20160428 201518 mp02 d redlynch draft masterplan · 25 50 100 150m st andrew’s goomboora park...

1
N PO Box 8187 Wynnum North QLD 4178 [email protected] 0459 273 283 Placemaking I Landscape Architecture I Urban Design Rounsefell Design Rounse ABN: 20 164 429 056 DRAFT Client: Cairns Regional Council DRAFT MASTERPLAN SCALE 1:2500 @ A1/ 1:5000 @ A3 DWG NO. 201518-MP02 REVISION D DATE: 28 APRIL 2016 Redlync h Masterplan 25 50 100 150M GOOMBOORA PARK ST ANDREW’S CATHOLIC COLLEGE POWERLINK SITE REDLYNCH CENTRAL SHOPPING CENTRE MCDONALDS PETROL STATION INDOOR STADIUM (FUTSAL) FRESHWATER CHRISTIAN COLLEGE STATE GOVERNMENT LAND 8 2 6 GLENOMA PARK “BIG ISLAND” DRAINAGE CHANNEL field 1 field 2 field 3 field 4 existing parking 40 existing parking 22 existing shared pathway existing footbridge possible future substation site substation buffer zone substation buffer zone existing cane rail and major water and sewer alignment existing cane rail and major water and sewer alignment possible future substation site future powerline easement possible future powerline easement possible future powerline easement existing parking existing child care possible future pool by SACC Freshwater Creek 4 7 5 Freshwater REDLYNCH CONNECTION RD REDLYNCH INTAKE RD LARSEN RD HERITAGE CENTRAL ST HERITAGE S ST CYPRUS DR LOMATIA CL SATINASH CL NORFOLK CIRCUIT PORTELLI ROAD BYRON TCE MICHELANGELO DR BASALT ST VIEW ST LORIDAN DR WINDSOR CL BANNING AVE OPALINE CL BRINSMEAD-KAMERUNGA RD WESTERN ARTERIAL RD CAIRNS OBERSKY CL VILLAGE TCE Creek 1 21 21 21 21 21 21 21 21 21 22 proposed new site entry road with avenue tree planting - road level within dashed area designed above Q5 flood level, including AFL parking area B shared clubhouse elevated above Q100 flood levels - ramp access from field and Portelli Road level AFL clubhouse/ community hub elevated above Q100 flood levels - ramp access from Q5 road/parking level; drop off area east side senior AFL field with lighting - 135m x 165m with 5m runoff AFL field 110m x155m with 5m runoff rectangle field with lighting - 80mx120m with 5 m runoff rectangle field 80mx120m with 5m runoff - junior cricket between fields 6 and 7 on-street 90 degree parking with manoeuvre space direct access from Portelli Road (elevated above fields) new internal site access road and 90 degree parking at grade future clubhouse location future sporting use existing Powerlink electricity pylons on centreline of 20m wide easement; long term constraint - maximum extent (total 120m width shown) of potential future 60m wide power easement subject to final Powerlink design and alignment future parking area for rectangle fields nature play area combined with open kickabout/ event space and shady picnic facilities environment and outdoor education centre above Q100 flood level with ramp access - small cafe facility and minimal toilets - pole construction required due to proximity to creek future sporting use once cane rail operations cease to south and rail no longer required 2 18 3 19 20 21 22 23 23 23 24 24 24 24 20 20 20 20 20 18 18 25 19 19 19 19 4 5 6 7 8 9 9 9 9 10 25 26 27 27 28 29 29 29 29 30 30 31 32 33 32 31 31 31 31 10 11 11 33 12 13 14 15 16 16 15 14 13 1 17 17 12 12 12 LORIDAN DRIVE PARK (BMX JUMPS) UNDERPASS 32 68 100 125 125 A B C G G F E D H I 8 6 18 37 (100) 100 24 overflow parking area connected paths throughout site footbridges/ culverts across watercourses - widths and design as required in each location; small build-out viewing deck in centre of Glenoma Park bridge main 3.5m shared pathway runs length of west side of creek and connects to Goomboora Park to south, Glenoma Park to east, and to wider community path network - alignment to be verified on site to minimise earthworks and avoid existing significant trees new rehabilitation planting along Freshwater Creek - minimum 30m wide west from existing edge of cane field continue existing Treeforce rehabilitation planting area to ‘Big Island’ existing Goomboora Park pathway existing cane rail - 1.8m high fence both sides required for where it passes through the site; long term after can rail no longer required due to development to south, potential rail trail opportunity future link road and parking existing multi-use courts developed into 3 court indoor facility in future new 3.5m connection between footbridge and existing shared path on Cairns Western Arterial Road picnic areas in key locations informal 2m wide deco pathways through forest existing maintenance track along edge of cane field re-used in path network open pockets/ themed planting in rainforest e.g. palm grove to provide different path journey experiences; potential for educational/ botanical learning experiences large existing Leichhardt tree - retain as feature and build paths/road around State Government land - future strategic drainage corridor site boundary minor watercourses/drainage lines Freshwater Creek channel existing extent of 1:100 year flood level through site existing shared path network new parking areas - identifying letter and number of bays NOTE: ALL ROAD AND PARKING LAYOUTS SUBJECT TO TRAFFIC ENGINEER’S DETAIL DESIGN CONFIRMATION ALL INFRASTRUCTURE AND PLANTING WITHIN POWERLINE EASEMENT SUBJECT TO POWERLINK REQUIREMENTS PARKING REQUIREMENTS BASED ON 50 BAYS PER FIELD PLUS 1 ACCESSIBLE PARK PER 50 SPACES; COMMUNITY USE BUILDINGS 1 SPACE PER 15M2 GFA LEGEND 28 28 28 3 RICE’S GULLY OVERFLOW CHANNEL 26 existing amenities 28

Upload: vandien

Post on 22-May-2018

215 views

Category:

Documents


2 download

TRANSCRIPT

N

PO Box 8187 Wynnum North QLD [email protected] 273 283

Placemaking I Landscape Architecture I Urban Design

Rounsefell DesignRounseABN: 20 164 429 056

DRAFTClient: Cairns Regional Council DRAFT MASTERPLAN

SCALE 1:2500 @ A1/ 1:5000 @ A3DWG NO. 201518-MP02REVISION DDATE: 28 APRIL 2016

Redlynch Masterplan

25 50 100 150M

GOOMBOORA PARKST ANDREW’S CATHOLIC COLLEGE

POWERLINK SITE

REDLYNCH CENTRAL SHOPPING CENTRE

MCDONALDS

PETROL STATION

INDOOR STADIUM(FUTSAL)

FRESHWATER CHRISTIAN COLLEGE

STATE GOVERNMENT LAND

8 26

GLENOMA PARK

“BIG ISLAND”

DRAINAGE CHANNEL

fi eld 1 fi eld 2

fi eld 3 fi eld 4

existing parking

40

existing parking

22

existing shared pathway

existing footbridge

possible future substation site

substation buffer zone

substation buffer zone

exist

ing

cane

rail a

nd m

ajor

wat

er a

nd se

wer

alig

nmen

t

exist

ing

cane

rail a

nd m

ajor

wat

er a

nd se

wer

alig

nmen

t

possible future substation site

future powerline easement

possible future

powerline easement

possible future

powerline easement

existing parking

existing child care

possible future pool by SACC

Fres

hwat

erC

reek

4

7

5

Freshwater

REDL

YNC

H C

ON

NEC

TION

RD

REDL

YNC

H IN

TAKE

RD

LARSEN RD

HERIT

AGE CEN

TRAL S

T

HERI

TAG

E S

ST

CYP

RUS

DR

LOM

ATIA

CL

SATIN

ASH

CL

NORFOLK CIRCUIT

PORT

ELLI

RO

AD

BYRON TCE

MICHELANGELO DR

BASALT ST

VIEW ST

LORIDAN DR

WIN

DSO

R C

L

BANN

ING

AVE

OPA

LIN

E C

L

BRINSMEAD-KAMERUNGA RD

WESTERN

ARTERIALRD

CAIRNS

OBERSKY CL

VILLAGE TCE

Creek

1

21

21

21

21

21

21

2121

21

22

proposed new site entry road with avenue tree planting - road level within dashed area designed above Q5 fl ood level, including AFL parking area B

shared clubhouse elevated above Q100 fl ood levels - ramp access from fi eld and Portelli Road level

AFL clubhouse/ community hub elevated above Q100 fl ood levels - ramp access from Q5 road/parking level; drop off area east side

senior AFL fi eld with lighting - 135m x 165m with 5m runoff

AFL fi eld 110m x155m with 5m runoff

rectangle fi eld with lighting - 80mx120m with 5 m runoff

rectangle fi eld 80mx120m with 5m runoff - junior cricket between fi elds 6 and 7

on-street 90 degree parking with manoeuvre space direct access from Portelli Road (elevated above fi elds)

new internal site access road and 90 degree parking at gradefuture clubhouse location

future sporting use

existing Powerlink electricity pylons on centreline of 20m wide easement; long term constraint - maximum extent (total 120m width shown) of potential future 60m wide power easement subject to fi nal Powerlink design and alignment

future parking area for rectangle fi elds

nature play area combined with open kickabout/ event space and shady picnic facilities

environment and outdoor education centre above Q100 fl ood level with ramp access - small cafe facility and minimal toilets - pole construction required due to proximity to creek

future sporting use once cane rail operations cease to south and rail no longer required

2

18

3

19

20

21

22

23

23

23

24

24

24

24

20

20

20

20

20

18

18

25

19

19

19

19

4

5

6

7

8

9

9

9

9

1025

26

27

27

28

29

29

29

29

30

30

31

32

33

32

31

31

31

31

10

11

11

33

12

13

14

15

16

16

15

14

13

1 17

17

12

12

12

LORIDAN DRIVE PARK (BMX JUMPS)

UNDERPASS

32

68

100

125

125

A

B

C

G

G

F

E

D

H

I8

6

18

37

(100)

100

24

overfl ow parking area

connected paths throughout site

footbridges/ culverts across watercourses - widths and design as required in each location; small build-out viewing deck in centre of Glenoma Park bridge

main 3.5m shared pathway runs length of west side of creek and connects to Goomboora Park to south, Glenoma Park to east, and to wider community path network - alignment to be verifi ed on site to minimise earthworks and avoid existing signifi cant trees

new rehabilitation planting along Freshwater Creek - minimum 30m wide west from existing edge of cane fi eld

continue existing Treeforce rehabilitation planting area to ‘Big Island’

existing Goomboora Park pathway

existing cane rail - 1.8m high fence both sides required for where it passes through the site; long term after can rail no longer required due to development to south, potential rail trail opportunity

future link road and parking

existing multi-use courts developed into 3 court indoor facility in future

new 3.5m connection between footbridge and existing shared path on Cairns Western Arterial Road

picnic areas in key locations

informal 2m wide deco pathways through forest

existing maintenance track along edge of cane fi eld re-used in path network

open pockets/ themed planting in rainforest e.g. palm grove to provide different path journey experiences; potential for educational/ botanical learning experiences

large existing Leichhardt tree - retain as feature and build paths/road around

State Government land - future strategic drainage corridor

site boundary

minor watercourses/drainage lines

Freshwater Creek channel

existing extent of 1:100 year fl ood level through site

existing shared path network

new parking areas - identifying letter and number of bays

NOTE: ALL ROAD AND PARKING LAYOUTS SUBJECT TO TRAFFIC ENGINEER’S DETAIL DESIGN CONFIRMATION

ALL INFRASTRUCTURE AND PLANTING WITHIN POWERLINE EASEMENT SUBJECT TO POWERLINK REQUIREMENTS

PARKING REQUIREMENTS BASED ON 50 BAYS PER FIELD PLUS 1 ACCESSIBLE PARK PER 50 SPACES; COMMUNITY USE BUILDINGS 1 SPACE PER 15M2 GFA

LEGEND

28

28

28

3

RICE’S GULLY

OVERFLO

W CHANNEL

26

existing amenities

28