2015 kane county condition report.pdfi. geographical & administrative data 3 ii. physical...
TRANSCRIPT
![Page 1: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/1.jpg)
Prepared for:
Kane County Division of Transportation
STRUCTURE NO. 045-3097
Fabyan Parkway / FAP 0363
over
Fox River
May 14, 2015
2015 Kane County Condensed Bridge Condition Report
Prepared by:
123 North Wacker Drive, Suite 900
Chicago, Illinois 60606
312.704.9300 • www.collinsengr.com
![Page 2: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/2.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Collins Engineers, Inc. | Page 2
CONDENSED BRIDGE CONDITION REPORT REGION: 1 DISTRICT: 1 ROUTE: Fabyan Parkway / F.A.P. 0363 COUNTY: Kane STRUCTURE NUMBER: 045-3097 LOCATION: Fabyan Parkway over the Fox River DATES INSPECTED: March 14, 2014: Routine Bridge Inspection June 11, 2014: Supplemental Snooper Inspection April 16, 2015: Site Walkthrough (Evaluation of Wearing Surface/Median) Table of Contents Item: Page: I. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope of Work Determination & Analysis 9 V. Discussion and Recommended Scope of Work 10 Attachments: A. Location Map B. IDOT Master Structure Report C. Bridge Inspection Report D. Top and Bottom of Deck Condition Surveys E. Cost Estimates F. Structure Photos G. Abbreviated Existing Plans
![Page 3: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/3.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Collins Engineers, Inc. | Page 3
I. Geographical & Administrative Data:
Structure Number: 045-3097 County: Kane Route Carried: Fabyan Parkway / F.A.P. 0363 Feature Crossed: Fox River Roadway Classification: Other Principal Arterial ADT (current/design): 29,200 (2014) ADTT (current/design): 8% (2014) Inventory Rating (HS or HL): 0.900 (HS 18.0) Operating Rating (HS or HL): 1.502 (HS 30.0)
Construction / Reconstruction / Repair History: 1974 – Original Construction
Route at time of original construction: C.H. 8 Section at time of original construction: 201 B – M.F.T.
1980 – Deck overlay 1991 – Partial depth and full depth deck repairs and new deck overlay 1998 – Expansion joint repairs and concrete repairs 2005 – Concrete repairs to substructure and top of deck, rebuilt concrete parapets,
electrical work, replaced expansion joints and deck overlay
![Page 4: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/4.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Collins Engineers, Inc. | Page 4
II. Physical Description of Structure: Superstructure: Non-Composite Welded Plate Girders (Haunched Girders in
Unit 1) Substructure: The west abutment is an open concrete abutment on concrete
columns which are supported by spread footings. The east abutment is a concrete stub abutment supported on steel H piles.
Length: 1,309’-4” back-to-back of abutments Width: 62’-0” out-to-out of deck
58’-6” face-to-face of curbs Span Arrangement: 2 units / 7 spans total
Unit 1: 175’-0”, 280’-0”, 280’-0”, 175’-0” Unit 2: 130’-0”, 130’-0”, 130’-0”
Skew: 0° Wearing Surface: The wearing surface is a 3’’ latex modified concrete overlay
on top of the reinforced concrete deck, which is approximately 6 ½ ’’ thick. The original deck was 8 ½’’ thick. In 1980 a bituminous wearing surface was added on top of the original deck. The deck repairs in 1991 included the removal of the bituminous wearing surface as well as the removal of the top of the concrete deck down to the top of the original reinforcement (approximately 2’’ of concrete) and the addition of a 3’’ microsilica wearing surface. In 2005 the microsilica wearing surface was replaced with the existing 3 in. latex modified concrete overlay.
Alignment: Horizontal Alignment: The structure is in a tangent horizontal
alignment. Both approaches are on curved roadway sections. Vertical Alignment: There is a 1% grade increase from west to east across the structure.
Utilities: 6 in. diameter electrical conduits are present in the north and
south bays suspended from the bottom of the deck. Surface corrosion is present at some locations along the conduit. Additional conduit is mounted to the inside of the south fascia girder. 1.5 in. diameter conduit is present on the south parapet for bridge lighting. Light poles are mounted on the concrete parapets on both sides of the structure. An overhead pole mounted utility is present along the bike path on the east side of the river. The utility line crosses the structure near the 4th pier from west.
![Page 5: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/5.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Collins Engineers, Inc. | Page 5
III. Field Inspection & Physical Evaluation: The routine bridge inspection for this structure was conducted on March 14, 2014 and a supplemental inspection with a snooper bridge inspection vehicle was performed on June 11, 2014. An additional site walkthrough was conducted on April 16, 2015 to assess the top of deck and median condition, as those aspects of the structure would be the most likely to have notable changes in condition since the time of the initial inspection and are under consideration for potential repair and maintenance work. Approach Roadway: The HMA approach roadway and concrete curbs and gutters are in satisfactory condition. Rutting and longitudinal cracks up to 3/4 in. wide are present along the lane lines. Map cracking up to 1/8 in. wide is present throughout the approach roadways. Several transverse cracks up to 3/4 in. wide are present in the approach roadway approximately 30 ft. from the ends of the structure. Transverse cracks up to 1/8 in. wide are present in the concrete curbs and gutters. The traversable grooved median in the approach roadway has numerous spalls, most of which have been patched with bituminous material. Superstructure Deck: The deck is in satisfactory condition. Top of Deck: Longitudinal and transverse hairline cracking is present in the concrete wearing surface at approximately 6 ft. spacing. A spalled area is present for 40 ft. between the parapet and the outside lane marking at the northeast corner of the structure. This area has been covered with asphalt. Underside of Deck: Transverse cracking with efflorescence is present throughout the bottom of the deck, typically at 10 ft. spacing. The cracks are at approximately 3 ft. spacing at the west end of the west span. Numerous delaminations and spalls, some with exposed reinforcement, are present on the underside of the deck. The spalled areas total approximately 87 sq. ft. and the delaminated areas total approximately 333 sq. ft. The total damaged area including spalls and delaminations is approximately 0.6% of the total area of the underside of the deck. Median: A raised concrete median is present along the center of the structure. Longitudinal cracking up to 1/8 in. wide is present at numerous areas along the median. This cracking is typically 4 to 6 in. from the edges of the median. Several spalls and impending spalls are present. Several transverse hairline cracks and areas of rust staining are also present in the median. Some areas of the median were repaired in
![Page 6: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/6.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Collins Engineers, Inc. | Page 6
1991 and 2005 and a few small areas appear to have been patched more recently. The patched areas are typically sound. Parapets: The concrete parapets were repaired and extended to meet current height requirements in 2005 and are in overall good condition. Minor vertical hairline cracking is present throughout the parapets, typically at 3 ft. spacing. A 1.5 ft. by 1.5 ft. spall with cracked concrete was present on the outside face of the north parapet in the 4th span from the west at the time of the snooper inspection. The bridge parapet meets current IDOT requirements for this structure. Joints: The modular expansion joints located at the east and west abutment and at the 4th pier from west were installed 2005 and are in fair condition. There is minor debris accumulation in the joints. A 14 ft. transverse crack up to 1/8 in. wide is present in the anchorage concrete in the westbound outside lane on the west side of the 4th pier. A hairline crack is also present along the east side of this joint. Transverse cracking up to 1/2 in. wide is present at the anchorage concrete along the west abutment joint. Most of the cracks along the west joint have been sealed; however, several unsealed cracks up to 1/8 in. are present. Moderate water leakage is occurring through the ends of the west expansion joint. Several deteriorated areas are present in the joint seal at the east expansion joint. The joint opening at the 4th pier measured 2 in. wide and the other joint openings measured 1-7/8 in. wide at the time of the inspection. The temperature was 48°F at the time the measurement was taken. Deck Drains: Cast iron floor drains with frames and grates are located in the deck along the edges of the bridge. Cast iron drain pipes are bolted to the frames under the deck and supported by brackets attached to the girders. The bell section of the pipes where they attach to the drains near the bottom of the deck are cracked at the 3rd drain from the west on the north side and the 5th drain from the west at the south side, which is allowing the water to come in contact with the girders at these locations. The northwest drain in the west span is leaking at the bell section of the pipe. Moderate surface corrosion is present on most of the pipes. The deck drains do not extend below the bottom flanges of the girders, which allows water to come into contact with the bottom flanges of the girders at the drain locations. Beams: The weathering steel girders are in satisfactory condition. The most notable deficiencies on the girders are located beneath the expansion joints at the abutments and the 4th pier from the west. Areas of section loss are present in the webs of several of the girders at the 4th pier and in a few cross frame members at the abutments and the 4th pier.
![Page 7: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/7.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Collins Engineers, Inc. | Page 7
Most of the areas with section loss in the girder webs are behind the bearing stiffeners. One area of section loss is present in front of the bearing stiffener at the north girder on the west side of the 4th pier. This area is 6 in. long by 1 in. wide. The steel within 5 ft. of the expansion joints at the abutments and the 4th pier from west was painted in 2005. The paint in these areas remains in good condition and there is no evidence of active corrosion at these locations. Most of the corrosion and section loss in the girder webs likely occurred prior to the replacement of the expansion joints in 2005 and does not appear to have progressed since then. There is an area of 100% section loss in the bottom chord of the southernmost cross brace at the west abutment. The area of section loss is 30 in. long, with a total cross section loss in the bottom chord of approximately 20%. Surface corrosion is present along the bottom flanges and bottoms of the webs within 15 ft. of the ends of the beams at the 4th pier from west; however, this surface corrosion is mostly outside of the painted areas of the beams and the corrosion is likely from water running along the beams from the expansion joint at the 4th pier prior to the expansion joint repair in 2005. There does not appear to be active corrosion in the painted areas of the beams and the surface corrosion that is present within 15 ft. of the beam ends is likely not active. The splices are generally in good condition; however, there are loose or missing nuts and bolts at several of the girder splices and diaphragm connections, many of which are due to insufficient clearance between the cross bracing connections and the girder splices. Pack rust between the top plate on the bottom flange and the web is present on most exterior girder splice plates. The deck drains do not extend past the bottom flanges of the girders. Active surface corrosion is present on the bottom flanges of the girders near the deck drains. The flanges near the deck drains are the only areas of the girders where there is evidence of active corrosion. Bearings: The bearings are in good condition. Nuts are either loose or missing from several of the anchor bolts on the bearings. The bearings at the 2nd and 3rd piers form west sit off center on the cap; however, this is likely from the original construction as the anchor plates show no signs of movement. Substructure Abutments/Wingwalls: The abutments are in satisfactory condition. Vertical hairline cracks with efflorescence and rust staining are present on the backwalls of the abutments. A 6 ft. x 1 ft. spall with 2 in. penetration and exposed rebar and efflorescence is present at the north end of the west abutment backwall near the north girder.
![Page 8: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/8.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Collins Engineers, Inc. | Page 8
Hairline map cracking with efflorescence is present at the abutment corners and extending to the wingwalls. Piers: The piers are in satisfactory condition. There is a minor concrete spall at the east side of 4th pier from west near the bearing of the 2nd girder from south. A hairline crack is present at the bearing seat of the north fascia girder at the 4th pier. A 1 ft. x 1 ft. delamination is present on the underside of the north cantilever of the 6th pier from west. A 6 in. x 1 ft. spall with 1 in. penetration and exposed rebar is present on the north end of the east face of the cantilever at the 3rd pier from west. Minor abrasions are present at the inside face of both stems of the 3rd pier at the groundline. Hairline diagonal cracking originating near the exterior girder and continuing down toward the stem is present on the cantilever caps. Scour/Slope Protection: There are concrete slopewalls at the abutments, which are in fair condition. Transverse cracks up to 1/16’’ wide are present in the west slopewall and transverse cracks up to 1/2’’ wide are present in the east slopewall. The east abutment slopewall has settled approximately 2’’ at some locations. Due to the settlement, a 2’’ gap is present at the north corner of the east slopewall between the slopewall and the abutment. The channel is in satisfactory condition. The channel bottom is rocky. Minor erosion is present at the east bank with several undermined trees. Inspection History (NBIS Ratings): Year Deck: Super: Sub: 2002 6 7 7 2004 6 7 7 2006 8 7 7 2008 7 7 7 2010 6 6 7 2012 6 6 7 2014 6 6 7 Geometric Data: The structure is in a tangent horizontal alignment with a curved roadway section on both approaches. There is a slight grade increase from west to east across the structure.
![Page 9: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/9.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Collins Engineers, Inc. | Page 9
IV. Potential Scope of Work Determination & Analysis: Deck Drain Replacement and Extension: Several of the deck drain pipes are cracked and/or leaking. Additionally, the deck drain pipes do not extend past the bottom flanges of the girders. This results in water coming into contact with the girders at the bottom flanges near the drains. Minor surface corrosion is occurring on the girders at these locations. The cracked deck drains can be replaced and the other drains can be extended with PVC pipe to reduce the water coming into contact with the girders. A snooper or other bridge access vehicle would be required to access the underside of the deck to perform this work. Traffic control with temporary lane closures of the outside lanes would be required for the access vehicle. Concrete Repairs at Median: Numerous spalls are present on the concrete median on top of the structure. Repairing these spalls would involve removing the damaged concrete and the adjacent concrete to below the reinforcement and cleaning the exposed reinforcement prior to installing the concrete patches. Traffic control with temporary lane closures would be required for this work. Replace Deck Overlay: The deck overlay is in satisfactory condition with longitudinal and transverse hairline cracking present at approximately 6 ft. spacing along the deck and a spalled area present for 40 ft. between the parapet and the outside lane marking at the northeast corner of the structure. The spalled area has been covered with asphalt. Replacing the deck overlay would include hydro scarification to remove the existing overlay and to prepare the concrete surface for the placement of the new concrete overlay. The existing overlay is approximately 3 in. thick and extends to the top layer of deck reinforcement. Traffic control would be required for this work. Clean and Reseal Expansion Joints and Seal Cracks in Anchorage Blocks: The modular expansion joints at the abutments and at the 4th pier from west have accumulated small amounts of debris in the joints. Additionally there is evidence of minor water leakage at the joints. The debris in the joints should be removed and the neoprene seals replaced to prevent water leakage to the girders and substructure. The cracks in the anchorage blocks can be sealed with an epoxy crack sealer. Clean and Paint Exposed Reinforcement: Numerous spalls and delaminated areas are present on the underside of the deck. The total damaged area including spalls and delaminations is approximately 0.6% of the total deck area. The delaminated concrete can be removed and the exposed reinforcement can be blast cleaned and epoxy painted to prevent further corrosion of the reinforcement.
![Page 10: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/10.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Collins Engineers, Inc. | Page 10
V. Discussion and Recommended Scope of Work: Alternative 1: Mid-Term Recommended Repairs (3-5 Years) The recommended course of action is to take measures to inhibit further corrosion and preserve the existing condition of the beams. The existing drain pipes do not extend past the low steel locations and are cracked in several locations. Replacing the cracked drain pipes with PVC pipes and installing PVC deck drain extensions at the other pipes is recommended to inhibit further corrosion. The deck drain extensions should extend to a minimum of 3 in. below the bottoms of the girders. The main cause of the damage to the girders was the water leaking through the expansion joints prior to the replacement of the joints in 2005. Minor transverse cracking is present in the concrete anchorage blocks and there is evidence of water leakage through some areas of the neoprene seals; however, the modular joints appear to be functioning properly. It is recommended that the neoprene seals be replaced to prevent water leakage to the girders and substructure. The existing expansion joints are Wabo Modular STM series joints manufactured by Watson Bowman Acme. The manufacturer confirmed that the neoprene seals can be replaced without replacing the entire joint. There is no evidence that any other components of the joints would need to be replaced at this time. The transverse cracks in the concrete anchorage blocks at the joints should also be sealed with an epoxy sealer at the same time that the neoprene seals are replaced. The concrete median has several spalled areas along the corners of the median. Longitudinal cracking is present along approximately 65% of the median edges and is more prevalent on the east side of the structure. Over time it is likely that spalls will develop along these areas. It appears that many of the cracks along the median will eventually lead to spalls that do not go deeper than the median reinforcement. In order to effectively patch these spalls, sound concrete would need to be removed at these locations so that the patches can go beyond the existing reinforcement. A snooper or other access vehicle will be required to access the deck drains. Temporary lane closures will be required while this work is being performed for the bridge access vehicle and for the work at the median and the expansion joints. Alternative 2: Long Term Recommended Repairs (5-8 Years) Although the wearing surface is currently in satisfactory condition, it would likely be cost effective to replace it within the 5-8 year time frame and to replace the median at that time as well. It may also be cost effective to replace the approach pavement at the ends of the structure at the time that this work is to be performed.
![Page 11: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/11.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Collins Engineers, Inc. | Page 11
The total damaged area on the underside of the deck including spalls and delaminations is approximately 0.6% of the total deck area. When the existing wearing surface is removed it is assumed that some areas of the deck may require full depth deck repairs. For the areas on the underside of the deck that have spalls and delaminations but do not require full depth repair, cleaning and painting the exposed reinforcement would help to inhibit corrosion. Access to the underside of the deck to perform this work would require specialized access vehicles and temporary lane closures will be required while this work is being performed. Additional Options: Based on the condition of the beams, it is not recommended at this time that steel repairs be performed on the girders. The existing damage to the beams has only a minimal impact on the capacity of the structure and repairing the steel would not substantially increase the capacity of the structure. The weathering steel was painted in 2005 in the areas below the expansion joints at the abutments and at the 4th pier from west. The paint remains in good condition and there is no evidence of continued section loss in the girder webs. The only areas where active corrosion is progressing are at the girder flanges near the deck drain pipes.
![Page 12: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/12.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Collins Engineers, Inc. | Page 12
ATTACHMENTS: Attachment A. Location Map Attachment B. IDOT Master Structure Report Attachment C. Bridge Inspection Report Attachment D. Top and Bottom of Deck Condition Surveys Attachment E. Cost Estimates Attachment F. Structure Photos Photo No. 1 South Elevation Photo No. 2 North Elevation Photo No. 3 Downstream from the Bridge Deck Photo No. 4 Upstream from the Bridge Deck Approach Roadway Photo No. 5 Typical Approach Roadway (East Shown) Photo No. 6 Typical Longitudinal Cracks in Approach Roadway (West Shown) Photo No. 7 Typical Map Cracking in Approach Roadway (West Shown) Photo No. 8 Typical Approach Roadway Median (East Shown) Top of Deck Photo No. 9 Top of Deck Photo No. 10 Typical Hairline Cracking in Deck Photo No. 11 Northeast Corner Asphalt Patch Underside of Deck Photo No. 12 Typical Transverse Deck Cracking with Efflorescence (Span 1 Shown) Photo No. 13 Spall at Span 1 Photo No. 14 Spall at Span 6 Photo No. 15 Spall at Span 2 between Beams 6 & 7 Photo No. 16 Spall at Span 2 between Beams 4 & 5 Median Photo No. 17 Center Median Photo No. 18 Corner Spall in Median on Span 3 (3/14/2014) Photo No. 19 Patched Spall in Median on Span 3 (4/16/2015) Photo No. 20 Median Delamination at Center of Span 2 Photo No. 21 Spall at Edge of Patch on Median Parapets Photo No. 22 Typical Parapet (North Shown) Joints Photo No. 23 East Expansion Joint Photo No. 24 West Expansion Joint Photo No. 25 Typical Expansion Joint Condition (East Joint Shown) Photo No. 26 Cracking at Anchorage Block at West Expansion Joint Photo No. 27 Cracking along Pier 4 Expansion Joint Photo No. 28 Typical Sealed Cracks at the West Expansion Joint Deck Drains Photo No. 29 Typical Drain Pipe (Northwest Pipe in Span 3 Shown) Photo No. 30 Broken Drain Pipe at North Side of Span 2 Photo No. 31 Broken Drain Pipe at South Side of Span 3 Photo No. 32 Water Leakage at Top of Northwest Drain Pipe in West Span Beams Photo No. 33 Typical Girders (Span 1 Shown), looking East Photo No. 34 Typical Cross Frame, looking East Photo No. 35 Typical Cross Frame Connection, looking Northeast Photo No. 36 3”x1” Hole in the Web of Girder 7 at Pier 4 Photo No. 37 Holes in Girders at Pier 4 Photo No. 38 Section Loss at the South Cross Frame at the West Abutment Photo No. 39 Typical Girder Corrosion near Pier 4 (Girder 6 Shown) Photo No. 40 Missing Nut at a Lateral Brace at Girder 3 in Span 3 Photo No. 41 Loose Bolt at Splice 2 in Girder 5 in Span 2 Photo No. 42 Missing Bolt at Splice 5 in Girder 5 in Span 2
![Page 13: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/13.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Collins Engineers, Inc. | Page 13
Photo No. 43 Loose Bolt at Splice 5 in Girder 4 in Span 2 Photo No. 44 Two Missing Bolts at Splice 6 in Girder 5 in Span 3 Photo No. 45 Typical Pack Rust at Splice (Girder 1 Splice 6 Shown) Photo No. 46 Typical East Abutment Bearing Photo No. 47 Typical West Abutment Bearing Photo No. 48 Typical Pier 1 Bearing Photo No. 49 Loose Bearing Anchor Bolt at Girder 4 Bearing in Pier 3 Photo No. 50 Beam 1 Bearing at Pier 2 Abutments/Wingwalls Photo No. 51 Typical Abutment (West Shown) Photo No. 52 Cracking and Staining on the Abutment Back Wall (West Shown) Photo No. 53 Spall at the North End of the West Abutment Photo No. 54 Typical Wingwall (Northwest Shown) Piers Photo No. 55 Typical Pier Elevation (Pier 1 Shown) Photo No. 56 Spalling at Pier 3 Photo No. 57 Hairline Cracking at the Cantilever Cap (North End of Pier 1 Shown) Slopewalls Photo No. 58 Typical Slopewall (West Shown) Photo No. 59 Typical Crack at the West Slopewall Photo No. 60 Crack at the East Slopewall Other Photo No. 61 Undermined Trees at the Northeast Bank Photo No. 62 Typical Guardrail (Southeast Shown) Photo No. 63 Corrosion on Utility Conduits Photo No. 64 Typical Light Pole Attachment G. Abbreviated Existing Plans
![Page 14: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/14.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
APPENDIX A
LOCATION MAP
![Page 15: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/15.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
APPENDIX A
LOCATION MAP
![Page 16: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/16.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
APPENDIX B
IDOT MASTER STRUCTURE REPORT
![Page 17: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/17.jpg)
Structure Number: 045-3097 District: 1
Inventory DataFacility Carried: FABYAN PARKWAY Bridge Name: FABYAN Sufficiency Rating: 71.3 Structure Length: 1309.3Feature Crossed: FOX RIVER Location: FABYAN PK W OF IL 25 HBP Eligible: No AASHTO Bridge Length: 99.9Bridge Remarks: Replaced By: - Length of Long Span: 280.0Bridge Status: 1 OPEN - NO RESTRICT Status Date: 04/1988 Replaces: - Bridge Roadway Width: 55.5Status Remarks: Last Update Date: 07/05/2012 Appr Roadway Width: 72.0Maint County: 045 KANE Maint Township: 09 GENEVA Parallel Structure: None Deck Width: 62.0Maint Responsibility: 03 COUNTY Multi-Level Structure Nbr: Sidewalk Width Right: 0.0Service On/Under: 1 HIGHWAY 5 / WATERWAY Skew Direction: N None Sidewalk Width Left: 0.0Reporting Agency: 3 COUNTY Skew Angle: 0 D Navigation Control: 0 NoMain Span Matl/Type: 4 STEEL CONTINUOUS / 02 STRINGER/MULTI-BEAM/GIRDER Structure Flared: No Navigation Horiz Clear: 0Nbr Of Main Spans: 7 Nbr Of Approach Spans: 0 Historical Significance: No Navigation Vert Clear: 0***Approaches*** Border Bridge State: Culvert Fill Depth: 0.0Near #1 Matl/Type: / Bdr State SN: Number Culvert Cells: 0Near #2 Matl/Type: / Bdr State % Responsibility: 0 Culvert Opening Area: 0.0Far #1 Matl/Type: / Structural Steel Wt 4185350 Culvert Cell Height: 0.00Far #2 Matl/Type: / Substructure Material: 55 Culvert Cell Width: 0.00Median Width/Type: 3 Ft. / 3 Curb Rated By: N N/A Rate Method: EGuardrail Type L/R: 0None / 0 None Inventory Rating: 1.000(36) Load Rating Date: 01/01/1900 Railroad Crossing InfoToll Facility Indicator: 0 No Toll Operating Rating: 1.365(49) Crossing 1 Nbr:Latitude: 41.86472414 S Longitude: 88.31221639 S Design Load: 02 HS20 Crossing 1 Nbr:Deck Structure Type: A CIP CON NRMLLY FORM Deck Structure Thickness: 6.5 SD: N FO: N RR Lateral Underclear: 0.0Sidewalks Under Structure: 0 None RR Vertical Underclear: 0 Ft 0 In
Key Route On DataKey Route Nbr: FEDERAL-AID PRIMARY 0363 Station: 1.4500Appurtenances Main Route 00000 Segment:Inventory County: 045 KANE Linked: YTownship/Road Dist 09 GENEVA Natl. Hwy System: On NHSMunicipality 0355 BATAVIA Inventory Direction:Urban Area: 1051 1051 Curr AADT Yr/Count: 2014 / 29200
Functional Class: 3 OTHER PRINCIPAL ARTERIAL Est Truck Percentage: 8** CLEARANCES ** South/East North/West Number Of Lanes: 4Max Rdwy Width: 0.0 One Or Two Way: 2 Two-WayHorizontal: 60.0 0.0 Bypass Length: 5
Future AADT Yr/Cnt: 2032 / 35218
Designated Truck Rte: NONELateral: Special Systems: Yes
Key Route Under Data Station:
Segment: Linked: Natl. Hwy System:
Inventory Direction:Curr AADT Yr/Count: /
Est Truck Percentage:South/East North/West Number Of Lanes:
One Or Two Way:Bypass Length:Future AADT Yr/Cnt: /Designated Truck Rte: Special Systems:
*** Marked Route On Data ***Designation Kind Number
Route #1: 1 Mainline 8 OtherRoute #2: 1 MainlineRoute #3: 1 Mainline
*** Marked Route Under Data ***Designation Kind Number
Illinois Department of TransportationStructures Information Management System
Structure Summary Report
Date: 04/08/2015
1Page:
![Page 18: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/18.jpg)
Structure Number: 045-3097 District: 1
Data Related to Inspection Information*** Inspection Intervals *** *** Maximum Allowable Posting Limits *** Bridge Posting Level:
Routine NBIS: 24 MOS Underwater: 60 MOS One Truck At A Time: 0 Combination Type 3S-1: Tons 5 No Posting Required
Special: N Single Unit Vehicles: Tons Combination Type 3S-2 Tons
Inspection/Appraisal InformationInspection Date: 03/14/2014 Inspection Temperature: 43Deg. F
Deck: 6 SATISFACTORY CONDITION - MINOR DETERIORATION
Superstructure: 6 SATISFACTORY CONDITION - MINOR DETERIORATION
Substructure: 7 GOOD CONDITION - SOME MINOR PROBLEMS
Culvert: N NOT APPLICABLE
Channel and Protection: 6 SATISFACTORY CONDITION - MINOR DETERIORATION
Structural Evaluation: 6 EQUAL TO PRESENT MINIMUM CRITERIA
Deck Geometry: 5 BETTER THAN ADEQUATE TO BE LEFT IN PLACE
Underclearance-Vert/Lat.: N NOT APPLICABLE
Waterway Adequacy: 9 SUPERIOR TO PRESENT DESIRABLE CRITERIA
Approach Roadway Align: 7 BETTER THAN PRESENT MINIMUM CRITERIA
Bridge Railing Appraisal: 3 Meets Standards
Approach Guardrail: 333 Acceptable Acceptable Acceptable
Pier Navig Protection: N N/A
** Actual Posted Limits **Single Unit Vehicles: TonsCombination Type 3S-1: TonsCombination Type 3S-2: TonsOne Truck At A Time: 0
Deck Wearing Surf: C LAT MOD CON OVERLAY Last Paint Type:Deck Membrane: F NONE Deck Protection: J NONE Total Deck Thick: 9.5 Last Paint Date:
Underwater Inspection/Appraisal Information
Inspection Date: 11/22/2010Temperature: 50 Inspection Method: DPSV Diver Probe Sonar Visual
Appraisal Rating: 6 SATISFACTORY - MODERATE DETERIORATION IN UNDERWATER UNITS
Scour Critical Information MiscellaneousRating: 8 CALCULATED SCOUR ABOVE FOOTING Evaluation Method: B Rational AnalysisAnalysis Date: 02/14/1992 Microfilm Data Recorded: No
Construction InformationYear: 1974 Original ReconstructedRoute: CH 8 Sta: 82+15 Sta:Section Nbr: 201B-MFTContract Nbr:Fed Aid Pr#: 00000000000000Built By: 3 COUNTY AGENCY
Illinois Department of TransportationStructures Information Management System
Structure Summary Report
Date: 04/08/2015
2Page:
![Page 19: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/19.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
APPENDIX C
BRIDGE INSPECTION REPORT
![Page 20: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/20.jpg)
Routine Inspection Report
SN: 045-3097 District: 1 Spans: 7 Appr. Spans: Skew: 27600 Truck Pct:
ADT Un: Maint. Co: Twsp: Status:
Facility Carried: Feature Crossed:
Location: Municipality: Team/Sub Section: Insp/Rte:
Bridge Name: Material & Type:
Insp. Intervals Routine: Fracture Critical: Underwater: Special: Element Level:
90- Inspection Date: 90C - Temp. (°F): 90B1- In Depth:
Is Delinquent: Reason:
90A - Agency Program Manager: 90A3- Consultant Program Manager:
90A1- Team Leader: 90A2- Inspector:
90B- Inspection Remarks:
Resources
Time to Inspect (H:M): Traffic Control: Y Boat: Waders: Y Y Snooper: Y Y
Ladder: Y Y Manlift: Y N Bucket Truck: N Other:
Inspector's AppraisalsPrev New
58 - Deck Condition: 6 6
59 - Superstructure Cond: 6 6
60 - Substructure Cond: 7 7
62 - Culvert Condition: N N
61 - Channel Condition: 8 6
71 - Waterway Adequacy: 9 9
72 - Approach Rdwy Align: 7 7
111 - Pier Navig Protection: N N
90B - Inspection Remarks
Comments
59A - Weathering steel painted at the expansion joints in 2005.
5
Open - No Restrictions
0
Kane
ADT:0
16:0016:00 Y Y Y
3/14/2014 43
Michael Haas Carolyn Kois
James Hamelka
Fox RiverFabyan Parkway
Fabyan Pk W of IL 25
Transverse HL cracks with light efflorescence on bottom of deck.
Cross braces exhibit several areas with section loss. Minor surface corrosion is typical along the
Hairline transverse and longitudinal cracks spaced at approximately 6 ft. in wearing surface.
girders with localized areas of moderate corrosion at the bottom flanges near the deck drains.
Several small spalls and hairline cracking. Rust staining on piers from water runoff from the
weathering steel.
4/02Fabyan
060024
Erosion at east bank with several undermined trees.
Pre
vio
us
Insp
ecti
on
s 2012 - Str. In satisfactory cond. Widely spa. tight long. & trans. cracks in overlay. Minor amount of spalls on deck btm. Girders have some active
corrosion @ deck jts. Substr. in good cond. Insp. delayed to 3/26 due to insp truck availability.
Printed 8/11/2014 1 BBS BIR (03/04/14)
![Page 21: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/21.jpg)
Routine Inspection Report Structure Number:
Additional Inspection DataPrev New
36A - Bridge Railing Adequacy: 3 3 Rail Types:Prev New Prev New Prev New
Approach Guardrail Adequacy: 36B - Transitions: 3 3 3 3 36D - Ends: 3 3
Prev New Prev New Prev New
108A - Wearing Surface Type: 108B - Type of Membrane: F F 108C - Deck Protection: J J
108D - Total Deck Thickness (In.):
Prev New
59A - Paint Date (Mo/Yr):
59B - Paint Type Color: Fascia - ; Inter. - ; Railing -
59C - Utilities Attached:
Prev New
70A2 - Single Unit Vehicles Tons
70B2 - Combination Type 3S-1 (3 or 4 axles): Tons
70C2 - Combination Type 3S-2 (5 or more axles): Tons
70D2 - One Truck at a Time
Joint Openings (In.):
90B - Inspection Remarks Continued:
Signature Date
Inspection Team Leader:
Consultant Program Manager:
Agency Program Manager:
6 1/4''
045-3097
Weight Limit Posting
Concrete Parapets
_______
3/14/2014
_________ _________
9-N-N 9-N-N
36C - Guardrail:
3/14/2014
CC
9.5 9.5
Printed 8/11/2014 2 BBS BIR (03/04/14)
![Page 22: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/22.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
APPENDIX D
TOP AND BOTTOM OF DECK CONDITION SURVEY
![Page 23: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/23.jpg)
N
T.
39
N.Structure No.
045-3097
LOCATION SKETCH
R. 8 E., 3rd. P.M.
24’
24’
~ Bridge Deck
Concrete Slopewall
Span 2
6 Spaces @ |9’-9’’ = |58’-6’’
Electrical Box
N
Top of Water
Electrical Box
10’-
0’’
10’-
0’’
24’-0’’
24’-0’’
Span 1 Span 3 Span 4
130’-0’’ 130’-0’’ 130’-0’’
390’-0’’
Unit #2
10’-
0’’
10’-
0’’
Flo
w
910’-0’’
Unit #1
PLAN
1’-9’’ Plate girders
12’-0’’
Lane
3’-9’’
Shldr.
12’-0’’
Lane
3’-0’’
Median
Concrete Wearing Surface
3’’ Latex Modified
12’-0’’
Lane
6�’’ Thick
Concrete Deck
3’-9’’
Shldr.
58’-6’’ Bridge Roadway
1’-9’’
(Looking East)
12’-0’’
Lane
Cantilever
E. Face Pier Cap
6’’x1’ SP, RF
w/ Diff. Settlement
Heavy Trans. Cracks
Concrete Slopewall
Repair (SF)Spall (SF) Delam. (SF)Area (SF)
Total Damage
0.6 0.6
Deck Damage Estimates (March 2014)
65,282
Area (SF)
Total Deck% Damage
w/ Repairs
% Damage
Bottom of Deck 87 333 - 420 GENERAL PLAN AND ELEVATION
SHEET 1 OF 12
1,309’-4’’ Back to Back of Abutments
(Typ.)
Deck DrainPier 1
Pier 2
Pier 3
Pier 4
Pier 5
Pier 6
E.
Abutm
ent
W.
Abutm
ent
1
(Typ.)
Deck Drain 2 3 4 5
Electrical Conduit (Typ.)
6 7(Typ.)
Lighting Conduit Bonded Longitudinal Joint
62’-0’’ Out to Out of Deck
(Typ.)
Light Fixture
~ Bicycle Path
Bicycle Path Bicycle Path
TYPICAL DECK CROSS SECTION
ELEVATION(Looking North)
~ Bicycle Path
175’-0’’ ~ to ~ Brgs. 280’-0’’ ~ to ~ Brgs. 280’-0’’ ~ to ~ Brgs. 175’-0’’ ~ to ~ Brgs.
Span 5
~ to ~ Brgs.
Span 6
~ to ~ Brgs.
Span 7
~ to ~ Brgs.
Stems at Ground Line
Inside Face Pier
Minor Abrasion on
Abutment to Pier 4.
located from the West
Electrical Conduit
wall of abutment
face of the back
staining on the front
6’x1’ Spall w/ rust
on parapet
1’x2’ Spall
on parapet
1.5’x2.5’ Spall
the East Abutment.
disconnected at
Lighting Conduit,
LEGEND
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
PROJECT NO. 8319
DRAWN BY: PRH
ILLINOIS PROFESSIONAL DESIGN FIRM LICENSE NO. 184-000993
www.collinsengr.com
(312) 704-9300
Chicago, Il. 60606
Suite 900
123 North Wacker Drive
KANE COUNTY DIVISION OF TRANSPORTATION
CHECKED BY: MAH
STRUCTURE NUMBER: 045-3097
KANE COUNTY
FOX RIVER
FABYAN PARKWAY OVER
WL
EF
SS
SP
MARCH 14, 2014
DATE:
Crack
Spalls
Delamination
= Water Leakage
= Efflorescence
= Shear Stirrup
= Spall
![Page 24: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/24.jpg)
N
17’-3�’’ 2 Spa. @ 17’-6’’ 2 Spa. @ 17’-6’’ 2 Spa. @ 17’-6’’
Span 1 Span 2
143’-9’’
Span 1 Span 2
109’-6’’ 31’-1�’’ 112’-6’’
length along beam x width across beam.
Damage area dimensions are shown as
Note:
RF RF
1’x3’RF
RF
RFRF
1’x2’1’x2’
2’x2’
3’x3’
2’x5’
2’x8’ Loose Bolt
Missing Bolt
RF
RF on Splice ‘
Missing nutMissing nut on
bearing pin
1
2
3
4
5
6
7
161’-4�’’ 214’-0’’
Floor drain
Layout
Light Std.
Layout
7 Spa. @ 17’-8’’ = 123’-8’’
= 35’-0’’ = 35’-0’’
5 Spa. @ 19’-0’’ = 95’-0’’ 20’-0’’ 5 Spa. @ 19’-0’’ = 95’-0’’
= 35’-0’’
93’-9’’ 68’-9’’ 68’-9’’ 67’-6’’
79’-7�’’
65’-6’’ 47’-0’’ 37’-6’’ 51’-10�’’
12’-6’’ 12’-6’’ 12’-6’’ 12’-6’’6 Spa. @ 25’-0’’ = 150’-0’’ 9 Spa. @ 25’-0’’ = 225’-0’’ 18’-9’’ 11’-3’’
Bk. of
W. Abut.
13’-9�’’
175’-0’’ ~. to ~. Brg.
~ Light Std. #1
~ Brg. W. Abut. ~ Brg. Pier 1
~ Light Std. #2
~ Brg. Pier 2
~ Brg. W. Abut. ~ Brg. Pier 1
~ Field Splice 1 ~ Field Splice 2 ~ Field Splice 3 ~ Field Splice 4 ~ Field Splice 5
~ Brg. Pier 2
Transverse Jt.
Regular Underside
Transverse Cracks in Bay 1 & 2
30’’x3’’ Hole in Bot. Leg of Cross Frame
1’x2’
2’x3’
1’x2’ 1’x2’
the Angle of other Brgs.
Bearing @ BM 7 Rotated Outward Approx. Twice
1’x1’
1’x2’
1’x2’2’x2’
1’x2’
1’x1’
1’x2’
1’x3’
1’x1’
1’x1’
2’x2’
1’x1’
1’x1’
2’x1’
2’x4’1’x1’
6 spaces
@ 9’-
9’’ = 58’-
6’’
16’’x1’’ Hole in Bot. Leg of Cross Frame (Active Corrosion Top Cross Brace)
1’x2’
2’x3’
1’x1’
1 Loose Bolt
1’x1’
Top of Pipe Drain Extension Broken
1 Loose Bolt
1’x2’1’x1’1’x1’ 1’x1’ RF
3’x3’1’x1’
1’x1’
1’x1’
1’x2’
1’x2’
1’x2’ 1’x2’
RF
1’x1’1’x2’
TOP OF DECK
UNDERSIDE OF DECK
1’x3’
2 Loose Bolts on Splice ‘
UNIT 1-A BOTTOM OF DECK SURVEY
Deck Drain (Typ.)
280’-0’’ ~. to ~. Brg.
175’-0’’ ~. to ~. Brg. 280’-0’’ ~. to ~. Brg.
Pack Rust typ @ top ‘ btm. flange
& web on exterior girders
1’x1’ 1’x1’
1’x6"
1’x1’
1’x1’
15’x6’’ Delamination
HL to �’’ Cracking |6’’ from Median Edges, Typ.
HL Transverse Crack, Typ.
SHEET 2 OF 12
LEGEND
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
PROJECT NO. 8319
DRAWN BY: PRH
ILLINOIS PROFESSIONAL DESIGN FIRM LICENSE NO. 184-000993
www.collinsengr.com
(312) 704-9300
Chicago, Il. 60606
Suite 900
123 North Wacker Drive
KANE COUNTY DIVISION OF TRANSPORTATION
CHECKED BY: MAH
STRUCTURE NUMBER: 045-3097
KANE COUNTY
FOX RIVER
FABYAN PARKWAY OVER
WL
EF
SS
SP
MARCH 14, 2014
DATE:
Crack
Spalls
Delamination
= Water Leakage
= Efflorescence
= Shear Stirrup
= Spall
![Page 25: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/25.jpg)
N
length along beam x width across beam.
Damage area dimensions are shown as
Note:
17’-3�’’2 Spa. @ 17’-6’’2 Spa. @ 17’-6’’2 Spa. @ 17’-6’’
Span 4Span 3
143’-9’’ 107’-9’’
Span 4Span 3
112’-6’’ 31’-1�’’ 109’-6’’
~ Light Std. #3 ~ Light Std. #4
143’-9�’’98’-8�’’ 214’-0’’
7 Spa. @ 17’-8’’ = 123’-8’’
= 35’-0’’= 35’-0’’
5 Spa. @ 19’-0’’ = 95’-0’’20’-0’’5 Spa. @ 19’-0’’ = 95’-0’’
= 35’-0’’
67’-6’’
51’-10�’’ 37’-6’’ 47’-0’’ 65’-6’’
18’-9’’11’-3’’ 9 Spa. @ 25’-0’’ = 225’-0’’ 12’-6’’ 12’-6’’ 12’-6’’ 12’-6’’ 6 Spa. @ 25’-0’’ = 150’-0’’
Floor drain
Layout
Light Std.
Layout
~ Brg. Pier 3
68’-9’’ 68’-9’’
~ Brg. Pier 4
1
2
3
4
5
6
7
~ Brg. Pier 2
~ Field Splice 6 ~ Field Splice 7 ~ Field Splice 8 ~ Field Splice 9
~ Brg. Pier 3
~ Field Splice 10
~ Brg. Pier 4
3 loose bolts
Corrosion from drain
6’x3’
RS
Loose
~ Brg. Pier 2
Missing Bearing Anchor Bolt
diaphram
nut on
Cracks Underside
1’x2’
1’x2’
1’x1’
1’x2’ 1’x2’
1’x1’
Webs @ Bot.
Holes in Gir.
Gir. Web @ Bot.
6’’x2’’ Hole in
1’x1’1’x1’
7�’’x1’’ Hole
1�’’} Hole
6-8’’ Off Joint Rail
14’’ L
CO (0.025’’)
trans. stiffener w/ excessive corrosion on bottom flange
Local Paint Failure on top of bottom flange to just past 1st
Diaphragm Members
Active Corrosion on
1’x1’
1’x2’
2’x1’1’x1’1’x1’
1’x1’1’x1’
1’x1’
1’x1’
1’x1’
1’x2’
1’x3’
1 Loose Bolt
Extension Broken
Top of Pipe Drain
2’x3’
2 Missing Bolts
1’x2’
1 Loose Bolt
Lat. Bracing
Missing Nut
1’x8’
TOP OF DECK
UNDERSIDE OF DECK
2’x2’
UNIT 1-B BOTTOM OF DECK SURVEY
280’-0’’ ~. to ~. Brg. 175’-0’’ ~. to ~. Brg.
280’-0’’ ~. to ~. Brg. 175’-0’’ ~. to ~. Brg.
Deck Drain (Typ.)
1’x1’
1’x8’
1’x8’
each Pipe Drain
btm. of flange typ. @
Steel delamination on
Electrical Conduit
5’ long, due to missing
Exposed electrical wires,
Girder 5
to painted area on
Corrosion typ. adjacent
5’ to 10’ Regular Transverse& web ‘’s
Pack Rust @ btm. splice
Pack Rust @ btm. splice ‘
& btm. flange ‘ on exterior girder
Minor Corrosion, typ., of Pipe Drain
6’ Patch3’x8’’ Spall2’x2’ Spall 1’x2’ Spall2’ Impending Corner Spall
HL to �’’ Cracking |6’’ from Median Edges, Typ.
SHEET 3 OF 12
LEGEND
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
PROJECT NO. 8319
DRAWN BY: PRH
ILLINOIS PROFESSIONAL DESIGN FIRM LICENSE NO. 184-000993
www.collinsengr.com
(312) 704-9300
Chicago, Il. 60606
Suite 900
123 North Wacker Drive
KANE COUNTY DIVISION OF TRANSPORTATION
CHECKED BY: MAH
STRUCTURE NUMBER: 045-3097
KANE COUNTY
FOX RIVER
FABYAN PARKWAY OVER
WL
EF
SS
SP
MARCH 14, 2014
DATE:
Crack
Spalls
Delamination
= Water Leakage
= Efflorescence
= Shear Stirrup
= Spall
![Page 26: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/26.jpg)
N
length along beam x width across beam.
Damage area dimensions are shown as
Note:
Floor drain
Layout
Light Std.
Layout
17’-3�’’ 2 Spa. @ 19’-0’’ 2 Spa. @ 19’-0’’ 17’-3�’’
Span 5 Span 6 Span 7
196’-2’’109’-6’’
31’-10’’ 83’-7�’’
Span 5 Span 6 Span 7
Cross Frame Spacing
~ Light Std. # ~ Light Std. #8
5 Spa. @ 19’-0’’ = 95’-0’’ 19’-0’’ 19’-0’’
= 38’-0’’ = 38’-0’’
16’-0’’ 19’-0’’ 19’-0’’ 5 Spa. @ 19’-0’’ = 95’-0’’
101’-10’’ 28’-2’’ 28’-2’’ 28’-2’’ 28’-2’’73’-8’’ 101’-10’’
18 Spa. @ 21’-8’’ = 390’-0’’
36’-9�’’ 160’-2�’’
Bk. of
E. Abut.
~ Brg. Pier 4 ~ Brg. Pier 5 ~ Brg. Pier 6
39’-0’’99’-8’’ 91’-0’’ 47’-8’’
~ Brg. Pier 4 ~ Brg. Pier 5 ~ Brg. Pier 6 ~ Brg. E. Abut.
~ Brg. E. Abut.
~ Field Splice 12 ~ Field Splice 14~ Field Splice 13 ~ Field Splice 11
1
2
3
4
5
6
7
Loose bolts 2’x2’
2’x3’
2’x2’
RF
RF
2’x4’
Loose bolts on
cross brace
Moderate pack rusting
RS
2’x5’
1’x2’
1’x3’ 1’x2’
RF
1’x2’
1’x1’ 1’x1’2’x4’ 2’x2’
At drain
Small spall at
1’h x 5’w
NE corner pier
1’x2’
1’x2’
1’x2’
1’x4’
1’x4’
1’x4’
1’x2’
1’x8’
2’x5’
1’x5’ 2’x2’
2’x5’
2’x5’
2’x6’
1’x1.5’ 1’x1.5’
Drain Downspout with 14’’ Crk.
2’x1’
1’x8’ 2’x2’
1’x3’ RF
2’x2’
Webs @ Bot.
10’’x2’’ Hole in Gir.
Webs @ Top
2’’} Hole in Gir.
Web @ Btm.
Pin Hole in
1’x1’
1’x4’
1’x2’
1’x2’
1’x8’
1’x2’
1’x3’
1’x4’
1’x1’
1’x2’
TOP OF DECK
UNDERSIDE OF DECK
UNIT 2 BOTTOM OF DECK SURVEY
130’-0’’ ~. to ~. Brg.
Deck Drain (Typ.)
130’-0’’ ~. to ~. Brg. 130’-0’’ ~. to ~. Brg.
130’-0’’ ~. to ~. Brg. 130’-0’’ ~. to ~. Brg. 130’-0’’ ~. to ~. Brg.
cross brace member
8’’} Hole in WT
btm. of web
3"x1" Hole @
1.5’ Corner Spall 1’ Corner spall adjacent to patched area
|20’ Crack with Impending Spall
1.5’x1.5’ Spall
HL to �’’ Cracking |6’’ from Median Edges, Typ.
SHEET 4 OF 12
LEGEND
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
PROJECT NO. 8319
DRAWN BY: PRH
ILLINOIS PROFESSIONAL DESIGN FIRM LICENSE NO. 184-000993
www.collinsengr.com
(312) 704-9300
Chicago, Il. 60606
Suite 900
123 North Wacker Drive
KANE COUNTY DIVISION OF TRANSPORTATION
CHECKED BY: MAH
STRUCTURE NUMBER: 045-3097
KANE COUNTY
FOX RIVER
FABYAN PARKWAY OVER
WL
EF
SS
SP
MARCH 14, 2014
DATE:
Crack
Spalls
Delamination
= Water Leakage
= Efflorescence
= Shear Stirrup
= Spall
![Page 27: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/27.jpg)
EAST ABUTMENT
PLAN
ELEVATION(Looking East)
the wingwalls.
HL map cracking with efflorescence is present along abutment corners and extending to
Vertical HL cracks with efflorescence ans rust staining typical along abutment backwall.
Notes:
SHEET 5 OF 12
LEGEND
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
PROJECT NO. 8319
DRAWN BY: PRH
ILLINOIS PROFESSIONAL DESIGN FIRM LICENSE NO. 184-000993
www.collinsengr.com
(312) 704-9300
Chicago, Il. 60606
Suite 900
123 North Wacker Drive
KANE COUNTY DIVISION OF TRANSPORTATION
CHECKED BY: MAH
STRUCTURE NUMBER: 045-3097
KANE COUNTY
FOX RIVER
FABYAN PARKWAY OVER
WL
EF
SS
SP
MARCH 14, 2014
DATE:
Crack
Spalls
Delamination
= Water Leakage
= Efflorescence
= Shear Stirrup
= Spall
![Page 28: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/28.jpg)
WEST ABUTMENTthe wingwalls.
HL map cracking with efflorescence is present along abutment corners and extending to
Vertical HL cracks with efflorescence ans rust staining typical along abutment backwall.
Notes:
6’x1’ SP, RF
SHEET 6 OF 12
LEGEND
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
PROJECT NO. 8319
DRAWN BY: PRH
ILLINOIS PROFESSIONAL DESIGN FIRM LICENSE NO. 184-000993
www.collinsengr.com
(312) 704-9300
Chicago, Il. 60606
Suite 900
123 North Wacker Drive
KANE COUNTY DIVISION OF TRANSPORTATION
CHECKED BY: MAH
STRUCTURE NUMBER: 045-3097
KANE COUNTY
FOX RIVER
FABYAN PARKWAY OVER
WL
EF
SS
SP
MARCH 14, 2014
DATE:
Crack
Spalls
Delamination
= Water Leakage
= Efflorescence
= Shear Stirrup
= Spall
PLAN
ELEVATION(Looking West)
![Page 29: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/29.jpg)
PIER 1
Rust staining from the weathering steel girders is present on all piers.
the exterior girders and continuing towards the stem is typical on all piers.
Minor hairline diagonal cracks present on the cantilever caps originating near
Notes:
SHEET 7 OF 12
LEGEND
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
PROJECT NO. 8319
DRAWN BY: PRH
ILLINOIS PROFESSIONAL DESIGN FIRM LICENSE NO. 184-000993
www.collinsengr.com
(312) 704-9300
Chicago, Il. 60606
Suite 900
123 North Wacker Drive
KANE COUNTY DIVISION OF TRANSPORTATION
CHECKED BY: MAH
STRUCTURE NUMBER: 045-3097
KANE COUNTY
FOX RIVER
FABYAN PARKWAY OVER
WL
EF
SS
SP
MARCH 14, 2014
DATE:
Crack
Spalls
Delamination
= Water Leakage
= Efflorescence
= Shear Stirrup
= Spall
ELEVATIONEND VIEW
ELEVATIONEND VIEW
(Looking West)
(Looking East)
![Page 30: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/30.jpg)
PIER 2
Rust staining from the weathering steel girders is present on all piers.
the exterior girders and continuing towards the stem is typical on all piers.
Minor hairline diagonal cracks present on the cantilever caps originating near
Notes:
SHEET 8 OF 12
LEGEND
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
PROJECT NO. 8319
DRAWN BY: PRH
ILLINOIS PROFESSIONAL DESIGN FIRM LICENSE NO. 184-000993
www.collinsengr.com
(312) 704-9300
Chicago, Il. 60606
Suite 900
123 North Wacker Drive
KANE COUNTY DIVISION OF TRANSPORTATION
CHECKED BY: MAH
STRUCTURE NUMBER: 045-3097
KANE COUNTY
FOX RIVER
FABYAN PARKWAY OVER
WL
EF
SS
SP
MARCH 14, 2014
DATE:
Crack
Spalls
Delamination
= Water Leakage
= Efflorescence
= Shear Stirrup
= Spall
ELEVATIONEND VIEW
ELEVATIONEND VIEW
(Looking West)
(Looking East)
![Page 31: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/31.jpg)
PIER 3
6’’x1’ SP, RF
Minor abrasionsare present on the inside faces of both pier stems.
Rust staining from the weathering steel girders is present on all piers.
the exterior girders and continuing towards the stem is typical on all piers.
Minor hairline diagonal cracks present on the cantilever caps originating near
Notes:
SHEET 9 OF 12
LEGEND
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
PROJECT NO. 8319
DRAWN BY: PRH
ILLINOIS PROFESSIONAL DESIGN FIRM LICENSE NO. 184-000993
www.collinsengr.com
(312) 704-9300
Chicago, Il. 60606
Suite 900
123 North Wacker Drive
KANE COUNTY DIVISION OF TRANSPORTATION
CHECKED BY: MAH
STRUCTURE NUMBER: 045-3097
KANE COUNTY
FOX RIVER
FABYAN PARKWAY OVER
WL
EF
SS
SP
MARCH 14, 2014
DATE:
Crack
Spalls
Delamination
= Water Leakage
= Efflorescence
= Shear Stirrup
= Spall
ELEVATIONEND VIEW(Looking West)
ELEVATIONEND VIEW(Looking East)
![Page 32: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/32.jpg)
PIER 4
Rust staining from the weathering steel girders is present on all piers.
the exterior girders and continuing towards the stem is typical on all piers.
Minor hairline diagonal cracks present on the cantilever caps originating near
Notes:
1’x1’ SP
SHEET 10 OF 12
LEGEND
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
PROJECT NO. 8319
DRAWN BY: PRH
ILLINOIS PROFESSIONAL DESIGN FIRM LICENSE NO. 184-000993
www.collinsengr.com
(312) 704-9300
Chicago, Il. 60606
Suite 900
123 North Wacker Drive
KANE COUNTY DIVISION OF TRANSPORTATION
CHECKED BY: MAH
STRUCTURE NUMBER: 045-3097
KANE COUNTY
FOX RIVER
FABYAN PARKWAY OVER
WL
EF
SS
SP
MARCH 14, 2014
DATE:
Crack
Spalls
Delamination
= Water Leakage
= Efflorescence
= Shear Stirrup
= Spall
ELEVATIONEND VIEW(Looking West)
ELEVATIONEND VIEW(Looking East)
![Page 33: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/33.jpg)
PIER 5
Rust staining from the weathering steel girders is present on all piers.
the exterior girders and continuing towards the stem is typical on all piers.
Minor hairline diagonal cracks present on the cantilever caps originating near
Notes:
SHEET 11 OF 12
LEGEND
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
PROJECT NO. 8319
DRAWN BY: PRH
ILLINOIS PROFESSIONAL DESIGN FIRM LICENSE NO. 184-000993
www.collinsengr.com
(312) 704-9300
Chicago, Il. 60606
Suite 900
123 North Wacker Drive
KANE COUNTY DIVISION OF TRANSPORTATION
CHECKED BY: MAH
STRUCTURE NUMBER: 045-3097
KANE COUNTY
FOX RIVER
FABYAN PARKWAY OVER
WL
EF
SS
SP
MARCH 14, 2014
DATE:
Crack
Spalls
Delamination
= Water Leakage
= Efflorescence
= Shear Stirrup
= Spall
ELEVATIONEND VIEW(Looking West)
ELEVATIONEND VIEW(Looking East)
![Page 34: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/34.jpg)
PIER 6
Rust staining from the weathering steel girders is present on all piers.
the exterior girders and continuing towards the stem is typical on all piers.
Minor hairline diagonal cracks present on the cantilever caps originating near
Notes:
SHEET 12 OF 12
LEGEND
RS
RP
RF
PS
PD
LE
DL
CO
CC
CO
= Rust Staining
= Repair
= Reinforcement
= Prestressed Strand
= Plugged Drain Hole
= Leaching
= Delamination
= Corrosion
= Crack - Closed
= Crack - Open
PROJECT NO. 8319
DRAWN BY: PRH
ILLINOIS PROFESSIONAL DESIGN FIRM LICENSE NO. 184-000993
www.collinsengr.com
(312) 704-9300
Chicago, Il. 60606
Suite 900
123 North Wacker Drive
KANE COUNTY DIVISION OF TRANSPORTATION
CHECKED BY: MAH
STRUCTURE NUMBER: 045-3097
KANE COUNTY
FOX RIVER
FABYAN PARKWAY OVER
WL
EF
SS
SP
MARCH 14, 2014
DATE:
Crack
Spalls
Delamination
= Water Leakage
= Efflorescence
= Shear Stirrup
= Spall
ELEVATIONEND VIEW
ELEVATIONEND VIEW
(Looking West)
(Looking East)
![Page 35: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/35.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
APPENDIX E
COST ESTIMATES
![Page 36: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/36.jpg)
Fabyan Parkway over Fox River____________________________________Structure No. 045-3097May 14, 2015
Alternative 1:Mid Term Recommended Repairs (3-5 Years)
Item Unit Quantity Unit Price Total
Replace Drain Pipes Each 2 $800 $1,600Drain Pipe Extensions Each 20 $300 $6,000Clean Expansion Joints and Replace Seals Ft. 186 $90 $16,740Seal Cracks in Expansion Joint Anchorages Ft. 186 $30 $5,580Structural Repair of Concrete (depth < 5'') Sq. Ft. 131 $200 $26,200Snooper L Sum 1 $4,000 $4,000Traffic Control and Protection L Sum 1 $5,400 $5,400
Subtotal $65,520
10% Contingency $6,55210% Mobilization $6,552
Total Cost of Repairs $78,624
Cost Estimate
____________________________________________________________________________________Appendix E │Page 1
____________________________________________________________________________________Appendix E │Page 1
![Page 37: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/37.jpg)
Fabyan Parkway over Fox River____________________________________Structure No. 045-3097May 14, 2015
Alternative 2:Long Term Recommended Repairs (5-8 Years)
Item Unit Quantity Unit Price Total
Bridge Deck Scarification, 3 1/2'' Sq. Yd. 8152 $110 $896,720Bridge Deck Concrete Latex Overlay, 3 1/2'' Sq. Yd. 8152 $115 $937,480Deck Repair (Full Depth) Sq. Yd. 26 $600 $15,750Clean and Paint Exposed Reinforcement Sq. Ft. 315 $30 $9,450Snooper L Sum 1 $13,000 $13,000Median Removal Sq. Ft. 3927 $25 $98,1759'' Concrete Median Sq. Ft. 3927 $22 $86,394Traffic Control and Protection L Sum 1 $18,000 $18,000
Subtotal $2,074,969
10% Contingency $207,49710% Mobilization $207,497
$2,489,963Total Cost of Repairs
Cost Estimate
Note: The estimated quantities for full depth deck repair and cleaning and painting exposed reinforcement are calculated based on the area of existing spalls and delaminations on the underside of the deck increased by 50% to account for future deterioration. It is assumed that half of this area will require full depth deck repairs and the other half will not. The areas that do not require full depth repair can be cleaned and painted to inhibit corrosion of the rebar on the underside of the deck.
____________________________________________________________________________________Appendix E │Page 2
____________________________________________________________________________________Appendix E │Page 2
![Page 38: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/38.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
APPENDIX F
STRUCTURE PHOTOS
![Page 39: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/39.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 1
Photo No. 1
South Elevation, looking Northeast
Photo No. 2
North Elevation, looking Southwest
![Page 40: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/40.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 2
Photo No. 3
Downstream from the Bridge Deck, looking South
Photo No. 4
Upstream from the Bridge Deck, looking North
![Page 41: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/41.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 3
Photo No. 5
Typical Approach Roadway (East Shown), looking Northeast
Photo No. 6
Typical Longitudinal Cracks in Approach Roadway (West Shown), looking East
![Page 42: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/42.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 4
Photo No. 7
Typical Map Cracking in Approach Roadway (West Shown), looking North
Photo No. 8
Typical Approach Roadway Median (East Shown), looking West
![Page 43: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/43.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 5
Photo No. 9
Top of Deck, looking West
Photo No. 10
Typical Hairline Cracking in Deck, looking North
![Page 44: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/44.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 6
Photo No. 11
Northeast Corner Asphalt Patch, looking West
Photo No. 12
Typical Transverse Deck Cracking with Efflorescence (Span 1 Shown), looking East
![Page 45: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/45.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 7
Photo No. 13
Spall at Span 1, looking East
Photo No. 14
Spall at Span 6, looking South
![Page 46: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/46.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 8
Photo No. 15
Spall at Span 2 between Beams 6 & 7, looking West
Photo No. 16
Spall at Span 2 between Beams 4 & 5, looking North
![Page 47: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/47.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 9
Photo No. 17
Center Median, looking Southwest
Photo No. 18
Corner Spall in Median on Span 3 (3/14/2014), looking East
![Page 48: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/48.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 10
Photo No. 19
Patched Spall in Median on Span 3 (4/16/2015), looking East
Photo No. 20
Median Delamination at Center of Span 2, looking West
![Page 49: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/49.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 11
Photo No. 21
Spall at Edge of Patch on Median, looking West
Photo No. 22
Typical Parapet (North Shown), looking North
![Page 50: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/50.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 12
Photo No. 23
East Expansion Joint, Looking North
Photo No. 24
West Expansion Joint, looking South
![Page 51: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/51.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 13
Photo No. 25
Typical Expansion Joint Condition (East Joint Shown), looking North
Photo No. 26
Cracking at Anchorage Block at West Expansion Joint, looking South
![Page 52: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/52.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 14
Photo No. 27
Cracking along Pier 4 Expansion Joint, looking North
Photo No. 28
Typical Sealed Cracks at the West Expansion Joint, looking North
![Page 53: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/53.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 15
Photo No. 29
Typical Drain Pipe (Northwest Pipe in Span 3 Shown), looking East
Photo No. 30
Broken Drain Pipe at North Side of Span 2, looking East
![Page 54: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/54.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 16
Photo No. 31
Broken Drain Pipe at South Side of Span 3, looking Southeast
Photo No. 32
Water Leakage at Top of Northwest Drain Pipe in West Span, looking Northwest
![Page 55: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/55.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 17
Photo No. 33
Typical Girders (Span 1 Shown), looking East
Photo No. 34
Typical Cross Frame, looking East
![Page 56: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/56.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 18
Photo No. 35
Typical Cross Frame Connection, looking Northeast
Photo No. 36
3”x1” Hole in the Web of Girder 7 at Pier 4, looking Northeast
![Page 57: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/57.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 19
Photo No. 37
Holes in Girders at Pier 4, looking North
Photo No. 38
Section Loss at the South Cross Frame at the West Abutment, looking West
![Page 58: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/58.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 20
Photo No. 39
Typical Girder Corrosion near Pier 4 (Girder 6 Shown), looking South
Photo No. 40
Missing Nut at a Lateral Brace at Girder 3 in Span 3, looking Southeast
![Page 59: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/59.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 21
Photo No. 41
Loose Bolt at Splice 2 in Girder 5 in Span 2, looking North
Photo No. 42
Missing Bolt at Splice 5 in Girder 5 in Span 2, looking North
![Page 60: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/60.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 22
Photo No. 43
Loose Bolt at Splice 5 in Girder 4 in Span 2, looking North
Photo No. 44
Two Missing Bolts at Splice 6 in Girder 5 in Span 3, looking West
![Page 61: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/61.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 23
Photo No. 45
Typical Pack Rust at Splice (Girder 1 Splice 6 Shown), looking South
Photo No. 46
Typical East Abutment Bearing, looking East
![Page 62: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/62.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 24
Photo No. 47
Typical West Abutment Bearing, looking East
Photo No. 48
Typical Pier 1 Bearing, looking East
![Page 63: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/63.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 25
Photo No. 49
Loose Bearing Anchor Bolt at Girder 4 Bearing in Pier 3, looking West
Photo No. 50
Beam 1 Bearing at Pier 2, looking West
![Page 64: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/64.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 26
Photo No. 51
Typical Abutment (West Shown), looking Northwest
Photo No. 52
Cracking and Staining on the Abutment Back Wall (West Shown), looking West
![Page 65: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/65.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 27
Photo No. 53
Spall at the North End of the West Abutment, looking Southwest
Photo No. 54
Typical Wingwall (Northwest Shown), looking Southwest
![Page 66: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/66.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 28
Photo No. 55
Typical Pier Elevation (Pier 1 Shown), looking Southeast
Photo No. 56
Spalling at Pier 3, looking West
![Page 67: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/67.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 29
Photo No. 57
Hairline Cracking at the Cantilever Cap (North End of Pier 1 Shown), looking East
Photo No. 58
Typical Slopewall (West Shown), looking North
![Page 68: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/68.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 30
Photo No. 59
Typical Crack at the West Slopewall, looking North
Photo No. 60
Crack at the East Slopewall, looking Southeast
![Page 69: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/69.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 31
Photo No. 61
Undermined Trees at the Northeast Bank, looking North
Photo No. 62
Typical Guardrail (Southeast Shown), looking West
![Page 70: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/70.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
Appendix F | Page 32
Photo No. 63
Corrosion on Utility Conduits, looking West
Photo No. 64
Typical Light Pole, looking Northeast
![Page 71: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/71.jpg)
Fabyan Parkway over Fox River Structure No. 045-3097 May 14, 2015
APPENDIX G
ABBREVIATED EXISTING PLANS
![Page 72: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/72.jpg)
![Page 73: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/73.jpg)
![Page 74: 2015 Kane County CONDITION REPORT.pdfI. Geographical & Administrative Data 3 II. Physical Description of Structure 4 III. Field Inspection & Physical Evaluation 5 IV. Potential Scope](https://reader036.vdocuments.us/reader036/viewer/2022062602/5f01aef47e708231d4008b9d/html5/thumbnails/74.jpg)