2017 Performance Report for Fenelon Falls Waste Water Treatment Facility Amended Environmental Compliance Approval (ECA) #9572-ASGKMJ requires a performance report to be prepared on an annual basis, within ninety (90) days following the end of the period being reported upon. The report shall contain, but shall not be limited to, the following information: (a) a summary and interpretation of all monitoring data and a comparison to the effluent limits outlined in Condition 7, including an overview of the success and adequacy of the Works; (b) a description of any operating problems encountered and corrective actions taken; (c) a summary of all maintenance carried out on any major structure, equipment, apparatus, mechanism or thing forming part of the Works; (d) a summary of any effluent quality assurance or control measures undertaken in the reporting period; (e) a summary of the calibration and maintenance carried out on all effluent monitoring equipment; and (f) a description of efforts made and results achieved in meeting the Effluent Objectives of Condition 6; (g) a tabulation of the volume of sludge generated in the reporting period, an outline of anticipated volumes to be generated in the next reporting period and a summary of the locations to where the sludge was disposed; (h) a summary of any complaints received during the reporting period and any steps taken to address the complaints; (i) a summary of all By-pass, spill or abnormal discharge events; (j) a copy of all Notice of Modifications submitted to the Water Supervisor as a result of Schedule B, Section 1, with a status report on the implementation of each modification; (k) a report summarizing all modifications completed as a result of Schedule B, Section 3; and (l) any other information the Water Supervisor requires from time to time. The following is a report from the records maintained by the Ontario Clean Water Agency for the Fenelon Falls WPCP for the 2017 calendar year.

Upload: others

Post on 09-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

2017 Performance Report for Fenelon Falls Waste Water Treatment Facility

Amended Environmental Compliance Approval (ECA) #9572-ASGKMJ requires a performance report to be prepared on an annual basis, within ninety (90) days following the end of the period being reported upon. The report shall contain, but shall not be limited to, the following information: (a) a summary and interpretation of all monitoring data and a comparison to the effluent limits outlined in Condition 7, including an overview of the success and adequacy of the Works; (b) a description of any operating problems encountered and corrective actions taken; (c) a summary of all maintenance carried out on any major structure, equipment, apparatus, mechanism or thing forming part of the Works; (d) a summary of any effluent quality assurance or control measures undertaken in the reporting period; (e) a summary of the calibration and maintenance carried out on all effluent monitoring equipment; and (f) a description of efforts made and results achieved in meeting the Effluent Objectives of Condition 6; (g) a tabulation of the volume of sludge generated in the reporting period, an outline of anticipated volumes to be generated in the next reporting period and a summary of the locations to where the sludge was disposed; (h) a summary of any complaints received during the reporting period and any steps taken to address the complaints; (i) a summary of all By-pass, spill or abnormal discharge events; (j) a copy of all Notice of Modifications submitted to the Water Supervisor as a result of Schedule B, Section 1, with a status report on the implementation of each modification; (k) a report summarizing all modifications completed as a result of Schedule B, Section 3; and (l) any other information the Water Supervisor requires from time to time. The following is a report from the records maintained by the Ontario Clean Water Agency for the Fenelon Falls WPCP for the 2017 calendar year.

Page 2: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

2

(a) Attached is Appendix I: Process Assessment Report Wastewater for the Fenelon Falls WPCP. The Report contains a tabulation of all monthly average raw sewage and final effluent sample results obtained during the reporting period, a tabulation of average daily flows, and monthly volumes for the reporting period, and a tabulation of calculated total loading of BOD5, suspended solids, total phosphorus, and ammonia + ammonium as N concentrations in the final effluent.

All reporting requirements in the Certificate of Approval are in compliance. The

treatment plant was able to meet all of its Effluent Parameter Limits for 2017.

Summary of Effluent Parameters

Carbonaceous Biochemical Oxygen Demand (CBOD5) ECA #9572-ASGKMJ sets the CBOD5 annual average concentration limit at 25.0 mg/L

and the annual average waste loading at 45 kg/day.

Annual Average

Average Concentration

(mg/L)

Concentration Limit

(mg/L)

Compliance Limit

Achieved

Average Waste

Loading (kg/day)

Loading Limit

(kg/day)

Compliance Limit

Achieved

2017 <2.6 25.0 Yes <3.5 45.0 Yes

Total Suspended Solids (TSS) ECA #9572-ASGKMJ sets the CBOD5 annual average concentration limit at 25.0 mg/L

and the annual average waste loading at 45 kg/day.

Annual Average

Average Concentration

(mg/L)

Concentration Limit

(mg/L)

Compliance Limit

Achieved

Average Waste

Loading (kg/day)

Loading Limit

(kg/day)

Compliance Limit

Achieved

2017 <3.5 25.0 Yes <4.6 45.0 Yes

Total Phosphorus (TP) ECA #9572-ASGKMJ sets the TP 0.5 mg/L monthly average concentration limit at 25.0

mg/L and the annual average waste loading at 45 kg/day.

Page 3: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

3

Month Average Concentration

(mg/L)

Concentration Limit (mg/L)

Compliance Limit

Achieved

Average Waste

Loading (kg/day)

Loading Limit

(kg/day)

Compliance Limit

Achieved

January 0.14 0.5 Yes <0.1 0.9 Yes

February 0.14 0.5 Yes <0.1 0.9 Yes

March 0.10 0.5 Yes <0.1 0.9 Yes

April 0.11 0.5 Yes <0.1 0.9 Yes

May 0.09 0.5 Yes <0.1 0.9 Yes

June 0.11 0.5 Yes <0.1 0.9 Yes

July 0.09 0.5 Yes <0.1 0.9 Yes

August 0.07 0.5 Yes <0.1 0.9 Yes

September 0.06 0.5 Yes <0.1 0.9 Yes

October 0.05 0.5 Yes <0.1 0.9 Yes

November 0.08 0.5 Yes <0.1 0.9 Yes

December 0.12 0.5 Yes <0.1 0.9 Yes

Total (Ammonia+Ammonium) Nitrogen (TAN) ECA #9572-ASGKMJ sets the TAN monthly average concentration limit at 3.5 mg/L and the annual average waste loading at 6.3 kg/day for April 1 to October 31. The TAN monthly average concentration limit for November 1 to March 31 is 7.0 mg/L and the annual average waste loading at 12.6 kg/day.

Month Average Concentration

(mg/L)

Concentration Limit

(mg/L)

Compliance Limit

Achieved

Average Waste

Loading (kg/day)

Loading Limit

(kg/day)

Compliance Limit

Achieved

April 1 – October

31

0.40

3.5 Yes

0.61

6.3 Yes

January 1 – March

31 and

November 1 –

December 31

2.37 7.0 Yes 3.30 12.6 Yes

E. Coli

ECA #9572-ASGKMJ sets the monthly geometric mean density of E. Coli at 200

cfu/100mL.

Page 4: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

4

Month Geometric Mean Density (cfu/100mL)

Geometric Mean Density

Limit (mg/L)

Compliance Limit Achieved

January 2.00 200 Yes

February 2.00 200 Yes

March 5.59 200 Yes

April 2.00 200 Yes

May 2.00 200 Yes

June 2.00 200 Yes

July 2.00 200 Yes

August 2.00 200 Yes

September 2.00 200 Yes

October 2.00 200 Yes

November 2.30 200 Yes

December 2.00 200 Yes

pH ECA #9572-ASGKMJ has a pH compliance limit within the range of 6.5 to 9.5, inclusive, at all times. The pH results were all within the range of 6.0 – 9.5, inclusive, as required by the ECA.

Month Minimum Average Maximum

January 6.74 7.03 7.29

February 6.77 6.93 7.24

March 6.75 6.92 7.19

April 6.60 6.88 7.13

May 6.70 6.89 7.15

June 6.61 6.84 7.39

July 7.05 7.31 7.50

August 7.03 7.19 7.42

September 6.69 6.99 7.30

October 6.69 7.05 7.45

November 7.20 7.33 7.56

December 7.01 7.25 7.48

(b) Overall, the plant process ran well in 2017. There were not any operating problems in 2017 other than three partial bypass of the tertiary filters caused by snow melt and high flows. The effluent limits and objectives as set out in ECA #9572-ASGKMJ were met and there were not any major mechanical issues.

(c) OCWA uses a Work Maintenance System (WMS). WMS is a maintenance tracking system that can generate work orders as well as give summaries of completed and scheduled work. During the year, the operating authority at the facility generates

Page 5: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

5

scheduled work orders on a weekly, monthly and annual basis and the service work is recorded in the work order history. This ensures routine and preventive maintenance is carried out and assets are maintained to manufacturer’s and/or industry standards. Emergency and capital repair maintenance is completed and added to the system. Refer to Appendix II: Maintenance Summary. (d) Effluent quality assurance is maintained in several ways. Laboratory samples are sent to an accredited laboratory (SGS Lakefield) for analysis of all effluent parameters. Sampling calendars issued to the operator denote frequency of sampling and these calendars are submitted to the Process Compliance Technician at the end of each month. Raw and effluent samples are collected as per the Certificate of Approval and the results are reviewed on a regular basis to ensure compliance with the site’s objectives and limits. Work orders illustrating all scheduled and preventative maintenance to be completed are issued to the operator and/or mechanic. OCWA conducts internal audits of the facility and develops Action Plans to ensure deficiencies are identified.

Continuous phosphorus removal is achieved with the dosing of aluminum sulfate. A summary of its use and dosage is below:

Month Aluminum

Sulfate (kg)

Aluminum Sulfate Average Dosage (mg/L)

January 2483.90 59.49

February 2242.10 69.29

March 2479.40 57.01

April 2402.10 47.71

May 3179.90 46.11

June 2382.10 57.91

July 2521.40 72.69

August 2530.50 96.85

September 2433.00 98.43

October 2442.54 106.88

November 2352.96 67.00

December 2441.40 91.83

(e) Maintenance and calibrations carried out in 2017 on all effluent monitoring equipment are presented above in Section (c) and in Appendix III: Calibration Reports. (f) OCWA uses a number of best efforts to achieve the Effluent Objectives. Effluent quality assurance and control measures include in-house sampling and testing for operational parameters such as [e.g., suspended solids, pH, phosphorus, dissolved oxygen, etc.]. In-house testing provides real time results which are then used to enhance process and operational performance. OCWA also collects raw sewage and effluent samples as per the

Page 6: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

6

ECA and reviews these results on a regular basis to ensure compliance with the ECA objectives and limits.

OCWA uses a computerized maintenance management system which generates work orders to ensure maintenance of equipment is proactively performed. In addition, OCWA provides regular status reports to the Owner which includes operational data, equipment inventory, financial statements, maintenance activities and capital improvement recommendations. OCWA has developed comprehensive manuals detailing operations, maintenance, instrumentation and emergency procedures. To ensure facilities are operated in compliance with applicable legal requirements, facility staff have access to a network of operational compliance and support experts at the hub, region and corporate level. The Fenelon Falls WWTP was able to consistently meet the Effluent Objectives throughout 2017 with the exception of two Total Ammonia Nitrogen readings.

CBOD5 All of the CBOD5 results in 2017 were below the Effluent Objective of 15.0 mg/L in 2017.

Total Suspended Solids (TSS) All of the TSS results in 2017 were below the Effluent Objective of 15.0 mg/L in 2017.

Total Phosphorus (TP) All of the TSS results in 2017 were below the Effluent Objective of 0.3 mg/L in 2017.

Total Ammonia Nitrogen (TAN) The effluent objective for April 1 to October 1 is 2.5 mg/L and for November 1 to March 31 are 5.0 mg/L. All of the TAN results in 2017 between were below the Effluent Objective except for two results:

April 5, 2017 2.7 mg/L

November 29, 2017 5.4mg/L.

E.Coli All of the monthly geometric mean results in 2017 were below the Effluent Objective of 150 cfu/100mL in 2017.

pH All of the pH results in 2017 were within the Effluent Objective range of 6.5 to 9.0, inclusive. (g) Appendix IV: Biosolids Summary. The total volume of biosolids generated in 2017 was 2548.82 m3. The anticipated volume of biosolids for the next reporting period is not

Page 7: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

7

expected to be appreciably different from this reporting period and no change is expected from the current biosolids handling methods and disposal areas currently utilized. Shepherd Septic Services has been contracted to haul, land apply and store the Biosolids on their approved sites and certified holding lagoon during the winter.

Biosolids Volume

Month Volume (m3)

January 173.59

February 189.95

March 0.00

April 231.75

May 242.70

June 412.65

July 166.36

August 182.75

September 275.45

October 279.07

November 189.15

December 205.40

Appendix IV: Biosolids Summary has biosolids sampling results. (h) There were several odour complaints from a resident on Ellice St near the facility. OCWA staff communicated with the resident to try and identify the source of the odour. A complaint was received from a resident near the Ellice St PS concerning the fumes created when the generator is running. Operator spoke with the resident and the resident will be notified prior to monthly generator runs. (i) There were not any Spills or abnormal discharges during 2017 although there were three partial bypasses.

Partial Bypass 1: SAC #900409 (a) Date of the Event: February 23, 2017 at 19:50 to February 28, 2017 at 07:10; (b) Estimated volume: 1260m3; (c) Duration of the Event: 107 hours and 20 minutes; (d) Location of the Event: Sewage was directed through all processes with the exception of the estimated 1260 m3 that bypassed the tertiary filters (e) Reason for the Event: The partial bypass of the tertiary filters was caused by snow melt and high flows; and (f) Level of treatment: Sewage was directed through all processes within the Sewage Treatment Plant with the exception of the estimated 1260 m3 that bypassed the tertiary filters. Samples were collected at the beginning of the event, throughout the event and near the end of the event and analyzed for BOD, CBOD, TSS, Phosphorus, Total

Page 8: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

8

Ammonia Nitrogen, E. Coli, pH and temperature. Refer to Appendix IV: Partial Bypasses.

Partial Bypass 2: SAC #900462 (a) Date of the Event: March 1, 2017 at 15:40 to March 3, 2017 at 12:22; (b) Estimated volume: 1995.0 m3; (c) Duration of the Event: 44 hours and 44 minutes; (d) Location of the Event: Sewage was directed through all processes with the exception of the estimated 1995.0 m3 that bypassed the tertiary filters; (e) Reason for the Event: The partial bypass of the tertiary filters was caused by snow melt and high flows; and (f) Level of treatment: Sewage was directed through all processes within the Sewage Treatment Plant with the exception of the estimated 1995.0 m3 that bypassed the tertiary filters. Samples were collected at the beginning of the event, throughout the event and near the end of the event and analyzed for BOD, CBOD, TSS, Phosphorus, Total Ammonia Nitrogen, E. Coli, pH and temperature. Refer to Appendix IV: Partial Bypasses.

Partial Bypass 3: SAC #900906 (a) Date of the Event: May 2, 2017 at 14:40 and continued until May 9, 2017 at 9:40; (b) Estimated volume: 3620.0 m3; (c) Duration of the Event: 163 hours; (d) Location of the Event: Sewage was directed through all processes with the exception of the estimated 3620 m3 that bypassed the tertiary filters; (e) Reason for the Event: The partial bypass of the tertiary filters was caused by snow melt and high flows; and (f) Level of treatment: Sewage was directed through all processes within the Sewage Treatment Plant with the exception of the estimated 3620 m3 that bypassed the tertiary filters. Samples were collected at the beginning of the event, throughout the event and near the end of the event and analyzed for BOD, CBOD, TSS, Phosphorus, Total Ammonia Nitrogen, E. Coli, pH and temperature. Refer to Appendix IV: Partial Bypasses. (j) There were not any Notice of Modifications submitted to the Water Supervisor as a result of Schedule B, Section 1 in 2017. (k) A summary of all modifications completed as a result of Schedule B, Section 3 are included in Appendix II: Maintenance Summary. (l) The Water Supervisor has not requested any additional information be included in this report.

Page 9: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

9

Page 10: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

10

Page 11: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

11

Page 12: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

12

Page 13: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

13

Page 14: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

14

Page 15: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

15

Page 16: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

16

Page 17: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

17

Page 18: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

18

Page 19: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

19

Page 20: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

20

Page 21: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

21

Page 22: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

22

Page 23: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

23

Page 24: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

24

Page 25: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

25

Page 26: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

26

Page 27: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

27

Page 28: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

28

Page 29: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

29

Page 30: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

30

Page 31: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

31

Page 32: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

32

Page 33: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

33

Page 34: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

34

Page 35: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

35

Page 36: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

36

Page 37: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

37

Page 38: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

38

Page 39: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

39

Page 40: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

40

Page 41: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

41

Page 42: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

42

Page 43: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

43

Page 44: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

44

Page 45: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

45

Page 46: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

46

Page 47: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

47

Page 48: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

48

Page 49: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

49

Page 50: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

50

Page 51: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

51

Page 52: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

52

Page 53: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

53

Page 54: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

54

Page 55: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

55

Page 56: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

56

Page 57: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

57

Page 58: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

58

Page 59: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

59

Page 60: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

60

Page 61: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

61

Page 62: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

62

Page 63: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

63

Page 64: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

64

Page 65: 2017 Performance Report for Fenelon Falls Waste Water ... · limits outlined in Condition 7, including an overview of the success and adequacy of the ... (TSS) ECA #9572-ASGKMJ sets

65