2015 2016 school year step lane 1 base adjustment step ... · step 15c 100,390$ ‐$ $ 100,390 $...
TRANSCRIPT
![Page 1: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/1.jpg)
228 Day Schedule
2015‐2019
2015‐2016 School Year
Lane 1 Base
Step
Adjustment
Base
+ Step
Pension
Pick up
Total
Comp.
Step 1 ‐$ 55,358$ 3,875$ 59,233$
Step 2 55,358$ 1,021$ 56,379$ 3,947$ 60,326$
Step 3 56,379$ 1,226$ 57,605$ 4,032$ 61,637$
Step 4 57,626$ 1,328$ 58,954$ 4,127$ 63,081$
Step 5 58,999$ 2,145$ 61,144$ 4,280$ 65,424$
Step 6 63,009$ 2,656$ 65,665$ 4,597$ 70,262$
Step 7 67,577$ 2,809$ 70,386$ 4,927$ 75,313$
Step 8 71,975$ 2,809$ 74,784$ 5,235$ 80,019$
Step 9 75,539$ 2,809$ 78,348$ 5,484$ 83,832$
Step 10 78,574$ 2,656$ 81,230$ 5,686$ 86,916$
Step 11 80,818$ 2,451$ 83,269$ 5,829$ 89,098$
Step 12 83,335$ 2,043$ 85,378$ 5,976$ 91,354$
Step 13 85,431$ 1,736$ 87,167$ 6,102$ 93,269$
Step 14a 87,372$ 1,481$ 88,853$ 6,220$ 95,073$
Step 14b 89,496$ ‐$ 89,496$ 6,265$ 95,761$
Step 14c 90,310$ ‐$ 90,310$ 6,322$ 96,632$
Step 14d 91,117$ ‐$ 91,117$ 6,378$ 97,495$
Step 15a 91,117$ 1,377$ 92,494$ 6,475$ 98,969$
Step 15b 92,494$ ‐$ 92,494$ 6,475$ 98,969$
Step 15c 92,522$ ‐$ 92,522$ 6,477$ 98,999$
Step 16 92,522$ 1,376$ 93,898$ 6,573$ 100,471$
![Page 2: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/2.jpg)
228 Day Schedule
2015‐2019
2015‐2016 School Year
Lane 2 Base
Step
Adjustment
Base
+ Step
Pension
Pick up
Total
Comp.
Step 1 ‐$ 59,192$ 4,143$ 63,335$
Step 2 59,192$ 1,021$ 60,213$ 4,215$ 64,428$
Step 3 60,213$ 1,226$ 61,439$ 4,301$ 65,740$
Step 4 61,459$ 1,328$ 62,787$ 4,395$ 67,182$
Step 5 62,832$ 2,145$ 64,977$ 4,548$ 69,525$
Step 6 66,842$ 2,656$ 69,498$ 4,865$ 74,363$
Step 7 71,412$ 2,809$ 74,221$ 5,195$ 79,416$
Step 8 75,811$ 2,809$ 78,620$ 5,503$ 84,123$
Step 9 79,373$ 2,809$ 82,182$ 5,753$ 87,935$
Step 10 82,409$ 2,656$ 85,065$ 5,955$ 91,020$
Step 11 84,652$ 2,451$ 87,103$ 6,097$ 93,200$
Step 12 87,170$ 2,043$ 89,213$ 6,245$ 95,458$
Step 13 89,265$ 1,736$ 91,001$ 6,370$ 97,371$
Step 14a 91,206$ 1,481$ 92,687$ 6,488$ 99,175$
Step 14b 93,330$ ‐$ 93,330$ 6,533$ 99,863$
Step 14c 94,144$ ‐$ 94,144$ 6,590$ 100,734$
Step 14d 95,066$ ‐$ 95,066$ 6,655$ 101,721$
Step 15a 95,066$ 1,377$ 96,443$ 6,751$ 103,194$
Step 15b 96,443$ ‐$ 96,443$ 6,751$ 103,194$
Step 15c 96,471$ ‐$ 96,471$ 6,753$ 103,224$
Step 16 96,471$ 1,376$ 97,847$ 6,849$ 104,696$
![Page 3: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/3.jpg)
228 Day Schedule
2015‐2019
2015‐2016 School Year
Lane 3 Base
Step
Adjustment
Base
+ Step
Pension
Pick up
Total
Comp.
Step 1 ‐$ 61,110$ 4,278$ 65,388$
Step 2 61,110$ 1,021$ 62,131$ 4,349$ 66,480$
Step 3 62,131$ 1,226$ 63,357$ 4,435$ 67,792$
Step 4 63,378$ 1,328$ 64,706$ 4,529$ 69,235$
Step 5 64,751$ 2,145$ 66,896$ 4,683$ 71,579$
Step 6 68,759$ 2,656$ 71,415$ 4,999$ 76,414$
Step 7 73,329$ 2,809$ 76,138$ 5,330$ 81,468$
Step 8 77,728$ 2,809$ 80,537$ 5,638$ 86,175$
Step 9 81,292$ 2,809$ 84,101$ 5,887$ 89,988$
Step 10 84,326$ 2,656$ 86,982$ 6,089$ 93,071$
Step 11 86,568$ 2,451$ 89,019$ 6,231$ 95,250$
Step 12 89,086$ 2,043$ 91,129$ 6,379$ 97,508$
Step 13 91,182$ 1,736$ 92,918$ 6,504$ 99,422$
Step 14a 93,124$ 1,481$ 94,605$ 6,622$ 101,227$
Step 14b 95,247$ ‐$ 95,247$ 6,667$ 101,914$
Step 14c 96,061$ ‐$ 96,061$ 6,724$ 102,785$
Step 14d 97,039$ ‐$ 97,039$ 6,793$ 103,832$
Step 15a 97,039$ 1,377$ 98,416$ 6,889$ 105,305$
Step 15b 98,416$ ‐$ 98,416$ 6,889$ 105,305$
Step 15c 98,443$ ‐$ 98,443$ 6,891$ 105,334$
Step 16 98,443$ 1,376$ 99,819$ 6,987$ 106,806$
![Page 4: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/4.jpg)
228 Day Schedule
2015‐2019
2015‐2016 School Year
Lane 4 Base
Step
Adjustment
Base
+ Step
Pension
Pick up
Total
Comp.
Step 1 ‐$ 63,027$ 4,412$ 67,439$
Step 2 63,027$ 1,021$ 64,048$ 4,483$ 68,531$
Step 3 64,048$ 1,226$ 65,274$ 4,569$ 69,843$
Step 4 65,295$ 1,328$ 66,623$ 4,664$ 71,287$
Step 5 66,668$ 2,145$ 68,813$ 4,817$ 73,630$
Step 6 70,678$ 2,656$ 73,334$ 5,133$ 78,467$
Step 7 75,246$ 2,809$ 78,055$ 5,464$ 83,519$
Step 8 79,645$ 2,809$ 82,454$ 5,772$ 88,226$
Step 9 83,209$ 2,809$ 86,018$ 6,021$ 92,039$
Step 10 86,243$ 2,656$ 88,899$ 6,223$ 95,122$
Step 11 88,487$ 2,451$ 90,938$ 6,366$ 97,304$
Step 12 91,004$ 2,043$ 93,047$ 6,513$ 99,560$
Step 13 93,100$ 1,736$ 94,836$ 6,639$ 101,475$
Step 14a 95,040$ 1,481$ 96,521$ 6,756$ 103,277$
Step 14b 97,164$ ‐$ 97,164$ 6,801$ 103,965$
Step 14c 97,978$ ‐$ 97,978$ 6,858$ 104,836$
Step 14d 99,013$ ‐$ 99,013$ 6,931$ 105,944$
Step 15a 99,013$ 1,377$ 100,390$ 7,027$ 107,417$
Step 15b 100,390$ ‐$ 100,390$ 7,027$ 107,417$
Step 15c 100,417$ ‐$ 100,417$ 7,029$ 107,446$
Step 16 100,417$ 1,376$ 101,793$ 7,126$ 108,919$
![Page 5: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/5.jpg)
228 Day Schedule
2015‐2019
2015‐2016 School Year
Lane 5 Base
Step
Adjustment
Base
+ Step
Pension
Pick up
Total
Comp.
Step 1 ‐$ 64,944$ 4,546$ 69,490$
Step 2 64,944$ 1,021$ 65,965$ 4,618$ 70,583$
Step 3 65,965$ 1,226$ 67,191$ 4,703$ 71,894$
Step 4 67,212$ 1,328$ 68,540$ 4,798$ 73,338$
Step 5 68,585$ 2,145$ 70,730$ 4,951$ 75,681$
Step 6 72,594$ 2,656$ 75,250$ 5,268$ 80,518$
Step 7 77,163$ 2,809$ 79,972$ 5,598$ 85,570$
Step 8 81,563$ 2,809$ 84,372$ 5,906$ 90,278$
Step 9 85,126$ 2,809$ 87,935$ 6,155$ 94,090$
Step 10 88,159$ 2,656$ 90,815$ 6,357$ 97,172$
Step 11 90,404$ 2,451$ 92,855$ 6,500$ 99,355$
Step 12 92,922$ 2,043$ 94,965$ 6,648$ 101,613$
Step 13 95,018$ 1,736$ 96,754$ 6,773$ 103,527$
Step 14a 96,957$ 1,481$ 98,438$ 6,891$ 105,329$
Step 14b 99,081$ ‐$ 99,081$ 6,936$ 106,017$
Step 14c 99,895$ ‐$ 99,895$ 6,993$ 106,888$
Step 14d 100,988$ ‐$ 100,988$ 7,069$ 108,057$
Step 15a 100,988$ 1,377$ 102,365$ 7,166$ 109,531$
Step 15b 102,365$ ‐$ 102,365$ 7,166$ 109,531$
Step 15c 102,392$ ‐$ 102,392$ 7,167$ 109,559$
Step 16 102,392$ 1,376$ 103,768$ 7,264$ 111,032$
![Page 6: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/6.jpg)
228 Day Schedule
2015‐2019
2015‐2016 School Year
Lane 6 Base
Step
Adjustment
Base
+ Step
Pension
Pick up
Total
Comp.
Step 1 ‐$ 66,862$ 4,680$ 71,542$
Step 2 66,862$ 1,021$ 67,883$ 4,752$ 72,635$
Step 3 67,883$ 1,226$ 69,109$ 4,838$ 73,947$
Step 4 69,130$ 1,328$ 70,458$ 4,932$ 75,390$
Step 5 70,503$ 2,145$ 72,648$ 5,085$ 77,733$
Step 6 74,511$ 2,656$ 77,167$ 5,402$ 82,569$
Step 7 79,080$ 2,809$ 81,889$ 5,732$ 87,621$
Step 8 83,479$ 2,809$ 86,288$ 6,040$ 92,328$
Step 9 87,043$ 2,809$ 89,852$ 6,290$ 96,142$
Step 10 90,078$ 2,656$ 92,734$ 6,491$ 99,225$
Step 11 92,321$ 2,451$ 94,772$ 6,634$ 101,406$
Step 12 94,838$ 2,043$ 96,881$ 6,782$ 103,663$
Step 13 96,935$ 1,736$ 98,671$ 6,907$ 105,578$
Step 14a 98,875$ 1,481$ 100,356$ 7,025$ 107,381$
Step 14b 100,999$ ‐$ 100,999$ 7,070$ 108,069$
Step 14c 101,812$ ‐$ 101,812$ 7,127$ 108,939$
Step 14d 102,961$ ‐$ 102,961$ 7,207$ 110,168$
Step 15a 102,961$ 1,377$ 104,338$ 7,304$ 111,642$
Step 15b 104,338$ ‐$ 104,338$ 7,304$ 111,642$
Step 15c 104,366$ ‐$ 104,366$ 7,306$ 111,672$
Step 16 104,366$ 1,376$ 105,742$ 7,402$ 113,144$
![Page 7: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/7.jpg)
228 Day Schedule
2015‐2019
2016‐2017 School Year (Teachers Hired Before 1/1/17 Only)*
Lane 1 Base
Step
Adjustment
Base
+ Step
Pension Pick
up/
Supplemental
Total
Comp.
Step 1 ‐$ 55,358$ 3,875$ 59,233$
Step 2 55,358$ 1,021$ 56,379$ 3,947$ 60,326$
Step 3 56,379$ 1,226$ 57,605$ 4,032$ 61,637$
Step 4 57,605$ 1,328$ 58,933$ 4,125$ 63,058$
Step 5 58,954$ 2,145$ 61,099$ 4,277$ 65,376$
Step 6 61,144$ 2,656$ 63,800$ 4,466$ 68,266$
Step 7 65,665$ 2,809$ 68,474$ 4,793$ 73,267$
Step 8 70,386$ 2,809$ 73,195$ 5,124$ 78,319$
Step 9 74,784$ 2,809$ 77,593$ 5,432$ 83,025$
Step 10 78,348$ 2,656$ 81,004$ 5,670$ 86,674$
Step 11 81,230$ 2,451$ 83,681$ 5,858$ 89,539$
Step 12 83,269$ 2,043$ 85,312$ 5,972$ 91,284$
Step 13 85,378$ 1,736$ 87,114$ 6,098$ 93,212$
Step 14a 87,167$ 1,481$ 88,648$ 6,205$ 94,853$
Step 14b 88,853$ ‐$ 88,853$ 6,220$ 95,073$
Step 14c 89,496$ ‐$ 89,496$ 6,265$ 95,761$
Step 14d 90,310$ ‐$ 90,310$ 6,322$ 96,632$
Step 14e 91,117$ ‐$ 91,117$ 6,378$ 97,495$
Step 15a 91,117$ 1,377$ 92,494$ 6,475$ 98,969$
Step 15b 92,494$ ‐$ 92,494$ 6,475$ 98,969$
Step 15c 92,494$ ‐$ 92,494$ 6,475$ 98,969$
Step 15d 92,522$ ‐$ 92,522$ 6,477$ 98,999$
Step 16 92,522$ 1,376$ 93,898$ 6,573$ 100,471$
2016‐2017 School Year (Teachers Hired On or After 1/1/17 Only)*
Step 1 ‐$ 55,358$ 1,938$ 57,296$
Step 2 55,358$ 1,021$ 56,379$ 1,973$ 58,352$
Step 3 56,379$ 1,226$ 57,605$ 2,016$ 59,621$
* Teachers hired on or after January 1, 2017 receive half the value of incumbents' 7.0% pension
pick up in the form of salary in FY 17, and the full value in FY 18 and FY 19.
![Page 8: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/8.jpg)
228 Day Schedule
2015‐2019
2016‐2017 School Year (Teachers Hired Before 1/1/17 Only)*
Lane 2 Base
Step
Adjustment
Base
+ Step
Pension Pick
up/
Supplemental
Total
Comp.
Step 1 ‐$ 59,192$ 4,143$ 63,335$
Step 2 59,192$ 1,021$ 60,213$ 4,215$ 64,428$
Step 3 60,213$ 1,226$ 61,439$ 4,301$ 65,740$
Step 4 61,439$ 1,328$ 62,767$ 4,394$ 67,161$
Step 5 62,787$ 2,145$ 64,932$ 4,545$ 69,477$
Step 6 64,977$ 2,656$ 67,633$ 4,734$ 72,367$
Step 7 69,498$ 2,809$ 72,307$ 5,061$ 77,368$
Step 8 74,221$ 2,809$ 77,030$ 5,392$ 82,422$
Step 9 78,620$ 2,809$ 81,429$ 5,700$ 87,129$
Step 10 82,182$ 2,656$ 84,838$ 5,939$ 90,777$
Step 11 85,065$ 2,451$ 87,516$ 6,126$ 93,642$
Step 12 87,103$ 2,043$ 89,146$ 6,240$ 95,386$
Step 13 89,213$ 1,736$ 90,949$ 6,366$ 97,315$
Step 14a 91,001$ 1,481$ 92,482$ 6,474$ 98,956$
Step 14b 92,687$ ‐$ 92,687$ 6,488$ 99,175$
Step 14c 93,330$ ‐$ 93,330$ 6,533$ 99,863$
Step 14d 94,144$ ‐$ 94,144$ 6,590$ 100,734$
Step 14e 95,066$ ‐$ 95,066$ 6,655$ 101,721$
Step 15a 95,066$ 1,377$ 96,443$ 6,751$ 103,194$
Step 15b 96,443$ ‐$ 96,443$ 6,751$ 103,194$
Step 15c 96,443$ ‐$ 96,443$ 6,751$ 103,194$
Step 15d 96,471$ ‐$ 96,471$ 6,753$ 103,224$
Step 16 96,471$ 1,376$ 97,847$ 6,849$ 104,696$
2016‐2017 School Year (Teachers Hired On or After 1/1/17 Only)*
Step 1 ‐$ 59,192$ 2,072$ 61,264$
Step 2 59,192$ 1,021$ 60,213$ 2,107$ 62,320$
Step 3 60,213$ 1,226$ 61,439$ 2,150$ 63,589$
* Teachers hired on or after January 1, 2017 receive half the value of incumbents' 7.0% pension
pick up in the form of salary in FY 17, and the full value in FY 18 and FY 19.
![Page 9: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/9.jpg)
228 Day Schedule
2015‐2019
2016‐2017 School Year (Teachers Hired Before 1/1/17 Only)*
Lane 3 Base
Step
Adjustment
Base
+ Step
Pension Pick
up/
Supplemental
Total
Comp.
Step 1 ‐$ 61,110$ 4,278$ 65,388$
Step 2 61,110$ 1,021$ 62,131$ 4,349$ 66,480$
Step 3 62,131$ 1,226$ 63,357$ 4,435$ 67,792$
Step 4 63,357$ 1,328$ 64,685$ 4,528$ 69,213$
Step 5 64,706$ 2,145$ 66,851$ 4,680$ 71,531$
Step 6 66,896$ 2,656$ 69,552$ 4,869$ 74,421$
Step 7 71,415$ 2,809$ 74,224$ 5,196$ 79,420$
Step 8 76,138$ 2,809$ 78,947$ 5,526$ 84,473$
Step 9 80,537$ 2,809$ 83,346$ 5,834$ 89,180$
Step 10 84,101$ 2,656$ 86,757$ 6,073$ 92,830$
Step 11 86,982$ 2,451$ 89,433$ 6,260$ 95,693$
Step 12 89,019$ 2,043$ 91,062$ 6,374$ 97,436$
Step 13 91,129$ 1,736$ 92,865$ 6,501$ 99,366$
Step 14a 92,918$ 1,481$ 94,399$ 6,608$ 101,007$
Step 14b 94,605$ ‐$ 94,605$ 6,622$ 101,227$
Step 14c 95,247$ ‐$ 95,247$ 6,667$ 101,914$
Step 14d 96,061$ ‐$ 96,061$ 6,724$ 102,785$
Step 14e 97,039$ ‐$ 97,039$ 6,793$ 103,832$
Step 15a 97,039$ 1,377$ 98,416$ 6,889$ 105,305$
Step 15b 98,416$ ‐$ 98,416$ 6,889$ 105,305$
Step 15c 98,416$ ‐$ 98,416$ 6,889$ 105,305$
Step 15d 98,443$ ‐$ 98,443$ 6,891$ 105,334$
Step 16 98,443$ 1,376$ 99,819$ 6,987$ 106,806$
2016‐2017 School Year (Teachers Hired On or After 1/1/17 Only)*
Step 1 ‐$ 61,110$ 2,139$ 63,249$
Step 2 61,110$ 1,021$ 62,131$ 2,175$ 64,306$
Step 3 62,131$ 1,226$ 63,357$ 2,217$ 65,574$
* Teachers hired on or after January 1, 2017 receive half the value of incumbents' 7.0% pension
pick up in the form of salary in FY 17, and the full value in FY 18 and FY 19.
![Page 10: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/10.jpg)
228 Day Schedule
2015‐2019
2016‐2017 School Year (Teachers Hired Before 1/1/17 Only)*
Lane 4 Base
Step
Adjustment
Base
+ Step
Pension Pick
up/
Supplemental
Total
Comp.
Step 1 ‐$ 63,027$ 4,412$ 67,439$
Step 2 63,027$ 1,021$ 64,048$ 4,483$ 68,531$
Step 3 64,048$ 1,226$ 65,274$ 4,569$ 69,843$
Step 4 65,274$ 1,328$ 66,602$ 4,662$ 71,264$
Step 5 66,623$ 2,145$ 68,768$ 4,814$ 73,582$
Step 6 68,813$ 2,656$ 71,469$ 5,003$ 76,472$
Step 7 73,334$ 2,809$ 76,143$ 5,330$ 81,473$
Step 8 78,055$ 2,809$ 80,864$ 5,660$ 86,524$
Step 9 82,454$ 2,809$ 85,263$ 5,968$ 91,231$
Step 10 86,018$ 2,656$ 88,674$ 6,207$ 94,881$
Step 11 88,899$ 2,451$ 91,350$ 6,395$ 97,745$
Step 12 90,938$ 2,043$ 92,981$ 6,509$ 99,490$
Step 13 93,047$ 1,736$ 94,783$ 6,635$ 101,418$
Step 14a 94,836$ 1,481$ 96,317$ 6,742$ 103,059$
Step 14b 96,521$ ‐$ 96,521$ 6,756$ 103,277$
Step 14c 97,164$ ‐$ 97,164$ 6,801$ 103,965$
Step 14d 97,978$ ‐$ 97,978$ 6,858$ 104,836$
Step 14e 99,013$ ‐$ 99,013$ 6,931$ 105,944$
Step 15a 99,013$ 1,377$ 100,390$ 7,027$ 107,417$
Step 15b 100,390$ ‐$ 100,390$ 7,027$ 107,417$
Step 15c 100,390$ ‐$ 100,390$ 7,027$ 107,417$
Step 15d 100,417$ ‐$ 100,417$ 7,029$ 107,446$
Step 16 100,417$ 1,376$ 101,793$ 7,126$ 108,919$
2016‐2017 School Year (Teachers Hired On or After 1/1/17 Only)*
Step 1 ‐$ 63,027$ 2,206$ 65,233$
Step 2 63,027$ 1,021$ 64,048$ 2,242$ 66,290$
Step 3 64,048$ 1,226$ 65,274$ 2,285$ 67,559$
* Teachers hired on or after January 1, 2017 receive half the value of incumbents' 7.0% pension
pick up in the form of salary in FY 17, and the full value in FY 18 and FY 19.
![Page 11: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/11.jpg)
228 Day Schedule
2015‐2019
2016‐2017 School Year (Teachers Hired Before 1/1/17 Only)*
Lane 5 Base
Step
Adjustment
Base
+ Step
Pension Pick
up/
Supplemental
Total
Comp.
Step 1 ‐$ 64,944$ 4,546$ 69,490$
Step 2 64,944$ 1,021$ 65,965$ 4,618$ 70,583$
Step 3 65,965$ 1,226$ 67,191$ 4,703$ 71,894$
Step 4 67,191$ 1,328$ 68,519$ 4,796$ 73,315$
Step 5 68,540$ 2,145$ 70,685$ 4,948$ 75,633$
Step 6 70,730$ 2,656$ 73,386$ 5,137$ 78,523$
Step 7 75,250$ 2,809$ 78,059$ 5,464$ 83,523$
Step 8 79,972$ 2,809$ 82,781$ 5,795$ 88,576$
Step 9 84,372$ 2,809$ 87,181$ 6,103$ 93,284$
Step 10 87,935$ 2,656$ 90,591$ 6,341$ 96,932$
Step 11 90,815$ 2,451$ 93,266$ 6,529$ 99,795$
Step 12 92,855$ 2,043$ 94,898$ 6,643$ 101,541$
Step 13 94,965$ 1,736$ 96,701$ 6,769$ 103,470$
Step 14a 96,754$ 1,481$ 98,235$ 6,876$ 105,111$
Step 14b 98,438$ ‐$ 98,438$ 6,891$ 105,329$
Step 14c 99,081$ ‐$ 99,081$ 6,936$ 106,017$
Step 14d 99,895$ ‐$ 99,895$ 6,993$ 106,888$
Step 14e 100,988$ ‐$ 100,988$ 7,069$ 108,057$
Step 15a 100,988$ 1,377$ 102,365$ 7,166$ 109,531$
Step 15b 102,365$ ‐$ 102,365$ 7,166$ 109,531$
Step 15c 102,365$ ‐$ 102,365$ 7,166$ 109,531$
Step 15d 102,392$ ‐$ 102,392$ 7,167$ 109,559$
Step 16 102,392$ 1,376$ 103,768$ 7,264$ 111,032$
2016‐2017 School Year (Teachers Hired On or After 1/1/17 Only)*
Step 1 ‐$ 64,944$ 2,273$ 67,217$
Step 2 64,944$ 1,021$ 65,965$ 2,309$ 68,274$
Step 3 65,965$ 1,226$ 67,191$ 2,352$ 69,543$
* Teachers hired on or after January 1, 2017 receive half the value of incumbents' 7.0% pension
pick up in the form of salary in FY 17, and the full value in FY 18 and FY 19.
![Page 12: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/12.jpg)
228 Day Schedule
2015‐2019
2016‐2017 School Year (Teachers Hired Before 1/1/17 Only)*
Lane 6 Base
Step
Adjustment
Base
+ Step
Pension Pick
up/
Supplemental
Total
Comp.
Step 1 ‐$ 66,862$ 4,680$ 71,542$
Step 2 66,862$ 1,021$ 67,883$ 4,752$ 72,635$
Step 3 67,883$ 1,226$ 69,109$ 4,838$ 73,947$
Step 4 69,109$ 1,328$ 70,437$ 4,931$ 75,368$
Step 5 70,458$ 2,145$ 72,603$ 5,082$ 77,685$
Step 6 72,648$ 2,656$ 75,304$ 5,271$ 80,575$
Step 7 77,167$ 2,809$ 79,976$ 5,598$ 85,574$
Step 8 81,889$ 2,809$ 84,698$ 5,929$ 90,627$
Step 9 86,288$ 2,809$ 89,097$ 6,237$ 95,334$
Step 10 89,852$ 2,656$ 92,508$ 6,476$ 98,984$
Step 11 92,734$ 2,451$ 95,185$ 6,663$ 101,848$
Step 12 94,772$ 2,043$ 96,815$ 6,777$ 103,592$
Step 13 96,881$ 1,736$ 98,617$ 6,903$ 105,520$
Step 14a 98,671$ 1,481$ 100,152$ 7,011$ 107,163$
Step 14b 100,356$ ‐$ 100,356$ 7,025$ 107,381$
Step 14c 100,999$ ‐$ 100,999$ 7,070$ 108,069$
Step 14d 101,812$ ‐$ 101,812$ 7,127$ 108,939$
Step 14e 102,961$ ‐$ 102,961$ 7,207$ 110,168$
Step 15a 102,961$ 1,377$ 104,338$ 7,304$ 111,642$
Step 15b 104,338$ ‐$ 104,338$ 7,304$ 111,642$
Step 15c 104,338$ ‐$ 104,338$ 7,304$ 111,642$
Step 15d 104,366$ ‐$ 104,366$ 7,306$ 111,672$
Step 16 104,366$ 1,376$ 105,742$ 7,402$ 113,144$
2016‐2017 School Year (Teachers Hired On or After 1/1/17 Only)*
Step 1 ‐$ 66,862$ 2,340$ 69,202$
Step 2 66,862$ 1,021$ 67,883$ 2,376$ 70,259$
Step 3 67,883$ 1,226$ 69,109$ 2,419$ 71,528$
* Teachers hired on or after January 1, 2017 receive half the value of incumbents' 7.0% pension
pick up in the form of salary in FY 17, and the full value in FY 18 and FY 19.
![Page 13: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/13.jpg)
228 Day Schedule
2015‐2019
2017‐2018 School Year
Lane 1 Base
Step
Adjustment
Base
+ Step
Pension Pick up/
Supplemental
Salary*
Total
Comp.
Step 1 ‐$ 56,465$ 3,953$ 60,418$
Step 2 56,465$ 1,021$ 57,486$ 4,024$ 61,510$
Step 3 57,507$ 1,226$ 58,733$ 4,111$ 62,844$
Step 4 58,757$ 1,328$ 60,085$ 4,206$ 64,291$
Step 5 60,112$ 2,145$ 62,257$ 4,358$ 66,615$
Step 6 62,321$ 2,656$ 64,977$ 4,548$ 69,525$
Step 7 65,076$ 2,809$ 67,885$ 4,752$ 72,637$
Step 8 69,843$ 2,809$ 72,652$ 5,086$ 77,738$
Step 9 74,659$ 2,809$ 77,468$ 5,423$ 82,891$
Step 10 79,145$ 2,656$ 81,801$ 5,726$ 87,527$
Step 11 82,624$ 2,451$ 85,075$ 5,955$ 91,030$
Step 12 85,355$ 2,043$ 87,398$ 6,118$ 93,515$
Step 13 87,018$ 1,736$ 88,754$ 6,213$ 94,967$
Step 14a 88,856$ 1,481$ 90,337$ 6,324$ 96,661$
Step 14b 90,421$ ‐$ 90,421$ 6,329$ 96,750$
Step 14c 90,630$ ‐$ 90,630$ 6,344$ 96,974$
Step 14d 91,286$ ‐$ 91,286$ 6,390$ 97,676$
Step 14e 92,116$ ‐$ 92,116$ 6,448$ 98,564$
Step 14f 92,939$ ‐$ 92,939$ 6,506$ 99,445$
Step 15a 92,939$ 1,377$ 94,316$ 6,602$ 100,918$
Step 15b 94,344$ ‐$ 94,344$ 6,604$ 100,948$
Step 15c 94,344$ ‐$ 94,344$ 6,604$ 100,948$
Step 15d 94,344$ ‐$ 94,344$ 6,604$ 100,948$
Step 15e 94,372$ ‐$ 94,372$ 6,606$ 100,979$
Step 16 94,372$ 1,376$ 95,748$ 6,702$ 102,451$
![Page 14: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/14.jpg)
228 Day Schedule
2015‐2019
2017‐2018 School Year
Lane 2 Base
Step
Adjustment
Base
+ Step
Pension Pick up/
Supplemental
Salary*
Total
Comp.
Step 1 ‐$ 60,376$ 4,226$ 64,602$
Step 2 60,376$ 1,021$ 61,397$ 4,298$ 65,695$
Step 3 61,417$ 1,226$ 62,643$ 4,385$ 67,028$
Step 4 62,668$ 1,328$ 63,996$ 4,480$ 68,475$
Step 5 64,022$ 2,145$ 66,167$ 4,632$ 70,799$
Step 6 66,231$ 2,656$ 68,887$ 4,822$ 73,709$
Step 7 68,986$ 2,809$ 71,795$ 5,026$ 76,820$
Step 8 73,753$ 2,809$ 76,562$ 5,359$ 81,921$
Step 9 78,571$ 2,809$ 81,380$ 5,697$ 87,076$
Step 10 83,058$ 2,656$ 85,714$ 6,000$ 91,714$
Step 11 86,535$ 2,451$ 88,986$ 6,229$ 95,215$
Step 12 89,266$ 2,043$ 91,309$ 6,392$ 97,701$
Step 13 90,929$ 1,736$ 92,665$ 6,487$ 99,151$
Step 14a 92,768$ 1,481$ 94,249$ 6,597$ 100,846$
Step 14b 94,332$ ‐$ 94,332$ 6,603$ 100,935$
Step 14c 94,541$ ‐$ 94,541$ 6,618$ 101,159$
Step 14d 95,197$ ‐$ 95,197$ 6,664$ 101,860$
Step 14e 96,027$ ‐$ 96,027$ 6,722$ 102,749$
Step 14f 96,967$ ‐$ 96,967$ 6,788$ 103,755$
Step 15a 96,967$ 1,377$ 98,344$ 6,884$ 105,228$
Step 15b 98,372$ ‐$ 98,372$ 6,886$ 105,258$
Step 15c 98,372$ ‐$ 98,372$ 6,886$ 105,258$
Step 15d 98,372$ ‐$ 98,372$ 6,886$ 105,258$
Step 15e 98,400$ ‐$ 98,400$ 6,888$ 105,288$
Step 16 98,400$ 1,376$ 99,776$ 6,984$ 106,761$
![Page 15: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/15.jpg)
228 Day Schedule
2015‐2019
2017‐2018 School Year
Lane 3 Base
Step
Adjustment
Base
+ Step
Pension Pick up/
Supplemental
Salary*
Total
Comp.
Step 1 ‐$ 62,332$ 4,363$ 66,695$
Step 2 62,332$ 1,021$ 63,353$ 4,435$ 67,788$
Step 3 63,374$ 1,226$ 64,600$ 4,522$ 69,122$
Step 4 64,624$ 1,328$ 65,952$ 4,617$ 70,569$
Step 5 65,979$ 2,145$ 68,124$ 4,769$ 72,892$
Step 6 68,188$ 2,656$ 70,844$ 4,959$ 75,803$
Step 7 70,943$ 2,809$ 73,752$ 5,163$ 78,915$
Step 8 75,708$ 2,809$ 78,517$ 5,496$ 84,014$
Step 9 80,526$ 2,809$ 83,335$ 5,833$ 89,168$
Step 10 85,013$ 2,656$ 87,669$ 6,137$ 93,806$
Step 11 88,492$ 2,451$ 90,943$ 6,366$ 97,309$
Step 12 91,222$ 2,043$ 93,265$ 6,529$ 99,793$
Step 13 92,883$ 1,736$ 94,619$ 6,623$ 101,243$
Step 14a 94,722$ 1,481$ 96,203$ 6,734$ 102,938$
Step 14b 96,287$ ‐$ 96,287$ 6,740$ 103,027$
Step 14c 96,497$ ‐$ 96,497$ 6,755$ 103,252$
Step 14d 97,152$ ‐$ 97,152$ 6,801$ 103,953$
Step 14e 97,982$ ‐$ 97,982$ 6,859$ 104,841$
Step 14f 98,980$ ‐$ 98,980$ 6,929$ 105,908$
Step 15a 98,980$ 1,377$ 100,357$ 7,025$ 107,382$
Step 15b 100,384$ ‐$ 100,384$ 7,027$ 107,411$
Step 15c 100,384$ ‐$ 100,384$ 7,027$ 107,411$
Step 15d 100,384$ ‐$ 100,384$ 7,027$ 107,411$
Step 15e 100,412$ ‐$ 100,412$ 7,029$ 107,441$
Step 16 100,412$ 1,376$ 101,788$ 7,125$ 108,913$
![Page 16: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/16.jpg)
228 Day Schedule
2015‐2019
2017‐2018 School Year
Lane 4 Base
Step
Adjustment
Base
+ Step
Pension Pick up/
Supplemental
Salary*
Total
Comp.
Step 1 ‐$ 64,288$ 4,500$ 68,788$
Step 2 64,288$ 1,021$ 65,309$ 4,572$ 69,880$
Step 3 65,329$ 1,226$ 66,555$ 4,659$ 71,214$
Step 4 66,579$ 1,328$ 67,907$ 4,754$ 72,661$
Step 5 67,934$ 2,145$ 70,079$ 4,906$ 74,985$
Step 6 70,143$ 2,656$ 72,799$ 5,096$ 77,895$
Step 7 72,898$ 2,809$ 75,707$ 5,300$ 81,007$
Step 8 77,666$ 2,809$ 80,475$ 5,633$ 86,108$
Step 9 82,481$ 2,809$ 85,290$ 5,970$ 91,261$
Step 10 86,968$ 2,656$ 89,624$ 6,274$ 95,898$
Step 11 90,447$ 2,451$ 92,898$ 6,503$ 99,401$
Step 12 93,177$ 2,043$ 95,220$ 6,665$ 101,885$
Step 13 94,841$ 1,736$ 96,577$ 6,760$ 103,337$
Step 14a 96,679$ 1,481$ 98,160$ 6,871$ 105,031$
Step 14b 98,243$ ‐$ 98,243$ 6,877$ 105,120$
Step 14c 98,451$ ‐$ 98,451$ 6,892$ 105,343$
Step 14d 99,107$ ‐$ 99,107$ 6,938$ 106,045$
Step 14e 99,938$ ‐$ 99,938$ 6,996$ 106,933$
Step 14f 100,993$ ‐$ 100,993$ 7,070$ 108,063$
Step 15a 100,993$ 1,377$ 102,370$ 7,166$ 109,536$
Step 15b 102,398$ ‐$ 102,398$ 7,168$ 109,566$
Step 15c 102,398$ ‐$ 102,398$ 7,168$ 109,566$
Step 15d 102,398$ ‐$ 102,398$ 7,168$ 109,566$
Step 15e 102,425$ ‐$ 102,425$ 7,170$ 109,595$
Step 16 102,425$ 1,376$ 103,801$ 7,266$ 111,067$
![Page 17: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/17.jpg)
228 Day Schedule
2015‐2019
2017‐2018 School Year
Lane 5 Base
Step
Adjustment
Base
+ Step
Pension Pick up/
Supplemental
Salary*
Total
Comp.
Step 1 ‐$ 66,243$ 4,637$ 70,880$
Step 2 66,243$ 1,021$ 67,264$ 4,708$ 71,972$
Step 3 67,284$ 1,226$ 68,510$ 4,796$ 73,306$
Step 4 68,535$ 1,328$ 69,863$ 4,890$ 74,753$
Step 5 69,889$ 2,145$ 72,034$ 5,042$ 77,077$
Step 6 72,099$ 2,656$ 74,755$ 5,233$ 79,988$
Step 7 74,854$ 2,809$ 77,663$ 5,436$ 83,099$
Step 8 79,620$ 2,809$ 82,429$ 5,770$ 88,199$
Step 9 84,437$ 2,809$ 87,246$ 6,107$ 93,353$
Step 10 88,925$ 2,656$ 91,581$ 6,411$ 97,991$
Step 11 92,403$ 2,451$ 94,854$ 6,640$ 101,494$
Step 12 95,131$ 2,043$ 97,174$ 6,802$ 103,977$
Step 13 96,796$ 1,736$ 98,532$ 6,897$ 105,429$
Step 14a 98,635$ 1,481$ 100,116$ 7,008$ 107,124$
Step 14b 100,200$ ‐$ 100,200$ 7,014$ 107,214$
Step 14c 100,407$ ‐$ 100,407$ 7,028$ 107,435$
Step 14d 101,063$ ‐$ 101,063$ 7,074$ 108,137$
Step 14e 101,893$ ‐$ 101,893$ 7,133$ 109,025$
Step 14f 103,008$ ‐$ 103,008$ 7,211$ 110,218$
Step 15a 103,008$ 1,377$ 104,385$ 7,307$ 111,692$
Step 15b 104,412$ ‐$ 104,412$ 7,309$ 111,721$
Step 15c 104,412$ ‐$ 104,412$ 7,309$ 111,721$
Step 15d 104,412$ ‐$ 104,412$ 7,309$ 111,721$
Step 15e 104,440$ ‐$ 104,440$ 7,311$ 111,751$
Step 16 104,440$ 1,376$ 105,816$ 7,407$ 113,223$
![Page 18: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/18.jpg)
228 Day Schedule
2015‐2019
2017‐2018 School Year
Lane 6 Base
Step
Adjustment
Base
+ Step
Pension Pick up/
Supplemental
Salary*
Total
Comp.
Step 1 ‐$ 68,199$ 4,774$ 72,973$
Step 2 68,199$ 1,021$ 69,220$ 4,845$ 74,066$
Step 3 69,241$ 1,226$ 70,467$ 4,933$ 75,399$
Step 4 70,491$ 1,328$ 71,819$ 5,027$ 76,847$
Step 5 71,846$ 2,145$ 73,991$ 5,179$ 79,170$
Step 6 74,055$ 2,656$ 76,711$ 5,370$ 82,081$
Step 7 76,810$ 2,809$ 79,619$ 5,573$ 85,192$
Step 8 81,576$ 2,809$ 84,385$ 5,907$ 90,291$
Step 9 86,392$ 2,809$ 89,201$ 6,244$ 95,445$
Step 10 90,879$ 2,656$ 93,535$ 6,547$ 100,082$
Step 11 94,358$ 2,451$ 96,809$ 6,777$ 103,586$
Step 12 97,089$ 2,043$ 99,132$ 6,939$ 106,071$
Step 13 98,751$ 1,736$ 100,487$ 7,034$ 107,521$
Step 14a 100,589$ 1,481$ 102,070$ 7,145$ 109,215$
Step 14b 102,155$ ‐$ 102,155$ 7,151$ 109,306$
Step 14c 102,363$ ‐$ 102,363$ 7,165$ 109,529$
Step 14d 103,019$ ‐$ 103,019$ 7,211$ 110,230$
Step 14e 103,848$ ‐$ 103,848$ 7,269$ 111,118$
Step 14f 105,020$ ‐$ 105,020$ 7,351$ 112,372$
Step 15a 105,020$ 1,377$ 106,397$ 7,448$ 113,845$
Step 15b 106,425$ ‐$ 106,425$ 7,450$ 113,874$
Step 15c 106,425$ ‐$ 106,425$ 7,450$ 113,874$
Step 15d 106,425$ ‐$ 106,425$ 7,450$ 113,874$
Step 15e 106,453$ ‐$ 106,453$ 7,452$ 113,905$
Step 16 106,453$ 1,376$ 107,829$ 7,548$ 115,377$
![Page 19: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/19.jpg)
228 Day Schedule
2015‐2019
2018‐2019 School Year
Lane 1 Base
Step
Adjustment
Base
+ Step
Pension Pick up/
Supplemental
Salary*
Total
Comp.
Step 1 ‐$ 57,877$ 4,051$ 61,928$
Step 2 57,877$ 1,021$ 58,898$ 4,123$ 63,021$
Step 3 58,923$ 1,226$ 60,149$ 4,210$ 64,360$
Step 4 60,201$ 1,328$ 61,529$ 4,307$ 65,836$
Step 5 61,587$ 2,145$ 63,732$ 4,461$ 68,193$
Step 6 63,813$ 2,656$ 66,469$ 4,653$ 71,122$
Step 7 66,601$ 2,809$ 69,410$ 4,859$ 74,269$
Step 8 69,582$ 2,809$ 72,391$ 5,067$ 77,459$
Step 9 74,469$ 2,809$ 77,278$ 5,409$ 82,687$
Step 10 79,405$ 2,656$ 82,061$ 5,744$ 87,805$
Step 11 83,846$ 2,451$ 86,297$ 6,041$ 92,338$
Step 12 87,202$ 2,043$ 89,245$ 6,247$ 95,492$
Step 13 89,583$ 1,736$ 91,319$ 6,392$ 97,711$
Step 14a 90,973$ 1,481$ 92,454$ 6,472$ 98,926$
Step 14b 92,596$ ‐$ 92,596$ 6,482$ 99,077$
Step 14c 92,681$ ‐$ 92,681$ 6,488$ 99,169$
Step 14d 92,896$ ‐$ 92,896$ 6,503$ 99,399$
Step 14e 93,568$ ‐$ 93,568$ 6,550$ 100,118$
Step 14f 94,419$ ‐$ 94,419$ 6,609$ 101,028$
Step 15a 95,263$ 1,377$ 96,640$ 6,765$ 103,405$
Step 15b 96,674$ ‐$ 96,674$ 6,767$ 103,441$
Step 15c 96,702$ ‐$ 96,702$ 6,769$ 103,472$
Step 15d 96,702$ ‐$ 96,702$ 6,769$ 103,472$
Step 15e 96,702$ ‐$ 96,702$ 6,769$ 103,472$
Step 16 96,732$ 1,376$ 98,108$ 6,868$ 104,975$
![Page 20: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/20.jpg)
228 Day Schedule
2015‐2019
2018‐2019 School Year
Lane 2 Base
Step
Adjustment
Base
+ Step
Pension Pick up/
Supplemental
Salary*
Total
Comp.
Step 1 ‐$ 61,885$ 4,332$ 66,217$
Step 2 61,885$ 1,021$ 62,906$ 4,403$ 67,310$
Step 3 62,932$ 1,226$ 64,158$ 4,491$ 68,649$
Step 4 64,209$ 1,328$ 65,537$ 4,588$ 70,125$
Step 5 65,596$ 2,145$ 67,741$ 4,742$ 72,483$
Step 6 67,822$ 2,656$ 70,478$ 4,933$ 75,411$
Step 7 70,609$ 2,809$ 73,418$ 5,139$ 78,557$
Step 8 73,590$ 2,809$ 76,399$ 5,348$ 81,746$
Step 9 78,476$ 2,809$ 81,285$ 5,690$ 86,975$
Step 10 83,414$ 2,656$ 86,070$ 6,025$ 92,095$
Step 11 87,856$ 2,451$ 90,307$ 6,322$ 96,629$
Step 12 91,210$ 2,043$ 93,253$ 6,528$ 99,781$
Step 13 93,592$ 1,736$ 95,328$ 6,673$ 102,001$
Step 14a 94,982$ 1,481$ 96,463$ 6,752$ 103,215$
Step 14b 96,605$ ‐$ 96,605$ 6,762$ 103,368$
Step 14c 96,690$ ‐$ 96,690$ 6,768$ 103,458$
Step 14d 96,904$ ‐$ 96,904$ 6,783$ 103,688$
Step 14e 97,577$ ‐$ 97,577$ 6,830$ 104,407$
Step 14f 98,428$ ‐$ 98,428$ 6,890$ 105,317$
Step 15a 99,392$ 1,377$ 100,769$ 7,054$ 107,822$
Step 15b 100,803$ ‐$ 100,803$ 7,056$ 107,859$
Step 15c 100,831$ ‐$ 100,831$ 7,058$ 107,889$
Step 15d 100,831$ ‐$ 100,831$ 7,058$ 107,889$
Step 15e 100,831$ ‐$ 100,831$ 7,058$ 107,889$
Step 16 100,860$ 1,376$ 102,236$ 7,157$ 109,393$
![Page 21: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/21.jpg)
228 Day Schedule
2015‐2019
2018‐2019 School Year
Lane 3 Base
Step
Adjustment
Base
+ Step
Pension Pick up/
Supplemental
Salary*
Total
Comp.
Step 1 ‐$ 63,891$ 4,472$ 68,363$
Step 2 63,891$ 1,021$ 64,912$ 4,544$ 69,455$
Step 3 64,937$ 1,226$ 66,163$ 4,631$ 70,794$
Step 4 66,215$ 1,328$ 67,543$ 4,728$ 72,271$
Step 5 67,601$ 2,145$ 69,746$ 4,882$ 74,628$
Step 6 69,827$ 2,656$ 72,483$ 5,074$ 77,557$
Step 7 72,615$ 2,809$ 75,424$ 5,280$ 80,704$
Step 8 75,596$ 2,809$ 78,405$ 5,488$ 83,893$
Step 9 80,480$ 2,809$ 83,289$ 5,830$ 89,120$
Step 10 85,418$ 2,656$ 88,074$ 6,165$ 94,240$
Step 11 89,861$ 2,451$ 92,312$ 6,462$ 98,773$
Step 12 93,217$ 2,043$ 95,260$ 6,668$ 101,928$
Step 13 95,596$ 1,736$ 97,332$ 6,813$ 104,146$
Step 14a 96,985$ 1,481$ 98,466$ 6,893$ 105,358$
Step 14b 98,608$ ‐$ 98,608$ 6,903$ 105,511$
Step 14c 98,694$ ‐$ 98,694$ 6,909$ 105,603$
Step 14d 98,910$ ‐$ 98,910$ 6,924$ 105,833$
Step 14e 99,581$ ‐$ 99,581$ 6,971$ 106,551$
Step 14f 100,432$ ‐$ 100,432$ 7,030$ 107,462$
Step 15a 101,454$ 1,377$ 102,831$ 7,198$ 110,029$
Step 15b 102,866$ ‐$ 102,866$ 7,201$ 110,066$
Step 15c 102,894$ ‐$ 102,894$ 7,203$ 110,097$
Step 15d 102,894$ ‐$ 102,894$ 7,203$ 110,097$
Step 15e 102,894$ ‐$ 102,894$ 7,203$ 110,097$
Step 16 102,922$ 1,376$ 104,298$ 7,301$ 111,599$
![Page 22: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/22.jpg)
228 Day Schedule
2015‐2019
2018‐2019 School Year
Lane 4 Base
Step
Adjustment
Base
+ Step
Pension Pick up/
Supplemental
Salary*
Total
Comp.
Step 1 ‐$ 65,895$ 4,613$ 70,507$
Step 2 65,895$ 1,021$ 66,916$ 4,684$ 71,600$
Step 3 66,941$ 1,226$ 68,167$ 4,772$ 72,939$
Step 4 68,219$ 1,328$ 69,547$ 4,868$ 74,415$
Step 5 69,605$ 2,145$ 71,750$ 5,023$ 76,773$
Step 6 71,831$ 2,656$ 74,487$ 5,214$ 79,701$
Step 7 74,619$ 2,809$ 77,428$ 5,420$ 82,848$
Step 8 77,600$ 2,809$ 80,409$ 5,629$ 86,038$
Step 9 82,487$ 2,809$ 85,296$ 5,971$ 91,266$
Step 10 87,423$ 2,656$ 90,079$ 6,305$ 96,384$
Step 11 91,865$ 2,451$ 94,316$ 6,602$ 100,918$
Step 12 95,221$ 2,043$ 97,264$ 6,808$ 104,072$
Step 13 97,601$ 1,736$ 99,337$ 6,954$ 106,290$
Step 14a 98,991$ 1,481$ 100,472$ 7,033$ 107,505$
Step 14b 100,614$ ‐$ 100,614$ 7,043$ 107,657$
Step 14c 100,699$ ‐$ 100,699$ 7,049$ 107,748$
Step 14d 100,913$ ‐$ 100,913$ 7,064$ 107,977$
Step 14e 101,585$ ‐$ 101,585$ 7,111$ 108,696$
Step 14f 102,436$ ‐$ 102,436$ 7,171$ 109,607$
Step 15a 103,518$ 1,377$ 104,895$ 7,343$ 112,238$
Step 15b 104,930$ ‐$ 104,930$ 7,345$ 112,275$
Step 15c 104,958$ ‐$ 104,958$ 7,347$ 112,305$
Step 15d 104,958$ ‐$ 104,958$ 7,347$ 112,305$
Step 15e 104,958$ ‐$ 104,958$ 7,347$ 112,305$
Step 16 104,986$ 1,376$ 106,362$ 7,445$ 113,807$
![Page 23: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/23.jpg)
228 Day Schedule
2015‐2019
2018‐2019 School Year
Lane 5 Base
Step
Adjustment
Base
+ Step
Pension Pick up/
Supplemental
Salary*
Total
Comp.
Step 1 ‐$ 67,899$ 4,753$ 72,652$
Step 2 67,899$ 1,021$ 68,920$ 4,824$ 73,744$
Step 3 68,945$ 1,226$ 70,171$ 4,912$ 75,083$
Step 4 70,223$ 1,328$ 71,551$ 5,009$ 76,560$
Step 5 71,609$ 2,145$ 73,754$ 5,163$ 78,917$
Step 6 73,835$ 2,656$ 76,491$ 5,354$ 81,846$
Step 7 76,624$ 2,809$ 79,433$ 5,560$ 84,993$
Step 8 79,604$ 2,809$ 82,413$ 5,769$ 88,182$
Step 9 84,490$ 2,809$ 87,299$ 6,111$ 93,410$
Step 10 89,427$ 2,656$ 92,083$ 6,446$ 98,529$
Step 11 93,870$ 2,451$ 96,321$ 6,742$ 103,064$
Step 12 97,225$ 2,043$ 99,268$ 6,949$ 106,217$
Step 13 99,604$ 1,736$ 101,340$ 7,094$ 108,433$
Step 14a 100,995$ 1,481$ 102,476$ 7,173$ 109,650$
Step 14b 102,619$ ‐$ 102,619$ 7,183$ 109,802$
Step 14c 102,705$ ‐$ 102,705$ 7,189$ 109,894$
Step 14d 102,917$ ‐$ 102,917$ 7,204$ 110,121$
Step 14e 103,589$ ‐$ 103,589$ 7,251$ 110,840$
Step 14f 104,440$ ‐$ 104,440$ 7,311$ 111,751$
Step 15a 105,583$ 1,377$ 106,960$ 7,487$ 114,447$
Step 15b 106,994$ ‐$ 106,994$ 7,490$ 114,484$
Step 15c 107,023$ ‐$ 107,023$ 7,492$ 114,514$
Step 15d 107,023$ ‐$ 107,023$ 7,492$ 114,514$
Step 15e 107,023$ ‐$ 107,023$ 7,492$ 114,514$
Step 16 107,051$ 1,376$ 108,427$ 7,590$ 116,017$
![Page 24: 2015 2016 School Year Step Lane 1 Base Adjustment Step ... · Step 15c 100,390$ ‐$ $ 100,390 $ 7,027 $ 107,417 Step 15d 100,417$ ‐$ $ 100,417 $ 7,029 $ 107,446 Step 16 100,417$](https://reader035.vdocuments.us/reader035/viewer/2022070803/5f031b737e708231d407920b/html5/thumbnails/24.jpg)
228 Day Schedule
2015‐2019
2018‐2019 School Year
Lane 6 Base
Step
Adjustment
Base
+ Step
Pension Pick up/
Supplemental
Salary*
Total
Comp.
Step 1 ‐$ 69,904$ 4,893$ 74,798$
Step 2 69,904$ 1,021$ 70,925$ 4,965$ 75,890$
Step 3 70,951$ 1,226$ 72,177$ 5,052$ 77,229$
Step 4 72,228$ 1,328$ 73,556$ 5,149$ 78,705$
Step 5 73,615$ 2,145$ 75,760$ 5,303$ 81,063$
Step 6 75,841$ 2,656$ 78,497$ 5,495$ 83,991$
Step 7 78,629$ 2,809$ 81,438$ 5,701$ 87,138$
Step 8 81,610$ 2,809$ 84,419$ 5,909$ 90,328$
Step 9 86,494$ 2,809$ 89,303$ 6,251$ 95,554$
Step 10 91,431$ 2,656$ 94,087$ 6,586$ 100,673$
Step 11 95,873$ 2,451$ 98,324$ 6,883$ 105,207$
Step 12 99,229$ 2,043$ 101,272$ 7,089$ 108,361$
Step 13 101,610$ 1,736$ 103,346$ 7,234$ 110,580$
Step 14a 102,999$ 1,481$ 104,480$ 7,314$ 111,794$
Step 14b 104,622$ ‐$ 104,622$ 7,324$ 111,946$
Step 14c 104,709$ ‐$ 104,709$ 7,330$ 112,039$
Step 14d 104,922$ ‐$ 104,922$ 7,345$ 112,267$
Step 14e 105,594$ ‐$ 105,594$ 7,392$ 112,986$
Step 14f 106,444$ ‐$ 106,444$ 7,451$ 113,896$
Step 15a 107,646$ 1,377$ 109,023$ 7,632$ 116,654$
Step 15b 109,057$ ‐$ 109,057$ 7,634$ 116,691$
Step 15c 109,085$ ‐$ 109,085$ 7,636$ 116,721$
Step 15d 109,085$ ‐$ 109,085$ 7,636$ 116,721$
Step 15e 109,085$ ‐$ 109,085$ 7,636$ 116,721$
Step 16 109,115$ 1,376$ 110,491$ 7,734$ 118,225$