2016 t 114 addendum 1 - niagara region, ontario, canada · pdf filessp 34 adjusting and...
TRANSCRIPT
THE REGIONAL MUNICIPALITY OF NIAGARA
2016-T-114 Contract RN 16-14
Reconstruction of Regional Road 20 at South Grimsby Road 5 Intersection from
Streamside Drive to 170 m East of South Grimsby Road 5
In the Township of West Lincoln
A D D E N D U M N O. 1
I) DIRECTIVE
This Addendum shall form an integral part of the specifications and plans for the above project and shall
be read in conjunction therewith. This Addendum shall, however, take precedence over all requirements
of the previously issued specifications and plans with which it may prove to be at variance, unless
otherwise clarified by the Engineer.
This Addendum must be signed by the Tenderer in the appropriate space and must be attached to the
Form of Tender for submission at the time of tendering. Tenders not including this Addendum, signed
as required, may be rejected as informal.
II) CLARIFICATION/REVISIONS
1. NOTICE PAGE
Remove and replace NOTICE page with Addendum No. 1 NOTICE page.
2. FORM OF TENDER
Remove Pages FT 4 through FT 19, and Replace with Pages Addendum No. 1 FT 4 through
Addendum No. 1 FT 23
Items Modified in Addendum No. 1
- Items C2 to C5 shall be PVC DR 35 or rigid pipe CL65-D Storm Sewers
- Item C20 a), b) quantity to be revised to two (2) each for each item
- Section G Bell Relocation work
3. SPECIAL PROVISIONS – SUPPLEMENTAL SPECIAL PROVISIONS
Remove and replace page 33 with 33 – Addendum No. 1
SSP 34 Adjusting And Rebuilding Existing Maintenance Holes and Catch Basins
Replace 75 mm with 300mm
4. SCHEDULE OF DRAWINGS
Add Page SD-2 Addendum No. 1.
Drawings attached to Addendum No. 1
5. APPENDIX A
Bell Approved Civil Structures Contractors
2016-T-114
Contract RN 16-14 Reconstruction of Regional Road 20 at South Grimsby Road 5 Intersection from
Streamside Drive to 170 m East of South Grimsby Road 5
In the Township of West Lincoln
Addendum No. 1
- 2 -
Date Issued: Monday, August 22, 2016
Signature: Jeff Mulligan
Manager Purchasing Services
THE TENDERER SHALL ADJUST HIS BID PRICE ACCORDING TO THE CHANGES SPECIFIED IN
THIS ADDENDUM.
Tenderer’s Signature:
Company Name:
Date:
Addendum No. 1
NOTICE
This contract utilizes the Niagara Peninsula Standard Contract Document (Revision 17). This
document constitutes the specification for this project and must be utilized in preparing bids for
tenders or quotations.
The Niagara Peninsula Standard Contract Document is available on-line at the “Bid
Opportunities” section of the Regional Municipality of Niagara website (www.niagararegion.ca).
Contracts issued through tender calls and quotations will reference the Standard Document and
the responsibility for obtaining or having access to the Document will rest with the bidder. The
Standard Document can be utilized on all projects which clearly indicate reference and use of the
Niagara Peninsula Contract Document.
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
Bonding
a) 100% Performance. Labour and Materials Bond LS 1
A2 A2 SSP 8 Pre-Construction Survey LS 1
A3 A3 SSP 9 Site Office LS 1
A4 A4 Construction Layout LS 1
Clearing and Grubbing
a) Remove and dispose of bush, including hedges and roots, and trees less than 100 mm
diameter
LS 1
b) Tree and stump removal - greater than or equal to 100mm diameter each 12
A6 A8 SSP 10 Construction Signs, Traffic Control and Traffic Management Plan LS 1
A7 A9 Contingency Allowance LS 1 200,000 200,000
Subtotal Section A
Section A - General
RN 16-14
2016-T-114
Spec. No.
A1 A1
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
A5 A5
OPSS 201
Addendum No. 1 FT 4
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
Removals
B1 B27
OPSS. MUNI
510
SSP 15 Partial Depth Asphalt Removal - Milling m² 273
B2 B27
OPSS. MUNI
510
SSP 15 Removal of Concrete Curb and Gutter m 38
B3 B27
OPSS. MUNI
510
SSP 15
SSP 29
Remove, Store and Reinstall Wood Curb m 8
B4 B27
OPSS. MUNI
510
SSP 15 Removal of Concrete Sidewalk m² 120
B5 B27
OPSS. MUNI
510
SSP 15 Removal of Catchbasins, Ditch Inlets, Manholes, Including Plugging of Openings each 4
B6 B27
OPSS. MUNI
510, OPSS
MUNI 772
SSP 15
SSP 27
Remove, Store and Reinstall Chain Link Fence m 12
B7 B27 ,
OPSS. MUNI
510, OPSS
MUNI 721
SSP 15
SSP 33
Remove, Salvage and Reinstate Steel Beam Guide Rail m 162
B8 B27
OPSS. MUNI
510
SSP 15
SSP 17
Removal of Any Buried Pipes, Conduit, Etc. (Provisional) m 500
B9 B27
OPSS. MUNI
510
SSP 15
SSP 16
Removal of Culverts, Diameter Less Than 500 mm m 110
B10 B27
OPSS. MUNI
510
SSP 15
SSP 16
Removal of Culverts, Diamter Equal to, or Greater Than, 500 mm m 90
B11 B2
OPSS 180
OPSS.
MUNI 206
SSP 19 Earth Excavation (Grading), Including Full Depth Asphalt Removal m³ 8,600
B12 B14
OPSS 310
SSP 20 Hot Mix HL-3 HS (50 mm lift) (2017) t 700
B13 B14
OPSS 310
SSP 21 Hot Mix HL-8 HS (100 mm in 2 x 50 mm lifts) (2016) t 1,500
B14 B15
OPSS 311
Hot Mix HL-3F for Driveways (2016) t 25
B15 B12
OPSS 310
Tack Coat (2017) m² 4,900
B16 B3, B18,
OPSS 314,
OPSS 351,
OPSS 410,
OPSS 421,
OPSS 701
SSP 22 Granular 'A' Crushed Limestone 12,000
B17 B8
OPSS 353
SSP 23 Concrete Curb and Gutter (OPSD 600.040) (2016) m 800
B18 B8
OPSS 353
SSP 24 Concrete Curb and Gutter (OPSD 600.040) (2017) m 20
B19 B9
OPSS 351
SSP 25 Concrete Sidewalk m² 880
Section B - Roadwork, Pavement Marking & Signs
Addendum No. 1 FT 5
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
B20 B34 Tactile Warning Surfaces (610 mm Plates) each 10
B21 B6
OPSS 405
SSP 26 100 mm Diameter Pipe Subdrains m 667
B22 OPSS 721 Steel Beam Guide Rail (OPSD 912.130) m 14
B23 A7
OPSS 805
OPSS 1860
SSP 12 Silt Fence m 281
B24 OPSS 805 SSP 14 Straw Bale each 10
B25 OPSS 565 SSP 13 Barrier for Tree Protection m 95
B26 B21
OPSS 802,
203
SSP 28 50mm Imported Topsoil and Sod (2016) m² 300
B27 B22 50 mm Imported Topsoil, Seed and Mulch (2016) m² 4,000
B28 OPSS 565 SSP 53 Supply and Install Trees, 60 mm Caliber, Species per Approved Niagara Regional Listing each 10
Pavement Markings and Signs
B29 OPSS 710 SSP 30 Pavement Markings, Temporary (2016)
a) Temporary Pavement Marking m 770
b) Temporary Pavement Marking - Symbols each 3
B30 OPSS 532 SSP 31 Pavement Markings , Durable (2017)
a) Solid White - 100 mm Wide m 880
b) Solid Yellow - 100 mm Wide m 540
c) Solid White - 600 mm Wide m 120
d) Solid White - 100 mm Wide Cross Banding m 136
e) 333 Broken White - 100 mm Wide m 106
f) Symbols each 18
B31 B27
OPSS 706
OPSS MUNI
510
SSP 32 Remove, Salvage and Reinstall Signs each 3
B32 B27
OPSS 706
OPSS MUNI
SSP 32 Install new ground-mounted signs (Posts and Signs supplied by Niagara Region) each 16
Subtotal Section B
Addendum No. 1 FT 6
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
Storm Sewers
C1 C1, C2
OPSS 410
250 mm Dia. PVC DR-35 Catchbasin Leads m 60
C2 C1, C2
OPSS 410
300 mm Dia. PVC DR-35 or rigid pipe CL65-D Storm Sewers m 145
C3 C1, C2
OPSS 410
375 mm Dia. PVC DR-35 or rigid pipe CL65-D Storm Sewers m 45
C4 C1, C2
OPSS 410
450 mm Dia. PVC DR-35 or rigid pipe CL65-D Storm Sewer m 32
C5 C1, C2
OPSS 410
900 mm Dia. PVC DR-35 or rigid pipe CL65-D Storm Sewers m 141
C6 C1, C2
OPSS 410
300 mm Dia. HDPE Culvert m 7
C7 C1, C2
OPSS 410
400 mm Dia. HDPE Culvert m 10
C8 C1, C2
OPSS 410
560 mm Dia. HDPE Culvert m 8
C9 C1, C2
OPSS 410
630 mm Dia. HDPE Culvert m 24
C10 C1, C2
OPSS 410
800 mm Dia. HDPE Culvert m 40
C11 C4
OPSS 410
Break Into Manholes, Catchbasins,Ditch Inlets, Culverts and Sewers, and Ensure Watertight
Connection
each 3
Catchbasins and Manholes
C12 C6
OPSS 407
SSP 35 600 mm x 600 mm Catchbasin (OPSD 705.010) each 9
C13 C6
OPSS 407
SSP 35 600 mm x 1450 mm Twin Inlet Catch Basin (OPSD 705.020) each 1
C14 C6
OPSS 407
SSP 35 1200 mm Dia. Storm Manhole (OPSD 701.010) each 5
C15 C6
OPSS 407
SSP 35 1500 mm Dia. Storm Manhole (OPSD 701.011) each 2
C16 C6
OPSS 407
SSP 35 2400 mm Dia. Storm Manhole (OPSD 701.013) each 1
C17 OPSS 407 Connect Existing Storm Sewer to New Structure each 1
C18 C6
OPSS 407
SSP 35 600 mm x 600 mm Ditch Inlet (OPSD 705.030) each 2
C20 B13
OPSS 408
SSP 34 Adjust/Rebuild Existing Manholes, Catchbasins, Ditch Inlets
a) Adjustments each 2
b) Rebuild each 2
C21 B13
OPSS 408
SSP 34 Adjust Catchbasins, Valves and MHs to Finished Grade (2017) each 18
C22 B20
OPSS 511
Hand Laid Rip Rap Including Filter Cloth m² 30
Section C - Sewers and Culverts
Addendum No. 1 FT 7
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
Sanitary Sewers (Remove and Replace)
C22 C1
OPSS 410
SSP 36 250 mm Dia. PVC DR-35 Sanitary Sewers m 125
C23 C2
OPSS 410
SSP 36 125 mm Dia. PVC DR-28 Sanitary Laterals m 24
C24 OPSS 407 Connect Existing Sanitary Sewer to New Structure each 1
C25 C4
OPSS 410
Reconnect Existing Sanitary Lateral each 3
C26 C6
OPSS 407
SSP 35
SSP 36
1200 mm Dia. Sanitary Manhole each 1
C27 C4
OPSS 410
Break into Existing Sanitary Manhole each 1
C28 B13
OPSS 408
SSP 34 Adjust Existing Sanitary Manholes
a) Adjustments each 1
b) Rebuild each 1
C29 B13
OPSS 408
SSP 34 Adjust Sanitary Manholes to Finished Grade (2017) each 3
C30 C7 Cleanouts each 1
C31 C5
OPSS 409
SSP 37 Flushing and CCTV Inspection of Sanitary Sewer m 125
Subtotal Section D
Addendum No. 1 FT 8
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
D1 D1 SSP 41 150 mm PVC DR18 Watermain m 110
D2 D1 SSP 41 200 mm PVC DR18 Watermain m 40
D3 D13 SSP 42 Watermain Testing and Disinfection LS 1
D4 D2 SSP 41 150 mm Gate Valve and Box each 3
D5 D2 SSP 41 200mm Gate Valve and Box each 1
D6 SSP 41 Connect to Existing 150 mm AC Watermain each 2
D7 SSP 41 Connect to Existing 200 mm PVC Watermain each 1
D8 D4
OPSS 441
SSP 41
SSP 38
25 mm Type 'K' Soft Copper Water Service m 4
D9 D6
OPSS 441
SSP 41
SSP 39
25 mm Curb Stop and Stem each 2
D10 D7
OPSS 441
SSP 41
SSP 39
25 mm Curb Box each 2
D11 SSP 41 25 mm Main Stop each 2
D12 D10 SSP 41 Cathodic Protection of Watermains
a) Type DZP 550-12 (all services, fittings, valves and plugs) each 14
b) Type DZP 1110-24 (each hydrant assembly, multiple fittings (up to 3)) each 4
D13 D1, D3
OPSS 441
SSP 40 Relocate Existing Hydrant and Supply and Install New Secondary Valve each 2
D14 D1, D3
OPSS 441
SSP 40 Relocated Existing Hydrant and Adjust Secondary Valve each 1
D15 D1, D3
OPSS 441
SSP 40 Adjust Existing Hydrant and Secondary Valve each 2
D16 D9 SSP 43 Insulate Existing Watermain and Services (Provisional) m² 80
Subtotal Section E
Section D - Watermain
Addendum No. 1 FT 9
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
E1 SSP 44
SSP 45
Construction Layout (to be Approved by Skilled Trades Manager - Signals, prior to
construction)
(a) Site Layout LS 1
E2 OPSS 908
B28
Steel Handrail per OPSD 980.101 Pedestrian Barricade (Provisional) m 16
E3 SSP 44
SSP 46
Concrete Footings and Pads
(a) Type 3 - Concrete Pole Base - 2.15 m deep ea 3
i) additional hydrovac excavation (Provisional) ea 1
(b) Type 6 - Concrete Pole Base - 2.60 m deep ea 2
ii) additional hydrovac excavation (Provisional) ea 1
E4 SSP 44
SSP 47
Conduit
(a) Supply and Install 1-100 mm and 1-50 mm PVC Conduit m 85
b) Supply and Install 1-50mm PVC Conduit m 35
E5 SSP 44
SSP 48
Cable Installation (supplied by Region)
a) Install 4 conductor cable (cameras, 3 section heads) m 25
b) Install 7 conductor cable (ped heads) m 10
c) Install 25 conductor cable (traffic signals) m 65
d) Install Beldon cable - black/red (audible push buttons) m 55
e) Install RWU90 CSA 12 AWG (tracer cable) m 70
Supply and Install
f) Supply and Install #6 cable - black/white (illumination underground) m 70
g) Supply and Install #6 cable - green (ground) m 60
h) Supply and Install #8 cable - black/white (power supply) m 25
i) Supply and Install 12/2 cable (illumination riser) m 15
E6 SSP 44
SSP 49
Junction Boxes (supplied by Region)
(a) Install 330 x 600 mm junction box (signal plant) ea 9
Section E - Traffic Signals
Addendum No. 1 FT 10
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
E7 SSP 44
SSP 50
Poles (supplied by Region)
a) Install Sectional Steel Poles - Direct Buried (supplied by Region)
i) Type 6 - 7.0m (power pole) ea 1
b) Install Section steel poles - Base Mounted (Supplied by Region)
i) Type 3 - 5.4m tall (school zone flasher or stop sign flasher) ea 3
ii) Type 6 - 6.3m tall (signal pole w/o luminaire/camera) ea 1
iii) Type 6 - 10.5m tall (signal pole with luminaire/camera) ea 1
E8 SSP 44
SSP 51
Signal Mast Arms (supplied by Region)
a) Install traffic signal mast arm of appropriate length to position signal head at standard
location
i) 1.2m to 7.6m mast arm ea 2
E9 SSP 44 Appertanences (supplied by Region)
a) Install luminaire bracket / arm ea 1
E10 SSP 44
SSP 52
Grounding Rods
a) Supply and Install grounding rods including all wires necessary for connection ea 7
Subtotal Section F
Addendum No. 1 FT 11
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
F1 B23
OPSS 506
Calcium Chloride t 10
F2 B24
OPSS 506
Water for Compaction and Dust Control m³ 2,500
F4 B1 SSP54 Test Pits by Hydrovac each 10
F12 C4
OPSS 410
SSP 56 Connection of Private Drians to Storm Sewers or Structures (all sizes) m 20
F13 C4
OPSS 410
Reconnect Existing Sanitary Lateral each 3
F14 OPSS 401 SSP 55 Unshrinkable Fill m³ 25
F15 SSP 18 Removal of AC Pipes m 50
F16 C6
OPSS 407
SSP 57 Supply and Install CB Frame and Grate (OPSD 400.080) each 8
F17 SSP 58 Concrete Headwall (OPSD 804.030) LS 1
Subtotal Section G
Section F - Provisional Items
Addendum No. 1 FT 12
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
G1 SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 601 Location A10-A11 m 3
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 601, Location A2 m 3
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 601, Location A25 m 3
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 601, Location A26-A27 m 144
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 601, Location A5-A6 m 3
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 601, Location A8-A9 m 3
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 602, Location A12-A13 m 57
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 602, Location A12-A41 m 144
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 602, Location A41-A50 m 34
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 602, Location A7-A33 m 42
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 603, Location A3-A4 m 131
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 607, Location A74-A77 m 2
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 607, Location A75-A78 m 2
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 606, Location A69-A72 m 62
SSP 59 PLACE UNDERGROUND CABLE, 002238NM, Y07924, Plan 608, Location A12 m 2
SSP 59 LINE TRANSFER LT, 002286NM, Plan Y07924, Plan 602, Location A34 m 3
SSP 59 TRANSFER 879, 002286NM, Plan Y07924, Plan 607, Location A74 m 8
SSP 59 TRANSFER 879, 002286NM, Plan Y07924, Plan 607, Location A75 m 11
SSP 59 TRANSFER 879, 002286NM, Plan Y07924, Plan 601, Location A10 m 1
SSP 59 TRANSFER 879, 002286NM, Plan Y07924, Plan 601, Location A8 m 3
SSP 59 CABLE COPPER BJMB 50 PR 24 AWG, 104402NM, Y07924, Plan 602, Location A41-A50 m 34
SSP 59 CABLE COPPER BJMB 100 PR 24 AWG, 104403NM, Y07924, Plan 602, Location A35-A37 m 107
SSP 59 CABLE COPPER BJMB 100 PR 24 AWG, 104403NM, Y07924, Plan 602, Location A7-A37 m 68
SSP 59 CABLE COPPER BJAB 200 PR 22 AWG, 002311NM, Y07924, Plan 608, Location A76-A79 m 2
SSP 59 CABLE COPPER BJAB 200 PR 22 AWG, 002311NM, Y07924, Plan 602, Location A12 m 186
SSP 59 CABLE COPPER BJMB 200 PR 24 AWG, 104404NM, Y07924, Plan 601, Location A10-A11 m 3
SSP 59 CABLE COPPER BJMB 200 PR 24 AWG, 104404NM, Y07924, Plan 601, Location A8-A9 m 3
SSP 59 CABLE COPPER BJMB 200 PR 24 AWG, 104404NM, Y07924, Plan 602, Location A12-A41 m 144
SSP 59 CABLE COPPER BJMB 200 PR 24 AWG, 104404NM, Y07924, Plan 605, Location A12-A16 m 292
SSP 59 CABLE COPPER BJMB 200 PR 24 AWG, 104404NM, Y07924, Plan 605, Location A61-A65 m 63
Section G - Bell Canada Relocations
Addendum No. 1 FT 13
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
SSP 59 CABLE COPPER BJMB 200 PR 24 AWG, 104404NM, Y07924, Plan 606, Location A68-A69 m 7
SSP 59 CABLE COPPER BJMB 200 PR 24 AWG, 104404NM, Y07924, Plan 606, Location A69-A72 m 62
SSP 59 CABLE COPPER BJMB 300 PR 24 AWG, 955085NM, Y07924, Plan 603, Location A3-A4 m 131
SSP 59 CABLE COPPER BJMB 300 PR 24 AWG, 955085NM, Y07924, Plan 601, Location A2 m 3
SSP 59 CABLE COPPER BJMB 300 PR 24 AWG, 955085NM, Y07924, Plan 601, Location A5-A6 m 3
SSP 59 CABLE COPPER BJMB 300 PR 24 AWG, 955085NM, Y07924, Plan 602, Location A7-A33 m 42
SSP 59 CABLE COPPER BJMB 400 PR 24 AWG, 104406NM, Y07924, Plan 602, Location A12-A25 m 187
SSP 59 CABLE COPPER BJMB 400 PR 24 AWG, 104406NM, Y07924, Plan 602, Location A12-A41 m 186
SSP 59 CABLE COPPER BJMB 400 PR 24 AWG, 104406NM, Y07924, Plan 607, Location A74-A77 m 2
SSP 59 CABLE COPPER BJMB 400 PR 24 AWG, 104406NM, Y07924, Plan 607, Location A75-A78 m 2
SSP 59 CABLE COPPER BJMB 400 PR 24 AWG, 104406NM, Y07924, Plan 605, Location A41-A52 m 161
SSP 59 CABLE COPPER BJMB 400 PR 24 AWG, 104406NM, Y07924, Plan 605, Location A52-A64 m 63
SSP 59 CABLE COPPER BJMB 600 PR 24 AWG, 104407NM, Y07924 Plan 601, Location A25 m 3
SSP 59 CABLE COPPER BJMB 600 PR 24 AWG, 104407NM, Y07924 Plan 601, Location A26-A27 m 144
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A33 m 2
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A33 m 2
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A33-A36 m 3
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A53-A54 m 12
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A13-A36 m 40
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A13-A49 m 27
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A19-A31 m 7
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A3-A32 m 11
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A31-A32 m 6
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A32 m 3
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A33 m 1
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A3 m 2
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A3 m 2
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A32 m 2
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A13 m 3
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 602, Location A31 m 2
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 604, Location A38-A44 m 2
Addendum No. 1 FT 14
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 604, Location A42 m 1
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 604, Location A42-A44 m 2
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 604, Location A42-A49 m 80
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 604, Location A43-A46 m 2
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 604, Location A44 m 1
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 604, Location A45-A46 m 2
SSP 59 TR DUCT > 0.76 < = 0.91 VEH ACCESS, 011625NM, Y07924, Plan 604, Location A46 m 1
SSP 59 TR ADDL NON ENCASED DUCT ANY COVER, 052283NM, Y07924, Plan 602, Location A12-
A13m 228
SSP 59 TR ADDL NON ENCASED DUCT ANY COVER, 052283NM, Y07924, Plan 602, Location A13-
A36m 40
SSP 59 TR ADDL NON ENCASED DUCT ANY COVER, 052283NM, Y07924, Plan 602, Location A13-
A49m 27
SSP 59 TR ADDL NON ENCASED DUCT ANY COVER, 052283NM, Y07924, Plan 602, Location A19-
A31m 7
SSP 59 TR ADDL NON ENCASED DUCT ANY COVER, 052283NM, Y07924, Plan 602, Location A33-
A36m 3
SSP 59 TR ADDL NON ENCASED DUCT ANY COVER, 052283NM, Y07924, Plan 602, Location A53-
A54m 12
SSP 59 TR ADDL NON ENCASED DUCT ANY COVER, 052283NM, Y07924, Plan 604, Location A42-
A49m 80
SSP 59 TRENCH CABLE <=.91 METERS DEPTH, 016961NM, Y07924 Plan 605, Location A12-A16 m 292
SSP 59 TRENCH CABLE <=.91 METERS DEPTH, 016961NM, Y07924 Plan 605, Location A41-A52 m 161
SSP 59 TRENCH CABLE <=.91 METERS DEPTH, 016961NM, Y07924 Plan 605, Location A61-A65 m 63
SSP 59 TRENCH CABLE <=.91 METERS DEPTH, 016961NM, Y07924 Plan 605, Location A52-A64 m 63
SSP 59 TRENCH CABLE <=.91 METERS DEPTH, 016961NM, Y07924 Plan 602, Location A35-A37 m 107
SSP 59 TRENCH CABLE <=.91 METERS DEPTH, 016961NM, Y07924 Plan 602, Location A7-A37 m 68
SSP 59 TRENCH CABLE <=.91 METERS DEPTH, 016961NM, Y07924 Plan 602, Location A12-A25 m 187
SSP 59 TRENCH CABLE <=.91 METERS DEPTH, 016961NM, Y07924 Plan 602, Location A12-A41 m 186
SSP 59 TRENCH CABLE <=.91 METERS DEPTH, 016961NM, Y07924 Plan 608, Location A12 m 186
SSP 59 TRENCH CABLE <=.91 METERS DEPTH, 016961NM, Y07924 Plan 606, Location A68-A69 m 7
SSP 59 DIR BORE DUCT > 51MM < = 102MM, 011673NM, Y07924, Plan 605, Location A57-A58 m 8
SSP 59 DIR BORE DUCT > 51MM < = 102MM, 011673NM, Y07924, Plan 605, Location A59-A60 m 10
SSP 59 DIR BORE DUCT > 51MM < = 102MM, 011673NM, Y07924, Plan 605, Location A62-A63 m 13
SSP 59 DIR BORE DUCT > 51MM < = 102MM, 011673NM, Y07924, Plan 605, Location A66-A67 m 8
SSP 59 BUILD NEW COPPER SPLICE AER BUR BLDG SUB, 002273NM, Y07924, Plan 604,
Location A35ea 1
SSP 59 BUILD NEW COPPER SPLICE AER BUR BLDG SUB, 002273NM, Y07924, Plan 604,
Location A39ea 1
SSP 59 BUILD NEW COPPER SPLICE AER BUR BLDG SUB, 002273NM, Y07924, Plan 604,
Location A39ea 1
Addendum No. 1 FT 15
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
SSP 59 BUILD NEW COPPER SPLICE AER BUR BLDG SUB, 002273NM, Y07924, Plan 604,
Location A39ea 1
SSP 59 BUILD NEW COPPER SPLICE AER BUR BLDG SUB, 002273NM, Y07924, Plan 602,
Location A37ea 1
SSP 59 BUILD NEW COPPER SPLICE AER BUR BLDG SUB, 002273NM, Y07924, Plan 602,
Location A37ea 1
SSP 59 BUILD NEW COPPER SPLICE AER BUR BLDG SUB, 002273NM, Y07924, Plan 605,
Location A64ea 1
SSP 59 BUILD NEW COPPER SPLICE AER BUR BLDG SUB, 002273NM, Y07924, Plan 605,
Location A64ea 1
SSP 59 BUILD NEW COPPER SPLICE AER BUR BLDG SUB, 002273NM, Y07924, Plan 605,
Location A65ea 1
SSP 59 BUILD NEW COPPER SPLICE AER BUR BLDG SUB, 002273NM, Y07924, Plan 605,
Location A65ea 1
SSP 59 BUILD NEW COPPER SPLICE AER BUR BLDG SUB, 002273NM, Y07924, Plan 606,
Location A68ea 1
SSP 59 BUILD NEW COPPER SPLICE AER BUR BLDG SUB, 002273NM, Y07924, Plan 606,
Location A68ea 1
SSP 59 OPEN EXIST(AER BUR BLDG)COPPER SPLICE, 013386NM, Y07924, Plan 606, Location
A72ea 1
SSP 59 SPLICE TERMINATE PAIRS NEW EXISTING, 002285NM, Y07924, Plan 602, Location A37 pairs 100
SSP 59 SPLICE TERMINATE PAIRS NEW EXISTING, 002285NM, Y07924, Plan 602, Location A37 pairs 25
SSP 59 SPLICE TERMINATE PAIRS NEW EXISTING, 002285NM, Y07924, Plan 604, Location A35 pairs 200
SSP 59 SPLICE TERMINATE PAIRS NEW EXISTING, 002285NM, Y07924, Plan 604, Location A39 pairs 200
SSP 59 SPLICE TERMINATE PAIRS NEW EXISTING, 002285NM, Y07924, Plan 604, Location A39 pairs 400
SSP 59 SPLICE TERMINATE PAIRS NEW EXISTING, 002285NM, Y07924, Plan 604, Location A39 pairs 400
SSP 59 SPLICE TERMINATE PAIRS NEW EXISTING, 002285NM, Y07924, Plan 605, Location A64 pairs 400
SSP 59 SPLICE TERMINATE PAIRS NEW EXISTING, 002285NM, Y07924, Plan 605, Location A64 pairs 400
SSP 59 SPLICE TERMINATE PAIRS NEW EXISTING, 002285NM, Y07924, Plan 605, Location A65 pairs 200
SSP 59 SPLICE TERMINATE PAIRS NEW EXISTING, 002285NM, Y07924, Plan 605, Location A65 pairs 200
SSP 59 SPLICE TERMINATE PAIRS NEW EXISTING, 002285NM, Y07924, Plan 606, Location A68 pairs 200
SSP 59 SPLICE TERMINATE PAIRS NEW EXISTING, 002285NM, Y07924, Plan 606, Location A68 pairs 200
SSP 59 SPLICE TERMINATE PAIRS NEW EXISTING, 002285NM, Y07924, Plan 606, Location A72 pairs 350
SSP 59 PLACE SMALL TERMINAL PET, 002259NM, Y07924, Plan 602, Location A37 pet 1
Addendum No. 1 FT 16
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
SSP 59 REMOVE BURIED CLOSURE, 011809NM, Y07924, Plan 602, Location A22 closure 1
SSP 59 PL BURIED CLOSURE, 011807NM, Y07924, Plan 602, Location A37 closure 1
SSP 59 PL BURIED CLOSURE, 011807NM, Y07924, Plan 604, Location A38 closure 1
SSP 59 PL BURIED CLOSURE, 011807NM, Y07924, Plan 604, Location A45 closure 1
SSP 59 PL BURIED CLOSURE, 011807NM, Y07924, Plan 605, Location A51 closure 1
SSP 59 PL BURIED CLOSURE, 011807NM, Y07924, Plan 605, Location A64 closure 1
SSP 59 PL BURIED CLOSURE, 011807NM, Y07924, Plan 605, Location A65 closure 1
SSP 59 PL BURIED CLOSURE, 011807NM, Y07924, Plan 606, Location A68 closure 1
SSP 59 B.S.W(S) PLCD @ .15 TO .4M COV. ANY MTHD, 889254NM, Y07924, Plan 602, Location
A37ea 9
Subtotal Section G
Addendum No. 1 FT 17
Contract No.:
Title:
Location:
Item Item Description Unit Quantity Unit Price Amount
RN 16-14
2016-T-114
Spec. No.
Reconstruction of Regional Road 20 /
South Grimsby Road 5 Intersection
Township of West Lincoln
SCHEDULE OF TENDER UNIT PRICES
H1 B27
OPSS. MUNI
510
SSP 16
SSP 60
Removal of Existing 100 mm Dia. Sanitary Lateral m 10
H2 C2
OPSS 410
SSP 36
SSP 60
Supply and Install 100 mm Sanitary Lateral m 10
H3 OPSS 410 SSP 22
SSP 60
Granular 'A' Crushed Limestone t 70
H4 B8
OPSS 353
SSP 23
SSP 60
Concrete Curb and Gutter (OPSD 600.040) m 3
H5 B9
OPSS 351
SSP 25
SSP 60
Concrete Sidewalk m² 6
H6 B27
OPSS. MUNI
510
SSP 15
SSP 60
Partial Depth Asphalt Removal - Milling m² 20
H7 B27
OPSS. MUNI
510
SSP 15
SSP 60
Full Depth Asphalt Removal m² 12
H8 B14
OPSS 310
SSP 20
SSP 60
Hot Mix HL-3 HS (50 mm lift) t 3
H9 B14
OPSS 310
SSP 21
SSP 60
Hot Mix HL-8 HS (100 mm in 2 x 50 mm lifts) t 4
Subtotal Section H
Section H - Sanitary Lateral Replacement (121 Canborough St., Smithville) (Provisional)
Addendum No. 1 FT 18
Addendum No. 1 FT- 19
CONTRACT NO. 2016-T-114
(RN 16-14)
Reconstruction of
Regional Road 20 at South Grimsby Road 5 Intersection
from Streamside Drive to 150 m East of South Grimsby Road 5
In The Township of West Lincoln
SUMMARY OF TENDERED UNIT PRICES
SECTION "A" - General
SECTION "B" - Roadwork, Pavement Markings and
Signs
SECTION "C" - Sewers & Culverts
SECTION "D" - Watermain
SECTION "E" - Traffic Signals
SECTION "F" - Provisional Items
SECTION "G" - Bell Relocations
SECTION “H” - Sanitary Lateral Replacement
(121 Canborough St., Smithville)
TOTAL TENDER
Addendum No. 1 FT- 20
STATEMENT “A”
CONTRACT NO. 2016-T-114
(RN 16-14)
Reconstruction of
Regional Road 20 at South Grimsby Road 5 Intersection
from Streamside Drive to 150 m East of South Grimsby Road 5
In The Township of West Lincoln
TENDERER’S EXPERIENCE IN SIMILAR WORK
UNLESS THIS LIST IS PROPERLY COMPLETED, THE TENDER MAY BE
DISQUALIFIED
YEAR
COMPLETED
DESCRIPTION OF WORK FOR WHOM
WORK
PERFORMED
VALUE
Addendum No. 1 FT- 21
STATEMENT “B”
CONTRACT NO. 2016-T-114
(RN 16-14)
Reconstruction of
Regional Road 20 at South Grimsby Road 5 Intersection
from Streamside Drive to 150 m East of South Grimsby Road 5
In The Township of West Lincoln
(a) Harmonized Sales Tax:
The Contractor shall NOT include any amount in his tender price for the Harmonized
Sales Tax (H.S.T.). Any amount to be levied with respect to the H.S.T. will be included as
a separate item on the payment certificate. The appropriate H.S.T. levy will be paid to the
Contractor in addition to the amount approved by the Contract Administrator for work
performed under the contract and will, therefore, not affect the amount of the contract. The
Contractor will be required to make the appropriate remittance to Revenue Canada in
accordance with the legislation.
i) Total Tender Price including contingency and excluding HST ..... $
ii) Estimated Cost of Harmonized Sales Tax ..................................... $
iii) Total Contract Amount [ (i) + (ii) ] ................................................ $
iv) H.S.T. Registration Number:
Company Name Contractor’s Signature(s)
Address Contractor’s Seal
Witnesses:
Addendum No. 1 FT- 22
STATEMENT “C”
CONTRACT NO. 2016-T-114
(RN 16-14)
Reconstruction of
Regional Road 20 at South Grimsby Road 5 Intersection
from Streamside Drive to 150 m East of South Grimsby Road 5
In The Township of West Lincoln
ACCESSIBILITY REGULATIONS FOR CONTRACTED SERVICES
CONFIRMATION FORM
If the nature of your business with the Regional Municipality of Niagara (the “Region”) creates
the opportunity that any of your staff, contractors or any others associated with you would
interact with the public on behalf of the Owner, it is necessary that the Owner ensure those
providing service on our behalf have received the Customer Service Training in order that we
retain our compliance with the requirements of the Accessibility for Ontarians with Disabilities
Act 2005.
Please sign below to ensure you are the person able to bind your company. Companies whose
employee’s role may require them to interact with the public on behalf of the Owner, shall
receive the CUSTOMER SERVICE STANDARD TRAINING of the ACCESSIBILITY FOR
ONTARIANS WITH DISABILITIES ACT 2005.
If you have any questions, please contact the Accessibility Advisory Coordinator at 905-980-
6000, ext. 3252 or email [email protected]
Please enclose this form with your bid submission.
Company Name:
Signature of Authorized Individual:
Position:
Addendum No. 1 FT- 23
STATEMENT “D”
CONTRACT NO. 2016-T-114
(RN 16-14)
Reconstruction of
Regional Road 20 at South Grimsby Road 5 Intersection
from Streamside Drive to 150 m East of South Grimsby Road 5
In The Township of West Lincoln
LIST OF SUB-CONTRACTORS
The bidders shall list hereunder the names of all sub-contractors intended to be used in the
execution of this work subject to the approval of the Contract Administrator.
All work not performed directly by the Contractor's forces shall be included in this list. All
changes to this list must be approved by the Contract Administrator.
SUB-TRADE NAME OF SUB-CONTRACTOR ADDRESS OF SUB-
CONTRACTOR
Contract No.: - RN 16-14
2016-T-114
Title: - Reconstruction of Regional Road 20 at South
Grimsby Road 5 Intersection
Location: - Township of West Lincoln
33 - Addendum No. 1
SSP 33 REMOVE, SALVAGE AND REPLACE EXISTING STEEL BEAM GUIDE
RAIL
The contractor shall remove and salvage the railing from the existing steam beam guiderail as
shown on the contract drawings. The contractor shall review the condition of the posts with the
Contract Administrator. The contractor shall reuse the existing posts should the conditions be
acceptable to the Contractor Administrator, otherwise, new posts shall be installed as necessary.
The salvaged material shall be placed at the new location as shown on the contract drawings.
Payment at the contract price shall be full compensation for all labour, equipment and material
required to do the work.
SSP 34 ADJUSTING AND REBUILDING EXISTING MAINTENANCE HOLES
AND CATCH BASINS
Adjusting
The requirements of OPSS 408 shall apply except as modified herein.
The work to be carried out under this item shall include any structure requiring adjustment to
grade regardless of the opening diameter of type of structure.
This item includes Manholes and Catchbasins adjusted up to a maximum of 300 mm. Any
structure adjusted over the 300 mm will be paid under the Rebuild Manhole and Catchbasin item.
When adjusting from base course to surface course asphalt, the existing pavement shall be saw-
cut and removed, the frame shall be adjusted to final grade and HL-8 asphalt base placed and
compacted around the frame. The HL-8 Asphalt shall be included in the Contract unit price bid
under this item as required. No wood shims are to be used for adjusting of frames.
All work under this item shall be completed at minimum 24 hours prior to paving operations.
Rebuilding
The requirements of OPSS 408 & 1351 shall apply except as modified herein.
SD-2 – ADDENDUM NO. 1
Contract No. 2016-T-114
(RN 16-14)
Reconstruction of Regional Road 20 at South Grimsby Road 5 Intersection from
Streamside Drive to 170 m East of South Grimsby Road 5
In the Township of West Lincoln
4. Bell Relocation Drawings
YO7924_601
YO7924_602_ABN
YO7924_602_PLACEMENT
YO7924_603
YO7924_604_ABN
YO7924_604_PLACEMENT
YO7924_605_ABN
YO7924_605_PLACEMENT
YO7924_606
YO7925_607
YO7924_608
Bell Approved Civil Structures Contractors - Peel Region- 905 West- 519 SW
R.B Somerville- Chris Dekoning [email protected] ; or Steve Fifield [email protected] 13176 Dufferin Street, King City, Ontario, Canada, L7B 1K5 tel: 905.833.3100 fax: 905.833.3111
Avertex- Rick Hyatt- 647 -929- 1305 , [email protected]
205235 County Road 109, Amaranth, Ontario, L9W 0T8
Phone: 519-942-3030, Toll Free: 888-837-3030, Fax: 519-942-2383
GUCI- Jeff Brown - 905.945.8878- [email protected] Grimsby Utility Construction Inc. 211 Roberts Road, Grimsby, Ontario, L3M 4E8
Black and Macdonald- Frank Palastina 416-298-9977 – [email protected] Suite 2100 - 2 Bloor Street East,Toronto, Ontario M4W 1A8,
Telephone (416) 920-5100, Fax (416) 922-8768
JCH Contracting Jeff Snyder 519 787 3814 office- 31534 9th Line, Fergus, ON N0B 1J0
email: [email protected]
Pacheco Contractors George Teves 519-652-5041- email: [email protected] 4192 Perkins Rd, London, ON N6L 1C2
Picard Maurice Pickard 519 372 0905- Tel: 519-637-7500 email: [email protected] 170 Thom Drive, Owen Sound, Ontario, N4K 5N7
NX Communications Canada Inc
John Molendyk, Project Manager
NX Utilities- 35 Claireville Drive, Etobicoke, On M9W 5Z7,
p. 416.644.3411, f. 416.644.3412, c. 416.677.2215
Wiens Underground Electric Ltd.
Werner Wiens (905)682-5060 R. R. # 4, 65 Stewart Road Niagara-on-the-Lake , Ontario, L0S 1J0
Aecon- Tony Sinopoli, G.S.C.
20 Carlson Court, Suite 800 Toronto, ON, M9W 7K6
Office 416-297-2600 or (1-800-787-5008) Ext 3715 // Fax 416-940-2283 // Cell 416-433-5175
Please note that there can be other Bell approved contractors not on this list , as the list does and can change
from time to time.
For verification of a contractor not on this list, please contact Bell Canada directly . Only Bell can authorize its
contractors, this approval cannot be transferred from one company to another or assumed by any company
without proper verification from Bell Canada.
1st Example- A Bell approved hires a non Bell approved as a sub because they are busy , the sub
will not be Bell approved by default.
2nd Example- A contractor advises the Region or project driver that they are Bell approved and
have worked for Bell in the past.
This does not mean that the contractor is Bell approved for Civil, and without verification from Bell,
this contractor should not be considered Bell approved.
B B B B B B B B B B B B B B B B B B B
F
F
F
F
F
BBBBBBBBBBBBBBBBB
B B B B B B B B B B B B B B B B B B
B B B B B B B B B B B B B B B B B B YX
EAAB 3F BJMB 200-24/BUR
BJMB 300-24/BUR
3F BJMB 300-24/BUR
3F BJMB 200-24/BUR
BJMB 200-24/
144F BJMB 600-24/BUR
AB 3F BJMB 600-24/UG
AB 3F BJMB 200-24/BUR
AB 3F BJMB 600-24/BUR
fe
fe
fe
fe
fe
fe
fe
fe
fe
EB
EB
EB
EB
EBEB
EB
EB
EB
EB
EB EB
EB
EB
EB
EB
EB EB
JG
JG
JG
JG
PED OPP 11 SOUTH GRIMSBY RD # 5
PED SD 1 SOUTH GRIMSBY RD # 5
PED 1-1 20 HWY
PED 6633HIGHWAY
PED 1-2 HWY 20
(401-2,801-1000)200D
401-2,1-300
401-2,301-600
401-2,601-800
401-2,801-1000
D1-20013,1201-130013,801-90013,951-97515,101-12515,251-300D7601-7700
(D1-200)200D(13,1201-1300)100D(13,801-900)100D(13,951-975)25D(15,101-125)25D(15,251-300)50D(D7601-7700)100D
(401-2,601-800)200D
(401-2,1-600)600D
3
DN 3
DN 3
DN 3
DN 3
UP 3 141
3
3
3
3F
3F
3F
3F
3F
144F
3F
3F
3F
01
PED 2-1 20 HWY
06
05
05
02
02
01
03
01
02
03
04
05
06
03
PED 1-2 HWY 20
PED 1-0 ALLAN RD
PED 1-0 ALLAN RD
TYPE: OTHERNAME: 401-2NUMBER: MAIN+STREET:
PLEASE REMOVE THESE12m OF CABLE RATHER THAN ABANDONING
SECTION CUT
SECTION CUT
SECTION CUT
SECTION CUT
12
5
6
8
9
10
11
14
15
1718
2021
23 24
26
27
0
0
0
0
0
0
0
0
0
0
3
1
0
0
0
0
PED ALLAN RD N OF HWY 20OPI401-2RESIN_BP:1-200:D1-200IN_BP:201-300:13,1201-1300IN_BP:301-400:13,801-900IN_BP:401-425:13,951-975IN_BP:426-450:15,101-125IN_BP:451-500:15,251-300IN_BP:501-600:D7601-7700OUT_BP:1-800:401-2,1-800OUT_BP:801-1000:401-2,801-1000Out BP:1001-1200:200VAC
ITFACE_CABN/A
YUYUYU
YU
-
-
05
06
04
03
(05) B
JMB
300-2
4
(06) B
JMB
300-2
4
xx
xx
YV
YV
YV
YV
YV
YV
YVYV
YV
ISSUE DATE SIGNATURE
CLLI PLAN
WLNCON01
Joe Tomasi / (416) 215-4919N/A
WEST LINCOLN 601Y07924
ORIGINATOR / PHONE
Copyright Bell Canada
SC
R/W
REISSUE DATE
AS /
ASSOCIATE / PHONE
NETWORK#
ENGINEERING: This plan represents a Letter of Instruction.The work will be completed according to cost/requirementsestablished in BCH-Vendor contracts and conform to schedulesdetermined by the individual BCH Companies.
SC
SC
SC
602603
602
602
602
602605
602
602605
602
602
SC
6604
YV
YVYV
YV
YV
YVYV
YVYV
YVYV
YVYVYVYVYVYV
YVYV
YV
YV
YVYV
YXYX
YUYU
YUYU
YUYUYUYU
YUYU
B B BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BBB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
B
BB
BB
B
BB
BB
BB
BB
BB
BB
BB
BB
BBB
BB
BB
BB
BB
BB
BB
B
BB
BB
BB
B
BB
BB
BB
BB
BB
BB
BB
BB
BBB
B
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BBB
B
B
BB
BB
BB
BB
B
BBBBBBBBB
B BBBBBBBBBBBBBBBB
B
BB
BB
BB
BB
BB
BB
B
B
BB
BB
BB
BB
B
B
BB
BB
BB
BB
BB
BB
BB
B
BB
BB
BB
BB
BB
B
B
B B
BBBBBBBBBBBBBBBBBBB
BBBBBB B
BBBBBBBBBBBB B
BB
B B
B
B
G
E
BB
BB
BB
BB
BB
BB
BB
B
BB
BB
BB
BB
BB
BB
BB
B
BBBBBBBBB
BBBBBBBB
BBBBB
BB
BB
BBB
BB
B
BB
BB
BB
BB
BB
BB
BB
BB
B
BB
BB
BBBBBBBBBB
BB
BB
B
BEB
GGG
G
G
GG
G
U
U
P
A
A
A
A
A
A
A
A
A
K
A
A
P
Q
P
P
P
P
S
OK
ED
OK
11
11
VU
VU
1
1
1EB
EB
EB
EB
EB
EB
EB
EB
EB
EBEB
EB EB
EB
EB
EB
EBEB
EB
EB
EB
EB
EB
EBEB
EB
JG
06
05
02
05
05
0201
0502
05
02
A
B 02
05
B
A
A
B
02
C
F
E
AB01
AB02
05
06
01 02
05
06
04
03
02
05
AB
BB
BB
B
B
B
BB
B
B
B
B
B
B
B
B
ADA
A
D
A
D
DA
A
D
D
D
D
A A
D
D
AB 222F BJMB 200-24/BUR
AB 170F AJTB 400-26/BUR
AB 170F AJTB 400-26/BUR
AB
265F
AJT
B 1
00-2
6/B
UR
AB
36F
BJM
B 5
0-24
/BU
R
AB
75F
AJT
B 2
00-2
6/B
UR
AB
166F
AJT
B 3
00-2
6/B
UR
AB 78F BJMB 600-24/BUR
AB 175F BJAB 200-22/BUR
AB 176F AJMB 400-24/BUR
AB 175F BJAB 200-22/BUR
AB 176F AJMB 400-24/BUR
EMS
EM
S
2.1
3
( 1.8
0)
( 4.1
0)
( 1
21.0
0)
( 4.30)
( 0.50)
( 3.00)
( 2.1
3)
( 4.00)( 4.00)
( 5.50)
( 0.30)
( 1.50)
( 2.80)
( 2.00)
( 2.0
0)
( 3.0
0)
( 3.0
0)
1.52
3.00
2.0
0
1.00
3.0
0
3.0
0
6.10
6.00
43.0
0
3.00
0.3
0
1.00 2.00
3.00
3.0
0
1.00
9.0
0
0.3
0 7
.00
1.0
0 1
.70
1.00
2.1
0 2
.13
5.70
1.50
2.00
2.00 1.00
2.00
2.0
0
2.00
3.0
0
8.0
0
0.3
0
( 3.0
0)
( 2.1
3)
EAEA
EA
EA
EA
EA
EA
EAEA
EA
EA
EAEAEA
EA
EAEA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA EA
EAEA
EA
EA
EAEA
EA
EA
EA
EAEA
EA
EA
EA
EA
EA
EA
EAEA
EA
EA
EA
EA
EA
EA
EA
EA ED
ED
ED
ED
ED
ED
ED
EDED
ED
ED
EDED
ED
ED
EDED
ED
ED
ED
ED
ED
ED
ED
ED
ED
ED
EDEDED
ED
ED
ED
ED
ED
ED
EDED ED
ED
ED
ED
ED
ED
EDED
ED
ED
ED
ED
ED
ED
ED
ED
PE
D 1
-1 2
0 H
WY
FC
-50
PED 349 WEST ST
TYCO-25
PED 1
20
HW
Y
VC-2
5
MK 2 S GRIM RD 5FC12-0
OP
P P
ED
1 2
0 H
WY
FC
-0
PED SD 1 SOUTH GRIMSBY RD #5FC25-25
RM
PED
349
WEST S
T
FC
25-2
5
401-2
,701-7
50
401-2,376-400
AC:401-2,376-400
13,9
76-1
000
25NC
(401
-2,3
76-4
00)2
5D
WL:
SAME
CPED_CP
PROFORM 8
CP
ED
_CP
PR
OFO
RM
8
PE
D 6
610
HW
Y 2
0
ITFACE_CAB
N/A
RMCPED_CP
N/A
PED 1-0 ALLAN RD
ITFACE_CAB
N/A
349
339
CO
NC
RE
TE
SD
WK
PED
1-2
HW
Y 2
0
OPI PED ALLAN RD N OF HWY 20
LIN
K F
EN
CE
MV CA/NO CA
13690
(3m)
(MK 1 S GRIM RD 5)
13690
SPLIT
13690
PLACE 3 BSW (9m) HOUSES 325,339 & 349 WEST ST & CLICK TOEXISITING. ALL HAVE BELL SER-VICE
ARBS 19 TO 28, PIT REQ'D TO REMOVE EXT'GDUCTS(03 & 04)ARB 3, CAP & PL LOCATE BALL ON DUCT 03 & 04ARB 31, CAP & PL LOCATE BALL ON DUCT 01ARB 33, CONNECT NEW DUCTS TO EXT'GROAD CROSSINGARB , CONNECT NEW DUCTS TO EXT'GROAD CROSSING
ARB 51, EXPOSE 4m OF EXT'G BJAB 200-22 & SWING INTO NEW PED
3
7
12
13
1922
25
28
29
30
31
32 33
34
36
37
40
41
49
50
51
53
54
55
56
0
3 0
0
AB
12m
1D
/CFD
/90
AB
12m
2D
/PVC
D2/
90
AB79m
AB84m 1D /PVCD2/90
AB82m
1D /PVC
D2/90
AB84m
2D /PVC
D2/90
AB
36m
2D
/P
VC
D2/9
0
AB29m 2D /PVCD2/90
AB2m BEND 0D /PVCB/90
(06) BJMB 300-24
(02) BJMB 600-24/BJMB 200-24 (05) BJMB 200-24/BJMB 100-24
(02)
BJM
B 2
00-2
4/40
1-2,
800-
1000
(05)
BJM
B 2
00-2
4/40
1-2,
601-
800
(A) B
JAB 2
00-2
2
(A) B
JAB
200
-22/
13,1
-200
(E) BJM
B 50-24
AB(01) BJMB600-24 (02) BJMB 200-24/BJMB 600-24
(05)
BJM
B 3
00- 2
4
(06)
BJM
B 3
00- 2
4(02) BJMB 200-24/BJMB 600-24
(05)
BJM
B 3
00-2
4
(06)
BJM
B 3
00-2
4
(401-2,801-1000)200D
401-
2,65
1-70
0
(401-2
,601-8
00)2
00D
(401-2
,1-3
00)3
00D
(D1-200)200D
(13,1201-1300)100D
(15,201-300)100D
(D1-200)200D
(13,1201-1300)100D
(15,201-300)100D
(401-2
,301-4
00)1
00D
(D1-200)200D
(13,1201-1300)100D
(13,801-900)100D
(13,951-975)25D
(15,101-125)25D
(15,251-300)50D
(D7601-7700)100D
(13,1-200)200D
(13,801-1175)375D(15,101-125)25D
(13,1-200)200D
(13,801-1175)375D
(15,101-125)25D
6
6
4
4
10
10
11
11
10
10
11
11
2
40
2
29 175
176
5
8 157
81
36
5 3
8
27
5
7
78
9
9
175F
176F
170F
36F
75F
78F
9F
9F
F
F
xx
xx
YV
YV
YV
YV
ISSUE DATE SIGNATURE
CLLI PLAN
WLNCON01
Joe Tomasi/(416) 215-4919TOWN OF WEST LINCOLN/NIAGARA REGION
WEST LINCOLN 602Y07924
ORIGINATOR / PHONE
Copyright Bell Canada
SC
R/W
REISSUE DATE
AS /
ASSOCIATE / PHONE
NETWORK#
ENGINEERING: This plan represents a Letter of Instruction.The work will be completed according to cost/requirementsestablished in BCH-Vendor contracts and conform to schedulesdetermined by the individual BCH Companies.
603
604
605
SO
UT
H G
RIM
SB
Y R
OA
D #
5
#20 HWY
WEST ST
601
337m 1D/PVCD2/90
CONDUIT PLACED BY X98200
12
1m
TO
PE
D O
PP
11 S
OU
TH
GR
IMS
BY
RD
# 5
DEPTH OF COVER:BLVD 2.0mRD X'ING 2.0mENSURE 2m BELOWEXISTING CABLES
(WLNCO
N01/15,201-250)50D
(WLNCO
N01/401-2,651-700)50D
(WLNCO
N01/13,901-950)50D
(WLNCO
N01/D3951-3975)25D
(WLNCO
N01/13,976-1175)200D
(WLNCO
N01/15,101-125)25D
AJMB 400-24/BUR
ABADONED CABLES/CONDUIT ONLY
AB 79m 2D/PVCD2/90
6604
YV
YVYV
YV
YV
YVYV
YVYV
YVYV
YVYVYVYVYVYV
YVYV
YV
YV
YVYV
YXYX
YUYU
YUYU
YUYUYUYU
YUYU
F
F
F
F
F
F
F
F
F
F
F
F
F
B
G
E
EE
EE
EEE
B
GGG
G
G
GG
G
U
U
P
A
A
A
A
A
A
A
A
A
K
A
A
P
Q
P
P
P
P
S
OK
ED
OK
11
11
VU
VU
1
1
1EB
EB
EB
EB
EB
EB
EB
EB
EB
EBEB
EB EB
EB
EB
EB
EBEB
EB
EB
EB
EB
EB
EBEB
EB
JG
06
05
02
05
05
0201
0502
05
02
A
B 02
05
B
A
A
B
02
C
F
E
AB01
AB02
05
06
01 02
05
06
04
03
02
05
AB
BB
BB
B
B
B
BB
B
B
B
B
B
B
B
B
ADA
A
D
A
D
DA
A
D
D
D
D
A A
D
D
5BM2LT 72/AER 09-01-C
5BM2LT 48/AER 09-01-D
BJM
B 3
00-2
4/B
UR
42F BJMB 300-24/BUR
BJM
B 1
00-2
4/B
UR
144F BJMB 200-24/BUR
3F BJMB 600-24/BUR
BJAB 200-22/BUR
BJMB 400-24/BUR
BJMB 400-24/BUR
BJM
B 5
0-24
/BU
R
BJA
B 2
00-2
2/BU
R
AJMB 50-24/BUR A
JTB
200-2
6/B
UR
AJTB 100-26/BUR
AJTB 100-26/BUR
24MCLT 36+1-22/AER N/A
BJMB 100-24/BUR
BJMB 200-24/BUR
EMS
EM
S
2.1
3
( 1.8
0)
( 4.1
0)
( 1
21.0
0)
( 4.30)
( 0.50)
( 3.00)
( 2.1
3)
( 4.00)( 4.00)
( 5.50)
( 0.30)
( 1.50)
( 2.80)
( 2.00)
( 2.0
0)
( 3.0
0)
( 3.0
0)
1.52
3.00
2.0
0
1.00
3.0
0
3.0
0
6.10
6.00
43.0
0
3.00
0.3
0
1.00 2.00
3.00
3.0
0
1.00
9.0
0
0.3
0 7
.00
1.0
0 1
.70
1.00
2.1
0 2
.13
5.70
1.50
2.00
2.00 1.00
2.00
2.0
0
2.00
3.0
0
8.0
0
0.3
0
( 3.0
0)
EAEA
EA
EA
EA
EA
EA
EAEA
EA
EA
EAEAEA
EA
EAEA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA
EA EA
EAEA
EA
EA
EAEA
EA
EA
EA
EAEA
EA
EA
EA
EA
EA
EA
EAEA
EA
EA
EA
EA
EA
EA
EA
ED
ED
ED
ED
ED
ED
ED
EDED
ED
ED
EDED
ED
ED
EDED
ED
ED
ED
ED
ED
ED
ED
ED
ED
ED
EDEDED
ED
ED
ED
ED
ED
ED
EDED ED
ED
ED
ED
ED
ED
EDED
ED
ED
ED
ED
ED
ED
ED
PE
D 1
-1 2
0 H
WY
FC
-50
PED 349 WEST ST
TYCO-25
PED 1
20
HW
Y
VC-2
5
MK 2 S GRIM RD 5FC12-0
OP
P P
ED
1 2
0 H
WY
FC
-0
PED SD 1 SOUTH GRIMSBY RD #5FC25-25
RM
PED
349
WEST S
T
FC
25-2
5
401-2
,701-7
50
401-2,376-400
AC:401-2,376-400
13,9
76-1
000
25NC
(401
-2,3
76-4
00)2
5D
WL:
SAME
CPED_CP
PROFORM 8
CP
ED
_CP
PR
OFO
RM
8
PE
D 6
610
HW
Y 2
0
ITFACE_CAB
N/A
RMCPED_CP
N/A
PED 1-0 ALLAN RD
ITFACE_CAB
N/A
349
339
CO
NC
RE
TE
SD
WK
PED
1-2
HW
Y 2
0
OPI PED ALLAN RD N OF HWY 20
LIN
K F
EN
CE
MV CA/NO CA
13690
(3m)
(MK 1 S GRIM RD 5)
13690
SPLIT
13690
PLACE 3 BSW (9m) HOUSES 325,339 & 349 WEST ST & CLICK TOEXISITING. ALL HAVE BELL SER-VICE
ARBS 19 TO 28, PIT REQ'D TO REMOVE EXT'GDUCTS(03 & 04)ARB 3, CAP & PL LOCATE BALL ON DUCT 03 & 04ARB 31, CAP & PL LOCATE BALL ON DUCT 01ARB 33, CONNECT NEW DUCTS TO EXT'GROAD CROSSINGARB , CONNECT NEW DUCTS TO EXT'GROAD CROSSING
ARB 51, EXPOSE 4m OF EXT'G BJAB 200-22 & SWING INTO NEW PED
3
7
12
13
1922
25
28
29
30
31
32 33
34
36
37
40
41
49
50
51
53
54
55
56
0
3 0
0
12m
2D
/PVC
D2/
90
2m BEND 1D /PVCD2/90
2m BEND 1D /PVCB/90
3m 2D /PVCD2/90
1m Y 1D /PVCD2/90
2m Y 1D /PVCD2/902m BEND 1D /PVCD2/90
11m 1D /PVCD2/90
2m BEND 1D /PVCB/90
3m 1D /PVCD2/90
4m 2D /PVCD2/90
7m 2D /PVCD2/90
40m
2D
/P
VC
D2/9
0
3m BEND 2D /PVCB/90
57m 5D /PVCD2/90
27m 2D /PVCD2/90
80m 2D /PVCD2/90
2m BEND 1D /PVCB/906m 1D /P
VCD2/90
9m 2D /PVCD2/90
1m 2D /PVCD2/90
2m BEND 2D /PVCB/90
2m BEND 4D /PVCB/90
(06) BJMB 300-24
(02) BJMB 600-24/BJMB 200-24 (05) BJMB 200-24/BJMB 100-24
(02)
BJM
B 2
00-2
4/40
1-2,
800-
1000
(05)
BJM
B 2
00-2
4/40
1-2,
601-
800
(A) B
JAB 2
00-2
2
(A) B
JAB
200
-22/
13,1
-200
(E) BJM
B 50-24
AB(01) BJMB600-24 (02) BJMB 200-24/BJMB 600-24
(05)
BJM
B 3
00- 2
4
(06)
BJM
B 3
00- 2
4(02) BJMB 200-24/BJMB 600-24
(05)
BJM
B 3
00-2
4
(06)
BJM
B 3
00-2
4
FR401,1-72
FR401,1-72
FR100,1-48401-2
,1-3
00
401-2
,301-4
00
401-
2,65
1-70
0
401-2
,401-6
00
F167,1-24
F11,1-12
FC167,1
401-2,301-400
401-2,801-1000
401-2,301-600
401-2,601-800
D1-20013,1201-130013,801-90013,951-97515,101-12515,251-300D7601-7700
13,1-200
D1-20013,1201-130015,201-300
13,801-117515,101-125
13,1
-200
13,976-1000
401-2,726-75013,801-900
13,951-975
15,101-125
[R]15,201-250
1
1
15
15
91
91
90
90
92
92
16
16
2
2
3
3
A
A
51
68
LV 15
LV 15
5 40
UP 2 DN 2
4
31
23 6
UP 2DN 2
6
142
UP
2
141
171
UP 2
10
3
173
12
UP 2
171
15
1
31
UP 2
DN
2
DN 2
3
3
1
3 2
UP 2
28
56
587F
68F
186F
187F
186F
34F
4F
5F
5F
F
xx
xx
YV
YV
YV
YV
ISSUE DATE SIGNATURE
CLLI PLAN
WLNCON01
Joe Tomasi/(416) 215-4919TOWN OF WEST LINCOLN/NIAGARA REGION
WEST LINCOLN 602Y07924
ORIGINATOR / PHONE
Copyright Bell Canada
SC
R/W
REISSUE DATE
AS /
ASSOCIATE / PHONE
NETWORK#
ENGINEERING: This plan represents a Letter of Instruction.The work will be completed according to cost/requirementsestablished in BCH-Vendor contracts and conform to schedulesdetermined by the individual BCH Companies.
603
604
605
SO
UT
H G
RIM
SB
Y R
OA
D #
5
#20 HWY
WEST ST
601
337m 1D/PVCD2/90
CONDUIT PLACED BY X98200
12
1m
TO
PE
D O
PP
11 S
OU
TH
GR
IMS
BY
RD
# 5
DEPTH OF COVER:BLVD 2.0mRD X'ING 2.0mENSURE 2m BELOWEXISTING CABLES
15,201-250
401-2,651-700
13,901-950
D3951-3975
13,976-1175
15,101-125
BJMB 400-24/BUR
PLACEMENT OF CABLES/CONDUIT ONLY
FBBBBBBBBBBBBBBBB
BB
G GA
PP 1VU
1L
EB
A A AA
AJTB 100-26/BUR
AJTB 50-26/BUR
AJTB 50-26/BUR
BJMB 50-24/BUR
AB
166F
AJT
B 3
00-2
6/B
UR
BJM
B 3
00-2
4/B
UR
( 12
1.0
0)
( 3.00)
6.10
6.10
0.30
5.20 6.00
2.0
0 1
.00
2.6
0
2.6
0
5.40
EA
EA
EA
EA
EA EA
EA
EA
EA
EA
EA
ED
ED
ED
ED
ED
ED ED
ED
ED
ED
ED
ED
MK 3 S GRIM RD 5FC12-0
MK 4 S GRIM RD 5
FC12-0
PED OPP 11 SOUTH GRIMSBY RD # 5
(OPP LOT 6)
4
9m 2D/ PVCD2
12m
2D
/ P
VC
D2
401-2,1-100
401-2,101-150
401-2,151-200
401-2,201-250
(401-2
,1-3
00)3
00D
401-2
,1-3
00
36
57
15
22
121
3
UP 2
8
151
131
F
166F
xx
xx
YV
ISSUE DATE SIGNATURE
CLLI PLAN
WLNCON01
Joe Tomasi / (416) 215-4919WEST LINCOLN
WEST LINCOLN 603Y07924
ORIGINATOR / PHONE
Copyright Bell Canada
SC
R/W
REISSUE DATE
AS /
ASSOCIATE / PHONE
NETWORK#
ENGINEERING: This plan represents a Letter of Instruction.The work will be completed according to cost/requirementsestablished in BCH-Vendor contracts and conform to schedulesdetermined by the individual BCH Companies.
SO
UT
H G
RIM
SB
Y R
OA
D #
5
WESTLEA DR
602
TO
SC
& O
PI P
ED
ALLA
N R
D N
OF
HW
Y 2
0
12
1m
TO
OP
I
DEPTH OF COVER:-2.0m BELOW EXISTINGCABLE-BLVD 2m
YV
YV
YV
YV
YV
YV
YVB
BB
BB
BB
BB
BB
BB
BB
B
BB
B
BB
BB
BB
B
BB
B B
BBBBBBBBB
B
G G
E
E E
BB
BB
BB
BB
BB
B
BB
BB
BB
BB
BB
B
B
G
G
GA
A
AA
P
EB
EB
EB
EB
EBEBEBEB EB
EB EBEB
A
A
B
B
B
B
A
B
BB
B
B
B
BB
AA
AA
AA
( 2.0
0)
( 0.50)( 0.50)
( 0.50)
( 0.3
0)
1.50
1.50
1.50
2.0
0
2.0
0
EA
EAEA
EA
EA
EA
EA
EAEA
EA
ED
EDEDED
ED
ED
ED
ED
ED
ED
PED 315
WEST S
T
FC25-2
5
401-
2,37
6-40
0
CPED_CP
PROFO
RM 8
PED 315
-3 W
EST ST
CPED_TV
TV16
PED 315
-2 W
EST ST
MV C
A/N
O C
A
13690
13690
ARB 39, BREAK 4m OF EXISITINGDUCT & EXPOSE 4m OF BOTH AJMB400-24 & AJTB 400-26 CABLES & SWING UP INTO NEW TV1016 FORSPLICING
ARB 39, BREAK 4m OF EXISITINGDUCT & EXPOSE 4m OF BJAB 200-22 CABLE. SWING UP INTO NEW PRO 8 PED FOR SPLICING.
35
38
39
42
43
44
45
46
47
48
(A) B
JAB 200-22
(A) B
JAB
200-22
(B) B
JMB 400-24/B
JMB 400-24
184
F
F
F
F
F
F
F
F
xx
xxISSUE DATE SIGNATURE
CLLI PLAN
WLNCON01
Joe Tomasi / (416) 215-4919N/A
WEST LINCOLN 604Y07924
ORIGINATOR / PHONE
Copyright Bell Canada
SC
R/W
REISSUE DATE
AS /
ASSOCIATE / PHONE
NETWORK#
ENGINEERING: This plan represents a Letter of Instruction.The work will be completed according to cost/requirementsestablished in BCH-Vendor contracts and conform to schedulesdetermined by the individual BCH Companies.
2.0
2.10
ABANDONED FROM TOP TO BOTTOM:AB 84m 1D/PVCD2/90AB AJTB 100-26/BUR/265M(WLNCON01/401-2,301-400)100DAB 79m 2D/PVCD2/90AB BJAB 200-22/BUR/175M(WLNCON01/13,1-200)200DAB AJMB 400-24/BUR/176M(WLNCON01/13,801-1175)375D & (WLNCON01/15,101-125)25DAB AJTB 400-26/BUR/170M(WLNCON01/D1-200)200D & (WLNCON01/13,1201-1300)100D & (WLNCON01/15,201-300)100D
2.13
2.13
YV
YV
YV
YV
YV
YV
YV
F
F
F
F
G G
E
E E
G
G
GA
A
AA
P
EB
EB
EB
EB
EBEBEBEB EB
EB EBEB
A
A
B
B
B
B
A
B
BB
B
B
B
BB
AA
AA
AA
5BM2LT 72/AER 09-01-C
5BM2LT 72/AER
09-01-C
AJTB 100-26/BUR
AJTB 100-26/BUR
BJM
B 100-24/B
UR
BJAB 200-22/BUR
AJMB 400-24/BUR
AJTB 400-26/BUR
( 2.0
0)
( 0.50)( 0.50)
( 0.50)
( 0.3
0)
1.50
1.50
1.50
2.0
0
2.0
0
EA
EAEA
EA
EA
EA
EA
EAEA
EA
ED
EDEDED
ED
ED
ED
ED
ED
ED
PED 315
WEST S
T
FC25-2
5
401-
2,37
6-40
0
CPED_CP
PROFO
RM 8
PED 315
-3 W
EST ST
CPED_TV
TV16
PED 315
-2 W
EST ST
MV C
A/N
O C
A
13690
13690
ARB 39, BREAK 4m OF EXISITINGDUCT & EXPOSE 4m OF BOTH AJMB400-24 & AJTB 400-26 CABLES & SWING UP INTO NEW TV1016 FORSPLICING
ARB 39, BREAK 4m OF EXISITINGDUCT & EXPOSE 4m OF BJAB 200-22 CABLE. SWING UP INTO NEW PRO 8 PED FOR SPLICING.
35
38
39
42
43
44
45
46
47
48
2m BEND 1D /PVCD2/90
1m 1D /PVCD2/90
2m B
END 1D /P
VCD2/90
1m 1
D /PVCD2/
90
1m 1
D /PVCD2/
90
2m B
END 1D /P
VCD2/90
50m 1D
/ PVCD2
33m 1D
/ PVCD2
53m 1D
/ PVCD2
168m 2D
/PVCD2/90
2m B
END 1D
/PVCD2/90
(A) B
JAB 200-22
(A) B
JAB
200-22
(B) B
JMB 400-24/B
JMB 400-24
FR401,1-72
FR401,1-72
401-2,301-400
401-2,301-400
401-2,301-400
13,1-200
13,801-1175
15,101-125
D1-200
13,1201-1300
15,201-300
1
1
2
2
3
3
4
4
46
43
45
94 3
UP 2
298
291
5 4
173
107F
F
FF
F
xx
xxISSUE DATE SIGNATURE
CLLI PLAN
WLNCON01
Joe Tomasi / (416) 215-4919N/A
WEST LINCOLN 604Y07924
ORIGINATOR / PHONE
Copyright Bell Canada
SC
R/W
REISSUE DATE
AS /
ASSOCIATE / PHONE
NETWORK#
ENGINEERING: This plan represents a Letter of Instruction.The work will be completed according to cost/requirementsestablished in BCH-Vendor contracts and conform to schedulesdetermined by the individual BCH Companies.
80m 2D
/PVCD2/90
33
PLACEMENT OF CABLES/CONDUIT ONLY
6610
GAS STATION
EXISTINGPROPERTY
YU
YUYU
YV
YV
YV
YV
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
B
BBBB
BB
BB
BB
BB
BB
BB
BB
B
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BB
BBB
BBB
BB
BB
BB
BB
BB
BB
BB
BB
B
B
BB
BB
B
BB
BB
B
A
A
E
E
G
G
A
A
A
A
A
A
A
A
A
K
U
P
P
-
-
EB
EB
EB
EB
EB
EB
EB
EB
EB
EBEB
EB
EB
A
X
X
Y
A
B
C
A
A
A
B
B
B
B
A
A
A
A
B
B
B
B
JF
JF
AB 222F BJMB 200-24/BUR
AB 42F BJMB 200-24/BUR
AB 145F AJMB 400-24/BUR
AB 53F AJMB 400-24/BUR
AB 4
1F ~
16-
22/B
UR
#6
#6
( 1.00)
( 1.8
0)( 4.6
0)
( 4.6
0)
( 2.0
0)
( 1.00)
( 150.00)( 3.0
0)
( 3.5
0)( 3
.00)
( 3.0
0)
( 52.00)
128.60
1.0
0
8.3
0
8.9
0
0.3
0
0.7
0
0.7
0
0.3
0
EA
EA
EAEA
EA
EAEA
EA
EAEA
EA
EA
EA
EA
EA
EAEA
EA
EA
ED
ED
ED
ED
ED
ED
ED
ED
ED
ED
EDEDED
ED
ED ED
EDEDED
EDED
P 2 R
RE 20
HWY
PED 2
-1 2
0 HW
Y
FC25
-25
OPP PED 2 20 HWY
FC25-0
13,1
51-2
00
13,9
26-9
50
401-2,651-675
CPED
_CP
CP-8
16S
PED 6
633
HIG
HW
AY
CP
ED
_CP
PR
OFO
RM
8
PE
D 6
610
HW
Y 2
0
CPED_C
P
PRO
FORM
8
PED S
D 6
633
HW
Y 2
0
CPED_C
P
PRO
FORM
8
PED S
D 6
633-
1 HW
Y 2
0
MV CA/NO CA
MV CA/NO CA
ARB 65&, EXPOSE 6m OF EXT'G BJMB200-24 & SWING UP INTO NEW PED
ARB 64, EXPOSE 4m OF EXT'G BJMB400-24 & SWING UP INTO NEW PED
16
52
57
58
59
60
61
62
63
64
65
66
67
120m 10M
Strand
HP 4
0000
453/
2007
(401-2,801-1000)200D
(401-2,801-1000)200D
(15,201-250)50D
(401-2,651-700)50D
(13,901-950)50D
(D3951-3975)25D
(13,976-1175)200D
(15,101-125)25D
(15,201-250)50D
(401-2,651-700)50D
(13,901-950)50D
(D3951-3975)25D
(13,976-1175)200D
(15,101-125)25D
NO
CO
UN
T
143
6 6
36
145
53
222F
145F
53F
41F
F
xx
xx
YV
YV
ISSUE DATE SIGNATURE
CLLI PLAN
WLNCON01
Joe Tomasi / (416) 215-4919NIAGARA REGION
WEST LINCOLN 605Y07924
ORIGINATOR / PHONE
Copyright Bell Canada
SC
R/W
REISSUE DATE
AS /
ASSOCIATE / PHONE
NETWORK#
ENGINEERING: This plan represents a Letter of Instruction.The work will be completed according to cost/requirementsestablished in BCH-Vendor contracts and conform to schedulesdetermined by the individual BCH Companies.
TOSOUTH GRIMSBY ROAD
#5
602
606
TO PED 1-1 20 HWY
#20 HWY
WEST ST
DEPTH OF COVER:BLVD 2.0mRD X'ING 2.0mENSURE 2m BELOWEXISTING CABLES
CONDUIT PLACED
BY X98200
337m 1D/PVCD2/90
ABANDONING CABLES/CONDUIT
6610
GAS STATION
EXISTINGPROPERTY
YU
YUYU
YV
YV
YV
YV
F
F
F
F
F
F
F
A
A
E
E
E
G
G
A
A
A
A
A
A
A
A
A
K
U
P
P
-
-
EB
EB
EB
EB
EB
EB
EB
EB
EB
EBEB
EB
EB
A
X
X
Y
A
B
C
A
A
A
B
B
B
B
A
A
A
A
B
B
B
B
JF
JF
5BM2LT 48/AER 09-01-D
5BM2LT 48/AER 09-01-D
BJAB 200-22/BUR
BJAB 200-22/BUR
BJMB 400-24/BUR
BJMB 200-24/BUR
BJMB 200-24/BUR
AJMB 400-24/BUR
BJMB 400-24/BUR
AJMB 50-24/BUR
BJMB 50-24/BUR
BJM
B 5
0-24
/BUR
24MCLT 36+1-22/AER N/A
BJMB 200-24/BUR
#6
#6
( 1.00)
( 1.8
0)( 4.6
0)
( 4.6
0)
( 2.0
0)
( 1.00)
( 150.00)( 3.0
0)
( 3.5
0)( 3
.00)
( 3.0
0)
( 52.00)
128.60
1.0
0
8.3
0
8.9
0
0.3
0
0.7
0
0.7
0
0.3
0
EA
EA
EAEA
EA
EAEA
EA
EAEA
EA
EA
EA
EA
EA
EAEA
EA
EA
ED
ED
ED
ED
ED
ED
ED
ED
ED
ED
EDEDED
ED
ED ED
EDEDED
EDED
P 2 R
RE 20
HWY
PED 2
-1 2
0 HW
Y
FC25
-25
OPP PED 2 20 HWY
FC25-0
13,1
51-2
00
13,9
26-9
50
401-2,651-675
CPED
_CP
CP-8
16S
PED 6
633
HIG
HW
AY
CP
ED
_CP
PR
OFO
RM
8
PE
D 6
610
HW
Y 2
0
CPED_C
P
PRO
FORM
8
PED S
D 6
633
HW
Y 2
0
CPED_C
P
PRO
FORM
8
PED S
D 6
633-
1 HW
Y 2
0
MV CA/NO CA
MV CA/NO CA
ARB 65&, EXPOSE 6m OF EXT'G BJMB200-24 & SWING UP INTO NEW PED
ARB 64, EXPOSE 4m OF EXT'G BJMB400-24 & SWING UP INTO NEW PED
16
52
57
58
59
60
61
62
63
64
65
66
67
143m 1D /PVCD2/90
53m 2D /HDPE/90
8m 1D /HDPE/100
10m 1D /HDPE/100
8m 1D /HDPE/100
13m 1D /HDPE/100
12m
1D/ P
VCD2
45m 1D/ PVCD2
120m 10M
Strand
HP 4
0000
453/
2007
FR100,1-48
FR100,1-48
13,1-200
13,1-200
15,201-250
401-2,651-700
13,901-950
D3951-3975
13,976-1175
15,101-125
401-2,801-1000
15,201-250
401-2,651-700
13,901-950
D3951-3975
13,976-1175
15,101-125
401-
2,65
1-70
0
F167,1-24
F11,1-12
FC167,1
401-2,801-1000
401-2,801-1000
15,201-250401-2,651-70013,901-950D3951-397513,976-117515,101-125
401-2,651-700401-2,651-700
8
8
7
7
1
1
2
2
78
DN
2
UP 2
72
56
144 7
151
3
UP 2
3
53
5U
P 2
15
DN 2
DN
2
3
53
5U
P 2
32
1629
2F
161F
63F
63F
4F
7F
48F
F
xx
xx
YV
YV
ISSUE DATE SIGNATURE
CLLI PLAN
WLNCON01
Joe Tomasi / (416) 215-4919NIAGARA REGION
WEST LINCOLN 605Y07924
ORIGINATOR / PHONE
Copyright Bell Canada
SC
R/W
REISSUE DATE
AS /
ASSOCIATE / PHONE
NETWORK#
ENGINEERING: This plan represents a Letter of Instruction.The work will be completed according to cost/requirementsestablished in BCH-Vendor contracts and conform to schedulesdetermined by the individual BCH Companies.
TOSOUTH GRIMSBY ROAD
#5
602
606
TO PED 1-1 20 HWY
#20 HWY
WEST ST
DEPTH OF COVER:BLVD 2.0mRD X'ING 2.0mENSURE 2m BELOWEXISTING CABLES
CONDUIT PLACED
BY X98200
337m 1D/PVCD2/90
PLACEMENT CABLES/CONDUIT
COMM
ERCIAL
FUTURE
COMM
ERCIALSITE
FUTURE
PUMPING STATION
SANITARY
PROPOSED
YU
YU
YU
YU
YU
YU
FF
F
F
BB
BB
BB
BB
BB
BB
FBB
BB
BB
E
A
A
A
A
A
U
U
P
EA
EB
-
- EBEB
EB
EBEB
EB
JG
X
W
A
A
A
A
D
A
A
B
B
A
A
A
A
A
JF
JF
JF
5BM2LT 48/AER 09-01-D
BJAB 200-22/BUR
BJAB 200-22/BUR
AJMB 50-24/BUR
24MCLT 36+1-22/AER N/A
24MCLT 36+1-22/AER N/A
BJMB 200-24/BUR
BJMB 200-24/BUR
BJMB 200-24/BUR
BJMB 50-24/BUR
AB 4
8F B
JMB 2
00-2
4/BUR
BJMB 200-24/BUR
BJMB 200-24/BUR
AJMB 400-24/BUR
AJMB 400-24/BUR
AJMB 400-24/BUR
0.3
0
( 3.0
0)
( 9.0
0)
( 10.
00)
( 11.
00) ( 1
.80)
( 4.1
0)( 4
.60)
( 1.8
0)
( 4.1
0)
( 4.1
0)
( 4.5
0)
( 1.8
0)
( 4.1
0)
( 3.0
0)
( 0.3
0)
( 27.00)
( 6.00)
1.0
0
1.5
0
( 0.3
0)
EA
EA
EA
EA
EA
EAEA
EA
EA
EAEA
EAEA
EA
EA
EA
EA
EA
EAEA
EA
ED
ED
ED
ED
ED
ED EDED
ED
EDED
ED
ED
ED
ED
ED
ED
ED
EDED
ED
MK 0
-1 R
RE 2
0 H
WY
MK 2
-1 R
RE 2
0 HW
Y
PED 3
20
HW
Y
FC25
-25
13,1
51-2
00
13,1
76-1
91
401-
2,67
6-70
0
CPED
_CP
CP-8
16S
PED
CO
RN
ER
STR
EAM
-
SID
E &
HW
Y 2
0
CPED_C
P
PRO
FORM
8
PED S
D 6
659
HW
Y 2
0
ARBS 68, BREAK CONDUIT & EXPOSE 7mOF CABLE & SWING UP INTO NEW PEDARB 72, MOVE EXISTING PED OVER 2m TOWEST & RAISE 2m TO ACCOMMODATE THEGRADE CHANGE AT THIS LOCATION. USEEXT'G CP-816S
68
69
70
71
72
73
0
0 0
0
A:16MR:3/4"
131m 1D /PVCD2/90
14m
1D /P
VCD2/
90
337m 1D /PVCD2/90
21m
1D
/HD
PE/9
0
2m B
END 1
D /P
VCD2/
9027m 1D /PVCD2/90
RM6m 1D /PVCD2/90
AB16m 1D /PVCD2/90
(A) B
JMB 2
00-2
4
G : 10M
L=5M
HP 4
3937
453/
2007
HP 4
5936
453/
2007
HP 4
5933
453/
2007
HP 2
0841
453/
2007
FR100,1-48
13,1-200
13,1-200
15,201-250
401-2,651-700
13,901-950
D3951-3975
13,976-1175
15,101-125
F167,1-24
F11,1-12
FC167,1
F167,1-24
F11,1-12
FC167,1
401-2,926-950
D951-975
(401
-2,8
01-1
000)
200D
401-2,801-1000
401-2,801-1000
D4051-4075
401-2,676-700
401-2,801-1000
401-2,801-1000
401-2,801-925D8426-8500
15,201-250401-2,651-70013,901-950D3951-397513,976-117515,101-125
15,201-250
401-2,651-700
13,901-950
D3951-3975
13,976-1175
15,101-125
1
1
2
2
2
2
8
8
2
2
18
DN
2
3
74
63
61
189
5
UP 2
DN 2
5
57
UP 2
3
20
5
16
7
139
4F
62F
48F
F
F
F
xx
xx
YV
ISSUE DATE SIGNATURE
CLLI PLAN
WLNCON01
Joe Tomasi / (416) 215-4919NIAGARA REGION
WEST LINCOLN 606Y07924
ORIGINATOR / PHONE
Copyright Bell Canada
SC
R/W
REISSUE DATE
AS /
ASSOCIATE / PHONE
NETWORK#
ENGINEERING: This plan represents a Letter of Instruction.The work will be completed according to cost/requirementsestablished in BCH-Vendor contracts and conform to schedulesdetermined by the individual BCH Companies.
CO
NDUIT
PLA
CED B
Y X
9820
0
CONDUIT PLACED BY X98200
PLACED BY X22864
CONDUIT PLACED BY X98200#20 HW
Y
WEST ST
TO SC & OPI PED ALLAN RD N OF HWY 20
605
TOSTREAMSIDE
DR
DEPTH OF COVER:BLVD 2.0mRD X'ING 2.0mENSURE 2m BELOWEXISTING CABLES
F F
FF
AA
AJM
B 4
00-2
4/B
UR
AJT
B 4
00-2
6/B
UR
BJM
B 4
00-2
4/B
UR
BJM
B 4
00-2
4/B
UR
EBEB
EBEB
JGJG
PE
D 2
55 W
ES
T S
T
PE
D 1
- 2 H
WY
20
235 W
PE
D 1
-1 2
0 H
WY
13,8
01-1
175
15,1
01-1
25
D1-2
00
13,1
201-1
300
15,2
01-3
00
D1-2
00
13,1
201-1
300
15,2
01-3
00
13,8
01-1
175
15,1
01-1
25
UP 2 U
P 2
DN
2
DN
2
2F2F
SECTION CUTSECTION CUT
74
75
77
78
00
00
511
00
CPED_TVTV16PED 315-2 WEST ST
xx
xx
YV YV YV
YV
ISSUE DATE SIGNATURE
CLLI PLAN
WLNCON01
Joe Tomasi / (416) 215-4919N/A
WEST LINCOLN 607Y07924
ORIGINATOR / PHONE
Copyright Bell Canada
SC
R/W
REISSUE DATE
AS /
ASSOCIATE / PHONE
NETWORK#
ENGINEERING: This plan represents a Letter of Instruction.The work will be completed according to cost/requirementsestablished in BCH-Vendor contracts and conform to schedulesdetermined by the individual BCH Companies.
SEE PLAN 604 FORLOCATION
SC
SC604
604604604
F
F
A
BJA
B 2
00-2
2/B
UR
BJA
B 2
00-2
2/B
UR
fe
EB
EB
PE
D 1
20 H
WY
13,1
-200
13,1
- 200
UP
2
DN
2
2F
2F
A
76
79
CPED_CPPROFORM 8PED 315-3 WEST ST
xx
xx
YV YVISSUE DATE SIGNATURE
CLLI PLAN
WLNCON01
Joe Tomasi / (416) 215-4919N/A
WEST LINCOLN 608Y07924
ORIGINATOR / PHONE
Copyright Bell Canada
SC
R/W
REISSUE DATE
AS /
ASSOCIATE / PHONE
NETWORK#
ENGINEERING: This plan represents a Letter of Instruction.The work will be completed according to cost/requirementsestablished in BCH-Vendor contracts and conform to schedulesdetermined by the individual BCH Companies.
SEE PLAN 604 FORLOCATION
604604
SC