Lithko Contracting, Inc. | Concrete Solutions Pre−Problem Statement 2015 1
Associated Schools of Construction
2015 Student Competition
National Open Category
CONCRETE SOLUTIONS
![Page 2: 2015 asc concrete solutions competition](https://reader038.vdocuments.us/reader038/viewer/2022100510/579054741a28ab900c90ac66/html5/thumbnails/2.jpg)
Lithko Contracting, INC. | Concrete Solutions Pre−Problem Statement 2015
Introduction
Lithko Contracting, Inc. is proud to be sponsoring the 2015 “Concrete Solutions” ASC Student
Competition problem. Welcome and thank you for your participation.
Concrete has been a leading building material for over 2,000 years. Every project involves the use of
concrete in some way, and for some projects concrete is the main building material. Modern ready
mixed concrete also provides remarkable flexibility in meeting the needs of challenging design and
sustainability considerations. The ASC Competition has done an excellent job in providing an
environment for the competitors to experience life as a general contractor. In participating in the
Concrete Solutions problem you will have the opportunity to take a peek into the life of a self−
performing general contractor.
This competition offers an outstanding opportunity for your career development. It allows you to
showcase your talents, become a leader and network with potential employers and construction
recruiters. Congratulations on making the decision to compete.
Problem Details
Tippman Construction has recently been successful in its pursuit of a project for a private client located
in New York. The project is in an extremely remote location with terrible terrain and has to be
completed in 150 days. Lithko Contracting has been awarded the concrete scope of work, but due to
unforeseen circumstances, Lithko will not be able to perform the work. Lithko has agreed to find a
suitable replacement contractor and has shortlisted a select group of Concrete construction companies to
interview for the self−performing concrete scope of work. The successful bidder will work directly for
Lithko Contracting. The problem statement will be related to both preconstruction and operational
responsibilities.
Listed below are some items to review which will help prepare for the competition.
The competition teams will be expected to:
o Provide budget assistance.
o Provide design assistance and constructability reviews.
o Perform a quantitative takeoff.
o Develop a detailed estimate.
o Develop a construction pour sequence schedule.
o Recognize and address safety concerns and develop a detailed site specific safety plan.
o Recognize and be able to address project and ACI specification items.
o Analyze forming systems and determine which system best fits the project scope items.
![Page 3: 2015 asc concrete solutions competition](https://reader038.vdocuments.us/reader038/viewer/2022100510/579054741a28ab900c90ac66/html5/thumbnails/3.jpg)
Lithko Contracting, INC. | Concrete Solutions Pre−Problem Statement 2015
Deliverables that are expected to be received from the teams are as follows:
o Statement of Qualifications to include the following items:
Staff résumés,
Organization chart
Specific roles and responsibilities of each position.
Project approach.
Detailed request for qualifications will be distributed at a later date to the
competing teams. Distribution date will allow for sufficient time to prepare
your statements.
o Takeoff estimate sheets (these may be collected upon request),
o Written report or proposal, including any clarifications or specific exclusions (completion
of the provided bid form),
o Construction pour sequence schedule and validation or feedback of provided project
schedule (these will not be collected and rather must be part of the oral presentation),
o Oral presentation.
Scoring criteria will be broken down as follows:
o 10 Points Statement of Qualifications
o 40 Points Bid Form (template to be provided)
o 50 Points Interview Team Presentation
o 5 Points Bonus − for Identifying the “Concrete Solution”.
Other Notable Items
Participation in this problem will be limited to the twelve teams determined on a first come, first served
basis.
Competing teams will have access to the internet at their team’s discretion and cost.
Please note that points will be deducted for submitting deliverables past the stated due dates (1 point
for every minute late).
![Page 4: 2015 asc concrete solutions competition](https://reader038.vdocuments.us/reader038/viewer/2022100510/579054741a28ab900c90ac66/html5/thumbnails/4.jpg)
Lithko Contracting, INC. | Concrete Solutions Pre−Problem Statement 2015
White board, LCD projector, screen and laptop will be provided for presentations.
Team rooms will be visited by the judges periodically on Thursday, October 15, 2015.
Initial problem documents will be distributed via flash drive. Hard copies of particular documents will be
provided.
Prizes will be awarded for first, second and third place finishing teams. The competition
rules are listed at http://ascregion3.wix.com/ascregion3#!competition-rules/c1i7j and will
be strictly adhered to.
![Page 5: 2015 asc concrete solutions competition](https://reader038.vdocuments.us/reader038/viewer/2022100510/579054741a28ab900c90ac66/html5/thumbnails/5.jpg)
Lithko Contracting, INC. | Concrete Solutions Pre−Problem Statement 2015
Conference Schedule
The following is the basic schedule of events, detailed schedules for both competition and faculty
events will be distributed to all persons registered approximately one week before the conference
begins:
Wednesday October 14th, 2015
Team and Faculty Registration - 3PM - 7PM
Career Fair - 4PM - 8PM (snack food provided)
Welcome Session and Orientation - 8PM - 9PM
Thursday October 15th, 2015
RFP's distributed for all problems - 7AM
Faculty Breakfast and Regional Meeting - 8AM
Faculty Tour - 9AM - Noon
Student Luncheon - 11:30AM - 1PM
Faculty Lunch 12:30 - 1:30PM
Faculty Paper Presentations - 1:30 - 5PM
Student Pizza Dinner - 6PM
Faculty Dinner - 6PM
Competition Submissions Due - 11PM
Friday October 16th, 2015
Student/Faculty Breakfast - 7AM
All Presentation Materials Due - 9AM
Faculty Learning Sessions - 9AM - 4PM
Competition Presentations - 9AM - 6PM
Saturday October 17th, 2015
Awards Banquet and Breakfast - 8AM - 10AM
Conference Closes - 10AM
“Concrete Solutions” has been integrated into the ASC competition to allow you to have an
opportunity to experience the world of subcontracting and or self−perform concrete. We believe that
this problem will challenge you to think in detail about what it takes to win and build a job in this
extremely competitive market. Thank you very much for your interest and we look forward to seeing
you in October!
Questions can be directed to: Kelley Forster [email protected]