2014 Snow and Ice Program

Kentucky Department of Highways

Page 2: 2014 Snow and Ice Program Kentucky Department of Highways

2013-14 SNIC Costs

Page 3: 2014 Snow and Ice Program Kentucky Department of Highways
Page 4: 2014 Snow and Ice Program Kentucky Department of Highways

Mighty Mike

Page 5: 2014 Snow and Ice Program Kentucky Department of Highways

Environmental Considerations

Page 6: 2014 Snow and Ice Program Kentucky Department of Highways

Liquid Facilities Maintenance

Page 7: 2014 Snow and Ice Program Kentucky Department of Highways

Soil Tests for Chlorides

Sample IDRP Results US127NB A A 89.0 US127NB B A 124.0 US127SB A A 115.0 US127SB B A 65.0 I64WB A Int 47.0 I64WB B Int 38.0 US60WB A A 35.0 US60WB B A 40.0 I75NB A Int 22.5 I75NB B Int 78.5 BGPEB A A 89.0 BGPEB B A 43.0 KYOL A A 98.0 KYOL B A 90.5 US460 A A 99.5 Min = 21.5 (C Route) US460 B A 80.5 Max = 124.0 (A Route) KY1685 A C 96.0 KY1685 B C 60.5 KPDES Storm Water Discharge KY2919 A C 31.0 limit at 1200 ppm KY2919 B C 21.5

Page 8: 2014 Snow and Ice Program Kentucky Department of Highways

Safety Notes

More time on the road = more accidents

Falls22 reported last SNIC season (19 from truck)

Be sure to include Safety Coordinator in trainings

Page 9: 2014 Snow and Ice Program Kentucky Department of Highways
Page 10: 2014 Snow and Ice Program Kentucky Department of Highways
Page 11: 2014 Snow and Ice Program Kentucky Department of Highways
Page 12: 2014 Snow and Ice Program Kentucky Department of Highways
Page 13: 2014 Snow and Ice Program Kentucky Department of Highways
Page 14: 2014 Snow and Ice Program Kentucky Department of Highways

Brine/CaCl Application

Page 15: 2014 Snow and Ice Program Kentucky Department of Highways

1-Hour After Treatment

Page 16: 2014 Snow and Ice Program Kentucky Department of Highways

2-Hours After Treatment

Page 17: 2014 Snow and Ice Program Kentucky Department of Highways

4-Hours After Treatment

Page 18: 2014 Snow and Ice Program Kentucky Department of Highways

Hard Pack With Heavy Traffic

Page 19: 2014 Snow and Ice Program Kentucky Department of Highways

Preparation Reminders

Materials restockedEquipment retrofitEquipment calibratedFill stations repairedTraining (KYTC & Contractor)Contract truck inspectionsReadiness letter from CDESNIC maps updated

Page 20: 2014 Snow and Ice Program Kentucky Department of Highways

Training Classes

KYTC Staff ◦ Safety◦ Equipment Calibration◦ Salt Usage◦ Route Plans◦ NWS Guest Speaker

Contract vendors◦ Safety◦ Department Guidelines◦ Equipment Calibration◦ Salt Usage◦ Barn protocol◦ Response Time◦ Driver Requirements

Simulator

Page 21: 2014 Snow and Ice Program Kentucky Department of Highways

2014 Simulator Schedule

October 27, 28, 29 & 30 – Jackson D.O.◦ Districts 10,11 & 12

October 31 – Somerset D.O.◦ District 8

November 3, 4, 5 & 6 – Scott Co. Maint.◦ Districts 5,6,7 & 9

November 7, 10 & 12 – Leitchfield◦ Districts 3 & 4

November 13 & 14 – Princeton◦ Districts 1 & 2

Page 22: 2014 Snow and Ice Program Kentucky Department of Highways

New Materials

Clear Lane◦ 8000 tons available to KY

Magic Salt – (Liquid Enhancer)◦ Districts 3, 6 & 7◦ Liquid blend ◦ Stockpile treatment

Beet 55 – (Liquid Enhancer)◦ District 1◦ Liquid blend

Blue Dye – Morgan County

Page 23: 2014 Snow and Ice Program Kentucky Department of Highways

Empty Cave

Page 24: 2014 Snow and Ice Program Kentucky Department of Highways
Page 25: 2014 Snow and Ice Program Kentucky Department of Highways

Inventory as of September 8th

District Inventory Capacity % Cap 1 8,707 20,775 42% 2 19,764 26,300 75% 3 16,757 19,200 87% 4 20,296 22,800 89% 5 29,969 40,700 74% 6 7,732 31,200 25% 7 12,142 34,000 36%

Page 26: 2014 Snow and Ice Program Kentucky Department of Highways

District Inventory Capacity % Cap 8 15,027 19,950 75% 9 9,238 24,600 38% 10 7,118 17,800 40% 11 14,751 20,300 73% 12 16,683 25,400 66% Cave 24,000 71,500 34%

State 178,184 303,025 59%

Page 27: 2014 Snow and Ice Program Kentucky Department of Highways

Material Restocking

Liquids – okSalt – expect delaysDelivery Spread SheetPenaltiesDo not over-fill sheds/domesLouisville and D7 storage

Page 28: 2014 Snow and Ice Program Kentucky Department of Highways

Salt Usage

2013/14 - 440,355 tons

Last Season Tactics:◦Backed app rates down to 200 lbs plm◦Daytime snowfall – relied on plowing◦Use of aggregates on C Routes◦No overnight work on C Routes◦Liquids to de-ice

Page 29: 2014 Snow and Ice Program Kentucky Department of Highways

AVL Plans/511/SNIC Maps

Expansion to focus on District 75 KYTC trucks64 D7 contract trucks15 D6 contract trucks 5 D12 contract trucks

Page 30: 2014 Snow and Ice Program Kentucky Department of Highways

“We like to be aggressive about clearing our roadways, but we also must be careful in our planning and judicious in our use of salt and other materials to ensure we don’t run out.” Secretary Hancock

Page 31: 2014 Snow and Ice Program Kentucky Department of Highways

1 2 3 4 5 6 7 8 9 10 11 12 Cave0

5000

10000

15000

20000

25000

30000

35000

40000

0

5000

10000

15000

20000

25000

30000

35000

40000

February 7

Page 32: 2014 Snow and Ice Program Kentucky Department of Highways
Page 33: 2014 Snow and Ice Program Kentucky Department of Highways

A1 Salt (Broker)800 tons$275 / ton

Page 34: 2014 Snow and Ice Program Kentucky Department of Highways

A1 Salt Broker800 tons$275 / ton

Redmond Salt (Utah)$40 /ton plus shippingCould not begin shipping until mid-March

Page 35: 2014 Snow and Ice Program Kentucky Department of Highways

1 2 3 4 5 6 7 8 9 10 11 12 Cave0

5000

10000

15000

20000

25000

30000

35000

40000

0

5000

10000

15000

20000

25000

30000

35000

40000

February 7

Page 36: 2014 Snow and Ice Program Kentucky Department of Highways

1 2 3 4 5 6 7 8 9 10 11 12 Cave0

5000

10000

15000

20000

25000

30000

35000

40000

0

5000

10000

15000

20000

25000

30000

35000

40000

February 12

Page 37: 2014 Snow and Ice Program Kentucky Department of Highways

1 2 3 4 5 6 7 8 9 10 11 12 Cave0

5000

10000

15000

20000

25000

30000

35000

40000

0

5000

10000

15000

20000

25000

30000

35000

40000

February 12

Page 38: 2014 Snow and Ice Program Kentucky Department of Highways

1 2 3 4 5 6 7 8 9 10 11 12 Cave0

5000

10000

15000

20000

25000

30000

35000

40000

0

5000

10000

15000

20000

25000

30000

35000

40000

February 12

Page 39: 2014 Snow and Ice Program Kentucky Department of Highways

1 2 3 4 5 6 7 8 9 10 11 12 Cave0

5000

10000

15000

20000

25000

30000

35000

40000

0

5000

10000

15000

20000

25000

30000

35000

40000

February 12

Page 40: 2014 Snow and Ice Program Kentucky Department of Highways

1 2 3 4 5 6 7 8 9 10 11 12 Cave0

5000

10000

15000

20000

25000

30000

35000

40000

0

5000

10000

15000

20000

25000

30000

35000

40000

February 28

Page 41: 2014 Snow and Ice Program Kentucky Department of Highways
Page 42: 2014 Snow and Ice Program Kentucky Department of Highways
Page 43: 2014 Snow and Ice Program Kentucky Department of Highways
Page 44: 2014 Snow and Ice Program Kentucky Department of Highways

1 2 3 4 5 6 7 8 9 10 11 12 Cave0

5000

10000

15000

20000

25000

30000

35000

40000

0

5000

10000

15000

20000

25000

30000

35000

40000

March 4

Page 45: 2014 Snow and Ice Program Kentucky Department of Highways

1 2 3 4 5 6 7 8 9 10 11 12 Cave0

5000

10000

15000

20000

25000

30000

35000

40000

0

5000

10000

15000

20000

25000

30000

35000

40000

March 12

Page 46: 2014 Snow and Ice Program Kentucky Department of Highways

Ended Season with about 53,000 tons

Page 47: 2014 Snow and Ice Program Kentucky Department of Highways

Ended Season with about 53,000 tons

About 440 tons per county

Page 48: 2014 Snow and Ice Program Kentucky Department of Highways

Ended Season with about 53,000 tons

About 440 tons per county

Storms of March 2-5 required 48,000 tons

Page 49: 2014 Snow and Ice Program Kentucky Department of Highways

What did we do right?

Communication

Innovation

Teamwork

Page 50: 2014 Snow and Ice Program Kentucky Department of Highways

What can we do better?

Inventory tracking

More frequent vendor orders

Application rates

Increase reserves

Page 51: 2014 Snow and Ice Program Kentucky Department of Highways

Salt Usage Since 1974

'74

'76

'78

'80

'82

'84

'86

'88

'90

'92

'94

'96

'98

'00

'02

'04

'06

'08

'10

'12

'14

0

100,000

200,000

300,000

400,000

500,000

600,000

Page 52: 2014 Snow and Ice Program Kentucky Department of Highways

Average Usage Before/After 1994

'74

'76

'78

'80

'82

'84

'86

'88

'90

'92

'94

'96

'98

'00

'02

'04

'06

'08

'10

'12

'14

0

100,000

200,000

300,000

400,000

500,000

600,000

81,300

221,727

Page 53: 2014 Snow and Ice Program Kentucky Department of Highways

Salt Supply Expectation Report

Page 54: 2014 Snow and Ice Program Kentucky Department of Highways

Restocking for 2014-2015

Vendors proposed timeframe for deliveries to be completed.

1% penalty per day late.

Early orders have been late.

Waived penalties on summer orders if completed by Nov 1. (50% by Oct 15 for priority districts).