Items to Review and Discuss• Alternatives

▫ Review alternative selection process

▫ Present modeling results and recommendations

• Discussion

• Next step – Final Report and City Council Presentation

Meeting Purpose• Discussion of project recommendations

• Gather public feedback

Page 3: 20130901 public meeting_4 (1)

Project Goals• Reduce probability of flooding by improving

stormwater management

• Identify cost of implementation per level of service

• Do not adversely impact downstream interests

• Maintain and/or enhance water quality

• Long term sustainability

Page 4: 20130901 public meeting_4 (1)

Available Information

• Website

▫ Online at www.uppermallettsstudy.org

• Online Flood Reporting Tool

Page 5: 20130901 public meeting_4 (1)

Original Alternatives

Page 6: 20130901 public meeting_4 (1)

Alternative Development

Page 7: 20130901 public meeting_4 (1)

Alternative Packages

Name Imp

act

Po

ten

tial

Exp

ecte

d C

ost

Alt

ern

ativ

e P

acka

ge 1

Alt

ern

ativ

e P

acka

ge 2

Alt

ern

ativ

e P

acka

ge 3

Alt

ern

ativ

e P

acka

ge 4

Alt

ern

ativ

e P

acka

ge 5

Alt

ern

ativ

e P

acka

ge 6

Alt

ern

ativ

e P

acka

ge 7

Lawton Park High High X X X X X

Eisenhower Park High Medium X X X X X

Lans Basin Medium High X X X X

Pioneer HS (W of 7th) Low Low X

Pioneer HS (E of 7th) Low Low X X X

Cardinal Homes Low Medium X X X

Las Vegas Low Low X X X

Areas Outside of City Boundary 1 2 3 4 5 6 7

Ice Cube Medium Low X

Meadowinds Basin Low Low X

Page 8: 20130901 public meeting_4 (1)

Flooding Map – March 15, 2012

Page 9: 20130901 public meeting_4 (1)

Eisenhower/Churchill Park

Drainage Area

Initial Volume (cu. ft) 425,000Conceptual Volume 390,000Surface Area (acres) 1.9Anticipated Costs $1,250,000

Page 10: 20130901 public meeting_4 (1)

Flooding Map – Post Eisenhower

Page 11: 20130901 public meeting_4 (1)

Pioneer/Scio Church Improvements

Drainage Area Initial Volume (cu. ft) 80,000Conceptual Volume 400,000Surface Area (acres) 2.8Anticipated Costs $1,000,000

Page 12: 20130901 public meeting_4 (1)

Flooding Map – Post Pioneer

Page 13: 20130901 public meeting_4 (1)

Lawton Park

Drainage Area

Initial Volume (cu. ft) 825,000Conceptual Volume 340,000Surface Area (acres) 1.4Anticipated Costs $4,500,000

Page 14: 20130901 public meeting_4 (1)

Flooding Map – Post Lawton

Page 15: 20130901 public meeting_4 (1)

LocationOriginal Est.

VolumeConceptual

Volume

Lawton Park825,000 340,000

Eisenhower Park425,000 390,000

Pioneer (E. of 7th)80,000 400,000

Total 1,330,000 1,130,000

Volume Comparison

Page 16: 20130901 public meeting_4 (1)

Footing drain analysis

Footing Drain Flow as PercentageOf Overall System Flow

94.2%

5.8%

• Measured flow approximately 5 gallons per minute

• Study using conservative flow of 10 gpm

• Total system flow is 483 cubic feet per second

• Total footing drain flow is 28 cfs

Page 17: 20130901 public meeting_4 (1)

Footing drain analysis

Footing Drain Flow as PercentageOf Eisenhower Basin Flow

Footing Drain Flow as PercentageOf Lawton Basin Flow

2.2%

97.8%

5.4%

94.6%

No flow attributed to Pioneer basin due to drainage area specifics

Page 18: 20130901 public meeting_4 (1)

Discussion

Page 19: 20130901 public meeting_4 (1)

Next Steps

• Prepare report

• Presentation to Ann Arbor City Council

Page 20: 20130901 public meeting_4 (1)

Gather Information

Public Engagement

Upper Malletts Creek Stormwater Conveyance Study TimelineP

roje

ct A

wa

rdJ

an

ua

ry 2

013

Ap

ril

20

13

Preliminary Alternatives Analysis &

Memo

Draft Study

Report

Final Study Report

Finalized Alternatives Analysis &

Memo

Ju

ly 2

013

Dec

emb

er 2

013

Ja

nu

ary

20

14

Fe

bru

ary

20

14

Ma

rch

20

13

Data Collection, Monitorin

g, & Modeling

Fe

bru

ary

20

13

Sep

tem

ber

20

13

Page 21: 20130901 public meeting_4 (1)

Upper Malletts Creek

Stormwater Conveyance Study

Project UpdateSeptember 30, 2013