2014 project updates building the port of the future gina barro business development manager trade...
TRANSCRIPT
2014 Project Updates
Building the Port of the Future
Gina BarroBusiness Development Manager
Trade Development Division
Port of Long Beach Premier gateway for U.S. - Asia trade
Major Southern California economic engine
Investing in the Future $4 billion in projects
Middle Harbor $1.3 billion
First half set to open in late 2015
Ship-to-Shore Cranes Four on site
8 more of the most advanced cranes on the way
Before Construction
Pier E Pier F
2011 2012 2013 2014 2015 2016 2017 2018 2019
E 26 E 24 E 22
F 6
F 10
1 million-TEU capacity
Middle Harbor 3 million-TEU capacity
Most technologically advanced in N. America
$1 billion Gerald Desmond Bridge Replacement
Iconic Bridge $1.3 billion project
Opening to westbound traffic as early as 2017
Clearing the Path Ramp demolition
For information, download our LB Bridge app.
ITS Terminal Redevelopment2nd Phase will include slip development, south rail yard renovation and demolition of old terminal buildings.
Sustainability Green Port Policy
81%Drop in Diesel
Emissions since 2005
Shore Power Container ships plug in
Pier J
Pier G
Pier T
Pier A
Middle Harbor
14 Shore Power Berths
Upgrading Rail Green Port Gateway
Rail Improvements
Ocean Blvd. Track Realignment
Middle Harbor On-Dock Rail*
*Future project
Pier G Rail Yard
Pier B On-Dock Rail
Support Facility
New Fireboat Stations
LB Fire Station #15
LB Fire Station #20
Desmond Bridge Replacement
Project
Middle Harbor Redevelopment
Project
Maintenance Dredging Projects
Capital Dredging Projects
Bright Future Long Beach -- a great place to live and work