Print Date: 6/30/2015
Date Received at Chancellor's Office
2017 -21 FIVE YEA R CAPITAL OUTLAY PLAN
(2 017 - 18 FIRST FUNDING YEAR)
Desert CCD
Prepared in reference to the Community College Construction Act of 1980
and
approved on behalf of the local governing board for submission to
the office of he Chancellor, California Community Colleges
Title Superintendent/President
Date '7- 3' ,.. ,IS:
ContactPerson ~L=is=a~H~o~w~e=ll~-----------
Telephone (760)'""'6=7~4~-7-"'6=25~---------
Chancellor's Office reviewed by
Notice of Approval
Page: 1
Calif. Comm. Colleges Five Year Construction Plan
Inventory of Land Desert CCD
6/30/2015
Page 3
List the address and acreage of every land unit owned by the district (Education Code 81821(e)). Please identify all locations, both on-campus and off-campus, grouped according to their "parent" institution. In the event the list is long or complicated, please substitute copies of college bulletins or other notices to the public which display similar information. The list should be current as of October the prior year
Address
COLLEGE OF THE DESERT 43-500 MONTEREY AVENUE PALM DESERT CA 92260
MECCA THERMAL CAMPUS 61120 Buchanan Street Mecca, Ca
WEST VALLEY CAMPUS PALM SPRINGS North Indian and Tramview Rd Palm Springs, CA 92262
EAST VALLEY CAMPUS INDIO Oasis Street Indio, CA 92201
Legislative Districts
Campus
College Of The Desert Desert - District Offices*
Assembly Senate
42 23 42 23
Acreage
House
36 36
160.0
95.0
119.0
2.6
Cal if. Comm. Colleges
Address
Five Year Construction Plan Instructional Delivery Locations
Desert CCD
COACHELLA VALLEY HIGH SCHOOL 83-800 AIRPORT BLVD THERMAL CA
DESERT HOSPITAL 1150 NORTH INDIAN AVE PALM SPRI NGS CA
EISENHOWER MEDICAL CTR 39-000 BOB HOPE DR RANCHO MIRAGE CA
KENNEDY HOSPITAL 47-111 MONROE I NDIO CA
MANOR CARE NUR CTR 74-350 COUNTRY CLUB DR PALM DESERT CA
PALM SPRINGS HIGH SCHOOL 2401 East Baristo Rd PALM SPRINGS, CA
PALM SPRINGS POLICE TRAINING CTR 200 S CIVIC DR PALM SPRINGS CA
COLLEGE OF THE DESERT 43-500 MONTEREY AVENUE PALM DESERT CA 92260
MECCA THERMAL CAMPUS 61120 Buchanan Street Mecca, Ca
EAST VALLEY CAMPUS INDIO Oasis Street Indio, CA 92201
6/30/2015
Page 4
Calif. Comm. Colleges
No. Pro·ect Occu anc ASF Total Cost Source
WATER AND SEWER INFRASTRUCTUR 0 2008/2009
$3,336,000 State $25,814,000 NonState
2 Demo old gym/replace with tennis cou 2014/2015
3 Liberal Arts # 5 Renovation -3,692 2015/2016
$7,670,000 NonState
4 Administration Building #1 Renovation 4,034 2016/2017
$8,000,000 NonState
5 Transfer Art Bldg to District Inventory 13,605 2014/2015
6 Mecca Thermal Site Expansion 2015/2016
$29,700,000 NonState
7 Advanced Transportation Complex -15,040 2016/2017
$8,500,000 NonState
8 Renovation of Library - Learning Resou 2018/2019
$12,594,000 NonState
9 Renovation of Registration Building 2018/2019 $5,700,000 NonState
10 West Valley Center 2018/2019
$40,000,000 NonState
11 Desert Hot Springs Site 2017/2018
$1,800,000 NonState
12 Remove Alternate Energy Bldig Lectur 2015/2016
Five Year Construction Plan
District Projects Priority Order Desert CCD
2015 2016 2016 2017
College Of The Desert
College Of The Desert
Desert - District Offices* (C)(E)
$7,670,000
Desert - District Offices* (C)(E)
$8,000,000
Desert - District Offices*
College Of The Desert (W) (C)
$29, 700,000
College Of The Desert
College Of The Desert (W) (C)(E)
$572,000 $11,550,000
College Of The Desert (C)(E)
$5,700,000
College Of The Desert (P) (W)(C)(E)
$40,000,000
College Of The Desert (P) (W)
College Of The Desert
Schedule of Funds 2017 2018 2018 2019 2019 2020
(E)
(C)(E) $1,800,000
6/30/2015
Page 5
2020 2021 2021 2022
Calif. Comm. Colleges
No. Pro"ect Leet ASF WSCH Occu an
3 Liberal Arts #5 Renovation -6,392 -13,514 2015/2016
Desert - District Offices*
7 Advanced Transportation Complex 1,818 3,844 2016/2017
College Of The Desert
Lecture Actual*/ProJected W5CH 88,493 Cumulative Capacity
capacity/ Load Ratio
2016/2017
1n,419 182%
2016/2017 97,585 187,089 192%
Five Year Construction Plan
District Lecture Capacity/ Load Ratios Desert CCD
2017/2018
2017/2018 100,828 177,419 176%
2018/2019
2018/2019 104,176 177,419 170%
2019/2020
2019/2020 107,630 177,419 165%
2020/2021
2020/2021 111,192 177,419 160%
2021/2022
2021/2022 114,107 177,419 155%
6/30/2015
Page 6
2022/2023
2022/2023 114,107 177,419 155%
Calif. Comm. Colleges
No. Pro"ect Lab ASF WSCH Occu an
3 Liberal Arts #5 Renovation -1,944 -756 2015/ 2016
Desert - District Offices*
7 Advanced Transportation Complex -10,945 -1,301 2016/ 2017
College Of The Desert
Laboratory Actual*/ProJected WSCH 64,083 Cumulative Capacity
Capacity/ Load Ratio
2016/2017
21,286 127%
2016/ 2017 16,695 23,344 140%
Five Year Construction Plan
District Laboratory Capacity/Load Ratios Desert CCD
2017/2018
2017/2018 17,251 21,286 123%
2018/2019
2018/ 2019 17,823 21,286 119%
2019/2020
2019/ 2020 18,414 21,286 116%
2020/2021
2020/ 2021 19,024 21,286 112%
2021/2022
2021/ 2022 19,523 21,286 109%
6/30/2015
Page 7
2022/ 2023
2022/ 2023 19,523 21,286 109%
Calif. Comm. Colleges
No. Pro·ect Off ASF FTE Occu an 2016/2017
3 Liberal Arts #5 Renovation -356 -3 2015/2016
Desert - District Offices*
4 Administration Building #1 Renovation 3,469 25 2016/2017 460
Desert - District Offices* 146%
7 Advanced Transportation Complex -382 -3 2016/2017 458
College Of The Desert 145%
Office Actual*/ ProJected FI E 61,325 Cumulative capacity
Capacity/ Load Ratio
2016/ 2017 315 438
139%
Five Year Construction Plan
District Office Capacity/Load Ratios Desert CCD
2017/2018
2017/ 2018 315 458
145%
2018/2019
2018/ 2019 315 458
145%
2019/2020
2019/ 2020 319 458
143%
2020/ 2021
2020/ 2021 319 458
143%
2021/2022
2021/ 2022 319 458
143%
6/30/ 2015
Page 8
2022/ 2023
2022/ 2023 319 458
143%
Calif. Comm. Colleges
No. Pro·ect Lib ASF Occu an
7 Advanced Transportation Complex 500 2016/2017
College Of The Desert
Library Actual*/ProJected ASF 18,282 Cumulative Capacity
Capacity/Load Ratio
2016/2017
18,782 65%
2016/2017 29,000 18,282 63%
Five Year Construction Plan
District Library Capacity/ Load Ratios Desert CCD
2017/2018
2017/2018 29,646 18,782 63%
2018/2019
2018/2019 30,307 18,782 62%
2019/ 2020
2019/2020 30,985 18,782 61%
2020/ 2021
2020/2021 31,590 18,782 59%
2021/ 2022
2021/2022 32,209 18,782 58%
6/30/2015
Page 9
2022/2023
2022/2023 0
18,782
Calif. Comm. Colleges
No. Proiect
I AVTV I Occupancy ASF
AV/ Iv Actual*/Proiectea ASF 556 Cumulative Capacity
capacity/ Load Ratio
2016/2017
2016/2017 10,434
556 5%
Five Year Construction Plan
District AV /TV Capacity I Load Ratios Desert CCD
2017/2018
2017/2018 10,5//
556 5%
2018/2019
2018/ 2019 10,723
556 5%
2019/2020
2019/ 2020 10,873
556 5%
2020/ 2021
2020/2021 10,926
556 5%
2021/2022
2021/ 2022 10,978
556 5%
6/ 30/ 2015
Page 10
2022/ 2023
2022/ 2023 0
556
Calif. Comm. Colleges
District Load Distribution Reference: Chancellor's Office Forecast
Instructional Staff FTE
Actual Fall
2013 283
2014 292
Forecast
2015 300
2016 315
2017 315
2018 315
2019 319
2020 319
2021 319
Five Year Construction Plan
Load Distribution and Staff Forecast Desert CCD
Total Campus Off-Campus On-Campus WSCH WSCH WSCH
116,364 7,191 109,173
120,248 7,431 112,817
124,254 7,679 116,575
128,395 7,935 120,460
132,662 8,199 124,463
137,067 8,471 128,596
141,612 8,752 132,860
146,299 9,041 137,258
150,134 9,278 140,856
6/30/2015
Page 11
P.E. On-Campus Laboratory On-Campus Laboratory
WSCH Lecture WSCH WSCH
5,601 88,441 15,131
5,787 91,393 15,636
5,980 94,437 16,157
6,180 97,585 16,696
6,385 100,828 17,251
6,597 104,176 17,823
6,816 107,630 18,414
7,041 111, 192 19,024
7,226 114, 107 19,523
Calif. Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast Desert CCD
Instructional Load by Campus or Location Reference: Chancellor's Office Forecast
WSCH Distributed to Campuses or Other Locations
Actual Pro 'ected Cam us 2012 2013 2014 2015 2016 2017 2018
College Of The Desert 113,411 116,364 120,248 124,254 128,395 132,662 137,067
Desert - District Offices*
Total 113,411 116,364 120,248 124,254 128,395 132,662 137,067
6/30/2015
Page 12
2019 2020 2021
141,612 146,299 150,134
141,612 146,299 150,134
Calif. Comm. Colleges Five Year Construction Plan 6/30/2015 Load Distribution and Staff Forecast
Desert CCD Page 13
Total District Library: Load Reference: Chancellor's Office Forecast of Day-Graded Enrollment
Firs t 3,000 Total Day- Number of Initia l ASF Day Graded Between 3k - Above 9,000 Tota l ASF
Graded Campuses (3,795/Camp) (3.83/DG) 9k (3.39/DG) (2.94/DG) (d+e+f+g) a b c d e f
2015/2016 8,111 1 3,795 11,490 17,326 32,611
2016/2017 8,324 1 3,795 11,490 18,048 33,333
2017/2018 8,543 1 3,795 11,490 18,791 34,076
2018/2019 8,767 1 3,795 11,490 19,550 34,835
2019/2020 8,997 1 3,795 11,490 20,330 35,615
2020/2021 9,233 1 3,795 11,490 20,340 685 36,310
2021/2022 9,475 1 3,795 11,490 20,340 1,397 37,022
Calif. Comm. Colleges
Library Load by Campus or Location
Five Year Construction Plan Load Distribution and Staff Forecast
Desert CCD
Reference: Chancellor's Office Forecast of Day-Graded Enrollment
I Campus 2015 2016 2017
College Of The Desert 28,372 29,000 29,646 {87%) (87%) (87%)
Desert - District Offices* 4,239 4,333 4,430 {13%) {13%) {13%)
Total 32,611 33,333 34,076
6/30/2015
Page 14
2018 2019 2020 2021
30,307 30,985 31,590 32,209 (87%) (87%) (87%) (87%)
4,529 4,630 4,720 4,813 (13%) {13%) {13%) {13%)
34,835 35,615 36,310 37,022
Calif. Comm. Colleges
Total District AV Radio TV Load
Five Year Construction Plan Load Distribution and Staff Forecast
Desert CCD
Reference: Chancellor's Office Forecast of Day-Graded Enrollment
First 3,000 Total Day- Number of Initial ASF Day Graded Between 3k -
Graded Campuses (3,500/Camp) (1.50/DG) 9k (0.75/DG) (a) (b) (c) (d) (e) (f)
2015/2016 8,111 1 3,500 4,500 3,833
2016/2017 8,324 1 3,500 4,500 3,993
2017/2018 8,543 1 3,500 4,500 4,157
2018/2019 8,767 1 3,500 4,500 4,325
2019/2020 8,997 1 3,500 4,500 4,498
2020/2021 9,233 1 3,500 4,500 4,500
2021/2022 9,475 1 3,500 4,500 4,500
6/30/2015
Page 15
Above 9,000 Total ASF (0.25/DG) (d+e+f+g)
( q)
11,833
11,993
12,157
12,325
12,498
58 12,558
119 12,619
Calif. Comm. Colleges Five Year Construction Plan Load Distribution and Staff Forecast
Desert CCD
AV, Radio, TV Load by Campus or Location Reference: Chancellor's Office Forecast of Day-Graded Enrollment
I Campus 2015 2016 2017
College Of The Desert 10,295 10,434 10,577 (87%) (87%) (87%)
Desert - District Offices* 1,538 1,559 1,580 (13%) (13%) (13%)
Total 11,833 11,993 12,157
6/30/2015
Page 16
2018 2019 2020 2021
10,723 10,873 10,926 10,978 (87%) (87%) (87%) (87%)
1,602 1,625 1,633 1,640 (13%) (13%) (13%) (13%)
12,325 12,498 12,558 12,619
Calif. Comm. Colleges
No. Pro·ect Leet ASF WSCH Occu an
7 Advanced Transportation Complex 1,818 3,844 2016/2017
College OfThe Desert
Lecture Actual+/Proiected WSCH 88,493 Cumulative Capacity
Capacity/Load Ratio
2016/2017
190,932 196%
2016/2017 97,585 187,089 192%
Five Year Construction Plan Campus Lecture Capacity/Load Ratios
College Of The Desert
2017/2018
2017/2018 100,828 190,932 189%
2018/2019
2018/2019 104,176 190,932 183%
2019/2020
2019/2020 107,630 190,932 177%
2020/2021
2020/2021 111,192 190,932 172%
2021/2022
2021/2022 114,107 190,932 167%
6/30/2015
Page 18
2022/2023
2022/2023 114,107 190,932 167%
Calif. Comm. Colleges
No. Pro·ect Lab ASF WSCH Occu an
7 Advanced Transportation Complex -10,945 -1,301 2016/2017
College OfThe Desert
Laboratory Actual*/ProJected WSCH 64,083 Cumulative Capacity
Capacity/Load Ratio
2016/ 2017
22,042 132%
2016/2017 16,696 23,344 140%
Five Year Construction Plan
Campus Laboratory Capacity/Load Ratios
College Of The Desert
2017/2018
2017/2018 17,251 22,042 128%
2018/2019
2018/2019 17,823 22,042 124%
2019/2020
2019/ 2020 18,414 22,042 120%
2020/2021
2020/2021 19,024 22,042 116%
2021/2022
2021/ 2022 19,523 22,042 113%
6/30/2015
Page 19
2022/2023
2022/2023 19,523 22,042 113%
Calif. Comm. Colleges
No. Pro·ect Off ASF FTE Occu anc 2016/2017
7 Advanced Transportation Complex -382 -3 2016/2017 351
College Of The Desert 112%
Office Actual*/ProJected FIE 49,559 Cumulative Capacity
Capacity/Load Ratio
2016/ 2017 315 354
112%
Five Year Construction Plan
Campus Office Capacity/Load Ratios College Of The Desert
2017/2018
2017/2018 315 351
112%
2018/2019
2018/ 2019 315 351
112%
2019/2020
2019/2020 319 351
110%
2020/2021
2020/2021 319 351
110%
2021/2022
2021/ 2022 319 351
110%
6/30/2015
Page 20
2022/2023
2022/2023 319 351
110%
Calif. Comm. Colleges
No. Pro'ect Lib ASF Occu an
7 Advanced Transportation Complex 500 2016/2017
College Of The Desert
Library Actual*/ProJected ASF 18,150 Cumulative Capacity
capacity/Load Ratio
2016/2017
18,650 64%
2016/2017 29,000 18,150 63%
Five Year Construction Plan Campus Library Capacity/Load Ratios
College Of The Desert
2017/2018
2017/2018 29,646 18,650 63%
2018/2019
2018/2019 30,307 18,650 62%
2019/2020
2019/2020 30,985 18,650 60%
2020/2021
2020/2021 31,590 18,650 59%
2021/2022
2021/2022 32,209 18,650 58%
6/30/ 2015
Page 21
2022/2023
2022/2023 0
18,650
Calif. Comm. Colleges
No. Proiect
I AVTV I Occupancy ASF
AV/ I V Actual*/ Pro)ected ASF 556 Cumulative Capacity
Capacity/Load Ratio
2016/ 2017
I
2016/ 2017 10,434
556 5%
Five Year Construction Plan
Campus AV/TV Capacity/Load Ratios College Of The Desert
2017/2018
2017/ 2018 10,577
556 5%
2018/2019
2018/2019 10,723
556 5%
2019/2020
2019/2020 10,873
556 5%
2020/2021
2020/2021 10,926
556 5%
2021/2022
2021/ 2022 10,978
556 5%
6/ 30/2015
Page 22
2022/2023
2022/2023 0
556
Calif. Comm. Colleges
Campus Load Distribution Reference: Chancellor's Office Forecast
Instructional Staff FTE
Actual Fall
2013 283
2014 292
Forecast
2015 300
2016 315
2017 315
2018 315
2019 319
2020 319
2021 319
Five Year Construction Plan Load Distribution and Staff Forecast
College Of The Desert
Total Campus Off-Campus On-Campus WSCH WSCH WSCH
116,364 7,191 109,173
120,248 7,431 112,817
124,254 7/~79 116,575
128,395 7,935 120,460
132,662 8)99 124,463
137,067 8,471 128,596
141,612 8,752 132,860
146,299 9,041 137,258
150,134 9,278 140,856
6/30/2015
Page 23
P.E. On-Campus Laboratory On-Campus Laboratory
WSCH Lecture WSCH WSCH
5,601 88,441 15)31
5,787 91,393 15,636
5,980 94,437 16,157
6,180 97,585 16,696
6,385 100,828 17,251
6,597 104,176 17,823
6,816 107,630 18,414
7,041 111,192 19,024
7,226 114,107 19,523
Calif. Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast College Of The Desert
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus.
a
Instructors
Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al.
Department Administrators
Librarians Include certificated director of audio/visual, et. al.
Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al.
Fall 2015 Totals
Column (b) is the total number of Column (a) distributed to categories
Total Certificated Instructional and
Statutory Staff FTE b
275.0
15.0
10.0
2.0
5.0
307.0
Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructlonal work.
Non-Instructional Portion of FTE
c
2.0
5.0
7.0
Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructlonal duties.
6/30/2015
Page 24
Net Total Instructional and
Statutory Staff FTE (b-c)
d
275.0
15.0
10.0
300.0
Calif. Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast College Of The Desert
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus.
a
Instructors
Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al.
Department Administrators
Librarians Include certificated director of audio/visual, et. al.
Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al.
Fall 2016 Totals
Column (b) is the total number of Column (a) distributed to categories
Total Certificated Instructional and
Statutory Staff FTE b
284.0
20.0
11.0
2.0
5.0
322.0
Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work.
Non-I nstructional Portion of FTE
c
2.0
5.0
7.0
Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties.
6/ 30/ 2015
Page 25
Net Total Instructional and
Statutory Staff FTE (b-c)
d
284.0
20.0
11.0
315.0
Calif. Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast College Of The Desert
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus.
a
Instructors
Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al.
Department Administrators
Librarians Include certificated director of audio/visual, et. al.
Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of I nstruction, Director of Data Processing, et. al.
Fall 2017 Totals
Column (b) is the total number of Column (a) distributed to categories
Total Certificated Instructional and
Statutory Staff FTE b
284.0
20.0
11.0
2.0
5.0
322.0
Column ( c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work.
Non-Instructional Portion of FTE
c
2.0
5.0
7.0
Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties.
6/30/2015
Page 26
Net Total Instruct ional and
Statutory Staff FTE (b-c)
d
284.0
20.0
11.0
315.0
Ca lif. Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast
College Of The Desert
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus.
a
Instructors
Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al.
Department Administrators
Librarians I nclude certificated director of audio/visual, et. al.
Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al.
Fall 2018 Totals
Column (b) is the total number of Column (a) distributed to categories
Total Certificated Instructional and
Statutory Staff FTE b
284.0
20.0
11.0
2.0
5.0
322.0
Column (c) is the fraction or time express as Full-Time Equivalents devoted to noninstructional work.
Non-I nstructional Portion of FTE
c
2.0
5.0
7.0
Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties.
6/30/2015
Page 27
Net Total I nstructional and
Statutory Staff FTE (b-c)
d
284.0
20.0
11.0
315.0
Calif. Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast College Of The Desert
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus.
a
Instructors
Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al.
Department Administrators
Librarians Include certificated director of audio/visua l, et. al.
Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al.
Fall 2019 Totals
Column (b) is the total number of Column (a) distributed to categories
Total Certificated Instructional and
Statutory Staff FTE b
286.0
20.0
12.0
3.0
5.0
326.0
Column (c) Is the fraction of time express as Full-Time Equivalents devoted to noninstructional work.
Non-Instructional Portion of FTE
c
2.0
5.0
7.0
Counselors, department administrators, and statutorily required staff are counted as if they had no nonlnstructional duties.
6/30/2015
Page 28
Net Total Instructional and
Statutory Staff FTE (b-c)
d
286.0
20.0
12.0
1.0
319.0
Calif . Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast College Of The Desert
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus.
a
Instructors
Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al.
Department Administrators
Librarians Include certificated director of audio/visual, et. al.
Institutional Administrators Include certificated persons with responsibil ities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al.
Fall 2020 Totals
Column (b) is the total number of Column (a) distributed to categories
Total Certificated Instructional and
Statutory Staff FTE b
286.0
20.0
12.0
3.0
5.0
326.0
Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work.
Non-Instructional Portion of FTE
c
2.0
5.0
7.0
Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties.
6/30/2015
Page 29
Net Total Instructional and
Statutory Staff FTE (b-c)
d
286.0
20.0
12.0
1.0
319.0
Calif . Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast College Of The Desert
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus.
a
Instructors
Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al.
Department Administrators
Librarians Include certificated director of audio/visual, et. al.
Institutional Administrators I nclude certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of I nstruction, Director of Data Processing, et. al.
Fall 2021 Totals
Column (b) is the total number of Column (a) distributed to categories
Total Certificated Instructional and
Statutory Staff FTE b
286.0
20.0
12.0
3.0
5.0
326.0
Column (c) Is the fraction of time express as Full-Time Equivalents devoted to noninstructional work.
Non-Instructional Portion of FTE
c
2.0
5.0
7.0
Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties.
6/30/2015
Page 30
Net Total Instructional and
Statutory Staff FTE (b-c)
d
286.0
20.0
12.0
1.0
319.0
Calif. Comm. Colleges Five Year Construct ion Plan 6/30/2015
Cum Sum of Existing and Proposed Space, 2016 - 2022 College Of The Desert Page 31
Cumulative Summary of Existing and Pro~osed Areas( 2016-2022
Priority and AV Radio Year of Classroom Laboratory Office Library TV P.E. Assembly Inactive All Other
Occupancy lOO's 200's 300's 400's 530 - 535 520 - 525 610 - 625 050 - 070 Areas b d f h
49,559 7,400
7 2016/2017 Advanced Transportation Complex 1,818 -10,945 -382 500 -6,031 -15,040
90 311 53,138 49177 18,650 63 963 336 269
Total Existing and Proposed Space
90,311 53,138 49,177 18,650 556 29,367 7,400 23,707 63,963 336,269
Calif. Comm. Colleges Five Year Construction Plan
Capacity of Net Existing On-Campus ASF College Of The Desert
Classrooms, Classroom Service (Room Type lOO's)
Totals ............. • .
Laboratories and Laboratory Service Areas {Room Types 210£ 2151 2201 225£ 230£ 235£ 255} ASF/100 capacity
TOP CodeLDescri~tion Net ASF WSCH WSCH TOP Code/Descri~tion
0100 Agriculture and Natural Resources 980 492 199 0956 Manufacturing and Industrial Technology
0116 Agricultural Power Equipment Technology 856 1000 Fine and Applied Arts
0200 Architecture and Related Technologies 257 1100 Foreign Language
0300 Environmental Sciences and Tecl1nologles 235 1200 Health
0400 Biological Sciences 3,751 235 1,596 1300 Family and Consumer Sciences
0500 Business and Management 909 128 710 1400 Law
0600 Media and Communications 214 1500 Humanities (Letters)
0700 Information Technology 909 171 532 1600 Library Science
0800 Education 1,843 321 574 1700 Mathematics
0900 Engineering & Industrial Technologies 100 321 31 1800 Military Studies
0945 Industrial Systems Technology and Mainte 2,360 556 424 1900 Physical Sciences
0946 Environmental Control Technology (HVAC} 556 2000 Psychology
0947 Diesel Technology 856 2100 Public and Protective Services
0948 Automotive Technology 11,285 856 1,318 2200 Social Sciences
0949 Automotive Collison Repair 856 3000 Commercial Services
0950 Aeronautical and Aviation Technology 190 749 25 4900 Interdisciplinary Studies
0952 Construction Crafts Technology 749
Totals .. .. ... • .• . . .. .
Campus Avg Lab ASF/100 WSCH
Office and Office Service Areas (Room Type 300's)
Totals .... • ...•......
Net ASF
88,493
NetASF
7,004
1,305
4,821
8,850
12,106
7,670
64,083
Net ASF
49,559
6/30/2015
Page 32
ASF/100 Capacity WSCH WSCH
47.3 187,089
ASF/100 Capacity WSCH WSCH
385
257 2,725
150 870
214 2,253
257
150
150
150
150
214
257 3,444
150
214 5,657
150
214
257 2,984
23,344
275
ASF per Capacity FTE FTE
140 354
Calif. Comm. Colleges Five Year Construction Plan
Project Intent And Scope College Of The Desert
District Priority : 1 WATER AND SEWER INFRASTRUCTURE REPLACEMENT
Project Type : D Site Acquisit ion
181 Replacement
Total Estimated Costs : $29,150,000
Anticipated Source(s) of Funds : State and Non-State
Type of construction :
Seismic Retrofit :
If Existing - Age :
If Existing - Condition :
Anticipated Time Schedule
D New Construction
181 Infrastructure
Land Acquisition Preliminary Plans Working Drawing Construction
Year
Estimated Cost
Explain why th is project is needed:
2005/2006
$390,000
2005/2006
$1,215,000
2006/2007
$27,545,000
D Reconstruction
D Equipment
Equipment
6/30/2015
Page 33
Occupancy
2008/2009
The purpose of this project is to replace failing infrast ructure including water and sewer lines, fire suppression lines and systems and gas lines to serve the current needs of the campus at the College of the Desert
Calif. Comm. Colleges
District Priority No.:
Five Year Construction Plan
Project Intent And Scope College Of The Desert
1 WATER AND SEWER INFRASTRUCTURE REPLACEMENT
Outline of Project Space - Buildings and Remodelings
Project Primary
Project Secondary
Project Net ASF
Project Net Capacity
Classroom Type Laboratory lOO's 210 - 255
Classrooms, Classroom Service (Room Type lOO's)
Office Type 300's
Library Type 400's
AV - TV 530 - 535
Classroom Tot al s •...••....•••••
Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255)
6/30/2015
Page 34
All Other Total ASF
Net ASF/ 100 Capacity
ASF WSCH WSCH
0 47.3 0
Primary Effect Secondary Effect ASF/100 Capacity ASF/100 Capacity
TOP Code/Description Net ASF WSCH WSCH TOP Code/Description Net ASF WSCH WSCH
Laboratory Totals .••.. •.• •..•.•. 0 0
Net ASF per Capacity Office and Office Service Areas (Room Type 300's) ASF FTE FTE
Office Total s . .•....•.•.••.• 0 140 0.00
0
Calif. Comm. Colleges Five Year Construction Plan
Project Intent And Scope College Of The Desert
District Priority: 2 Demo old gym/replace with tennis courts
Project Type : 0 Site Acquisition
0 Replacement
Total Estimated Costs :
Anticipated Source(s) of Funds : State
Type of construction :
Seismic Retrofit :
If Existing - Age :
I f Existing - Condition :
Anticipated Time Schedule
Land Acquisition
Year
Estimated Cost
Preliminary Plans
2012/2013
$0
Explain why this project is needed:
0 New Construction
0 Infrast ructure
Working Drawing
2013/2014
$0
Construction
2013/2014
$0
~ Reconstruction
0 Equipment
Equipment
2014/2015
$0
Replacement of old gymnasium. Old gym will be demolished. The site will be repurposed with tennis courts. A new gymnasium will be constructed near the site.
6/30/2015
Page 35
Occupancy
2014/2015
Calif. Comm. Colleges
District Priority No.:
Five Year Construction Plan
Project Intent And Scope College Of The Desert
2 Demo old gym/replace with tennis courts
Outline of Project Space - Buildings and Remodelings
Project Primary
Project Secondary
Project Net ASF
Project Net Capacity
Classroom Type Laboratory l OO's 210 - 255
Classrooms, Classroom Service (Room Type l OO's)
Office Type 300's
Library Type 400's
AV -TV 530 - 535
Classroom Totals ..• ••• ..•• ••. • .
Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255)
6/30/ 2015
Page 36
All Other Total ASF
Net ASF/100 Capacity
ASF WSCH WSCH
0 47.3 0
Primary Effect Secondary Effect ASF/100 Capacity ASF/100 Capacity
TOP Code/Description Net ASF WSCH WSCH TOP Code/Description Net ASF WSCH WSCH
Laboratory Totals ••••••••. . •• ••• 0 0
Net ASF per Capacity Office and Office Service Areas (Room Type 300's) ASF FTE FTE
Office Totals •• • ••••• •.• •••• 0 140 o.oo
0
Calif. Comm. Colleges Five Year Construction Plan
Project Intent And Scope College Of The Desert
District Priority: 6 Mecca Thermal Site Expansion
Project Type : 0 Site Acquisition
0 Replacement
Total Estimated Costs : $29,700,000
Anticipated Source(s) of Funds : Non-State
181 New Construction
0 Infrastructure
Type of construction :
Seismic Retrofi t :
If Existing - Age :
If Existing - Condition :
Anticipated Time Schedule
Land Acquisition
Year
Estimated Cost
Preliminary Plans
2014/2015
$0
Expla in why this project is needed:
Working Drawing
2015/2016
$0
Expansion of Mecca Thermal Campus with permanent buildings
Construction
2016/2017
$29,700,000
0 Reconstruction
0 Equipment
Equipment
2017/2018
$0
6/30/2015
Page 37
Occupancy
2015/2016
Calif. Comm. Colleges
District Priority No.:
Five Year Construction Plan Project Intent And Scope
College Of The Desert
6 Mecca Thermal Site Expansion
Outline of Project Space - Buildings and Remodelings
Project Primary
Project Secondary
Project Net ASF
Project Net Capacity
Classroom Type Laboratory lOO's 210 - 255
Classrooms, Classroom Service (Room Type lOO's)
Office Type 300's
Library Type 400's
AV-TV 530 - 535
Classroom Total s • • •• . ••.•• • ••••
Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255)
6/30/2015
Page 38
All Other TotalASF
Net ASF/100 capacity
ASF WSCH WSCH
0 47.3 0
Primary Effect Secondary Effect ASF/ I 00 Capacity ASF/100 Capacity
TOP Code/Description Net ASF WSCH WSCH TOP Code/Description Net ASF WSCH WSCH
l aboratory Totals • • .••• . •.• .• ••• 0 0
Net ASF per Capacity Office and Office Service Areas (Room Type 300's) ASF FTE FTE
Office Total s . •. •. • ..••..••• 0 140 0.00
0
Calif. Comm. Colleges Five Year Construction Plan
Project Intent And Scope College Of The Desert
District Priority : 7 Advanced Transportation Complex
Project Type : D Site Acquisition
D Replacement
Total Estimated Costs : $8,500,000
l8l New Construction
D Infrastructure
Anticipated Sou rce(s) of Funds : Non-State
Type of construction :
Seismic Retrofit :
If Existing - Age :
If Existing - Condition :
Anticipated Time Schedule
Land Acquisition Preliminary Plans
Year
Estimated Cost
Explain why this project is needed:
2010/2011
$0
Working Drawing
2011/2012
$0
Construction
2014/2015
$8,500,000
D Reconstruction
D Equipment
Equipment
2014/2015
$0
6/30/2015
Page 39
Occupancy
2016/2017
Replace the Alternate Energy buillding #22 to reactivate space and house Advanced Transportation and Air Conditioning / Refrigeration instruction in a smaller facility.
The following buildings will be removed : Alternate Energy Building #22 (4527 asf inactive, 1482 asf classroom, 2360 Industrial Systems lab, 11,285 asf Auto lab, 592 office). Alternate Energy Storage #45 (1752 asf inactive, 1752 asf storage)
Cali f. Comm. Colleges
District Priority No.:
Five Year Construction Plan
Project Intent And Scope
College Of The Desert
7 Advanced Transportation Complex
Outline of Project Space - Buildings and Remodelings Classroom Type Laboratory Office Type Library Type
Project Primary
Project Secondary
Project Net ASF
Project Net Capacity
Classrooms, Classroom Service (Room Type lOO's)
lOO's 210 - 255
3,300
-1,482
1,818
2,700
-13,645
-10,945
300's 400's
210 500
-592
-382 500
AV-TV 530 - 535
Classroom Total s •.•••.•• •• •••• •
Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255)
6/30/2015
Page 40
All Other Total ASF
2,000 8,710
-8,031 -23,750
-6,031 -15,040
Net ASF/100 Capacity
ASF WSCH WSCH
1,818 47.3 3,844
Primary Effect Secondary Effect
TOP Code/Description
0945 Industrial Systems Technology and Mai 0948 Automotive Technology
NetASF
2,000 700
Office and Office Service Areas (Room Type 300's)
ASF/100 WSCH
556 856
Capacity WSCH
360 82
TOP Code/Description
0945 Industrial Systems Technology and Mai 0948 Automotive Technology
Net ASF
-2,360 -11,285
ASF/100 Capacity WSCH WSCH
556 -424 856 __ -~l,=31=8'--
Laboratory Totals . . • • • • • • • • • • . . • -10,945 -1,301
Net ASF per Capacity ASF FTE FTE
Office Totals • • •• .• .•.. . •• . • -382 140 -2.73
Calif. Comm. Colleges Five Year Construction Plan
Project Intent And Scope College Of The Desert
District Priority: 8 Renovation of Library - Learning Resource Center
Project Type : D Site Acquisition
D Replacement
Total Estimated Costs : $12,594,000
Anticipated Source(s) of Funds : Non-State
D New Construction
D Infrastructure
Type of construction :
Seismic Retrofit :
If Existing - Age :
If Existing - Condition :
Anticipated Time Schedule
Land Acquisition Preliminary Plans Working Drawing
Year 2014/2015 2015/2016
Estimated Cost $472,000 $572,000
Explain why this project is needed:
Construction
2016/2017
$11,550,000
r:8:I Reconstruction
0 Equipment
Equipment
2016/2017
$0
6/30/2015
Page 41
Occupancy
2018/2019
The project involves the modernization of the existing Library as part of a two building modernization project (with the renovation of the Registration building). The two renovated buildings will bring library, academic skills labs and support spaces, other learning labs and student computer labs to a centralized location. The project replaces a formerly approved FPP for a new library. The District withdrew that project as funding was not available to meet the required timeline of needs. Program and scope have been reduced somewhat to fit the available space.
Calif . Comm. Colleges
Dist rict Priority No. :
Five Year Construction Plan
Project Intent And Scope
College Of The Desert
8 Renovation of Library - Learning Resource Center
Outline of Project Space - Buildings and Remodelings
Project Primary
Project Secondary
Project Net ASF
Project Net Capacity
Classroom Type Laboratory lOO's 210 - 255
Classrooms, Classroom Service (Room Type lOO's)
Office Type 300's
Library Type 400's
AV-TV 530 - 535
Classroom Totals • ••• ••.•••• • • • •
Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255)
6/30/2015
Page 42
All Other Total ASF
Net ASF/100 Capacity
ASF WSCH WSCH
0 47.3 0
Primary Effect Secondary Effect ASF/100 Capacity ASF/100 Capacity
TOP Code/Description Net ASF WSCH WSCH TOP Code/Description Net ASF WSCH WSCH
Labora tory Total s •••• • •••• . • •••. 0 0
Net ASF per Capacity Office and Office Service Areas (Room Type 300's) ASF FTE FTE
Office Total s • • • ••• • •• •. ••• . 0 140 o.oo
0
Calif. Comm. Colleges Five Year Construction Plan
Project Intent And Scope College Of The Desert
District Priority : 9 Renovation of Registration Building
Project Type : D Site Acquisition
0 Replacement
Total Estimated Costs : $5,700,000
0 New Construction
0 Infrastructure
Anticipated Source(s) of Funds : Non-State
Type of construction :
Seismic Retrofit :
If Existing - Age :
If Existing - Condition :
Anticipated Time Schedule
Land Acquisition Preliminary Plans Working Drawing
Year
Estimated Cost
Explain why this project is needed:
2014/2015
$0
Construction
2016/2017
$5,700,000
~ Reconstruction
D Equipment
Equipment
2016/2017
$0
6/30/ 2015
Page 43
Occupancy
2018/2019
This project is in conjunction with the renovation of the Library. The renovated Registration building wi ll become pa rt of a Learning Resources Complex; two buildings consisting of the renovated Library and th is building. It will have seismic updates as well as other code compliance improvements. The program for th is building is primarily student learning labs and associated library support.
Calif. Comm. Colleges
District Priority No. :
Five Year Construction Plan
Project Intent And Scope College Of The Desert
9 Renovation of Registration Building
Outline of Project Space - Buildings and Remodelings
Project Primary
Project Secondary
Project Net ASF
Project Net Capacity
Classroom Type Laboratory lOO's 210 - 255
Classrooms, Classroom Service (Room Type lOO's)
Office Type 300's
Library Type 400's
AV-TV 530 - 535
Classroom Totals ••• • •••••••••••
Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255)
6/30/2015
Page 44
All Other Total ASF
Net ASF/100 capacity
ASF WSCH WSCH
0 47.3 0
Primary Effect Secondary Effect ASF/100 Capacity ASF/100 Capacity
TOP Code/Description Net ASF WSCH WSCH TOP Code/Description Net ASF WSCH WSCH
laboratory Totals .••• •.• • • •.•••. 0 0
Net ASF per Capacity Office and Office Service Areas (Room Type 300's) ASF FTE FTE
Office Totals .•••...•• .. . • . . 0 140 0.00
0
Calif. Comm. Colleges Five Year Construction Plan
Project Intent And Scope College Of The Desert
District Priority : 10 West Valley Center
Project Type : D Site Acquisition
D Replacement
Total Estimated Costs : $40,000,000
Anticipated Source(s) of Funds : Non-State
~ New Construction
D Infrastructure
Type of construction :
Seismic Retrofit :
If Existing - Age :
If Existing - Condition :
Anticipated Time Schedule
Land Acquisition
Year
Estimated Cost
Preliminary Plans
2015/2016
$0
Explain why this project is needed:
Working Drawing
2016/2017
$0
Construction
2016/2017
$40,000,000
Construction of build ings, site and infrastructure to support Education Plan for west valley ..
D Reconstruction
D Equipment
Equipment
2016/ 2017
$0
6/30/2015
Page 45
Occupancy
2018/2019
Calif. Comm. Colleges
District Priority No.:
Five Year Construction Plan
Project Intent And Scope
College Of The Desert
10 West Valley Center
Outline of Project Space - Buildings and Remodelings
Project Primary
Project Secondary
Project Net ASF
Project Net Capacity
Classroom Type Laboratory lOO's 210 - 255
Classrooms, Classroom Service (Room Type lOO's)
Orfice Type 300's
Library Type 400's
AV - TV 530 - 535
Classroom Totals ••••••••.••••••
Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255)
6/30/2015
Page 46
All Other Total ASF
Net ASF/100 Capacity
ASF WSCH WSCH
0 47.3 0
Primary Effect Secondary Effect ASF/100 Capacity ASF/100 Capacity
TOP Code/Description Net ASF WSCH WSCH TOP Code/Description Net ASF WSCH WSCH
Laboratory Totals •..•••.••...••. 0 0
Net ASF per Capacity Office and Office Service Areas (Room Type 300's) ASF FTE FTE
Office Totals ••.••••.••. • ••. 0 140 0.00
0
Calif. Comm. Colleges Five Year Construction Plan
Project Intent And Scope College Of The Desert
District Priority : 11 Desert Hot Springs Site
Project Type : [gJ Site Acquisition
D Replacement
Total Estimated Costs : $1,800,000
[gJ New Construction
0 Infrastructure
Anticipated Source(s) of Funds : Non-State
Type of construction :
Seismic Ret rofit :
If Existing - Age :
If Existing - Condition :
Anticipated Time Schedule
Land Acquisition Preliminary Plans
Year
Estimated Cost
Explain why this project is needed:
2015/2016
$0
Working Drawing
2016/2017
$0
Construct outreach center to support community needs programs.
Construction
2017/2018
$1,800,000
D Reconstruction
0 Equipment
Equipment
2017/2018
$0
6/30/2015
Page 47
Occupancy
2017/2018
Calif . Comm. Colleges
District Priority No.:
Five Year Construction Plan
Project Intent And Scope College Of The Desert
11 Desert Hot Springs Site
Outline of Project Space - Buildings and Remodelings
Project Primary
Project Secondary
Project Net ASF
Project Net Capacity
Classroom Type l aboratory lOO's 210 - 255
Classrooms, Classroom Service (Room Type lOO's)
Office Type 300's
library Type 400's
AV - TV 530 - 535
Classro o m Totals . • •• , ... ••• . •. ,
Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255)
6/30/2015
Page 48
All Other Total ASF
Net ASF/ 100 Capacity
ASF WSCH WSCH
0 47.3 0
Primary Effect Secondary Effect ASF/100 Capacity ASF/100 Capacity
TOP Code/Description Net ASF WSCH WSCH TOP Code/Description Net ASF WSCH WSCH
Laboratory Totals • • •• . • ••••• • . • , 0 0
Net ASF per Capacity Office and Office Service Areas (Room Type 300's) ASF FTE FTE
Office Totals .••••. • • • •.• ••• 0 140 o.oo
0
Calif. Comm. Colleges Five Year Construction Plan
Project Intent And Scope College Of The Desert
District Priority: 12 Remove Alternate Energy Bldig Lecture/Lab from Inventory
Project Type :
Total Estimated Costs :
D Site Acquisition
D Replacement
Anticipated Source(s) of Funds : State
Type of construction :
Seismic Retrofit :
I f Existing - Age :
If Existing - Condition :
Anticipated Time Schedule
D New Construction
D Infrastructure
Land Acquisition Preliminary Plans Working Drawing Construction
Year
Estimated Cost
Explain why this project is needed:
D Reconstruction
D Equipment
Equipment
6/30/2015
Page 49
Occupancy
2015/2016
All vocational ed classes except for Automotive Technology are relocating to a new building. Lecture Lab and Office to be placed offli ne in next Space Inventory
Calif. Comm. Colleges
District Priority No.:
Five Year Construction Plan Project Intent And Scope
College Of The Desert
12 Remove Alternate Energy Bldig Lecture/Lab from Inventory
Outline of Project Space - Buildings and Remodelings
Project Primary
Project Secondary
Project Net ASF
Project Net Capacity
Classroom Type Laboratory lOO's 210 - 255
Classrooms, Classroom Service (Room Type lOO's)
Office Type 300's
Library Type 400's
AV -TV 530 - 535
Classroom Totals •••.••••••• • •••
Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255)
6/30/2015
Page 50
All Other Total ASF
Net ASF/100 Capacity
ASF WSCH WSCH
0 47.3 0
Primary Effect Secondary Effect ASF/100 Capacity ASF/100 Capacity
TOP Code/Description Net ASF WSCH WSCH TOP Code/Description Net ASF WSCH WSCH
Laboratory Totals • .. • • ...• •..• •• 0 0
Net ASF per Capacity Orflce and Office Service Areas {Room Type 300's) ASF FTE FTE
Office Totals •..•.•..••..••. 0 140 0 .00
0
Calif. Comm. Colleges
No. Pro.ect LectASF WSCH Occu an
3 Liberal Arts #5 Renovation -6,392 -13,514 2015/2016
Desert - District Offices*
Lecture Actual~)Pro)eeted WSCH O Cumulative Capacity
Capacity/Load Ratio
2016/ 2017
2016/2017 a 0
Five Year Construction Plan
Campus Lecture Capacity/Load Ratios Desert - District Offices*
2017/ 2018
2017/2018 a
-13,514
2018/2019
2018/2019 a
-13,514
2019/2020
2019/2020 a
-13,514
2020/ 2021
2020/2021 a
-13,514
2021/ 2022
2021/2022 a
-13,514
6/ 30/2015
Page 52
2022/ 2023
2022/2023 a
-13,514
Calif. Comm. Colleges
No. Pro'ect Lab ASF WSCH Occu an
3 Liberal Arts #5 Renovation -1,944 -756 2015/2016
Desert - District Offices*
Laboratory Actual*/ProJected WSCH O Cumulative Capacity
Capacity/ Load Ratio
2016/2017
2016/2017 a 0
Five Year Construction Plan
Campus Laboratory Capacity/Load Ratios Desert - District Offices*
2017/2018
2017/2018 a
-756
2018/2019
2018/ 2019 a
-756
2019/2020
2019/ 2020 a
-756
2020/2021
2020/2021 a
-756
2021/2022
2021/ 2022 a
-756
6/ 30/ 2015
Page 53
2022/ 2023
2022/2023 a
-756
Calif. Comm. Colleges
No. Pro·ect Off ASF FTE Occu an 2016/2017
3 Liberal Arts # 5 Renovation -356 -2 2015/ 2016
Desert - District Offices*
4 Administration Building #1 Renovation 3,469 22 2016/2017 93
Desert - District Offices*
Office Actual*/ ProJected F I E 11,766 Cumulative Capacity
Capacity/Load Ratio
2016/ 2017 a 74
Five Year Construction Plan
Campus Office Capacity/Load Ratios Desert - District Offices*
2017/2018 2018/2019 2019/2020
2017/2018 a
93
2018/2019 a 93
2019/ 2020 a
93
2020/2021
2020/ 2021 a 93
2021/2022
2021/ 2022 a 93
6/30/2015
Page 54
2022/ 2023
2022/2023 a
93
Calif. Comm. Colleges
No. Pro.ect Lib ASF Occu an
Library Actual*/ ProJected ASF 132 Cumulative capacity
capacity/Load Ratio
2016/2017
2016/2017 a
132
Five Year Construction Plan
Campus Library Capacity/Load Ratios
Desert - District Offices*
2017/2018
2017/2018 a
132
2018/2019
2018/ 2019 a
132
2019/2020
2019/ 2020 a
132
2020/2021
2020/ 2021 a
132
2021/2022
2021/2022 a
132
6/30/ 201S
Page SS
2022/ 2023
2022/2023 a
132
calif. Comm. Colleges
No. Project
I AVTV I Occupancy ASF
AV/ IV Actual*/ Pro3ected ASF 0 Cumulative capacity
Capacity/Load Ratio
2016/2017
2016/ 2017 0 0
Five Year Construction Plan
Campus AV/ TV Capacity/ Load Ratios Desert - District Offices*
2017/2018 2018/2019 2019/ 2020
2017/2018 0 0
2018/2019 0 0
2019/2020 0 0
2020/ 2021
2020/2021 0 0
2021/2022
2021/2022 0 0
6/30/ 2015
Page 56
2022/2023
2022/2023 0 0
Calif. Comm. Colleges
Campus Load Distribution Reference: Chancellor's Office Forecast
Instructional Staff FTE
Actual Fall
2013 0
2014 0
Forecast
2015 0
2016 0
2017 0
2018 0
2019 0
2020 0
2021 0
Five Year Construction Plan
Load Distribution and Staff Forecast Desert - District Offices*
Total Campus Off-Campus On-Campus WSCH WSCH WSCH
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0
0
6/30/2015
Page 57
P.E. On-Campus Laboratory On-Campus Laboratory
WSCH Lecture WSCH WSCH
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
0 0 0
Calif. Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast Desert - District Offices*
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus.
a
Instructors
Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al.
Department Administrators
Librarians Include certificated director of audio/visual, et. al.
Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of I nstruction, Director of Data Processing, et. al.
Fall 2015 Totals
Column (b) is the total number of Column (a) distributed to categories
Total Certificated Instructional and
Statutory Staff FTE b
0.0
Column (c) Is the fraction of time express as Full-Time Equivalents devoted to noninstructional work.
Non-Instructional Portion of FTE
c
0.0
Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties.
6/30/2015
Page 58
Net Total I nstructional and
Statutory Staff FTE (b-c)
d
0.0
Calif . Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast Desert - District Offices*
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose ofnce Is located off-campus.
a
Instructors
Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al.
Department Administrators
Librarians Include certificated director of audio/visual, et. al.
Institutional Administrators Include certificated persons with responsibili ties covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al.
Fall 2016 Totals
Column (b) Is the total number of Column (a) distributed to categories
Total Certificated Instructional and
Statutory Staff FTE b
0.0
Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work.
Non-Instructional Portion of FTE
c
0.0
Counselors, department administrators, and statutorily required staff are counted as if they had no nonlnstructlonal duties.
6/30/2015
Page 59
Net Total Instructional and
Statutory Staff FTE (b-c)
d
0.0
Ca lif. Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast Desert - District Offices*
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office Is located off·campus.
a
Instructors
Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and T itle 5 required staff, et. al.
Department Administrators
Librarians Include certificated director of audio/visual, et. al.
Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al.
Fall 2017 Totals
Column (b) is the total number of Column (a) distributed to categories
Total Certificated I nstructional and
Statutory Staff FTE b
0.0
Column ( c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work.
Non-Instructional Portion of FTE
c
0.0
Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties.
6/30/2015
Page 60
Net Total Instructional and
Statutory Staff FTE (b-c)
d
0.0
Calif. Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast Desert - District Offices*
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus.
a
Instructors
Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al.
Department Administrators
Librarians Include certificated director of audio/ visual, et. al.
Institutional Administrators Include certi ficated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al.
Fall 2018 Totals
Column (b) is the total number of Column {a) distributed to categories
Total Certificated Instructional and
Statutory Staff FfE b
0.0
Column {c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work.
Non-Instructional Portion of FfE
c
0.0
Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties.
6/30/20 15
Page 61
Net Total Instructional and
Statutory Staff FfE (b-c)
d
0.0
calif. Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast Desert - District Offices*
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus.
a
Instructors
Counselors Include certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al.
Department Administrators
Librarians Include certificated director of audio/visual, et. al.
Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al.
Fall 2019 Totals
Column (b) is the total number of Column (a) distributed to categories
Total Certi ficated Instructional and
Statutory Staff FTE b
0.0
Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work.
Non-Instructional Portion of FTE
c
0.0
Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties.
6/30/2015
Page 62
Net Total Instructional and
Statutory Staff FTE (b-c)
d
0.0
Calif. Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast Desert - District Offices*
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus.
a
Instructors
Counselors I nclude certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 requ ired staff, et. al.
Department Administrators
Librarians Include certificated director of audio/visual, et. al.
Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al.
Fall 2020 Totals
Column (b) is the total number of Column (a) distributed to categories
Total Certificated Instructional and
Statutory Staff FfE b
0.0
Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work.
Non-I nstructional Portion of FfE
c
0.0
Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties.
6/30/2015
Page 63
Net Total Instructional and
Statutory Staff FfE (b-c)
d
0.0
Calif. Comm. Colleges Five Year Construction Plan
Load Distribution and Staff Forecast Desert - District Offices*
Campus Worksheet for Computing FTE Instruction Staff College Instructional Staff, Fall Term. Included are all certificated staff for day, extended day, and adult education except those whose office is located off-campus.
a
Instructors
Counselors I nclude certificated special program coordinators, economic opportunity program, coordinators, statutory and Title 5 required staff, et. al.
Department Administrators
Librarians Include certificated director of audio/visual, et. al.
Institutional Administrators Include certificated persons with responsibilities covering the entire institution, such as Superintendent, Assistant Superintendent, President, Dean of Instruction, Director of Data Processing, et. al.
Fall 2021 Totals
Column (b) is the total number of Column (a) distributed to categories
Total Certificated Instructional and
Statutory Staff FTE b
0.0
Column (c) is the fraction of time express as Full-Time Equivalents devoted to noninstructional work.
Non-Instructional Portion of FTE
c
0.0
Counselors, department administrators, and statutorily required staff are counted as if they had no noninstructional duties.
6/30/2015
Page 64
Net Total Instructional and
Statutory Staff FTE (b-c)
d
0.0
Calif. Comm. Colleges Five Year Construction Plan Cum Sum of Existing and Proposed Space, 2016 - 2022
Desert - District Offices*
Cumulative Summa~ of Existing and ProQosed Areas1 2016-2022
Priority and AV Radio Year of Classroom Laboratory Office Library TV P.E. Assembly
Occupancy lOO's 200's 300's 400's 530 - 535 520 - 525 610 - 625 a b d h
Total ASF 11,766
3 2015/2016 Liberal Arts # 5 Renovation -6,392 156 -356 1,700 -6,392 156 11410 l 700
4 2016/2017 Administration Building # 1 Renovation 3,469
14 879
Total Existing and Proposed Space
-6,392 156 14,879 132 1,700
6/30/2015
Page 65
I nactive All Other 050 - 070 Areas
16,935
1,200 -3,692 6,237 13 243
565 4,034 6 802 17 277
6,802 17,277
Calif. Comm. Colleges Five Year Construction Plan
Capacity of Net Existing On-Campus ASF Desert - District Offices*
Classrooms, Classroom Service (Room Type lOO's)
Totals ......... • ... . .
Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255) ASF/ 100 Capacity
TOP Code/Description Net ASF WSCH WSCH TOP Code/Description
Office and Office Service Areas (Room Type 300's)
Totals ... .. ... . ..... .
6/30/2015
Page 66
Net ASF/100 Capacity ASF WSCH WSCH
0 4~3 0
ASF/100 Capacity Net ASF WSCH WSCH
Net ASF per Capacity ASF FTE FTE
11, 766 160 74
Calif. Comm. Colleges Five Year Construction Plan
Project Intent And Scope Desert - District Offices*
6/30/2015
District Priority : 3 Liberal Arts #5 Renovation
Project Type : D Site Acquisition
D Replacement
Total Estimated Costs : $7,670,000
D New Construction
D Infrastructure
181 Reconstruction
0 Equipment
Page 67
Anticipated Source(s) of Funds : Non-State
Type of construction :
Seismic Retrofit :
If Existing - Age :
If Existing - Condition :
Anticipated Time Schedule
Land Acquisition Preliminary Plans Working Drawing Construction Equipment Occupancy
Year 2015/2016
Estimated Cost
2010/2011
$0
2014/2015
$0
2016/2017
$7,670,000
2016/2017
$0
Explain why this project is needed: Renovate the existing Liberal Arts Building #5 to house District Administrative Offices, Center for Training and Development, and Institutional Effectiveness support space and offices. Reactivate space that will be deactivated when Communications functions are relocated to the Communications and Community Center.
Space in the Liberal Arts building will be vacated for renovation Other spaces in the Liberal Arts Building 115 are available for reuse after functions are relocated to the new Communications and Community Center (2439 asf inactive).
Space in the Registration Building #10 will be vacated (900 asf in terdisciplinary lab, 606 asf office) and the building will be removed.
Calif. Comm. Colleges
District Priority No.:
Five Year Construction Plan
Project Intent And Scope
Desert - District Offices*
3 Liberal Arts #5 Renovation
Outline of Project Space - Buildings and Remodelings Classroom Type Laboratory Office Type Library Type
Project Primary
Project Secondary
Project Net ASF
Project Net Capacity
Classrooms, Classroom Service (Room Type l OO's)
l OO's 210 - 255
-6,392
-6,392
2,100
- 1,944
156
300's 400's
250
-606
-356
AV-lV 530- 535
1,700
1,700
Classroom Totals .. . •.• .. .•....•
Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255)
6/30/2015
Page 68
All Other Total ASF
1,200 5,250
-8,942
1,200 -3,692
Net ASF/100 Capacity
ASF WSCH WSCH
-6,392 47.3 -13,514
Primary Effect Secondary Effect ASF/100 Capacity
TOP Code/Description Net ASF WSCH WSCH
Office and Office Service Areas (Room Type 300's)
TOP Code/Description
1300 Nutrition, Foods, and Culinary Arts 4900 Interdisclpllnary Studies
Laboratory Totals ......•....•. , .
Office Totals •....• , •. .... •.
ASF/100 Capacity Net ASF WSCH WSCH
-1,044 257 -406 --·~90_0_ 257 -350
-1,944 -756
Net ASF per capacity ASF FTE ITT
-356 160 -2
Calif. Comm. Colleges Five Year Construction Plan
Proje ct Intent And Scope Desert - District Offices*
District Priority: 4 Administration Building #1 Renovation
Project Type : D Site Acquisition
D Replacement
Total Estimated Costs : $8,000,000
Anticipated Source(s) of Funds : Non-State
Type of construction :
Seismic Retrofit :
If Existing - Age :
If Existing - Condition :
Anticipated Time Schedule
Land Acquisition Preliminary Plans
Year
Estimated Cost
Explain why this project is needed:
2010/2011
$0
D New Construction
D Infrastructure
Working Drawing
2014/2015
$0
Construction
2016/2017
$8,000,000
~ Reconstruction
D Equipment
Equipment
2016/2017
$0
6/30/2015
Page 69
Occupancy
2016/2017
Renovate the existing Administration Building # 1 to consolidate administration functions including the President, Business Services, Human Resources, FAculty Senate, Public Information and Foundation.
Spaces in the Administration Building # 1 wi ll be vacated for renovation (3492 asf office, 435 asf meeting)
Other spaces in the Administration Building #1 are available for reuse after functions are relocated to the new Student Center (4034 asf inactive).
The following buildings will be vacated and removed: Admin Services - Personnel #35 (3680 office, 362 meeting) Central Annex #3 (2880 asf meeting)
Calif. Comm. Colleges
District Priority No.:
Five Year Construction Plan
Project Intent And Scope Desert - Dist rict Offices*
4 Administration Building #1 Renovation
Outline of Project Space - Buildings and Remodelings
Project Primary
Project Secondary
Proj ect Net ASF
Project Net Capacity
Classroom Type Laboratory lOO's 210 - 255
Classrooms, Classroom Service (Room Type lOO's)
Office Type 300's
6,961
-3,492
3,469
Library Type 400's
AV-TV 530 - 535
Classr oom Totals . • •• . • ••• .. • •. •
Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255)
Alf Other
1,000
-435
565
6/30/2015
Page 70
Total ASF
7,961
-3,927
4,034
Net ASF/100 capacity
ASF WSCH WSCH
0 47.3 0
Primary Effect Secondary Effect ASF/100 Capacity ASF/100 Capacity
TOP Code/Descript ion Net ASF WSCH WSCH TOP Code/Description Net ASF WSCH WSCH
Laboratory Totals •••• .• •.. . •. . •. 0 0
Net ASF per Capacity Office and Office Service Areas (Room Type 300's) ASF FTE FTE
Office Tota ls ••.• • ••.. . • .•. • 3,469 160 22
Calif. Comm. Colleges Five Year Construction Plan
Project Intent And Scope Desert - District Offices*
Distr ict Priority : 5 Transfer Art Bldg to District Inventory
Project Type :
Total Estimated Costs :
D Site Acquisition
D Replacement
Anticipated Source(s) of Funds : State
Type of construction :
Seismic Retrofit :
If Existing - Age :
If Existing - Condition :
Anticipated Time Schedule
D New Construction
D Infrastructure
Land Acquisition Preliminary Plans Working Drawing Construction
Year
Estimated Cost
Explain why this project is needed:
D Reconstruction
D Equipment
Equipment
6/30/2015
Page 71
Occupancy
2014/2015
After Visual Arts programs vacate the Art Bui lding #26, transfer the Art Building to the District inventory and reuse for District maintenance.
Calif. Comm. Colleges
District Priority No.:
Five Year Construction Plan
Project Intent And Scope Desert - District Offices*
5 Transfer Art Bldg to District Inventory
Outline of Project Space - Buildings and Remodelings
Project Primary
Project Secondary
Project Net ASF
Project Net Capacity
Classroom Type Laboratory IOO's 210 • 255
Classrooms, Classroom Service (Room Type lOO's)
Office Type 300's
Library Type 400's
AV·TV 530. 535
Classroom Tota l s •••..••••••••••
Laboratories and Laboratory Service Areas (Room Types 210, 215, 220, 225, 230, 235, 255)
6/30/2015
Page 72
All Other Total ASF
13,605 13,605
13,605 13,605
Net ASF/100 Capacity
ASF WSCH WSCH
0 47.3 0
Primary Effect Secondary Effect ASF/100 Capacity ASF/100 Capacity
TOP Code/Description Net ASF WSCH WSCH TOP Code/Description Net ASF WSCH WSCH
Laboratory Totals •..•••• . ... . .•• 0 0
Net ASF per Capacity Office and Office Service Areas (Room Type 300's) ASF FTE FTE
Office Totals •.•••.••.••.••• 0 160 0