1/22/2015

1

WelcomeWelcome

AgendaAgenda

Project Overview

Project Development

Preliminary Design

Next Steps

Public Meeting #2January 22, 2015

Public Meeting #2January 22, 2015

1/22/2015

2

Public ParticipationPublic Participation

Tonight is for You!

Project Presentation

Preliminary Design Exhibits

Interactive Discussions

Comment/Feedback Forms

PROJECT OVERVIEWPROJECT OVERVIEW

1/22/2015

3

Project OverviewProject Overview

Goals and Objectives:

Enhance and Beautify the Green Street Corridor

Promote Economic Development

Increase Connectivity within Campustown and to City Districts

Public Meeting #1 - March 12, 2014

Introduction of the Green Street Project

Summary of the Existing Conditions

Gather Public Comments and Identify Concerns

Project OverviewProject Overview

1/22/2015

4

Enter text

PHASE 2 2003

PHASE 1 2002

Project OverviewProject Overview

Project Study Area

PHASE 3A 2016PHASE 3B TBD

Enter text

PHASE 3 2016

PHASE 2 2003

PHASE 1 2002

Project OverviewProject Overview

Project Study Area

1/22/2015

5

Enter text

LEGEND

21,70020,300

XX 2001 ADTXX 2014 ADT

19,90022,600

17,40010,500

1,950325

12,2008,000

7,4006,700

750600

800350

1,4501,450

6,2005,000

9,1005,100

17,40010,500

3,0503,0501,200

1,200

12,2008,100

Project OverviewProject Overview

Existing Traffic (Average Daily Traffic)

101 Total Reported Accidents during 2009-2013

5%pedestrian crashes bicycle crashes

6%Crashes resulted in injuries16%

crashes resulted in property damage only

69%

X

LEGEND

MIDBLOCK ACCIDENTS

INTERSECTION ACCIDENTS

PEDESTRIAN ACCIDENT

BICYCLE ACCIDENT

X

X

NEIL

ST.

LOCU

ST S

T.

FIRS

T ST

.

SECO

ND S

T.

THIR

D ST

.

FOUR

TH S

T.

GREEN ST.

22 3 1 4 2

7 55 7 17 3

Project OverviewProject Overview

Accident History

1/22/2015

6

Project Related Concerns A better connection needed to the Boneyard Creek, including way-finding Retailers slow to develop west of Fourth Street (lack of pedestrian traffic) Lack of bike lanes and sidewalks

Comments about the Green Street Corridor− “Finding a way to safely get pedestrians & bikes thru the viaduct is huge”− “Look for new concepts from recent projects in other urban areas”− “The viaduct should be an aesthetic priority”

When you think about Green Street, what comes to mind?− “The have’s and have not’s (Green Street east of Fourth vs. west of Fourth)”− “Too much traffic, still”− “Heavy pedestrian traffic”

Project OverviewProject Overview

What We Heard From You…

PROJECT DEVELOPMENTPROJECT DEVELOPMENT

1/22/2015

7

The PLANNING of Green Street

Create exciting and safe spaces for pedestrians

Foster multiple modes of transportation

Embrace changing development models and programs

Reflect ecology, traditions, and culture of the region

Employ sustainable, cost-effective and sensible solutions

Project DevelopmentProject Development

The ENGINEERING of Green Street

Complete Street Approach

− Typology and Modal Hierarchy

− Local Policy & Procedures

Implementing Best Practices with Previous Experiences

− Storm Water Drainage

− ADA Compliance

Project Development Process

− Funding Source = Design Criteria

− Collaborative Effort with Engineers, Planners and Landscape Architects

Project DevelopmentProject Development

1/22/2015

8

Green Street Proximities

Approx. 15 Minute Walking Time

Approx. 15 Minute Walking Time

Project DevelopmentProject Development

Building Heights and Road Connections

NEILSTREET

LOCUSTSTREET

FIRSTSTREET

WRIGHTSTREET

FOURTHSTREET

SECONDSTREET

THIRDSTREET

FIFTHSTREET

SIXTHSTREET

GREENSTREET

GREENSTREET

Project DevelopmentProject Development

1/22/2015

9

Outdoor Café Spaces

Project DevelopmentProject Development

PRELIMINARY DESIGNPRELIMINARY DESIGN

1/22/2015

10

Preliminary DesignPreliminary Design

Urban Design Approach

Preliminary DesignPreliminary Design

Urban Design Approach

66 Feet

Right-Of-Way

35 Feet

Curb to Curb

1/22/2015

11

Preliminary DesignPreliminary Design

Urban Design Approach

Preliminary DesignPreliminary Design

Urban Design Approach

Green St.

Firs

t S

t.

1/22/2015

12

Preliminary DesignPreliminary Design

Street Planter Detail

Preliminary DesignPreliminary Design

Street Planter Detail

1/22/2015

13

Preliminary DesignPreliminary Design

Street Tree Palette

Preliminary DesignPreliminary Design

Green Street Sidewalk Experience

1/22/2015

14

Preliminary DesignPreliminary Design

Gateway Scheme

Preliminary DesignPreliminary Design

Sustainable Stormwater Management – Third Street

1/22/2015

15

NEXT STEPSNEXT STEPS

Next StepsNext Steps

P U B L I C I N V O L V E M E N T

PRELIMINARY DESIGN BEGINS

EVALUATE EXISTING

CONDITIONS

COMPLETE PRELIMINARY DESIGN AND BEGIN

FINAL DESIGN

BID AND AWARD

CONTRACT

BEGIN CONSTRUCTION

STA

RT

COMPLETE FINAL

DESIGN

PUBLIC MEETING

PROJECT MILESTONE

IDENTIFY AND EVALUATE TYPICAL

SECTION ALTERNATIVES

2014 2015 2016

Project Development ProcessPreliminary Engineering &

Environmental StudiesContract Plan Preparations &

Land AcquisitionConstruction

WE ARE HERE

UTILITYCOORDINATION

1/22/2015

16

Thank YouThank You