20150226 boston hw meetup

45
HOW TO SELECT A FACTORY SCOTT N. MILLER CEO www.dragoninnovation.com @dragoninnovate 1 Tuesday, April 7, 15

Upload: dragon-innovation

Post on 26-Jul-2015

348 views

Category:

Devices & Hardware


0 download

TRANSCRIPT

Page 1: 20150226 boston hw meetup

HOW TO SELECT A FACTORY

SCOTT N. MILLERCEO

www.dragoninnovation.com@dragoninnovate

1Tuesday, April 7, 15

Page 2: 20150226 boston hw meetup

AGENDA

http://en.wikipedia.org

•Quick Survey and Context

• Step 1: Decide Where to Build

• Step 2: Run the RFQ Process

2Tuesday, April 7, 15

Page 3: 20150226 boston hw meetup

Quick Survey

3Tuesday, April 7, 15

Page 4: 20150226 boston hw meetup

Quick Survey

4Tuesday, April 7, 15

Page 5: 20150226 boston hw meetup

MIT RoboTuna

5Tuesday, April 7, 15

Page 6: 20150226 boston hw meetup

Agenda

6Tuesday, April 7, 15

Page 7: 20150226 boston hw meetup

Robotic Corvette Powered Dino

7Tuesday, April 7, 15

Page 8: 20150226 boston hw meetup

Agenda

8Tuesday, April 7, 15

Page 9: 20150226 boston hw meetup

Initial iRobot Expertise (Revenue)

9Tuesday, April 7, 15

Page 10: 20150226 boston hw meetup

Journey from $100,000 to $100 Price

10Tuesday, April 7, 15

Page 11: 20150226 boston hw meetup

My Real Baby ~ 100kVelociraptor ~100k

+

11Tuesday, April 7, 15

Page 12: 20150226 boston hw meetup

Roomba and Scooba

12Tuesday, April 7, 15

Page 13: 20150226 boston hw meetup

13Tuesday, April 7, 15

Page 14: 20150226 boston hw meetup

We are going to take something as insanely

complex as manufacturing consumer electronics and

make it feel easy.

VISION

14Tuesday, April 7, 15

Page 15: 20150226 boston hw meetup

15Tuesday, April 7, 15

Page 16: 20150226 boston hw meetup

16Tuesday, April 7, 15

Page 17: 20150226 boston hw meetup

BOLT

17Tuesday, April 7, 15

Page 18: 20150226 boston hw meetup

BOLT

18Tuesday, April 7, 15

Page 19: 20150226 boston hw meetup

DRAGON INNOVATION HAS HELPED LAUNCH AND SCALE OVER 100 COMPANIES SINCE 2009

19Tuesday, April 7, 15

Page 20: 20150226 boston hw meetup

Why is Manufacturing Hard?

20Tuesday, April 7, 15

Page 21: 20150226 boston hw meetup

Hint

21Tuesday, April 7, 15

Page 22: 20150226 boston hw meetup

GOING FROM THE PROTOTYPE TO PRODUCTION IS A LONG JOURNEY WITH MANY “UNKNOWN UNKNOWNS”

• COGS, tooling and manufacturing costs• Lead times• Permanence of Quality• Iteration cycles• DFMA• Factory Selection and Management• Team Scalability• Schedule & Project Management• Specialized skills (ME / EE / SW/ Q / SC / Logs)• Retail Channel

22Tuesday, April 7, 15

Page 23: 20150226 boston hw meetup

STEP 1: Decide Where to Manufacture

23Tuesday, April 7, 15

Page 24: 20150226 boston hw meetup

EXAMPLES TO TALK THROUGH

24Tuesday, April 7, 15

Page 25: 20150226 boston hw meetup

CHINA?

25Tuesday, April 7, 15

Page 26: 20150226 boston hw meetup

YES! MANUFACTURE IN CHINA IF YOUR PRODUCT...Requires significant manual labor to manufacture and assemble

26Tuesday, April 7, 15

Page 27: 20150226 boston hw meetup

YES! MANUFACTURE IN CHINA IF YOUR PRODUCT...Requires higher production volumes (>10k units)

27Tuesday, April 7, 15

Page 28: 20150226 boston hw meetup

YES! MANUFACTURE IN CHINA IF YOUR PRODUCT...Is COGS (Cost of Goods Sold) sensitive

28Tuesday, April 7, 15

Page 29: 20150226 boston hw meetup

YES! MANUFACTURE IN CHINA IF YOUR PRODUCT...Uses existing manufacturing technology (i.e. injection molding, etc)

http://berkeleysg.com

29Tuesday, April 7, 15

Page 30: 20150226 boston hw meetup

YES! MANUFACTURE IN CHINA IF YOUR PRODUCT...Is tolerant of variations in supply chain and logistics

http://berkeleysg.comhttp://kilterpulse.com

30Tuesday, April 7, 15

Page 31: 20150226 boston hw meetup

YES! MANUFACTURE IN CHINA IF YOUR PRODUCT...Can benefit from low cost Design for Manufacturing (DFM) Non-recurring Engineering (NRE)

http://berkeleysg.comhttp://kilterpulse.com

http://plasticstoday.com

31Tuesday, April 7, 15

Page 32: 20150226 boston hw meetup

YES! MANUFACTURE IN CHINA IF YOUR PRODUCT...Has “physically” protectable IP

http://berkeleysg.comhttp://kilterpulse.com

32Tuesday, April 7, 15

Page 33: 20150226 boston hw meetup

USA (aka Domestic) ?

33Tuesday, April 7, 15

Page 34: 20150226 boston hw meetup

YES! MANUFACTURE IN THE US IF YOUR PRODUCT...Requires low volumes

34Tuesday, April 7, 15

Page 35: 20150226 boston hw meetup

YES! MANUFACTURE IN THE US IF YOUR PRODUCT...Can be manufactured and assembled through automation

35Tuesday, April 7, 15

Page 36: 20150226 boston hw meetup

YES! MANUFACTURE IN THE US IF YOUR PRODUCT...Is sensitive to shipping time and expense

http://berkeleysg.com

36Tuesday, April 7, 15

Page 38: 20150226 boston hw meetup

YES! MANUFACTURE IN THE US IF YOUR PRODUCT...Requires non-standard capital equipment

38Tuesday, April 7, 15

Page 39: 20150226 boston hw meetup

YES! MANUFACTURE IN THE US IF YOUR PRODUCT...Is part of a government contract

39Tuesday, April 7, 15

Page 40: 20150226 boston hw meetup

STEP 2: Select a Factory (RFQ)

40Tuesday, April 7, 15

Page 41: 20150226 boston hw meetup

OVERVIEW OF THE CM SELECTION PROCESS

http://en.wikipedia.org

1. Talk with trusted network connections who have manufacturing experience.2. Create a differentiated list of 5 - 10 CMs.3. Down select to 3 - 5 factories based on your product category (why?)4. Create a Request for Quote (RFQ) Package.5. Visit!6. Analyze Results.7. Negotiate Big Items.8. Talk with the CM’s customers.9. Select the winner, and leave the others on good terms.

41Tuesday, April 7, 15

Page 42: 20150226 boston hw meetup

RFQ PACKAGE

http://en.wikipedia.org

• Company Overview- Team overview- Funding- Product- What’s done- What needs to be done- Factory Criteria

• BOM- Canonical format (A2A) in Excel- Transparent and Formula Driven- Separate Std, Special and Consigned Margins/Markups- Include all costs to Ex-Factory- Fill in the blanks

• Schedule- Gantt chart (Cloud)- Fill in the blanks

42Tuesday, April 7, 15

Page 43: 20150226 boston hw meetup

FACTORY VISIT CHECKLIST

http://en.wikipedia.org

Do you like the team? Are they experienced and friendly?Do they have the right manufacturing capabilities?Does your intended volume match their volume capabilities?Are they financially stable?Do they have enough working capital to get going?Do they have favorable payment terms?Are they transparent in their costing?Do they take IP seriously? Did they show you something they shouldn’t have?Are they ethical in their treatment of their workers and otherwise?Do you have access to upper management?Are they excited about working on your product?

43Tuesday, April 7, 15

Page 44: 20150226 boston hw meetup

CM COMPARISON (A2A DECISION MATRIX)

• Total Material Costs• Labor• Margins/Markup (Std, Special, Consigned)• Pareto of Top 5 Most Expensive Components• Fixed Costs (tooling, fixtures, NRE)• Schedule• Fit Criteria

44Tuesday, April 7, 15

Page 45: 20150226 boston hw meetup

RECOMMENDED READING

"Factory Girls", Leslie Chang:  W.S.J. Reporter Who Lived In China Interviewing Migrant Factory Workers In The Pearl River Delta.  Great Insight Into The Workforce.

"Poorly Made In China", Paul Midler:  Light, Humorous, And Scary.

"Mr. China", Tim Clissold:  Older Humorous Memoir Of One Of The First Westerners To Do Modern Work In China After Mao.

45Tuesday, April 7, 15