2017 climate & refrigerants...
TRANSCRIPT
![Page 1: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/1.jpg)
2017 Climate & Refrigerants
OutlookStephen Yurek
President & CEO
![Page 2: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/2.jpg)
There is Much to Come
Much Has Occurred…
![Page 3: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/3.jpg)
Kigali is Merely the Beginning
![Page 4: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/4.jpg)
315: Member Companies: Over 95% of all HVACR products manufactured and installed in North America
44:
AHRI Certification Programs: Nearly 900 participants representing over 70% of all HVACR products manufactured globally
102: AHRI standards and guidelines in use across the globe
AHRI is a Trade Association
![Page 5: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/5.jpg)
Residential and commercial central air conditioners and
heat pumps and components
Residential and commercial furnaces and boilers and
components
Residential and commercial water heaters and
components
Commercial refrigeration equipment and components
AHRI Members Manufacture:
![Page 6: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/6.jpg)
Big Changes are Coming▪High GWP Refrigerants will be phased down on a global scale▪Drivers:
Montreal Protocol – Kigali Amendment
U.S. EPA SNAP Program / Climate Action Plan
Canadian regulations F-gas regulations in Europe
![Page 7: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/7.jpg)
Montreal Protocol Developments▪Agreement on HFC phase down reached in Kigali, Rwanda
Reduces greenhouse gas emissions by 70 Gigatons CO2e by 2050
Separate baselines and reduction schedules for A2 and A5 countries
Will be guided by a technology and economic review process every 5 years
Provides financial assistance to developing countries
First step down is in 2019 for A2 countries
![Page 8: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/8.jpg)
A5 Group 1 A5 Group 2 A2
Baseline 2020-2022 2024-2026 2011-2013
Formula Average HFC consumption
Average HFC consumption
Average HFC consumption
HCFC 65% baseline 65% baseline 15% baseline*
Freeze 2024 2028 -
1st step 2029 – 10% 2032 – 10% 2019 – 10%
2nd step 2035 – 30% 2037 – 20% 2024 – 40%
3rd step 2040 – 50% 2042 – 30% 2029 – 70%
4th step 2034 – 80%
Plateau 2045 – 80% 2047 – 85% 2036 – 85%
Phase Down Schedule
* For Belarus, Russian Federation, Kazakhstan, Tajikistan, Uzbekistan 25% HCFC component of baseline and different initial
two steps (1) 5% reduction in 2020 and (2) 35% reduction in 2025
Notes:
1. Group 1: Article 5 parties not part of Group 2
2. Group 2: GCC, India, Iran, Iraq, Pakistan
3. Technology review in 2022 and every 5 years
4. Technology review 4-5 years before 2028 to consider the compliance deferral of 2 years from the freeze of 2028 of
Article 5 Group 2 to address growth in relevant sectors above certain threshold.
![Page 9: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/9.jpg)
How does this impact HVACR
equipment manufacturers?
![Page 10: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/10.jpg)
Equipment Manufacturers:
▪Must assess available alternatives for products and applications
▪Conduct research and development, both individually and collectively
▪As an industry, adapt regulatory and safety barriers to allow the safe use of equipment using A2L and A3 refrigerants
▪Retool and optimize manufacturing processes
▪Train technicians and building managers
![Page 11: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/11.jpg)
What’s Next?▪Montreal Protocol Amendment, while good, is just the beginning
▪We must identify suitable alternative refrigerants…and quickly
▪Low-GWP Alternative Refrigerants Evaluation Program (AREP) laid the groundwork, identifying most promising alternatives
▪Now the final work begins
![Page 12: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/12.jpg)
HFC-Using Equipment Around the World
North America
Ducted equipment – AC/HP (mature)Commercial AC (mature)Mini/multi-split, VRF (mature)
Asia
Europe
Middle East
Mini/multi-split, VRF (mature)Commercial AC (mature)
Ducted equipment – AC/HP (mature)Commercial AC (mature)Mini/multi-split, VRF (mature)
Mini/multi-split, VRF (mature)Commercial AC (mature)
![Page 13: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/13.jpg)
Industry is Moving Forward• OEMs starting to select alternatives
• Commercial refrigeration: HCs, CO2, HFC/HFO blends, and cascade systems
• Chillers: HFO 1233zd(E), HFO-1234ze(E)• Unitary: R32, R452B
• Manufacturers are developing components and equipment
• However,• Regulatory and safety barriers must be adapted to allow the
safe use of equipment using A2L and A3 refrigerants• Difference between available alternative refrigerants and
equipment and Commercially Available Equipment
![Page 14: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/14.jpg)
AHRTI Flammabe Refrigerant Research
Joint Research to support ASHRAE 15 revisions
Summer 2017: draft ASHRAE 15 completed
for PPR
End of 2017: publication of the
updated ASHRAE 15 including 2L refrigerants
Jan 2018: 2021 IMC: change proposals are due
Objective is to produce publicly available technical results to support codes and standards activities related to the use of flammable refrigerants
•Ensure timely completion of relevant standards such as ASHRAE 15 & IEC 60335-2-40
Joint effort by AHRI, ASHRAE, DOE, and California
![Page 15: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/15.jpg)
State of Safety Standards – Global View
Inte
rnat
iona
lU
nite
d St
ates
2017 2021 2022+
Model Building
Codes
State and
Local Codes
complete under revision
RefrigerantClassification Usage Restriction Application
ASHRAE34Refrigerant Designation & Safety ClassificationUL2182
ASHRAE15Safety Standards for Refrigeration Systems2015-2018
UL1995Heating and CoolingEquipment 2014-2015
UL471CommercialRefrigerators and Freezers 2015-2019
UL621Ice Cream Makers2015-2019
UL60335-2-40Heating and Cooling Equipment -2017
UL60335-2-89Commercial Refrigeration -2018
RefrigerantClassification Usage Restriction Application
ISO817Refrigerant Designation & Safety Classification (2013-2014)
ISO5149Safety and Environmental Requirements, Phase 1Phase 2 2014-2015
IEC60335-2-40Heating and Cooling equipment2015-2017
IEC60335-2-89Commercial Refrigeration2015-2019
IEC60335-2-24Refrigerating appliancesIce and Ice Cream Makers2015-2019
Source: Rajan Rajendran - Emerson
![Page 16: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/16.jpg)
Commercial Availability
Components (refrigerants, compressors, controls, values, etc.)
•Design and testing of prototypes
•Regulatory approvals
•Retool and optimize manufacturing processes
•Production
Distribution, Installation, Operation, and Maintenance
•Training (technicians, operators, building owners)
•Regulatory requirements for transportation, installation, and operation
Equipment
•Design and testing of prototypes
•Regulatory approvals
•Retool and optimize manufacturing processes
•Production
![Page 17: 2017 Climate & Refrigerants Outlookccacoalition.org/sites/default/files/2017_technology-air... · Agreement on HFC phase down reached in Kigali, ... operation Equipment •Design](https://reader031.vdocuments.us/reader031/viewer/2022021822/5b16715c7f8b9a5e6d8bf9ac/html5/thumbnails/17.jpg)
Buckle up…It’s going to be a bumpy ride!