By 30 June, draft WP to EP, EC and BoRBy 1st September, BoR approves WP By 30 September, AB adopts WP
Annual Work Programme
Activities, tasks and deliverables under 4 broad themes in continuity with last year
ChallengesWP in line with draft budget adopted by AB (with supportive BoR Opinion) – subject to the assignment of resources
Agency’s strategic areas 2015 – 2017 unchanged from last year
Multiannual outlook
Work Programme – Structure & Timing
2
ACER WP
Four Themes contributing to the
Energy Union
ACER work within the Energy Union context
Energy Union
Energy security,
solidarity and trust
A fully-integrated Internal EnergyMarket
Energy efficiency/
moderation of energy demand
Decarboni-sation of the
economy
Research and Innovation
3
• Complete transposition of Third Package
• Implementation & Monitoring of Network Codes
Themes of 2016 ACER WP
• REMIT ‘live’• Wholesale Market Monitoring
• European Network Planning • PCI selection & process • Cross-Border Cost Allocation
• “Bridge to 2025 implementation”
Theme 1: (Post-) IEM Completion
Theme 3: Infrastructure Challenge
Theme 2: Wholesale Energy Market Integrity and Transparency
Theme 4: Future Challenges, including RES Integration
4
Fully functioning IEM backbone of the Energy Union as underlined by the EP draft report on Energy Union!
Theme 1 – (Post-) IEM Completion Framework Guidelines and Network Codes
• Implementation of adopted NC and Guidelines• Follow-up on possible rules on Harmonised
Tariff StructuresElectricity
Gas
• Implementation of adopted NC and Guidelines• Early implementation of NC on Harmonised
Transmission Tariff Structures• CAM NC Amendment on Incremental Capacity• 3rd Congestion Report
5
Early Implementation: Electricity Day-Ahead Regional Integration (Market Coupling)
Theme 1 – (Post-) IEM Completion
6
Early Implementation:Current Gas CAM Pilot Projects (as of June 2015)
AT, BE, DK, ES, DE, FR,
IE, IT, NL, PT, SI, UKPRISMA Platform
PLGSA Platform: Bundled
Capacity at Polish IPs + Pilots
HU, RORegional Booking Platform:
Auctions of Bundled Capacity
LU/DE Pilot Project w/ PRISMA
DE/CZ &
PL/CZ
2 bundling Pilot Projects:
PRISMA: DE/CZ
GSA: PL/CZ
CZ/SK
Discussion on Pilot(s) between
eustream (SK) &
I) GSA
II) PRISMA
SI/HR Discussion on PRISMA Pilot
BG, GR, SE, FL, LT, LV,
EEundecided
CAMCOORDINATED AUCTIONSfor the allocation of a common set of cross-border bundled capacity products
Theme 1 – (Post-) IEM Completion
7
Adoption of the Implementing Acts
Registration of Market Participants
Data reporting and monitoring by ACER
Dec 2014
after 9 months
Feb/Mar 2015
Oct 2015
within 3 months
Getting ready for Market Monitoring of wholesale energy markets
Jan2015
Entry into Force of the Implementing Acts
Less than 4 months to go!Trade data reporting obligation starts on 7 October
2015
Theme 2 – REMIT - Timeline
8
9
56
35
5
10
15
30
20
25
2012 2013 2014
Year of notification
Progress of potential REMIT breach cases reported to/by the Agency – status as of 31/05/2015
Pending
Closed – Breach found and sanctioned
Closed – Breach found and no formal sanction applied (e.g.: warning)
Closed - Insufficient evidence or no breach
16
1
23
412
2015 Until
31/05/2015
10
33
12
Nu
mb
er o
f cases
Theme 2 – REMIT
9
ACER REMIT Portal: single entry point to information & applications for market participants, stakeholders and general public; also gives access to “Whistleblower platform”
Roundtable meetings to collect feedback from stakeholders
6th edition of ACER Q&A paper … released early June
REMIT Coordination Group (ACER and NRAs) to facilitate coordination in REMIT operations
NRAs 2nd Survey on state of play for REMIT application at national level
Continuous regulatory capacity building
Regular ACER and NRAs sessions on Open Questions & Answers
Intense, joint effort by ACER and NRAs to finalise the implementation of REMIT
Theme 2 – REMIT – Getting ready
10
ACER 2016 draft budget 20.078.441€* - Additional staff (+44) for REMIT and TEN-E Regulation
- Renewal of REMIT service contracts
Energy trade data reporting & market monitoring starts 7 October 2015
EC recognised need for additional resources; 27 May statement of estimates for 2016: ACER +10 staff members and €15.547m budget
but proposed resources are still insufficient…
* Adopted by AB (26 March) with supportive opinion of BoR
Theme 2 – REMIT – Budget challenges
Grateful to ITRE Committee for the continuous support
11
Theme 2 – REMIT: Concerns about impact of EU Financial Regulation on IEM
Currently majority of wholesale gas and electricity tradingoutside the scope of EU financial regulation Not considered ‘Financial Instruments’ under MiFID or
Can avail of a number of exemptions under MiFID
Current Level 2 legislation proposals will potentially capturemore energy trading under financial market regulationthrough: Widening the scope of the definition of ‘financial instruments’ under MiFID II
Narrowing possibility for energy firms to be exempted from MiFID II
This will add costs and regulatory burden on firms tradingenergy for little benefit (market integrity and transparency arespecifically catered for by REMIT)
Potential to damage liquidity making the IEM and Energy Unionmore difficult to achieve
Regulations to be finalised in 2 phases: in the coming weeks andmonths. Need for action
12
Theme 3 – The Infrastructure Challenge
ACER Priorities in 2016• Opinion on methodologies for cost-
benefit analysis• Report on national methodologies,
criteria to evaluate investments
PCI Support
EU network Planning
• Opinion on ENTSO-E’s Ten Year Network Development Plan
• Report on implementation of the inter-TSO compensation fund
• Opinions on national plans• Opinions on ENTSOs WP, supply
outlooks, adequacy forecasts
PCI Implementation Monitoring
• Annual report on PCI implementation and recommendations
ACER may also be called to issue Decisions on Cross-Border Cost Allocation
• PCI selection: Opinion on consistent application of criteria across regions (every 2 years)
13
o Bridge key elements linked to the Energy Union:o Including strengthening interactions with our neighbours’
NRAs and regulatory capacity building along IEM principles
Theme 4 - Meeting future challenges: the “Bridge to 2025”
2. Smarter
demand
side/grids
1. Flexibility
3. Further
competition
DSR Wholesale
Retail
Customers
14
The EU Energy Sector trends and
More liquid, flexible and integrated Gas
Markets
Towards aLow-Carbon Society
Increased penetration of Renewable Sources
Adequacy concerns and need for Flexibility
Uncertainty over Future Gas Demand
New uses of Gas
Gas used for Flexible Power Generation
Flexibility and Adequacy Markets in
Electricity
challenges
Theme 4 - Meeting future challenges : the “Bridge to 2025”
15
ACER will include the metric calculation results (biannually) for each market in the Market Monitoring Report (MMR) when (REMIT) data is available October 2015: market
places data April 2016: OTC data Probably first covered in
MMR 2016 (published 2017) NRAs to carry out self-evaluation
second half 2015
ACER to summarise and evaluate the results of self-evaluation and proposed measures
Implementation of the GTM
Theme 4 - Meeting future challenges: the “Bridge to 2025”
16
• Reinforcement of ACER recognised also in the EP draft report on EU: Possible areas
Oversight of ENTSOs & other Bodies
• Increasingly important role of ENTSOs• Effective oversight of the ENTSOs by ACER• Similar oversight of other bodies with critical
or monopoly IEM functions
Stronger NRAs Coordination
• Mechanisms to further enhance cooperation between NRAs
• ACER to replace “all NRAs” in taking CACM 3rd level decisions
Monitoring of Markets
• ACER powers to require from all EU energy-sector entities information needed for monitoring
Theme 4 - Meeting future challenges:
17
Thank you for your
attention
Save the Date! 9 July ACER Annual Conference
‘An Energy Union for Consumers’, Brdo Conference Centre, Slovenia
www.acer.europa.eu
ANNEX
ACER delivered 8 Framework Guidelines and recommended 11 (of 14) Network Codes for adoption
FG adopted by the Agency NC Status
Electricity
Grid Connection 20.07.20113 NCs recommended for adoption
With the EC - expected vote in Ctte in June-August 2012
Capacity Allocation & Cong.
Management
Forwards
29.07.2011
1 NCs recommended - approved in Ctte
1 NCs recommended - with EC - expected vote in Cttee in
September 2015
System Operation 02.12.2011
3 NCs recommended for adoption
1 NC being considered by ACER
Merged in one code by end of June 2015
Balancing 18.09.2012 1 NC: ACER recommendation expected in July2015
Gas
Capacity Allocation 03.08.2011 OJ: 14.10.2013 EiF: 1.11.2015
Balancing 18.10.2011 OJ: 26.03.2014 EiF: 1.10.2015
Interop. & Data Exch. 26.07.2012 Adopted on 30 April
Harm. Tariff Struct. 29.11.2013 ACER Opinion issued on 30.03.2015
Theme 1 – (Post-) IEM Completion
Annex 1
SINGLE EU ALLOCATION PLATFORMone-stop shop for allocating long-term transmission rights
Capacity Calculation
FLOW-BASED METHODto improve network security and the level of available capacity
SINGLE EU PRICE COUPLINGto optimise use of existing day-ahead cross-border capacities at EU level
SINGLE EU CONTINUOUS TRADINGwith the possibility of auctions
Long Term
Intraday
Day-Ahead
Electricity Capacity Allocation and Congestion Management Cross-regional Roadmaps
… for early, voluntary implementation of the Target Model
Theme 1 – (Post-) IEM Completion
Annex 2
- Single Price Coupling covering 19 Member States
- 4MMC Price Coupling (CZ. HU, SK, RO)
Single EU DA Price Coupling
Electricity CACM Roadmaps: State of Play
Single EU ID Contin. Trading
- Significant delay due to PXs’ disagreement- EC took the process over at FF Nov 2013- Statement of Principles from NRAs to
project parties in April 2015
Single EU LT Allocat. Platform
- MoU between CASC and CAO (75% of the EU borders with LT TRs)
- Common auction rules being developed by ENTSO-E, to be approved by NRAs
- CWE pilot project went live in May 2015- The CEE region to follow (ad-hoc solutions
may be required to address the loop flows phenomenon)
Flow-Based Cap. Calc. Method
Theme 1 – (Post-) IEM Completion
Annex 3
Operation of Centralised European register of energy market participants and of Information System for collection & sharing of data
Market monitoring of trading activity in wholesale energy markets
Coordination of NRAs and other authorities for consistency in REMIT implementation & ensure a coordinated approach in the enforcement of market abuse rules
Annual report on the Agency’s activities under REMIT
Key tasks in AWP 2016
Theme 2 - REMIT
Annex 4
TEN-E RegulationCross-Border Cost Allocation Decisions
Two CBCA Decisions adopted by ACER so far:.GIPL – Gas Interconnection Poland Lithuania (11.8.2014)
.LitPol – LT part of the Lithuania – Poland electricity interconnection (16.04.2015)
0
100
200
300
400
500
600
700
800
PL LT LV EE
Benefits
Costs
CBCA from CBCA to €m
LT PL 54.9 (64.0%)
LV PL 29.4 (34.3%)
EE PL 1.5 (1.7%)
Total Compensation 85.8 (100%)
LT receiving positive net benefits
(benefits > cost)
No CBCA compensation necessary
Theme 3 – The Infrastructure Challenge
Annex 5
Performance of Wholesale Gas Market in 2014GTM 2011 criteria
Based on 5 indicators:
Churn rate
Market size (TWh/year)
Number of gas sources
Herfindahl–HirschmanIndex
Residual Supply Index
Well-functioning Inadequate
Theme 4 - Meeting future Challenges: GTM