1. ACHD Integrated Five Year Work Plan FY2014-18, Initial Draft (15 min)Presenter: Karen Gallagher, Planning and Development Services
ACTION REQUESTED: Provide Comments
2. Broadway Bridge Design Options (20 min)Presenter: Karen Gallagher, Planning and Development Services
ACTION REQUESTED: Provide Comments
3. Interim Budget Change (5 min)Presenter: Brent Davis, Finance and Administration
ACTION REQUESTED: Approval
4. Executive Session: Personnel, Labor Negotiations, Land Acquisition,
Records Exempt from Public Disclosure, Pending/Probable Litigation, I.C.
67-2345(1)(b)(c)(d)(f)
I. CALL TO ORDER
II. WORK SESSION ITEMS
III. ADJOURNMENT
-
8/13/2019 2013-09-10 City Council - Full Agenda-1067
2/14
Date: September 5, 2013
To: Mayor and City Council
From: Karen GallagherTransportation Planner
Re: ACHDs Integrated Five Year Work Plan FY 2014-18Comments on Initial Draft
Requested Action
Provide feedback on the initial draft of ACHDs Integrated Five Year Work Plan FY
2014-18. They have requested comments by September 13th
. The ACHD Commissionplans to adopt the IFYWP on September 25th.
SummaryWe are at the tail end of the development of this years Integrated Five Year Work Plan(IFYWP). On April 5, 2013, Boise City sent ACHD the annual transportation requests list.ACHD collected all the lists from other municipalities and the school districts, determinedeach projects prioritization score, added projects, and made some minor adjustments to theprevious years FYWP to create a new plan for FY 2014-2018.
Attached is ACHDs 6-page summary of the IFYWP. The entire IFYWP can be found
at:http://www.achdidaho.org/Default.aspx (see bullet under Quick Links).
New Approach
Over the next 3-5 months, the PDS team will examine the Citys transportation goals inconjunction with targeted areas of change (land use), as well as sidewalk needs, anddiscuss with Council future strategies for identifying and ranking our transportationpriorities. This will be followed by joint meetings with ACHD to highlight areas ofredevelopment and other transportation goals with the CIP and IFYWP and to provide amore cogent and comprehensive justification for our transportation priorities.
Projects
Economic DevelopmentThis is the first year the District has created funding for Economic DevelopmentProjects. Boise submitted nine projects. The District included two of them in thedraft Plan: Royal Blvd. Extension (between 9thand Capitol) and Emerald St. andAmericana Blvd, from Orchard to Ann Morrison Park complete street with bikelanes, 3 travel lanes, and sidewalks.
Capital and Community ProgramsBoise summited 28 Capital Projects (streets, intersections, and seven of theEconomic Development projects). Twenty projects are proceeding; seven are not(see attached list).
2.1
Packet Pg.
http://www.achdidaho.org/Default.aspxhttp://www.achdidaho.org/Default.aspxhttp://www.achdidaho.org/Default.aspxhttp://www.achdidaho.org/Default.aspx -
8/13/2019 2013-09-10 City Council - Full Agenda-1067
3/14
In the Community Programs category, Boise requested 43 projects. Thirty-one projects areproceeding; 19 are not (some are new and have not yet been scoped) (see attached list). ACHD isproposing to increase the annual funding for Community Programs from $4 million to $5-6 million.
In 2014, ACHD will begin designing seven capital projects and three community program projectsin Boise.
ITS and Sidewalk Repair AreasOne of the changes with the new IntegratedFive Year Work Plan is the inclusion of specificmaintenance projects, such as lists of roads to be overlaid and specific Intelligent TransportationSystems (ITS) projects. There are four ITS projects in Boise:
Adaptive Traffic Signal Boise/ Eagle/ Garden/ City of Boise Boise Towne Square Mall Adaptive Signal Broadway Ave. Adaptive Signal Three Cities Intelligent Transportation System Improvement
There are seven areas identified for sidewalk repair and filling of short gaps. West Downtown Boise Sidewalk Repair El Pelar Estates Sidewalk Repair Five Mile/ Ustick/ Maple Grove/ Edna Sidewalk Repair Harris Ranch Sidewalk Repair North End Downtown Sidewalk Repair North End Harrison 13thSidewalk Repair Sherwood and San Marino Sidewalk Repair
Prioritization OutliersThere are five projects proposed to be added to the IFYWP that are outliers, meaning they score verylow on the prioritization criteria (rank 85, 94, 116, 122 out of 130 projects). It is unclear why theseprojects are being added to the Plan. There are 42 other projects that rank above the highest rated ofthe outliers that are not proceeding, including the intersections at Broadway/Ave. B/Idaho St./WarmSprings Ave. and State St/Glenwood. While the prioritization score is not the end-all, someexplanation is warranted and could be requested.
Attachments
Status- Boises Capital Projects Request ListStatus - Boises Community Programs Projects Request ListIntroduction to the Initial Draft of the Integrated Five Year Work Plan
2.1
Packet Pg.
-
8/13/2019 2013-09-10 City Council - Full Agenda-1067
4/14
ACHD Ini tial
Draft IFWYP
FY2014-2018
Aug 13, 2013
2013 Boise City
Priority for
FY2014-18
Roadway or Intersection () Description
Design in PD,
Const UFlong-term priority
State Street, Veterans Mem Pkwy (36th St)
/ 28th
St
Widen to 7 lanes. Develop transition plan to
achieve 2 lanes dedicated for transit.
Design in 2014Const 2018 1 State St & Veterans Mem Pkwy (36th St)Cost estimate for concept design in 2013.
2017 2 State St & Collister Dr Widen to 7 lanes. Develop transition plan to
achieve 2 lanes dedicated for transit.
Design in 2017
Const PD3 State St & Pierce Park Ln
Widen to 7 lanes. Develop transition plan to
achieve 2 lanes dedicated for transit.
UF long-term priori ty State Street, Collister / 36th
St
Widen to 7 lanes. Develop transition plan to
achieve 2 lanes dedicated for transit.
Intersections 1st per TTOP.
UF long-term priori ty State Street, Pierce Park / Collister
Widen to 7 lanes. Develop transition plan to
achieve 2 lanes dedicated for transit.
Intersections 1st per TTOP.
UF 4 State St & Glenwood St Rebuild intersection.
long-term priori ty State Street, Glenwood / Pierce Park
Widen to 7 lanes. Develop transition plan to
achieve 2 lanes dedicated for transit.
Intersections 1st per TTOP.
begin in 2017 5 long-term priori tyFairview Ave, Linder / Orchard, Access
ManagementImplement Fairview Access Management Plan
2017 6 long-term priori ty Cole / Fairview
2014-2018 7 Downtown Boise Implementation Plan
Execute outcomes of Downtown Boise
Implementation Plan - one-way, two-way stree
conversions and bike network.
yes 8 Emerald, Orchard / Latah and restripeAmericana
Convert 4 lanes to 3 and add bike lanes. Also
restripe Americana, Latah to Ann Morrision
Park with bike lanes.
9Orchard, Chinden to Overland: 4 to 3 lanes
and add bike lanes.Convert 4 lanes to 3 and add bike lanes.
10 Orchard, Emerald / Morris HillDevelop Concept Plan to construct a complete
street.
yes 11 Capitol Blvd / 9th St. / Royal Blvd
Design and construct a new intersection at to
improve vehicular access to the Lusk Street Ar
and provide another connection to the BSU
campus for pedestrians and bicyclists.
12 32nd Street, Moore / Whitewater Park Blvd:
Extend the local street to provide the
neighborhood and an undeveloped, higher
density parcel critical access to Whitewater Par
Blvd. and Esther Simplot Park. Coordinate with
CCDC.
2.1
Packet Pg.
-
8/13/2019 2013-09-10 City Council - Full Agenda-1067
5/14
13 28th Street, Main / Fairview
Extend the local street through this superblock
to secure the street network for better circulatio
and to create a local town center typology stree
with buildings fronting the street. An east-wes
alley or road connection to Whitewater Park
Blvd. will also be needed, but can be phased in
at a later date. Coordinate with CCDC.
14 Beacon, Boise Ave / Broadway
Create a complete street by converting Emerald
from 4 Lanes to 3 Lanes. Keep two vehicular
lanes, dedicate one lane to left-turns, add
medians, pedestrian crossings and bike lanes.
2015 15 Five Mile, Fairview / Ustick Construct 5 lane complete street.
2014 16
Five Mile, Franklin / Fairview: includes
Emerald St / Five Mile Rd intersection &
south approach at Fairview / Five Mile
intersection.
Construct 5 lane complete street.
2016 17 36th
St / Hill Rd / Catalpa Dr Constructa single-lane roundabout. LID
potential.
2016 18 Cloverdale, Franklin / Fairview Construct 5 lane complete street.
2017 19 Cloverdale, Fairview / Ustick Construct 5 lane complete street. LID potentia
2014 20 Ustick, Cloverdale / Five Mile Construct 5 lane complete street.Design in 2015
Const PD21 Cloverdale, Ustick / McMillan Construct 5 lane complete street.
2018 22 Cole, I-84 to Franklin & Cole / Franklin Construct 5 lane complete street.
2015 23 Eagle & McMillan Rebuild intersection. Add turn lanes.
ROW 2015
Const PD 24 Maple Grove, Victory / Overland Construct 5 lane complete street.
Design in 2017
Const PD25 Maple Grove, Amity / Victory Construct 5 lane complete street.
Design in 2018 26 Cloverdale, McMillan / Chinden Construct 5 lane complete street.
FTR 27 Cloverdale, Victory / Overland Construct 5 lane complete street.
28 Cole & VictoryRebuild intersection. ACHD is working on
improvements to Maple Grove first.
PD Planned Development (2 yrs beyond 5 Yr Plan)
UF Unfunded (Beyond PD)
FTR Future (Beyond UF)
Intersection
Economic Development Applications
Listed in IFYWP
Not listed in IFYWP
2.1
Packet Pg.
-
8/13/2019 2013-09-10 City Council - Full Agenda-1067
6/14
Construction
Year per
initial draft
IFWYP (Aug
2013)
March
2013
Boise City
Rank
Projects in Bo ise City and Boise Area of Impact
2015 1 Amity, Ho lcomb / Surpr ise Way: Asphal t pathway connec tion on n or th side to complete loc al sys tem.
Amity, Federal Way / Surp rise Way - Widen Am ity to pr ovide bike lanes and turn lane in to a subdi vision.
2014 signal at
McM, 2015 more
2 Bikeway on Shamrock, Emerald to DeMeyer Park
3 Capitol Boulevard and Crescent Rim Drive, Yale (Elmers) to Eastover Terrace (entrance to Depot) or
other logical termin. Improved bicycle and pedestrian connection(also listed as an Economic
Development Request).
2014 4 Orchard, Targee / Spaulding: 1/4 mile sidewalk on west sid e.
2016 5 Camas, Orchard / Roosevelt: s/w on bot h sides, north at a minimum: 1,900 ft.
6 Orchard / Alpine, signalized pedestrian crossing
7 Phillippi / Overland signalized pedestrian crossing
2013/2014 8 9th & Grove: Install new countdown pedestrian crossing l ight and crosswalk.
2014 9 Maple Grove, Northvi ew / Ustick: gaps in s idewalk on east si de (1,500 ft)
2014 10 Maple Grove, Garverdale (north of Fairview) / Northv iew: sid ewalk gaps on west side (800 ft) wit h
pedestrian accuated signal at Northvi ew
yes 11 Emerald, Orchard / Latah, sidewalk gaps on both sides
12 Kootenai, Vista / Federal Way, sidewalk on bo th si des,includes improved rail crossing.
13 Victory , Virginia / Federal Way: 845 ft sidewalk gaps o n both sides (1,690 ft total).Includes railroad
crossing.
2018 14 Overland, Columbus / Federal Way: fill si dewalk gaps on both s ides.Includes r ailroad cr ossing.
2014 15 Five Mile, north o f Ustick : 660 ft gap in s idewalk on east side.
16 McMillan Road Pedestrian Refuge Medians and Traffic Calming Medians, Eagle / Cloverdale
2014 17 Roosevelt, Overland / Cassia: sidewalk on bo th sid es.
2018 18 Collister, Hillsi de to Outlook / Briarhill (north of Hill Road): 420 ft sidewalk gap on east side
2014 19 Spaulding, Eagleson / Phillip pi: si dewalk on the south side (650 feet).
20 Bikeway on L eadville, Linden to Greenbelt
2018 21 Cole, Kettering / Mt. View: contin uous s idewalks, both si des
22 Columbus, Overland / Kootenai (Protest): sid ewalk on both sides
2014 23 Maple Grove, Mapleview / Shellie Ln: 430 ft si dewalk segment on east si de
yes, in DBIP 24 Bikeway on 3rd Street, Myrtle (Julia Davis) to Fort
25 Bikeway on Shoshone or Owyhee, Elder to Alpi ne
yes, in DBIP 26 Bikeway on Bannock or Jefferson, Downtown to Whitewater Park Blvd
2018 (from Amity
and to south)
27 Bikeway on Holcom b, New York Canal to Columbia Village
28 Heron, 13th to 9th:
-
8/13/2019 2013-09-10 City Council - Full Agenda-1067
7/14
33 Phillippi , Targee / Overland: sidewalk on both si des
2017 34 Clark, Orchard / Roosevelt: s/w on both sides, one side at a min. (2,100 ft on n orth s ide)
2016 35 27th Street, north o f Fairview: 185 ft sidewalk gap on west si de and missing p edestrian ramps at
driveway
36 Jefferson, gaps in s idewalk between 27th St. and Whitewater Park Blv d.
37 Madison gaps in s idewalk between 27th St. and Whitewater Park Blvd.
38 Coston, Warm Springs Ave / north of Franklin , sidewalk on both sides
39 Improved Railroad Crossingat Peasley for Pedestri ans and Bicycl ists
40 Cherry Ln, Owyhee / Vista: 1,550 ft si dewalk on sou th si de.
41 Garden St, Emerald / Franklin: sidewalk on bot h sides
42 Eckert, Boise / Arrow Junction: sidewalk on eastand west side (east side located in Power Tranmiss ion
parcel - may not be improved with development)
2018 43 Liberty, Emerald / Franklin, sidewalk on both sides
ProjectislistedinIFYWPProjectisnotlistedinIFYWP
DBIP ACHD'sDowntownBoiseImplementationPlan
2.1
Packet Pg.
-
8/13/2019 2013-09-10 City Council - Full Agenda-1067
8/14
PacketPg.
8
Attachment:StaffReport(1844:ACHDIFYWPInitialDraftFY2014-18)
-
8/13/2019 2013-09-10 City Council - Full Agenda-1067
9/14
Attachment 1: Changes from 2013-2017 FYWP to 2014-2018 Initial Draft
___________________________________________________________________________________________________________________
Ada County Highway District 3775 Adams St Garden City, ID 83714 PH 208 387-6100 FX 345-7650 www.achdidaho.org
Consistency with Previous Five-Year Work Plan
Staff sought to preserve the programmed construction year of projects from adopted plans, and advance
construction where appropriate and feasible. Only two major projects experience a delay in programmed
construction year between the 2013-2017 FYWP and the initial draft 2014-2018 IFYWP:
The Franklin/Black Cat intersection, a federal aid project, was moved from 2015 to 2016, so that it canbe built concurrently with Franklin, Black Cat/Ten Mile (another federal aid project).
Cloverdale, Fairview/Ustick was moved from 2016 to 2017, so that the 36th/Hill/Catalpa roundaboutcould be advanced into 2016 to avoid a conflict with the State/Collister intersection, a federal aid
project, in 2017. This road segment can still be built in 2016 if sufficient funds are available.
The table below gives a more complete account of changes in construction of major projects (over $1M for
capital projects and over $250K for community programs) from the 2013-2017 FYWP.
Project2013-2017
Cn Year
2014-2018
Cn YearRemarks
02nd
St, Ave C/Linder (Kuna) N/A 2016 Kuna Downtown Corridor Plan
36th
/Hill/Catalpa roundabout 2017 2016 Deconflict with State/Collister project in 2017
Alpine, Orchard/Randall sidewalk N/A 2018 Central Bench Neighborhood Plan
Camas, Orchard/Roosevelt sidewalk PD 2016 Central Bench Neighborhood PlanCameron, Hummel/Aurora N/A 2017 Central Bench Neighborhood Plan
Cloverdale, Fairview/Ustick 2016 2017 Moved for 36th
/Hill/Catalpa (on shelf in 2016)
Cole/Franklin intersection PD 2018
Cole, I-84/Franklin PD 2018
Cole, Kettering/Mountain View sidewalk N/A 2018
Downtown Boise Plan N/A All Primarily maintenance program out of LOE
Executive, Parkdale/President N/A 2016 Program with Cloverdale, Franklin/Fairview
Franklin/Black Cat intersection 2015 2016* Program with Franklin, Black Cat/Ten Mile
Kuna-Mora Rd Reclaim N/A 2018 Specific project out of maintenance LOE
Lake Hazel Extension N/A 2015
Lake Hazel, Cloverdale/Lowland View
sidewalk PD 2017
Lake Hazel, Pearl Jensen/Acacia sidewalk N/A 2017
Liberty, Franklin/Emerald sidewalk N/A 2018 Central Bench Neighborhood Plan
Linder/Main/3rd
roundabout 2017 2016 Kuna Downtown Corridor Plan
McMillan, Locust Grove/Eagle UF 2015 Program with McMillan/Eagle, jump in ranking
Orchard, Targee/Spaulding sidewalk 2015 2014
Overland, Columbus/Federal Way sidewalk N/A 2018 Central Bench Neighborhood Plan
Owyhee, Malad/Overland sidewalk N/A 2016 Central Bench Neighborhood Plan
Pine, East 5th
/Adkins sidewalk PD 2017
President, Executive/Meadowland sidewalk PD 2016 Change in scope, build with Executive project
State, Glenwood/Collister sidewalk PD 2017 Change to local funding
State, Willow/Veterans Pkwy sidewalk N/A 2016Targee, Maple Grove/Penninger sidewalk N/A 2017
Ustick/Meridian intersection PD 2017/18 Changed from federal aid to local
Ustick, Linder/Meridian PD 2017/18 Program with Ustick/Meridian
Ustick, Meridian/Locust Grove PD 2017/18 Program with Ustick/Meridian
Victory Rd Reclaim N/A 2016 Specific project out of maintenance LOE
West 4th
, Broadway/Maple sidewalk N/A 2017 Downtown Meridian Neighborhood Plan
Projects shaded in gray indicate delayed construction.
*Funds are obligated in FY2016 for federal aid project; construction in FY2017.
2.1
Packet Pg.
-
8/13/2019 2013-09-10 City Council - Full Agenda-1067
10/14
Attachment 2: Status of Top Requests of Partner Agencies
___________________________________________________________________________________________________________________
Ada County Highway District 3775 Adams St Garden City, ID 83714 PH 208 387-6100 FX 345-7650 www.achdidaho.org
Agency Rank Project Remarks/2014-2018 IFYWP Disposition
Ada 1 SH-16/Floating Feather signal Deferred: does not meet warrants (lighting
was installed)
Ada 2 SH-16/Beacon Light intersection lighting Installed
Ada 3 Columbia/Locust Grove lighting Finalizing agreements with Ada, IPCO
Ada 4 Lake Hazel Extension Construction in 2015
Boise 1 State/Veterans Pkwy intersection Construction in PD (2018 shelf)
Boise 2 State/Collister intersection Construction in 2017 (federal aid)Boise 3 State/Pierce Park intersection Construction in PD
Boise 4 State/Glenwood intersection Unfunded
Boise 5 Fairview Access Management Construction beginning 2017
Boise CP1 Amity, Holcomb/Surprise Way path Construction 2015
Boise CP2 Shamrock Bikeway Construction 2014-2015
Boise CP3 Capitol/Crescent Rim pathway To be scoped
Boise CP4 Orchard, Targee/Spaulding Construction in 2014
BSD 1 Owyhee, Malad/Overland sidewalk Construction 2016
BSD 2 Owyhee, Nez Perce/Overland traffic calming To evaluate once school resumes
BSD 3 Owyhee/Nez Perce signal Deferred: does not meet warrants
BSD 4 Maple Grove/Northview ped signal Construction in 2014
Eagle 1 Eagle, SH44/Plaza & Eagle/Plaza signal Construction 2013/2014Eagle 2 Eagle, Plaza/State & Eagle/State Eagle/State Concept Study in progress
Eagle 3 Hill Rd Extension Construction in 2015
Eagle 4 SH16/Beacon Light signal
Eagle CP1 State, 2n
/Edgewood Construction in 2015
Eagle CP1 State, Academy/Edgewood Construction in 2014
Eagle CP2 Floating Feather, Park Ln/Ballantyne Construction in 2016
Garden City CP1 Adams, 38th
/40th
Proposed economic dev project
Garden City CP2 Garrett St To be scoped
Garden City CP3 Alworth/50th
pedestrian crossing To be installed shortly
Garden City 1 Clay, 32nd
/37th
curb/gutter/sidewalk To be scoped
Garden City 2 Stockton, 30th
/Goodall
Kuna 1 Linder/Main/3
r
intersection Construction in 2016 (roundabout)Kuna 2 Deer Flat & Linder intersection Construction in 2017 (federal aid)
Kuna 3 Avalon/Kuna/Kay signal Defer: does not meet warrants
Kuna CP1 Indian Creek Greenbelt connection to Kay
Kuna CP2 Indian Creek Greenbelt/Bridge Ave ped xing Include with Kuna Southwest Gateway
Kuna CP3 Deer Flat, Linder/Kay sidewalk To include with Deer Flat/Linder in 2017
Kuna CP4 2nd
St/Linder ped xing Construction in 2016
Meridian RD1 Ten Mile, Cherry/Ustick Construction in 2015
Meridian RD2 Ustick, Locust Grove/Leslie Way Construction in 2014
Meridian RD3 Ustick, Meridian/Locust Grove Construction in 2017-18 (2016 shelf)
Meridian IN1 Ustick/Locust Grove intersection Construction in 2014
Meridian IN2 Ustick/Meridian intersection Construction in 2017-18 (2016 shelf)
Meridian IN3 Ten Mile/Chinden signal Possible developer coop projectMeridian CP1 West 4th
, BRdway/Maple sidewalk Construction in 2017
Meridian CP2 West 1st
, BRdway/Pine sidewalk Construction in 2017
Meridian CP3 Locust Grove, McMillan/Chinden sidewalk Construction 2018
MSD 1 Westview/Mitchell crosswalk Complete
MSD 2 Cloverdale/Muir Ridge school zone beacon Construction in 2014
MSD 3 McMillan/Red Horse school zone beacon Construction in 2014
Star 1 Munger, Floating Feather/SH44 Defer: to be done through development
Star 2 Floating Feather, CanAda/SH16 Defer: to be done through development
Star CP1 Star Rd, SH44/Boise River curb/gutter/sidewalk Defer until Main St complete
Star CP2 Main St, South of SH44 Construction in 2014
2.1
Packet Pg.
-
8/13/2019 2013-09-10 City Council - Full Agenda-1067
11/14
Attachment 3: Recommended Economic Development Projects
4
Economic Development Requests
ACHD received a total of 14 applications under the new economic development program, which is currently
listed at $1.5M-$2.0M level of effort in each year of the Initial Draft. The ACHD Commission will consider
programming these specific projects during the Initial Draft Work Session on August 28.
3rdSt Extension (Meridian) Adams St, 38thSt/40thSt (Garden City) Aikens St Extension (Eagle) Bridge Ave Gateway (Kuna)
Emerald St, Orchard St/Latah St (Boise) Plaza Dr Extension (Eagle) Royal Blvd Extension (Boise)
East 3rd
St Extension (Meridian): This project proposes to extend East 3rdSt from Carlton Ave to Fairview Ave to
improve connectivity and circulation in downtown Meridian between Franklin Rd and Fairview Ave. This project
will likely need to be phased
Planning level cost estimate: $ 2,761,000 (from MDC 3rdSt Alignment Study Report)
Adams St, 38thSt/40thSt (Garden City): This project proposes to complete curb, gutter, and sidewalk along
Adams St to improve pedestrian safety and walkability.
Planning level cost estimate: $ 960,000
2.1
Packet Pg.
-
8/13/2019 2013-09-10 City Council - Full Agenda-1067
12/14
Attachment 3: Recommended Economic Development Projects
5
Aikens St Extension (Eagle): This project proposes to extend Aikens St to 2ndSt to enhance traffic circulation in
downtown Eagle.
Planning level cost estimate: $ 976,000
Bridge Ave Gateway (Kuna): This project proposes to install a landscaped median at the
Avalon/Bridge/Shortline intersection, as well as sidewalks and/or asphalt pathways on both sides of the St
between Shortline St and Main St. Project to be done concurrently with roadway reconstruction.
Planning level cost estimate: $ 457,000 (including roadway reconstruction)
Emerald St and Americana Blvd, Orchard St/Ann Morrison Park (Boise): This project proposes to reconfigure
Emerald St and Americana Blvd between Orchard St and Ann Morrison Park to add continuous bike lanes, filling
the gap that currently exists. This will require reduction of travel lanes. Project should also include completing
sidewalk gaps along the north side of Emerald St.
Planning level cost estimate: $ 1,000,000
2.1
Packet Pg.
-
8/13/2019 2013-09-10 City Council - Full Agenda-1067
13/14
Attachment 3: Recommended Economic Development Projects
6
Plaza Dr Extension (Eagle): This project proposes to extend Plaza Dr from 2nd
St to Iron Eagle Drive,
with a spur extending south across SH44 to improve access, connectivity, and circulation in downtown
Eagle. Due to access control issues, ACHD staff recommends excluding the proposed spur to or across
SH44.
Planning level cost estimate: $ 1,794,000
Royal Blvd Extension (Boise): This project proposes to extend Royal Blvd across 9th
St to Capitol Blvd,
and install full traffic signals at both intersections in order to improve vehicular access to the
Lusk/Royal area, and pedestrian connectivity across the 9th
/Capitol couplet.
Planning level cost estimate: $ 620,000
2.1
Packet Pg.
-
8/13/2019 2013-09-10 City Council - Full Agenda-1067
14/14
E
1
PBP
r
TCn
_
ity oY 201
epte
xpenditure
. PublicAnalysis:
ublic Workoise Riverarks.
dditional hquired. B
herefore, thonditionaleeded to fu
ource/UseSource
Use
________avid H. Bieayor
Bois3 Inte
ber 1
Changes
orks/Park$51,000 (o
s and Parkark Phase 2
draulic ansed on pha
e phase 2etter of Mad the phase
FundCapitalCapital
_________ter
im B
, 2013
and Rece-time)
and RecreHydraulic
lysis of thse 1 infor
ydraulic anp Revision2 study.
Dept/OrgPWPW
__
dget
eation (Ca
tion requenalysis ca
Boise Riation, a n
lysis will a(CLOMR).
Acct.TRevDon
ExpCapit
hang
pital Fund
t approvalital project
er floodwa-net rise
llow additiThe Friend
pe CBationalProj $
s
Boise
of a $51,0funded by
y in the Eolution is
nal studys of Parks
urrentudget
$023,749
iver Park
0 appropricontributio
ther Simplot achieva
f the riverave agreed
ProposedBudget$51,000$74,749
Phase 2
tion increan from the
t/River Pale for the
floodway ito contribut
BudgetChangeAmount
$51,000
$51,000
Page 1
ydraulic
e for theriends of
k area isloodway.
cluding ae $51,000
2.3