2016-02-12-14-21-52_stewart_1976580

3
LinkedIn Basic Profile Stewart Ritchie Site Installations / Package Manager & LV Installation Consultant Clwyd | Utilities & Water Current: S R Electrical Engineering Ltd Previous Lloyd Morris Electrical Ltd Education: College SUMMARY A highly experienced, confident SITE INSTALLATIONS / PACKAGE MANAGER with proven track record of delivering outstanding service in a fast changing and challenging construction and safety critical environment. With expertise in all phases of LV electrical installation processes and systems I am an analytical and innovative thinker able to solve complex problems on site, recommend and implement solutions to ensure projects are completed on time to client’s 100% satisfaction. Renowned for excellent team leadership, motivation and management skills, I am able to keep financial control of budgets and deliver projects often to tight deadlines helping to ensure the companies long-term success. I am a positive communicator experienced in building respect and confidence with clients, contractors, sub-contractors, team members and decision makers at the highest level which is coupled with an organised and creative approach in meeting the client’s need resulting in a profitable solution for his company. OBJECTIVE Seeking challenging Site Installation / Package Manager role with forward- looking company setting high standards for electrical and installation delivery within the Pharamacutical, Water and Utilities industry. SELECTED ACHIEVEMENTS Successfully completed over 50 refurbishment, upgrading and major new projects varying between £100k - £2.5m for Severn Trent Water on time and in budget. Completed Minworth STW £1.3m ASP7 Scheme new build 48-week project in 27-weeks. Rebate to Severn Trent. Managed multiple sites (up to 20 max) covering schemes from £10k - £300k, completing site documentation, checking sub-contractors SSOW, risk assessments and H & S Audits. Successfully completed Minworth STW major flagship (3NO HV Back to Grid CHP`s) upgrade in 8-months on time and under budget. KEY SKILLS

Upload: stewart-ritchie

Post on 09-Feb-2017

73 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2016-02-12-14-21-52_STEWART_1976580

LinkedIn Basic Profile

Stewart RitchieSite Installations / Package Manager & LV Installation Consultant

Clwyd | Utilities & Water

Current: S R Electrical Engineering Ltd

Previous Lloyd Morris Electrical Ltd

Education: College

SUMMARY

A highly experienced, confident SITE INSTALLATIONS / PACKAGE MANAGER with proven track record of delivering outstanding service in a fast changing and challenging construction and safety critical environment. With expertise in all phases of LV electrical installation processes and systems I am an analytical and innovative thinker able to solve complex problems on site, recommend and implement solutions to ensure projects are completed on time to client’s 100% satisfaction.

Renowned for excellent team leadership, motivation and management skills, I am able to keep financial control of budgets and deliver projects often to tight deadlines helping to ensure the companies long-term success.I am a positive communicator experienced in building respect and confidence with clients, contractors, sub-contractors, team members and decision makers at the highest level which is coupled with an organised and creative approach in meeting the client’s need resulting in a profitable solution for his company.

OBJECTIVE

Seeking challenging Site Installation / Package Manager role with forward-looking company setting high standards for electrical and installation delivery within the Pharamacutical, Water and Utilities industry.

SELECTED ACHIEVEMENTS

Successfully completed over 50 refurbishment, upgrading and major new projects varying between £100k - £2.5m for Severn Trent Water on time and in budget.

Completed Minworth STW £1.3m ASP7 Scheme new build 48-week project in 27-weeks. Rebate to Severn Trent.

Managed multiple sites (up to 20 max) covering schemes from £10k - £300k, completing site documentation, checking sub-contractors SSOW, risk assessments and H & S Audits.

Successfully completed Minworth STW major flagship (3NO HV Back to Grid CHP`s) upgrade in 8-months on time and under budget.

KEY SKILLS

Project management , Trouble shooter, stakeholder relationship management, Team Leader, people management, communication, time management, negotiation, health and safety, risk management, construction, budget management, engineering

EXPERIENCE

S R Electrical Engineering LtdSENIOR LV PACKAGE MANAGER/LV INSTALLATION CONSULTANT2014 – 2015 (1 year 8 months) | Leicestershire

Completing project site surveys ensuring compatibility with proposed project.Produced control drawings and project plan, supervise installation teams, inspection and testing for Electrical installation and production of completion handover documentation.

Page 2: 2016-02-12-14-21-52_STEWART_1976580

Managed 13 sub-contractor companies on site.Planned works, supervising contractor’s teams throughout project and was the focus point for dealing with issues/problems with the contractor’s team.Managed and met all H & S Regulations, reviewed method statements, SSOW and risk assessments.

Lloyd Morris Electrical LtdLV ELECTRICAL DESIGN ENGINEER/PROJECT ELECTRICAL MANAGER2006-2014 (8 years) | West & East Midlands

Project managementCompleted over 50 refurbishment, upgrading and major new projects varying between £100k - £2.5m for Severn Trent Water on time and in budget.Managed multiple sites (up to 20 max) covering schemes from £10k - £300k, completing site documentation, checking sub-contractors SSOW, risk assessments and H & S Audits.Completed Minworth STW £1.1m ASP7 Scheme new build 48-week project in 27-weeks.Completed Minworth STW major flagship (HV Back to Grid CHP) upgrade in 8-months on time and under budget resulting in returning money to Severn Trent Water.Completed project site surveys ensuring compatibility with proposed project.Produced control drawings and project plans, supervised installation teams, inspection and testing for electrical installation and production of completion handover documentation.Planned works, supervising contractor’s teams throughout project and was the focus point for dealing with issues/problems with the contractor’s team.Managed and met all H & S Regulations, reviewed method statements, SSOW and risk assessments.

Continue as necessary completing with three/four examples as above

PROJECTS MANAGER & L V DESIGN ENGINEER2005-2006 Wrexham

Managed design of all power, control, instrument and all types of communication cabling networks, block cable diagrams and termination drawings for construction. Engineer Projects form Central Office. Procurement and man management.

Senior Site Supervisor / Principal Contractor Site Manager2003-2005 (3 years) | Isle of Man Sewerage for Adoption. Beinn-Y-Phott Reservoir P.Station Upgrade.

Oversaw civil, mechanical, electrical, heating and ventilation installationsRefurbishment of the Beinn-e-Phott Reservoir and pumping station

Approved Electrician / Site Supervisor / Senior Site Supervisor1993-2003 (10 years) | UK & HollandPermoid FabricatorsElectrical Installation Manager1992-1993

Thorpe ElectricalAPPROVED ELECTRICIAN1989-1992 (1 year X months) | Banbury

Carlton Leslie OffshoreAPPROVED ELECTRICIAN1988-1989 (1 year X months) | Wallsend

National Coal BoardELECTRICIAN1970-1988 (18 years)CERTIFICATION & TRAININGEUSR (Blue Water Hygiene) Card Engineering Utilities Skills RegisterJIB Electro Technical Assessed – Industry Assessed Level – Electrical Site ManagerONC Electrical Engineering

Page 3: 2016-02-12-14-21-52_STEWART_1976580