September 16-19, 2012 Chicago, IL 2012 Annual Conference & Exposition Installation of Multiple Deck-Girder Bridge Spans Utilizing A Rail-Mounted Launching Truss/Gantry Crane on Amtrak’s Empire Line Paul DelSignore, PE Senior Director Structures, Amtrak Joshua Kessler Senior Engineer Structures, Amtrak Paul H. Markelz President, Rcrane

Upload: letruc

Post on 25-May-2018

220 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Installation of Multiple Deck-Girder Bridge Spans Utilizing A Rail-Mounted

Launching Truss/Gantry Crane on Amtrak’s Empire Line

• Paul DelSignore, PE Senior Director Structures, Amtrak

• Joshua Kessler Senior Engineer Structures, Amtrak

• Paul H. MarkelzPresident, Rcrane

Page 2: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Introduction-Typical Construction

Page 3: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Amtrak’s Super Computer

Page 4: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Introduction-Rail Mounted Gantry Crane

Page 5: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Project Location• Stuyvesant, NY• 2 Bridges, 2 Tracks (4-Spans Total)• 17 Miles South of Albany• 126 Miles North of New York City• Along the East Bank of the Hudson River

Page 6: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Empire Line History

• Empire Line (Hudson Line)– Origins of this line trace back to the Troy

and Greenbush Railroad which was chartered in 1845

– Part of former New York Central’s infamous “Water Level Route” from New York to Chicago

Page 7: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Present/Future Operations

• 28 trains per day • 2011 Ridership over

1,000,000 Passengers • Future double track

capacity, more trains, and higher speed service

Page 8: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Present Conditions

Page 9: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Design

• Encased I-Beam Deck Girder

Page 10: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Encased I-beam Slab

Page 11: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Planning & Construction

Joshua Kessler Senior Engineer Structures, Amtrak

Page 12: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

PlanningSafetyQualityCost

Track OutagesMobilizationCoordination

Page 13: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Construction Schedule

• Week 1: Prep bridges and load flat cars on work train for Track 1 install

• Week 2: Replace Spans Track 1

• Week 3: Prep bridges and load flat cars on work train for Track 2 install

• Week 4: Replace Spans Track 2

Page 14: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Construction-Staging

Page 15: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Construction-Staging• Staging area was 16

miles from jobsite

• Industrial track used for staging

• Loaded new slabs with 250 ton crane

Page 16: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Work Train Staging

• New spans, track panels, and other material placed in proper sequence on the work train.

Page 17: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Mobilization

Page 18: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Construction

Page 19: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Construction

Page 20: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Construction

Page 21: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Construction

Page 22: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Construction

Page 23: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Construction

Page 24: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Construction

Page 25: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Project Efficiencies- Decreased track occupancy

outages significantly

- No restrictions on adjacent track or adjustments to train schedules

- Adjacent Track Protection- nine-1 hour fouls/day- one-2 ½ hour foul/day

- No nighttime work and reduced overtime hours

- Increased production and performance

- Increased safety

- 25% reduction in costs vs. traditional installation methods

Page 26: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Gantry Crane-Specifications

• Paul H. MarkelzPresident, Rcrane

Page 27: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Capacities/Dimensions

• Overall Length 89’ 4”• 10’ wide for travel, 18’ wide working width• Dual 40 ton maximum crane capacity• Interior working Dimensions:

– 57’ length, 13’ width, 8’ height

Page 28: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Travel Narrow - 10’ Wide

Page 29: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Working Width –18’ Out, 13’ Inside

Page 30: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Lifelines, Walkways, and Handrails

Page 31: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Dual 40 Ton Hoists-Set 60 Ton Load

Page 32: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Material Handling-Old Span

Page 33: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Material Handling-On Flat Cars

Page 34: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Material Handling-New Slabs

Page 35: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Material Handling-Between Cars

Page 36: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Self-Contained Work Train-Generators, air compressor, welder, tools, spare hoists

-Locomotive (or equivalent) required for tractive effort

Page 37: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

RCXX 2

Page 38: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Construction Video

Click Here to Start

Page 39: 2012 Annual Conference & Exposition Installation of ... · Launching Truss/Gantry Crane on ... Design • Encased I-Beam Deck Girder. September 16-19, ... DelSignore_MultipleBridgeSpanAmtrak.ppt

September 16-19, 2012 Chicago, IL

2012 Annual Conference & Exposition

Questions?

Presenters:• Paul DelSignore,PE

Senior Director Structures, Amtrak• Joshua Kessler

Senior Engineer Structures, Amtrak• Paul H. Markelz

President, Rcrane