2016 3 eng · 2018. 5. 31. · wwt without compromise since 1990. title: 2016_3 eng.cdr author:...
TRANSCRIPT
![Page 1: 2016 3 ENG · 2018. 5. 31. · WWT without compromise since 1990. Title: 2016_3 ENG.cdr Author: Administrator Created Date: 3/8/2016 12:05:20 PM](https://reader033.vdocuments.us/reader033/viewer/2022051902/5ff116e3f38da9159b227d63/html5/thumbnails/1.jpg)
Site Selection
Construction
Operation
Management
Old Landfill study
•
•
•
•
•
STRUCTURE STABILITY STUDY
•
•
•
•
•
Planning
Design
Operation
Construction
Management
WASTE WATER TREATMENT
LANDFILL ENGINEERING
•
•
•
Dam Investigation
Dam Monitoring
Dam Rehabilitation
Contact
Phone:
Fax:
E-mail:
Internet:
+49 (0) 36075 / 55000
+49 (0) 36075 / 439308
www.sco-tech.com
Address. SCO Engineering GmbH
Au f de r He ide 15
D-37351 Dingelstädt
Federal Republic of Germany
WWT without compromise
since 1990