­2016 PASS 2,385                                                                                                    61221A W2775 AgPower  Jerome,  LLC  -­‐  Double  A  Dairy  Digester PCC  3 2012 Short-­‐term Eligible  Short-­‐term 06/2013 6/4/14 May-­2016 PASS 2,275                                                                                                    60072A W787 Beardsley  -­‐  Beardsley PCC  1 2012 Short-­‐term Eligible  Short-­‐term 01/2013 6/9/13 Dec-­2015 PASS 3,934                                                                                                    60072A W787 Beardsley  -­‐  Beardsley PCC  1 2012 Short-­‐term Eligible  Short-­‐term 02/2013 6/9/13 Jan-­2016 PASS 3,156                                                                                                    60072A W787 Beardsley  -­‐  Beardsley PCC  1 2012 Short-­‐term Eligible  Short-­‐term 03/2013 6/9/13 Feb-­2016 PASS 2,707                                                                                                    60072A W787 Beardsley  -­‐  Beardsley PCC  1 2012 Short-­‐term Eligible  Short-­‐term 04/2013 6/9/13 Mar-­2016 PASS 2,931                                                                                                    60072A W787 Beardsley  -­‐  Beardsley PCC  1 2012 Short-­‐term Eligible  Short-­‐term 05/2013 6/9/13 Apr-­2016 PASS 3,304                                                                                                    60072A W787 Beardsley  -­‐  Beardsley PCC  1 2012 Short-­‐term Eligible  Short-­‐term 06/2013 6/9/13 May-­2016 PASS 2,706                                                                                                    60776A W240 Big  Horn  -­‐  Big  Horn  Wind  Project  LLC PCC  2 2011 Short-­‐term Eligible  Short-­‐term 01/2011 12/6/13 Dec-­2013 PASS 6,303                                                                                                    60776A W240 Big  Horn  -­‐  Big  Horn  Wind  Project  LLC PCC  2 2011 Short-­‐term Eligible  Short-­‐term 02/2011 1/16/14 Jan-­2014 PASS 5,699                                                                                                    60776A W240 Big  Horn  -­‐  Big  Horn  Wind  Project  LLC PCC  2 2011 Short-­‐term Eligible  Short-­‐term 02/2011 1/27/14 Jan-­2014 PASS 1,092                                                                                                    61378A W1952 Birch  Creek  Power  -­‐  Birch  Creek  Power PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2013 6/4/14 Dec-­2015 PASS 17                                                                                                                61378A W1952 Birch  Creek  Power  -­‐  Birch  Creek  Power PCC  3 2012 Short-­‐term Eligible  Short-­‐term 02/2013 6/4/14 Jan-­2016 PASS 810                                                                                                            61378A W1952 Birch  Creek  Power  -­‐  Birch  Creek  Power PCC  3 2012 Short-­‐term Eligible  Short-­‐term 03/2013 6/4/14 Feb-­2016 PASS 1,310                                                                                                    61378A W1952 Birch  Creek  Power  -­‐  Birch  Creek  Power PCC  3 2012 Short-­‐term Eligible  Short-­‐term 04/2013 6/4/14 Mar-­2016 PASS 1,300                                                                                                    61378A W1952 Birch  Creek  Power  -­‐  Birch  Creek  Power PCC  3 2012 Short-­‐term Eligible  Short-­‐term 05/2013 6/4/14 Apr-­2016 PASS 1,281                                                                                                    61378A W1952 Birch  Creek  Power  -­‐  Birch  Creek  Power PCC  3 2012 Short-­‐term Eligible  Short-­‐term 06/2013 6/4/14 May-­2016 PASS 1,084                                                                                                    60994A W1361 Columbia  Ridge  -­‐  Columbia  Ridge  1 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 05/2011 4/25/14 Apr-­2014 PASS 399                                                                                                            60994A W1361 Columbia  Ridge  -­‐  Columbia  Ridge  1 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 06/2011 4/25/14 May-­2014 PASS 547                                                                                                            60994A W1385 Columbia  Ridge  -­‐  Columbia  Ridge  2 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 05/2011 4/25/14 Apr-­2014 PASS 405                                                                                                            60994A W1385 Columbia  Ridge  -­‐  Columbia  Ridge  2 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 06/2011 4/25/14 May-­2014 PASS 540                                                                                                            60994A W1387 Columbia  Ridge  -­‐  Columbia  Ridge  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 05/2011 4/25/14 Apr-­2014 PASS 382                                                                                                            60994A W1387 Columbia  Ridge  -­‐  Columbia  Ridge  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 06/2011 4/25/14 May-­2014 PASS 540                                                                                                            60994A W1388 Columbia  Ridge  -­‐  Columbia  Ridge  4 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 06/2011 4/25/14 May-­2014 PASS 558                                                                                                            60994A W1389 Columbia  Ridge  -­‐  Columbia  Ridge  5 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 06/2011 4/25/14 May-­2014 PASS 560                                                                                                            60994A W1390 Columbia  Ridge  -­‐  Columbia  Ridge  6 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 05/2011 4/25/14 Apr-­2014 PASS 315                                                                                                            60994A W1390 Columbia  Ridge  -­‐  Columbia  Ridge  6 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 06/2011 4/25/14 May-­2014 PASS 556                                                                                                            60994A W1391 Columbia  Ridge  -­‐  Columbia  Ridge  7 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 3/25/14 Mar-­2014 PASS 251                                                                                                            60994A W1391 Columbia  Ridge  -­‐  Columbia  Ridge  7 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 05/2011 4/25/14 Apr-­2014 PASS 401                                                                                                            60994A W1391 Columbia  Ridge  -­‐  Columbia  Ridge  7 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 06/2011 4/25/14 May-­2014 PASS 548                                                                                                            60994A W1392 Columbia  Ridge  -­‐  Columbia  Ridge  8 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 3/25/14 Mar-­2014 PASS 512                                                                                                            60994A W1392 Columbia  Ridge  -­‐  Columbia  Ridge  8 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 05/2011 4/25/14 Apr-­2014 PASS 409                                                                                                            60994A W1392 Columbia  Ridge  -­‐  Columbia  Ridge  8 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 06/2011 4/25/14 May-­2014 PASS 507                                                                                                            60928A W1379 Combine  Hills  II  -­‐  Eurus  Combine  Hills  II  LLC PCC  0 2010 Short-­‐term Eligible  Short-­‐term 01/2011 11/25/13 Dec-­2013 PASS 17,225                                                                                                60928A W1379 Combine  Hills  II  -­‐  Eurus  Combine  Hills  II  LLC PCC  0 2010 Short-­‐term Eligible  Short-­‐term 02/2011 1/16/14 Jan-­2014 PASS 15,457                                                                                                60928A W1379 Combine  Hills  II  -­‐  Eurus  Combine  Hills  II  LLC PCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 3/25/14 Mar-­2014 PASS 1,219                                                                                                    61381A W2011 Dry  Creek  Project  -­‐  Dry  Creek  Project PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2013 6/4/14 Dec-­2015 PASS 281                                                                                                            61381A W2011 Dry  Creek  Project  -­‐  Dry  Creek  Project PCC  3 2012 Short-­‐term Eligible  Short-­‐term 02/2013 6/4/14 Jan-­2016 PASS 185                                                                                                            61375A W225 Falls  Creek  Hydro  -­‐  Falls  Creek  Hydro PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2013 6/4/14 Dec-­2015 PASS 1,644                                                                                                    61375A W225 Falls  Creek  Hydro  -­‐  Falls  Creek  Hydro PCC  3 2012 Short-­‐term Eligible  Short-­‐term 02/2013 6/4/14 Jan-­2016 PASS 1,160                                                                                                    61375A W225 Falls  Creek  Hydro  -­‐  Falls  Creek  Hydro PCC  3 2012 Short-­‐term Eligible  Short-­‐term 03/2013 6/4/14 Feb-­2016 PASS 2,375                                                                                                    61375A W225 Falls  Creek  Hydro  -­‐  Falls  Creek  Hydro PCC  3 2012 Short-­‐term Eligible  Short-­‐term 04/2013 6/4/14 Mar-­2016 PASS 3,194                                                                                                    61375A W225 Falls  Creek  Hydro  -­‐  Falls  Creek  Hydro PCC  3 2012 Short-­‐term Eligible  Short-­‐term 05/2013 6/4/14 Apr-­2016 PASS 2,684                                                                                                    61375A W225 Falls  Creek  Hydro  -­‐  Falls  Creek  Hydro PCC  3 2012 Short-­‐term Eligible  Short-­‐term 06/2013 6/4/14 May-­2016 PASS 853                                                                                                            61375A W225 Falls  Creek  Hydro  -­‐  Falls  Creek  Hydro PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/4/14 Jun-­2016 PASS 111                                                                                                            61375A W225 Falls  Creek  Hydro  -­‐  Falls  Creek  Hydro PCC  3 2012 Short-­‐term Eligible  Short-­‐term 08/2013 6/4/14 Jul-­2016 PASS 18                                                                                                                61205A W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 11/2013 6/20/14 Oct-­2016 PASS 880                                                                                                            61205A W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2013 6/20/14 Nov-­2016 PASS 988                                                                                                            61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 09/2013 6/9/14 Aug-­2016 PASS 1,031                                                                                                    61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2013 6/9/14 Sep-­2016 PASS 35                                                                                                                61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2013 6/20/14 Sep-­2016 PASS 1,003                                                                                                    61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 11/2013 6/20/14 Oct-­2016 PASS 874                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2013 6/20/14 Nov-­2016 PASS 970                                                                                                            60804A W965 Glenrock  III  -­‐  Glenrock  III PCC  3 2013 Short-­‐term Eligible  Short-­‐term 01/2013 6/4/14 Dec-­2015 PASS 704                                                                                                            60819A W536 Goodnoe  Hills  -­‐  Goodnoe  Hills PCC  3 2013 Short-­‐term Eligible  Short-­‐term 02/2013 6/4/14 Jan-­2016 PASS 1,114                                                                                                    60899A W1334 High  Plains  -­‐  High  Plains PCC  3 2013 Short-­‐term Eligible  Short-­‐term 02/2013 6/4/14 Jan-­2016 PASS 1,005                                                                                                    61202A W1690 Juniper  Canyon  -­‐  Juniper  Canyon PCC  2 2012 Short-­‐term Eligible  Short-­‐term 06/2013 5/21/14 May-­2016 PASS 10,649                                                                                                61202A W1690 Juniper  Canyon  -­‐  Juniper  Canyon PCC  2 2012 Short-­‐term Eligible  Short-­‐term 07/2013 5/27/14 Jun-­2016 PASS 4,307                                                                                                    61200A W1689 Leaning  Juniper  II  -­‐  Leaning  Juniper  II PCC  2 2012 Short-­‐term Eligible  Short-­‐term 06/2013 5/27/14 May-­2016 PASS 9,016                                                                                                    61200A W1689 Leaning  Juniper  II  -­‐  Leaning  Juniper  II PCC  2 2012 Short-­‐term Eligible  Short-­‐term 07/2013 5/27/14 Jun-­2016 PASS 25,028                                                                                                61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2013 6/9/14 Dec-­2015 PASS 435                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2013 6/9/14 Jan-­2016 PASS 427                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2013 6/9/14 Feb-­2016 PASS 475                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2013 6/9/14 Mar-­2016 PASS 445                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2013 6/9/14 Apr-­2016 PASS 440                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2013 6/9/14 May-­2016 PASS 404                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2013 6/9/14 Jun-­2016 PASS 394                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2013 6/9/14 Jul-­2016 PASS 388                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2013 6/9/14 Aug-­2016 PASS 367                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2013 6/9/14 Sep-­2016 PASS 327                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2013 6/9/14 Oct-­2016 PASS 299                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2013 6/9/14 Nov-­2016 PASS 420                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2013 6/9/14 Dec-­2015 PASS 868                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2013 6/9/14 Jan-­2016 PASS 855                                                                                                            

Note : Please  create  one  line  per  combination  of  REC  vintage  and    REC retirement  date.    For  example  RECs  that  have  the  same  vintage  are  retired  on  two  separate   dates,  please   include  one  line  per  retirement  date.  Likewise  if  RECs  of  different  vintages  (e.g.  June2013  and  July  2013)  are  retired  on  the  same  date,  please  include  one  line  per  vintage.

Page 39: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2013 6/9/14 Feb-­2016 PASS 949                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2013 6/9/14 Mar-­2016 PASS 890                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2013 6/9/14 Apr-­2016 PASS 881                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2013 6/9/14 May-­2016 PASS 807                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2013 6/9/14 Jun-­2016 PASS 788                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2013 6/9/14 Jul-­2016 PASS 777                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2013 6/9/14 Aug-­2016 PASS 734                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2013 6/9/14 Sep-­2016 PASS 654                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2013 6/9/14 Oct-­2016 PASS 597                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2013 6/9/14 Nov-­2016 PASS 840                                                                                                            61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2013 6/9/14 Dec-­2015 PASS 1,309                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2013 6/9/14 Jan-­2016 PASS 1,291                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2013 6/9/14 Feb-­2016 PASS 1,431                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2013 6/9/14 Mar-­2016 PASS 1,345                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2013 6/9/14 Apr-­2016 PASS 1,329                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2013 6/9/14 May-­2016 PASS 1,218                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2013 6/9/14 Jun-­2016 PASS 1,189                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2013 6/9/14 Jul-­2016 PASS 1,173                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2013 6/9/14 Aug-­2016 PASS 1,108                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2013 6/9/14 Sep-­2016 PASS 987                                                                                                            61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2013 6/9/14 Oct-­2016 PASS 901                                                                                                            61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2013 6/9/14 Nov-­2016 PASS 1,267                                                                                                    61380A W2009 Marsh  Valley  Project  -­‐  Marsh  Valley  Project PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2013 6/4/14 Dec-­2015 PASS 443                                                                                                            61380A W2009 Marsh  Valley  Project  -­‐  Marsh  Valley  Project PCC  3 2012 Short-­‐term Eligible  Short-­‐term 02/2013 6/4/14 Jan-­2016 PASS 481                                                                                                            61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 05/2012 6/4/14 Apr-­2015 PASS 961                                                                                                            61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 06/2012 6/4/14 May-­2015 PASS 2,137                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2012 6/4/14 Jun-­2015 PASS 2,031                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 08/2012 6/4/14 Jul-­2015 PASS 2,043                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 09/2012 6/4/14 Aug-­2015 PASS 2,041                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 10/2012 6/4/14 Sep-­2015 PASS 787                                                                                                            61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2013 6/4/14 Dec-­2015 PASS 2,364                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 02/2013 6/4/14 Jan-­2016 PASS 2,130                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 03/2013 6/4/14 Feb-­2016 PASS 2,355                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 04/2013 6/4/14 Mar-­2016 PASS 2,304                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 05/2013 6/4/14 Apr-­2016 PASS 1,847                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 06/2013 6/4/14 May-­2016 PASS 2,100                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/4/14 Jun-­2016 PASS 2,001                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 08/2013 6/4/14 Jul-­2016 PASS 1,854                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 09/2013 6/4/14 Aug-­2016 PASS 11                                                                                                                61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 10/2013 6/4/14 Sep-­2016 PASS 2,149                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 11/2013 6/4/14 Oct-­2016 PASS 2,319                                                                                                    61383A W1877 Middle  Fork  Irrigation  District  -­‐  Hydro  system  -­‐  Middle  Fork  Irrigation  District  -­‐  Hydro  systemPCC  3 2012 Short-­‐term Eligible  Short-­‐term 12/2013 6/4/14 Nov-­2016 PASS 566                                                                                                            62314A W2869 Mountain  Air  Wind  Projects  -­‐  Mountain  Air  Wind  Projects PCC  3 2013 Short-­‐term Eligible  Short-­‐term 06/2013 6/4/14 May-­2016 PASS 18,747                                                                                                60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 09/2010 7/28/13 Aug-­2013 PASS 623                                                                                                            60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  0 2010 Short-­‐term Eligible  Short-­‐term 12/2010 8/14/13 Nov-­2013 PASS 662                                                                                                            60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  3 2013 Short-­‐term Eligible  Short-­‐term 03/2013 6/4/14 Feb-­2016 PASS 1,152                                                                                                    60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3 PCC  3 2013 Short-­‐term Eligible  Short-­‐term 06/2013 6/4/14 May-­2016 PASS 133                                                                                                            60923A W1884 Pilgrim  Stage  Station  Wind  Park,  LLC  -­‐  Pilgrim  Stage  Station  Wind  ParkPCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2013 6/4/14 Dec-­2015 PASS 1,609                                                                                                    60806A W928 Rolling  Hills  -­‐  Rolling  Hills PCC  3 2013 Short-­‐term Eligible  Short-­‐term 01/2013 6/4/14 Dec-­2015 PASS 1,259                                                                                                    62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2013 6/9/14 Dec-­2015 PASS 88                                                                                                                62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2013 6/9/14 Jan-­2016 PASS 113                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2013 6/9/14 Feb-­2016 PASS 144                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2013 6/9/14 Mar-­2016 PASS 190                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2013 6/9/14 Apr-­2016 PASS 203                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2013 6/9/14 May-­2016 PASS 203                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2013 6/9/14 Jun-­2016 PASS 209                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2013 6/9/14 Jul-­2016 PASS 197                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2013 6/9/14 Aug-­2016 PASS 159                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2013 6/9/14 Sep-­2016 PASS 134                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2013 6/9/14 Oct-­2016 PASS 85                                                                                                                62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2013 6/9/14 Nov-­2016 PASS 82                                                                                                                60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 3/25/14 Mar-­2014 PASS 3,170                                                                                                    60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 05/2011 4/25/14 Apr-­2014 PASS 2,048                                                                                                    60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  Burlington PCC  0 2010 Short-­‐term Eligible  Short-­‐term 06/2011 4/25/14 May-­2014 PASS 2,807                                                                                                    60925A W1881 Thousand  Springs  Wind  Park,  LLC  -­‐  Thousand  Springs  Wind  Park PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2013 6/4/14 Dec-­2015 PASS 2,755                                                                                                    60925A W1881 Thousand  Springs  Wind  Park,  LLC  -­‐  Thousand  Springs  Wind  Park PCC  3 2012 Short-­‐term Eligible  Short-­‐term 02/2013 6/4/14 Jan-­2016 PASS 3,323                                                                                                    60924A W1883 Tuana  Gulch  Wind  Park,  LLC  -­‐  Tuana  Gulch  Wind  Park PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2013 6/4/14 Dec-­2015 PASS 2,221                                                                                                    60924A W1883 Tuana  Gulch  Wind  Park,  LLC  -­‐  Tuana  Gulch  Wind  Park PCC  3 2012 Short-­‐term Eligible  Short-­‐term 02/2013 6/4/14 Jan-­2016 PASS 2,648                                                                                                    60071A W788 Tulloch  -­‐  Tulloch PCC  1 2012 Short-­‐term Eligible  Short-­‐term 01/2013 6/9/14 Dec-­2015 PASS 1,888                                                                                                    60071A W788 Tulloch  -­‐  Tulloch PCC  1 2012 Short-­‐term Eligible  Short-­‐term 02/2013 6/9/14 Jan-­2016 PASS 6,948                                                                                                    60071A W788 Tulloch  -­‐  Tulloch PCC  1 2012 Short-­‐term Eligible  Short-­‐term 03/2013 6/9/14 Feb-­2016 PASS 9,790                                                                                                    60071A W788 Tulloch  -­‐  Tulloch PCC  1 2012 Short-­‐term Eligible  Short-­‐term 04/2013 6/9/14 Mar-­2016 PASS 12,447                                                                                                60071A W788 Tulloch  -­‐  Tulloch PCC  1 2012 Short-­‐term Eligible  Short-­‐term 05/2013 6/9/14 Apr-­2016 PASS 14,330                                                                                                60071A W788 Tulloch  -­‐  Tulloch PCC  1 2012 Short-­‐term Eligible  Short-­‐term 06/2013 6/9/14 May-­2016 PASS 7,300                                                                                                    60071A W3091 Tulloch  -­‐  Tulloch  -­‐  Unit  3 PCC  1 2012 Short-­‐term Eligible  Short-­‐term 03/2013 6/9/14 Feb-­2016 PASS 515                                                                                                            60071A W3091 Tulloch  -­‐  Tulloch  -­‐  Unit  3 PCC  1 2012 Short-­‐term Eligible  Short-­‐term 04/2013 6/9/14 Mar-­2016 PASS 655                                                                                                            60071A W3091 Tulloch  -­‐  Tulloch  -­‐  Unit  3 PCC  1 2012 Short-­‐term Eligible  Short-­‐term 05/2013 6/9/14 Apr-­2016 PASS 754                                                                                                            60071A W3091 Tulloch  -­‐  Tulloch  -­‐  Unit  3 PCC  1 2012 Short-­‐term Eligible  Short-­‐term 06/2013 6/9/14 May-­2016 PASS 635                                                                                                            60564A W188 Wolverine  Creek  -­‐  Wolverine  Creek PCC  3 2013 Short-­‐term Eligible  Short-­‐term 02/2013 6/4/14 Jan-­2016 PASS 886                                                                                                            

Page 40: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  (2014)  36  Month  RetirementData  Reported  by:Marin  Clean  Energy  (MCE) Input  RequiredAugust  31,  2018 Information  is  Hard  Coded  (No  Input  Required)

CPUC  ID RPS  ID WREGIS_ID Facility  Name Expected  PCC  Classification Contract  Year Contract  Length Short  Term  Contract  Eligibility Vintage  Month/Year Retirement  Date  (MM/DD/YYYY)

Last  Month  to  Retire  REC  (Month/Year)

Do  RECs  "Pass"  or  "Fail"  Requirements  of  36  Month  

Rule:  MWh  REC  Quantity  Retired

62244A W3537 Alta  10 PCC  2 2014 Short-­‐term Eligible  Short-­‐term 07/2014 6/29/15 Jun-­2017 PASS 22,950                                                                                                62244A W3537 Alta  10 PCC  2 2014 Short-­‐term Eligible  Short-­‐term 08/2014 5/13/15 Jul-­2017 PASS 7,704                                                                                                    62244A W3537 Alta  10 PCC  2 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/29/15 Jul-­2017 PASS 9,185                                                                                                    62244A W3537 Alta  10 PCC  2 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/29/15 Aug-­2017 PASS 7,140                                                                                                    62244A W3537 Alta  10 PCC  2 2014 Short-­‐term Eligible  Short-­‐term 10/2014 6/29/15 Sep-­2017 PASS 812                                                                                                            62244A W3537 Alta  10 PCC  2 2014 Short-­‐term Eligible  Short-­‐term 11/2014 6/29/15 Oct-­2017 PASS 12,209                                                                                                60736A W834 Cabazon  Wind  Partners PCC  1 2012 Short-­‐term Eligible  Short-­‐term 01/2014 6/29/15 Dec-­2016 PASS 5,530                                                                                                    60736A W834 Cabazon  Wind  Partners PCC  1 2012 Short-­‐term Eligible  Short-­‐term 02/2014 6/29/15 Jan-­2017 PASS 7,649                                                                                                    60736A W834 Cabazon  Wind  Partners PCC  1 2012 Short-­‐term Eligible  Short-­‐term 03/2014 6/29/15 Feb-­2017 PASS 9,646                                                                                                    60736A W834 Cabazon  Wind  Partners PCC  1 2012 Short-­‐term Eligible  Short-­‐term 04/2014 6/29/15 Mar-­2017 PASS 7,755                                                                                                    61017A W1383 Campbell  Hill PCC  3 2014 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 1,746                                                                                                    61017A W1383 Campbell  Hill PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2013 6/22/15 Jul-­2016 PASS 7,202                                                                                                    61017A W1383 Campbell  Hill PCC  3 2014 Short-­‐term Eligible  Short-­‐term 07/2014 6/22/15 Jun-­2017 PASS 7,404                                                                                                    61188A W1687 Dunlap  1 PCC  3 2014 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 3,513                                                                                                    60928A W1379 Combine  Hills  II  -­‐  Eurus  Combine  Hills  II  LLCPCC  0 2010 Short-­‐term Eligible  Short-­‐term 03/2011 2/24/14 Feb-­2014 PASS 20,492                                                                                                60928A W1379 Combine  Hills  II  -­‐  Eurus  Combine  Hills  II  LLCPCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 3/25/14 Mar-­2014 PASS 15,561                                                                                                61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 07/2013 6/23/15 Jun-­2016 PASS 910                                                                                                            61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 08/2013 6/23/15 Jul-­2016 PASS 1,060                                                                                                    61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 09/2013 6/23/15 Aug-­2016 PASS 1,046                                                                                                    61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2013 6/23/15 Sep-­2016 PASS 1,080                                                                                                    61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 01/2014 6/23/15 Dec-­2016 PASS 457                                                                                                            61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 02/2014 6/23/15 Jan-­2017 PASS 968                                                                                                            61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 03/2014 6/23/15 Feb-­2017 PASS 1,085                                                                                                    61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 04/2014 6/23/15 Mar-­2017 PASS 1,043                                                                                                    61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 05/2014 6/23/15 Apr-­2017 PASS 1,033                                                                                                    61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 06/2014 6/23/15 May-­2017 PASS 916                                                                                                            61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 07/2014 6/23/15 Jun-­2017 PASS 1,053                                                                                                    61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 08/2014 6/23/15 Jul-­2017 PASS 1,051                                                                                                    61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 09/2014 6/23/15 Aug-­2017 PASS 698                                                                                                            61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2014 6/23/15 Sep-­2017 PASS 1,054                                                                                                    61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 11/2014 6/23/15 Oct-­2017 PASS 1,077                                                                                                    61205C W3547 G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2014 6/23/15 Nov-­2017 PASS 1,092                                                                                                    61206A W1565 G2  Energy  Ostrom  Rd PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 01/2014 6/23/15 Dec-­2016 PASS 27                                                                                                                61206A W1565 G2  Energy  Ostrom  Rd PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 05/2014 6/23/15 Apr-­2017 PASS 102                                                                                                            61206A W1565 G2  Energy  Ostrom  Rd PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 06/2014 6/23/15 May-­2017 PASS 70                                                                                                                61206A W1565 G2  Energy  Ostrom  Rd PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 07/2014 6/23/15 Jun-­2017 PASS 210                                                                                                            61206A W1565 G2  Energy  Ostrom  Rd PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 08/2014 6/23/15 Jul-­2017 PASS 70                                                                                                                61206A W1565 G2  Energy  Ostrom  Rd PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 09/2014 6/23/15 Aug-­2017 PASS 14                                                                                                                61206A W1565 G2  Energy  Ostrom  Rd PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2014 6/23/15 Sep-­2017 PASS 145                                                                                                            61206A W1565 G2  Energy  Ostrom  Rd PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2014 6/23/15 Nov-­2017 PASS 2                                                                                                                      61206A W3932 G2  Energy  Ostrom  Rd  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 01/2014 6/23/15 Dec-­2016 PASS 1,071                                                                                                    61206A W3932 G2  Energy  Ostrom  Rd  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 02/2014 6/23/15 Jan-­2017 PASS 969                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 03/2014 6/23/15 Feb-­2017 PASS 1,104                                                                                                    61206A W3932 G2  Energy  Ostrom  Rd  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 04/2014 6/23/15 Mar-­2017 PASS 1,053                                                                                                    61206A W3932 G2  Energy  Ostrom  Rd  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 05/2014 6/23/15 Apr-­2017 PASS 988                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 06/2014 6/23/15 May-­2017 PASS 979                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 07/2014 6/23/15 Jun-­2017 PASS 862                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 08/2014 6/23/15 Jul-­2017 PASS 992                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 09/2014 6/23/15 Aug-­2017 PASS 938                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2014 6/23/15 Sep-­2017 PASS 955                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 11/2014 6/23/15 Oct-­2017 PASS 1,058                                                                                                    61206A W3932 G2  Energy  Ostrom  Rd  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2014 6/23/15 Nov-­2017 PASS 1,104                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2013 Short-­‐term Eligible  Short-­‐term 01/2014 6/29/15 Dec-­2016 PASS 2,232                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2013 Short-­‐term Eligible  Short-­‐term 02/2014 6/29/15 Jan-­2017 PASS 2,016                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2013 Short-­‐term Eligible  Short-­‐term 03/2014 6/29/15 Feb-­2017 PASS 2,229                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2013 Short-­‐term Eligible  Short-­‐term 04/2014 6/29/15 Mar-­2017 PASS 2,160                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2013 Short-­‐term Eligible  Short-­‐term 05/2014 6/29/15 Apr-­2017 PASS 2,232                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2013 Short-­‐term Eligible  Short-­‐term 06/2014 6/29/15 May-­2017 PASS 2,160                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2013 Short-­‐term Eligible  Short-­‐term 07/2014 6/29/15 Jun-­2017 PASS 2,232                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2013 Short-­‐term Eligible  Short-­‐term 08/2014 6/29/15 Jul-­2017 PASS 2,232                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2013 Short-­‐term Eligible  Short-­‐term 09/2014 6/29/15 Aug-­2017 PASS 2,160                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2013 Short-­‐term Eligible  Short-­‐term 10/2014 6/29/15 Sep-­2017 PASS 2,232                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2013 Short-­‐term Eligible  Short-­‐term 11/2014 6/29/15 Oct-­2017 PASS 2,163                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2013 Short-­‐term Eligible  Short-­‐term 12/2014 6/29/15 Nov-­2017 PASS 2,232                                                                                                    60008A W125 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  18PCC  1 2014 Short-­‐term Eligible  Short-­‐term 07/2014 6/29/15 Jun-­2017 PASS 11,074                                                                                                60008A W125 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  18PCC  1 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/29/15 Jul-­2017 PASS 8,924                                                                                                    60008A W125 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  18PCC  1 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/29/15 Aug-­2017 PASS 5,002                                                                                                    60805A W964 Glenrock  I PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 2,025                                                                                                    60805A W964 Glenrock  I PCC  3 2012 Short-­‐term Eligible  Short-­‐term 08/2013 6/22/15 Jul-­2016 PASS 785                                                                                                            

Note : Please  create  one  line  per  combination  of  REC  vintage  and    REC retirement  date.    For  example  RECs  that  have  the  same  vintage  are  retired  on  two  separate   dates,  please   include  one  line  per  retirement  date.  Likewise  if  RECs  of  different  vintages  (e.g.  June  2014  and  July  2014)  are  retired  on  the  same  date,  please   include  one  line  per  vintage.

Page 41: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

CPUC  ID RPS  ID WREGIS_ID Facility  Name Expected  PCC  Classification Contract  Year Contract  Length Short  Term  Contract  Eligibility Vintage  Month/Year Retirement  Date  (MM/DD/YYYY)

Last  Month  to  Retire  REC  (Month/Year)

Do  RECs  "Pass"  or  "Fail"  Requirements  of  36  Month  

Rule:  MWh  REC  Quantity  Retired

60805A W964 Glenrock  I PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2014 6/22/15 Jun-­2017 PASS 7,883                                                                                                    60804A W965 Glenrock  III PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 639                                                                                                            60804A W965 Glenrock  III PCC  3 2012 Short-­‐term Eligible  Short-­‐term 08/2013 6/22/15 Jul-­2016 PASS 532                                                                                                            60804A W965 Glenrock  III PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2014 6/22/15 Jun-­2017 PASS 3,039                                                                                                    60917A W1862 Golden  Valley  Wind  Park PCC  3 2012 Short-­‐term Eligible  Short-­‐term 11/2013 6/22/15 Oct-­2016 PASS 2,216                                                                                                    60917A W1862 Golden  Valley  Wind  Park PCC  3 2012 Short-­‐term Eligible  Short-­‐term 12/2013 6/22/15 Nov-­2016 PASS 2,472                                                                                                    60917A W1862 Golden  Valley  Wind  Park PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2014 6/22/15 Dec-­2016 PASS 2,646                                                                                                    60917A W1862 Golden  Valley  Wind  Park PCC  3 2012 Short-­‐term Eligible  Short-­‐term 02/2014 6/22/15 Jan-­2017 PASS 2,354                                                                                                    60819A W536 Goodnoe  Hills PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 1,491                                                                                                    60724A W978 Hay  Canyon PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 2,754                                                                                                    60724A W978 Hay  Canyon PCC  3 2012 Short-­‐term Eligible  Short-­‐term 09/2013 6/22/15 Aug-­2016 PASS 449                                                                                                            60899A W1334 High  Plains PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 2,778                                                                                                    60745A W184 Hopkins  Ridge PCC  3 2012 Short-­‐term Eligible  Short-­‐term 08/2013 6/22/15 Jul-­2016 PASS 5,000                                                                                                    60745A W184 Hopkins  Ridge PCC  3 2012 Short-­‐term Eligible  Short-­‐term 09/2013 6/22/15 Aug-­2016 PASS 2,500                                                                                                    61202A W1690 Juniper  Canyon PCC  2 2012 Short-­‐term Eligible  Short-­‐term 03/2014 2/9/15 Feb-­2017 PASS 7,180                                                                                                    61202A W1690 Juniper  Canyon PCC  2 2012 Short-­‐term Eligible  Short-­‐term 04/2014 2/9/15 Mar-­2017 PASS 878                                                                                                            61202A W1690 Juniper  Canyon PCC  2 2012 Short-­‐term Eligible  Short-­‐term 05/2014 2/9/15 Apr-­2017 PASS 13,178                                                                                                61202A W1690 Juniper  Canyon PCC  2 2012 Short-­‐term Eligible  Short-­‐term 06/2014 2/9/15 May-­2017 PASS 2,717                                                                                                    61263A W4192 Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 12/2014 6/23/15 Nov-­2017 PASS 1,437                                                                                                    60602A W237 Klondike  Wind  Power  III  LLC PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 8,113                                                                                                    61200A W1689 Leaning  Juniper  II PCC  2 2012 Short-­‐term Eligible  Short-­‐term 03/2014 2/9/15 Feb-­2017 PASS 7,435                                                                                                    61200A W1689 Leaning  Juniper  II PCC  2 2012 Short-­‐term Eligible  Short-­‐term 04/2014 2/9/15 Mar-­2017 PASS 12,785                                                                                                61200A W1689 Leaning  Juniper  II PCC  2 2012 Short-­‐term Eligible  Short-­‐term 05/2014 2/9/15 Apr-­2017 PASS 5,827                                                                                                    60974A W2398 LFG  Phase  II  -­‐  LFG  Engines  7-­‐9  (Roosevelt  Biogas  1)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 01/2014 6/29/15 Dec-­2016 PASS 526                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant,  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2014 6/29/15 Dec-­2016 PASS 760                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant,  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2014 6/29/15 Jan-­2017 PASS 793                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant,  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2014 6/29/15 Feb-­2017 PASS 932                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant,  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2014 6/29/15 Mar-­2017 PASS 965                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant,  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2014 6/29/15 Apr-­2017 PASS 862                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant,  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2014 6/29/15 May-­2017 PASS 1,032                                                                                                    61632A W2318 Lincoln  Landfill  Power  Plant,  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2014 6/29/15 Jun-­2017 PASS 1,061                                                                                                    61632A W2318 Lincoln  Landfill  Power  Plant,  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2014 6/29/15 Jul-­2017 PASS 799                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant,  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2014 6/29/15 Aug-­2017 PASS 697                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant,  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2014 6/29/15 Sep-­2017 PASS 943                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant,  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2014 6/29/15 Oct-­2017 PASS 970                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant,  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2014 6/29/15 Nov-­2017 PASS 819                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant,  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2014 6/23/15 Dec-­2016 PASS 380                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant,  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2014 6/23/15 Jan-­2017 PASS 396                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant,  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2014 6/23/15 Feb-­2017 PASS 466                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant,  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2014 6/23/15 Mar-­2017 PASS 483                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant,  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2014 6/23/15 Apr-­2017 PASS 431                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant,  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2014 6/23/15 May-­2017 PASS 516                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant,  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2014 6/23/15 Jun-­2017 PASS 530                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant,  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2014 6/23/15 Jul-­2017 PASS 400                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant,  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2014 6/23/15 Aug-­2017 PASS 348                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant,  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2014 6/23/15 Sep-­2017 PASS 472                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant,  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2014 6/23/15 Oct-­2017 PASS 485                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant,  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2014 6/23/15 Nov-­2017 PASS 409                                                                                                            61632A W3188 Lincoln  Landfill  Power  Plant,  Units  4,  5  &6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2014 6/29/15 Dec-­2016 PASS 1,148                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant,  Units  4,  5  &6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2014 6/29/15 Jan-­2017 PASS 1,196                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant,  Units  4,  5  &6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2014 6/29/15 Feb-­2017 PASS 1,407                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant,  Units  4,  5  &6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2014 6/29/15 Mar-­2017 PASS 1,456                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant,  Units  4,  5  &6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2014 6/29/15 Apr-­2017 PASS 1,301                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant,  Units  4,  5  &6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2014 6/29/15 May-­2017 PASS 1,557                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant,  Units  4,  5  &6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2014 6/29/15 Jun-­2017 PASS 1,602                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant,  Units  4,  5  &6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2014 6/29/15 Jul-­2017 PASS 1,205                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant,  Units  4,  5  &6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2014 6/29/15 Aug-­2017 PASS 1,052                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant,  Units  4,  5  &6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2014 6/29/15 Sep-­2017 PASS 1,424                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant,  Units  4,  5  &6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2014 6/29/15 Oct-­2017 PASS 1,463                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant,  Units  4,  5  &6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2014 6/29/15 Nov-­2017 PASS 1,238                                                                                                    62044A W2670 Lower  Snake  River  (LSR)  -­‐  Phalen  GulchPCC  3 2012 Short-­‐term Eligible  Short-­‐term 08/2013 6/22/15 Jul-­2016 PASS 1,721                                                                                                    62044A W2670 Lower  Snake  River  (LSR)  -­‐  Phalen  GulchPCC  3 2012 Short-­‐term Eligible  Short-­‐term 09/2013 6/22/15 Aug-­2016 PASS 13,279                                                                                                60729A W185 Marengo PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 2,163                                                                                                    60730A W772 Marengo  2 PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 1,047                                                                                                    60896A W1341 McFadden  Ridge PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 1,015                                                                                                    60896A W1341 McFadden  Ridge PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2014 6/22/15 Jun-­2017 PASS 2,433                                                                                                    60919A W1863 Milner  Dam  Wind  Park PCC  3 2012 Short-­‐term Eligible  Short-­‐term 11/2013 6/22/15 Oct-­2016 PASS 681                                                                                                            60919A W1863 Milner  Dam  Wind  Park PCC  3 2012 Short-­‐term Eligible  Short-­‐term 12/2013 6/22/15 Nov-­2016 PASS 995                                                                                                            62314A W2869 Mountain  Air  Wind  Projects PCC  3 2012 Short-­‐term Eligible  Short-­‐term 10/2013 6/22/15 Sep-­2016 PASS 5,939                                                                                                    62314A W2869 Mountain  Air  Wind  Projects PCC  3 2012 Short-­‐term Eligible  Short-­‐term 12/2014 6/22/15 Nov-­2017 PASS 12,500                                                                                                62288A W2906 Palouse  Wind PCC  3 2012 Short-­‐term Eligible  Short-­‐term 11/2013 6/22/15 Oct-­2016 PASS 666                                                                                                            62288A W2906 Palouse  Wind PCC  3 2012 Short-­‐term Eligible  Short-­‐term 12/2013 6/22/15 Nov-­2016 PASS 1,492                                                                                                    60806A W928 Rolling  Hills PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 3,918                                                                                                    60806A W928 Rolling  Hills PCC  3 2012 Short-­‐term Eligible  Short-­‐term 08/2013 6/22/15 Jul-­2016 PASS 5,827                                                                                                    62237A W2969 San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2014 6/23/15 Dec-­2016 PASS 83                                                                                                                

Page 42: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

CPUC  ID RPS  ID WREGIS_ID Facility  Name Expected  PCC  Classification Contract  Year Contract  Length Short  Term  Contract  Eligibility Vintage  Month/Year Retirement  Date  (MM/DD/YYYY)

Last  Month  to  Retire  REC  (Month/Year)

Do  RECs  "Pass"  or  "Fail"  Requirements  of  36  Month  

Rule:  MWh  REC  Quantity  Retired

62237A W2969 San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2014 6/23/15 Jan-­2017 PASS 80                                                                                                                62237A W2969 San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2014 6/23/15 Feb-­2017 PASS 131                                                                                                            62237A W2969 San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2014 6/23/15 Mar-­2017 PASS 143                                                                                                            62237A W2969 San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2014 6/23/15 Apr-­2017 PASS 148                                                                                                            62237A W2969 San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2014 6/23/15 May-­2017 PASS 196                                                                                                            62237A W2969 San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2014 6/23/15 Jun-­2017 PASS 193                                                                                                            62237A W2969 San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2014 6/23/15 Jul-­2017 PASS 154                                                                                                            62237A W2969 San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2014 6/23/15 Aug-­2017 PASS 153                                                                                                            62237A W2969 San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2014 6/23/15 Sep-­2017 PASS 119                                                                                                            62237A W2969 San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2014 6/23/15 Oct-­2017 PASS 79                                                                                                                62237A W2969 San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2014 6/23/15 Nov-­2017 PASS 48                                                                                                                60807A W975 Seven  Mile  Hill  1 PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 2,270                                                                                                    60807A W975 Seven  Mile  Hill  1 PCC  3 2012 Short-­‐term Eligible  Short-­‐term 08/2013 6/22/15 Jul-­2016 PASS 824                                                                                                            60807A W975 Seven  Mile  Hill  1 PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2014 6/22/15 Jun-­2017 PASS 4,241                                                                                                    60808A W976 Seven  Mile  Hill  2 PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 678                                                                                                            60808A W976 Seven  Mile  Hill  2 PCC  3 2012 Short-­‐term Eligible  Short-­‐term 08/2013 6/22/15 Jul-­2016 PASS 99                                                                                                                60596A W1491 Sierra  Pacific  Burlington  -­‐  Sierra  Pacific  BurlingtonPCC  0 2010 Short-­‐term Eligible  Short-­‐term 03/2011 2/24/14 Feb-­2014 PASS 3,066                                                                                                    61199A W1749 Top  of  the  World PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 8,639                                                                                                    60721A W360 White  Creek  Wind  1 PCC  1 2012 Short-­‐term Eligible  Short-­‐term 03/2013 6/29/15 Feb-­2016 PASS 10,818                                                                                                60721A W360 White  Creek  Wind  1 PCC  1 2012 Short-­‐term Eligible  Short-­‐term 04/2013 6/29/15 Mar-­2016 PASS 15,744                                                                                                60721A W360 White  Creek  Wind  1 PCC  1 2012 Short-­‐term Eligible  Short-­‐term 05/2013 6/29/15 Apr-­2016 PASS 3,484                                                                                                    60721A W360 White  Creek  Wind  1 PCC  2 2012 Short-­‐term Eligible  Short-­‐term 01/2014 2/9/15 Dec-­2016 PASS 1,700                                                                                                    60721A W360 White  Creek  Wind  1 PCC  2 2012 Short-­‐term Eligible  Short-­‐term 02/2014 2/9/15 Jan-­2017 PASS 2,507                                                                                                    60721A W360 White  Creek  Wind  1 PCC  2 2012 Short-­‐term Eligible  Short-­‐term 03/2014 2/9/15 Feb-­2017 PASS 4,410                                                                                                    60721A W360 White  Creek  Wind  1 PCC  2 2012 Short-­‐term Eligible  Short-­‐term 04/2014 2/9/15 Mar-­2017 PASS 1,665                                                                                                    60746A W183 Wild  Horse PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 15,535                                                                                                60746A W183 Wild  Horse PCC  3 2012 Short-­‐term Eligible  Short-­‐term 01/2014 6/22/15 Dec-­2016 PASS 7,500                                                                                                    60746A W183 Wild  Horse PCC  3 2014 Short-­‐term Eligible  Short-­‐term 01/2014 6/22/15 Dec-­2016 PASS 991                                                                                                            60746A W183 Wild  Horse PCC  3 2014 Short-­‐term Eligible  Short-­‐term 02/2014 6/22/15 Jan-­2017 PASS 39,394                                                                                                60746A W183 Wild  Horse PCC  3 2014 Short-­‐term Eligible  Short-­‐term 04/2014 6/22/15 Mar-­2017 PASS 66,150                                                                                                60746A W183 Wild  Horse PCC  3 2014 Short-­‐term Eligible  Short-­‐term 05/2014 6/22/15 Apr-­2017 PASS 48,537                                                                                                60746A W183 Wild  Horse PCC  3 2014 Short-­‐term Eligible  Short-­‐term 06/2014 6/22/15 May-­2017 PASS 12,131                                                                                                60746A W1364 Wild  Horse  -­‐  Phase  II PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 8,048                                                                                                    60746A W1364 Wild  Horse  -­‐  Phase  II PCC  3 2012 Short-­‐term Eligible  Short-­‐term 08/2013 6/22/15 Jul-­2016 PASS 4,733                                                                                                    60746A W1364 Wild  Horse  -­‐  Phase  II PCC  3 2012 Short-­‐term Eligible  Short-­‐term 09/2013 6/22/15 Aug-­2016 PASS 7,637                                                                                                    60746A W1364 Wild  Horse  -­‐  Phase  II PCC  3 2012 Short-­‐term Eligible  Short-­‐term 10/2013 6/22/15 Sep-­2016 PASS 4,582                                                                                                    60564E W188 Wolverine  Creek PCC  3 2012 Short-­‐term Eligible  Short-­‐term 07/2013 6/22/15 Jun-­2016 PASS 1,458                                                                                                    60926A W1874 Yahoo  Creek  Wind  Park PCC  3 2012 Short-­‐term Eligible  Short-­‐term 10/2013 6/22/15 Sep-­2016 PASS 39                                                                                                                

Page 43: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  (2015)  36  Month  RetirementData  Reported  by:Marin  Clean  Energy  (MCE) Input  RequiredAugust  31,  2018 Information  is  Hard  Coded  (No  Input  Required)

CPUC  ID RPS  ID WREGIS_ID Facility  Name Expected  PCC  Classification Contract  Year Contract  Length Short  Term  Contract  Eligibility Vintage  Month/Year Retirement  Date  (MM/DD/YYYY)

Last  Month  to  Retire  REC  (Month/Year)

Do  RECs  "Pass"  or  "Fail"  Requirements  of  36  Month  

Rule:  MWh  REC  Quantity  Retired

60928A W1379 Combine  Hills  II  -­‐  Eurus  Combine  Hills  II  LLCPCC  0 2010 Short-­‐term Eligible  Short-­‐term 04/2011 3/25/14 Mar-­2014 PASS 2,816                                                                                                    61221A W2775 AgPower  Jerome,  LLC  -­‐  Double  A  Dairy  DigesterPCC  3 2015 Short-­‐term Eligible  Short-­‐term 02/2015 6/14/16 Jan-­2018 PASS 1,494                                                                                                    61221A W2775 AgPower  Jerome,  LLC  -­‐  Double  A  Dairy  DigesterPCC  3 2015 Short-­‐term Eligible  Short-­‐term 04/2015 6/14/16 Mar-­2018 PASS 816                                                                                                            61221A W2775 AgPower  Jerome,  LLC  -­‐  Double  A  Dairy  DigesterPCC  3 2015 Short-­‐term Eligible  Short-­‐term 05/2015 6/14/16 Apr-­2018 PASS 1,802                                                                                                    61221A W2775 AgPower  Jerome,  LLC  -­‐  Double  A  Dairy  DigesterPCC  3 2015 Short-­‐term Eligible  Short-­‐term 06/2015 6/14/16 May-­2018 PASS 1,493                                                                                                    61221A W2775 AgPower  Jerome,  LLC  -­‐  Double  A  Dairy  DigesterPCC  3 2015 Short-­‐term Eligible  Short-­‐term 07/2015 6/14/16 Jun-­2018 PASS 1,615                                                                                                    60916A W1875 Camp  Reed  Wind  Park  -­‐  Camp  Reed  Wind  ParkPCC  3 2014 Short-­‐term Eligible  Short-­‐term 12/2014 6/14/16 Nov-­2017 PASS 2,500                                                                                                    61017A W1383 Campbell  Hill  -­‐  Campbell  Hill PCC  3 2014 Short-­‐term Eligible  Short-­‐term 07/2014 6/14/16 Jun-­2017 PASS 280                                                                                                            61017A W1383 Campbell  Hill  -­‐  Campbell  Hill PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 8,792                                                                                                    61017A W1383 Campbell  Hill  -­‐  Campbell  Hill PCC  3 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/14/16 Aug-­2017 PASS 10,050                                                                                                61017A W1383 Campbell  Hill  -­‐  Campbell  Hill PCC  3 2014 Short-­‐term Eligible  Short-­‐term 10/2014 6/14/16 Sep-­2017 PASS 12,921                                                                                                61017A W1383 Campbell  Hill  -­‐  Campbell  Hill PCC  3 2014 Short-­‐term Eligible  Short-­‐term 11/2014 6/14/16 Oct-­2017 PASS 6,694                                                                                                    60822A W892 Cedar  Creek  -­‐  Cedar  Creek PCC  2 2015 Short-­‐term Eligible  Short-­‐term 12/2015 5/12/16 Nov-­2018 PASS 50,000                                                                                                62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 04/2015 6/27/16 Mar-­2018 PASS 160                                                                                                            62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 05/2015 6/27/16 Apr-­2018 PASS 3,435                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 06/2015 6/27/16 May-­2018 PASS 2,454                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 07/2015 6/27/16 Jun-­2018 PASS 3,673                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 08/2015 6/27/16 Jul-­2018 PASS 3,390                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 09/2015 6/27/16 Aug-­2018 PASS 2,566                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 10/2015 6/27/16 Sep-­2018 PASS 2,253                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 11/2015 6/27/16 Oct-­2018 PASS 1,673                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 12/2015 6/27/16 Nov-­2018 PASS 1,168                                                                                                    60622A W471 Corona  -­‐  MWD  Corona PCC  1 2015 Short-­‐term Eligible  Short-­‐term 03/2015 6/27/16 Feb-­2018 PASS 441                                                                                                            60622A W471 Corona  -­‐  MWD  Corona PCC  1 2015 Short-­‐term Eligible  Short-­‐term 04/2015 6/27/16 Mar-­2018 PASS 1,099                                                                                                    60622A W471 Corona  -­‐  MWD  Corona PCC  1 2015 Short-­‐term Eligible  Short-­‐term 05/2015 6/27/16 Apr-­2018 PASS 1,076                                                                                                    60622A W471 Corona  -­‐  MWD  Corona PCC  1 2015 Short-­‐term Eligible  Short-­‐term 06/2015 6/27/16 May-­2018 PASS 1,863                                                                                                    60622A W471 Corona  -­‐  MWD  Corona PCC  1 2015 Short-­‐term Eligible  Short-­‐term 07/2015 6/27/16 Jun-­2018 PASS 1,878                                                                                                    60622A W471 Corona  -­‐  MWD  Corona PCC  1 2015 Short-­‐term Eligible  Short-­‐term 08/2015 6/27/16 Jul-­2018 PASS 1,875                                                                                                    60622A W471 Corona  -­‐  MWD  Corona PCC  1 2015 Short-­‐term Eligible  Short-­‐term 09/2015 6/27/16 Aug-­2018 PASS 1,308                                                                                                    60622A W471 Corona  -­‐  MWD  Corona PCC  1 2015 Short-­‐term Eligible  Short-­‐term 10/2015 6/27/16 Sep-­2018 PASS 1,486                                                                                                    60622A W471 Corona  -­‐  MWD  Corona PCC  1 2015 Short-­‐term Eligible  Short-­‐term 11/2015 6/27/16 Oct-­2018 PASS 1,672                                                                                                    60622A W471 Corona  -­‐  MWD  Corona PCC  1 2015 Short-­‐term Eligible  Short-­‐term 12/2015 6/27/16 Nov-­2018 PASS 87                                                                                                                60901A W1287 Diamond  Valley  Lake  Hydroelectric  Plant  -­‐  MWD  DVLPCC  1 2015 Short-­‐term Eligible  Short-­‐term 03/2015 6/27/16 Feb-­2018 PASS 390                                                                                                            60901A W1287 Diamond  Valley  Lake  Hydroelectric  Plant  -­‐  MWD  DVLPCC  1 2015 Short-­‐term Eligible  Short-­‐term 04/2015 6/27/16 Mar-­2018 PASS 1,141                                                                                                    60901A W1287 Diamond  Valley  Lake  Hydroelectric  Plant  -­‐  MWD  DVLPCC  1 2015 Short-­‐term Eligible  Short-­‐term 05/2015 6/27/16 Apr-­2018 PASS 1,619                                                                                                    60901A W1287 Diamond  Valley  Lake  Hydroelectric  Plant  -­‐  MWD  DVLPCC  1 2015 Short-­‐term Eligible  Short-­‐term 06/2015 6/27/16 May-­2018 PASS 3,721                                                                                                    60901A W1287 Diamond  Valley  Lake  Hydroelectric  Plant  -­‐  MWD  DVLPCC  1 2015 Short-­‐term Eligible  Short-­‐term 07/2015 6/27/16 Jun-­2018 PASS 427                                                                                                            61188A W1687 Dunlap  I  -­‐  Dunlap  I PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 490                                                                                                            61188A W1687 Dunlap  I  -­‐  Dunlap  I PCC  3 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/14/16 Aug-­2017 PASS 490                                                                                                            61188A W1687 Dunlap  I  -­‐  Dunlap  I PCC  3 2014 Short-­‐term Eligible  Short-­‐term 10/2014 6/14/16 Sep-­2017 PASS 2,786                                                                                                    61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 01/2015 6/27/16 Dec-­2017 PASS 1,043                                                                                                    61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 02/2015 6/27/16 Jan-­2018 PASS 842                                                                                                            61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 03/2015 6/27/16 Feb-­2018 PASS 1,085                                                                                                    61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 04/2015 6/27/16 Mar-­2018 PASS 870                                                                                                            61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 05/2015 6/27/16 Apr-­2018 PASS 899                                                                                                            61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 06/2015 6/27/16 May-­2018 PASS 549                                                                                                            61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 07/2015 6/27/16 Jun-­2018 PASS 997                                                                                                            61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 08/2015 6/27/16 Jul-­2018 PASS 1,061                                                                                                    61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 09/2015 6/27/16 Aug-­2018 PASS 974                                                                                                            61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2015 6/27/16 Sep-­2018 PASS 852                                                                                                            61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 11/2015 6/27/16 Oct-­2018 PASS 1,000                                                                                                    61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2015 6/27/16 Nov-­2018 PASS 1,099                                                                                                    61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 01/2015 6/27/16 Dec-­2017 PASS 43                                                                                                                61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 04/2015 6/27/16 Mar-­2018 PASS 43                                                                                                                61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 05/2015 6/27/16 Apr-­2018 PASS 40                                                                                                                61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 06/2015 6/27/16 May-­2018 PASS 476                                                                                                            61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 07/2015 6/27/16 Jun-­2018 PASS 15                                                                                                                61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 08/2015 6/27/16 Jul-­2018 PASS 16                                                                                                                61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2015 6/27/16 Sep-­2018 PASS 53                                                                                                                61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 11/2015 6/27/16 Oct-­2018 PASS 462                                                                                                            61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2015 6/27/16 Nov-­2018 PASS 513                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 01/2015 6/27/16 Dec-­2017 PASS 1,051                                                                                                    61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 02/2015 6/27/16 Jan-­2018 PASS 962                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 03/2015 6/27/16 Feb-­2018 PASS 985                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 04/2015 6/27/16 Mar-­2018 PASS 1,015                                                                                                    61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 05/2015 6/27/16 Apr-­2018 PASS 978                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 06/2015 6/27/16 May-­2018 PASS 483                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 07/2015 6/27/16 Jun-­2018 PASS 1,040                                                                                                    61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 08/2015 6/27/16 Jul-­2018 PASS 1,073                                                                                                    

Note : Please  create  one  line  per  combination  of  REC  vintage  and    REC retirement  date.    For  example  RECs  that  have  the  same  vintage  are  retired  on  two  separate   dates,  please   include  one  line  per  retirement  date.  Likewise  if  RECs  of  different  vintages  (e.g.  June  2015  and  July  2015)  are  retired  on  the  same  date,  please   include  one  line  per  vintage.

Page 44: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 09/2015 6/27/16 Aug-­2018 PASS 1,068                                                                                                    61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2015 6/27/16 Sep-­2018 PASS 1,026                                                                                                    61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 11/2015 6/27/16 Oct-­2018 PASS 462                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2015 6/27/16 Nov-­2018 PASS 513                                                                                                            60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2015 Short-­‐term Eligible  Short-­‐term 05/2015 6/27/16 Apr-­2018 PASS 6,950                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2015 Short-­‐term Eligible  Short-­‐term 06/2015 6/27/16 May-­2018 PASS 3,800                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2015 Short-­‐term Eligible  Short-­‐term 07/2015 6/27/16 Jun-­2018 PASS 7,200                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2015 Short-­‐term Eligible  Short-­‐term 09/2015 6/27/16 Aug-­2018 PASS 345                                                                                                            60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2015 Short-­‐term Eligible  Short-­‐term 10/2015 6/27/16 Sep-­2018 PASS 5,578                                                                                                    60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2015 Short-­‐term Eligible  Short-­‐term 11/2015 6/27/16 Oct-­2018 PASS 888                                                                                                            60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17PCC  1 2015 Short-­‐term Eligible  Short-­‐term 12/2015 6/27/16 Nov-­2018 PASS 2,483                                                                                                    60805A W964 Glenrock  I  -­‐  Glenrock  I PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 353                                                                                                            60805A W964 Glenrock  I  -­‐  Glenrock  I PCC  3 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/14/16 Aug-­2017 PASS 450                                                                                                            60805A W964 Glenrock  I  -­‐  Glenrock  I PCC  3 2014 Short-­‐term Eligible  Short-­‐term 10/2014 6/14/16 Sep-­2017 PASS 2,099                                                                                                    60804A W965 Glenrock  III  -­‐  Glenrock  III PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 148                                                                                                            60804A W965 Glenrock  III  -­‐  Glenrock  III PCC  3 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/14/16 Aug-­2017 PASS 233                                                                                                            60804A W965 Glenrock  III  -­‐  Glenrock  III PCC  3 2014 Short-­‐term Eligible  Short-­‐term 10/2014 6/14/16 Sep-­2017 PASS 694                                                                                                            60819A W536 Goodnoe  Hills  -­‐  Goodnoe  Hills PCC  3 2014 Short-­‐term Eligible  Short-­‐term 07/2014 6/14/16 Jun-­2017 PASS 345                                                                                                            60819A W536 Goodnoe  Hills  -­‐  Goodnoe  Hills PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 454                                                                                                            60819A W536 Goodnoe  Hills  -­‐  Goodnoe  Hills PCC  3 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/14/16 Aug-­2017 PASS 5                                                                                                                      62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 05/2015 6/27/16 Apr-­2018 PASS 2,931                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 06/2015 5/25/16 May-­2018 PASS 3,287                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 07/2015 5/25/16 Jun-­2018 PASS 4,134                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 08/2015 5/25/16 Jul-­2018 PASS 3,048                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 08/2015 6/27/16 Jul-­2018 PASS 950                                                                                                            62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 09/2015 6/27/16 Aug-­2018 PASS 2,828                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 10/2015 6/27/16 Sep-­2018 PASS 2,725                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 11/2015 6/27/16 Oct-­2018 PASS 1,962                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 12/2015 6/27/16 Nov-­2018 PASS 1,640                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  1 2012 Short-­‐term Eligible  Short-­‐term 01/2014 5/23/16 Dec-­2016 PASS 3,418                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  1 2012 Short-­‐term Eligible  Short-­‐term 02/2014 5/23/16 Jan-­2017 PASS 1,465                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  1 2012 Short-­‐term Eligible  Short-­‐term 03/2014 5/23/16 Feb-­2017 PASS 4,757                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  1 2012 Short-­‐term Eligible  Short-­‐term 04/2014 5/23/16 Mar-­2017 PASS 5,160                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  1 2012 Short-­‐term Eligible  Short-­‐term 05/2014 5/23/16 Apr-­2017 PASS 6,264                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  1 2012 Short-­‐term Eligible  Short-­‐term 06/2014 5/23/16 May-­2017 PASS 6,964                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  1 2012 Short-­‐term Eligible  Short-­‐term 07/2014 5/23/16 Jun-­2017 PASS 5,051                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  1 2012 Short-­‐term Eligible  Short-­‐term 08/2014 5/23/16 Jul-­2017 PASS 4,472                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  1 2012 Short-­‐term Eligible  Short-­‐term 09/2014 5/23/16 Aug-­2017 PASS 4,504                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  1 2012 Short-­‐term Eligible  Short-­‐term 10/2014 5/23/16 Sep-­2017 PASS 945                                                                                                            60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  2 2011 Short-­‐term Eligible  Short-­‐term 01/2015 3/22/16 Dec-­2017 PASS 1,983                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  2 2011 Short-­‐term Eligible  Short-­‐term 02/2015 3/22/16 Jan-­2018 PASS 3,382                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  2 2012 Short-­‐term Eligible  Short-­‐term 03/2015 3/22/16 Feb-­2018 PASS 3,637                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  2 2012 Short-­‐term Eligible  Short-­‐term 04/2015 3/22/16 Mar-­2018 PASS 4,402                                                                                                    60899A W1334 High  Plains  -­‐  High  Plains PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 394                                                                                                            60899A W1334 High  Plains  -­‐  High  Plains PCC  3 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/14/16 Aug-­2017 PASS 1,987                                                                                                    60899A W1334 High  Plains  -­‐  High  Plains PCC  3 2014 Short-­‐term Eligible  Short-­‐term 10/2014 6/14/16 Sep-­2017 PASS 619                                                                                                            61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 01/2015 6/27/16 Dec-­2017 PASS 1,676                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 02/2015 6/27/16 Jan-­2018 PASS 2,813                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 03/2015 6/27/16 Feb-­2018 PASS 4,798                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 04/2015 6/27/16 Mar-­2018 PASS 5,618                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 05/2015 6/27/16 Apr-­2018 PASS 6,039                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 06/2015 6/27/16 May-­2018 PASS 6,381                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 07/2015 6/27/16 Jun-­2018 PASS 6,122                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 08/2015 6/27/16 Jul-­2018 PASS 6,014                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 09/2015 6/27/16 Aug-­2018 PASS 4,667                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 10/2015 6/27/16 Sep-­2018 PASS 2,935                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 11/2015 6/27/16 Oct-­2018 PASS 764                                                                                                            61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 12/2015 6/27/16 Nov-­2018 PASS 2,157                                                                                                    60602A W237 Klondike  III  -­‐  Klondike  Wind  Power  III  LLCPCC  2 2011 Short-­‐term Eligible  Short-­‐term 01/2015 3/22/16 Dec-­2017 PASS 436                                                                                                            60602A W237 Klondike  III  -­‐  Klondike  Wind  Power  III  LLCPCC  2 2012 Short-­‐term Eligible  Short-­‐term 01/2015 3/22/16 Dec-­2017 PASS 1,269                                                                                                    60602A W237 Klondike  III  -­‐  Klondike  Wind  Power  III  LLCPCC  2 2012 Short-­‐term Eligible  Short-­‐term 02/2015 3/22/16 Jan-­2018 PASS 4,053                                                                                                    60602A W237 Klondike  III  -­‐  Klondike  Wind  Power  III  LLCPCC  2 2012 Short-­‐term Eligible  Short-­‐term 03/2015 3/22/16 Feb-­2018 PASS 3,213                                                                                                    60602A W237 Klondike  III  -­‐  Klondike  Wind  Power  III  LLCPCC  2 2012 Short-­‐term Eligible  Short-­‐term 04/2015 3/22/16 Mar-­2018 PASS 5,899                                                                                                    60602A W237 Klondike  III  -­‐  Klondike  Wind  Power  III  LLCPCC  2 2012 Short-­‐term Eligible  Short-­‐term 05/2015 3/22/16 Apr-­2018 PASS 5,993                                                                                                    60562A W200 Leaning  Juniper  I  -­‐  Leaning  Juniper  I PCC  3 2014 Short-­‐term Eligible  Short-­‐term 07/2014 6/14/16 Jun-­2017 PASS 504                                                                                                            60562A W200 Leaning  Juniper  I  -­‐  Leaning  Juniper  I PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 429                                                                                                            60562A W200 Leaning  Juniper  I  -­‐  Leaning  Juniper  I PCC  3 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/14/16 Aug-­2017 PASS 24                                                                                                                60562A W200 Leaning  Juniper  I  -­‐  Leaning  Juniper  I PCC  3 2014 Short-­‐term Eligible  Short-­‐term 06/2015 6/14/16 May-­2018 PASS 3,389                                                                                                    61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2015 6/27/16 Dec-­2017 PASS 882                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2015 6/27/16 Jan-­2018 PASS 728                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2015 6/27/16 Feb-­2018 PASS 977                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2015 6/27/16 Mar-­2018 PASS 817                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2015 6/27/16 Apr-­2018 PASS 867                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2015 6/27/16 May-­2018 PASS 587                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2015 6/27/16 Jun-­2018 PASS 515                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2015 6/27/16 Jul-­2018 PASS 518                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2015 6/27/16 Aug-­2018 PASS 504                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2015 6/27/16 Sep-­2018 PASS 780                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2015 6/27/16 Oct-­2018 PASS 713                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2015 6/27/16 Nov-­2018 PASS 894                                                                                                            

Page 45: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2015 6/27/16 Dec-­2017 PASS 441                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2015 6/27/16 Jan-­2018 PASS 364                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2015 6/27/16 Feb-­2018 PASS 489                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2015 6/27/16 Mar-­2018 PASS 408                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2015 6/27/16 Apr-­2018 PASS 434                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2015 6/27/16 May-­2018 PASS 293                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2015 6/27/16 Jun-­2018 PASS 258                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2015 6/27/16 Jul-­2018 PASS 259                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2015 6/27/16 Aug-­2018 PASS 252                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2015 6/27/16 Sep-­2018 PASS 390                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2015 6/27/16 Oct-­2018 PASS 356                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2015 6/27/16 Nov-­2018 PASS 447                                                                                                            61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2015 6/27/16 Dec-­2017 PASS 1,330                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2015 6/27/16 Jan-­2018 PASS 1,099                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2015 6/27/16 Feb-­2018 PASS 1,474                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2015 6/27/16 Mar-­2018 PASS 1,234                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2015 6/27/16 Apr-­2018 PASS 1,309                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2015 6/27/16 May-­2018 PASS 885                                                                                                            61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2015 6/27/16 Jun-­2018 PASS 777                                                                                                            61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2015 6/27/16 Jul-­2018 PASS 783                                                                                                            61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2015 6/27/16 Aug-­2018 PASS 760                                                                                                            61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2015 6/27/16 Sep-­2018 PASS 1,177                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2015 6/27/16 Oct-­2018 PASS 1,075                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2015 6/27/16 Nov-­2018 PASS 1,351                                                                                                    62044A W2670 Lower  Snake  River  -­‐  Phalen  Gulch  -­‐  LSR-­‐Phalen  GulchPCC  3 2014 Short-­‐term Eligible  Short-­‐term 07/2014 6/14/16 Jun-­2017 PASS 2,700                                                                                                    60729A W185 Marengo  -­‐  Marengo PCC  3 2014 Short-­‐term Eligible  Short-­‐term 07/2014 6/14/16 Jun-­2017 PASS 529                                                                                                            60729A W185 Marengo  -­‐  Marengo PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 490                                                                                                            60729A W185 Marengo  -­‐  Marengo PCC  3 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/14/16 Aug-­2017 PASS 565                                                                                                            60729A W185 Marengo  -­‐  Marengo PCC  3 2014 Short-­‐term Eligible  Short-­‐term 10/2014 6/14/16 Sep-­2017 PASS 618                                                                                                            60730A W772 Marengo  II  -­‐  Marengo  II PCC  3 2014 Short-­‐term Eligible  Short-­‐term 07/2014 6/14/16 Jun-­2017 PASS 254                                                                                                            60730A W772 Marengo  II  -­‐  Marengo  II PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 221                                                                                                            60730A W772 Marengo  II  -­‐  Marengo  II PCC  3 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/14/16 Aug-­2017 PASS 265                                                                                                            60730A W772 Marengo  II  -­‐  Marengo  II PCC  3 2014 Short-­‐term Eligible  Short-­‐term 10/2014 6/14/16 Sep-­2017 PASS 330                                                                                                            60896A W1341 McFadden  Ridge  -­‐  McFadden  RidgePCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 191                                                                                                            60896A W1341 McFadden  Ridge  -­‐  McFadden  RidgePCC  3 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/14/16 Aug-­2017 PASS 883                                                                                                            62006A W3186 Meadow  Creek  Wind  Farm  -­‐  Five  Pine  ProjectPCC  3 2015 Short-­‐term Eligible  Short-­‐term 04/2015 6/14/16 Mar-­2018 PASS 2,551                                                                                                    62006A W3186 Meadow  Creek  Wind  Farm  -­‐  Five  Pine  ProjectPCC  3 2015 Short-­‐term Eligible  Short-­‐term 05/2015 6/14/16 Apr-­2018 PASS 5,763                                                                                                    62006A W3185 Meadow  Creek  Wind  Farm  -­‐  Five  Pine  ProjectPCC  3 2015 Short-­‐term Eligible  Short-­‐term 06/2015 6/14/16 May-­2018 PASS 6,192                                                                                                    62006A W3185 Meadow  Creek  Wind  Farm  -­‐  Five  Pine  ProjectPCC  3 2015 Short-­‐term Eligible  Short-­‐term 10/2015 6/14/16 Sep-­2018 PASS 7,184                                                                                                    62006A W3185 Meadow  Creek  Wind  Farm  -­‐  Five  Pine  ProjectPCC  3 2015 Short-­‐term Eligible  Short-­‐term 11/2015 6/14/16 Oct-­2018 PASS 6,333                                                                                                    62006A W3185 Meadow  Creek  Wind  Farm  -­‐  North  Point  Wind  FarmPCC  3 2015 Short-­‐term Eligible  Short-­‐term 04/2015 6/14/16 Mar-­2018 PASS 20,605                                                                                                62006A W3185 Meadow  Creek  Wind  Farm  -­‐  North  Point  Wind  FarmPCC  3 2015 Short-­‐term Eligible  Short-­‐term 05/2015 6/14/16 Apr-­2018 PASS 12,904                                                                                                62006A W3185 Meadow  Creek  Wind  Farm  -­‐  North  Point  Wind  FarmPCC  3 2015 Short-­‐term Eligible  Short-­‐term 06/2015 6/14/16 May-­2018 PASS 14,212                                                                                                62006A W3185 Meadow  Creek  Wind  Farm  -­‐  North  Point  Wind  FarmPCC  3 2015 Short-­‐term Eligible  Short-­‐term 07/2015 6/14/16 Jun-­2018 PASS 273                                                                                                            62006A W3186 Meadow  Creek  Wind  Farm  -­‐  North  Point  Wind  FarmPCC  3 2015 Short-­‐term Eligible  Short-­‐term 09/2015 6/14/16 Aug-­2018 PASS 13,200                                                                                                62006A W3186 Meadow  Creek  Wind  Farm  -­‐  North  Point  Wind  FarmPCC  3 2015 Short-­‐term Eligible  Short-­‐term 10/2015 6/14/16 Sep-­2018 PASS 17,194                                                                                                62006A W3186 Meadow  Creek  Wind  Farm  -­‐  North  Point  Wind  FarmPCC  3 2015 Short-­‐term Eligible  Short-­‐term 11/2015 6/14/16 Oct-­2018 PASS 18,589                                                                                                62314A W2869 Mountain  Air  Wind  Projects  -­‐  Mountain  Air  Wind  ProjectsPCC  3 2014 Short-­‐term Eligible  Short-­‐term 03/2015 6/14/16 Feb-­2018 PASS 4,054                                                                                                    62314A W2869 Mountain  Air  Wind  Projects  -­‐  Mountain  Air  Wind  ProjectsPCC  3 2015 Short-­‐term Eligible  Short-­‐term 03/2015 6/14/16 Feb-­2018 PASS 109                                                                                                            62314A W2869 Mountain  Air  Wind  Projects  -­‐  Mountain  Air  Wind  ProjectsPCC  3 2015 Short-­‐term Eligible  Short-­‐term 05/2015 6/14/16 Apr-­2018 PASS 4,337                                                                                                    61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 01/2015 6/27/16 Dec-­2017 PASS 13                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 02/2015 6/27/16 Jan-­2018 PASS 12                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 03/2015 6/27/16 Feb-­2018 PASS 9                                                                                                                      61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 04/2015 6/27/16 Mar-­2018 PASS 7                                                                                                                      61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 05/2015 6/27/16 Apr-­2018 PASS 22                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 06/2015 6/27/16 May-­2018 PASS 34                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 07/2015 6/27/16 Jun-­2018 PASS 45                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 08/2015 6/27/16 Jul-­2018 PASS 34                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 09/2015 6/27/16 Aug-­2018 PASS 13                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 10/2015 6/27/16 Sep-­2018 PASS 8                                                                                                                      61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 11/2015 6/27/16 Oct-­2018 PASS 5                                                                                                                      61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 12/2015 6/27/16 Nov-­2018 PASS 5                                                                                                                      60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3PCC  3 2014 Short-­‐term Eligible  Short-­‐term 10/2014 6/14/16 Sep-­2017 PASS 1,233                                                                                                    60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3PCC  3 2014 Short-­‐term Eligible  Short-­‐term 11/2014 6/14/16 Oct-­2017 PASS 1,646                                                                                                    60803A W697 Nine  Canyon  Wind  Project  -­‐  Nine  Canyon  Phase  3PCC  3 2014 Short-­‐term Eligible  Short-­‐term 12/2014 6/14/16 Nov-­2017 PASS 1,288                                                                                                    60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2015 6/27/16 Jun-­2018 PASS 1,047                                                                                                    60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2015 6/27/16 Jul-­2018 PASS 1,007                                                                                                    60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2015 6/27/16 Aug-­2018 PASS 2,285                                                                                                    60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2015 6/27/16 Jun-­2018 PASS 707                                                                                                            60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2015 6/27/16 Jul-­2018 PASS 1,106                                                                                                    60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2015 6/27/16 Aug-­2018 PASS 2,507                                                                                                    60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2015 6/27/16 Jun-­2018 PASS 1,203                                                                                                    60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2015 6/27/16 Jul-­2018 PASS 1,158                                                                                                    60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2015 6/27/16 Aug-­2018 PASS 2,626                                                                                                    60625A W473 Red  Mountain  -­‐  MWD  Red  MountainPCC  1 2015 Short-­‐term Eligible  Short-­‐term 03/2015 6/27/16 Feb-­2018 PASS 774                                                                                                            60625A W473 Red  Mountain  -­‐  MWD  Red  MountainPCC  1 2015 Short-­‐term Eligible  Short-­‐term 04/2015 6/27/16 Mar-­2018 PASS 206                                                                                                            60625A W473 Red  Mountain  -­‐  MWD  Red  MountainPCC  1 2015 Short-­‐term Eligible  Short-­‐term 05/2015 6/27/16 Apr-­2018 PASS 1,293                                                                                                    60625A W473 Red  Mountain  -­‐  MWD  Red  MountainPCC  1 2015 Short-­‐term Eligible  Short-­‐term 07/2015 6/27/16 Jun-­2018 PASS 171                                                                                                            60625A W473 Red  Mountain  -­‐  MWD  Red  MountainPCC  1 2015 Short-­‐term Eligible  Short-­‐term 08/2015 6/27/16 Jul-­2018 PASS 3,117                                                                                                    60625A W473 Red  Mountain  -­‐  MWD  Red  MountainPCC  1 2015 Short-­‐term Eligible  Short-­‐term 09/2015 6/27/16 Aug-­2018 PASS 2,776                                                                                                    

Page 46: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

60625A W473 Red  Mountain  -­‐  MWD  Red  MountainPCC  1 2015 Short-­‐term Eligible  Short-­‐term 10/2015 6/27/16 Sep-­2018 PASS 3,066                                                                                                    60625A W473 Red  Mountain  -­‐  MWD  Red  MountainPCC  1 2015 Short-­‐term Eligible  Short-­‐term 11/2015 6/27/16 Oct-­2018 PASS 2,247                                                                                                    62426A W4445 Rising  Tree  Wind  Farm  II  LLC  -­‐  Rising  Tree  Wind  Farm  II  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 01/2015 6/14/16 Dec-­2017 PASS 362                                                                                                            62426A W4445 Rising  Tree  Wind  Farm  II  LLC  -­‐  Rising  Tree  Wind  Farm  II  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 02/2015 6/14/16 Jan-­2018 PASS 40                                                                                                                62426A W4445 Rising  Tree  Wind  Farm  II  LLC  -­‐  Rising  Tree  Wind  Farm  II  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 03/2015 6/14/16 Feb-­2018 PASS 92                                                                                                                62426A W4445 Rising  Tree  Wind  Farm  II  LLC  -­‐  Rising  Tree  Wind  Farm  II  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 04/2015 6/14/16 Mar-­2018 PASS 16                                                                                                                62426A W4445 Rising  Tree  Wind  Farm  II  LLC  -­‐  Rising  Tree  Wind  Farm  II  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 05/2015 6/14/16 Apr-­2018 PASS 24                                                                                                                62426A W4445 Rising  Tree  Wind  Farm  II  LLC  -­‐  Rising  Tree  Wind  Farm  II  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 06/2015 6/14/16 May-­2018 PASS 11                                                                                                                62426A W4445 Rising  Tree  Wind  Farm  II  LLC  -­‐  Rising  Tree  Wind  Farm  II  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 07/2015 6/14/16 Jun-­2018 PASS 58                                                                                                                62426A W4445 Rising  Tree  Wind  Farm  II  LLC  -­‐  Rising  Tree  Wind  Farm  II  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 08/2015 6/14/16 Jul-­2018 PASS 2                                                                                                                      62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 04/2015 6/27/16 Mar-­2018 PASS 4                                                                                                                      62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 05/2015 6/27/16 Apr-­2018 PASS 7,675                                                                                                    62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 06/2015 6/27/16 May-­2018 PASS 14,840                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 07/2015 6/27/16 Jun-­2018 PASS 29,640                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 08/2015 6/27/16 Jul-­2018 PASS 38,275                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 09/2015 6/27/16 Aug-­2018 PASS 20,529                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 10/2015 6/27/16 Sep-­2018 PASS 18,490                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 11/2015 6/27/16 Oct-­2018 PASS 14,417                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 12/2015 6/27/16 Nov-­2018 PASS 22,792                                                                                                62425A W4444 Rising  Tree  Wind  Farm  LLC  -­‐  Rising  Tree  Wind  Farm  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 01/2015 6/14/16 Dec-­2017 PASS 1,015                                                                                                    62425A W4444 Rising  Tree  Wind  Farm  LLC  -­‐  Rising  Tree  Wind  Farm  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 02/2015 6/14/16 Jan-­2018 PASS 236                                                                                                            62425A W4444 Rising  Tree  Wind  Farm  LLC  -­‐  Rising  Tree  Wind  Farm  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 03/2015 6/14/16 Feb-­2018 PASS 356                                                                                                            62425A W4444 Rising  Tree  Wind  Farm  LLC  -­‐  Rising  Tree  Wind  Farm  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 04/2015 6/14/16 Mar-­2018 PASS 119                                                                                                            62425A W4444 Rising  Tree  Wind  Farm  LLC  -­‐  Rising  Tree  Wind  Farm  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 05/2015 6/14/16 Apr-­2018 PASS 88                                                                                                                62425A W4444 Rising  Tree  Wind  Farm  LLC  -­‐  Rising  Tree  Wind  Farm  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 07/2015 6/14/16 Jun-­2018 PASS 255                                                                                                            62425A W4444 Rising  Tree  Wind  Farm  LLC  -­‐  Rising  Tree  Wind  Farm  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 08/2015 6/14/16 Jul-­2018 PASS 1                                                                                                                      62425A W4444 Rising  Tree  Wind  Farm  LLC  -­‐  Rising  Tree  Wind  Farm  LLCPCC  3 2015 Short-­‐term Eligible  Short-­‐term 10/2015 6/14/16 Sep-­2018 PASS 1                                                                                                                      60806A W928 Rolling  Hills  -­‐  Rolling  Hills PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 217                                                                                                            60927A W1885 Salmon  Falls  Wind  Park,  LLC  -­‐  Salmon  Falls  Wind  ParkPCC  3 2014 Short-­‐term Eligible  Short-­‐term 06/2015 6/14/16 May-­2018 PASS 3,727                                                                                                    62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2015 5/19/16 Dec-­2017 PASS 78                                                                                                                62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2015 5/19/16 Jan-­2018 PASS 93                                                                                                                62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2015 5/19/16 Feb-­2018 PASS 147                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2015 5/19/16 Mar-­2018 PASS 185                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2015 5/19/16 Apr-­2018 PASS 197                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2015 5/19/16 May-­2018 PASS 209                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2015 5/19/16 Jun-­2018 PASS 198                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2015 5/19/16 Jul-­2018 PASS 185                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2015 5/19/16 Aug-­2018 PASS 143                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2015 5/19/16 Sep-­2018 PASS 115                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2015 5/19/16 Oct-­2018 PASS 90                                                                                                                62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2015 5/19/16 Nov-­2018 PASS 58                                                                                                                61090A W2045 Seneca  Sustainable  Energy  -­‐  Seneca  Sustainable  EnergyPCC  2 2012 Short-­‐term Eligible  Short-­‐term 01/2015 3/22/16 Dec-­2017 PASS 7,819                                                                                                    61090A W2045 Seneca  Sustainable  Energy  -­‐  Seneca  Sustainable  EnergyPCC  2 2012 Short-­‐term Eligible  Short-­‐term 02/2015 3/22/16 Jan-­2018 PASS 7,206                                                                                                    61090A W2045 Seneca  Sustainable  Energy  -­‐  Seneca  Sustainable  EnergyPCC  2 2012 Short-­‐term Eligible  Short-­‐term 03/2015 3/22/16 Feb-­2018 PASS 7,812                                                                                                    61090A W2045 Seneca  Sustainable  Energy  -­‐  Seneca  Sustainable  EnergyPCC  2 2012 Short-­‐term Eligible  Short-­‐term 04/2015 3/22/16 Mar-­2018 PASS 7,697                                                                                                    60807A W975 Seven  Mile  Hill  I  -­‐  Seven  Mile  Hill  I PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 390                                                                                                            60807A W975 Seven  Mile  Hill  I  -­‐  Seven  Mile  Hill  I PCC  3 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/14/16 Aug-­2017 PASS 2,723                                                                                                    60808A W976 Seven  Mile  Hill  II  -­‐  Seven  Mile  Hill  IIPCC  3 2014 Short-­‐term Eligible  Short-­‐term 07/2014 6/14/16 Jun-­2017 PASS 1,004                                                                                                    61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 01/2015 6/27/16 Dec-­2017 PASS 2                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 02/2015 6/27/16 Jan-­2018 PASS 2                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 03/2015 6/27/16 Feb-­2018 PASS 2                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 04/2015 6/27/16 Mar-­2018 PASS 2                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 05/2015 6/27/16 Apr-­2018 PASS 3                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 06/2015 6/27/16 May-­2018 PASS 2                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 07/2015 6/27/16 Jun-­2018 PASS 2                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 08/2015 6/27/16 Jul-­2018 PASS 2                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 09/2015 6/27/16 Aug-­2018 PASS 2                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 10/2015 6/27/16 Sep-­2018 PASS 2                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 11/2015 6/27/16 Oct-­2018 PASS 2                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 12/2015 6/27/16 Nov-­2018 PASS 2                                                                                                                      60621A W475 Temescal  -­‐  MWD  Temescal PCC  1 2015 Short-­‐term Eligible  Short-­‐term 03/2015 6/27/16 Feb-­2018 PASS 1,945                                                                                                    60621A W475 Temescal  -­‐  MWD  Temescal PCC  1 2015 Short-­‐term Eligible  Short-­‐term 04/2015 6/27/16 Mar-­2018 PASS 1,920                                                                                                    60621A W475 Temescal  -­‐  MWD  Temescal PCC  1 2015 Short-­‐term Eligible  Short-­‐term 05/2015 6/27/16 Apr-­2018 PASS 1,783                                                                                                    60621A W475 Temescal  -­‐  MWD  Temescal PCC  1 2015 Short-­‐term Eligible  Short-­‐term 06/2015 6/27/16 May-­2018 PASS 1,972                                                                                                    60621A W475 Temescal  -­‐  MWD  Temescal PCC  1 2015 Short-­‐term Eligible  Short-­‐term 07/2015 6/27/16 Jun-­2018 PASS 1,990                                                                                                    60621A W475 Temescal  -­‐  MWD  Temescal PCC  1 2015 Short-­‐term Eligible  Short-­‐term 08/2015 6/27/16 Jul-­2018 PASS 1,935                                                                                                    60621A W475 Temescal  -­‐  MWD  Temescal PCC  1 2015 Short-­‐term Eligible  Short-­‐term 09/2015 6/27/16 Aug-­2018 PASS 1,336                                                                                                    60621A W475 Temescal  -­‐  MWD  Temescal PCC  1 2015 Short-­‐term Eligible  Short-­‐term 10/2015 6/27/16 Sep-­2018 PASS 1,616                                                                                                    60621A W475 Temescal  -­‐  MWD  Temescal PCC  1 2015 Short-­‐term Eligible  Short-­‐term 11/2015 6/27/16 Oct-­2018 PASS 1,770                                                                                                    61199A W1749 Top  of  the  World  -­‐  Top  of  the  World PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 762                                                                                                            61199A W1749 Top  of  the  World  -­‐  Top  of  the  World PCC  3 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/14/16 Aug-­2017 PASS 6,685                                                                                                    60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2012 Short-­‐term Eligible  Short-­‐term 05/2013 12/26/15 Apr-­2016 PASS 9,204                                                                                                    60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2012 Short-­‐term Eligible  Short-­‐term 06/2013 12/26/15 May-­2016 PASS 8,709                                                                                                    60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2012 Short-­‐term Eligible  Short-­‐term 07/2013 12/26/15 Jun-­2016 PASS 1,087                                                                                                    60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2011 Short-­‐term Eligible  Short-­‐term 05/2013 12/26/15 Apr-­2016 PASS 865                                                                                                            60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2011 Short-­‐term Eligible  Short-­‐term 06/2013 12/26/15 May-­2016 PASS 1,298                                                                                                    60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  2 2014 Short-­‐term Eligible  Short-­‐term 05/2015 4/6/16 Apr-­2018 PASS 13,132                                                                                                60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  2 2014 Short-­‐term Eligible  Short-­‐term 06/2015 4/6/16 May-­2018 PASS 12,920                                                                                                60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  2 2014 Short-­‐term Eligible  Short-­‐term 07/2015 4/6/16 Jun-­2018 PASS 14,570                                                                                                60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  2 2014 Short-­‐term Eligible  Short-­‐term 08/2015 4/6/16 Jul-­2018 PASS 7,216                                                                                                    

gmo_404
Rectangle
gmo_404
Rectangle
Page 47: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  2 2014 Short-­‐term Eligible  Short-­‐term 09/2015 4/6/16 Aug-­2018 PASS 2,162                                                                                                    60564A W188 Wolverine  Creek  -­‐  Wolverine  Creek PCC  3 2014 Short-­‐term Eligible  Short-­‐term 07/2014 6/14/16 Jun-­2017 PASS 287                                                                                                            60564A W188 Wolverine  Creek  -­‐  Wolverine  Creek PCC  3 2014 Short-­‐term Eligible  Short-­‐term 08/2014 6/14/16 Jul-­2017 PASS 287                                                                                                            60564A W188 Wolverine  Creek  -­‐  Wolverine  Creek PCC  3 2014 Short-­‐term Eligible  Short-­‐term 09/2014 6/14/16 Aug-­2017 PASS 1,490                                                                                                    60926A W1874 Yahoo  Creek  Wind  Park  -­‐  Yahoo  Creek  Wind  ParkPCC  3 2014 Short-­‐term Eligible  Short-­‐term 05/2015 6/14/16 Apr-­2018 PASS 515                                                                                                            60926A W1874 Yahoo  Creek  Wind  Park  -­‐  Yahoo  Creek  Wind  ParkPCC  3 2014 Short-­‐term Eligible  Short-­‐term 06/2015 6/14/16 May-­2018 PASS 3,817                                                                                                    

Page 48: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  (2016)  36  Month  RetirementData  Reported  by:Marin  Clean  Energy  (MCE) Input  RequiredAugust  31,  2018 Information  is  Hard  Coded  (No  Input  Required)

CPUC  ID RPS  ID WREGIS_ID Facility  Name Expected  PCC  Classification Contract  Year Contract  Length Short  Term  Contract  Eligibility Vintage  Month/Year Retirement  Date  (MM/DD/YYYY)

Last  Month  to  Retire  REC  (Month/Year)

Do  RECs  "Pass"  or  "Fail"  Requirements  of  36  Month  

Rule:  MWh  REC  Quantity  Retired

63056A W1588 Biglow  Canyon  Wind  Farm  -­‐  Biglow  Canyon  3PCC  2 2016 Short-­‐term Eligible  Short-­‐term 08/2016 5/17/17 Jul-­2019 PASS 34,363                                                                                                63055A W1268 Biglow  Canyon  Wind  Farm  -­‐  Biglow  Phase  2PCC  2 2016 Short-­‐term Eligible  Short-­‐term 08/2016 5/17/17 Jul-­2019 PASS 15,896                                                                                                60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEFPCC  3 2016 Short-­‐term Eligible  Short-­‐term 07/2016 6/8/17 Jun-­2019 PASS 77                                                                                                                60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEFPCC  3 2016 Short-­‐term Eligible  Short-­‐term 06/2016 6/8/17 May-­2019 PASS 72                                                                                                                60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEFPCC  3 2016 Short-­‐term Eligible  Short-­‐term 09/2016 6/8/17 Aug-­2019 PASS 81                                                                                                                60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEFPCC  3 2016 Short-­‐term Eligible  Short-­‐term 10/2016 6/8/17 Sep-­2019 PASS 77                                                                                                                60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEFPCC  3 2016 Short-­‐term Eligible  Short-­‐term 08/2016 6/8/17 Jul-­2019 PASS 63                                                                                                                60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEFPCC  3 2016 Short-­‐term Eligible  Short-­‐term 11/2016 6/8/17 Oct-­2019 PASS 69                                                                                                                60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEFPCC  3 2016 Short-­‐term Eligible  Short-­‐term 12/2016 6/8/17 Nov-­2019 PASS 78                                                                                                                60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2016 6/9/17 Jul-­2019 PASS 1,108                                                                                                    60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2016 6/9/17 Aug-­2019 PASS 370                                                                                                            60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/9/17 Sep-­2019 PASS 1,006                                                                                                    60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/9/17 Nov-­2019 PASS 4,906                                                                                                    60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/9/17 Oct-­2019 PASS 1,255                                                                                                    60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 04/2016 6/9/17 Mar-­2019 PASS 1,192                                                                                                    60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 6/9/17 Apr-­2019 PASS 1,812                                                                                                    60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 06/2016 6/9/17 May-­2019 PASS 2,256                                                                                                    60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2016 6/9/17 Jun-­2019 PASS 1,221                                                                                                    60822A W892 Cedar  Creek  -­‐  Cedar  Creek PCC  2 2016 Short-­‐term Eligible  Short-­‐term 07/2016 5/22/17 Jun-­2019 PASS 32,533                                                                                                60822A W892 Cedar  Creek  -­‐  Cedar  Creek PCC  2 2016 Short-­‐term Eligible  Short-­‐term 12/2016 5/22/17 Nov-­2019 PASS 1,507                                                                                                    60822A W892 Cedar  Creek  -­‐  Cedar  Creek PCC  2 2016 Short-­‐term Eligible  Short-­‐term 10/2016 5/22/17 Sep-­2019 PASS 10,400                                                                                                60822A W892 Cedar  Creek  -­‐  Cedar  Creek PCC  2 2016 Short-­‐term Eligible  Short-­‐term 09/2016 5/22/17 Aug-­2019 PASS 39,987                                                                                                60822A W892 Cedar  Creek  -­‐  Cedar  Creek PCC  2 2016 Short-­‐term Eligible  Short-­‐term 08/2016 5/22/17 Jul-­2019 PASS 34,322                                                                                                61384A W1900 Cedar  Creek  II  -­‐  Cedar  Creek  II PCC  2 2016 Short-­‐term Eligible  Short-­‐term 08/2016 5/22/17 Jul-­2019 PASS 4,669                                                                                                    61384A W1900 Cedar  Creek  II  -­‐  Cedar  Creek  II PCC  2 2016 Short-­‐term Eligible  Short-­‐term 09/2016 5/22/17 Aug-­2019 PASS 6,115                                                                                                    61384A W1900 Cedar  Creek  II  -­‐  Cedar  Creek  II PCC  2 2016 Short-­‐term Eligible  Short-­‐term 07/2016 5/22/17 Jun-­2019 PASS 10,467                                                                                                62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/9/17 Nov-­2019 PASS 1,092                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/9/17 Sep-­2019 PASS 1,709                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/9/17 Oct-­2019 PASS 1,537                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 08/2016 6/9/17 Jul-­2019 PASS 3,355                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 09/2016 6/9/17 Aug-­2019 PASS 2,592                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 06/2016 6/9/17 May-­2019 PASS 3,736                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 6/9/17 Apr-­2019 PASS 3,504                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 07/2016 6/9/17 Jun-­2019 PASS 3,815                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 04/2016 6/9/17 Mar-­2019 PASS 2,985                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 03/2016 6/9/17 Feb-­2019 PASS 2,587                                                                                                    62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 01/2016 6/9/17 Dec-­2018 PASS 909                                                                                                            62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 02/2016 6/9/17 Jan-­2019 PASS 1,839                                                                                                    60533A W128 Clearwater  Paper  Corporation  -­‐  #3  turbine  generatorPCC  3 2016 Short-­‐term Eligible  Short-­‐term 09/2016 6/8/17 Aug-­2019 PASS 2,700                                                                                                    62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2016 6/8/17 Aug-­2019 PASS 36                                                                                                                62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/8/17 Oct-­2019 PASS 27                                                                                                                62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/8/17 Sep-­2019 PASS 28                                                                                                                62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/8/17 Nov-­2019 PASS 22                                                                                                                63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/8/17 Nov-­2019 PASS 75                                                                                                                63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/8/17 Sep-­2019 PASS 88                                                                                                                63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/8/17 Oct-­2019 PASS 97                                                                                                                63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/8/17 Oct-­2019 PASS 102                                                                                                            63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/8/17 Sep-­2019 PASS 104                                                                                                            63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/8/17 Nov-­2019 PASS 78                                                                                                                61205A W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/8/17 Nov-­2019 PASS 973                                                                                                            61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/9/17 Nov-­2019 PASS 1,119                                                                                                    61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/9/17 Oct-­2019 PASS 993                                                                                                            61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 03/2016 6/9/17 Feb-­2019 PASS 809                                                                                                            61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/9/17 Sep-­2019 PASS 1,092                                                                                                    61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 09/2016 6/9/17 Aug-­2019 PASS 1,008                                                                                                    61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 08/2016 6/9/17 Jul-­2019 PASS 1,133                                                                                                    61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 04/2016 6/9/17 Mar-­2019 PASS 1,102                                                                                                    61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 07/2016 6/9/17 Jun-­2019 PASS 1,060                                                                                                    61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 6/9/17 Apr-­2019 PASS 1,098                                                                                                    61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RDPCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 06/2016 6/9/17 May-­2019 PASS 1,074                                                                                                    61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 6/9/17 Apr-­2019 PASS 170                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 06/2016 6/9/17 May-­2019 PASS 43                                                                                                                61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 07/2016 6/9/17 Jun-­2019 PASS 28                                                                                                                61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 03/2016 6/9/17 Feb-­2019 PASS 92                                                                                                                61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 04/2016 6/9/17 Mar-­2019 PASS 112                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 01/2016 6/9/17 Dec-­2018 PASS 442                                                                                                            61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 08/2016 6/9/17 Jul-­2019 PASS 65                                                                                                                61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/9/17 Oct-­2019 PASS 12                                                                                                                61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/9/17 Sep-­2019 PASS 158                                                                                                            

Note : Please  create  one  line  per  combination  of  REC  vintage  and    REC retirement  date.    For  example  RECs  that  have  the  same  vintage  are  retired  on  two  separate   dates,  please   include  one  line  per  retirement  date.  Likewise  if  RECs  of  different  vintages  (e.g.  June  2016  and  July  2016)  are  retired  on  the  same  date,  please   include  one  line  per  vintage.

Page 49: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/9/17 Nov-­2019 PASS 87                                                                                                                62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/9/17 Nov-­2019 PASS 1,450                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/9/17 Sep-­2019 PASS 2,479                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 6/9/17 Apr-­2019 PASS 1,062                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/9/17 Oct-­2019 PASS 1,973                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 08/2016 6/9/17 Jul-­2019 PASS 3,829                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 09/2016 6/9/17 Aug-­2019 PASS 3,200                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 02/2016 5/24/17 Jan-­2019 PASS 2,447                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 01/2016 5/24/17 Dec-­2018 PASS 1,263                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 03/2016 5/24/17 Feb-­2019 PASS 3,062                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 04/2016 5/24/17 Mar-­2019 PASS 3,097                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 07/2016 6/9/17 Jun-­2019 PASS 4,350                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 5/24/17 Apr-­2019 PASS 2,812                                                                                                    62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  SolarPCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 06/2016 6/9/17 May-­2019 PASS 4,182                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  1 2012 Short-­‐term Eligible  Short-­‐term 11/2014 3/13/17 Oct-­2017 PASS 5,892                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  1 2012 Short-­‐term Eligible  Short-­‐term 12/2014 3/13/17 Nov-­2017 PASS 3,701                                                                                                    60857A W1306 Harvest  Wind  -­‐  Harvest  Wind PCC  1 2012 Short-­‐term Eligible  Short-­‐term 10/2014 3/13/17 Sep-­2017 PASS 2,291                                                                                                    61841A W5056 Henrietta  Solar  Plant  -­‐  Parrey,  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 07/2016 6/9/17 Jun-­2019 PASS 24,975                                                                                                61841A W5056 Henrietta  Solar  Plant  -­‐  Parrey,  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 09/2016 6/9/17 Aug-­2019 PASS 20,842                                                                                                61841A W5056 Henrietta  Solar  Plant  -­‐  Parrey,  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 08/2016 6/9/17 Jul-­2019 PASS 28,201                                                                                                61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 01/2016 6/9/17 Dec-­2018 PASS 1,715                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 02/2016 6/9/17 Jan-­2019 PASS 3,555                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 04/2016 6/9/17 Mar-­2019 PASS 5,105                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 03/2016 6/9/17 Feb-­2019 PASS 4,766                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 06/2016 6/9/17 May-­2019 PASS 6,563                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 05/2016 6/9/17 Apr-­2019 PASS 6,208                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 07/2016 6/9/17 Jun-­2019 PASS 6,474                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 09/2016 6/9/17 Aug-­2019 PASS 4,952                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 08/2016 6/9/17 Jul-­2019 PASS 5,708                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 11/2016 6/9/17 Oct-­2019 PASS 2,988                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 10/2016 6/9/17 Sep-­2019 PASS 3,488                                                                                                    61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 12/2016 6/9/17 Nov-­2019 PASS 2,217                                                                                                    61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 11/2016 6/9/17 Oct-­2019 PASS 2                                                                                                                      61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 12/2016 6/9/17 Nov-­2019 PASS 2                                                                                                                      61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 09/2016 6/9/17 Aug-­2019 PASS 2                                                                                                                      61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 08/2016 6/9/17 Jul-­2019 PASS 2                                                                                                                      61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 10/2016 6/9/17 Sep-­2019 PASS 2                                                                                                                      61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 07/2016 6/9/17 Jun-­2019 PASS 2                                                                                                                      61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 06/2016 6/9/17 May-­2019 PASS 2                                                                                                                      61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 03/2016 6/9/17 Feb-­2019 PASS 2                                                                                                                      61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 05/2016 6/9/17 Apr-­2019 PASS 1                                                                                                                      61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 04/2016 6/9/17 Mar-­2019 PASS 2                                                                                                                      62246A W3157 Limon  Wind  -­‐  Limon  Wind  I PCC  2 2012 Short-­‐term Eligible  Short-­‐term 03/2016 5/9/17 Feb-­2019 PASS 10,782                                                                                                62246A W3157 Limon  Wind  -­‐  Limon  Wind  I PCC  2 2012 Short-­‐term Eligible  Short-­‐term 01/2016 5/9/17 Dec-­2018 PASS 8,880                                                                                                    62859A W4269 Limon  Wind  III,  LLC  -­‐  Limon  Wind  III,  LLCPCC  2 2012 Short-­‐term Eligible  Short-­‐term 07/2016 5/9/17 Jun-­2019 PASS 8,600                                                                                                    62859A W4269 Limon  Wind  III,  LLC  -­‐  Limon  Wind  III,  LLCPCC  2 2012 Short-­‐term Eligible  Short-­‐term 09/2016 5/9/17 Aug-­2019 PASS 8,000                                                                                                    62859A W4269 Limon  Wind  III,  LLC  -­‐  Limon  Wind  III,  LLCPCC  2 2012 Short-­‐term Eligible  Short-­‐term 08/2016 5/9/17 Jul-­2019 PASS 7,800                                                                                                    62859A W4269 Limon  Wind  III,  LLC  -­‐  Limon  Wind  III,  LLCPCC  2 2012 Short-­‐term Eligible  Short-­‐term 10/2016 5/9/17 Sep-­2019 PASS 6,938                                                                                                    61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2016 6/9/17 Jun-­2019 PASS 327                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 6/9/17 Apr-­2019 PASS 394                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2016 6/9/17 May-­2019 PASS 344                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2016 6/9/17 Mar-­2019 PASS 452                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2016 6/9/17 Dec-­2018 PASS 499                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2016 6/9/17 Jan-­2019 PASS 260                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2016 6/9/17 Feb-­2019 PASS 340                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2016 6/9/17 Jul-­2019 PASS 381                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/9/17 Sep-­2019 PASS 418                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2016 6/9/17 Aug-­2019 PASS 413                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/9/17 Oct-­2019 PASS 411                                                                                                            61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/9/17 Nov-­2019 PASS 346                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/9/17 Nov-­2019 PASS 691                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/9/17 Oct-­2019 PASS 823                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2016 6/9/17 Aug-­2019 PASS 825                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/9/17 Sep-­2019 PASS 836                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2016 6/9/17 Jul-­2019 PASS 762                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2016 6/9/17 Feb-­2019 PASS 679                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2016 6/9/17 Jan-­2019 PASS 520                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2016 6/9/17 Dec-­2018 PASS 998                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2016 6/9/17 Mar-­2019 PASS 905                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 6/9/17 Apr-­2019 PASS 787                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2016 6/9/17 May-­2019 PASS 688                                                                                                            61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2016 6/9/17 Jun-­2019 PASS 655                                                                                                            61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2016 6/9/17 Jun-­2019 PASS 988                                                                                                            61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2016 6/9/17 May-­2019 PASS 1,039                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 6/9/17 Apr-­2019 PASS 1,188                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2016 6/9/17 Mar-­2019 PASS 1,366                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2016 6/9/17 Feb-­2019 PASS 1,024                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2016 6/9/17 Dec-­2018 PASS 1,506                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2016 6/9/17 Jan-­2019 PASS 785                                                                                                            61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2016 6/9/17 Jul-­2019 PASS 1,150                                                                                                    

Page 50: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/9/17 Sep-­2019 PASS 1,261                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2016 6/9/17 Aug-­2019 PASS 1,246                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/9/17 Nov-­2019 PASS 1,042                                                                                                    61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/9/17 Oct-­2019 PASS 1,242                                                                                                    63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/9/17 Sep-­2019 PASS 89                                                                                                                63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 08/2016 6/9/17 Jul-­2019 PASS 177                                                                                                            63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 09/2016 6/9/17 Aug-­2019 PASS 153                                                                                                            63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 07/2016 6/9/17 Jun-­2019 PASS 181                                                                                                            63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 06/2016 6/9/17 May-­2019 PASS 147                                                                                                            63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 6/9/17 Apr-­2019 PASS 78                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 06/2016 6/9/17 May-­2019 PASS 57                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 07/2016 6/9/17 Jun-­2019 PASS 69                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 04/2016 6/9/17 Mar-­2019 PASS 33                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 05/2016 6/9/17 Apr-­2019 PASS 44                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 03/2016 6/9/17 Feb-­2019 PASS 27                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 01/2016 6/9/17 Dec-­2018 PASS 7                                                                                                                      61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 02/2016 6/9/17 Jan-­2019 PASS 28                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 10/2016 6/9/17 Sep-­2019 PASS 17                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 09/2016 6/9/17 Aug-­2019 PASS 26                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 08/2016 6/9/17 Jul-­2019 PASS 49                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 12/2016 6/9/17 Nov-­2019 PASS 33                                                                                                                61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 11/2016 6/9/17 Oct-­2019 PASS 16                                                                                                                60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/9/17 Nov-­2019 PASS 5,829                                                                                                    60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/9/17 Oct-­2019 PASS 1,640                                                                                                    60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/9/17 Sep-­2019 PASS 1,115                                                                                                    60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2016 6/9/17 Aug-­2019 PASS 420                                                                                                            60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 6/9/17 Apr-­2019 PASS 6,910                                                                                                    60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 04/2016 6/9/17 Mar-­2019 PASS 6,696                                                                                                    60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 02/2016 6/9/17 Jan-­2019 PASS 2,665                                                                                                    60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 03/2016 6/9/17 Feb-­2019 PASS 6,798                                                                                                    60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2016 6/9/17 Jul-­2019 PASS 734                                                                                                            60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2016 6/9/17 Jun-­2019 PASS 318                                                                                                            60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 06/2016 6/9/17 May-­2019 PASS 5,626                                                                                                    60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 06/2016 6/9/17 May-­2019 PASS 6,170                                                                                                    60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2016 6/9/17 Jun-­2019 PASS 458                                                                                                            60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2016 6/9/17 Jul-­2019 PASS 1,551                                                                                                    60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 03/2016 6/9/17 Feb-­2019 PASS 7,413                                                                                                    60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 02/2016 6/9/17 Jan-­2019 PASS 2,574                                                                                                    60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 04/2016 6/9/17 Mar-­2019 PASS 7,344                                                                                                    60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 6/9/17 Apr-­2019 PASS 7,579                                                                                                    60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2016 6/9/17 Aug-­2019 PASS 858                                                                                                            60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/9/17 Sep-­2019 PASS 2,507                                                                                                    60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/9/17 Oct-­2019 PASS 3,220                                                                                                    60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/9/17 Nov-­2019 PASS 6,102                                                                                                    60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/9/17 Nov-­2019 PASS 6,684                                                                                                    60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/9/17 Oct-­2019 PASS 1,881                                                                                                    60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/9/17 Sep-­2019 PASS 1,277                                                                                                    60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2016 6/9/17 Aug-­2019 PASS 482                                                                                                            60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 6/9/17 Apr-­2019 PASS 7,801                                                                                                    60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 04/2016 6/9/17 Mar-­2019 PASS 7,560                                                                                                    60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 02/2016 6/9/17 Jan-­2019 PASS 3,063                                                                                                    60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 03/2016 6/9/17 Feb-­2019 PASS 7,787                                                                                                    60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2016 6/9/17 Jul-­2019 PASS 842                                                                                                            60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2016 6/9/17 Jun-­2019 PASS 365                                                                                                            60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 06/2016 6/9/17 May-­2019 PASS 6,352                                                                                                    62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 09/2016 6/9/17 Aug-­2019 PASS 23,676                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 08/2016 6/9/17 Jul-­2019 PASS 39,620                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 10/2016 6/9/17 Sep-­2019 PASS 20,636                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 11/2016 6/9/17 Oct-­2019 PASS 14,555                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 02/2016 6/9/17 Jan-­2019 PASS 4,391                                                                                                    62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 12/2016 6/9/17 Nov-­2019 PASS 19,654                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 07/2016 6/9/17 Jun-­2019 PASS 42,898                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 05/2016 6/9/17 Apr-­2019 PASS 34,744                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 06/2016 6/9/17 May-­2019 PASS 40,714                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 03/2016 6/9/17 Feb-­2019 PASS 32,850                                                                                                62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 04/2016 6/9/17 Mar-­2019 PASS 24,181                                                                                                62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2016 6/8/17 Mar-­2019 PASS 169                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2016 6/8/17 Jan-­2019 PASS 103                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2016 6/8/17 Feb-­2019 PASS 121                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2016 6/8/17 Dec-­2018 PASS 52                                                                                                                62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2016 6/8/17 May-­2019 PASS 205                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2016 6/8/17 Apr-­2019 PASS 190                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2016 6/8/17 Jun-­2019 PASS 215                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2016 6/8/17 Nov-­2019 PASS 64                                                                                                                62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2016 6/8/17 Oct-­2019 PASS 80                                                                                                                62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2016 6/8/17 Aug-­2019 PASS 152                                                                                                            62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2016 6/8/17 Sep-­2019 PASS 96                                                                                                                62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  AirportPCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2016 6/8/17 Jul-­2019 PASS 184                                                                                                            60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLCPCC  1 2016 Short-­‐term Eligible  Short-­‐term 09/2016 6/9/17 Aug-­2019 PASS 6,772                                                                                                    60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLCPCC  1 2016 Short-­‐term Eligible  Short-­‐term 10/2016 6/9/17 Sep-­2019 PASS 3,129                                                                                                    

Page 51: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLCPCC  1 2016 Short-­‐term Eligible  Short-­‐term 11/2016 6/9/17 Oct-­2019 PASS 1,283                                                                                                    60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLCPCC  1 2016 Short-­‐term Eligible  Short-­‐term 12/2016 6/9/17 Nov-­2019 PASS 2,724                                                                                                    60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLCPCC  1 2016 Short-­‐term Eligible  Short-­‐term 08/2016 6/9/17 Jul-­2019 PASS 11,238                                                                                                60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLCPCC  1 2016 Short-­‐term Eligible  Short-­‐term 06/2016 6/9/17 May-­2019 PASS 8,369                                                                                                    60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLCPCC  1 2016 Short-­‐term Eligible  Short-­‐term 07/2016 6/9/17 Jun-­2019 PASS 9,934                                                                                                    61842A W2756 Solano  Wind  Phase  3  -­‐  Solano  Wind  Phase  3PCC  1 2012 Short-­‐term Eligible  Short-­‐term 04/2016 6/8/17 Mar-­2019 PASS 31,203                                                                                                61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 05/2016 6/9/17 Apr-­2019 PASS 4                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 06/2016 6/9/17 May-­2019 PASS 7                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 01/2016 6/9/17 Dec-­2018 PASS 1                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 02/2016 6/9/17 Jan-­2019 PASS 1                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 03/2016 6/9/17 Feb-­2019 PASS 1                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 04/2016 6/9/17 Mar-­2019 PASS 1                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 07/2016 6/9/17 Jun-­2019 PASS 7                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 09/2016 6/9/17 Aug-­2019 PASS 1                                                                                                                      61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2)PCC  1 2011 Short-­‐term Eligible  Short-­‐term 08/2016 6/9/17 Jul-­2019 PASS 1                                                                                                                      60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 08/2016 6/8/17 Jul-­2019 PASS 3,071                                                                                                    60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 09/2016 6/8/17 Aug-­2019 PASS 3,159                                                                                                    60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 10/2016 6/8/17 Sep-­2019 PASS 3,127                                                                                                    60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 12/2016 6/8/17 Nov-­2019 PASS 3,159                                                                                                    60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 11/2016 6/8/17 Oct-­2019 PASS 2,859                                                                                                    60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 07/2016 6/8/17 Jun-­2019 PASS 3,214                                                                                                    60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 06/2016 6/8/17 May-­2019 PASS 2,798                                                                                                    60633A W3412 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  4 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 06/2016 6/8/17 May-­2019 PASS 2,460                                                                                                    60633A W3412 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  4 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 11/2016 6/8/17 Oct-­2019 PASS 2,513                                                                                                    60633A W3412 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  4 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 12/2016 6/8/17 Nov-­2019 PASS 2,775                                                                                                    60633A W3412 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  4 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 10/2016 6/8/17 Sep-­2019 PASS 2,749                                                                                                    60633A W3412 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  4 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 09/2016 6/8/17 Aug-­2019 PASS 2,772                                                                                                    60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 10/2016 6/8/17 Sep-­2019 PASS 3,127                                                                                                    60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 09/2016 6/8/17 Aug-­2019 PASS 3,155                                                                                                    60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 11/2016 6/8/17 Oct-­2019 PASS 2,860                                                                                                    60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 12/2016 6/8/17 Nov-­2019 PASS 3,159                                                                                                    60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 06/2016 6/8/17 May-­2019 PASS 2,796                                                                                                    60633A W868 Total  Energy  Facility  -­‐  TEF  -­‐  GEN3 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 06/2016 6/8/17 May-­2019 PASS 2,793                                                                                                    60633A W868 Total  Energy  Facility  -­‐  TEF  -­‐  GEN3 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 12/2016 6/8/17 Nov-­2019 PASS 3,159                                                                                                    60633A W868 Total  Energy  Facility  -­‐  TEF  -­‐  GEN3 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 11/2016 6/8/17 Oct-­2019 PASS 2,858                                                                                                    60633A W868 Total  Energy  Facility  -­‐  TEF  -­‐  GEN3 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 09/2016 6/8/17 Aug-­2019 PASS 3,152                                                                                                    60633A W868 Total  Energy  Facility  -­‐  TEF  -­‐  GEN3 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 10/2016 6/8/17 Sep-­2019 PASS 3,127                                                                                                    63027A W4482 Tucannon  River  Wind  Farm  -­‐  Tucannon  River  1PCC  2 2016 Short-­‐term Eligible  Short-­‐term 08/2016 5/17/17 Jul-­2019 PASS 21,346                                                                                                63027A W4482 Tucannon  River  Wind  Farm  -­‐  Tucannon  River  1PCC  2 2016 Short-­‐term Eligible  Short-­‐term 07/2016 5/17/17 Jun-­2019 PASS 28,221                                                                                                63027A W4483 Tucannon  River  Wind  Farm  -­‐  Tucannon  River  2PCC  2 2016 Short-­‐term Eligible  Short-­‐term 07/2016 5/17/17 Jun-­2019 PASS 20,174                                                                                                60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2012 Short-­‐term Eligible  Short-­‐term 11/2014 3/13/17 Oct-­2017 PASS 14,044                                                                                                60721A W360 White  Creek  Wind  1  -­‐  White  Creek PCC  1 2012 Short-­‐term Eligible  Short-­‐term 12/2014 3/13/17 Nov-­2017 PASS 2,869                                                                                                    

Page 52: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Annual  RPS  Compliance  Report:  (2017)  36  Month  RetirementData  Reported  by:Marin  Clean  Energy  (MCE) Input  RequiredAugust  31,  2018 Information  is  Hard  Coded  (No  Input  Required)

CPUC  ID RPS  ID WREGIS_ID Facility  Name Expected  PCC  Classification Contract  Year Contract  Length Short  Term  Contract  Eligibility Vintage  Month/Year Retirement  Date  (MM/DD/YYYY)

Last  Month  to  Retire  REC  (Month/Year)

Do  RECs  "Pass"  or  "Fail"  Requirements  of  36  Month  

Rule:  MWh  REC  Quantity  Retired

NA 63055A W1268 Biglow  Canyon  Wind  Farm  -­‐  Biglow  Phase  2 PCC  2 2017 Short-­‐term Eligible  Short-­‐term 09/2017 4/30/18 Aug-­2020 PASS 11,908                                                                                                NA 60878A W4880 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B01  Block  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 01/2017 6/14/18 Dec-­2019 PASS 5,615                                                                                                    NA 60878A W4880 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B01  Block  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 02/2017 6/14/18 Jan-­2020 PASS 5,581                                                                                                    NA 60878A W4880 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B01  Block  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 9,093                                                                                                    NA 60878A W4880 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B01  Block  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 8,989                                                                                                    NA 60878A W4880 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B01  Block  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 11,721                                                                                                NA 60878A W4880 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B01  Block  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 11,240                                                                                                NA 60878A W4880 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B01  Block  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 10,869                                                                                                NA 60878A W4880 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B01  Block  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 9,776                                                                                                    NA 60878A W4953 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B02  Block  02 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 01/2017 6/14/18 Dec-­2019 PASS 5,326                                                                                                    NA 60878A W4953 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B02  Block  02 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 02/2017 6/14/18 Jan-­2020 PASS 5,295                                                                                                    NA 60878A W4953 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B02  Block  02 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 8,600                                                                                                    NA 60878A W4953 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B02  Block  02 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 8,527                                                                                                    NA 60878A W4953 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B02  Block  02 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 11,118                                                                                                NA 60878A W4953 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B02  Block  02 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 10,661                                                                                                NA 60878A W4953 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B02  Block  02 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 10,310                                                                                                NA 60878A W4953 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B02  Block  02 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 9,272                                                                                                    NA 60878A W4954 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B03  Block  03 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 01/2017 6/14/18 Dec-­2019 PASS 4,198                                                                                                    NA 60878A W4954 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B03  Block  03 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 02/2017 6/14/18 Jan-­2020 PASS 4,172                                                                                                    NA 60878A W4954 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B03  Block  03 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 6,881                                                                                                    NA 60878A W4954 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B03  Block  03 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 6,720                                                                                                    NA 60878A W4954 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B03  Block  03 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 8,762                                                                                                    NA 60878A W4954 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B03  Block  03 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 8,402                                                                                                    NA 60878A W4954 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B03  Block  03 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 8,126                                                                                                    NA 60878A W4954 Blythe  Solar  110,  LLC  -­‐  BLY110-­‐B03  Block  03 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 7,307                                                                                                    NA 60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17 PCC  1 2013 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 7,430                                                                                                    NA 60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17 PCC  1 2013 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 7,440                                                                                                    NA 60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17 PCC  1 2013 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 7,200                                                                                                    NA 60007A W124 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  17 PCC  1 2013 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 1,804                                                                                                    NA 60008A W125 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  18 PCC  1 2013 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 7,440                                                                                                    NA 60008A W125 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  18 PCC  1 2013 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 6,720                                                                                                    NA 60008A W125 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  18 PCC  1 2013 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 7,200                                                                                                    NA 60008A W125 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  18 PCC  1 2013 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 7,200                                                                                                    NA 60008A W125 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  18 PCC  1 2013 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 7,440                                                                                                    NA 60009A W126 Geysers  Power  Plant  -­‐  Calpine  Geothermal  Unit  20 PCC  1 2013 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 7,440                                                                                                    NA 60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 6,406                                                                                                    NA 60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 5,394                                                                                                    NA 60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 5,191                                                                                                    NA 60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 6,608                                                                                                    NA 60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 7,190                                                                                                    NA 60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 6,828                                                                                                    NA 60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 6,809                                                                                                    NA 60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 3,913                                                                                                    NA 60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 2,847                                                                                                    NA 60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 2,902                                                                                                    NA 60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 2,227                                                                                                    NA 60535A W243 Camanche  -­‐  Camanche  1,2,&3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 2,050                                                                                                    NA 60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 6,977                                                                                                    NA 60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 6,331                                                                                                    NA 60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 7,035                                                                                                    NA 60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 6,672                                                                                                    NA 60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 7,006                                                                                                    NA 60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 6,941                                                                                                    NA 60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 5,133                                                                                                    NA 60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 3,182                                                                                                    NA 60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 2,618                                                                                                    NA 60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 2,373                                                                                                    NA 60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 3,385                                                                                                    NA 60536A W233 Pardee  -­‐  Pardee  1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 3,629                                                                                                    NA 60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 7,528                                                                                                    NA 60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 6,793                                                                                                    NA 60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 7,615                                                                                                    NA 60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 7,276                                                                                                    NA 60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 7,655                                                                                                    NA 60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 7,363                                                                                                    NA 60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 5,439                                                                                                    NA 60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 850                                                                                                            NA 60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 270                                                                                                            NA 60536A W241 Pardee  -­‐  Pardee  2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 3,857                                                                                                    NA 60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 8,001                                                                                                    NA 60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 7,260                                                                                                    NA 60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 8,066                                                                                                    NA 60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 7,651                                                                                                    

Note : Please  create  one  line  per  combination  of  REC  vintage  and    REC retirement  date.    For  example  RECs  that  have  the  same  vintage  are  retired  on  two  separate   dates,  please   include  one  line  per  retirement  date.  Likewise  if  RECs  of  different  vintages  (e.g.  June  2017  and  July  2017)  are  retired  on  the  same  date,  please   include  one  line  per  vintage.

gmo_404
Line
Page 53: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

NA 60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 8,033                                                                                                    NA 60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 7,958                                                                                                    NA 60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 5,885                                                                                                    NA 60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 3,649                                                                                                    NA 60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 3,003                                                                                                    NA 60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 2,721                                                                                                    NA 60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 3,881                                                                                                    NA 60536A W242 Pardee  -­‐  Pardee  3 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 4,162                                                                                                    NA 60600A W3959 Cape  Scott  Wind  -­‐  Cape  Scott  Wind PCC  2 2016 Short-­‐term Eligible  Short-­‐term 01/2017 4/26/18 Dec-­2019 PASS 9,681                                                                                                    NA 60600A W3959 Cape  Scott  Wind  -­‐  Cape  Scott  Wind PCC  1 2016 Short-­‐term Eligible  Short-­‐term 09/2017 6/14/18 Aug-­2020 PASS 3,377                                                                                                    NA 60822A W892 Cedar  Creek  -­‐  Cedar  Creek PCC  2 2016 Short-­‐term Eligible  Short-­‐term 02/2017 5/9/18 Jan-­2020 PASS 43,183                                                                                                NA 60822A W892 Cedar  Creek  -­‐  Cedar  Creek PCC  2 2016 Short-­‐term Eligible  Short-­‐term 05/2017 5/9/18 Apr-­2020 PASS 17,671                                                                                                NA 60822A W892 Cedar  Creek  -­‐  Cedar  Creek PCC  2 2016 Short-­‐term Eligible  Short-­‐term 06/2017 5/9/18 May-­2020 PASS 19,523                                                                                                NA 60822A W892 Cedar  Creek  -­‐  Cedar  Creek PCC  2 2016 Short-­‐term Eligible  Short-­‐term 07/2017 5/9/18 Jun-­2020 PASS 23,068                                                                                                NA 60822A W892 Cedar  Creek  -­‐  Cedar  Creek PCC  2 2016 Short-­‐term Eligible  Short-­‐term 08/2017 5/9/18 Jul-­2020 PASS 18,198                                                                                                NA 61384A W1900 Cedar  Creek  II  -­‐  Cedar  Creek  II PCC  2 2016 Short-­‐term Eligible  Short-­‐term 01/2017 5/9/18 Dec-­2019 PASS 50,508                                                                                                NA 61384A W1900 Cedar  Creek  II  -­‐  Cedar  Creek  II PCC  2 2016 Short-­‐term Eligible  Short-­‐term 03/2017 5/9/18 Feb-­2020 PASS 55,715                                                                                                NA 61384A W1900 Cedar  Creek  II  -­‐  Cedar  Creek  II PCC  2 2016 Short-­‐term Eligible  Short-­‐term 07/2017 5/9/18 Jun-­2020 PASS 11,961                                                                                                NA 60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEF PCC  3 2016 Short-­‐term Eligible  Short-­‐term 01/2017 6/14/18 Dec-­2019 PASS 78                                                                                                                NA 60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEF PCC  3 2016 Short-­‐term Eligible  Short-­‐term 02/2017 6/14/18 Jan-­2020 PASS 71                                                                                                                NA 60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEF PCC  3 2016 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 76                                                                                                                NA 60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEF PCC  3 2016 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 74                                                                                                                NA 60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEF PCC  3 2016 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 74                                                                                                                NA 60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEF PCC  3 2016 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 71                                                                                                                NA 60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEF PCC  3 2016 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 79                                                                                                                NA 60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEF PCC  3 2016 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 85                                                                                                                NA 60866A W1376 Calabasas  Gas-­‐to-­‐Energy  Facility  -­‐  CGTEF PCC  3 2016 Short-­‐term Eligible  Short-­‐term 09/2017 6/14/18 Aug-­2020 PASS 79                                                                                                                NA 62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 5/23/18 Dec-­2019 PASS 991                                                                                                            NA 62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 5/23/18 Jan-­2020 PASS 1,374                                                                                                    NA 62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 5/23/18 Feb-­2020 PASS 2,545                                                                                                    NA 62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 5/23/18 Mar-­2020 PASS 2,505                                                                                                    NA 62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 5/23/18 Apr-­2020 PASS 2,938                                                                                                    NA 62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 5/23/18 May-­2020 PASS 3,501                                                                                                    NA 62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 5/23/18 Jun-­2020 PASS 3,401                                                                                                    NA 62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 5/23/18 Jul-­2020 PASS 2,745                                                                                                    NA 62355A W4150 City  of  Corcoran  Solar  -­‐  City  of  Corcoran  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 357                                                                                                            NA 62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 5/23/18 Dec-­2019 PASS 23                                                                                                                NA 62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 5/23/18 Jan-­2020 PASS 22                                                                                                                NA 62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 5/23/18 Feb-­2020 PASS 44                                                                                                                NA 62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 5/23/18 Mar-­2020 PASS 48                                                                                                                NA 62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 5/23/18 Apr-­2020 PASS 65                                                                                                                NA 62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 5/23/18 May-­2020 PASS 62                                                                                                                NA 62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 5/23/18 Jun-­2020 PASS 66                                                                                                                NA 62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 5/23/18 Jul-­2020 PASS 56                                                                                                                NA 62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 5/23/18 Aug-­2020 PASS 47                                                                                                                NA 62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 5/23/18 Sep-­2020 PASS 43                                                                                                                NA 62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 5/23/18 Oct-­2020 PASS 24                                                                                                                NA 62742A W5192 Cost  Plus  Plaza  -­‐  Cost  Plus  Plaza PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 5/23/18 Nov-­2020 PASS 25                                                                                                                NA 61360A W1992 Dokie  Wind  -­‐  Dokie  Wind PCC  2 2016 Short-­‐term Eligible  Short-­‐term 01/2017 4/26/18 Dec-­2019 PASS 11,260                                                                                                NA 61360A W1992 Dokie  Wind  -­‐  Dokie  Wind PCC  1 2016 Short-­‐term Eligible  Short-­‐term 09/2017 6/14/18 Aug-­2020 PASS 8,369                                                                                                    NA 62709A W5654 DRES  Quarry  1  -­‐  DRES  Quarry  1 PCC  1 2014 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 5/23/18 Jun-­2020 PASS 95                                                                                                                NA 62709A W5654 DRES  Quarry  1  -­‐  DRES  Quarry  1 PCC  1 2014 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 137                                                                                                            NA 62709A W5654 DRES  Quarry  1  -­‐  DRES  Quarry  1 PCC  1 2014 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 143                                                                                                            NA 62709A W5654 DRES  Quarry  1  -­‐  DRES  Quarry  1 PCC  1 2014 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 110                                                                                                            NA 62709A W5654 DRES  Quarry  1  -­‐  DRES  Quarry  1 PCC  1 2014 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 127                                                                                                            NA 61034A W186 Elkhorn  Valley  Wind  Farm  -­‐  Elkhorn  Valley  Wind  Farm PCC  2 2016 Short-­‐term Eligible  Short-­‐term 01/2017 5/9/18 Dec-­2019 PASS 14,541                                                                                                NA 61034A W186 Elkhorn  Valley  Wind  Farm  -­‐  Elkhorn  Valley  Wind  Farm PCC  2 2016 Short-­‐term Eligible  Short-­‐term 02/2017 5/9/18 Jan-­2020 PASS 26,840                                                                                                NA 61034A W186 Elkhorn  Valley  Wind  Farm  -­‐  Elkhorn  Valley  Wind  Farm PCC  2 2016 Short-­‐term Eligible  Short-­‐term 03/2017 5/9/18 Feb-­2020 PASS 11,711                                                                                                NA 63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 86                                                                                                                NA 63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 89                                                                                                                NA 63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 166                                                                                                            NA 63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 173                                                                                                            NA 63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 215                                                                                                            NA 63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 212                                                                                                            NA 63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 210                                                                                                            NA 63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 170                                                                                                            NA 63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 152                                                                                                            NA 63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 162                                                                                                            NA 63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 95                                                                                                                NA 63035A W5190 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #1 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 91                                                                                                                NA 63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 88                                                                                                                NA 63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 95                                                                                                                NA 63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 176                                                                                                            NA 63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 165                                                                                                            NA 63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 220                                                                                                            NA 63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 205                                                                                                            NA 63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 202                                                                                                            NA 63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 166                                                                                                            NA 63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 153                                                                                                            NA 63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 164                                                                                                            NA 63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 99                                                                                                                NA 63036A W5191 Freethy  Industrial  Park  -­‐  Freethy  Industrial  Park  Unit  #2 PCC  1 2015 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 94                                                                                                                NA 61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 1,060                                                                                                    

gmo_404
Line
gmo_404
Line
gmo_404
Line
gmo_404
Line
gmo_404
Line
gmo_404
Line
gmo_404
Line
gmo_404
Line
gmo_404
Line
gmo_404
Line
gmo_404
Oval
gmo_404
Line
gmo_404
Line
gmo_404
Line
Page 54: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

NA 61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 864                                                                                                            NA 61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 1,042                                                                                                    NA 61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 880                                                                                                            NA 61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 332                                                                                                            NA 61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 972                                                                                                            NA 61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 1,038                                                                                                    NA 61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 913                                                                                                            NA 61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 1,058                                                                                                    NA 61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 1,076                                                                                                    NA 61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 1,038                                                                                                    NA 61205C W3547 G2  Energy  Hay  Road  -­‐  G2  Hay  Road PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 1,113                                                                                                    NA 61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 1,048                                                                                                    NA 61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 907                                                                                                            NA 61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 1,028                                                                                                    NA 61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 648                                                                                                            NA 61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 1,121                                                                                                    NA 61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 1,082                                                                                                    NA 61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 866                                                                                                            NA 61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 1,089                                                                                                    NA 61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 1,098                                                                                                    NA 61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 1,150                                                                                                    NA 61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 1,005                                                                                                    NA 61206A W1565 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  RD PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 1,157                                                                                                    NA 61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 148                                                                                                            NA 61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 102                                                                                                            NA 61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 121                                                                                                            NA 61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 331                                                                                                            NA 61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 182                                                                                                            NA 61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 75                                                                                                                NA 61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 44                                                                                                                NA 61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 74                                                                                                                NA 61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 59                                                                                                                NA 61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 60                                                                                                                NA 61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 169                                                                                                            NA 61206A W3932 G2  Energy  Ostrom  Rd  -­‐  G2  Energy  Ostrom  Rd.  Unit  2 PCC  1 2010 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 31                                                                                                                NA 60908A W1254 Geothermal  1_Unit  1  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 8,484                                                                                                    NA 60908A W1254 Geothermal  1_Unit  1  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 8,593                                                                                                    NA 60908A W1254 Geothermal  1_Unit  1  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 8,808                                                                                                    NA 60908A W1254 Geothermal  1_Unit  1  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 8,330                                                                                                    NA 60908A W1254 Geothermal  1_Unit  1  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 8,763                                                                                                    NA 60908A W1254 Geothermal  1_Unit  1  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 8,657                                                                                                    NA 60908A W1254 Geothermal  1_Unit  1  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 09/2017 6/14/18 Aug-­2020 PASS 8,309                                                                                                    NA 60908A W1254 Geothermal  1_Unit  1  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 10/2017 6/14/18 Sep-­2020 PASS 3,728                                                                                                    NA 60908A W1255 Geothermal  1_Unit  2  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 8,506                                                                                                    NA 60908A W1255 Geothermal  1_Unit  2  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 8,459                                                                                                    NA 60908A W1255 Geothermal  1_Unit  2  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 8,002                                                                                                    NA 60908A W1255 Geothermal  1_Unit  2  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 7,472                                                                                                    NA 60908A W1255 Geothermal  1_Unit  2  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 7,525                                                                                                    NA 60908A W1255 Geothermal  1_Unit  2  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 7,779                                                                                                    NA 60908A W1255 Geothermal  1_Unit  2  -­‐  Geothermal  1 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 09/2017 6/14/18 Aug-­2020 PASS 7,670                                                                                                    NA 60911A W1257 Geothermal  2_Unit  4  -­‐  Geothermal  2 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 7,010                                                                                                    NA 60911A W1257 Geothermal  2_Unit  4  -­‐  Geothermal  2 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 11,820                                                                                                NA 60911A W1257 Geothermal  2_Unit  4  -­‐  Geothermal  2 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 12,398                                                                                                NA 60911A W1257 Geothermal  2_Unit  4  -­‐  Geothermal  2 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 12,278                                                                                                NA 60911A W1257 Geothermal  2_Unit  4  -­‐  Geothermal  2 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 12,728                                                                                                NA 60911A W1257 Geothermal  2_Unit  4  -­‐  Geothermal  2 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 12,580                                                                                                NA 60911A W1257 Geothermal  2_Unit  4  -­‐  Geothermal  2 PCC  1 2016 Short-­‐term Eligible  Short-­‐term 09/2017 6/14/18 Aug-­2020 PASS 12,101                                                                                                NA 62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 1,333                                                                                                    NA 62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 1,655                                                                                                    NA 62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 3,101                                                                                                    NA 62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 3,342                                                                                                    NA 62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 3,894                                                                                                    NA 62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 4,270                                                                                                    NA 62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 4,124                                                                                                    NA 62357A W4151 Goose  Lake  Solar  -­‐  Goose  Lake  Solar PCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 3,677                                                                                                    NA 61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 01/2017 5/23/18 Dec-­2019 PASS 1,902                                                                                                    NA 61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 02/2017 5/23/18 Jan-­2020 PASS 2,451                                                                                                    NA 61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 03/2017 5/23/18 Feb-­2020 PASS 2,457                                                                                                    NA 61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 2,140                                                                                                    NA 61263A W4192 Kansas  -­‐  Kansas PCC  1 2012 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 5,835                                                                                                    NA 61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 01/2017 6/14/18 Dec-­2019 PASS 3                                                                                                                      NA 61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 02/2017 6/14/18 Jan-­2020 PASS 3                                                                                                                      NA 61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 3                                                                                                                      NA 61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 3                                                                                                                      NA 61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 3                                                                                                                      NA 61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 3                                                                                                                      NA 61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 1                                                                                                                      NA 61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 3                                                                                                                      NA 61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 09/2017 6/14/18 Aug-­2020 PASS 3                                                                                                                      NA 61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 10/2017 6/14/18 Sep-­2020 PASS 3                                                                                                                      NA 61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 11/2017 6/14/18 Oct-­2020 PASS 3                                                                                                                      NA 61044A W1108 Lewiston  Powerplant  -­‐  Lewiston PCC  1 2011 Short-­‐term Eligible  Short-­‐term 12/2017 6/14/18 Nov-­2020 PASS 3                                                                                                                      NA 61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 290                                                                                                            

Page 55: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

NA 61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 356                                                                                                            NA 61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 442                                                                                                            NA 61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 435                                                                                                            NA 61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 417                                                                                                            NA 61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 416                                                                                                            NA 61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 339                                                                                                            NA 61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 373                                                                                                            NA 61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 313                                                                                                            NA 61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 385                                                                                                            NA 61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 388                                                                                                            NA 61632A W2319 Lincoln  Landfill  Power  Plant  -­‐  Unit  3 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 388                                                                                                            NA 61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 580                                                                                                            NA 61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 713                                                                                                            NA 61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 884                                                                                                            NA 61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 870                                                                                                            NA 61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 833                                                                                                            NA 61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 833                                                                                                            NA 61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 678                                                                                                            NA 61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 746                                                                                                            NA 61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 625                                                                                                            NA 61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 771                                                                                                            NA 61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 775                                                                                                            NA 61632A W2318 Lincoln  Landfill  Power  Plant  -­‐  Units  1  &  2 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 777                                                                                                            NA 61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 6/14/18 Dec-­2019 PASS 876                                                                                                            NA 61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 6/14/18 Jan-­2020 PASS 1,076                                                                                                    NA 61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 1,335                                                                                                    NA 61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 1,313                                                                                                    NA 61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 1,256                                                                                                    NA 61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 1,258                                                                                                    NA 61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 1,023                                                                                                    NA 61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 1,126                                                                                                    NA 61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 943                                                                                                            NA 61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 1,165                                                                                                    NA 61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 1,168                                                                                                    NA 61632A W3188 Lincoln  Landfill  Power  Plant  -­‐  Units  4,  5,  &  6 PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 1,174                                                                                                    NA 60817A W893 Logan  Wind  Energy  -­‐  Logan PCC  2 2016 Short-­‐term Eligible  Short-­‐term 04/2017 5/9/18 Mar-­2020 PASS 51,550                                                                                                NA 60817A W893 Logan  Wind  Energy  -­‐  Logan PCC  2 2016 Short-­‐term Eligible  Short-­‐term 07/2017 5/9/18 Jun-­2020 PASS 7,971                                                                                                    NA 60817A W893 Logan  Wind  Energy  -­‐  Logan PCC  2 2016 Short-­‐term Eligible  Short-­‐term 12/2017 5/9/18 Nov-­2020 PASS 20,606                                                                                                NA 63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 6/14/18 Feb-­2020 PASS 18                                                                                                                NA 63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 6/14/18 Mar-­2020 PASS 80                                                                                                                NA 63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 6/14/18 Apr-­2020 PASS 207                                                                                                            NA 63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 206                                                                                                            NA 63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 182                                                                                                            NA 63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 170                                                                                                            NA 63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 126                                                                                                            NA 63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 105                                                                                                            NA 63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 64                                                                                                                NA 63219A W4903 Marin  Carport  -­‐  Buck  Institute  -­‐  Marin  Carport  -­‐  Buck  InstitutePCC  1 2011 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 62                                                                                                                NA 63268A W5189 Meikle  Wind  -­‐  Meikle  Wind PCC  2 2016 Short-­‐term Eligible  Short-­‐term 01/2017 4/26/18 Dec-­2019 PASS 11,271                                                                                                NA 63268A W5189 Meikle  Wind  -­‐  Meikle  Wind PCC  2 2016 Short-­‐term Eligible  Short-­‐term 03/2017 4/26/18 Feb-­2020 PASS 9,187                                                                                                    NA 61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 01/2017 6/14/18 Dec-­2019 PASS 60                                                                                                                NA 61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 02/2017 6/14/18 Jan-­2020 PASS 19                                                                                                                NA 61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 14                                                                                                                NA 61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 42                                                                                                                NA 61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 74                                                                                                                NA 61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 55                                                                                                                NA 61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 66                                                                                                                NA 61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 63                                                                                                                NA 61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 09/2017 6/14/18 Aug-­2020 PASS 54                                                                                                                NA 61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 10/2017 6/14/18 Sep-­2020 PASS 43                                                                                                                NA 61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 11/2017 6/14/18 Oct-­2020 PASS 35                                                                                                                NA 61045A W1161 Nimbus  Powerplant  -­‐  Nimbus  Plant  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 12/2017 6/14/18 Nov-­2020 PASS 54                                                                                                                NA 61252A W3746 Port  Angeles  Mill  -­‐  CoGen  No.  11 PCC  2 2016 Short-­‐term Eligible  Short-­‐term 01/2017 4/26/18 Dec-­2019 PASS 615                                                                                                            NA 62247A W3160 Quality  Wind  -­‐  Quality  Wind PCC  1 2016 Short-­‐term Eligible  Short-­‐term 09/2017 6/14/18 Aug-­2020 PASS 8,540                                                                                                    NA 62247A W3160 Quality  Wind  -­‐  Quality  Wind PCC  2 2016 Short-­‐term Eligible  Short-­‐term 01/2017 4/26/18 Dec-­2019 PASS 12,986                                                                                                NA 63651A W5551 Redwood  Renewable  Energy  Facility  -­‐  Waste  Management  Landfill  Redwood  LGGTEPCC  1 2014 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 6/14/18 May-­2020 PASS 308                                                                                                            NA 63651A W5551 Redwood  Renewable  Energy  Facility  -­‐  Waste  Management  Landfill  Redwood  LGGTEPCC  1 2014 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 6/14/18 Jun-­2020 PASS 1,488                                                                                                    NA 63651A W5551 Redwood  Renewable  Energy  Facility  -­‐  Waste  Management  Landfill  Redwood  LGGTEPCC  1 2014 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 6/14/18 Jul-­2020 PASS 2,631                                                                                                    NA 63651A W5551 Redwood  Renewable  Energy  Facility  -­‐  Waste  Management  Landfill  Redwood  LGGTEPCC  1 2014 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 6/14/18 Aug-­2020 PASS 2,440                                                                                                    NA 63651A W5551 Redwood  Renewable  Energy  Facility  -­‐  Waste  Management  Landfill  Redwood  LGGTEPCC  1 2014 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 6/14/18 Sep-­2020 PASS 2,370                                                                                                    NA 63651A W5551 Redwood  Renewable  Energy  Facility  -­‐  Waste  Management  Landfill  Redwood  LGGTEPCC  1 2014 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 6/14/18 Oct-­2020 PASS 2,631                                                                                                    NA 63651A W5551 Redwood  Renewable  Energy  Facility  -­‐  Waste  Management  Landfill  Redwood  LGGTEPCC  1 2014 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 6/14/18 Nov-­2020 PASS 2,523                                                                                                    NA 62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 5,399                                                                                                    NA 62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 35,892                                                                                                NA 62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 39,724                                                                                                NA 62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 44,854                                                                                                NA 62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 45,850                                                                                                NA 62469A W4612 Rising  Tree  Wind  Farm  III  LLC  -­‐  Rising  Tree  Wind  Farm  III  LLCPCC  1 2014 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 33,435                                                                                                NA 62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 01/2017 5/23/18 Dec-­2019 PASS 66                                                                                                                NA 62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 02/2017 5/23/18 Jan-­2020 PASS 71                                                                                                                NA 62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 03/2017 5/23/18 Feb-­2020 PASS 137                                                                                                            NA 62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 04/2017 5/23/18 Mar-­2020 PASS 149                                                                                                            NA 62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 05/2017 5/23/18 Apr-­2020 PASS 207                                                                                                            

gmo_404
Line
gmo_404
Line
gmo_404
Line
gmo_404
Line
gmo_404
Line
gmo_404
Line
gmo_404
Line
gmo_404
Oval
Page 56: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

NA 62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 06/2017 5/23/18 May-­2020 PASS 206                                                                                                            NA 62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 07/2017 5/23/18 Jun-­2020 PASS 88                                                                                                                NA 62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 08/2017 5/23/18 Jul-­2020 PASS 136                                                                                                            NA 62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 09/2017 5/23/18 Aug-­2020 PASS 135                                                                                                            NA 62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 10/2017 5/23/18 Sep-­2020 PASS 115                                                                                                            NA 62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 11/2017 5/23/18 Oct-­2020 PASS 69                                                                                                                NA 62237A W2969 San  Rafael  Airport  -­‐  San  Rafael  Airport PCC  1 2012 Long-­‐term Long-­‐term  -­‐  N/A 12/2017 5/23/18 Nov-­2020 PASS 72                                                                                                                NA 60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 01/2017 6/14/18 Dec-­2019 PASS 3,019                                                                                                    NA 60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 02/2017 6/14/18 Jan-­2020 PASS 2,869                                                                                                    NA 60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 2,577                                                                                                    NA 60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 3,552                                                                                                    NA 60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 7,570                                                                                                    NA 60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 8,458                                                                                                    NA 60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 8,424                                                                                                    NA 60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 10,249                                                                                                NA 60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 09/2017 6/14/18 Aug-­2020 PASS 5,400                                                                                                    NA 60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 11/2017 6/14/18 Oct-­2020 PASS 1,325                                                                                                    NA 60488A W231 Shiloh  I  Wind  Project  -­‐  Shiloh  I  Wind  Project  LLC PCC  1 2016 Short-­‐term Eligible  Short-­‐term 12/2017 6/14/18 Nov-­2020 PASS 420                                                                                                            NA 61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 02/2017 6/14/18 Jan-­2020 PASS 4                                                                                                                      NA 61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 9                                                                                                                      NA 61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 9                                                                                                                      NA 61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 9                                                                                                                      NA 61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 1                                                                                                                      NA 61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 6                                                                                                                      NA 61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 6                                                                                                                      NA 61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 09/2017 6/14/18 Aug-­2020 PASS 3                                                                                                                      NA 61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 10/2017 6/14/18 Sep-­2020 PASS 7                                                                                                                      NA 61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 11/2017 6/14/18 Oct-­2020 PASS 5                                                                                                                      NA 61046A W1177 Stampede  Powerplant  -­‐  Stampede  (2) PCC  1 2011 Short-­‐term Eligible  Short-­‐term 12/2017 6/14/18 Nov-­2020 PASS 2                                                                                                                      NA 60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 01/2017 6/14/18 Dec-­2019 PASS 3,108                                                                                                    NA 60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 02/2017 6/14/18 Jan-­2020 PASS 2,902                                                                                                    NA 60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 3,178                                                                                                    NA 60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 3,072                                                                                                    NA 60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 3,257                                                                                                    NA 60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 3,109                                                                                                    NA 60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 3,204                                                                                                    NA 60633A W866 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  1 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 3,232                                                                                                    NA 60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 01/2017 6/14/18 Dec-­2019 PASS 3,108                                                                                                    NA 60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 02/2017 6/14/18 Jan-­2020 PASS 2,902                                                                                                    NA 60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 3,178                                                                                                    NA 60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 3,072                                                                                                    NA 60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 3,257                                                                                                    NA 60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 3,113                                                                                                    NA 60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 3,201                                                                                                    NA 60633A W867 Total  Energy  Facility  -­‐  TEF  -­‐  GEN2 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 08/2017 6/14/18 Jul-­2020 PASS 1,415                                                                                                    NA 60633A W868 Total  Energy  Facility  -­‐  TEF  -­‐  GEN3 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 01/2017 6/14/18 Dec-­2019 PASS 3,105                                                                                                    NA 60633A W868 Total  Energy  Facility  -­‐  TEF  -­‐  GEN3 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 02/2017 6/14/18 Jan-­2020 PASS 2,902                                                                                                    NA 60633A W868 Total  Energy  Facility  -­‐  TEF  -­‐  GEN3 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 3,178                                                                                                    NA 60633A W868 Total  Energy  Facility  -­‐  TEF  -­‐  GEN3 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 3,072                                                                                                    NA 60633A W868 Total  Energy  Facility  -­‐  TEF  -­‐  GEN3 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 3,254                                                                                                    NA 60633A W868 Total  Energy  Facility  -­‐  TEF  -­‐  GEN3 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 3,112                                                                                                    NA 60633A W868 Total  Energy  Facility  -­‐  TEF  -­‐  GEN3 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 3,198                                                                                                    NA 60633A W3412 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  4 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 01/2017 6/14/18 Dec-­2019 PASS 2,731                                                                                                    NA 60633A W3412 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  4 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 02/2017 6/14/18 Jan-­2020 PASS 2,550                                                                                                    NA 60633A W3412 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  4 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 03/2017 6/14/18 Feb-­2020 PASS 2,793                                                                                                    NA 60633A W3412 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  4 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 04/2017 6/14/18 Mar-­2020 PASS 2,699                                                                                                    NA 60633A W3412 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  4 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 05/2017 6/14/18 Apr-­2020 PASS 2,864                                                                                                    NA 60633A W3412 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  4 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 06/2017 6/14/18 May-­2020 PASS 2,734                                                                                                    NA 60633A W3412 Total  Energy  Facility  -­‐  TEF  -­‐  GEN  4 PCC  3 2016 Short-­‐term Eligible  Short-­‐term 07/2017 6/14/18 Jun-­2020 PASS 2,813                                                                                                    NA 63027A W4482 Tucannon  River  Wind  Farm  -­‐  Tucannon  River  1 PCC  2 2017 Short-­‐term Eligible  Short-­‐term 09/2017 4/30/18 Aug-­2020 PASS 2,881                                                                                                    NA 63027A W4483 Tucannon  River  Wind  Farm  -­‐  Tucannon  River  2 PCC  2 2017 Short-­‐term Eligible  Short-­‐term 09/2017 4/30/18 Aug-­2020 PASS 15,211                                                                                                

Dec-­1902 PASSDec-­1902 PASSDec-­1902 PASSDec-­1902 PASSDec-­1902 PASSDec-­1902 PASS

gmo_404
Line
gmo_404
Line
Page 57: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Revised  2/11/2011

 

August  31,  2018 Name:  Dawn  WeiszTitle:    Chief  Executive  OfficerEmail:    [email protected]:    (415)  464-­‐6020Fax:    (415)  459-­‐8095Address:  1125  Tamalpais  Avenue,  San  Rafael,  CA  94901

2017  Static  Contract  Informaiton

BEFORE  THE  PUBLIC  UTILITIES  COMMISSION  OF  THE  STATE  OF  CALIFORNIA

Order  Instituting  Rulemaking  to  Continue  Implementation  and  

Administration  of  California  Renewables  Portfolio  Standard  Program.

Rulemaking  15-­‐02-­‐020(Filed  February  26,  2015)

Marin  Clean  Energy  (MCE)

Page 58: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Initial  Reporting  Year Facility  Name Technology Technology  Sub-­‐Type Expected  PCC  Classification Facility  Status Contract  Execution  Date Contract  Start  Date

2018 Exelon  Sept-­Dec  2017_PCC1 Wind/Solar/Geothermal PCC1 online 9/7/17 9/8/172018 PowerEx  April-­Dec  2018_PCC1 Wind PCC1 online 9/15/17 4/1/182018 PowerEx  Jan-­Dec  2018_PCC2 Wind PCC2 online 9/18/17 1/1/182018 PowerEX  Jan-­Dec  2019_PCC2 Wind PCC2 online 9/18/17 1/1/192018 PowerEx  Jan2019-­Dec  2020_PCC1 Wind PCC1 online 10/13/17 1/1/192018 Morgan  Stanley  Apr  2018-­Dec  2020_PCC1 Wind PCC1 online 11/14/17 4/1/182018 NextEra  Apr-­Dec  2018_PCC1 Solar  PV PCC1 online 11/8/17 4/1/182018 Energy  Finance  Associates  Dec  2018  -­  Dec  2028_PCC1  (Marin  HQ) Solar  PV PCC1 under  development  -­  on  schedule 2/2/17 12/1/182018 sPower  MCE  Solar  One  Dec  2017-­Dec  2037_PCC1 Solar  PV PCC1 online 5/30/17 12/18/172018 NextEra  Jan  2019  -­  Dec  2023_PCC1 Wind PCC1 online 11/8/17 1/1/192018 ConEd  May  2018-­Dec  2019_PCC1 Solar  PV PCC1 online 3/6/18 5/1/182018 SVP  Apr-­Dec2018_PCC1 Geothermal   PCC1 online 2/28/18 4/1/182018 City  of  Lancaster  Nov-­Dec2017_PCC1 Wind PCC1 online 11/8/17 11/8/172017 3Phases  Jan  2018  -­  Dec  2019_PCC2 Wind PCC2 online 6/23/17 1/1/182018 Portland  General  Electric  Sep-­Dec2017_PCC2 Wind PCC2 online 9/1/17 9/1/172018 Portland  General  Electric  Jan-­Dec2018_PCC2 Wind PCC2 online 1/31/18 1/31/182018 Portland  General  Electric  Jan-­Dec2018_PCC2_2 Wind PCC2 online 1/31/18 1/31/182018 Xcel  Jan-­Dec  2018_PCC2 Wind PCC2 online 10/16/17 1/1/182018 Xcel  Jan-­Dec  2018_PCC2_2 Wind PCC2 online 1/29/18 1/1/182018 Apple  Valley  Nov-­Dec2017_PCC1 Wind PCC1 online 11/8/17 11/8/172018 Oakley  RV  &  Boat  Storage  July  2018-­July  2038_PCC1 Solar  PV PCC1 online 5/9/18 7/20/182018 BayWa  Strauss  Wind  Project  April  2020-­April  2035_PCC1 Wind PCC1 under  development  -­  on  schedule 6/1/18 4/1/202018 STX  P-­STX_PCC3 Biomass PCC3 online 3/18/18 7/1/182018 3Phases  Jul-­Dec2018_PCC1 Various PCC1 online 6/29/18 7/1/18

RPS  Static  Contract  Information  

Page 59: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Contract  Term Contract  End  Date Contract  Termination  Date Share  (%)  or  Fixed  Contract  Amount  of  Total  Generation CPUC  ID  Number WREGIS  ID RPS  ID Owner/Seller Scheduling  Coordinator Facility  Location:    

County  4  Months 12/31/17 Fixed  Contracted  Amount N/A 62469A,  60878A,  60488,  60025A,  60004AExelon    (fka  Constellation)9  Months 12/31/18 Fixed  Contracted  Amount N/A 613604,  622474,  60600A,  63268APowerex  Corp.12  Months 12/31/18 Fixed  Contracted  Amount N/A 61360A,  62247A,  60600A,  63268A,  60721APowerex  Corp.12  Months 12/31/19 Fixed  Contracted  Amount N/A 61360A,  62247A,  60600A,  63268A,  60721APowerex  Corp.2    Years 12/31/20 Fixed  Contracted  Amount N/A 61360A,  62247A,  60600A,  63268APowerex  Corp.2  Year,  9  Months 12/31/20 Fixed  Contracted  Amount N/A 60857A,  60602A Morgan  Stanley  Capital  Group  Inc.9  Months 12/31/18 Fixed  Contracted  Amount N/A 60878A NextEra10  Years 12/1/28 Shared  (%) N/A Energy  Finance  Associates Marin20  Years 12/17/37 Shared  (%) N/A MCE  Solar  One,  LLC Contra  Costa5  Years 12/31/23 Shared  (%) N/A 55396 NextEra19  Months 12/31/19 Fixed  Contracted  Amount N/A 62516,  60585 CED  Lost  Hills  Solar,  LLC9  Months 12/31/18 Fixed  Contracted  Amount N/A Various City  of  Santa  Clara  dba  Silicon  Valley  Power)2  Months 12/31/17 Fixed  Contracted  Amount N/A 62469A,  60878A,  60488,  60025A,  60004A,  60025A,  60004A,  60535A,  63282CCity  of  Lancaster2  years 12/31/19 Fixed  Contracted  Amount N/A 60858,  60092A,  60107,  60385,  603863Phases4  Months 12/31/17 Fixed  Contracted  Amount N/A 63027A,  63056A Portland  General  Electric11  Months 12/31/18 Fixed  Contracted  Amount N/A 63027A,  630564 Portland  General  Electric11  Months 12/31/18 Fixed  Contracted  Amount N/A 63027A,  63055A,  63056APortland  General  Electric12  Months 12/31/18 Fixed  Contracted  Amount N/A 62246A,  62246A,  62859AXcel12  Months 12/31/18 Fixed  Contracted  Amount N/A 62246A,  62246A,  62859A,  60822A,  60822AXcel2    Months 12/31/17 Fixed  Contracted  Amount N/A 62469Á,  60878A,  60488,  60025A,  60004A,  60535A,  63282CApple  Valley  Choice  Energy20  Years 7/19/38 Shared  (%) N/A Hayworth-­Fabian,  LLC Contra  Costa15  Years 3/31/35 Shared  (%) N/A Strauss  Wind,  LLC Santa  Barbara  County6  Months 12/31/18 Fixed  Contracted  Amount N/A Various STX  Services  B.V.6  Months 12/31/18 Fixed  Contracted  Amount N/A 60858,  60092A,  60107,  60385,  603863  Phases  Renewables  Inc.

RPS  Static  Contract  Information  

Page 60: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Facility  Location:    State  

Facility  Location:    Country  

Facility  Location:  Longitude  

Facility  Location:  Latitude  

Facility(ies)  Directly  Interconnected  to  a  CBA CBA(s)  of  Interconnection Execution  Date  for  Substitute  Energy  Agreement  (PCC  2  Only) Duration  of  Substitute  Energy  

Agreement  (PCC  2  Only) Resale  Agreement Notes  (Optional)

California United  States resale  –  seller Portfolio  dealCanada not  resale Portfolio  dealUnited  States,  Canada not  resale Portfolio  dealUnited  States,  Canada not  resale Portfolio  dealCanada not  resale Portfolio  deal

California,  Oregon United  States not  resale Portfolio  dealCalifornia United  States not  resaleCalifornia United  States not  resaleCalifornia United  States not  resaleCalifornia United  States not  resaleCalifornia United  States not  resale Portfolio  dealCalifornia United  States not  resale Portfolio  dealCalifornia United  States resale  –  seller Portfolio  deal

not  resale Portfolio  dealUnited  States not  resale Portfolio  dealUnited  States not  resale Portfolio  dealUnited  States not  resale Portfolio  deal

Colorado United  States not  resale Portfolio  dealColorado United  States not  resale Portfolio  dealCalifornia United  States resale  –  seller Portfolio  dealCalifornia United  States not  resaleCalifornia United  States not  resaleCalifornia United  States not  resale Portfolio  deal

not  resale Portfolio  deal

RPS  Static  Contract  Information  

Page 61: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

_____________________________________________

Dawn Weisz, Chief Executtive Officer

OFFICER  VERIFICATION  FORM  

I am an officer of the reporting corporation herein, and am authorized to make this verification

on its behalf. The statements in the foregoing document are true of my own knowledge, except

as to matters which are therein stated on information or belief, and as to those matters I believe

them to be true. The spreadsheet format used to file this RPS Hourly e-Tag Summary Report

has not [has] been altered from the version issued or approved by Energy Division [, with the

alterations described in this report].

I declare under penalty of perjury that the foregoing is true and correct.

Executed on August 29, 2018 at San Rafael, California.

Page 62: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

Revised  2/11/2011

 

August  31,  2018 Name: Dawn  WeiszTitle: Chief  Executive  OfficerEmail: [email protected]  Phone: (415)  464-­‐6020Fax: (415)  459-­‐8095Address: 1125  Tamalpais  Avenue,  San  Rafael,  CA  94901

2017  Hourly  Meter  and  e-­‐Tag  Reconciliation  Report

BEFORE  THE  PUBLIC  UTILITIES  COMMISSION  OF  THE  STATE  OF  CALIFORNIA

Order  Instituting  Rulemaking  to  Continue  Implementation  and  

Administration  of  California  Renewables  Portfolio  Standard  

Program.

Rulemaking  15-­‐02-­‐020(Filed  February  26,  2015)

Marin  Clean  Energy  (MCE)

Page 63: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

9/20/17 1 BCHA_PWX01Y053376_CISO 21.0 27.0340 100% 78% n/a 21.00009/20/17 2 BCHA_PWX01Y053385_CISO 27.0 38.6400 100% 70% n/a 27.00009/20/17 3 BCHA_PWX01Y053401_CISO 32.0 48.2580 100% 66% n/a 32.00009/20/17 4 BCHA_PWX01Y053415_CISO 48.0 61.1380 100% 79% n/a 48.00009/20/17 5 BCHA_PWX01Y053428_CISO 50.0 51.9120 100% 96% n/a 50.00009/20/17 6 BCHA_PWX01Y053440_CISO 65.0 51.2960 100% 100% n/a 51.29609/20/17 7 BCHA_PWX01Y053452_CISO 36.0 56.7140 100% 88% n/a 36.00009/20/17 7 BCHA_PWX01Y053454_CISO 7.0 56.7140 100% 88% n/a 7.00009/20/17 7 BCHA_PWX01Y053455_CISO 7.0 56.7140 100% 88% n/a 7.00009/20/17 8 BCHA_PWX01Y053465_CISO 53.0 58.6040 100% 90% n/a 53.00009/20/17 9 BCHA_PWX01Y053476_CISO 64.0 50.8620 100% 100% n/a 50.86209/20/17 18 BCHA_PWX01Y053718_CISO 29.0 42.3360 100% 71% n/a 29.00009/20/17 18 BCHA_PWX01Y053719_CISO 1.0 42.3360 100% 71% n/a 1.00009/20/17 19 BCHA_PWX01Y053735_CISO 27.0 58.4080 100% 55% n/a 27.00009/20/17 19 BCHA_PWX01Y053736_CISO 5.0 58.4080 100% 55% n/a 5.00009/20/17 20 BCHA_PWX01Y053760_CISO 40.0 64.2040 100% 62% n/a 40.00009/20/17 21 BCHA_PWX01Y053773_CISO 73.0 45.7520 100% 100% n/a 45.75209/20/17 22 BCHA_PWX01Y053796_CISO 53.0 39.8720 100% 100% n/a 39.87209/20/17 23 BCHA_PWX01Y053816_CISO 49.0 46.4240 100% 100% n/a 46.42409/20/17 24 BCHA_PWX01Y053836_CISO 41.0 38.5700 100% 100% n/a 38.57009/21/17 1 BCHA_PWX01Y053851_CISO 43.0 47.1380 100% 91% n/a 43.00009/21/17 2 BCHA_PWX01Y053856_CISO 39.0 58.2680 100% 67% n/a 39.00009/21/17 3 BCHA_PWX01Y053875_CISO 62.0 49.9380 100% 100% n/a 49.93809/21/17 4 BCHA_PWX01Y053896_CISO 54.0 41.7900 100% 100% n/a 41.79009/21/17 5 BCHA_PWX01Y053911_CISO 45.0 33.6420 100% 100% n/a 33.64209/21/17 6 BCHA_PWX01Y053930_CISO 39.0 33.7540 100% 100% n/a 33.75409/21/17 7 BCHA_PWX01Y053945_CISO 30.0 37.8840 100% 79% n/a 30.00009/21/17 8 BCHA_PWX01Y053967_CISO 19.0 36.4560 100% 100% n/a 19.00009/21/17 8 BCHA_PWX01Y053968_CISO 4.0 36.4560 100% 100% n/a 4.00009/21/17 8 BCHA_PWX01Y053970_CISO 7.0 36.4560 100% 100% n/a 7.00009/21/17 8 BCHA_PWX01Y053973_CISO 7.0 36.4560 100% 100% n/a 6.45609/21/17 9 BCHA_PWX01Y053984_CISO 13.0 17.1220 100% 100% n/a 13.00009/21/17 9 BCHA_PWX01Y053985_CISO 29.0 17.1220 100% 100% n/a 4.12209/21/17 10 BCHA_PWX01Y054012_CISO 30.0 16.2540 100% 100% n/a 16.25409/21/17 11 BCHA_PWX01Y054036_CISO 17.0 14.6160 100% 100% n/a 14.61609/21/17 12 BCHA_PWX01Y054176_CISO 14.0 4.8300 100% 100% n/a 4.83009/21/17 14 BCHA_PWX01Y054243_CISO 1.0 5.5160 100% 18% n/a 1.00009/21/17 15 BCHA_PWX01Y054269_CISO 5.0 7.8960 100% 63% n/a 5.00009/21/17 18 BCHA_PWX01Y054291_CISO 17.0 19.3340 100% 88% n/a 17.00009/21/17 19 BCHA_PWX01Y054297_CISO 15.0 24.7240 100% 61% n/a 15.00009/21/17 20 BCHA_PWX01Y054310_CISO 21.0 27.6780 100% 76% n/a 21.00009/21/17 21 BCHA_PWX01Y054317_CISO 23.0 32.5500 100% 71% n/a 23.00009/21/17 22 BCHA_PWX01Y054328_CISO 32.0 33.2640 100% 96% n/a 32.00009/21/17 23 BCHA_PWX01Y054341_CISO 34.0 35.6580 100% 95% n/a 34.00009/21/17 24 BCHA_PWX01Y054350_CISO 32.0 37.6040 100% 85% n/a 32.00009/22/17 1 BCHA_PWX01Y054379_CISO 37.0 33.2640 100% 100% n/a 33.26409/22/17 2 BCHA_PWX01Y054390_CISO 39.0 16.6740 100% 100% n/a 16.67409/22/17 3 BCHA_PWX01Y054394_CISO 11.0 12.9780 100% 100% n/a 11.00009/22/17 3 BCHA_PWX01Y054395_CISO 10.0 12.9780 100% 100% n/a 1.97809/22/17 4 BCHA_PWX01Y054407_CISO 8.0 10.1080 100% 100% n/a 8.00009/22/17 4 BCHA_PWX01Y054408_CISO 8.0 10.1080 100% 100% n/a 2.10809/22/17 5 BCHA_PWX01Y054419_CISO 6.0 2.8140 100% 100% n/a 2.81409/22/17 5 BCHA_PWX01Y054420_CISO 6.0 2.8140 100% 100% n/a 0.00009/22/17 6 BCHA_PWX01Y054435_CISO 6.0 8.1340 100% 74% n/a 6.00009/22/17 7 BCHA_PWX01Y054451_CISO 2.0 8.4280 100% 47% n/a 2.00009/22/17 7 BCHA_PWX01Y054452_CISO 2.0 8.4280 100% 47% n/a 2.00009/22/17 8 BCHA_PWX01Y054464_CISO 10.0 11.4520 100% 87% n/a 10.00009/22/17 9 BCHA_PWX01Y054484_CISO 10.0 11.3260 100% 88% n/a 10.0000

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

Page 64: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

9/22/17 18 BCHA_PWX01Y054756_CISO 8.0 5.6980 100% 100% n/a 5.69809/22/17 19 BCHA_PWX01Y054762_CISO 3.0 0.2520 100% 100% n/a 0.25209/22/17 19 BCHA_PWX01Y054767_CISO 1.0 0.2520 100% 100% n/a 0.00009/22/17 21 BCHA_PWX01Y054788_CISO 1.0 0.0000 100% 0% n/a 0.00009/22/17 22 BCHA_PWX01Y054800_CISO 1.0 0.0000 100% 0% n/a 0.00009/22/17 23 BCHA_PWX01Y054810_CISO 1.0 0.0980 100% 100% n/a 0.09809/23/17 2 BCHA_PWX01Y054854_CISO 1.0 0.0000 100% 0% n/a 0.00009/23/17 4 BCHA_PWX01Y054887_CISO 1.0 0.0000 100% 0% n/a 0.00009/23/17 5 BCHA_PWX01Y054907_CISO 1.0 0.0000 100% 0% n/a 0.00009/23/17 6 BCHA_PWX01Y054922_CISO 1.0 0.0000 100% 0% n/a 0.00009/23/17 7 BCHA_PWX01Y054935_CISO 1.0 0.0000 100% 0% n/a 0.00009/23/17 8 BCHA_PWX01Y054957_CISO 1.0 0.0000 100% 0% n/a 0.00009/23/17 18 BCHA_PWX01Y055040_CISO 1.0 3.3740 100% 30% n/a 1.00009/23/17 19 BCHA_PWX01Y055049_CISO 4.0 0.7420 100% 100% n/a 0.74209/23/17 20 BCHA_PWX01Y055055_CISO 3.0 0.1400 100% 100% n/a 0.14009/23/17 22 BCHA_PWX01Y055079_CISO 1.0 0.1400 100% 100% n/a 0.14009/23/17 24 BCHA_PWX01Y055104_CISO 1.0 2.9820 100% 34% n/a 1.00009/24/17 1 BCHA_PWX01Y055105_CISO 1.0 4.3540 100% 23% n/a 1.00009/24/17 2 BCHA_PWX01Y055119_CISO 1.0 9.7160 100% 10% n/a 1.00009/24/17 3 BCHA_PWX01Y055133_CISO 8.0 19.9780 100% 40% n/a 8.00009/24/17 4 BCHA_PWX01Y055151_CISO 11.0 32.7040 100% 34% n/a 11.00009/24/17 5 BCHA_PWX01Y055164_CISO 22.0 48.2300 100% 46% n/a 22.00009/24/17 6 BCHA_PWX01Y055175_CISO 46.0 47.6980 100% 96% n/a 46.00009/24/17 7 BCHA_PWX01Y055182_CISO 59.0 44.6600 100% 100% n/a 44.66009/24/17 8 BCHA_PWX01Y055196_CISO 36.0 42.3780 100% 85% n/a 36.00009/24/17 18 BCHA_PWX01Y055267_CISO 57.0 57.5540 100% 99% n/a 57.00009/24/17 19 BCHA_PWX01Y055272_CISO 60.0 52.0520 100% 100% n/a 52.05209/24/17 20 BCHA_PWX01Y055283_CISO 59.0 48.8880 100% 100% n/a 48.88809/24/17 21 BCHA_PWX01Y055298_CISO 44.0 53.8860 100% 82% n/a 44.00009/24/17 22 BCHA_PWX01Y055320_CISO 48.0 67.9560 100% 71% n/a 48.00009/24/17 23 BCHA_PWX01Y055331_CISO 34.0 63.1680 100% 90% n/a 34.00009/24/17 23 BCHA_PWX01Y055339_CISO 23.0 63.1680 100% 90% n/a 23.00009/24/17 24 BCHA_PWX01Y055348_CISO 32.0 53.0880 100% 100% n/a 32.00009/24/17 24 BCHA_PWX01Y055359_CISO 51.0 53.0880 100% 100% n/a 21.08809/25/17 1 BCHA_PWX01Y055375_CISO 15.0 58.4920 100% 96% n/a 15.00009/25/17 1 BCHA_PWX01Y055378_CISO 41.0 58.4920 100% 96% n/a 41.00009/25/17 2 BCHA_PWX01Y055389_CISO 57.0 65.8420 100% 87% n/a 57.00009/25/17 3 BCHA_PWX01Y055404_CISO 12.0 56.9940 100% 100% n/a 12.00009/25/17 3 BCHA_PWX01Y055407_CISO 25.0 56.9940 100% 100% n/a 25.00009/25/17 3 BCHA_PWX01Y055409_CISO 2.0 56.9940 100% 100% n/a 2.00009/25/17 3 BCHA_PWX01Y055410_CISO 1.0 56.9940 100% 100% n/a 1.00009/25/17 3 BCHA_PWX01Y055411_CISO 20.0 56.9940 100% 100% n/a 16.99409/25/17 4 BCHA_PWX01Y055428_CISO 31.0 55.4540 100% 100% n/a 31.00009/25/17 4 BCHA_PWX01Y055429_CISO 17.0 55.4540 100% 100% n/a 17.00009/25/17 4 BCHA_PWX01Y055430_CISO 12.0 55.4540 100% 100% n/a 7.45409/25/17 4 BCHA_PWX01Y055431_CISO 4.0 55.4540 100% 100% n/a 0.00009/25/17 5 BCHA_PWX01Y055450_CISO 59.0 59.9480 100% 98% n/a 59.00009/25/17 6 BCHA_PWX01Y055471_CISO 55.0 54.0540 100% 100% n/a 54.05409/25/17 7 BCHA_PWX01Y055492_CISO 61.0 60.1160 100% 100% n/a 60.11609/25/17 8 BCHA_PWX01Y055502_CISO 7.0 71.5260 100% 81% n/a 7.00009/25/17 8 BCHA_PWX01Y055503_CISO 51.0 71.5260 100% 81% n/a 51.00009/25/17 15 BCHA_PWX01Y055726_CISO 13.0 25.5360 100% 51% n/a 13.00009/25/17 16 BCHA_PWX01Y055737_CISO 20.0 24.1500 100% 83% n/a 20.00009/25/17 17 BCHA_PWX01Y055742_CISO 35.0 10.6960 100% 100% n/a 10.69609/25/17 18 BCHA_PWX01Y055758_CISO 12.0 11.7040 100% 100% n/a 11.70409/25/17 19 BCHA_PWX01Y055770_CISO 9.0 12.8800 100% 70% n/a 9.00009/25/17 20 BCHA_PWX01Y055788_CISO 14.0 13.6360 100% 100% n/a 13.63609/25/17 21 BCHA_PWX01Y055806_CISO 11.0 22.3860 100% 49% n/a 11.0000

Page 65: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

9/25/17 22 BCHA_PWX01Y055817_CISO 16.0 20.9720 100% 76% n/a 16.00009/25/17 23 BCHA_PWX01Y055833_CISO 22.0 15.1480 100% 100% n/a 15.14809/25/17 24 BCHA_PWX01Y055866_CISO 21.0 13.5940 100% 100% n/a 13.59409/26/17 1 BCHA_PWX01Y055886_CISO 11.0 9.4780 100% 100% n/a 9.47809/26/17 2 BCHA_PWX01Y055891_CISO 11.0 11.2140 100% 98% n/a 11.00009/26/17 3 BCHA_PWX01Y055904_CISO 11.0 2.9820 100% 100% n/a 2.98209/26/17 4 BCHA_PWX01Y055912_CISO 3.0 2.0020 100% 100% n/a 2.00209/26/17 5 BCHA_PWX01Y055923_CISO 5.0 3.3740 100% 100% n/a 3.37409/26/17 6 BCHA_PWX01Y055935_CISO 4.0 4.8720 100% 82% n/a 4.00009/26/17 7 BCHA_PWX01Y055957_CISO 7.0 1.6660 100% 100% n/a 1.66609/26/17 9 BCHA_PWX01Y055979_CISO 3.0 5.1660 100% 58% n/a 3.00009/26/17 10 BCHA_PWX01Y055993_CISO 4.0 8.2460 100% 49% n/a 4.00009/26/17 15 BCHA_PWX01Y056160_CISO 9.0 3.9060 100% 100% n/a 3.90609/26/17 16 BCHA_PWX01Y056171_CISO 4.0 2.2400 100% 100% n/a 2.24009/26/17 17 BCHA_PWX01Y056194_CISO 4.0 2.4640 100% 100% n/a 2.46409/26/17 18 BCHA_PWX01Y056214_CISO 2.0 0.0420 100% 100% n/a 0.04209/26/17 19 BCHA_PWX01Y056226_CISO 1.0 0.0000 100% 0% n/a 0.00009/26/17 20 BCHA_PWX01Y056245_CISO 1.0 1.2740 100% 78% n/a 1.00009/26/17 21 BCHA_PWX01Y056265_CISO 1.0 0.0000 100% 0% n/a 0.00009/26/17 23 BCHA_PWX01Y056288_CISO 1.0 0.0000 100% 0% n/a 0.00009/26/17 24 BCHA_PWX01Y056305_CISO 1.0 0.0000 100% 0% n/a 0.00009/27/17 2 BCHA_PWX01Y056336_CISO 1.0 0.0420 100% 100% n/a 0.04209/27/17 3 BCHA_PWX01Y056348_CISO 1.0 1.6240 100% 62% n/a 1.00009/27/17 5 BCHA_PWX01Y056366_CISO 3.0 1.6520 100% 100% n/a 1.65209/27/17 6 BCHA_PWX01Y056385_CISO 3.0 0.0140 100% 100% n/a 0.01409/27/17 8 BCHA_PWX01Y056414_CISO 1.0 0.0000 100% 0% n/a 0.00009/27/17 12 BCHA_PWX01Y056511_CISO 1.0 0.0000 100% 0% n/a 0.00009/27/17 15 BCHA_PWX01Y056622_CISO 1.0 0.0000 100% 0% n/a 0.00009/27/17 21 BCHA_PWX01Y056717_CISO 1.0 0.0000 100% 0% n/a 0.00009/27/17 22 BCHA_PWX01Y056734_CISO 1.0 0.5040 100% 100% n/a 0.50409/27/17 24 BCHA_PWX01Y056758_CISO 1.0 0.7840 100% 100% n/a 0.78409/28/17 1 BCHA_PWX01Y056780_CISO 2.0 0.2100 100% 100% n/a 0.21009/28/17 2 BCHA_PWX01Y056785_CISO 1.0 8.6100 100% 12% n/a 1.00009/28/17 3 BCHA_PWX01Y056799_CISO 1.0 13.1320 100% 8% n/a 1.00009/28/17 4 BCHA_PWX01Y056807_CISO 16.0 4.4800 100% 100% n/a 4.48009/28/17 5 BCHA_PWX01Y056822_CISO 7.0 6.6640 100% 100% n/a 6.66409/28/17 6 BCHA_PWX01Y056832_CISO 5.0 9.3240 100% 54% n/a 5.00009/28/17 7 BCHA_PWX01Y056844_CISO 11.0 6.3140 100% 100% n/a 6.31409/28/17 8 BCHA_PWX01Y056857_CISO 6.0 7.6580 100% 78% n/a 6.00009/28/17 9 BCHA_PWX01Y056877_CISO 7.0 2.6320 100% 100% n/a 2.63209/28/17 17 BCHA_PWX01Y057288_CISO 5.0 6.2580 100% 80% n/a 5.00009/28/17 18 BCHA_PWX01Y057310_CISO 5.0 14.8680 100% 34% n/a 5.00009/28/17 19 BCHA_PWX01Y057325_CISO 6.0 45.2760 100% 13% n/a 6.00009/28/17 20 BCHA_PWX01Y057339_CISO 20.0 40.2220 100% 50% n/a 20.00009/28/17 21 BCHA_PWX01Y057347_CISO 63.0 26.2920 100% 100% n/a 26.29209/28/17 22 BCHA_PWX01Y057362_CISO 36.0 21.7280 100% 100% n/a 21.72809/28/17 23 BCHA_PWX01Y057376_CISO 29.0 9.5620 100% 100% n/a 9.56209/28/17 24 BCHA_PWX01Y057385_CISO 8.0 15.2040 100% 53% n/a 8.00009/29/17 1 BCHA_PWX01Y057396_CISO 16.0 17.8360 100% 90% n/a 16.00009/29/17 2 BCHA_PWX01Y057406_CISO 13.0 18.4520 100% 100% n/a 13.00009/29/17 2 BCHA_PWX01Y057410_CISO 6.0 18.4520 100% 100% n/a 5.45209/29/17 3 BCHA_PWX01Y057415_CISO 20.0 18.8160 100% 100% n/a 18.81609/29/17 4 BCHA_PWX01Y057429_CISO 17.0 36.9180 100% 46% n/a 17.00009/29/17 5 BCHA_PWX01Y057443_CISO 25.0 52.4440 100% 48% n/a 25.00009/29/17 6 BCHA_PWX01Y057452_CISO 29.0 56.3500 100% 76% n/a 29.00009/29/17 6 BCHA_PWX01Y057457_CISO 14.0 56.3500 100% 76% n/a 14.00009/29/17 7 BCHA_PWX01Y057474_CISO 14.0 40.0120 100% 100% n/a 14.00009/29/17 7 BCHA_PWX01Y057475_CISO 47.0 40.0120 100% 100% n/a 26.0120

Page 66: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

9/29/17 8 BCHA_PWX01Y057494_CISO 8.0 19.0540 100% 100% n/a 8.00009/29/17 8 BCHA_PWX01Y057495_CISO 52.0 19.0540 100% 100% n/a 11.05409/29/17 8 BCHA_PWX01Y057496_CISO 1.0 19.0540 100% 100% n/a 0.00009/29/17 9 BCHA_PWX01Y057511_CISO 29.0 6.4400 100% 100% n/a 6.44009/29/17 10 BCHA_PWX01Y057538_CISO 11.0 0.2940 100% 100% n/a 0.29409/29/17 16 BCHA_PWX01Y057744_CISO 1.0 2.5900 100% 39% n/a 1.00009/29/17 17 BCHA_PWX01Y057756_CISO 1.0 5.9640 100% 17% n/a 1.00009/29/17 18 BCHA_PWX01Y057775_CISO 2.0 18.0040 100% 11% n/a 2.00009/29/17 19 BCHA_PWX01Y057799_CISO 14.0 21.8120 100% 64% n/a 14.00009/29/17 20 BCHA_PWX01Y057818_CISO 17.0 26.5860 100% 64% n/a 17.00009/29/17 21 BCHA_PWX01Y057837_CISO 29.0 27.2720 100% 100% n/a 27.27209/29/17 22 BCHA_PWX01Y057852_CISO 21.0 14.7840 100% 100% n/a 14.78409/29/17 23 BCHA_PWX01Y057868_CISO 10.0 25.2280 100% 75% n/a 10.00009/29/17 23 BCHA_PWX01Y057869_CISO 9.0 25.2280 100% 75% n/a 9.00009/29/17 24 BCHA_PWX01Y057882_CISO 0.0 28.3920 100% 67% n/a 0.00009/29/17 24 BCHA_PWX01Y057898_CISO 19.0 28.3920 100% 67% n/a 19.00009/30/17 1 BCHA_PWX01Y057914_CISO 29.0 31.8080 100% 91% n/a 29.00009/30/17 2 BCHA_PWX01Y057930_CISO 31.0 23.3380 100% 100% n/a 23.33809/30/17 3 BCHA_PWX01Y057941_CISO 16.0 35.7700 100% 92% n/a 16.00009/30/17 3 BCHA_PWX01Y057951_CISO 17.0 35.7700 100% 92% n/a 17.00009/30/17 4 BCHA_PWX01Y057963_CISO 32.0 38.2620 100% 84% n/a 32.00009/30/17 5 BCHA_PWX01Y057973_CISO 20.0 25.5080 100% 78% n/a 20.00009/30/17 6 BCHA_PWX01Y057991_CISO 24.0 32.6480 100% 74% n/a 24.00009/30/17 7 BCHA_PWX01Y058011_CISO 38.0 4.9700 100% 100% n/a 4.97009/30/17 8 BCHA_PWX01Y058017_CISO 21.0 5.7120 100% 100% n/a 5.71209/30/17 18 BCHA_PWX01Y058145_CISO 34.0 32.9560 100% 100% n/a 32.95609/30/17 19 BCHA_PWX01Y058153_CISO 30.0 62.3840 100% 48% n/a 30.00009/30/17 20 BCHA_PWX01Y058177_CISO 33.0 61.0400 100% 54% n/a 33.00009/30/17 21 BCHA_PWX01Y058196_CISO 74.0 40.9220 100% 100% n/a 40.92209/30/17 22 BCHA_PWX01Y058202_CISO 49.0 42.5740 100% 100% n/a 42.57409/30/17 23 BCHA_PWX01Y058221_CISO 9.0 50.8760 100% 79% n/a 9.00009/30/17 23 BCHA_PWX01Y058228_CISO 31.0 50.8760 100% 79% n/a 31.00009/30/17 24 BCHA_PWX01Y058234_CISO 35.0 63.4480 100% 73% n/a 35.00009/30/17 24 BCHA_PWX01Y058247_CISO 11.0 63.4480 100% 73% n/a 11.0000

Page 67: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

9/20/17 1 BCHA_PWX01Y053369_CISO 100.0 122.4867 100% 98% n/a 100.00009/20/17 1 BCHA_PWX01Y053372_CISO 20.0 122.4867 100% 98% n/a 20.00009/20/17 2 BCHA_PWX01Y053391_CISO 121.0 126.8638 100% 95% n/a 121.00009/20/17 3 BCHA_PWX01Y053409_CISO 124.0 125.3584 100% 99% n/a 124.00009/20/17 4 BCHA_PWX01Y053421_CISO 131.0 120.5050 100% 100% n/a 120.50509/20/17 5 BCHA_PWX01Y053434_CISO 117.0 113.8376 100% 100% n/a 113.83769/20/17 6 BCHA_PWX01Y053447_CISO 114.0 111.5764 100% 100% n/a 111.57649/20/17 7 BCHA_PWX01Y053463_CISO 104.0 109.0452 100% 95% n/a 104.00009/20/17 8 BCHA_PWX01Y053466_CISO 45.0 111.9831 100% 100% n/a 45.00009/20/17 8 BCHA_PWX01Y053467_CISO 18.0 111.9831 100% 100% n/a 18.00009/20/17 8 BCHA_PWX01Y053469_CISO 54.0 111.9831 100% 100% n/a 48.98319/20/17 9 BCHA_PWX01Y053477_CISO 51.0 109.4001 100% 47% n/a 51.00009/20/17 16 BCHA_PWX01Y053695_CISO 49.0 108.9755 100% 45% n/a 49.00009/20/17 17 BCHA_PWX01Y053698_CISO 25.0 105.2752 100% 24% n/a 25.00009/20/17 18 BCHA_PWX01Y053708_CISO 95.0 105.0819 100% 95% n/a 95.00009/20/17 18 BCHA_PWX01Y053717_CISO 5.0 105.0819 100% 95% n/a 5.00009/20/17 19 BCHA_PWX01Y053726_CISO 75.0 97.6629 100% 100% n/a 75.00009/20/17 19 BCHA_PWX01Y053728_CISO 33.0 97.6629 100% 100% n/a 22.66299/20/17 20 BCHA_PWX01Y053755_CISO 26.0 106.5238 100% 89% n/a 26.00009/20/17 20 BCHA_PWX01Y053756_CISO 69.0 106.5238 100% 89% n/a 69.00009/20/17 21 BCHA_PWX01Y053774_CISO 107.0 103.0980 100% 100% n/a 103.09809/20/17 22 BCHA_PWX01Y053798_CISO 109.0 107.6464 100% 100% n/a 107.64649/20/17 23 BCHA_PWX01Y053805_CISO 102.0 103.7119 100% 100% n/a 102.00009/20/17 23 BCHA_PWX01Y053806_CISO 4.0 103.7119 100% 100% n/a 1.71199/20/17 24 BCHA_PWX01Y053832_CISO 106.0 101.1916 100% 100% n/a 101.19169/21/17 1 BCHA_PWX01Y053850_CISO 105.0 82.6411 100% 100% n/a 82.64119/21/17 2 BCHA_PWX01Y053860_CISO 92.0 73.1853 100% 100% n/a 73.18539/21/17 3 BCHA_PWX01Y053885_CISO 74.0 63.8413 100% 100% n/a 63.84139/21/17 4 BCHA_PWX01Y053904_CISO 59.0 40.7690 100% 100% n/a 40.76909/21/17 4 BCHA_PWX01Y053905_CISO 5.0 40.7690 100% 100% n/a 0.00009/21/17 5 BCHA_PWX01Y053912_CISO 54.0 29.3502 100% 100% n/a 29.35029/21/17 6 BCHA_PWX01Y053931_CISO 24.0 33.8793 100% 71% n/a 24.00009/21/17 7 BCHA_PWX01Y053949_CISO 39.0 33.9354 100% 100% n/a 33.93549/21/17 8 BCHA_PWX01Y053965_CISO 35.0 27.8178 100% 100% n/a 27.81789/21/17 9 BCHA_PWX01Y053986_CISO 21.0 11.8282 100% 100% n/a 11.82829/21/17 9 BCHA_PWX01Y053987_CISO 13.0 11.8282 100% 100% n/a 0.00009/21/17 10 BCHA_PWX01Y054008_CISO 17.0 9.8731 100% 100% n/a 9.87319/21/17 11 BCHA_PWX01Y054034_CISO 7.0 16.9200 100% 41% n/a 7.00009/21/17 12 BCHA_PWX01Y054173_CISO 9.0 19.1893 100% 83% n/a 9.00009/21/17 12 BCHA_PWX01Y054174_CISO 7.0 19.1893 100% 83% n/a 7.00009/21/17 14 BCHA_PWX01Y054244_CISO 21.0 8.6564 100% 100% n/a 8.65649/21/17 15 BCHA_PWX01Y054270_CISO 6.0 5.7221 100% 100% n/a 5.72219/21/17 18 BCHA_PWX01Y054289_CISO 3.0 0.0000 100% 0% n/a 0.00009/22/17 5 BCHA_PWX01Y054423_CISO 3.0 8.2112 100% 85% n/a 3.00009/22/17 5 BCHA_PWX01Y054424_CISO 4.0 8.2112 100% 85% n/a 4.00009/22/17 6 BCHA_PWX01Y054433_CISO 7.0 12.0397 100% 58% n/a 7.00009/22/17 7 BCHA_PWX01Y054447_CISO 5.0 13.4289 100% 67% n/a 5.00009/22/17 7 BCHA_PWX01Y054449_CISO 4.0 13.4289 100% 67% n/a 4.00009/22/17 8 BCHA_PWX01Y054461_CISO 15.0 14.6684 100% 100% n/a 14.66849/22/17 9 BCHA_PWX01Y054485_CISO 13.0 13.0638 100% 100% n/a 13.00009/22/17 18 BCHA_PWX01Y054753_CISO 43.0 27.5831 100% 100% n/a 27.58319/22/17 19 BCHA_PWX01Y054763_CISO 33.0 28.1267 100% 100% n/a 28.12679/22/17 20 BCHA_PWX01Y054773_CISO 20.0 28.6276 100% 70% n/a 20.00009/22/17 21 BCHA_PWX01Y054785_CISO 28.0 20.4776 100% 100% n/a 20.47769/22/17 22 BCHA_PWX01Y054798_CISO 21.0 11.4232 100% 100% n/a 11.42329/22/17 23 BCHA_PWX01Y054807_CISO 16.0 15.7845 100% 100% n/a 15.78459/22/17 24 BCHA_PWX01Y054828_CISO 11.0 13.1375 100% 84% n/a 11.00009/23/17 1 BCHA_PWX01Y054842_CISO 15.0 12.2038 100% 100% n/a 12.20389/23/17 2 BCHA_PWX01Y054856_CISO 12.0 11.2635 100% 100% n/a 11.2635

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

Page 68: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

9/23/17 3 BCHA_PWX01Y054868_CISO 5.0 10.6889 100% 94% n/a 5.00009/23/17 3 BCHA_PWX01Y054869_CISO 5.0 10.6889 100% 94% n/a 5.00009/23/17 4 BCHA_PWX01Y054885_CISO 5.0 12.5733 100% 87% n/a 5.00009/23/17 4 BCHA_PWX01Y054886_CISO 6.0 12.5733 100% 87% n/a 6.00009/23/17 5 BCHA_PWX01Y054904_CISO 5.0 11.5650 100% 86% n/a 5.00009/23/17 5 BCHA_PWX01Y054908_CISO 5.0 11.5650 100% 86% n/a 5.00009/23/17 6 BCHA_PWX01Y054920_CISO 6.0 7.6180 100% 100% n/a 6.00009/23/17 6 BCHA_PWX01Y054921_CISO 6.0 7.6180 100% 100% n/a 1.61809/23/17 7 BCHA_PWX01Y054940_CISO 10.0 9.3815 100% 100% n/a 9.38159/23/17 8 BCHA_PWX01Y054951_CISO 10.0 11.6660 100% 86% n/a 10.00009/23/17 13 BCHA_PWX01Y054993_CISO 7.0 13.1534 100% 53% n/a 7.00009/23/17 14 BCHA_PWX01Y055000_CISO 5.0 16.8780 100% 30% n/a 5.00009/23/17 15 BCHA_PWX01Y055005_CISO 8.0 20.9637 100% 38% n/a 8.00009/23/17 18 BCHA_PWX01Y055039_CISO 48.0 42.9273 100% 100% n/a 42.92739/23/17 19 BCHA_PWX01Y055046_CISO 38.0 32.4113 100% 100% n/a 32.41139/23/17 20 BCHA_PWX01Y055054_CISO 40.0 46.4220 100% 86% n/a 40.00009/23/17 21 BCHA_PWX01Y055061_CISO 38.0 57.3533 100% 66% n/a 38.00009/23/17 22 BCHA_PWX01Y055072_CISO 27.0 69.6233 100% 85% n/a 27.00009/23/17 22 BCHA_PWX01Y055076_CISO 32.0 69.6233 100% 85% n/a 32.00009/23/17 23 BCHA_PWX01Y055087_CISO 59.0 86.0264 100% 69% n/a 59.00009/23/17 24 BCHA_PWX01Y055094_CISO 41.0 96.8509 100% 84% n/a 41.00009/23/17 24 BCHA_PWX01Y055095_CISO 14.0 96.8509 100% 84% n/a 14.00009/23/17 24 BCHA_PWX01Y055103_CISO 26.0 96.8509 100% 84% n/a 26.00009/24/17 1 BCHA_PWX01Y055107_CISO 95.0 85.2733 100% 100% n/a 85.27339/24/17 2 BCHA_PWX01Y055120_CISO 86.0 69.8455 100% 100% n/a 69.84559/24/17 2 BCHA_PWX01Y055122_CISO 1.0 69.8455 100% 100% n/a 0.00009/24/17 3 BCHA_PWX01Y055134_CISO 41.0 77.3941 100% 97% n/a 41.00009/24/17 3 BCHA_PWX01Y055139_CISO 18.0 77.3941 100% 97% n/a 18.00009/24/17 3 BCHA_PWX01Y055128_CISO 16.0 77.3941 100% 97% n/a 16.00009/24/17 4 BCHA_PWX01Y055150_CISO 72.0 85.4676 100% 84% n/a 72.00009/24/17 5 BCHA_PWX01Y055161_CISO 13.0 77.4610 100% 100% n/a 13.00009/24/17 5 BCHA_PWX01Y055166_CISO 78.0 77.4610 100% 100% n/a 64.46109/24/17 6 BCHA_PWX01Y055170_CISO 54.0 77.8515 100% 100% n/a 54.00009/24/17 6 BCHA_PWX01Y055179_CISO 26.0 77.8515 100% 100% n/a 23.85159/24/17 7 BCHA_PWX01Y055181_CISO 41.0 73.4325 100% 100% n/a 41.00009/24/17 7 BCHA_PWX01Y055183_CISO 5.0 73.4325 100% 100% n/a 5.00009/24/17 7 BCHA_PWX01Y055191_CISO 29.0 73.4325 100% 100% n/a 27.43259/24/17 8 BCHA_PWX01Y055198_CISO 74.0 69.9122 100% 100% n/a 69.91229/24/17 18 BCHA_PWX01Y055259_CISO 62.0 63.4320 100% 100% n/a 62.00009/24/17 18 BCHA_PWX01Y055263_CISO 9.0 63.4320 100% 100% n/a 1.43209/24/17 19 BCHA_PWX01Y055269_CISO 67.0 69.1979 100% 97% n/a 67.00009/24/17 20 BCHA_PWX01Y055286_CISO 64.0 48.5874 100% 100% n/a 48.58749/24/17 21 BCHA_PWX01Y055302_CISO 74.0 37.3584 100% 100% n/a 37.35849/24/17 22 BCHA_PWX01Y055316_CISO 25.0 65.0216 100% 38% n/a 25.00009/24/17 23 BCHA_PWX01Y055332_CISO 56.0 69.6776 100% 80% n/a 56.00009/24/17 24 BCHA_PWX01Y055350_CISO 67.0 57.8645 100% 100% n/a 57.86459/25/17 1 BCHA_PWX01Y055373_CISO 61.0 54.5642 100% 100% n/a 54.56429/25/17 2 BCHA_PWX01Y055391_CISO 43.0 57.9476 100% 74% n/a 43.00009/25/17 3 BCHA_PWX01Y055403_CISO 9.0 49.1786 100% 100% n/a 9.00009/25/17 3 BCHA_PWX01Y055412_CISO 60.0 49.1786 100% 100% n/a 40.17869/25/17 4 BCHA_PWX01Y055425_CISO 19.0 66.8520 100% 66% n/a 19.00009/25/17 4 BCHA_PWX01Y055433_CISO 25.0 66.8520 100% 66% n/a 25.00009/25/17 5 BCHA_PWX01Y055448_CISO 47.0 61.1167 100% 77% n/a 47.00009/25/17 6 BCHA_PWX01Y055462_CISO 12.0 54.9347 100% 100% n/a 12.00009/25/17 6 BCHA_PWX01Y055463_CISO 11.0 54.9347 100% 100% n/a 11.00009/25/17 6 BCHA_PWX01Y055464_CISO 20.0 54.9347 100% 100% n/a 20.00009/25/17 6 BCHA_PWX01Y055465_CISO 14.0 54.9347 100% 100% n/a 11.93479/25/17 6 BCHA_PWX01Y055469_CISO 20.0 54.9347 100% 100% n/a 0.00009/25/17 7 BCHA_PWX01Y055483_CISO 11.0 58.4318 100% 84% n/a 11.0000

Page 69: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

9/25/17 7 BCHA_PWX01Y055486_CISO 37.0 58.4318 100% 84% n/a 37.00009/25/17 7 BCHA_PWX01Y055490_CISO 1.0 58.4318 100% 84% n/a 1.00009/25/17 8 BCHA_PWX01Y055501_CISO 55.0 51.1386 100% 100% n/a 51.13869/25/17 9 BCHA_PWX01Y055519_CISO 28.0 46.6023 100% 60% n/a 28.00009/25/17 15 BCHA_PWX01Y055719_CISO 30.0 53.8586 100% 56% n/a 30.00009/25/17 16 BCHA_PWX01Y055734_CISO 68.0 43.5307 100% 100% n/a 43.53079/25/17 17 BCHA_PWX01Y055741_CISO 30.0 51.4384 100% 78% n/a 30.00009/25/17 17 BCHA_PWX01Y055744_CISO 10.0 51.4384 100% 78% n/a 10.00009/25/17 18 BCHA_PWX01Y055754_CISO 54.0 57.6745 100% 94% n/a 54.00009/25/17 19 BCHA_PWX01Y055769_CISO 45.0 73.4738 100% 61% n/a 45.00009/25/17 20 BCHA_PWX01Y055786_CISO 21.0 67.9652 100% 100% n/a 21.00009/25/17 20 BCHA_PWX01Y055793_CISO 55.0 67.9652 100% 100% n/a 46.96529/25/17 21 BCHA_PWX01Y055800_CISO 60.0 59.3807 100% 100% n/a 59.38079/25/17 21 BCHA_PWX01Y055803_CISO 11.0 59.3807 100% 100% n/a 0.00009/25/17 22 BCHA_PWX01Y055818_CISO 4.0 42.0955 100% 100% n/a 4.00009/25/17 22 BCHA_PWX01Y055823_CISO 28.0 42.0955 100% 100% n/a 28.00009/25/17 22 BCHA_PWX01Y055824_CISO 40.0 42.0955 100% 100% n/a 10.09559/25/17 23 BCHA_PWX01Y055837_CISO 22.0 41.2628 100% 100% n/a 22.00009/25/17 23 BCHA_PWX01Y055841_CISO 30.0 41.2628 100% 100% n/a 19.26289/25/17 24 BCHA_PWX01Y055863_CISO 28.0 23.6777 100% 100% n/a 23.67779/26/17 1 BCHA_PWX01Y055877_CISO 25.0 16.6021 100% 100% n/a 16.60219/26/17 1 BCHA_PWX01Y055880_CISO 5.0 16.6021 100% 100% n/a 0.00009/26/17 2 BCHA_PWX01Y055892_CISO 16.0 18.0869 100% 88% n/a 16.00009/26/17 3 BCHA_PWX01Y055902_CISO 20.0 9.6826 100% 100% n/a 9.68269/26/17 4 BCHA_PWX01Y055916_CISO 14.0 12.0187 100% 100% n/a 12.01879/26/17 5 BCHA_PWX01Y055924_CISO 11.0 5.2507 100% 100% n/a 5.25079/26/17 6 BCHA_PWX01Y055936_CISO 11.0 11.1319 100% 99% n/a 11.00009/26/17 7 BCHA_PWX01Y055958_CISO 7.0 29.2123 100% 24% n/a 7.00009/26/17 8 BCHA_PWX01Y055973_CISO 20.0 53.0389 100% 38% n/a 20.00009/26/17 9 BCHA_PWX01Y055985_CISO 36.0 44.3934 100% 81% n/a 36.00009/26/17 10 BCHA_PWX01Y055995_CISO 55.0 28.0346 100% 100% n/a 28.03469/26/17 15 BCHA_PWX01Y056156_CISO 92.0 106.3696 100% 86% n/a 92.00009/26/17 16 BCHA_PWX01Y056167_CISO 11.0 105.7248 100% 100% n/a 11.00009/26/17 16 BCHA_PWX01Y056172_CISO 92.0 105.7248 100% 100% n/a 92.00009/26/17 16 BCHA_PWX01Y056173_CISO 8.0 105.7248 100% 100% n/a 2.72489/26/17 17 BCHA_PWX01Y056192_CISO 110.0 92.1508 100% 100% n/a 92.15089/26/17 18 BCHA_PWX01Y056213_CISO 105.0 85.6154 100% 100% n/a 85.61549/26/17 19 BCHA_PWX01Y056228_CISO 45.0 70.0509 100% 100% n/a 45.00009/26/17 19 BCHA_PWX01Y056229_CISO 50.0 70.0509 100% 100% n/a 25.05099/26/17 20 BCHA_PWX01Y056242_CISO 78.0 31.2123 100% 100% n/a 31.21239/26/17 21 BCHA_PWX01Y056260_CISO 30.0 35.9949 100% 83% n/a 30.00009/26/17 22 BCHA_PWX01Y056278_CISO 31.0 53.4660 100% 58% n/a 31.00009/26/17 23 BCHA_PWX01Y056292_CISO 36.0 62.5898 100% 58% n/a 36.00009/26/17 24 BCHA_PWX01Y056303_CISO 50.0 55.4546 100% 90% n/a 50.00009/27/17 1 BCHA_PWX01Y056315_CISO 37.0 62.6402 100% 86% n/a 37.00009/27/17 1 BCHA_PWX01Y056317_CISO 17.0 62.6402 100% 86% n/a 17.00009/27/17 2 BCHA_PWX01Y056327_CISO 2.0 62.8375 100% 88% n/a 2.00009/27/17 2 BCHA_PWX01Y056331_CISO 53.0 62.8375 100% 88% n/a 53.00009/27/17 3 BCHA_PWX01Y056339_CISO 10.0 58.2499 100% 100% n/a 10.00009/27/17 3 BCHA_PWX01Y056340_CISO 16.0 58.2499 100% 100% n/a 16.00009/27/17 3 BCHA_PWX01Y056341_CISO 16.0 58.2499 100% 100% n/a 16.00009/27/17 3 BCHA_PWX01Y056342_CISO 29.0 58.2499 100% 100% n/a 16.24999/27/17 4 BCHA_PWX01Y056353_CISO 26.0 55.6278 100% 92% n/a 26.00009/27/17 4 BCHA_PWX01Y056354_CISO 25.0 55.6278 100% 92% n/a 25.00009/27/17 5 BCHA_PWX01Y056363_CISO 60.0 41.4278 100% 100% n/a 41.42789/27/17 6 BCHA_PWX01Y056371_CISO 18.0 52.7486 100% 100% n/a 18.00009/27/17 6 BCHA_PWX01Y056372_CISO 18.0 52.7486 100% 100% n/a 18.00009/27/17 6 BCHA_PWX01Y056382_CISO 9.0 52.7486 100% 100% n/a 9.00009/27/17 6 BCHA_PWX01Y056384_CISO 8.0 52.7486 100% 100% n/a 7.7486

Page 70: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

9/27/17 7 BCHA_PWX01Y056395_CISO 20.0 58.3372 100% 74% n/a 20.00009/27/17 7 BCHA_PWX01Y056396_CISO 22.0 58.3372 100% 74% n/a 22.00009/27/17 7 BCHA_PWX01Y056399_CISO 1.0 58.3372 100% 74% n/a 1.00009/27/17 8 BCHA_PWX01Y056404_CISO 29.0 69.5074 100% 94% n/a 29.00009/27/17 8 BCHA_PWX01Y056405_CISO 29.0 69.5074 100% 94% n/a 29.00009/27/17 8 BCHA_PWX01Y056412_CISO 7.0 69.5074 100% 94% n/a 7.00009/27/17 10 BCHA_PWX01Y056431_CISO 23.0 29.4985 100% 100% n/a 23.00009/27/17 10 BCHA_PWX01Y056454_CISO 61.0 29.4985 100% 100% n/a 6.49859/27/17 11 BCHA_PWX01Y056456_CISO 28.0 28.5882 100% 100% n/a 28.00009/27/17 11 BCHA_PWX01Y056461_CISO 6.0 28.5882 100% 100% n/a 0.58829/27/17 11 BCHA_PWX01Y056464_CISO 10.0 28.5882 100% 100% n/a 0.00009/27/17 12 BCHA_PWX01Y056513_CISO 24.0 49.4527 100% 49% n/a 24.00009/27/17 13 BCHA_PWX01Y056584_CISO 6.0 61.9584 100% 44% n/a 6.00009/27/17 13 BCHA_PWX01Y056586_CISO 21.0 61.9584 100% 44% n/a 21.00009/27/17 14 BCHA_PWX01Y056602_CISO 57.0 57.7723 100% 100% n/a 57.00009/27/17 14 BCHA_PWX01Y056605_CISO 6.0 57.7723 100% 100% n/a 0.77239/27/17 15 BCHA_PWX01Y056618_CISO 62.0 40.0743 100% 100% n/a 40.07439/27/17 16 BCHA_PWX01Y056632_CISO 44.0 31.4321 100% 100% n/a 31.43219/27/17 16 BCHA_PWX01Y056633_CISO 1.0 31.4321 100% 100% n/a 0.00009/27/17 17 BCHA_PWX01Y056659_CISO 24.0 26.7499 100% 100% n/a 24.00009/27/17 17 BCHA_PWX01Y056660_CISO 13.0 26.7499 100% 100% n/a 2.74999/27/17 18 BCHA_PWX01Y056674_CISO 25.0 28.1798 100% 89% n/a 25.00009/27/17 19 BCHA_PWX01Y056685_CISO 30.0 21.4854 100% 100% n/a 21.48549/27/17 20 BCHA_PWX01Y056705_CISO 28.0 26.0963 100% 100% n/a 26.09639/27/17 21 BCHA_PWX01Y056720_CISO 24.0 20.7336 100% 100% n/a 20.73369/27/17 22 BCHA_PWX01Y056731_CISO 18.0 29.8135 100% 60% n/a 18.00009/27/17 23 BCHA_PWX01Y056751_CISO 28.0 37.5468 100% 75% n/a 28.00009/27/17 24 BCHA_PWX01Y056757_CISO 28.0 30.3460 100% 92% n/a 28.00009/28/17 1 BCHA_PWX01Y056776_CISO 19.0 22.0376 100% 100% n/a 19.00009/28/17 1 BCHA_PWX01Y056777_CISO 19.0 22.0376 100% 100% n/a 3.03769/28/17 2 BCHA_PWX01Y056786_CISO 11.0 25.8575 100% 100% n/a 11.00009/28/17 2 BCHA_PWX01Y056787_CISO 11.0 25.8575 100% 100% n/a 11.00009/28/17 2 BCHA_PWX01Y056789_CISO 8.0 25.8575 100% 100% n/a 3.85759/28/17 3 BCHA_PWX01Y056800_CISO 25.0 19.8949 100% 100% n/a 19.89499/28/17 4 BCHA_PWX01Y056809_CISO 22.0 15.1954 100% 100% n/a 15.19549/28/17 5 BCHA_PWX01Y056821_CISO 16.0 19.0827 100% 84% n/a 16.00009/28/17 6 BCHA_PWX01Y056828_CISO 20.0 24.9980 100% 80% n/a 20.00009/28/17 7 BCHA_PWX01Y056843_CISO 17.0 28.8639 100% 59% n/a 17.00009/28/17 8 BCHA_PWX01Y056856_CISO 29.0 46.7834 100% 62% n/a 29.00009/28/17 9 BCHA_PWX01Y056872_CISO 16.0 41.6583 100% 77% n/a 16.00009/28/17 9 BCHA_PWX01Y056873_CISO 16.0 41.6583 100% 77% n/a 16.00009/28/17 10 BCHA_PWX01Y056894_CISO 25.0 49.4491 100% 89% n/a 25.00009/28/17 10 BCHA_PWX01Y056902_CISO 9.0 49.4491 100% 89% n/a 9.00009/28/17 10 BCHA_PWX01Y056903_CISO 10.0 49.4491 100% 89% n/a 10.00009/28/17 12 BCHA_PWX01Y057091_CISO 42.0 60.0216 100% 70% n/a 42.00009/28/17 16 BCHA_PWX01Y057273_CISO 48.0 42.1562 100% 100% n/a 42.15629/28/17 16 BCHA_PWX01Y057279_CISO 20.0 42.1562 100% 100% n/a 0.00009/28/17 17 BCHA_PWX01Y057285_CISO 33.0 37.9395 100% 87% n/a 33.00009/28/17 18 BCHA_PWX01Y057308_CISO 39.0 48.8471 100% 80% n/a 39.00009/28/17 19 BCHA_PWX01Y057321_CISO 40.0 43.3479 100% 92% n/a 40.00009/28/17 20 BCHA_PWX01Y057337_CISO 54.0 23.8461 100% 100% n/a 23.84619/28/17 21 BCHA_PWX01Y057349_CISO 36.0 18.0094 100% 100% n/a 18.00949/28/17 22 BCHA_PWX01Y057358_CISO 14.0 26.6454 100% 53% n/a 14.00009/28/17 23 BCHA_PWX01Y057370_CISO 26.0 28.4644 100% 91% n/a 26.00009/28/17 24 BCHA_PWX01Y057383_CISO 24.0 20.3314 100% 100% n/a 20.33149/29/17 1 BCHA_PWX01Y057394_CISO 26.0 20.6331 100% 100% n/a 20.63319/29/17 2 BCHA_PWX01Y057403_CISO 9.0 23.9169 100% 79% n/a 9.00009/29/17 2 BCHA_PWX01Y057404_CISO 10.0 23.9169 100% 79% n/a 10.00009/29/17 3 BCHA_PWX01Y057417_CISO 19.0 29.2082 100% 65% n/a 19.0000

Page 71: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

9/29/17 4 BCHA_PWX01Y057427_CISO 9.0 16.5127 100% 100% n/a 9.00009/29/17 4 BCHA_PWX01Y057432_CISO 20.0 16.5127 100% 100% n/a 7.51279/29/17 5 BCHA_PWX01Y057441_CISO 10.0 18.7669 100% 53% n/a 10.00009/29/17 6 BCHA_PWX01Y057450_CISO 6.0 18.8530 100% 95% n/a 6.00009/29/17 6 BCHA_PWX01Y057451_CISO 5.0 18.8530 100% 95% n/a 5.00009/29/17 6 BCHA_PWX01Y057461_CISO 7.0 18.8530 100% 95% n/a 7.00009/29/17 7 BCHA_PWX01Y057467_CISO 21.0 33.0076 100% 64% n/a 21.00009/29/17 8 BCHA_PWX01Y057484_CISO 8.0 73.0302 100% 23% n/a 8.00009/29/17 8 BCHA_PWX01Y057485_CISO 9.0 73.0302 100% 23% n/a 9.00009/29/17 9 BCHA_PWX01Y057513_CISO 53.0 100.7292 100% 53% n/a 53.00009/29/17 10 BCHA_PWX01Y057534_CISO 22.0 105.7156 100% 81% n/a 22.00009/29/17 10 BCHA_PWX01Y057537_CISO 64.0 105.7156 100% 81% n/a 64.00009/29/17 11 BCHA_PWX01Y057548_CISO 32.0 83.8752 100% 38% n/a 32.00009/29/17 14 BCHA_PWX01Y057688_CISO 8.0 28.3274 100% 100% n/a 8.00009/29/17 14 BCHA_PWX01Y057690_CISO 27.0 28.3274 100% 100% n/a 20.32749/29/17 14 BCHA_PWX01Y057702_CISO 8.0 28.3274 100% 100% n/a 0.00009/29/17 15 BCHA_PWX01Y057721_CISO 25.0 24.4209 100% 100% n/a 24.42099/29/17 16 BCHA_PWX01Y057743_CISO 25.0 16.7136 100% 100% n/a 16.71369/29/17 17 BCHA_PWX01Y057755_CISO 20.0 58.7515 100% 34% n/a 20.00009/29/17 18 BCHA_PWX01Y057774_CISO 7.0 83.9608 100% 26% n/a 7.00009/29/17 18 BCHA_PWX01Y057777_CISO 15.0 83.9608 100% 26% n/a 15.00009/29/17 19 BCHA_PWX01Y057798_CISO 95.0 53.0393 100% 100% n/a 53.03939/29/17 20 BCHA_PWX01Y057815_CISO 75.0 42.4416 100% 100% n/a 42.44169/29/17 21 BCHA_PWX01Y057836_CISO 39.0 59.6885 100% 65% n/a 39.00009/29/17 22 BCHA_PWX01Y057847_CISO 8.0 79.0838 100% 47% n/a 8.00009/29/17 22 BCHA_PWX01Y057851_CISO 29.0 79.0838 100% 47% n/a 29.00009/29/17 23 BCHA_PWX01Y057863_CISO 84.0 71.8316 100% 100% n/a 71.83169/29/17 24 BCHA_PWX01Y057884_CISO 0.0 71.2483 100% 94% n/a 0.00009/29/17 24 BCHA_PWX01Y057889_CISO 67.0 71.2483 100% 94% n/a 67.00009/30/17 1 BCHA_PWX01Y057912_CISO 22.0 86.8181 100% 67% n/a 22.00009/30/17 1 BCHA_PWX01Y057916_CISO 36.0 86.8181 100% 67% n/a 36.00009/30/17 2 BCHA_PWX01Y057924_CISO 8.0 124.2653 100% 44% n/a 8.00009/30/17 2 BCHA_PWX01Y057929_CISO 4.0 124.2653 100% 44% n/a 4.00009/30/17 2 BCHA_PWX01Y057927_CISO 43.0 124.2653 100% 44% n/a 43.00009/30/17 3 BCHA_PWX01Y057943_CISO 121.0 116.7387 100% 100% n/a 116.73879/30/17 4 BCHA_PWX01Y057962_CISO 119.0 113.5379 100% 100% n/a 113.53799/30/17 5 BCHA_PWX01Y057968_CISO 100.0 119.9023 100% 83% n/a 100.00009/30/17 6 BCHA_PWX01Y057983_CISO 35.0 104.2130 100% 100% n/a 35.00009/30/17 6 BCHA_PWX01Y057989_CISO 83.0 104.2130 100% 100% n/a 69.21309/30/17 7 BCHA_PWX01Y058004_CISO 25.0 83.4525 100% 100% n/a 25.00009/30/17 7 BCHA_PWX01Y058005_CISO 25.0 83.4525 100% 100% n/a 25.00009/30/17 7 BCHA_PWX01Y058002_CISO 44.0 83.4525 100% 100% n/a 33.45259/30/17 7 BCHA_PWX01Y058006_CISO 22.0 83.4525 100% 100% n/a 0.00009/30/17 8 BCHA_PWX01Y058018_CISO 45.0 70.5539 100% 100% n/a 45.00009/30/17 8 BCHA_PWX01Y058019_CISO 5.0 70.5539 100% 100% n/a 5.00009/30/17 8 BCHA_PWX01Y058020_CISO 1.0 70.5539 100% 100% n/a 1.00009/30/17 8 BCHA_PWX01Y058021_CISO 28.0 70.5539 100% 100% n/a 19.55399/30/17 8 BCHA_PWX01Y058029_CISO 19.0 70.5539 100% 100% n/a 0.00009/30/17 18 BCHA_PWX01Y058142_CISO 84.0 42.8324 100% 100% n/a 42.83249/30/17 19 BCHA_PWX01Y058152_CISO 53.0 23.5790 100% 100% n/a 23.57909/30/17 20 BCHA_PWX01Y058178_CISO 34.0 20.9895 100% 100% n/a 20.98959/30/17 21 BCHA_PWX01Y058192_CISO 26.0 9.8868 100% 100% n/a 9.88689/30/17 22 BCHA_PWX01Y058205_CISO 24.0 2.0157 100% 100% n/a 2.01579/30/17 24 BCHA_PWX01Y058239_CISO 19.0 0.0000 100% 0% n/a 0.0000

Page 72: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

9/20/17 1 BCHA_PWX01Y053370_CISO 44.0 88.0512 100% 50% n/a 44.00009/20/17 2 BCHA_PWX01Y053384_CISO 31.0 96.1344 100% 80% n/a 31.00009/20/17 2 BCHA_PWX01Y053392_CISO 46.0 96.1344 100% 80% n/a 46.00009/20/17 3 BCHA_PWX01Y053403_CISO 2.0 82.6752 100% 100% n/a 2.00009/20/17 3 BCHA_PWX01Y053410_CISO 108.0 82.6752 100% 100% n/a 80.67529/20/17 4 BCHA_PWX01Y053416_CISO 50.0 95.8464 100% 77% n/a 50.00009/20/17 4 BCHA_PWX01Y053417_CISO 2.0 95.8464 100% 77% n/a 2.00009/20/17 4 BCHA_PWX01Y053423_CISO 22.0 95.8464 100% 77% n/a 22.00009/20/17 5 BCHA_PWX01Y053435_CISO 93.0 105.6384 100% 88% n/a 93.00009/20/17 6 BCHA_PWX01Y053441_CISO 67.0 109.4016 100% 89% n/a 67.00009/20/17 6 BCHA_PWX01Y053448_CISO 30.0 109.4016 100% 89% n/a 30.00009/20/17 7 BCHA_PWX01Y053456_CISO 69.0 108.5760 100% 100% n/a 69.00009/20/17 7 BCHA_PWX01Y053464_CISO 42.0 108.5760 100% 100% n/a 39.57609/20/17 8 BCHA_PWX01Y053470_CISO 111.0 105.8688 100% 100% n/a 105.86889/20/17 17 BCHA_PWX01Y053699_CISO 25.0 76.3008 100% 33% n/a 25.00009/20/17 18 BCHA_PWX01Y053716_CISO 77.0 77.2800 100% 100% n/a 77.00009/20/17 19 BCHA_PWX01Y053725_CISO 73.0 78.1632 100% 93% n/a 73.00009/20/17 20 BCHA_PWX01Y053759_CISO 75.0 93.6000 100% 80% n/a 75.00009/20/17 21 BCHA_PWX01Y053775_CISO 86.0 92.2176 100% 93% n/a 86.00009/20/17 22 BCHA_PWX01Y053797_CISO 13.0 94.6752 100% 99% n/a 13.00009/20/17 22 BCHA_PWX01Y053800_CISO 81.0 94.6752 100% 99% n/a 81.00009/20/17 23 BCHA_PWX01Y053812_CISO 90.0 83.5776 100% 100% n/a 83.57769/20/17 24 BCHA_PWX01Y053834_CISO 87.0 69.1968 100% 100% n/a 69.19689/21/17 1 BCHA_PWX01Y053847_CISO 72.0 65.1264 100% 100% n/a 65.12649/21/17 1 BCHA_PWX01Y053849_CISO 2.0 65.1264 100% 100% n/a 0.00009/21/17 2 BCHA_PWX01Y053857_CISO 61.0 65.3952 100% 95% n/a 61.00009/21/17 2 BCHA_PWX01Y053862_CISO 1.0 65.3952 100% 95% n/a 1.00009/21/17 3 BCHA_PWX01Y053883_CISO 67.0 67.4688 100% 99% n/a 67.00009/21/17 4 BCHA_PWX01Y053894_CISO 10.0 74.4192 100% 90% n/a 10.00009/21/17 4 BCHA_PWX01Y053903_CISO 57.0 74.4192 100% 90% n/a 57.00009/21/17 5 BCHA_PWX01Y053913_CISO 68.0 63.7632 100% 100% n/a 63.76329/21/17 5 BCHA_PWX01Y053916_CISO 9.0 63.7632 100% 100% n/a 0.00009/21/17 6 BCHA_PWX01Y053929_CISO 16.0 58.5600 100% 100% n/a 16.00009/21/17 6 BCHA_PWX01Y053935_CISO 6.0 58.5600 100% 100% n/a 6.00009/21/17 6 BCHA_PWX01Y053937_CISO 44.0 58.5600 100% 100% n/a 36.56009/21/17 7 BCHA_PWX01Y053947_CISO 0.0 58.5408 100% 97% n/a 0.00009/21/17 7 BCHA_PWX01Y053948_CISO 13.0 58.5408 100% 97% n/a 13.00009/21/17 7 BCHA_PWX01Y053950_CISO 21.0 58.5408 100% 97% n/a 21.00009/21/17 7 BCHA_PWX01Y053951_CISO 23.0 58.5408 100% 97% n/a 23.00009/21/17 8 BCHA_PWX01Y053966_CISO 50.0 62.1888 100% 100% n/a 50.00009/21/17 8 BCHA_PWX01Y053969_CISO 13.0 62.1888 100% 100% n/a 12.18889/21/17 9 BCHA_PWX01Y053982_CISO 28.0 51.2256 100% 100% n/a 28.00009/21/17 9 BCHA_PWX01Y053983_CISO 26.0 51.2256 100% 100% n/a 23.22569/21/17 9 BCHA_PWX01Y053999_CISO 11.0 51.2256 100% 100% n/a 0.00009/21/17 10 BCHA_PWX01Y054011_CISO 57.0 31.2192 100% 100% n/a 31.21929/21/17 11 BCHA_PWX01Y054035_CISO 25.0 22.1760 100% 100% n/a 22.17609/21/17 11 BCHA_PWX01Y054037_CISO 17.0 22.1760 100% 100% n/a 0.00009/21/17 12 BCHA_PWX01Y054175_CISO 27.0 26.9184 100% 100% n/a 26.91849/21/17 14 BCHA_PWX01Y054240_CISO 42.0 22.1952 100% 100% n/a 22.19529/21/17 15 BCHA_PWX01Y054272_CISO 23.0 21.2736 100% 100% n/a 21.27369/21/17 18 BCHA_PWX01Y054288_CISO 16.0 15.6288 100% 100% n/a 15.62889/21/17 19 BCHA_PWX01Y054300_CISO 10.0 9.1200 100% 100% n/a 9.12009/21/17 19 BCHA_PWX01Y054301_CISO 9.0 9.1200 100% 100% n/a 0.00009/21/17 20 BCHA_PWX01Y054307_CISO 12.0 2.1120 100% 100% n/a 2.11209/21/17 21 BCHA_PWX01Y054320_CISO 4.0 0.0000 100% 0% n/a 0.00009/22/17 1 BCHA_PWX01Y054375_CISO 1.0 0.9408 100% 100% n/a 0.94089/22/17 2 BCHA_PWX01Y054389_CISO 1.0 0.1728 100% 100% n/a 0.17289/22/17 3 BCHA_PWX01Y054398_CISO 1.0 0.2688 100% 100% n/a 0.2688

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

Page 73: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

9/22/17 6 BCHA_PWX01Y054434_CISO 1.0 3.2640 100% 31% n/a 1.00009/22/17 7 BCHA_PWX01Y054445_CISO 1.0 2.8224 100% 35% n/a 1.00009/22/17 8 BCHA_PWX01Y054467_CISO 2.0 1.9008 100% 100% n/a 1.90089/22/17 9 BCHA_PWX01Y054483_CISO 3.0 5.4144 100% 55% n/a 3.00009/22/17 18 BCHA_PWX01Y054754_CISO 1.0 2.2080 100% 45% n/a 1.00009/22/17 19 BCHA_PWX01Y054764_CISO 3.0 10.6944 100% 28% n/a 3.00009/22/17 20 BCHA_PWX01Y054772_CISO 3.0 8.9856 100% 33% n/a 3.00009/22/17 21 BCHA_PWX01Y054783_CISO 8.0 7.6800 100% 100% n/a 7.68009/22/17 22 BCHA_PWX01Y054795_CISO 5.0 6.5856 100% 76% n/a 5.00009/22/17 23 BCHA_PWX01Y054806_CISO 10.0 8.5056 100% 100% n/a 8.50569/22/17 24 BCHA_PWX01Y054827_CISO 6.0 10.3104 100% 58% n/a 6.00009/23/17 1 BCHA_PWX01Y054844_CISO 10.0 12.3648 100% 81% n/a 10.00009/23/17 2 BCHA_PWX01Y054855_CISO 9.0 14.5152 100% 62% n/a 9.00009/23/17 3 BCHA_PWX01Y054870_CISO 7.0 13.0752 100% 100% n/a 7.00009/23/17 3 BCHA_PWX01Y054871_CISO 7.0 13.0752 100% 100% n/a 6.07529/23/17 4 BCHA_PWX01Y054888_CISO 6.0 21.7536 100% 55% n/a 6.00009/23/17 4 BCHA_PWX01Y054889_CISO 6.0 21.7536 100% 55% n/a 6.00009/23/17 5 BCHA_PWX01Y054900_CISO 10.0 18.4128 100% 100% n/a 10.00009/23/17 5 BCHA_PWX01Y054901_CISO 9.0 18.4128 100% 100% n/a 8.41289/23/17 6 BCHA_PWX01Y054926_CISO 10.0 14.7456 100% 100% n/a 10.00009/23/17 6 BCHA_PWX01Y054927_CISO 9.0 14.7456 100% 100% n/a 4.74569/23/17 7 BCHA_PWX01Y054939_CISO 16.0 10.9824 100% 100% n/a 10.98249/23/17 8 BCHA_PWX01Y054950_CISO 10.0 20.4672 100% 49% n/a 10.00009/23/17 13 BCHA_PWX01Y054992_CISO 10.0 21.1200 100% 47% n/a 10.00009/23/17 14 BCHA_PWX01Y055001_CISO 12.0 22.6752 100% 53% n/a 12.00009/23/17 15 BCHA_PWX01Y055004_CISO 19.0 22.3680 100% 85% n/a 19.00009/23/17 18 BCHA_PWX01Y055035_CISO 13.0 49.9200 100% 46% n/a 13.00009/23/17 18 BCHA_PWX01Y055038_CISO 10.0 49.9200 100% 46% n/a 10.00009/23/17 19 BCHA_PWX01Y055044_CISO 42.0 56.9088 100% 74% n/a 42.00009/23/17 20 BCHA_PWX01Y055052_CISO 49.0 37.5552 100% 100% n/a 37.55529/23/17 21 BCHA_PWX01Y055063_CISO 51.0 52.8576 100% 96% n/a 51.00009/23/17 22 BCHA_PWX01Y055075_CISO 2.0 54.8544 100% 73% n/a 2.00009/23/17 22 BCHA_PWX01Y055077_CISO 38.0 54.8544 100% 73% n/a 38.00009/23/17 23 BCHA_PWX01Y055088_CISO 63.0 38.7072 100% 100% n/a 38.70729/23/17 24 BCHA_PWX01Y055102_CISO 42.0 52.7616 100% 80% n/a 42.00009/24/17 1 BCHA_PWX01Y055113_CISO 28.0 51.7056 100% 62% n/a 28.00009/24/17 1 BCHA_PWX01Y055108_CISO 4.0 51.7056 100% 62% n/a 4.00009/24/17 2 BCHA_PWX01Y055124_CISO 43.0 51.7056 100% 100% n/a 43.00009/24/17 2 BCHA_PWX01Y055121_CISO 12.0 51.7056 100% 100% n/a 8.70569/24/17 3 BCHA_PWX01Y055135_CISO 33.0 60.9408 100% 75% n/a 33.00009/24/17 3 BCHA_PWX01Y055137_CISO 13.0 60.9408 100% 75% n/a 13.00009/24/17 4 BCHA_PWX01Y055152_CISO 58.0 70.3296 100% 82% n/a 58.00009/24/17 5 BCHA_PWX01Y055163_CISO 55.0 86.7456 100% 63% n/a 55.00009/24/17 6 BCHA_PWX01Y055171_CISO 4.0 92.5632 100% 100% n/a 4.00009/24/17 6 BCHA_PWX01Y055172_CISO 44.0 92.5632 100% 100% n/a 44.00009/24/17 6 BCHA_PWX01Y055173_CISO 21.0 92.5632 100% 100% n/a 21.00009/24/17 6 BCHA_PWX01Y055174_CISO 22.0 92.5632 100% 100% n/a 22.00009/24/17 6 BCHA_PWX01Y055178_CISO 4.0 92.5632 100% 100% n/a 1.56329/24/17 7 BCHA_PWX01Y055184_CISO 1.0 108.0000 100% 80% n/a 1.00009/24/17 7 BCHA_PWX01Y055185_CISO 37.0 108.0000 100% 80% n/a 37.00009/24/17 7 BCHA_PWX01Y055186_CISO 24.0 108.0000 100% 80% n/a 24.00009/24/17 7 BCHA_PWX01Y055187_CISO 24.0 108.0000 100% 80% n/a 24.00009/24/17 8 BCHA_PWX01Y055197_CISO 11.0 103.7568 100% 97% n/a 11.00009/24/17 8 BCHA_PWX01Y055199_CISO 74.0 103.7568 100% 97% n/a 74.00009/24/17 8 BCHA_PWX01Y055200_CISO 5.0 103.7568 100% 97% n/a 5.00009/24/17 8 BCHA_PWX01Y055194_CISO 11.0 103.7568 100% 97% n/a 11.00009/24/17 9 BCHA_PWX01Y055205_CISO 16.0 78.0096 100% 21% n/a 16.00009/24/17 18 BCHA_PWX01Y055264_CISO 58.0 72.8256 100% 80% n/a 58.0000

Page 74: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

9/24/17 19 BCHA_PWX01Y055270_CISO 63.0 61.2480 100% 100% n/a 61.24809/24/17 20 BCHA_PWX01Y055289_CISO 60.0 59.6352 100% 100% n/a 59.63529/24/17 21 BCHA_PWX01Y055300_CISO 55.0 61.4592 100% 89% n/a 55.00009/24/17 22 BCHA_PWX01Y055321_CISO 45.0 45.3888 100% 100% n/a 45.00009/24/17 22 BCHA_PWX01Y055315_CISO 21.0 45.3888 100% 100% n/a 0.38889/24/17 23 BCHA_PWX01Y055330_CISO 48.0 47.4624 100% 100% n/a 47.46249/24/17 24 BCHA_PWX01Y055349_CISO 42.0 46.0608 100% 91% n/a 42.00009/25/17 1 BCHA_PWX01Y055370_CISO 40.0 43.6800 100% 92% n/a 40.00009/25/17 2 BCHA_PWX01Y055392_CISO 60.0 60.7296 100% 99% n/a 60.00009/25/17 3 BCHA_PWX01Y055413_CISO 36.0 66.2592 100% 54% n/a 36.00009/25/17 4 BCHA_PWX01Y055434_CISO 62.0 90.9120 100% 68% n/a 62.00009/25/17 5 BCHA_PWX01Y055444_CISO 52.0 86.2656 100% 83% n/a 52.00009/25/17 5 BCHA_PWX01Y055449_CISO 20.0 86.2656 100% 83% n/a 20.00009/25/17 6 BCHA_PWX01Y055470_CISO 96.0 60.9024 100% 100% n/a 60.90249/25/17 7 BCHA_PWX01Y055485_CISO 53.0 41.1264 100% 100% n/a 41.12649/25/17 7 BCHA_PWX01Y055488_CISO 3.0 41.1264 100% 100% n/a 0.00009/25/17 7 BCHA_PWX01Y055489_CISO 10.0 41.1264 100% 100% n/a 0.00009/25/17 7 BCHA_PWX01Y055491_CISO 16.0 41.1264 100% 100% n/a 0.00009/25/17 8 BCHA_PWX01Y055504_CISO 8.0 53.7600 100% 82% n/a 8.00009/25/17 8 BCHA_PWX01Y055513_CISO 36.0 53.7600 100% 82% n/a 36.00009/25/17 9 BCHA_PWX01Y055518_CISO 28.0 55.9680 100% 50% n/a 28.00009/25/17 10 BCHA_PWX01Y055534_CISO 23.0 44.9472 100% 51% n/a 23.00009/25/17 12 BCHA_PWX01Y055631_CISO 9.0 78.1248 100% 12% n/a 9.00009/25/17 15 BCHA_PWX01Y055717_CISO 22.0 69.2160 100% 75% n/a 22.00009/25/17 15 BCHA_PWX01Y055718_CISO 30.0 69.2160 100% 75% n/a 30.00009/25/17 16 BCHA_PWX01Y055733_CISO 56.0 73.6320 100% 76% n/a 56.00009/25/17 17 BCHA_PWX01Y055743_CISO 84.0 54.6432 100% 100% n/a 54.64329/25/17 18 BCHA_PWX01Y055755_CISO 63.0 36.2880 100% 100% n/a 36.28809/25/17 19 BCHA_PWX01Y055768_CISO 45.0 31.6800 100% 100% n/a 31.68009/25/17 19 BCHA_PWX01Y055775_CISO 11.0 31.6800 100% 100% n/a 0.00009/25/17 20 BCHA_PWX01Y055790_CISO 21.0 40.0704 100% 52% n/a 21.00009/25/17 21 BCHA_PWX01Y055805_CISO 39.0 43.6416 100% 92% n/a 39.00009/25/17 21 BCHA_PWX01Y055811_CISO 1.0 43.6416 100% 92% n/a 1.00009/25/17 22 BCHA_PWX01Y055819_CISO 15.0 30.7008 100% 100% n/a 15.00009/25/17 22 BCHA_PWX01Y055820_CISO 35.0 30.7008 100% 100% n/a 15.70089/25/17 22 BCHA_PWX01Y055825_CISO 3.0 30.7008 100% 100% n/a 0.00009/25/17 23 BCHA_PWX01Y055836_CISO 31.0 28.1088 100% 100% n/a 28.10889/25/17 24 BCHA_PWX01Y055864_CISO 30.0 11.8272 100% 100% n/a 11.82729/26/17 1 BCHA_PWX01Y055881_CISO 16.0 23.9232 100% 67% n/a 16.00009/26/17 2 BCHA_PWX01Y055893_CISO 14.0 23.2128 100% 82% n/a 14.00009/26/17 2 BCHA_PWX01Y055894_CISO 5.0 23.2128 100% 82% n/a 5.00009/26/17 3 BCHA_PWX01Y055901_CISO 31.0 18.3360 100% 100% n/a 18.33609/26/17 4 BCHA_PWX01Y055915_CISO 18.0 17.1648 100% 100% n/a 17.16489/26/17 5 BCHA_PWX01Y055926_CISO 21.0 14.1696 100% 100% n/a 14.16969/26/17 6 BCHA_PWX01Y055942_CISO 17.0 14.5152 100% 100% n/a 14.51529/26/17 7 BCHA_PWX01Y055960_CISO 14.0 14.9568 100% 94% n/a 14.00009/26/17 8 BCHA_PWX01Y055972_CISO 16.0 6.2400 100% 100% n/a 6.24009/26/17 9 BCHA_PWX01Y055983_CISO 10.0 1.7472 100% 100% n/a 1.74729/26/17 10 BCHA_PWX01Y055996_CISO 2.0 9.5232 100% 21% n/a 2.00009/26/17 15 BCHA_PWX01Y056159_CISO 91.0 105.3120 100% 86% n/a 91.00009/26/17 16 BCHA_PWX01Y056168_CISO 105.0 113.5680 100% 92% n/a 105.00009/26/17 17 BCHA_PWX01Y056191_CISO 118.0 117.8688 100% 100% n/a 117.86889/26/17 18 BCHA_PWX01Y056212_CISO 122.0 101.2224 100% 100% n/a 101.22249/26/17 19 BCHA_PWX01Y056230_CISO 118.0 71.8848 100% 100% n/a 71.88489/26/17 20 BCHA_PWX01Y056243_CISO 88.0 77.0688 100% 100% n/a 77.06889/26/17 21 BCHA_PWX01Y056261_CISO 75.0 79.7568 100% 94% n/a 75.00009/26/17 22 BCHA_PWX01Y056277_CISO 46.0 82.7328 100% 93% n/a 46.00009/26/17 22 BCHA_PWX01Y056279_CISO 31.0 82.7328 100% 93% n/a 31.0000

Page 75: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

9/26/17 23 BCHA_PWX01Y056289_CISO 33.0 58.7904 100% 100% n/a 33.00009/26/17 23 BCHA_PWX01Y056290_CISO 67.0 58.7904 100% 100% n/a 25.79049/26/17 24 BCHA_PWX01Y056304_CISO 61.0 87.5712 100% 70% n/a 61.00009/27/17 1 BCHA_PWX01Y056314_CISO 29.0 81.9840 100% 66% n/a 29.00009/27/17 1 BCHA_PWX01Y056318_CISO 25.0 81.9840 100% 66% n/a 25.00009/27/17 2 BCHA_PWX01Y056330_CISO 94.0 81.9648 100% 100% n/a 81.96489/27/17 3 BCHA_PWX01Y056343_CISO 24.0 64.8000 100% 100% n/a 24.00009/27/17 3 BCHA_PWX01Y056344_CISO 50.0 64.8000 100% 100% n/a 40.80009/27/17 4 BCHA_PWX01Y056356_CISO 11.0 80.1216 100% 80% n/a 11.00009/27/17 4 BCHA_PWX01Y056357_CISO 53.0 80.1216 100% 80% n/a 53.00009/27/17 5 BCHA_PWX01Y056364_CISO 63.0 90.1824 100% 70% n/a 63.00009/27/17 6 BCHA_PWX01Y056375_CISO 5.0 87.0912 100% 93% n/a 5.00009/27/17 6 BCHA_PWX01Y056376_CISO 5.0 87.0912 100% 93% n/a 5.00009/27/17 6 BCHA_PWX01Y056381_CISO 45.0 87.0912 100% 93% n/a 45.00009/27/17 6 BCHA_PWX01Y056386_CISO 26.0 87.0912 100% 93% n/a 26.00009/27/17 7 BCHA_PWX01Y056391_CISO 28.0 90.3168 100% 100% n/a 28.00009/27/17 7 BCHA_PWX01Y056393_CISO 27.0 90.3168 100% 100% n/a 27.00009/27/17 7 BCHA_PWX01Y056398_CISO 40.0 90.3168 100% 100% n/a 35.31689/27/17 8 BCHA_PWX01Y056408_CISO 15.0 87.3600 100% 84% n/a 15.00009/27/17 8 BCHA_PWX01Y056409_CISO 58.0 87.3600 100% 84% n/a 58.00009/27/17 9 BCHA_PWX01Y056417_CISO 30.0 92.3328 100% 100% n/a 30.00009/27/17 9 BCHA_PWX01Y056418_CISO 40.0 92.3328 100% 100% n/a 40.00009/27/17 9 BCHA_PWX01Y056419_CISO 30.0 92.3328 100% 100% n/a 22.33289/27/17 10 BCHA_PWX01Y056428_CISO 40.0 97.8624 100% 86% n/a 40.00009/27/17 10 BCHA_PWX01Y056432_CISO 16.0 97.8624 100% 86% n/a 16.00009/27/17 10 BCHA_PWX01Y056434_CISO 13.0 97.8624 100% 86% n/a 13.00009/27/17 10 BCHA_PWX01Y056435_CISO 15.0 97.8624 100% 86% n/a 15.00009/27/17 11 BCHA_PWX01Y056457_CISO 28.0 51.6480 100% 100% n/a 28.00009/27/17 11 BCHA_PWX01Y056462_CISO 34.0 51.6480 100% 100% n/a 23.64809/27/17 11 BCHA_PWX01Y056463_CISO 34.0 51.6480 100% 100% n/a 0.00009/27/17 12 BCHA_PWX01Y056510_CISO 14.0 60.4992 100% 100% n/a 14.00009/27/17 12 BCHA_PWX01Y056516_CISO 17.0 60.4992 100% 100% n/a 17.00009/27/17 12 BCHA_PWX01Y056517_CISO 66.0 60.4992 100% 100% n/a 29.49929/27/17 12 BCHA_PWX01Y056520_CISO 9.0 60.4992 100% 100% n/a 0.00009/27/17 13 BCHA_PWX01Y056580_CISO 10.0 48.5952 100% 60% n/a 10.00009/27/17 13 BCHA_PWX01Y056581_CISO 19.0 48.5952 100% 60% n/a 19.00009/27/17 14 BCHA_PWX01Y056601_CISO 14.0 47.5200 100% 29% n/a 14.00009/27/17 15 BCHA_PWX01Y056620_CISO 4.0 40.7232 100% 10% n/a 4.00009/27/17 16 BCHA_PWX01Y056631_CISO 25.0 39.6864 100% 100% n/a 25.00009/27/17 16 BCHA_PWX01Y056641_CISO 20.0 39.6864 100% 100% n/a 14.68649/27/17 17 BCHA_PWX01Y056662_CISO 36.0 45.4272 100% 100% n/a 36.00009/27/17 17 BCHA_PWX01Y056664_CISO 11.0 45.4272 100% 100% n/a 9.42729/27/17 18 BCHA_PWX01Y056676_CISO 33.0 23.1936 100% 100% n/a 23.19369/27/17 19 BCHA_PWX01Y056686_CISO 37.0 8.4096 100% 100% n/a 8.40969/27/17 20 BCHA_PWX01Y056704_CISO 11.0 11.1744 100% 98% n/a 11.00009/27/17 21 BCHA_PWX01Y056719_CISO 5.0 26.6304 100% 19% n/a 5.00009/27/17 22 BCHA_PWX01Y056732_CISO 20.0 28.4736 100% 70% n/a 20.00009/27/17 23 BCHA_PWX01Y056749_CISO 17.0 22.4832 100% 100% n/a 17.00009/27/17 23 BCHA_PWX01Y056750_CISO 18.0 22.4832 100% 100% n/a 5.48329/27/17 24 BCHA_PWX01Y056759_CISO 17.0 27.3408 100% 100% n/a 17.00009/27/17 24 BCHA_PWX01Y056764_CISO 12.0 27.3408 100% 100% n/a 10.34089/28/17 1 BCHA_PWX01Y056779_CISO 26.0 34.4256 100% 76% n/a 26.00009/28/17 2 BCHA_PWX01Y056788_CISO 34.0 26.1696 100% 100% n/a 26.16969/28/17 3 BCHA_PWX01Y056801_CISO 32.0 22.0224 100% 100% n/a 22.02249/28/17 4 BCHA_PWX01Y056811_CISO 23.0 34.2336 100% 67% n/a 23.00009/28/17 5 BCHA_PWX01Y056820_CISO 26.0 28.9920 100% 90% n/a 26.00009/28/17 6 BCHA_PWX01Y056829_CISO 35.0 34.5792 100% 100% n/a 34.57929/28/17 7 BCHA_PWX01Y056846_CISO 31.0 37.0368 100% 84% n/a 31.0000

Page 76: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

9/28/17 8 BCHA_PWX01Y056859_CISO 36.0 45.7344 100% 79% n/a 36.00009/28/17 9 BCHA_PWX01Y056870_CISO 1.0 44.2176 100% 86% n/a 1.00009/28/17 9 BCHA_PWX01Y056871_CISO 2.0 44.2176 100% 86% n/a 2.00009/28/17 9 BCHA_PWX01Y056878_CISO 35.0 44.2176 100% 86% n/a 35.00009/28/17 10 BCHA_PWX01Y056895_CISO 25.0 37.2864 100% 100% n/a 25.00009/28/17 10 BCHA_PWX01Y056904_CISO 30.0 37.2864 100% 100% n/a 12.28649/28/17 16 BCHA_PWX01Y057274_CISO 14.0 14.5344 100% 100% n/a 14.00009/28/17 16 BCHA_PWX01Y057278_CISO 7.0 14.5344 100% 100% n/a 0.53449/28/17 17 BCHA_PWX01Y057287_CISO 18.0 4.1280 100% 100% n/a 4.12809/28/17 18 BCHA_PWX01Y057312_CISO 8.0 5.0304 100% 100% n/a 5.03049/28/17 19 BCHA_PWX01Y057320_CISO 4.0 13.9776 100% 29% n/a 4.00009/28/17 20 BCHA_PWX01Y057336_CISO 6.0 12.4992 100% 48% n/a 6.00009/28/17 21 BCHA_PWX01Y057348_CISO 25.0 2.8800 100% 100% n/a 2.88009/28/17 22 BCHA_PWX01Y057360_CISO 5.0 3.7632 100% 100% n/a 3.76329/28/17 23 BCHA_PWX01Y057374_CISO 2.0 8.4672 100% 24% n/a 2.00009/28/17 24 BCHA_PWX01Y057382_CISO 5.0 12.3840 100% 40% n/a 5.00009/29/17 1 BCHA_PWX01Y057393_CISO 12.0 15.2448 100% 79% n/a 12.00009/29/17 2 BCHA_PWX01Y057401_CISO 13.0 24.0192 100% 54% n/a 13.00009/29/17 3 BCHA_PWX01Y057418_CISO 22.0 36.7872 100% 60% n/a 22.00009/29/17 4 BCHA_PWX01Y057428_CISO 24.0 42.5088 100% 56% n/a 24.00009/29/17 5 BCHA_PWX01Y057442_CISO 29.0 61.7088 100% 47% n/a 29.00009/29/17 6 BCHA_PWX01Y057460_CISO 50.0 59.2320 100% 84% n/a 50.00009/29/17 7 BCHA_PWX01Y057469_CISO 47.0 52.4544 100% 100% n/a 47.00009/29/17 7 BCHA_PWX01Y057470_CISO 6.0 52.4544 100% 100% n/a 5.45449/29/17 7 BCHA_PWX01Y057471_CISO 8.0 52.4544 100% 100% n/a 0.00009/29/17 8 BCHA_PWX01Y057491_CISO 23.0 39.9360 100% 100% n/a 23.00009/29/17 8 BCHA_PWX01Y057492_CISO 22.0 39.9360 100% 100% n/a 16.93609/29/17 9 BCHA_PWX01Y057507_CISO 15.0 30.3936 100% 100% n/a 15.00009/29/17 9 BCHA_PWX01Y057509_CISO 45.0 30.3936 100% 100% n/a 15.39369/29/17 9 BCHA_PWX01Y057508_CISO 4.0 30.3936 100% 100% n/a 0.00009/29/17 10 BCHA_PWX01Y057536_CISO 25.0 14.2464 100% 100% n/a 14.24649/29/17 14 BCHA_PWX01Y057689_CISO 40.0 59.1552 100% 79% n/a 40.00009/29/17 14 BCHA_PWX01Y057701_CISO 7.0 59.1552 100% 79% n/a 7.00009/29/17 15 BCHA_PWX01Y057720_CISO 17.0 36.9984 100% 100% n/a 17.00009/29/17 15 BCHA_PWX01Y057724_CISO 49.0 36.9984 100% 100% n/a 19.99849/29/17 16 BCHA_PWX01Y057738_CISO 42.0 24.3072 100% 100% n/a 24.30729/29/17 17 BCHA_PWX01Y057753_CISO 40.0 70.1184 100% 57% n/a 40.00009/29/17 18 BCHA_PWX01Y057773_CISO 13.0 105.7728 100% 12% n/a 13.00009/29/17 19 BCHA_PWX01Y057792_CISO 125.0 74.4000 100% 100% n/a 74.40009/29/17 20 BCHA_PWX01Y057814_CISO 79.0 42.6240 100% 100% n/a 42.62409/29/17 21 BCHA_PWX01Y057833_CISO 62.0 55.4112 100% 100% n/a 55.41129/29/17 22 BCHA_PWX01Y057848_CISO 25.0 109.4208 100% 23% n/a 25.00009/29/17 23 BCHA_PWX01Y057865_CISO 96.0 84.7488 100% 100% n/a 84.74889/29/17 24 BCHA_PWX01Y057879_CISO 0.0 71.2512 100% 100% n/a 0.00009/29/17 24 BCHA_PWX01Y057880_CISO 0.0 71.2512 100% 100% n/a 0.00009/29/17 24 BCHA_PWX01Y057881_CISO 0.0 71.2512 100% 100% n/a 0.00009/29/17 24 BCHA_PWX01Y057885_CISO 0.0 71.2512 100% 100% n/a 0.00009/29/17 24 BCHA_PWX01Y057890_CISO 23.0 71.2512 100% 100% n/a 23.00009/29/17 24 BCHA_PWX01Y057899_CISO 81.0 71.2512 100% 100% n/a 48.25129/30/17 1 BCHA_PWX01Y057915_CISO 57.0 83.7504 100% 68% n/a 57.00009/30/17 2 BCHA_PWX01Y057926_CISO 78.0 114.3168 100% 68% n/a 78.00009/30/17 3 BCHA_PWX01Y057942_CISO 102.0 117.9072 100% 87% n/a 102.00009/30/17 4 BCHA_PWX01Y057954_CISO 29.0 121.2864 100% 63% n/a 29.00009/30/17 4 BCHA_PWX01Y057958_CISO 47.0 121.2864 100% 63% n/a 47.00009/30/17 5 BCHA_PWX01Y057970_CISO 47.0 117.0432 100% 75% n/a 47.00009/30/17 5 BCHA_PWX01Y057971_CISO 41.0 117.0432 100% 75% n/a 41.00009/30/17 6 BCHA_PWX01Y057988_CISO 121.0 114.1632 100% 100% n/a 114.16329/30/17 7 BCHA_PWX01Y058007_CISO 113.0 122.9184 100% 92% n/a 113.0000

Page 77: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

DateHour  Ending

E-­‐Tag  ID  NumberHourly  Final  Schedule  (MWh)

Hourly  Meter  Data  (MWh)

Percent  Share  of  Final  

Schedule  (%)

Percent  Share  of  Facility  Generation  

Output  (%)Contract  ID

 Preliminary  Estimate  of  Eligible  PCC  1  Volume  

(MWh)

Annual  Hourly  Comparison  for  PCC  1  Claims  Scheduled  into  a  CBA

9/30/17 8 BCHA_PWX01Y058028_CISO 120.0 115.4496 100% 100% n/a 115.44969/30/17 18 BCHA_PWX01Y058137_CISO 24.0 73.6320 100% 100% n/a 24.00009/30/17 18 BCHA_PWX01Y058140_CISO 63.0 73.6320 100% 100% n/a 49.63209/30/17 19 BCHA_PWX01Y058161_CISO 91.0 62.9760 100% 100% n/a 62.97609/30/17 20 BCHA_PWX01Y058176_CISO 62.0 90.0864 100% 69% n/a 62.00009/30/17 21 BCHA_PWX01Y058190_CISO 66.0 70.9440 100% 93% n/a 66.00009/30/17 22 BCHA_PWX01Y058204_CISO 21.0 63.2448 100% 100% n/a 21.00009/30/17 22 BCHA_PWX01Y058206_CISO 4.0 63.2448 100% 100% n/a 4.00009/30/17 22 BCHA_PWX01Y058208_CISO 66.0 63.2448 100% 100% n/a 38.24489/30/17 23 BCHA_PWX01Y058222_CISO 62.0 34.4640 100% 100% n/a 34.46409/30/17 24 BCHA_PWX01Y058240_CISO 46.0 48.1536 100% 96% n/a 46.0000

Page 78: 2017RPS&Compliance&Report€¦ · Rulemaking 15-02-020 MCE – August 31, 2018 Page 1 of 2 . Marin Clean Energy . 2017 RPS Compliance Report . Reporting RPS Compliance Status for

_____________________________________________

Dawn Weisz, Chief Executive Officer, Marin Clean Energy

OFFICER  VERIFICATION  FORM  

I am an officer of the reporting corporation herein, and am authorized to make this

verification on its behalf. The statements in the foregoing document are true of my

own knowledge, except as to matters which are therein stated on information or

belief, and as to those matters I believe them to be true. The spreadsheet format

used to file this 2017 Meter and e-Tag Reconciliation Report has not been altered

from the version issued or approved by Energy Division.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on August 29, 2018 at San Rafael, CA.