document.xlsx Printed 04:13:09,04/18/2023 Page 1 of 3
Failure modes and effects analysis (FMEA)
Project: QUAD TORC Date: 27/02/2015
FMEA Team: METAL HEADS -20150195 Prepared by: THOMAS J NEREVEETTIL
SEV = How severe is effect on the customer?
OCC = How frequent is the cause likely to occur?
DET = How probable is detection of cause?
RPN = Risk priority number in order to rank concerns; calculated as SEV x OCC x DET
Process step Potential failure mode Potential failure effects Potential causes Current process controls Actions taken
What is the step? 10 10 10 1000 10 10 10 1000
fuel empty tank 8 2 fuel gauge 4 64 1 1 1 1
fuel pump mechanical failure 8 improper maintanance of pump 5 none 8 320 2 2 3 12
battey corroded total electrical system failure 5 2 anti corrosion spray ,cleaning 2 20 proper maintainance maintainance done 1 1 1 1
starter motor mechanical failure cannot start the engine 7 3 maintainance 3 63 proper maintainance maintainance done 2 2 2 8
SEV
OCC
DET
RPN
Actions recommended
Responsibility (target date)
New SEV
New OCC
New DET
New RPN
In what ways can the step go wrong?
What is the impact on the customer if the failure mode is not prevented or corrected?
What causes the step to go wrong? (i.e., How could the failure mode occur?)
What are the existing controls that either prevent the failure mode from occurring or detect it should it occur?
What are the actions for reducing the occurrence of the cause or for improving its detection? You should provide actions on all high RPNs and on severity ratings of 9 or 10.
Who is responsible for the recommended action? What date should it be completed by?
What were the actions implemented? Include completion month/year (then recalculate resulting RPN).
unable to reach the destination / penality / time loss
fuel tank leak / unproper filling / low fuel efficiency / rong fuel gauge
proper filling / working fuel gauge
Thomas J N , ill be completed by 25/04/2015
working fuel gauge / stop the leakage
unable to reach the destination / penality / time loss
proper cleaning and maintainance of pump
Sen jacob John , will be completed by 26/04/2015
cleaned the pump and filteres
improper maintanance of battery and terminals
Kevin Eldho Issac ,will be completed by 25/04/2015
improper maintanance of motor / defetive
Sen jacob John , will be completed by 26/04/2015
document.xlsx Printed 04:13:09,04/18/2023 Page 2 of 3
Failure modes and effects analysis (FMEA)
Project: QUAD TORC Date: 27/02/2015
FMEA Team: METAL HEADS -20150195 Prepared by: THOMAS J NEREVEETTIL
SEV = How severe is effect on the customer?
OCC = How frequent is the cause likely to occur?
DET = How probable is detection of cause?
RPN = Risk priority number in order to rank concerns; calculated as SEV x OCC x DET
Process step Potential failure mode Potential failure effects Potential causes Current process controls Actions takenSEV
OCC
DET
RPN
Actions recommended
Responsibility (target date)
New SEV
New OCC
New DET
New RPN
switch fail to operate 7 1 ingnition switch 1 7 1 1 1 1
chassis bend / mechanical failure instability / danger to the driver 10 6 2 120 3 2 2 12
suspension 10 3 lotus suspension analysis 2 60 2 2 2 8
steering locking / mechanical failure instability /danger to Driver 8 3 testing and simuation 2 48 2 2 2 8
battey short circuit 9 inproper insulation / overloading 2 fuse / relay
3 54 1 1 1 1
fail to provide adequate power unable to start the engine and other electronic systems
manufacturiing defect / improper installation
replacement / maintainance
Thomas J N , will be completed by 27/04/2015
maintainance done / replaced
improper welding / material /design
impact testing / simulation and analysis
proper designing and testing
Thomas J N , will be completed by 27/04/2015
tested the design ,simulated and analyzed the problem ,made necessary changes
broken / unepected damping / mechanical failure
instability / danger to the driver / uncomfortable
improper designing and installation / wrong suspenson
proper designing and testing
Nikhil C Nandhan , will be completed by 27/04/2015
tested the design ,simulated and analyzed the problem ,made necessary changes
improper designing and installation
proper designing and testing
Toby Tony , will be completed by 28/04/2015
tested the design ,simulated and analyzed the problem ,made necessary changes
fire / total electrical system failure
proper insulation with right rated fuse / reduce overloading
Abhay , should be completed by 20/03/2015
proper insulaton was given , rated fuses were installed