0 ISSUE PBM STIE STIN SEPT. 95 REV. DESCRIPTION PREP.D CHK.D APPR.D DATE ––––––––––––––––––––––––––––– Il presente documento è RISERVATO ed è di proprietà dell'AGIP. Esso non sarà mostrato a Terzi né sarà utilizzato per scopi diversi da quelli per i quali è stato inviato. This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent FUNCTIONAL SPECIFICATION DISTRIBUTED CONTROL SYSTEM 20149.EQP.STA.FUN REV. 0 DECEMBER 1994

Upload: brome2014

Post on 24-Nov-2015

6 views

Category:

Documents


0 download

DESCRIPTION

distributed control system - agip company specification for DCS

TRANSCRIPT

  • 0 ISSUE PBM STIE STIN SEPT. 95

    REV. DESCRIPTION PREP.D CHK.D APPR.D DATE

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    FUNCTIONAL SPECIFICATION

    DISTRIBUTED CONTROL SYSTEM

    20149.EQP.STA.FUN

    REV. 0

    DECEMBER 1994

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 2

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    FOREWORD

    Rev. 0 Total number of pages 29December 1994Issue in conformity with the E.E.C. directivesThis specification replaces and supersedes the following specification: 03390.CMP.STA.SPC. "DISTRIBUTED CONTROL SYSTEM".

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 3

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    TABLE OF CONTENTS

    1. GENERAL

    1.1. Scope

    1.2. Normative references1.2.1 European, national and international normative references1.2.2 Normative references from other Organisations1.2.3. Internal normative references

    2. FUNCTIONAL NORMATIVE REQUIREMENTS

    2.1. Definitions

    2.2. Symbols and abbreviations

    2.3. Operative environment

    2.4. Functional Requirements2.4.1 Functions of the system2.4.2 Structure of the system2.4.3 Software of the system

    2.5 Boundary conditions, limits and exclusions2.5.1 Interconnections2.5.2 Interfaces with other systems2.5.3 Integrated ESD system

    2.6. Ergonomics

    2.7. Safety

    2.8 Non repetitive functional requirements2.8.1 Telecontrol functions

    2.9 Requirements for Quality Management and Assurance

    2.10. Additional requirements for review2.10.1. Tests and inspections

    2.11. Documentation2.11.1. Documentation with the tender2.11.2. Documentation for approval2.11.3. Documentation to be used by the Company for the plant design2.11.4. Test documentation2.11.5. Final technical documentation

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 4

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    1. GENERAL

    1.1. Scope

    This specification sets out the minimum requirements for the design, fabrication andtesting of a Distributed Control System for hydrocarbons production and treatment plants.For all the aspects not covered by this specification, reference is made to the applicableNormative references and to the project technical documentation, and in particular to:

    Technical Data Sheet (T.D.S) Inspection Data Sheet (I.D.S.) Requested Documentation Data Sheet (R.D.D.S.),

    which shall indicate the project data and the special choices made.The technical requirements of this Functional Specification are based on considerationsrelevant to performances and efficiency. All the requirements refer therefore to objectivelogic and then cannot be discriminatory.Any proposed alternative shall be evaluated if its operative and performance validity, asrequested by this document, is demonstrated.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 5

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    1.2 Normative references

    The Normative references and the Publications relevant to the Distributed ControlSystem are listed here below.As far as applicable, a priority reference shall be given to the EN normative referencesand to the CENELEC harmonisation documents or, in their absence, to the international,ISO, IEC, and to the national ones, CEI, CEI/UNEL, UNI.The requirements of Laws and Rules issued by the local Authorities or Legal Bodies,under which jurisdiction the plants shall be installed, shall be always respected.

    1.2.1 European, International and National Normative references

    EUROPEANCENELEC

    INTERNATIONALIEC

    NATIONALCEI/CEI UNEL

    TITLE( NOTE 1 )

    HD 384 36464-8

    (note 2)Electrical installations at nominal voltage up toand including 1,000 V a.c. or 1,500 V d.c.

    EN 60439-1 ( ) 439-1 ( ) 17-13/1(note 2)

    Low-voltage switchgear and controlgearassemblies.Part 1 : Type-tested and partially type-tested

    assemblies.EN 60917 ( ) 917 () 48-17 Modular order for the development of

    mechanical structures for electronic equipmentpractices.

    HD 528 S1 ( ) 890 () 17-43

    A method of temperature-rise assessment byextrapolation for partially type-testedassemblies (PTTA) of low-voltage switchgearand controlgear.

    EN 60529 ( ) 529 () 70 - 1 Degrees of protection provided by enclosures(IP Code)

    EN 50014 ( ) --- 31-8Electrical assemblies for potentially explosiveatmosphere.General prescriptions.

    EN 50020 ( ) --- 31-9Electrical assemblies for potentially explosiveatmosphere.Intrinsically safe i protection mode.

    EN 50039( ) --- 31-10Electrical assemblies for potentially explosiveatmosphere.Intrinsically safe i electric systems.

    HD 481.1 ( ) 801-1 ( ) 65-5Electromagnetic compatibility for industrial-process measurement and control equipmentPart 1 : General Introduction

    EN 801-2 ( ) 801-2 ( ) 65-6Electromagnetic compatibility for industrial-process measurement and control equipmentPart 2 : Electrostatic discharge requirements

    HD 481.2 ( ) 801-3 ( ) 65-7Electromagnetic compatibility for industrial-process measurement and control equipmentPart 3 Radiated electromagnetic field

    requirements

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 6

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    European, International and National Normative references (cont.)

    EUROPEANCENELEC

    INTERNATIONALIEC

    NATIONALCEI/CEI UNEL

    TITLE( NOTE 1 )

    --- 332 - 3 20 - 22 Tests on electric cables under fire conditions.

    HD 405. 1 S1 ( ) 332 - 1 ( ) 20 - 35Tests on electric cables under fire conditions.Part 1: Test on a single vertical insulated wireor cable.

    --- 754 20 - 37 Electric cables - Test on gases evolved duringcombustion.

    --- --- 20 - 38Rubber insulated cables which do notpropagate the flame and having a low emissionof toxic and corrosive fumes and gases.

    --- 50-351 --- International Electrotechnical Vocabulary.-Automatic control.

    --- 750 --- Element designation in electrotechnology.

    EN 601082-1 ( ) 1082-1 ( ) 3-36Preparation of documents used inelectrotechnologyPart 1 : General requirements.

    HD 246.4 1082-2 3-33 Recommendations for the preparation ofelectric circuit diagrams

    --- 1082-3 ---Preparation of documents used inelectrotechnology.Part 3: Connection diagrams, tables, and lists.

    617 - 2 ( ) 3 - 14Graphical symbols for diagrams.Part 2: Symbols elements, qualifying symbolsand other symbols having general application.

    --- 617-7 ( ) 3-19Graphical symbols for diagrams.Part 7: Switchgear, controlgear and protectivedevices.

    --- 617-8 ( ) 3-20Graphical symbols for diagrams.Part 8: Measuring instruments, lamps andsignalling devices.

    --- 617-13 ( ) 3-24 Graphical symbols for diagrams.Part 13: Analogue elements

    --- 617-12 ( ) 3-26 Graphical symbols for diagrams.Part 12: Binary logic elements

    Explanation notes for tables in paragraph 1.2.11) The titles of the IEC Publications, when these are correspondent to the CEI and

    CENELEC normative references, are the translation of the relevant original titles.2) Normative references with minor modifications with respect to the IEC Publication.3) The normative references and the publications with the indication () are fully

    correspondent to the CEI national ones. Differently, the treated matter is identical,but the requirements can be different.

    4) When required, the symbology contained in ISA S5.1 and ISA S 5.2, listed inparagraph 1.2.2. shall be utilised for the execution of logic diagrams.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 7

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    European, International and National Normative references (cont.)

    EUROPEANCENELEC

    INTERNATIONALIEC

    NATIONALCEI/CEI UNEL

    TITLE( NOTE 1 )

    --- 6385 --- Ergonomic principles in the design of worksystems.

    --- 3511 --- Process measurement control functions andinstrumentation - Symbolic representation.

    --- --- CNR-UNI10003

    Physic Units: S.I. International Unit System

    --- 5167 - 1 CNR-UNI10023

    Rate measurements for fluid flows bydiaphragms, nozzles and Venturi tubes. Ratemeasurements for fluid flows by diaphragms,nozzles and Venturi tubes,

    1.2.2 Normative references from other Organisations

    ISA S 5.1 Instrumentation symbols and identification.ISA S 5.2 Binary logic diagrams for process operation.ISA S 18.1 Annunciator sequences and specifications.ISA RP 55.1 Hardware testing of digital process computers.ANSI C 37.2 Manual and automatic station control, supervisory and associated

    telemetering.SAMA PMC 33.1 Electromagnetic susceptibility of process control instrumentation

    equipment.

    1.2.3 Internal Normative references

    20140.EQP.STA.FUN "INSTRUMENTATION BOARDS"

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 8

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2. FUNCTIONAL NORMATIVE REQUIREMENTS

    2.1. Definitions

    Reference is made to Normative references listed in paragraph 1.2 for definitions andterminology.

    The followings definitions are used, too:

    a) Operator's station

    Unit where the information are centralised, able to process sequences and supervisionprogrammes, and acting as interface between the peripheral units and the operator.

    b) Operator's console

    Man/machine interface unit for the control of the plant, able to process data from otherunits.

    c) Local operator's video terminal

    Man/machine local interface unit connected to a peripheral unit for processing data forthe visual display of process parameters and plants associated logic.

    d) Acquisition data remote terminal unit (RTU)

    Section of the system monitored by one or more operator's stations (or operator'slocal video terminals) through a data communication line, acting as interface with theplant and able to execute logic for the local control.

    e) Data interface system

    Intermediate unit able to commute signals and messages between the stations of thesystem and stations of external systems.

    f) Unit

    Section of the system made by an hardware and software integration able to operateautonomously in conformity with the requirements of the system configuration.

    g) Communication lines

    Physical connections among the units of the system for communications and dataexchange.

    h) Communication protocol

    Specifications and procedures for the structure of the messages exchanged amongthe units.

    2.2. Symbols and abbreviations

    Reference is made to Normative references listed in paragraph 1.2.1 for symbols andabbreviations.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 9

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2.3. Operative environment

    The system shall be suitable for the environment conditions of the installation site. Indetail, all the listed here below environment factors which can have influence on the life ofmaterials and on safety shall be taken into consideration:

    minimum and maximum temperature; combined influence of temperature, humidity and contaminants (formation of

    condense); elevation above the sea level; presence of solids, sand, dust; presence of corrosive and polluting substances; formation of fouling or mildew; seismic effects; direct or indirect electric shocks; electromagnetic influences; installation in atmosphere with hazard of explosion and/or fire; mechanical stresses and vibrations (including violent impacts and harmonic type

    vibrations which could occur in the normal operation service).

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 10

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2.4. Functional Requirements

    2.4.1 Functions of the system

    The system shall be able to satisfy all the control and monitoring functions, providing theoperator with all the instruments necessary for a complete and correct management ofthe process control.The configuration of the system shall be designed to guarantee an high level of reliabilityand availability.Each component shall be replaced, in case of fault or malfunctioning, without affectingthe continuity in the operations of the system.The maximum attention shall be paid in providing a selective distribution of the electricsupply.The whole system shall have the maximum flexibility in being connected with othersystems or for future extensions.

    The following main functions are required to the system:

    Data acquisition Visual display of the events (elements state and process conditions) Automatic continuous control of the process with the possibility of manual intervention

    on controllers and logic. Visual display of the plant's diagrams Pre-arrangement for the remote management of controls/supervision system. Management and process calculations and print of the reports. Historical record of data. Transmission of data to external systems. Self-diagnostic Automatic selection of the off-service sections of the system and automatic insertion

    of the relevant stand-by units (if any). The stand-by units shall be indicated in the DataSheet.

    Initial loading of the software by floppy disk or streaming tape.

    The system's units shall be connected to a data communication line.The configuration of the communication system shall be based on a hierarchical structurewith several levels which shall guarantee the reliability of the data transmission.The configuration and the dimensions of the system shall allow the transmission of thedata at the same time to the addresses of the various joints.The highest level of communication, identified by the high transmission speed, shall beprovided for the interface with a remote supervision system, when required.The system or its units shall be managed in accordance with the following procedures:

    a) Local Supervision and Control (Manual)This procedure allow the management of the units of the plant by the operator withstep by step sequences, the execution of start/stop instructions (for equipment,engines) and opening/closure instructions (for valves) and the acquisition and thevisual display of the safety shut downs managed separately by the control system.

    b) Remote Supervision (Manual)It allows the management of the plant by the operator from the remote control centre,with step by step sequences, as per "Local Supervision and Control".

    c) Automatic LocalIt allows the management of the plant by the operator, by utilising instructionsactivating automatic control and management sequences.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 11

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    With this procedure the intervention of the operator shall be required only for specialoperations conditions.

    d) Automatic RemoteIt allows the telecontrol through sequences activated with macro instructions operatedfrom the remote Operative Centre to which the system is connected by the datanetwork used to transmit to the Centre all the information relevant to the operatingconditions, production and maintenance of the plant.This operative procedure allows, therefore, the management of the plant by theoperator with procedures defined time by time on the basis of the requirements foroperating the plant, as, for instance:

    macro instructions/sequences for the control of equipment and elements. input of parameters for an automatic operating/maintenance management.

    2.4.2 Structure of the system

    The structure of the system, the data relevant to its configuration and the requiredperformances shall be indicated in the Technical Data Sheet. All the possible solutions tooptimise and integrate the configuration of the system shall be verified and proposedduring the development of the design.The structure shall be designed on the basis of the following main fixtures:

    Interface of the operator with both on-line and off-line functions for the configuration,visual display, control and filing of data

    Interface unit with the process and the data acquisition Communication system Interface unit with the supervision system Electric supply Boards and containers.

    All the system, however, shall be designed taking into account the followingcharacteristics:

    - Electromagnetic compatibility with outside interference towards the system and viceversa.

    - Modularity and flexibility such to permit the adaptation of the system to restrains givenby the plant and allow its future extension.

    - High availability through the utilisation of reliable components and stand-by units forthe equipment.

    - Facility in the identification and replacement of fault parts.- Real-time operative systems and totally tested software.- Hierarchical distribution of the control functions.- Integration of the automation and safety functions (for a system complete with ESD

    "Emergency Shut Down")- Data Base and application software easily configurable with guided and interactive

    procedures.- Access to communication via external systems with upper hierarchical level.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 12

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    A typical schematic configuration of a Distributed Control System is shown in fig. 1 herebelow:

    Figure 1: Typical configuration of a Distributed Control System

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 13

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2.4.2.1 Operator's interface

    The operator's interface shall have at least two stations (one in stand-by), each able todisplay visually the process parameters and to guarantee to the operator themanagement and the control of the plant.A typical operator's station shall include:

    Colour 19" monitor Facilities (mouse, track ball, touch screen) Operative keyboard Alphanumeric configuration keyboard Printer

    When required, the operator's station shall include also a panel or a console, with lampsand push buttons for the signals and the activation of the emergency sequences, and aconfiguration station.The operator's interface shall be provided at least, in its configuration, with the possibilityto insert an additional operative station and a printer to connect directly to the data line ofthe system.It shall be designed such that a single back-up station shall be able to guarantee thewhole operability of the system for off-service or non operability of the normally operatingone.From the operator's station it shall be possible to access all the data of the plant suitablygrouped in video pages displayed on a colour monitor.The types and the quantity of the video pages required shall be defined in the projectdocuments on the basis of the following information:

    a) Overview pages

    They give to the operator a general and immediate overview of the operativeconditions of the plant, by displaying visually any alarm situation of the processvariables (deviation and/or out-of-range) with interactive references to the detailpages.

    b) System pages

    They display visually all the units connected to the data communication line andrepresenting the system joints, with the real-time indication of the operating state ofthe equipment (main/back-up, fault) and of the diagnostic messages.

    c) Group pages

    They allow the normal control operations by the operator.The selected page shall be identified on the monitor by a plant unit's number and title.The characteristics to be visually displayed for the required control shall be specifiedtime by time in the project documents.

    d) Detail pages

    They display the information relevant to a selected point with a complete description ofthe service. This type of page shall contain all the detailed information with additionaldata, as range limits, alarm threshold, etc.In addition, they shall allow to operator the quick access to the manual/automaticcontrol stations and make possible, thanks to the keyboard and the utilisation of codesor access selectors, the modification of parameters and data relevant to the examinedpoints.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 14

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    e) Trend pages

    They display the recorded process variables. Each of these variables can be selectedfor the reading of the real-time or historical data.Each page shall be updated in real-time with the newly acquired process values.

    f) Alarms pages

    In these pages, the display of the alarm state of a variable shall be automatic with anoptical and an acoustical indication.Suitable summary pages shall be programmed with the indication of the last 10alarms, in order of occurrence.The following information shall be displayed for each alarm:

    - day, hour, minutes and seconds of occurrence;- identification tag of the Data Base point relevant to the alarm signal;- description of the service;- alarm type.

    The priority levels and the characteristics needed for their configuration shall beindicated in the Technical Data Sheet.

    g) Synoptic pages

    They display graphically the process lines and the equipment with the relevantinstrumentation. Each of them shall be organised to display at least:

    - measure value for each analogue variable- state of equipment, pumps, valves, etc.- alarm for analogue or digital variables.

    The equipment in the Operator's interface shall have the following characteristics:

    Printers

    Printers and video copiers for the man/machine interface functions shall be of theserial type.

    Calculation and filing unit

    The calculation and filing unit shall process the data acquired from the interfacemodules and shall record on tape the parameters for which the historical file isrequired.

    Local operator monitor

    The operator's stations can be utilised for the local management of the plant or itsareas with specific function of local control substation, on the basis of the controlstrategy.The operator's console may be replaced by a 19" colour monitor operating as terminalfor the calibration and maintenance procedures, on the basis of the quantity of signalsto be controlled from the local control substation.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 15

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2.4.2.2 Process interface unit

    These units are directly linked to the field instruments (as, for instance, transmitters,valves, pressure switches, etc.) with the scope to control the process and to generatestart and stop sequences both in normal operating conditions and in absence ofcommunication with the operator's station.Each interface unit shall be able to acquire from the field inlet signals of different type(analog, state and/or computation digital), and to activate towards the process digital andanalog outlets.The inlet and outlet signals shall be of the intrinsically safe or non-intrinsically safe type,as per the classification of the relevant plant's area. All the signals, however, shall begalvanically insulated from the system.The I/O cards shall be protected against short circuits, transients, overvoltages anddisturbance from radio frequencies.Acquisition cards with different back-up levels, as defined in the Data Sheet, shall beprovided for the control analogue signals and for the shut down ones.The instructions cards shall be able to pilot solenoid valves and any other field actuator.Suitable relays shall be provided for insufficient rate.The opportunity to associate one or more units to each area, or more areas under thesame unit, shall be evaluated, on the basis of the number and functions relevant to eachplant's area and of the interdependence among the areas.Some units shall be located in field cabins or buildings with the function of local sub-system, on the basis of the extension of the plant (or plant's areas). The data processingunits shall be provided with a back-up power supply network.Each single controller shall work at 70% of its capacity.The quantity and type of inlet/outlet signals, necessary for the dimensioning of the unit'sacquisition, control and back-up modules, shall be defined in the technical data sheet.

    2.4.2.3 Communication system

    The units in the system shall be interconnected by cables (bus) to form a datacommunication network.The physical exclusion or insertion of an unit (joint) shall not compromise the traffic ofsignals on the same line, which shall maintain the required characteristics.The interface modules in the communication and data exchange system shall beprovided with back-up units.The physical supports (cables) for the communication bus among the joints shall bebacked-up, with automatic commutation from one line to the other for any failure ormalfunction.

    2.4.2.4 Interface units with the supervision system

    The communication system shall be able to interface with the supervision equipment bymeans of interface units (gateways, bridges) in the data communication lines.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 16

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2.4.2.5 Electric power supply

    The electric power supply, provided by a continuity system, shall be defined by thefollowing parameters of the control system:

    - Number of supply circuits- Total power absorbed by the system and its main components- Peak power required- Power dissipated by the system- Maximum period of time with lack of power which does not shut down the system.

    The power supply circuits, properly equipped with switches, circuit breakers and fuses toguarantee the selectivity of the performances and the insulation, shall be provided for allthe components and units of the control system.The power supply to the most important units, as the operator's station, the control units,CPU and I/O, shall be backed-up.

    2.4.2.6 Boards and enclosures

    Boards and enclosures for the electric/electronic equipment shall comply with theNormative references listed in paragraph 1.1. and with the functional specification

    20140.EQP.STA.FUN "INSTRUMENTATION BOARDS",

    which indicates all the mechanical and electric fabrication requirements.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 17

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2.4.3 System software

    The system software shall be developed on a modular base and distributed to all theunits of the system, to reduce the risks of off-service conditions and optimise thefunctions.The central data processing and management units shall be configured as per thefollowing software areas:

    Basic software of the operative system Diagnostic software Application software.

    If not otherwise required, each single software area shall be freely developed, providedthat the achievement of the functional requirements is guaranteed.

    2.4.3.1 Basic software (real time)

    The basic software of the operative system shall:

    - be oriented towards real time applications for the process control- support the multitasking and multiprocessor functions- manage the communication network through interface task- guarantee the support and complete management of the peripheral units.

    2.4.3.2 Diagnostic software

    The diagnostic software shall verify the operation status of equipment and software of theunit. In detail:

    - verify dynamically the points configured in the Data Base (value, state and address)- verify the state of the electronics at the level of each single card and module- monitor and verify the measurements acquisition channels- address failure and malfunctions messages for a clear and univocal identification of

    the interested element.

    In addition, the following software shall be provided:

    On-line diagnostic

    This software shall operate continuously on all the parts on-line of the system. It shallhave, as primary objective, the detection of operation anomalies, the evaluation oftheir gravity, the transmission of suitable alarm messages to the operator, and theimplementation of suitable actions, as: exclusion of the fault equipment, commutationon the back-up equipment (if any), re-addressing of the functions on other peripheralunits, etc.The diagnostic software, in addition to the detection of all the critical failures in thesystem, shall configure dedicated messages to be transmitted to the maintenanceremote units.They shall also configure messages relevant to anomalies, malfunctions and failure inthe monitored plant's equipment (fault signals from power suppliers, cards, barriers,solenoid valves, etc.).

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 18

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    Off-line diagnostic

    This software is applied to the units off-line from the system and the other equipment.Its scope is to detect the reasons of the failure or the defect in the sub-system.A system of diagnostic programmes, which will allow to test all the components of thesystem, both one by one and as a complex, shall be provided for each sub-system.They shall be resident or can be loaded from floppy disk.

    2.4.3.3 Application software

    This software shall update the Data Base in the operator's station with the dynamic datafrom the plant.In addition to the acquired data and to the values of the analogue outlets, the Data Baseshall include also all the standard calculated data and the generated calculated points(obtained from the manipulation of the standard calculations).Each application software for the management of the system's functions shall haveaccess to this Data Base.

    2.4.3.4 Standard functions

    The system shall manage the data relevant to the values and the states of the pointsconfigured in the Data Base area with a series of standard functions to provide:

    a) Management of calculationsb) Visual display and print of the alarmsc) Management of the elementsd) Instructionse) Filings

    The characteristics of these functions are described here below:

    a) Management of calculations

    The calculations shall be carried out on analogue and digital points and shall generatecalculated analogue or digital type points.The analogue calculations shall be carried out with a basic period configurableindependently from the other calculations and from the acquisition period of the pointsgiving a contribution, which shall be of the analogue acquired, standard and nonstandard calculated, types.

    The standard analogue type calculations shall be:

    - Calculation of the rate as per Codes and standards referred to the project- Real-time average values on a maximum of 6 contemporaneous measurements- The 4 arithmetical operations between two measures or between a measure and a

    constant value- Real-time summation of several measures- Operating period (hours) of a plant's element- Count of the time period of events for measures, summations and alarms,

    and on Hourly/Daily/Weekly/Monthly basis for:

    - Average, maximum and minimum value of a measure- Integral of a measure- Accumulation in the time of a measure.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 19

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    The standard calculation of digital type shall be:

    - function "OR" logic- function "AND" logic- function "XOR" logic

    with the following characteristics:

    - calculated on changes of the considered points (acquired digital, standardcalculated, non standard calculated)

    - the calculation shall not be considered reliable when one of the points isconsidered unreliable.

    - the calculation shall not be carried out on a value forced manually by the operator(out of scanning).

    b) Visual display and print of the alarms

    When not otherwise required, the management of the alarms shall be organised asfollows:

    Detection of the alarm state

    Identification of the conditions for which a point is considered in alarm state.Generally, these conditions, for the alarms of the system, are:

    - Acquisition anomalies- Changes in the acquired value- State change of an element

    It shall be possible to filter the data, to reduce the possibility of a configuration ofalarms states due to special conditions originated by the operator.

    Management of alarms

    The alarm conditions shall be notified to the operators by visual display and print,as per ISA 18.1.A dedicated treatment may be associated to the priority level (acoustic signal,reference to the graphic operative page and/or start of the automatic interventionsequence).The priority levels and the treatment of the configured alarms shall be at least:

    - Level 1: Shut down/emergency alarms (from the ESD system)- Level 2: Out-of-range alarms- Level 3: Warning alarms- Level 3: Deviation from the fixed in advance alarms parameters.

    Visual display of the alarms

    The alarms shall be visually displayed on the monitors of the station in properdedicated pages, which shall be organised per plant's areas.The operator shall acknowledge the displayed alarms acting on a properacknowledgement push button.The following parameters, at least, shall be displayed:

    - Date and hour- Error Code or Signal Tag- Description- Any numerical value.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 20

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    Print of the alarms

    Each alarm event shall be printed in a row of the alarm print-out.If the dedicated printer is malfunctioning, the relevant data shall be transmittedautomatically to the other printer.The data contained in the print-out row can be transmitted in parallel to otherprinters or required as files to be tape recorded.

    Filing

    It consists in the implementation of a file for alarms acknowledged by the operator,but still active. This file shall be ordered by time and continuously updated by theissue or cancellation of the alarm states.

    c) Management of the elements

    It is a function for the check of the state congruence of the plant's equipment anddevices with the variation of the digital signals linked to them.The software logic, when an instruction has been transmitted, shall verify (after aprogrammable time interval) the congruence of the state of the addressed elementwith the feedback signals state.In case of discordance, the system shall issue an alarm signal, complete with all thecharacteristics associated to the relevant element.When required, the check for spontaneous variations of an element shall be provided,when the said element changes its state also in absence of any instruction addressedby the operator.The software shall also manage the digital signals for the protection of the equipmentand relevant to the required alarm signals.

    d) Instructions

    The system shall manage the transmission of instructions towards the field interfaceunits. These instructions shall be activated from the operative keyboard or videopunters modifying in the Data Base of the system the state corresponding to the outletdigital signal.The success of the instruction shall be verified through the control of the final state.

    e) Filings

    The system shall provide a series of filing functions for the acquired points. Thesefunctions shall be essentially of two types:

    historical type filingIt allows to keep in the system memory, for a defined period, the history of acertain number of points in the Data Base.

    filing of eventsIt allows to memorise a window of samples for a certain period before and after anevent as, for instance, the intervention of an acquired or calculated digital.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 21

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2.4.3.5 Operator/plant interface functions

    These are functions interacting directly with the operator who shall operate through theoperator's console or the local monitor.The main functions of this type are:

    a) operative automatic functions for the management of the plant;b) operative functions under request by the operator for the management of the plant;c) service functions for updating the configuration of the points in the Data Base.

    Their characteristics are described here below:

    a) operative automatic function for the management of the plant

    Updating of the video pages Updating of points on the synoptic Visual display of the elements/equipment states Visual display and print of events Visual display and print of alarms Generation of print-outs

    b) operative functions under request by the operator for the management of the plant

    Pages display

    A dedicated page with the alarms in a specific area of the plant can be displayed.The alarms, displayed by date and still active, shall be acknowledged by acting ona specific push buttons.The operator can utilise an instruction for the display of alarms alreadyacknowledged but still active (starting from the meno recent).Video pages (synoptic and/or defined in advance pages) can be displayed bytyping the code of the requested page.

    Transmission of instructions

    It shall be possible to transmit an instruction of analogue or digital type as follows:- by selecting from the keyboard the element in the graphic display relevant to

    the object to which the instruction shall be transmitted and the instruction to betransmitted.

    - by transmitting the instruction directly from the keyboard.

    Forcing of signals/measures (upon request by the operator)

    The operator shall have the possibility to force the value of a point in the DataBase:- by selecting the type of analogue or digital point- by inserting, by means of the keyboard or pointer, the tag of the point and the

    relevant value and/or state- by displaying directly on the monitor the control windows by means of pointer

    and positioning the display on the relevant configured functions.

    Print-outs request

    The operator shall have the possibility to request a visual display and a print of allthe print-outs relevant to the conditions of the plant.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 22

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    c) Service functions for updating the configuration of the points in the Data Base.

    They shall refer mainly to the configuration of:

    Points of the system Print-outs Video pages Files Application software.

    The characteristics which all the service configurations of the system have in commonshall be:

    - menu organisation on several levels with data insertion guided and monitored on-line.

    - operative continuity of the system during the phase of data insertion and/ormodification, by acting on a support structure which shall update the operativestructure of the system only after the data congruence control.It shall be possible to modify the control software at the level of the single unit,leaving the interested joint on-line.

    The peculiar characteristics for each configuration function are described here below:

    Points of the system

    It shall be possible to add, modify or delete any analogue or digital point of the DataBase of the following types:

    - Analogue acquired- Analogue calculated- Digital acquired- Digital calculated- Outlet digital- Elements- Real- Entire- Logic

    The parameters which the function shall allow to configure shall have a permanentsection containing all the data necessary for the identification the variable and adynamic section linked to the values of the variable.In the Data entry phase, the parameters relevant to each point shall be visuallydisplayed on the monitor by a spreadsheet.

    Print-outs

    The configuration, modification or deletion of all the print-outs of the system shall befeasible. The print-outs shall be obtained with programmes written in high levellanguage which allows both to print in different formats the information relevant to thepoints of the Data Base (tags, descriptions, value/states, measurement units) and torefer to the filed data.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 23

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    Video pages

    The addition, modification or deletion of video pages shall be feasible.The execution of these operations, totally protected by programming mistakes, shallnot interfere with the on-line functions of the process.The protection shall be at different level both for the graphic type and the compilationand animation functions of the graphic pages managed directly from the operator'sstation. Interactive graphic procedures shall be utilised for the functions of graphicand/or semi-graphic configuration.The operator shall be able to draw, modify and/or delete directly on the monitor thegraphic parts and to abilitate, replace and/or eliminate the existing video pages.The functions of configuration of the video pages shall make possible the preparationand updating of:

    - Forms library (symbols library)- Synoptic type video pages (with no pre-arranged structure)- Pre-arranged structure video pages, as measurement trends, group pages, lists,

    histograms, etc.

    Files

    The function of configuration of the files shall allow the definition of the points to bemanaged and filed, in accordance with the following procedures:

    - Historic file, to memorise on file tapes the history of the Data Base points.- Event file, to memorise a window of samples in a certain time period before and

    after an event (process, acquired or calculated).

    Application software programmes

    As application software programmes, are intended all those specific functions(calculation or not) necessary to the system to satisfy completely the requirements forthe management of the plant and not provided in the standard calculation section.In order to answer to these necessities, the system shall manage two different typesof application programmes:

    - Application software programmes with pre-defined dedicated structure written inhigh level language, which shall be mainly utilised for the configuration of synoptictype video pages and print-outs.

    - Application software programmes of generic type written in high level languageutilising interface functions with the Data Base area.

    Its configuration functions shall be:

    - definition of the application software- configuration of the calculation activities- compilation- software debugging

    Each of the above functions may be executed with the system still on-line with nointerference with any of the running functions.For the generic type application programmes, in addition, the confguratore shall carryout congruence controls to verify the exclusion of interference with other programmes(overlapped records of data, conflictuality, execution priority levels).

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 24

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2.4.3.6 Process interface functions

    They are managed by the process interface unit and consist in a series of processes andcontrols based on the configuration and type of inlet and outlet signals.The acquisition and local control units shall operate independently from the centralsystem, to which all the data necessary to the operator for the management of the plant'sconnected section shall be transmitted.

    The main functions, at least, shall be:

    Physical interface with the plant signals

    The physical interface shall be obtained with modules for the acquisition of inlet/outletanalogue/digital signals, which shall guarantee the insulation of the system'sequipment and provide the conditioning, scanning, amplification and conversion(analogue to digital and vice versa) of the signals.

    Execution of local scheduled process logic

    The management of the programmed control functions (sequences and controls) shallbe configured in a module provided with non volatile but modifiable memory, able toallow the configuration of the application software programmes of the user through thevideo station of the local operator.In the configuration of the units as local control sub-station, the modules with controlfunctions may be requested to carry out both the standard functions listed inparagraph 2.4.3.4. and the algorithms and the calculation functions indicated in theproject documents.

    Interface with other systems for the management of safety systems and/or otherplants as, for instance, the electric power production and distribution plant

    The unit shall be able to manage, though proper modules, the transmission of data,via MODBUS/MODBUS extended, to other programmable logic systems.The interface shall be of the serial type, with speed programmable on electricstandard defined in the data sheet.

    Interface with a local network

    Communication cards provided with controller shall be utilised for the transmissionand the exchange of information with the joints of the sub-system.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 25

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2.5 Boundary conditions, limits and exclusions

    This document shall be applied only to the Distributed Control System as unit up to theinterface boards. Therefore, it does not apply to the field instrumentation, the ESDsystem, the Telecontrol and Supervision System, which functional requirements are notwithin the scope of this document.

    The following aspects shall be also taken into account, in function of the characteristics ofthe plant to be controlled, defined in the project documents:

    2.5.1 Interconnections

    Whenever required, the Distributed Control System shall be supplied complete with allthe cables for the interconnections of the interface boards with the electric equipment andpackages, for the transmission of the field signals.

    2.5.2 Interface with other systems

    During the design of the system, the interface with other computerised systems (as PLCdedicated to shut down functions) shall be taken into account, by interface with serialtype communication ports, programmable with standard software language.

    2.5.3 Integrated ESD system

    When an integrated system for the management of the safety and shut down functions isrequired, the control system shall be provided with suitable logs dedicated to theacquisition of these functions and the configuration (at Level 1) of the relevant alarms.The two systems shall be directly connected by the same bus, backed-up to guaranteethe transfer of data (diagnostic, shut down and alarm) with priority with respect to theother units of the system.The operativity of the shut down functions (instructions and sequences) shall beprotected by suitable access keys (insertion/exclusion/maintenance by-pass).

    2.6 Ergonomics

    The architecture of the system, the assembly and the lay-out of the equipment shallreflect the ergonomics criteria and requirements stated in the Normative references (ISO6385) and shall provide to the operators the maximum level of operability andfunctionality.The lay-out and the interfaces of the equipment (keyboards, printers, monitor andfacilities) shall facilitate the intervention of the operator on the various video stations withsimple movements.Any signalling and control facility, installed on the front of the boards, shall be positionedso that the correct identification and operability by the users is guaranteed.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 26

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2.7 Safety

    All the safety requirements indicated in the Rules and Laws for the prevention ofaccidents of the country where the plant is installed shall be applied.The separation of the conductors in accordance with their typology, as listed here below,and the different level of voltage shall be taken into account in the implementation ofelectric circuits:

    - power and auxiliary a.c. and d.c. supply- instruments supply- analog and digital signals- intrinsically safe circuits.

    Proper earthing systems, both protection and operating, shall be provided, as indicated inthe functional specification 20140.EQP.STA.FUN "INSTRUMENTATION BOARDS".

    2.8 Non repetitive functional requirements

    The Distributed Control System, when required, shall provide the development ofdedicated software programmes for the conversion, preparation and coding of the data tobe transmitted to the Supervision and Telecontrol system, to be compatible with thetelecontrol system and to guarantee the remote management.

    2.8.1 Telecontrol functions

    The transmission equipment shall allow the supervision system to interrogate the variousunits to carry out the function of telecontrol and telemeasurement on logic/analogelements and variables allocated to the units of the control system.The characteristics relevant to the employed transmission supports, the distances amongthe modules and the geographical co-ordinates shall be indicated in the projectdocuments.All the telecontrol functions shall be managed by the system with high level languageapplication software programmes. They shall make possible:

    - To read all the Data Base and write freely in the area allocated to the non standardcalculated points (analogue and digital)

    - To define own areas in the local Data Base to be used as temporary areas for thecalculations

    - To utilise automatically the printers of the operator's stations- To verify timing, priorities and correct execution of the application software

    programmes.

    2.9 Requirements for Quality Management and Assurance

    Requirements for Quality Management or Quality Assurance, where appropriate, arecontained in the Specification enclosed in the Tender documents.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 27

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2.10. Additional requirement for review

    2.10.1 Tests and inspections

    The Distributed Control System, and all its equipment and auxiliaries, extent of thesupply, shall be made available for inspection, during and after their fabrication.All the tests and inspections shall be carried out by the Contractor or by his designatedRepresentative. They shall be attended and approved by the Company's inspectors orauthorised Representatives.All the equipment, the assistance personnel and whatever else necessary for theexecution of the scheduled tests and inspections shall be provided by the Contractor.The tests and inspections shall be at least those indicated by the Normative referencesand/or listed in the Inspection Data Sheet. They shall be carried out in conformity with theprocedures indicated in the relevant Normative references and with the followingprovisions:

    The procedures for the tests required, but not specified in the Normative references,shall be indicated in the Inspection Data Sheet.

    The procedures for any other inspection and test, not specified in the Normativereferences and in this specification, shall be defined time by time.

    The type test for the auxiliaries shall be requested when they comply with the relevantNormative references. The Contractor shall verify that the test has been carried outand provide all the relevant documentation.

    The provisions for the type test shall be valid also for the acceptance tests of theauxiliaries, provided that they are submitted to the inspections listed in the InspectionsData Sheet.

    The inspections and tests shall be carried out in accordance with the followingclassification:

    Type test Acceptance test Special test.

    All the relevant documentation, as copies of certificates, drawings, specifications, testprocedures, cards prepared with the collected data, shall be made available to theCompany for review.

    2.10.1.1 Type test

    Scope of the type test is to verify the conformity of a specific product with the normativereferences and the original design.The execution of the type test shall be the complete responsibility of the Contractor. Thetest can be carried out on prototypes or equipment and/or components samples.Any approval of equipment and/or components similar to those included in the supply, asthe prototypes, shall be of exclusive competence of the Company, which has the right torequire any test selected among the type ones.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 28

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2.10.1.2 Acceptance test

    Scope of the acceptance test is to ascertain, through the review of documents and theexecution of reduced but significant tests and inspections, the conformity to the technicalrequirements of the original design and the compliance with the Companysrequirements. Any defect in the material or in the fabrication shall be detected by theacceptance test too.This test shall be carried out under the responsibility of the Contractor, on all theequipment of the Distributed Control System to be supplied.The test and inspections included in the Acceptance test shall be those listed in theNormative references and in the Inspection Data Sheet. In detail, the following activitiesshall be carried out:

    Visual and dimensional inspections Mechanical tests Electric tests Functional tests Hardware inspections Software review

    The final shop acceptance test shall be carried out with all the boards and equipmentinterconnected.The signals from/to the field shall be simulated by simple devices connected to theterminal strips.

    2.10.1.3 Special test

    They include all the tests and inspections not included in the type or acceptance tests,and that the Company may specifically require.The list of tests and inspections, and, when necessary, the execution procedures shall beindicated in the Inspection Data Sheet (I.D.S.) enclosed to the project specification.

    2.10.1.4 Test procedures

    The control system shall pass with positive results the test indicated by the Rules andlisted in the Inspection Data Sheet, and which shall be carried out in conformity wit theContractor's procedures, approved and officially accepted by the Company.The following elements, at least, shall be contained in the procedure for each single test:

    execution procedure equipment and fixtures utilised acceptance criteria and limits, in compliance with the relevant Rules and the project

    documents part of the system or unit to which the procedure is applied.

  • 20149.EQP.STA.FUNRev. 0 December 94Sheet 29

    Il presente documento RISERVATO ed di propriet dell'AGIP. Esso non sar mostrato a Terzi n sar utilizzato per scopi diversi da quelli per i quali stato inviato.This document is CONFIDENTIAL and the sole property of AGIP It shall neither be shown to third parties nor used for purposes other than those for which it has been sent

    2.11 Documentation

    2.11.1 Documentation with the tender

    a) Company's Data Sheet filled in any part and with attachments (if any).b) Information useful for the correct evaluation of the tender, as, for instance:

    information on the equipment type and Manufacturer's standard components dimensions and weight of boards an/or equipment and of the packing.

    2.11.2 Documentation for approval

    The approval given by the Company to the documentation, if necessary, shall be relevantonly to the formal review of the parameters indicated in the project documents.

    2.11.3 Documentation to be used by the Company for the plant design

    The Contractor shall supply to the Company all the documentation necessary for theexecution of the plant design and for the installation of the system, object of the supply.

    2.11.4 Test Documentation

    The test documentation shall include at least the following documents:

    complete certification relevant to the type, acceptance and special tests. list of the executed inspections and tests, and description of the procedures and

    utilised instruments.

    2.11.5 Final technical documentation

    The final documentation, with the exception of catalogues and publications provided bythe Contractor and sub-Contractors (if any), shall include the following data:

    name of the Contractor name of the Company identification tag, defined by the Company title of the document reference to the Company's order.

    The documentation shall be subdivided as follows:

    a) Design and installation instructionsb) Operative instructionsc) Maintenance instructions

    The inclusion of the description and the drawings in catalogues or publications providedby the Contractor will be accepted, provided that:

    the catalogues (or publications) shall contain all the data and the requestedinformation in their final form;

    the catalogues (or publications) shall be relevant to the supplied types and thematerials, object of the supply, are clearly identified among those shown in thedocument.

    The documentation submitted to the Company's approval shall be included in the finaldocumentation, in the revision approved by the Company.