![Page 1: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/1.jpg)
![Page 2: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/2.jpg)
21.04.23 2
![Page 3: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/3.jpg)
21.04.23 3
![Page 4: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/4.jpg)
21.04.23 4
![Page 5: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/5.jpg)
21.04.23 5
Conclusions
1) Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);
2) State budget overcommitment of 81.4 mln. euro has a considerable role in sustaining financial progress, it has influenced achievement of indicators (many has been eceeded significantly), as well as solving shortage of funds for certain target groups;
4) Most output and result indicators of OP target values have been already reached or even exceeded;
5) There are only few of indicators where target values set in the OP will not be reached fully - Number of students studying for Masters’s degrees with ESF support (85,2%), Percentage of students enrolled in the improved vocational education programmes of the total number of vocational education students (14,3%);
6) Preparation for closure has been started already – different type of audits within intermediate bodies/ responsible authorities, as well within MA;
7) At beginning of 2016 MA will lauch work on the Final implementation report to EC;8) As in Latvia for ESF activities/projects there were stricter requirements regarding
sustainability than demanded by the amended Article 57 of Regulation (EU) No 539/2010, the discussion on the ESF-funded project ex-post monitoring was initiated by MA which resulted with changes of national regulations (lightening ex-post monitoring requirements).
![Page 6: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/6.jpg)
21.04.23 6
![Page 7: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/7.jpg)
Society Integration Foundation
7
Public foundation (established by the law on “Society Integration Foundation” in 2001)
Intermediate body
![Page 8: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/8.jpg)
Project information
8
Priority: 1.5. "Administrative Capacity Building"
Measure : 1.5.2. "Capacity Building of Human Resources"
Sub-activity : 1.5.2.2."Administrative Capacity Building of NGOs"
Project: "Capacity building of animal protection organizations"
Project promoter: Ulubele Animal Shelter
Total costs: 35 292,68 EUR
Project duration, months: 10
![Page 10: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/10.jpg)
10
![Page 11: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/11.jpg)
Project «Development and Implementation of Motivation Program for Homeless Unemployed People»
•Administrated by European Social Fund Department (State Employment Agency)
•Budget - EUR 131 278•Timing - 2 years •Beneficiary - Riga Shelter•Country - Latvia•The aim - develop social care for homeless persons (incl. persons released from prison, people with disabilities, imminent disabilities or chronic illnesses).
11
![Page 12: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/12.jpg)
Project activities
12
![Page 13: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/13.jpg)
Outcome indicator
•240 persons have received advanced social rehabilitation services during the project implementation.
•Interesting facts to mention:– 6 persons found permanent job– 60 persons show their ability
to enter into working conditions/find job– Formed 2 pairs
13
![Page 14: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/14.jpg)
Before
14
![Page 15: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/15.jpg)
After
15
![Page 16: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/16.jpg)
Before Before
16
![Page 17: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/17.jpg)
After
17
![Page 18: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/18.jpg)
Finishing the ESF projects under 2007.-2013. programming period
Aivars VoldeksHead of
Programme Implementation Division
Vilnius, 22.10.2015.
![Page 19: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/19.jpg)
State Regional development agency
Agency was established on April 23, 2004;
The Agency is an authority operating under the Supervision of the Ministry of Environmental Protection and Regional Development;
employees More than 17 years of experience in different programme administration:
- 2007- 2013 programming period;- 2004 - 2006 programming period; - Swiss-Latvian cooperation programme;- Social Safety Net Strategy;- State Budget Programmes;- European Economic Area Financial Mechanism and the
Norwegian Financial Mechanism.
19
![Page 20: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/20.jpg)
Activities of ESF in 2007.-2013. programming period
20
Activities of ESF ESF allocated financing (100
%), EUR
Specialists recruited for the planning regions, cities and amalgamated local municipalities
Aim of activity: to attract specialists in local municipalities for the autonomous functions that must be at the same time new service of municipality
Eligible costs: salary of the attracted specialist for 24 month. After this period, municipalities must to maintain a specialist at least 6 months by their own financing.
3 506 867
Enhancing the administrative capacity and the capacity of development planning in regions and local municipalities
Aim of activity – eleboration of planning documents
Eligible costs: payment for services who develop planning documents (strategies, teritorial plans, development programms etc.)
3 227 488
Total 6 734 355
![Page 21: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/21.jpg)
What is done by ESF?
21
Results of activity «Specialists recruited for the planning regions, cities and amalgamated local municipalities»:
Completed 125 projects (of 126);attracted 237 specialists (the most popular professions: project manager, social workers, lawyer, area organiser, building engineer, an economist).
Results of activity «Enhancing the administrative capacity and the capacity of development planning in regions and local municipalities»:
Completed all 71 projects;Eleborated 133 planning documents (investment plans, territorial plans, startegies, development programs)
![Page 22: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/22.jpg)
22
Activity «Specialists recruited for the planning regions, cities and amalgamated local municipalities»:
creating 237 new jobs - the reduction in unemployment in municipalities;
most of the newly created jobs are retained even after project implementation;
municipalities have attracted qualified specialists to function better and more effective implementation;
local government offers a wider range of services to local citizens;
compatibility with other activities!
For example attracted: project managers prepare and implement ERDF projects; lawyers are involved in implementation of ERDF projects as the organisators of
public procurement; area organizers helps to eleborate strategies and other planning documents in
ESF activity; social workers are employees, for example in social center that is created in
ERDF project.
![Page 23: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/23.jpg)
23
Activity «Enhancing the administrative capacity and the capacity of development planning in regions and local municipalities»:
133 development planning documents - long term effect for strategical development of municipalities;
some local municipalities cooperate with neighbouring municipalities to establish the common development programming documents for achieving common objectives;
a number of support programmes are implemented on the basis of local development programmes, i.e. municipality may take such investments, which they are the most necessary, but there is a condition that they must be included in the development programme.
For example: major street reconstruction (road) to promote entrepreneurship, bridge construction, construction of concert halls, renewal or conversion of cultural and historical architectural monuments, etc.
![Page 24: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/24.jpg)
24
the lack of qualified specialists in the municipalities - repeatedly advertisements on established vacancies, including reduction of qualification requirements;
public procurement issues (procurements, which are related with the planning documents) - too high qualification requirements;
the public, including local residents and politicians, involvement in the eleboration of local development planning documents - the opportunity to express their views regarding the necessary infrastructure for business development, etc.
![Page 25: 2015.12.24.2 3 4 5 Conclusions 1)Constantly good overall implementation progress is in closing phase (88,6% projects and 70% of activities are completed);](https://reader035.vdocuments.us/reader035/viewer/2022070415/5697bfec1a28abf838cb8600/html5/thumbnails/25.jpg)
25