2012-2013 fund - all entry

96
REPORT AS ON 10/02/2014 ` IN LAC NO. DATE 1 CONSTRUCTION OF BLOOD BANK IN KHATRA S.D. HOSPITAL COMPLEX EXECUTIVE ENGINEER, PUBLIC WORKS DEPARTMENT, BANKURA DIVISION-II AND EXECUTIVE ENGINEER, PUBLIC WORKS DEPARTMENT, MIDNAPORE ELECTRICAL DIVISION 62/PM(F)/P/ 1B-68/2012 03-05-2012 75.86656 75.86656 31-05-2013 CIVIL WORK COMPLETE; PROBLEM IN CONSTRUCTIO N OF PARTITION WALL 2 DEVELOPMENT AND REPAIRING OF DAMAGED CONDITION OF SCHOOL BUILDINGS WITH ELECTRIFICATION OF LOUPARA HIGH SCHOOL UNDER RAIPUR BLOCK BLOCK DEVELOPMENT OFFICER, RAIPUR BLOCK 85/PM(F)/P/ 1B-71/2012 & 321 09-05-2012 & 26-09-2012 4.50000 4.50000 100% 15-12-2012 4.50000 COMPLETE 3.1 RENOVATION OF CANAL FOR RESTORATION OF IRRIGATION POTENTIAL IN BETWEEN CH. 55.00 & CH. 92.00 INCLUDING CANAL STRUCTURES AT CH. 1.50 & CH. 63.00 UNDER ONDA BLOCK EXECUTIVE ENGINEER, BANKURA IRRIGATION DIVISION, 03242-254934 98/PM(F)/P/ 1B-67/2012 & 173/PM(F)/P /1B-67/2012 DATED 13- 07-2012 31-05-2012 26.75799 26.75799 100% COMPLETE DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 PHYSICAL PROGRESS NAME OF THE SCHEME RELEASED AMOUNT UC RECEIVED REMARKS SANCTIONED AMOUNT EXPECTED DATE OF COMPLETION SL. NO. IMPLEMENTING AGENCY WITH CONTACT DETAILS 76.26716 PUA DEPT.'S SANCTION ORDER

Upload: pupbankura

Post on 26-Nov-2015

74 views

Category:

Documents


6 download

TRANSCRIPT

Page 1: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE1 CONSTRUCTION OF

BLOOD BANK IN KHATRA

S.D. HOSPITAL COMPLEX

EXECUTIVE ENGINEER,

PUBLIC WORKS

DEPARTMENT, BANKURA

DIVISION-II AND EXECUTIVE

ENGINEER, PUBLIC WORKS

DEPARTMENT, MIDNAPORE

ELECTRICAL DIVISION

62/PM(F)/P/

1B-68/2012

03-05-2012 75.86656 75.86656 31-05-2013 CIVIL WORK

COMPLETE;

PROBLEM IN

CONSTRUCTIO

N OF

PARTITION

WALL

2 DEVELOPMENT AND

REPAIRING OF DAMAGED

CONDITION OF SCHOOL

BUILDINGS WITH

ELECTRIFICATION OF

LOUPARA HIGH SCHOOL

UNDER RAIPUR BLOCK

BLOCK DEVELOPMENT

OFFICER, RAIPUR BLOCK

85/PM(F)/P/

1B-71/2012

& 321

09-05-2012 &

26-09-2012

4.50000 4.50000 100% 15-12-2012 4.50000 COMPLETE

3.1 RENOVATION OF CANAL

FOR RESTORATION OF

IRRIGATION POTENTIAL IN

BETWEEN CH. 55.00 & CH.

92.00 INCLUDING CANAL

STRUCTURES AT CH. 1.50

& CH. 63.00 UNDER ONDA

BLOCK

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION, 03242-254934

98/PM(F)/P/

1B-67/2012

&

173/PM(F)/P

/1B-67/2012

DATED 13-

07-2012

31-05-2012 26.75799 26.75799 100% COMPLETE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

76.26716

PUA DEPT.'S SANCTION

ORDER

Page 2: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

3.2 RENOVATION OF CANAL

FOR RESTORATION OF

IRRIGATION POTENTIAL IN

BETWEEN CH. 92.00 & CH.

120.00 INCLUDING CANAL

STRUCTURES AT CH.

101.00 UNDER ONDA

BLOCK

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION, 03242-254934

98/PM(F)/P/

1B-67/2012

&

173/PM(F)/P

/1B-67/2012

DATED 13-

07-2013

31-05-2012 25.76252 25.76252 100% COMPLETE

3.3 RENOVATION OF CANAL

FOR RESTORATION OF

IRRIGATION POTENTIAL IN

BETWEEN CH. 204.10 &

CH. 232.00 INCLUDING

CANAL STRUCTURES AT

CH. 198.00 UNDER ONDA

BLOCK

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION, 03242-254934

98/PM(F)/P/

1B-67/2012

&

173/PM(F)/P

/1B-67/2012

DATED 13-

07-2014

31-05-2012 27.14059 27.14059 100% COMPLETE

4 228 UNITS OF

PISICULTURE SCHEME

WITHIN 14 BLOCKS OF

BANKURA AND KHATRA

SUB-DIVISION

ASSISTANT DIRECTOR OF

FISHERIES, BANKURA

105/PM(F)/P

/1B-79/2012

05-06-2012 11.85600 11.85600 100% 11.85600 COMPLETE

76.26716

Page 3: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

5 EXCAVATION OF WATER

HARVESTING TANK,

BOULDER PITCHING WORK

WITH TOE WALL,

CONSTRUCTION OF GHAT,

PLANTATION AND ECO-

DEVELOPMENT AT PUP

ADMINISTRATIVE

BUILDING PREMISES

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

106/PM(F)/P

/1B-88/2012

05-06-2012 55.12595 36.15924 85% 30-09-2013 36.15924 PLANTATION,

BORING

COMPLETE,

TANK AND

ALLIED WORK

TO BE

COMPLETED

VERY SHORTLY

6.1 SINKING OF MEDIUM

DUTY TUBE-WELL FOR

IRRIGATION IN MURAKATI

(KALARA) VILLAGE,

SALTORA GP, TALDANGRA

PS

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

110/PM(F)/P

/1B-77/2012

07-06-2012 3.03000 3.03000 100% 28-02-2013 COMPLETE

6.2 SINKING OF MEDIUM

DUTY TUBE-WELL FOR

IRRIGATION IN SATBAR

VILLAGE, SALTORA GP,

TALDANGRA PS

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

110/PM(F)/P

/1B-77/2012

07-06-2012 3.03000 3.03000 SITE NOT

AVAILABLE

6.3 SINKING OF MEDIUM

DUTY TUBE-WELL FOR

IRRIGATION IN KARANDIHI

VILLAGE, SALTORA GP,

TALDANGRA PS

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

110/PM(F)/P

/1B-77/2012

07-06-2012 3.03000 3.03000 SITE NOT

AVAILABLE

Page 4: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

7 CONSTRUCTION OF SC/ST

GIRLS HOSTEL BUILDING

OF BIRSHA MUNDA

MEMORIAL COLLEGE,

PIRRA, RAIPUR BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

RAIPUR

157/PM(F)/P

/1B-93/2012

06-07-2012 92.27288 68.30214 80% 30-05-2013 68.30214 WORK IN

PROGRESS

8 CONSTRUCTION OF

BOUNDARY WALL AT

P.R.M.S.

MAHAVIDYALAYA,

BARAGARI, JAMBONI

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

SARENGA

160/PM(F)/P

/1B-

130/2012

11-07-2012 48.84000 15-06-2013 WORK

STARTED

9 BORING OF A 200 x 150

MM. DIA TUBE-WELL OF

DEPTH 200 MT. AT

BHARAT SEVASHRAM

SANGHA, KENDUADIHI

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

161/PM(F)/P

/1B-

133/2012

11-07-2012 3.76948 1.77078 100% 15-04-2013 1.77078 COMPLETE

10 SINKING OF A DEEP TUBE-

WELL OF 200 MT. DEPTH

AND INSTALLATION OF

SUBMERSIBLE PUMP SET

AND NECESSARY WATER

DISTRIBUTION LINE OF

AMADER HASPATAL

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

171/PM(F)/P

/1B-

52/2011(PT.-

I)

13-07-2012 5.00819 3.51613 100% 15-04-2013 3.51613 COMPLETE

11 CONSTRUCTION OF

BRIDGE AT EKCHALA

(MARAKANALI),

GANGAJALGHATI P.S.

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

178/PM(F)/P

/1B-

116/2012

17-07-2012 25.00000 21.67155 85% 30-09-2013 21.67155 WORK IN

PROGRESS

Page 5: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

12.1 INFRASTRUCTURE

DEVELOPMENT WORKS AT

BANSIDI HIGH SCHOOL,

INDPUR

BLOCK DEVELOPMENT

OFFICER, INDPUR BLOCK

179/PM(F)/P

/1B-

150/2012

18-07-2012 20.77653 REVISED

ESTIMATE AS

SUBMITTED BY

BDO VETTED

FROM PUP ON

29/07/2013

12.2 REPAIRING AND

RENOVATION WORK OF

SCHOOL BUILDING AT

CHHATNA CHANDIDAS

VIDYAPITH, CHHATNA

BLOCK DEVELOPMENT

OFFICER, CHHATNA BLOCK

179/PM(F)/P

/1B-

150/2012

18-07-2012 14.48700 13.75664 100% 10-05-2013 13.75664 COMPLETE

13.1 CONSTRUCTION OF

CONCRETE ROAD FROM

BIKNA UPOR PARA TO

NAMO PARA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

181/PM(F)/P

/1B-20/2012

23-07-2012 16.45132 100% 30-04-2013 COMPLETE

13.2 CONSTRUCTION OF BRICK

WORK DRAIN FROM

BIKNA UPOR PARA TO

NAMO PARA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

181/PM(F)/P

/1B-20/2012

23-07-2012 10.18784 100% 30-06-2013 COMPLETE

13.3 CONSTRUCTION OF

CONCRETE ROAD FROM

RAMSAGAR BUS STAND

TO RAMSAGAR RLY.

STATION

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

181/PM(F)/P

/1B-20/2012

23-07-2012 23.58344 COMPLETE

13.4 CONSTRUCTION OF BRICK

WORK DRAIN FROM

RAMSAGAR BUS STAND

TO RAMSAGAR RLY.

STATION

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

181/PM(F)/P

/1B-20/2012

23-07-2012 20.26142 WORK IN

PROGRESS

36.16744 36.1674480% 30-09-2013

23.30520 23.30520

Page 6: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

14 CONSTRUCTION OF 15KM

BITUMINOUS ROAD FROM

DHANJHAR MORE TO

KARAPARA (BANSIDIHA)

AT RANIBANDH

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

187/PM(F)/P

/1B-

143/2012

25-07-2012 170.00000 170.00000 100% 31-07-2013 170.00000 COMPLETE

15 CONSTRUCTION OF ROAD

FROM RATANPUR TO

KRISHNAGAR AT ONDA

BLOCK

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

189/PM(F)/P

/1B-

144/2012

25-07-2012 117.61524 117.61524 45% 30-11-2013 117.36727 WORK IN

PROGRESS

16 CULTIVATION OF KHARIFF

ONION IN BANKURA

DISTRICT

DIRECTOR OF RESEARCH,

BIDHAN CHANDRA KRISHI

VISWAVIDYALAYA, P.O. -

KALYANI, DIST. - NADIA

190/PM(F)/P

/1B-

148/2012

25-07-2012 9.00000 9.00000 100% 2.16169 COMPLETE

17.1 ROY BUNDH SURFACE

FLOW MINOR IRRIGATION

SCHEME, BHABRIGORA

MOUZA, INDPUR BLOCK

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

191/PM(F)/P

/1B-

137/2012

25-07-2012 80.80050 80.80050 100% 26-04-2013 COMPLETE

17.2 PONDA BUNDH SURFACE

FLOW MINOR IRRIGATION

SCHEME, RADHANAGAR

MOUZA, INDPUR BLOCK

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

191/PM(F)/P

/1B-

137/2012

25-07-2012 56.01009 56.01009 100% 26-04-2013 COMPLETE

17.3 UPAR BUNDH SURFACE

FLOW MINOR IRRIGATION

SCHEME, SAYERDI

MOUZA, INDPUR BLOCK

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

191/PM(F)/P

/1B-

137/2012

25-07-2012 27.27898 27.27898 100% 26-04-2013 COMPLETE

13.49815

Page 7: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

17.4 KAMALYA BELGORIA

SURFACE FLOW MINOR

IRRIGATION SCHEME,

KAJALKURA MOUZA,

INDPUR BLOCK

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

191/PM(F)/P

/1B-

137/2012

25-07-2012 21.81970 21.81970 100% 26-04-2013 COMPLETE

17.5 NATUN BUNDH SURFACE

FLOW MINOR IRRIGATION

SCHEME, LEDAPALASH

MOUZA, INDPUR BLOCK

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

191/PM(F)/P

/1B-

137/2012

25-07-2012 35.54999 35.54999 100% 01-01-2013 COMPLETE

17.6 LAYEK BUNDH SURFACE

FLOW MINOR IRRIGATION

SCHEME, KAJALKURA

MOUZA, INDPUR BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

191/PM(F)/P

/1B-

137/2012

25-07-2012 43.58450 31.82655 100% 30-06-2013 31.82655 COMPLETE

17.7 ARALDIHI SCHOOL BUNDH

SURFACE FLOW MINOR

IRRIGATION SCHEME,

ARALDIHI MOUZA,

INDPUR BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

191/PM(F)/P

/1B-

137/2012

25-07-2012 20.11056 11.76998 100% 30-06-2013 11.76998 COMPLETE

17.8 HURHURA BUNDH

SURFACE FLOW MINOR

IRRIGATION SCHEME,

MADHABPUR MOUZA,

GANGAJALGHATI BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

191/PM(F)/P

/1B-

137/2012

25-07-2012 35.27534 25.03379 100% 30-06-2013 25.03379 COMPLETE

13.49815

Page 8: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

17.9 CONSTRUCTION OF CHECK

DAM AND

AUGMENTATION OF

RESERVOIR, MAHESNA

MOUZA, CHHATNA BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

191/PM(F)/P

/1B-

137/2012

25-07-2012 38.72656 65% 30-11-2013 WORK IN

PROGRESS

18.1 BANER BUNDH MINOR

IRRIGATION SCHEME IN

CHHATNA BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

192/PM(F)/P

/1B-

149/2012

26-07-2012 47.69337 25.98405 100% 30-05-2013 25.98405 COMPLETE

18.2 RESHER PUKUR MINOR

IRRIGATION SCHEME IN

CHHATNA BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

192/PM(F)/P

/1B-

149/2012

26-07-2012 37.88384 21.49535 100% 30-05-2013 21.49535 COMPLETE

18.3 DHOBAGORA SOLER

BUNDH IN INDPUR BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

192/PM(F)/P

/1B-

149/2012

26-07-2012 61.77828 35.49425 90% 30-11-2013 35.49425 WORK IN

PROGRESS

18.4 BARABUNDH MINOR

IRRIGATION SCHEME IN

INDPUR BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

192/PM(F)/P

/1B-

149/2012

26-07-2012 29.12293 13.55864 100% 30-05-2013 13.55864 COMPLETE

19 CONSTRUCTION OF A

VOCATIONAL TRAINING

CENTRE AND HOSTEL

BUILDING AT AMADER

HASPATAL, CHHATNA

FOUNDATION FOR HEALTH

ACTION

226/PM(F)/P

/1B-52/2011

16-08-2012 60.00607 60.00607 100% 30-06-2013 39.49217 COMPLETE

Page 9: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

20 CONSTRUCTION OF

BITUMINOUS ROAD FROM

KHATRA KANGSABATI

SISHU VIDYALAYA TO

BANTILLA VILLAGE,

KHATRA BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

284/PM(F)/P

/1B-

178/2012

07-09-2012 72.61834 27.30297 85% 30-09-2013 27.30297 WORK IN

PROGRESS

21 CONSTRUCTION OF

INCOMPLETE TOURIST

COTTAGE AND

INCOMPLETE TOURIST

HUT AT ENDOGENOUS

TOURISM PROJECT,

BARAGHUTU,

MUKUTMANIPUR, KHATRA

PS

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH EO,

KHATRA

292/PM(F)/P

/1B-

187/2012

12-09-2012 19.63154 10.41345 60% 10.41345 WORK IN

PROGRESS

22.1 CEMENT CONCRETE ROAD

AT PALAJURIA VILLAGE

FROM ASTHIR BUNDH TO

EXISTING CONCRETE

ROAD, GANGAJALGHATI

PS

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

304/PM(F)/P

/1B-

116/2012

(PT.-I)

17-09-2012 15.68943 15.55921 100% 15-05-2013 15.55921 COMPLETE

22.2 CEMENT CONCRETE ROAD

AT RAJARAMPUR VILLAGE,

GANGAJALGHATI PS

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

304/PM(F)/P

/1B-

116/2012

(PT.-I)

17-09-2012 22.33824 13.55160 100% 15-05-2013 13.55160 COMPLETE

Page 10: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

22.3 IMPROVEMENT OF

MORRUM ROAD FROM

JAMBEDIA JORE TO

VIRINGI MORE VIA VIRINGI

VILLAGE, GANGAJALGHATI

PS

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

304/PM(F)/P

/1B-

116/2012

(PT.-I)

17-09-2012 23.89221 50% 31-10-2013 WORK IN

PROGRESS

22.4 IMPROVEMENT OF

MORRUM ROAD FROM

EKCHALA MORE TO

MORAKANALI MORE VIA

EKCHALA VILLAGE,

GANGAJALGHATI PS

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

304/PM(F)/P

/1B-

116/2012

(PT.-I)

17-09-2012 24.37135 9.56597 80% 30-09-2013 9.56597 WORK IN

PROGRESS

23 CONSTRUCTION OF

BOUNDARY WALL AT

VIVEKANANDA SIKSHA

MANDIR (JR. HIGH

SCHOOL) AT MOLEBONA,

BANKURA-I BLOCK

SCHOOL AUTHORITY,

VIVEKANANDA SIKSHA

MANDIR (JR. HIGH SCHOOL)

313/PM(F)/P

/1B-

186/2012

24-09-2012 25.97403 25.97403 100% 20-04-2013 25.97403 COMPLETE

24 DISEMINATION OF AGRO

TECHNIQUES FOR

GROWING AND

PROCESSING OF

TURMERIC IN NON-

TRADITIONAL AREAS OF

PASCHIMANCHAL FOR

LIVELIHOOD

DIRECTOR OF RESEARCH,

BIDHAN CHANDRA KRISHI

VISWAVIDYALAYA, P.O. -

KALYANI, DIST. - NADIA

322/PM(F)/P

/1B-

188/2012

26-09-2012 19.50000 19.50000 6.96604 ONGOING,

PROJECT HAS 3

YRS. DURATION

Page 11: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

25.1 CONSTRUCTION OF

BOUNDARY WALL AT

BARIKUL UDAY BHARATI

HIGH SCHOOL (HS),

BARIKUL

BLOCK DEVELOPMENT

OFFICER, RANIBUNDH

BLOCK

323/PM(F)/P

/1B-

193/2012

27-09-2012 21.23786 20.21763 100% 30-04-2013 20.21763 COMPLETE

25.2 UPGRADATION TO

BITUMINOUS ROAD FROM

AHANDA PIYARSEE GIRLS

HIGH SCHOOL TO NH-60A,

INDPUR PS

BLOCK DEVELOPMENT

OFFICER, INDPUR BLOCK

323/PM(F)/P

/1B-

193/2012

27-09-2012 50.95586 17.77060 25% 31-05-2013 16.78116 WORK IN

PROGRESS

26.1 RENOVATION OF CANAL

IN THE FORM OF

RESTORING & LINING IN

BETWEEN CH. 126.70 AND

CH. 160.00 OF DY-4 OF

B.B.C. FOR RESTORATION

OF DISTRESSED

IRRIGATION POTENTIAL

WITHIN ONDA BLOCK,

DIST. BANKURA UNDER

BANKURA IRRIGATION

DIVISION

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION, 03242-254934

342/PM(F)/P

/1B-

167/2012

09-10-2012 31.75000 31.75000 100% 30-04-2013 COMPLETE120.94868

Page 12: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

26.2 RENOVATION OF CANAL

IN THE FORM OF

RESECTIONING & LINING

IN BETWEEN CH. 160.00

AND CH. 198.80 OF DY-4

OF B.B.C. FOR

RESTORATION OF

DISTRESSED IRRIGATION

POTENTIAL WITHIN ONDA

BLOCK, DIST. BANKURA

UNDER BANKURA

IRRIGATION DIVISION

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION, 03242-254934

342/PM(F)/P

/1B-

167/2012

09-10-2012 38.95000 38.95000 100% 30-04-2013 COMPLETE

26.3 RENOVATION OF CANAL

IN THE FORM OF

RESECTIONING & LINING

IN BETWEEN CH.198.80

AND CH. 257.50 OF DY-4

OF B.B.C. FOR

RESTORATION OF

DISTRESSED IRRIGATION

POTENTIAL WITHIN ONDA

BLOCK, DIST. BANKURA

UNDER BANKURA

IRRIGATION DIVISION.

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION, 03242-254934

342/PM(F)/P

/1B-

167/2012

09-10-2012 49.98000 49.98000 85% 31-12-2013 WORK IN

PROGRESS

120.94868

Page 13: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

26.4 RESTORATION OF

DISTRESSED IRRIGATION

POTENTIAL IN THE FORM

OF RE-SECTIONING OF

CANAL INCLUDING

CEMENT CONCRETE

LINING IN BETWEEN CH.

836.00 & CH 980.22 OF

SIMLAPAL BRANCH CANAL

WITHIN SIMLAPAL BLOCK,

DIST. BANKURA UNDER

BANKURA IRRIGATION

DIVISION

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION, 03242-254934

342/PM(F)/P

/1B-

167/2012

09-10-2012 49.91000 49.91000 30% 31-12-2013 WORK IN

PROGRESS

26.5 RESTORATION OF

DISTRESSED IRRIGATION

POTENTIAL IN THE FORM

OF RE-SECTIONING OF

CANAL INCLUDING

CEMENT CONCRETE

LINING & REPAIR OF

STRUCTURES IN

DISTRIBUTORY CANAL NO.

15, 16, 17, 18 OF

SIMLAPAL BRANCH CANAL

WITHIN SIMLAPAL BLOCK,

DIST. BANKURA UNDER

BANKURA IRRIGATION

DIVISION

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION, 03242-254934

342/PM(F)/P

/1B-

167/2012

09-10-2012 49.89000 49.89000 70% 31-12-2013 WORK IN

PROGRESS

120.94868

Page 14: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

26.6 RESTORATION OF

DISTRESSED IRRIGATION

POTENTIAL IN THE FORM

OF CANAL INCLUDING

CEMENT CONCRETE

LINING & REPAIR OF

STRUCTURES IN

DISTRIBUTARY CANAL NO.

13 OF SIMLAPAL BRANCH

CANAL WITHIN SIMLAPAL

BLOCK, DIST. BANKURA

UNDER BANKURA

IRRIGATION DIVISION

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION, 03242-254934

342/PM(F)/P

/1B-

167/2012

09-10-2012 31.85000 31.85000 70% 31-12-2013 WORK IN

PROGRESS

27.1 WORK OF SANITATION AT

AMDANGA HOSTEL,

SIMLAPAL BLOCK

SECRETARY, YUGACHARYA

VIVEKANANDA SEVA SAMITY

362/PM(F)/P

/1B-

217/2012

30-10-2012 2.99893 2.99893 100% 30-06-2013 2.99893 COMPLETE

27.2 SINKING OF SUBMERSIBLE

PUMP AND PIPELINE AT

AMDANGA HOSTEL,

SIMLAPAL BLOCK

SECRETARY, YUGACHARYA

VIVEKANANDA SEVA SAMITY

362/PM(F)/P

/1B-

217/2012

30-10-2012 2.81251 2.81251 100% 30-06-2013 2.81251 COMPLETE

120.94868

Page 15: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

28 COMPLETION OF

DEVELOPMENT OF TRIBAL

TANK ADJUNCTION TO

SUSUNIA HILL INCLUDING

BOATING CLUB AND

PISICULTURE, CHHATNA

BLOCK

BLOCK DEVELOPMENT

OFFICER, CHHATNA BLOCK

366/PM(F)/P

/1B-

219/2012

06-11-2012 57.50786 27.07305 60% 30-06-2013 27.07305 TANK

EXCAVATION IS

IN PROGRESS

29.1 CONSTRUCTION OF

BOUNDARY WALL AT

BHARAT SEVASHRAM

SANGHA, KHATRA PS

SECRETARY, BHARAT

SEVASHRAM SANGHA,

KHATRA

375/PM(F)/P

/1B-

231/2012

20-11-2012 21.07423 21.07423 100% 21.07423 COMPLETE

29.2 CONSTRUCTION OF

FENCING AT BHARAT

SEVASHRAM SANGHA,

KHATRA PS

SECRETARY, BHARAT

SEVASHRAM SANGHA,

KHATRA

375/PM(F)/P

/1B-

231/2012

20-11-2012 5.25124 5.25124 100% 5.25124 COMPLETE

30 CONSTRUCTION OF

HOSTEL BUILDING,

KITCHEN STORE, DINING

AND WATER CLOSET BATH

OF SALDAHA JUNIOR HIGH

SCHOOL, SALDAHA

VILLAGE, TALDANGRA

BLOCK

SCHOOL AUTHORITY,

SALDAHA JUNIOR HIGH

SCHOOL

377/PM(F)/P

/1B-

186/2012

21-11-2012 14.39078 14.39078 100% 14.39078 COMPLETE

Page 16: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

31 CONSTRUCTION OF

BOUNDARY WALL OF

JYOTI PRATIBANDHI

PUNARBASAN KENDRA,

BANKURA (SADAR) SUB-

DIVISION

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

378/PM(F)/P

/1B-

227/2012

21-11-2012 18.78989 18.21910 100% 31-05-2013 18.21910 COMPLETE

32 RE-EXCAVATION AND

CONSTRUCTION OF

BATHING GHAT, GUARD

WALL ETC. OF BHARAT

SEVASHRAM SANGHA

POND, KHATRA BLOCK

SECRETARY, BHARAT

SEVASHRAM SANGHA,

KHATRA

379/PM(F)/P

/1B-

216/2012

21-11-2012 23.57070 23.57070 100% 31-05-2013 23.57070 COMPLETE

33 CONSTRUCTION OF

BOUNDARY WALL AT

PAIRASOLE DUBURIA

JUNIOR HIGH SCHOOL,

MEJIA BLOCK

SCHOOL AUTHORITY,

PAIRASOLE DUBURIA

JUNIOR HIGH SCHOOL

387/PM(F)/P

/1B-

223/2012

23-11-2012 10.26511 10.26511 50% 5.05142 WORK IN

PROGRESS

34.1 CONSTRUCTION OF SIDE

DRAIN FROM

PANCHMURA SABRAKONE

ROAD TO PANCHMURA

KUMARPARA, TALDANGRA

BLOCK

EXECUTIVE OFFICER,

TALDANGRA PANCHAYAT

SAMITY

402/PM(F)/P

/1B-

189/2012

05-12-2012 22.64636 22.64636 50% 31-05-2013 10.00000 WORK IN

PROGRESS

Page 17: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

34.2 CONSTRUCTION OF PCC

ROAD FROM PANCHMURA

SABRAKONE ROAD TO

PANCHMURA

KUMARPARA, TALDANGRA

BLOCK

EXECUTIVE OFFICER,

TALDANGRA PANCHAYAT

SAMITY

402/PM(F)/P

/1B-

189/2012

05-12-2012 24.86973 24.86973 100% 23.20588 COMPLETE

34.3 CONSTRUCTION OF PCC

ROAD OVER EXISTING

VILLAGE ROAD AT

PANCHMURA

KUMARPARA, TALDANGRA

BLOCK

EXECUTIVE OFFICER,

TALDANGRA PANCHAYAT

SAMITY

402/PM(F)/P

/1B-

189/2012

05-12-2012 12.49113 12.49113 100% 31-05-2013 11.86479 COMPLETE

35 RE-EXCAVATION OF NAGRI

SAHEB BUNDH, KHATRA

P.S.

EXECUTIVE OFFICER,

KHATRA PANCHAYAT

SAMITY

410/PM(F)/P

/1B-

235/2012

11-12-2012 37.55526 37.55526 100% 30-04-2013 37.37119 COMPLETE

36 CONSTRUCTION OF

CONCRETE ROAD FROM

KARAPARA CHOWMATHA

TO NAMOPARA IN

PURUSHOTTAMPUR

VILLAGE,

PURUSHOTTAMPUR

MAUZA, INDPUR BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

415/PM(F)/P

/1B-

238/2012

13-12-2012 37.12752 18.76838 50% 30-09-2013 18.76838 WORK IN

PROGRESS

Page 18: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

37 CONSTRUCTION OF 3 NOS.

OF COTTAGE AND ALLIED

WORKS FOR COMPLETION

OF MURUTHBAHA ECO

PARK AT SUSUNIA,

BANKURA

BLOCK DEVELOPMENT

OFFICER, CHHATNA BLOCK

434/PM(F)/P

/1B-

192/2012

20-12-2012 58.10722 17.58357 30% 30-06-2013 17.58357 CONST. OF

COTTAGE

RUNNING

UPTO PLINTH

LEVEL

38 CONSTRUCTION OF EXTRA

FOUNDATION FOR

ADDITIONAL CLASSROOMS

ON 1ST FLOOR OF

PUNISOLE NASRUL ULLOM

SIDDQUIA M.S.K. (SR.

MADRASAH TYPE), ONDA

PS

EXECUTIVE OFFICER, ONDA

PANCHAYAT SAMITY

437/PM(F)/P

/1B-

254/2012

21-12-2012 7.35000 7.35000 NO

INFORMATION

RECEIVED

39 DEVELOPMENT OF

TECHNOLOGY FOR

PRODUCTION OF WINE

GRAPES IN DROUGHT

PRONE AREA OF BANKURA

DISTRICT (TOTAL 41.24000

LAC)

BIDHAN CHANDRA KRISHI

VISWAVIDYALAYA,

MOHANPUR, NADIA

439/PM(F)/P

/1B-

236/2012

24-12-2012 16.30400 16.30400 40% PROJECT IS

ONGOING

Page 19: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

40.1 RENOVATION OF CANAL

IN THE FORM OF

RESECTIONING & LINING

IN BETWEEN CH. 258.09

AND CH. 286.112 OF DY-4

OF B.B.C. FOR

RESTORATION OF

DISTRESSED IRRIGATION

POTENTIAL WITHIN ONDA

BLOCK, DIST. – BANKURA

UNDER BANKURA

IRRIGATION DIVISION

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION, 03242-254934

01/PM(F)/P/

1B-67/2012

04-01-2013 32.78000 32.78000 15% 31-12-2013 WORK IN

PROGRESS

40.2 RENOVATION OF CANAL

IN THE FORM OF

RESECTIONING & LINING

IN BETWEEN CH. 287.506

AND CH. 323.936 OF DY-4

OF B.B.C. FOR

RESTORATION OF

DISTRESSED IRRIGATION

POTENTIAL WITHIN ONDA

BLOCK, DIST. – BANKURA

UNDER BANKURA

IRIGATION DIVISION

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION, 03242-254934

01/PM(F)/P/

1B-67/2012

04-01-2013 44.89000 44.89000 15% 31-12-2013 WORK IN

PROGRESS

Page 20: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

40.3 RENOVATION OF CANAL

IN THE FORM OF

RESECTIONING & LINING

IN BETWEEN CH. 324.609

AND CH. 368.00 OF DY-4

OF B.B.C. FOR

RESTORATION OF

DISTRESSED IRRIGATION

POTENTIAL WITHIN ONDA

BLOCK, DIST. – BANKURA

UNDER BANKURA

IRRIGATION DIVISION

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION, 03242-254934

01/PM(F)/P/

1B-67/2012

04-01-2013 49.98000 49.98000 15% 31-12-2013 WORK IN

PROGRESS

40.4 RENOVATION OF CANAL

IN THE FORM OF

RESECTIONING & LINING

IN BETWEEN CH. 368.886

AND CH. 411.00 OF DY-4

OF B.B.C. FOR

RESTORATION OF

DISTRESSED IRRIGATION

POTENTIAL WITHIN ONDA

BLOCK, DIST. – BANKURA

UNDER BANKURA

IRRIGATION DIVISION

EXECUTIVE ENGINEER,

BANKURA IRRIGATION

DIVISION, 03242-254934

01/PM(F)/P/

1B-67/2012

04-01-2013 49.20000 49.20000 15% 15-07-2013 WORK IN

PROGRESS

Page 21: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

41.1 RESTORATION OF LOST

IRRIGATION POTENTIAL BY

M/R TO CAST IN SITU

CEMENT CONCRETE

LINING IN BETWEEN CH.

14.00 TO CH. 18.00, CH.

38.00 TO CH. 42.00 ETC.

OF DY-03 OF R.M.B.C.,

MUKUTMONIPUR,

KHATRA BLOCK

EXECUTIVE ENGINEER,

KANGSABATI CANALS

DIVISION - II, KHATRA,

BANKURA

02/PM(F)/P/

1B-188/2012

04-01-2013 23.82127 23.82127 100% 30-06-2013 COMPLETE

41.2 IMPROVEMENT OF

IRRIGATION POTENTIAL

AND CANAL SYSTEM BY

RESECTIONING &

CONSTRUCTION OF

CONCRETE LINING FROM

CH. 344.00 TO CH. 359.00

OF MR-3 OF DY-08 OF

R.M.B.C. WITHIN RAIPUR

BLOCK

EXECUTIVE ENGINEER,

KANGSABATI CANALS

DIVISION - II, KHATRA,

BANKURA

02/PM(F)/P/

1B-188/2012

04-01-2013 24.23655 24.23655 100% COMPLETE

Page 22: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

41.3 IMPROVEMENT OF

IRRIGATION POTENTIAL

AND CANAL SYSTEM BY

RESECTIONING &

CONSTRUCTION OF

CONCRETE LINING FROM

CH. 328.00 TO CH.343.00

OF MR-3 OF DY-8 OF

R.M.B.C. WITHIN RAIPUR

BLOCK

EXECUTIVE ENGINEER,

KANGSABATI CANALS

DIVISION - II, KHATRA,

BANKURA

02/PM(F)/P/

1B-188/2012

04-01-2013 24.37774 24.37774 100% COMPLETE

41.4 RESTORATION OF LOST

IRRIGATION POTENTIAL OF

DY-06 OF K.M.C.(U) FROM

CH. 128.00 TO CH.132.0O

AND 135.00 TO CH. 138.00

WITHIN SIMLAPAL BLOCK

EXECUTIVE ENGINEER,

KANGSABATI CANALS

DIVISION - II, KHATRA,

BANKURA

02/PM(F)/P/

1B-188/2012

04-01-2013 7.72585 7.72585 100% COMPLETE

41.5 RESTORATION OF LOST

IRRIGATION POTENTIAL OF

DY-08 OF S.M.C.(U) FROM

CH. 288.00 TO CH. 231.50,

CH. 233.50 TO CH. 238.50

ETC. WITHIN KHATRA

BLOCK

EXECUTIVE ENGINEER,

KANGSABATI CANALS

DIVISION - II, KHATRA,

BANKURA

02/PM(F)/P/

1B-188/2012

04-01-2013 10.01345 10.01345 85% 31-12-2013 WORK IN

PROGRESS

Page 23: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

41.6 RESTORATION OF LOST

IRRIGATION POTENTIAL OF

DY-08 OF S.M.C.(U) FROM

CH. 88.00 TO CH. 207.00

WITHIN KHATRA BLOCK

EXECUTIVE ENGINEER,

KANGSABATI CANALS

DIVISION - II, KHATRA,

BANKURA

02/PM(F)/P/

1B-188/2012

04-01-2013 10.16305 10.16305 85% 31-12-2013 WORK IN

PROGRESS

42.1 IMPROVEMENT OF RIDING

QUALITY OF BANKURA-

SALTORA ROAD FROM

18.60 KMP TO 19.20 KMP

(KHARBONA BAZAR) IN

THE DISTRICT OF

BANKURA

EXECUTIVE ENGINEER, PWD,

BANKURA DIVISION

13/PM(F)/P/

1B-247/2012

24-01-2013 18.13512 36.27023

42.2 IMPROVEMENT OF RIDING

QUALITY OF BANKURA-

SALTORA ROAD FROM

12.31 KMP TO 14.20 KMP

(CHHATNA BAZAR) IN THE

DISTRICT OF BANKURA

EXECUTIVE ENGINEER, PWD,

BANKURA DIVISION

13/PM(F)/P/

1B-247/2012

24-01-2013 40.67724 81.35448

43.1 CONSTRUCTION OF

LIBRARY BUILDING AT

RAMCHANDRA TARUN

PALLY, MEJIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

19/PM(F)/P/

1B-253/2012

24-01-2013 13.38992 9.51356 60% 30-11-2013 9.51356 WORK IN

PROGRESS

*FULL

AMOUNT

RELEASED BY

MISTAKE, BUT

AS OTHER

SOURCE OF

FUND

RECEIVED BY

EE, PWD

ENTIRE

AMOUNT WILL

BE REFUNDED

TO PUP

Page 24: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

43.2 CONSTRUCTION OF

CEMENT CONCRETE ROAD

FROM LALBAZAR PRIMARY

SCHOOL TO LALBAZAR

MASJID (IN 3 PART),

ARDHAGRAM GP, MEJIA

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

19/PM(F)/P/

1B-253/2012

24-01-2013 24.43413 16.95020 100% 16.95020 COMPLETE

44 REPAIRING OF CENTRAL

LABORATORY OF PMGSY

CELL OF BANKURA

DIVISION

ADDITIONAL EXECUTIVE

OFFICER, BANKURA ZILLA

PARISHAD

23/PM(F)/P/

1B-259/2012

30-01-2013 6.21360 6.21360 NOT STARTED

45.1 RENOVATION OF

DILAPIDATED ROAD FROM

MAIN ROAD OF

NABAJIBANPUR VILLAGE

(SAMABAY BANK) TO

BORO POOL (TANTKANALI)

BLOCK DEVELOPMENT

OFFICER, BANKURA-II BLOCK

71/PM(F)/P/

1B-25/2013

11-03-2013 4.00000 15-07-2013 COMPLETE

OUT OF NREGS

FUND

45.2 RENOVATION OF

DILAPIDATED ROAD FROM

BADRA MORE TO

NADIGHAT

BLOCK DEVELOPMENT

OFFICER, BANKURA-II BLOCK

71/PM(F)/P/

1B-25/2013

11-03-2013 5.00000 15-07-2013 STARTED SOON

Page 25: 2012-2013 Fund - All Entry

REPORT AS ON 10/02/2014 ` IN LAC

NO. DATE

DISTRICT: BANKURADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

PHYSICAL

PROGRESS

NAME OF THE SCHEME RELEASED

AMOUNT

UC RECEIVED REMARKSSANCTIONED

AMOUNT

EXPECTED DATE

OF

COMPLETION

SL. NO. IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

46.1 CONSTRUCTION OF SC/ ST

HOSTEL BUILDING AT

DUMURTORE BAGBADINI

HIGH SCHOOL, RAIPUR

BLOCK

SCHOOL AUTHORITY,

DUMURTORE BAGBADINI

HIGH SCHOOL

99/PM(F)/P/

1B-24/2013

18-03-2013 20.78564 20.78564 50% 12.19032 WORK IN

PROGRESS

46.2 SINKING OF DEEP TUBE-

WELL AT DUMURTORE

BAGBADINI HIGH SCHOOL,

RAIPUR BLOCK

SCHOOL AUTHORITY,

DUMURTORE BAGBADINI

HIGH SCHOOL

99/PM(F)/P/

1B-24/2013

18-03-2013 3.59500 3.59500 100% 3.59500 COMPLETE

TOTAL: 2744.06355 2276.14612 1353.71976

Page 26: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE1 IMPLEMENTATION OF 69

(SIXTY NINE) NOS. OF

SCHEMES IN RESPECT OF

RAJNAGAR BLOCK

EXECUTIVE OFFICER,

RAJNAGAR PANCHAYAT

SAMITY

256/PM(F)/P

/1B-31/2012

24-08-2012 123.37000 123.37000 99% 123.36673 WORK IN

PROGRESS

2 IMPLEMENTATION OF 23

(TWENTY THREE) NOS. OF

SCHEMES IN RESPECT OF

MD. BAZAR BLOCK

EXECUTIVE OFFICER, MD.

BAZAR PANCHAYAT SAMITY

257/PM(F)/P

/1B-32/2012

24-08-2012 120.32000 120.32000 100% 120.32000 COMPLETE

3 IMPLEMENTATION OF 5

(FIVE) NOS. OF SCHEMES

IN RESPECT OF NALHATI-I

BLOCK

EXECUTIVE OFFICER,

NALHATI-I PANCHAYAT

SAMITY; 03465-255236;

9474766664;

[email protected]

259/PM(F)/P

/1B-34/2012

24-08-2012 37.01500 37.01500 100% 37.01500 COMPLETE

4 IMPLEMENTATION OF 8

(EIGHT) NOS. OF SCHEMES

IN RESPECT OF

ILLAMBAZAR BLOCK

EXECUTIVE OFFICER,

ILLAMBAZAR PANCHAYAT

SAMITY

260/PM(F)/P

/1B-35/2012

24-08-2012 28.06500 28.06500 100% 28.06500 COMPLETE

5 IMPLEMENTATION OF 29

(TWENTY NINE) NOS. OF

SCHEMES IN RESPECT OF

BOLPUR-SRINIKETAN

BLOCK

EXECUTIVE OFFICER,

BOLPUR-SRINIKETAN

PANCHAYAT SAMITY; 03463-

264280/ 264172/

9434040654,

[email protected]

261/PM(F)/P

/1B-36/2012

24-08-2012 100.72500 100.72500 100% 100.72500 COMPLETE

DISTRICT: BIRBHUMDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

Page 27: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: BIRBHUMDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

6 IMPLEMENTATION OF 61

(SIXTY ONE) NOS. OF

SCHEMES IN RESPECT OF

SURI-I BLOCK

EXECUTIVE OFFICER, SURI-I

PANCHAYAT SAMITY, 03462-

225409/ 9434004880

262/PM(F)/P

/1B-41/2012

24-08-2012 124.53500 124.53500 100% 113.35277 COMPLETE

7 IMPLEMENTATION OF 35

(THIRTY FIVE) NOS. OF

SCHEMES IN RESPECT OF

DUBRAJPUR BLOCK

EXECUTIVE OFFICER,

DUBRAJPUR PANCHAYAT

SAMITY

266/PM(F)/P

/1B-29/2012

27-08-2012 103.29000 103.29000 95% 100.89902 WORK IN

PROGRESS

8 IMPLEMENTATION OF 60

(SIXTY) NOS. OF SCHEMES

IN RESPECT OF MURARAI-I

BLOCK

EXECUTIVE OFFICER,

MURARAI-I PANCHAYAT

SAMITY

267/PM(F)/P

/1B-28/2012

27-08-2012 76.24000 76.24000 100% 76.24000 COMPLETE

9 IMPLEMENTATION OF 8

(EIGHT) NOS. OF SCHEMES

IN RESPECT OF

KHOYRASOLE BLOCK

EXECUTIVE OFFICER,

KHOYRASOLE PANCHAYAT

SAMITY

268/PM(F)/P

/1B-30/2012

27-08-2012 29.53500 29.53500 90% 26.53500 WORK IN

PROGRESS

10 IMPLEMENTATION OF 48

(FORTY EIGHT) NOS. OF

SCHEMES IN RESPECT OF

RAMPURHAT-I BLOCK

EXECUTIVE OFFICER,

RAMPURHAT-I PANCHAYAT

SAMITY

269/PM(F)/P

/1B-33/2012

27-08-2012 58.50000 58.50000 100% 58.50000 COMPLETE

11 CONSTRUCTION OF MINI

BARRAGE OVER KANA

AJOY AT UPARKHARA

MOUZA, BOLPUR-

SRINIKETAN PS (5TH

INSTALMENT)

DISTRICT MAGISTRATE,

BIRBHUM

329/PM(F)/P

/1B-89/2008

(PT.-I)

28-09-2012 144.68000 144.68000 CIVIL PART

COMPLETE

Page 28: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: BIRBHUMDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

12.1 IMPROVEMENT OF RIDING

QUALITY AND

STRENGTHENING OF S/R

TO RAMPURHAT —

DUMKA ROAD FROM 0.0

KM TO 3.00 KM AND 9.00

KM TO 12.30 KM UNDER

RAMPURHAT SUB-

DIVISION

EXECUTIVE ENGINEER,

P.W.D., BIRBHUM DIVISION,

03462-255261, 9830149949,

[email protected]

351/PM(F)/P

/1B-

133/2011

12-10-2012 101.96240 101.96240 100% 31-03-2013 76.51008 COMPLETE

12.2 IMPROVEMENT OF RIDING

QUALITY AND

STRENGTHENING OF S/R

TO SURI — MD. BAZAR

ROAD FROM 0.0 KM TO

1.00 KM AND 3.81 KM TO

5.60 UNDER SURI SUB-

DIVISION

EXECUTIVE ENGINEER,

P.W.D., BIRBHUM DIVISION,

03462-255261, 9830149949,

[email protected]

351/PM(F)/P

/1B-

133/2011

12-10-2012 47.70926 47.70926 100% 31-03-2013 24.35613 COMPLETE

12.3 IMPROVEMENT &

STRENGTHENING OF

KHAGRA — JOYDEV ROAD

FROM 0.0 KM TO 8.00 KM

UNDER BOLPUR SUB-

DIVISION

EXECUTIVE ENGINEER,

P.W.D., BIRBHUM DIVISION,

03462-255261, 9830149949,

[email protected]

351/PM(F)/P

/1B-

133/2011

12-10-2012 171.52255 171.52255 100% 31-03-2013 137.10440 COMPLETE

Page 29: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: BIRBHUMDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

12.4 IMPROVEMENT &

STRENGTHENING OF

BOLPUR — ILLAMBAZAR

ROAD FROM 1.0 KM TO

9.40 KM EXCLUDING 3.0

KM TO 5.20 KM UNDER

BOLPUR SUB-DIVISION

EXECUTIVE ENGINEER,

P.W.D., BIRBHUM DIVISION,

03462-255261, 9830149949,

[email protected]

351/PM(F)/P

/1B-

133/2011

12-10-2012 131.89738 131.89738 95% 31-08-2013 131.89738 WORK IN

PROGRESS,

2012-13 FUND

UTILISED

12.5 IMPROVEMENT OF RIDING

QUALITY AND

STRENGTHENING OF SURI

RAJNAGAR ROAD (SH-13)

FROM 0.0 KM TO 4.00 KM

UNDER BIRBHUM

HIGHWAY DIVISION

EXECUTIVE ENGINEER,

P.W.D. (ROADS)

DIRECTORATE, BIRBHUM

HIGHWAY DIVISION,

9434173015, 03462-255381

351/PM(F)/P

/1B-

133/2011

12-10-2012 102.00000 102.00000 95% 31-10-2013 89.96072 WORK IN

PROGRESS

13 IMPROVEMENT OF ROAD

FROM ROYPUR TO

DHOLKATA AT PANCHAMI

AREA OF MD. BAZAR

BLOCK

DISTRICT MAGISTRATE,

BIRBHUM

367/PM(F)/P

/1B-

117/2012

12-11-2012 272.02011 272.02011 20% 50.28169 WORK IN

PROGRESS

14 CONSTRUCTION OF

BUILDING FOR A PUBLIC

HEALTH TRAINING CENTRE

AND HEALTH CARE

COMPLEX, BIRBHUM

SECRETARY, LIVER

FOUNDATION, 53 GOPAL

BANERJEE LANE, HOWRAH

414/PM(F)/P

/1B-99/2008

13-12-2012 20.00000 20.00000 100% 20.00000 COMPLETE

Page 30: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: BIRBHUMDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

SANCTIONED

AMOUNT

RELEASED

AMOUNT

15 IMPROVEMENT &

STRENGTHENING OF

BOLPUR — ILLAMBAZAR

ROAD FROM 1.0 KMP TO

9.40 KMP EXCLUDING 3.0

KMP TO 5.20 KMP UNDER

BOLPUR SUB-DIVISION

(ADDITIONAL SANCTION)

EXECUTIVE ENGINEER,

P.W.D., BIRBHUM DIVISION,

03462-255261, 9830149949,

[email protected]

438/PM(F)/P

/1B-

133/2011

24-12-2012 137.30196 137.30196 95% 31-08-2013 137.30196 WORK IN

PROGRESS,

2012-13 FUND

UTILISED

TOTAL: 1,930.68866 1,930.68866 1,452.43088

Page 31: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE1.1 RESECTIONING OF

DURGAPUR BRANCH

CANAL FROM CH. 0.00 TO

CH. 268.00 IN KANKSA

BLOCK UNDER DAMODAR

HEAD WORKS DIVISION

DISTRICT MAGISTRATE,

BURDWAN

180/PM(F)/P

/1B-

151/2012

20-07-2012 184.92185 184.92185

1.2 RESECTIONING OF

DURGAPUR BRANCH

CANAL FROM CH. 268.65

TO CH. 757.00 IN KANKSA

AND AUSGRAM-II BLOCK

UNDER DAMODAR HEAD

WORKS DIVISION

DISTRICT MAGISTRATE,

BURDWAN

180/PM(F)/P

/1B-

151/2012

20-07-2012 221.96128 221.96128

1.3 UPGRADATION AND

IMPROVEMENT OF

PANDAVESWAR -

NATUNDANGA ROAD

FROM 0.00 KMP TO 1.00

KMP UNDER ASANSOL SUB-

DIVISION

DISTRICT MAGISTRATE,

BURDWAN

180/PM(F)/P

/1B-

151/2012

20-07-2012 127.99466 127.99466

1.4 GROUND WATER BASED

WATER SUPPLY SCHEME

AT ALEFNAGAR IN

AUSGRAM - I BLOCK

DISTRICT MAGISTRATE,

BURDWAN

180/PM(F)/P

/1B-

151/2012

20-07-2012 68.97442 68.97442

DISTRICT: BURDWANDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSSANCTIONED

AMOUNT

289.08098

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

Page 32: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: BURDWANDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

1.5 GROUND WATER BASED

WATER SUPPLY SCHEME

AT SHYAMSUNDARPUR IN

AUSGRAM - II BLOCK

DISTRICT MAGISTRATE,

BURDWAN

180/PM(F)/P

/1B-

151/2012

20-07-2012 68.79944 68.79944

2 CONSTRUCTION OF RIG

BORE TUBE WELL IN 10

BLOCKS AND RIVERBED

TUBE WELL IN RANIGUNG

BLOCK (150 NOS. TUBE-

WELLS)

EXECUTIVE ENGINEER,

CENTRAL MECHANICAL

DIVISION, P.H.E.

DIRECTORATE, BURDWAN;

0342-2644048,

[email protected]

273/PM(F)/P

/1B-46/2012

29-08-2012 141.36138 141.36138 100% 141.36138 COMPLETE

3 CONSTRUCTION OF ICDS

CENTRES, ADDITIONAL

CLASSROOMS & SUPPLY

OF DRINKING WATER IN

10 BLOCKS

DISTRICT MAGISTRATE,

BURDWAN

274/PM(F)/P

/1B-

170/2011

29-08-2012 342.53710 342.53710

4 CONTINGENT FUND FOR

SMOOTH RUNNING OF

PUP SCHEMES

IMPLEMENTED DURING

2012-13

DISTRICT MAGISTRATE,

BURDWAN

406/PM(F)/P

/1B-85/2010

10-12-2012 5.68000 5.68000

289.08098

Page 33: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: BURDWANDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

5.1 RESTORATION OF CANAL

BED AND SLOPES

INCLUDING LINING

WORKS WITH PCC FROM

CH. 472.00 TO CH. 488.00

IN KANKSA BLOCK,

BURDWAN IRRIGATION

SUB-DIVN. NO. III

DISTRICT MAGISTRATE,

BURDWAN

22/PM(F)/P/

1B-258/2012

30-01-2013 22.44526 22.44526 100% 22.44526 COMPLETE

(50% WORK

SANCTIONED

IN THIS F.Y.)

5.2 RESTORATION OF CANAL

BED AND SLOPES

INCLUDING LINING

WORKS WITH PCC FROM

CH. 488.00 TO CH. 506.00

IN KANKSA & AUSGRAM-II

BLOCK, BURDWAN

IRRIGATION SUB-DIVN.

NO. III

DISTRICT MAGISTRATE,

BURDWAN

22/PM(F)/P/

1B-258/2012

30-01-2013 22.28023 22.28023 100% 22.28023 COMPLETE

(50% WORK

SANCTIONED

IN THIS F.Y.)

5.3 RESTORATION OF CANAL

BED AND SLOPES

INCLUDING LINING

WORKS WITH PCC FROM

CH. 528.00 TO CH. 544.00

IN AUSGRAM-II BLOCK,

BURDWAN IRRIGATION

SUB-DIVN. NO. III

DISTRICT MAGISTRATE,

BURDWAN

22/PM(F)/P/

1B-258/2012

30-01-2013 22.34318 22.34318 100% 22.34318 COMPLETE

(50% WORK

SANCTIONED

IN THIS F.Y.)

TOTAL: 1,229.29880 1,229.29880 497.51103

Page 34: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE1 CONSTRUCTION OF

CLASSROOMS, HOSTEL

BUILDING AND LADIES

TOILET OF TENTULMURI

RAMKRISHNA

SIKSHANIKETAN UNDER

KHARAGPUR-II BLOCK

BLOCK DEVELOPMENT

OFFICER, KHARAGPUR-II

BLOCK

89/PM(F)/P/

1B-19/2012

11-05-2012 10.19855 9.18504 100% 9.18504 COMPLETE

2 CONSTRUCTION OF

COMMUNITY CENTRE AT

KANKRAJHORE WITHIN

BINPUR-II PANCHAYAT

SAMITY (POST FACTO

APPROVAL)

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

93/PM(F)/P/

1B-66/2011

15-05-2012 4.35997 4.35997 100% 4.35997 COMPLETE

3 CONSTRUCTION OF RCC

BOX CULVERT OVER

MAHULIA KHAL IN

BETWEEN BANSIABHOL

AND SINGDHUI VILLAGE

UNDER NAYAGRAM BLOCK

BLOCK DEVELOPMENT

OFFICER, NAYAGRAM BLOCK

94/PM(F)/P/

1B-82/2012

30-05-2012 22.50588 21.25718 100% 21.25718 COMPLETE

4 CONSTRUCTION OF ROAD

FROM ASUI TO NURSOLE

UNDER GOPIBALLAVPUR-I

BLOCK

CHIEF ENGINEER,

P.W.D.(ROADS)

96/PM(F)/P/

1B-69/2012

31-05-2012 217.81620

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

Page 35: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

5.1 EXCAVATION OF NUNIA

PUCCA PUKUR UNDER

JAMBONI BLOCK

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

100/PM(F)/P

/1B-78/2012

01-06-2012 24.63672 23.70242 100% 23.70242 COMPLETE

5.2 RE-EXCAVATION OF BARA

BANKATA MUCHIR BUNDH

UNDER JAMBONI BLOCK

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

100/PM(F)/P

/1B-78/2012

01-06-2012 18.79900 NIT ISSUED ON

30/05/2012

5.3 RE-EXCAVATION OF

ALAMPUR KATHUA

BUNDH UNDER JAMBONI

BLOCK

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

100/PM(F)/P

/1B-78/2012

01-06-2012 18.79900 18.69857 100% 18.69857 COMPLETE

5.4 EXCAVATION OF

DUMURIA PANRUA

BUNDH UNDER JAMBONI

BLOCK

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

100/PM(F)/P

/1B-78/2012

01-06-2012 24.63672 23.78753 100% 23.78753 COMPLETE

6 CONSTRUCTION OF

NURSING TRAINING

SCHOOL AT LALGARH

WITHIN PHC CAMPUS

UNDER BINPUR-I BLOCK

WEST BENGAL MEDICAL

SERVICE CORPORATION

LIMITED

102/PM(F)/P

/1B-84/2012

04-06-2012 600.00000 300.00000 75% WORK IN

PROGRESS

UPTO PILE CAP

LEVEL, PILING

WORK

COMPLETE

7 CONSTRUCTION OF

HOSTEL BUILDING AT

ASANDA SIKSHA NIKETAN,

P.O. LALNAGAR

HEADMASTER, ASANDA

SIKSHA NIKETAN

108/PM(F)/P

/1B-

124/2011

07-06-2012 22.86835 22.86835 60% 11.43418 WORK IN

PROGRESS

Page 36: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

8.1 CONSTRUCTION OF CLASS

'A' SINGLE LANE ROAD

BRIDGE AT CH. 1233.26 OF

TSMC(N) IN MOUZA-

JARALATA, PS-JHARGRAM

ALONG KESIA-NATUNDIHI

ROAD UNDER

KANGSABATI CANALS

DIVISION NO. V,

JHARGRAM

EXECUTIVE ENGINEER,

KANGSABATI CANALS

DIVISION NO. V, JHARGRAM,

PASCHIM MEDINIPUR

109/PM(F)/P

/1B-85/2012

07-06-2012 49.92400 49.92400 50% WORK IN

PROGRESS,

W.O. ISSUED

ON 01-11-2012,

NIT ISSUED ON

03-08-2012

8.2 CONSTRUCTION OF CLASS

'A' SINGLE LANE ROAD

BRIDGE AT CH. 12.00 OF

DY-12L OF TSMC(N) IN

MOUZA-JARALATA, PS-

JHARGRAM ALONG KESIA-

NATUNDIHI ROAD

INCLUDING

CONSTRUCTION OF LINING

FROM CH. 0.00 TO CH.

20.00 OF DY-12L/ TSMC(N)

UNDER KANGSABATI

CANALS DIVISION NO. V,

JHARGRAM

EXECUTIVE ENGINEER,

KANGSABATI CANALS

DIVISION NO. V, JHARGRAM,

PASCHIM MEDINIPUR

109/PM(F)/P

/1B-85/2012

07-06-2012 32.95807 32.95807 50% WORK IN

PROGRESS,

W.O. ISSUED

ON 01-11-2012,

NIT ISSUED ON

03-08-2012

26.19818

Page 37: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

9 IMPROVEMENT OF ROAD

FROM BARAPENIA TO

NARAYANPUR VILLAGE IN

BANDHGORA G.P.,

JHARGRAM BLOCK

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

111/PM(F)/P

/1B-94/2012

11-06-2012 18.53949 17.91910 100% 15-01-2013 17.91910 COMPLETE

10 CONSTRUCTION OF GR.

FLOOR SCHOOL BUILDING

OF TENTULMURI PRIMARY

SCHOOL, KHARAGPUR-II

BLOCK DEVELOPMENT

OFFICER, KHARAGPUR-II

BLOCK

117/PM(F)/P

/1B-81/2012

12-06-2012 21.72171 19.83684 100% 19.50345 COMPLETE

11 ANTI-EROSION WORK

ALONG THE LEFT BANK OF

RIVER KANGSABATI AT

DHERUA MOUZA,

MEDINIPUR(SADAR)

EXECUTIVE ENGINEER

(I&W), WEST MEDINIPUR

DIVISION

118/PM(F)/P

/1B-86/2012

12-06-2012 51.55656 51.55656

12 CONSTRUCTION OF

BOUNDARY WALL OF A

MUSLIM GRAVEYARD AT

DAHIJURI UNDER BINPUR-I

P.S.

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

119/PM(F)/P

/1B-02/2012

12-06-2012 11.21914 9.81355 100% 9.81355 COMPLETE

13 CONSTRUCTION OF

SCHOOL BUILDING OF

BINPUR HIGH SCHOOL,

BINPUR

HEADMASTER, BINPUR HIGH

SCHOOL

131/PM(F)/P

/1B-87/2012

15-06-2012 24.81233 24.81233 75% 12.16511 ROOF LEVEL

WORK

CONTINUING

14.1 IMPROVEMENT OF ROAD

FROM GHUTIA TO BANKRA

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 8.35429 8.27154 100% 8.27154 COMPLETE

Page 38: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

14.2 IMPROVEMENT OF ROAD

FROM BHTURO TO ASTI

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 11.30479 11.17554 100% 11.17554 COMPLETE

14.3 IMPROVEMENT OF ROAD

FROM SARENGA TO

KURARIA

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 3.30447 3.27012 100% 3.27012 COMPLETE

14.4 IMPROVEMENT OF ROAD

FROM KENDUA TO

BAGHUA

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 4.95668 4.82411 100% 4.82411 COMPLETE

14.5 IMPROVEMENT OF ROAD

FROM AMLATORA TO

SARAKATA VIA BURISOLE

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 4.50958 4.45041 100% 4.45041 COMPLETE

14.6 IMPROVEMENT OF ROAD

FROM SALTALA TO ENATA

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 9.68982 9.31803 100% 9.31803 COMPLETE

14.7 IMPROVEMENT OF ROAD

FROM KHATKURA TO

BANNAGAJAR

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 3.75797 3.72468 100% 3.72468 COMPLETE

14.8 IMPROVEMENT OF ROAD

FROM BALIBANDH TO

JAMUNASOLE

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 3.11874 2.47165 100% 2.47165 COMPLETE

Page 39: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

14.9 IMPROVEMENT OF ROAD

FROM KANIMOHULI RAIL

STATION TO GAIDA

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 5.01257 4.95333 100% 4.95333 COMPLETE

14.10 IMPROVEMENT OF ROAD

FROM PARIHATI TO

GUIARA

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 8.26114 8.17730 100% 8.17730 COMPLETE

14.11 IMPROVEMENT OF ROAD

FROM ORO TO

BARABANKATA

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 7.43503 7.32278 100% 7.32278 COMPLETE

14.12 IMPROVEMENT OF ROAD

FROM GAGNASULI TO

BENASULI

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 7.70226 7.60226 100% 7.60226 COMPLETE

14.13 IMPROVEMENT OF ROAD

FROM PASCHIM

PURNAPANI TO

KENDUASULI

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 4.50958 4.46414 100% 4.46414 COMPLETE

14.14 IMPROVEMENT OF ROAD

FROM HIZLI TO

SONAMUKHI

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 4.22372 4.17257 100% 4.17257 COMPLETE

14.15 IMPROVEMENT OF ROAD

FROM BAGGHORI TO

BADAKATA

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 7.99756 7.90758 100% 7.90758 COMPLETE

Page 40: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

14.16 IMPROVEMENT OF ROAD

FROM GIDHNI ADIBASI

PARA TO SALPATHRA

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012

15-06-2012 4.48954 4.44426 100% 4.44426 COMPLETE

14.17 IMPROVEMENT OF ROAD

WITH MORRUM &

BOULDER FROM

KASAFALIA TO

RANGAMETIA VIA

BHALUKKHULIA

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012 &

396

15-06-2012 &

29-11-2012

10.77334 10.62233 100% 10.62233 COMPLETE

14.18 CONSTRUCTION OF RCC

SLAB CULVERT AT

BHALUKKHULIA ON

BHALUKKHULIA TO

KASAFALIA ROAD

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012 &

396

15-06-2012 &

29-11-2012

6.15000 6.15000 100% 6.15000 COMPLETE

14.19 CONSTRUCTION OF RCC

SLAB CULVERT AT

BHALUKKHULIA ON

KASAFALIA TO

BHALUKKHULIA ROAD

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012 &

396

15-06-2012 &

29-11-2012

6.15000 6.14823 100% 6.14823 COMPLETE

14.20 CONSTRUCTION OF RCC

BRIDGE OVER KASAFALIA

KHAL ON THE ROAD OF

BHALUKKHULIA TO

KASAFALIA ROAD

BLOCK DEVELOPMENT

OFFICER, JAMBONI BLOCK

132/PM(F)/P

/1B-

100/2012 &

396

15-06-2012 &

29-11-2012

8.00000 8.00000 100% 8.00000 COMPLETE

Page 41: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

15.1 IMPROVEMENT OF ROAD

FROM ANDHARIA PITCH

ROAD TO JAMDA IN

ANDHARIA AND BELATIKRI

GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 18.12171 17.46736 100% 15-12-2012 17.46736 COMPLETE

15.2 IMPROVEMENT OF ROAD

FROM BELATIKRI TO

LAGHATA NADIGHAT IN

BELATIKRI AND NEPURA

GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 21.91741 15.79283 55% 15-12-2012 15.79283 WORK IN

PROGRESS

15.3 IMPROVEMENT OF ROAD

FROM KANSINA MORE TO

RATHBERA CHAWK IN

ANDHARIA GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 13.55118 12.81494 100% 15-12-2012 12.81494 COMPLETE

15.4 IMPROVEMENT OF ROAD

FROM CHHOTO JAMDA TO

AMAINAGAR PITCH ROAD

IN BELATIKRI AND

ANDHARIA GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 18.12171 17.54448 100% 15-12-2012 17.54448 COMPLETE

15.5 IMPROVEMENT OF ROAD

FROM GOHOMIDANGA TO

BHULKA IN BAITA GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 13.55118 5.34015 50% 15-12-2012 1ST RA BILL

DRAWN

15.6 IMPROVEMENT OF ROAD

FROM GUJISOLE MORE TO

PANPURIA IN SIJUA GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 8.65624 8.32007 100% 15-12-2012 8.32007 COMPLETE

Page 42: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

15.7 IMPROVEMENT OF ROAD

FROM TANTISOLE

RAJBUNDH BRIDGE TO

DUMURIA PRIMARY

SCHOOL IN SIJUA GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 8.65624 8.29046 100% 15-12-2012 8.29046 COMPLETE

15.8 IMPROVEMENT OF ROAD

FROM LALGARH BAZAR TO

KANGSABATI NADIGHAT

IN LALGARH GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 2.13970 1.50460 100% 15-12-2012 1.50460 COMPLETE

15.9 IMPROVEMENT OF ROAD

FROM DUBRAJPUR TO

POLICE PHARI IN

RAMGARH GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 8.65624 8.31675 100% 15-12-2012 8.31675 COMPLETE

15.10 IMPROVEMENT OF ROAD

FROM KUMIRKATA PITCH

ROAD TO PANCHIARA IN

DAHIJURI GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 8.98066 7.95503 100% 15-12-2012 7.95503 COMPLETE

15.11 IMPROVEMENT OF ROAD

FROM MAGURA TO

ANKRO IN BINPUR

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 7.95368 2.61440 100% 15-12-2012 2.61440 COMPLETE

15.12 IMPROVEMENT OF ROAD

FROM FULBERI MORE TO

BANDARBONI IN DAHIJURI

GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 13.55118 9.98461 100% 15-12-2012 9.98461 COMPLETE

Page 43: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

15.13 IMPROVEMENT OF ROAD

FROM BAHADURPUR

PITCH ROAD TO

NACHHIPUR NADIGHAT IN

NEPURA GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 17.70938 13.26923 100% 15-12-2012 13.26923 COMPLETE

15.14 IMPROVEMENT OF ROAD

FROM LALGARH BURA

BABA THAN (PITCH ROAD)

TO PODIHA VILLAGE IN

LALGARH GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 7.79544 7.49121 100% 15-12-2012 7.49121 COMPLETE

15.15 SINKING OF TUBE WELL

WITH SUBMERSIBLE PUMP

AT LAGHATA PHC IN

NEPURA GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 2.50000 20% 15-12-2012 WORK IN

PROGRESS

15.16 SINKING OF TUBE WELL

WITH SUBMERSIBLE PUMP

AT NACHHIPUR HIGH

SCHOOL IN NEPURA GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 2.50000 20% 15-12-2012 WORK IN

PROGRESS

15.17 SINKING OF TUBE WELL

WITH SUBMERSIBLE PUMP

AT LALGARH PHC IN

LALGARH GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 2.50000 1.68492 50% 15-12-2012 1.68492 WORK IN

PROGRESS

15.18 SINKING OF TUBE WELL

WITH SUBMERSIBLE PUMP

AT LALGARH

SARADAMONI PRIMARY

SCHOOL IN LALGARH GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 2.50000 1.59973 50% 15-12-2012 1.59973 WORK IN

PROGRESS

Page 44: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

15.19 SINKING OF TUBE WELL

WITH SUBMERSIBLE PUMP

AT BAITA SRIGOPAL H.S.

SCHOOL, JASHPUR IN

BAITA GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 2.50000 15-12-2012 PENDING FOR

CHANGING OF

SITE

15.20 SINKING OF TUBE WELL

WITH SUBMERSIBLE PUMP

AT DHARAMPUR PHC IN

DHARAMPUR GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 2.50000 1.87039 100% 1.87039 COMPLETE

15.21 SINKING OF TUBE WELL

WITH SUBMERSIBLE PUMP

AT ANDHARIA CHAWK IN

ANDHARIA GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 2.49943 2.05069 100% COMPLETE

15.22 SINKING OF TUBE WELL

WITH SUBMERSIBLE PUMP

AT BINPUR CHAWK IN

BINPUR GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 2.49943 1.83324 100% 15-12-2012 1.83324 COMPLETE

15.23 SINKING OF TUBE WELL

WITH SUBMERSIBLE PUMP

AT AMAINAGAR IN

ANDHARIA GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 2.49943 2.09192 60% 15-12-2012 2.09192 WORK IN

PROGRESS

15.24 SINKING OF TUBE WELL

WITH SUBMERSIBLE PUMP

AT MURAR GARAI PARA IN

RAMGARH GP

BLOCK DEVELOPMENT

OFFICER, BINPUR-I BLOCK

133/PM(F)/P

/1B-98/2012

15-06-2012 2.49943 1.60526 100% 15-12-2012 1.60526 COMPLETE

Page 45: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

16.1 IMPROVEMENT OF ROAD

FROM AMLASOLE

BIRSARMUNDA MORE TO

JHARKHAND

BLOCK DEVELOPMENT

OFFICER, BINPUR-II BLOCK

134/PM(F)/P

/1B-99/2012

15-06-2012 6.78290 6.23312 100% 6.23312 COMPLETE

16.2 IMPROVEMENT OF ROAD

FROM DHOBAJAN COLONY

TO SUKNAPAHARI VIA

KHAMAR

BLOCK DEVELOPMENT

OFFICER, BINPUR-II BLOCK

134/PM(F)/P

/1B-99/2012

15-06-2012 20.29578 19.80897 100% 19.80897 COMPLETE

16.3 IMPROVEMENT OF ROAD

FROM SILDA SATIGHAT TO

RAGHUNATHPUR

BLOCK DEVELOPMENT

OFFICER, BINPUR-II BLOCK

134/PM(F)/P

/1B-99/2012

15-06-2012 23.77921 22.17645 100% 15-01-2013 22.17645 COMPLETE

16.4 IMPROVEMENT OF ROAD

FROM JARDA TO

RANGAMETIA,

SANDAPARA

BLOCK DEVELOPMENT

OFFICER, BINPUR-II BLOCK

134/PM(F)/P

/1B-99/2012

15-06-2012 20.99840 15.40325 100% 01-01-2013 15.40325 COMPLETE

16.5 IMPROVEMENT OF ROAD

FROM DHULIPARA TO

RAJDAHA IN BHELAIDIHA

BLOCK DEVELOPMENT

OFFICER, BINPUR-II BLOCK

134/PM(F)/P

/1B-99/2012

15-06-2012 5.80462 5.24106 100% 5.24106 COMPLETE

16.6 IMPROVEMENT OF ROAD

FROM LEDASAL TO

PANCHTAKARPAL, KANKO

BLOCK DEVELOPMENT

OFFICER, BINPUR-II BLOCK

134/PM(F)/P

/1B-99/2012

15-06-2012 19.55550 16.16900 100% 25-01-2013 16.16900 COMPLETE

Page 46: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

16.7 IMPROVEMENT OF ROAD

FROM GORAMTHAN TO

GADRASINI ASHRAM,

BELPAHARI

BLOCK DEVELOPMENT

OFFICER, BINPUR-II BLOCK

134/PM(F)/P

/1B-99/2012

15-06-2012 9.52460 8.71126 100% 01-01-2013 8.71126 COMPLETE

16.8 IMPROVEMENT OF ROAD

FROM DOMSOLE HIGH

SCHOOL TO BANKATI,

HARDA

BLOCK DEVELOPMENT

OFFICER, BINPUR-II BLOCK

134/PM(F)/P

/1B-99/2012

15-06-2012 9.67280 9.00553 100% 01-01-2013 9.00553 COMPLETE

16.9 IMPROVEMENT OF ROAD

FROM BELPAHARI TO

SANDAPARA IN

BELPAHARI

BLOCK DEVELOPMENT

OFFICER, BINPUR-II BLOCK

134/PM(F)/P

/1B-99/2012

15-06-2012 8.38352 7.46288 40% 01-01-2013 7.46288 WORK IN

PROGRESS

16.10 IMPROVEMENT OF ROAD

FROM RAGHUNATHPUR

TO ERGODA, ERGODA

BLOCK DEVELOPMENT

OFFICER, BINPUR-II BLOCK

134/PM(F)/P

/1B-99/2012

15-06-2012 13.29110 11.62628 100% 11.62628 COMPLETE

16.11 IMPROVEMENT OF ROAD

FROM MAHULBONI TO

ODOLCHUA IN SIMULPAL

BLOCK DEVELOPMENT

OFFICER, BINPUR-II BLOCK

134/PM(F)/P

/1B-99/2012

15-06-2012 10.05575 8.73974 100% 01-01-2013 8.73974 COMPLETE

17.1 IMPROVEMENT OF ROAD

FROM BAHARAKOTA TO

DURGAPUR

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 5.23219 3.67959 100% 25-01-2013 3.67959 COMPLETE

Page 47: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

17.2 IMPROVEMENT OF ROAD

FROM NH-6 TO

CHANDIPUR VIA GP

OFFICE

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 5.23219 5.23219 100% 30-01-2013 5.23219 COMPLETE

17.3 IMPROVEMENT OF ROAD

FROM CHANDRI TO

MADHABPUR VIA ASTI IN

CHANDRI GP

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 3.02559 2.84712 100% 30-05-2013 2.84712 COMPLETE

17.4 IMPROVEMENT OF ROAD

FROM KANYADUBA TO

MURGIDIHI

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 3.02559 2.09073 100% 31-01-2013 2.09073 COMPLETE

17.5 IMPROVEMENT OF ROAD

FROM PHASITALA TO

PATHRI VIA DHANGRI

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 5.23219 5.23219 100% 5.23219 COMPLETE

17.6 IMPROVEMENT OF ROAD

FROM AMDIHA TO

CHHANAPARA

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 5.23219 3.94241 100% 30-04-2013 3.94241 COMPLETE

17.7 IMPROVEMENT OF ROAD

FROM KALABONI TO

JARULIA

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 14.55227 14.54627 100% 15-01-2013 14.54627 COMPLETE

Page 48: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

17.8 IMPROVEMENT OF ROAD

FROM BIRIDANGA (NAHAR

KHAL CULVERT) TO

BETKUNDRI MPS GATE

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 6.57273 5.46283 100% 31-01-2013 5.46283 COMPLETE

17.9 IMPROVEMENT OF ROAD

FROM BARDANGA TO

SANKARBONI VIA

SAGARBHANGA

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 5.85139 3.91160 100% 30-05-2013 3.91160 COMPLETE

17.10 IMPROVEMENT OF ROAD

FROM KHALSHEULI TO

PAKURIAPAL VIA

RADHANAGAR

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 5.85139 5.47965 100% 15-01-2013 5.47965 COMPLETE

17.11 IMPROVEMENT OF ROAD

FROM AUSHPAL TO

TALDANGA

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 6.57273 6.31699 100% 31-01-2013 6.31699 COMPLETE

17.12 IMPROVEMENT OF ROAD

FROM BRINDABANPUR TO

ANDHARIASOLE IN

NEDABAHARA G.P.

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 10.51140 10.50614 100% 31-01-2013 10.50614 COMPLETE

17.13 IMPROVEMENT OF ROAD

FROM MADHUPUR TO

PHASITALA

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 14.55227 14.40258 100% 31-01-2013 14.40258 COMPLETE

Page 49: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

17.14 IMPROVEMENT OF ROAD

FROM DEBI CHAK TO

PATASIMUL

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 10.51140 10.51140 100% 31-01-2013 10.51140 COMPLETE

17.15 IMPROVEMENT OF ROAD

FROM JAMSOLA TO

KULDIHA

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 6.66189 6.51742 100% 31-01-2013 6.51742 COMPLETE

17.16 IMPROVEMENT OF ROAD

FROM BARDANGA CHAK

TO METAL

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 5.69089 5.67048 100% 31-01-2013 5.67048 COMPLETE

17.17 IMPROVEMENT OF ROAD

FROM GOLAGHUTIA TO

CHANDRI MORE

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 5.69089 5.08448 100% 30-05-2013 5.08448 COMPLETE

17.18 IMPROVEMENT OF ROAD

FROM KUNDALDIHA TO

TENGIA

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 5.69089 4.65118 85% 30-05-2013 4.65118 WORK IN

PROGRESS

17.19 IMPROVEMENT OF ROAD

FROM NETURA BUS

STAND (NH-6) TO

MATALSOLE

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 3.02559 2.80420 100% 30-05-2013 2.80420 COMPLETE

17.20 IMPROVEMENT OF ROAD

FROM KHALSEULI TO

DAMRASOLE VIA

KALABONI

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 5.69089 5.22085 100% 15-01-2013 5.22085 COMPLETE

Page 50: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

17.21 IMPROVEMENT OF ROAD

FROM PANCHAMI TO

PIPRI

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 3.02559 2.03420 90% 30-05-2013 2.03420 WORK IN

PROGRESS

17.22 IMPROVEMENT OF ROAD

FROM JABNIKATA TO DEER

PARK VIA KHARIKASULI

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

135/PM(F)/P

/1B-97/2012

15-06-2012 10.51140 9.28310 100% 30-04-2013 9.28310 COMPLETE

18 WATER SUPLY SCHEME

FOR R.G.T.S. SCHOOL AT

BELPAHARI, BINPUR-II

EXECUTIVE ENGINEER,

MIDNAPORE DIVISION,

P.H.E. DIRECTORATE

138/PM(F)/P

/1B-

111/2012

22-06-2012 13.70584 13.70584

19 SINKING OF 350 NOS.

INDIAN MARK-II TUBE-

WELL IN 7 PUP BLOCKS

EXECUTIVE ENGINEER,

MIDNAPORE DIVISION,

P.H.E. DIRECTORATE

139/PM(F)/P

/1B-

112/2012

22-06-2012 313.91000 313.91000 85% 156.95500 311 TUBE-WELL

COMPLETE

20 CONSTRUCTION OF

BOUNDARY WALL AT

LALGARH PHC, BINPUR-I

BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

BINPUR-I

152/PM(F)/P

/1B-

115/2011

04-07-2012 38.01873 NIT ISSUED ON

10-10-2013

21 CONSTRUCTION OF

SCHOOL BUILDING OF

CHHAY HAZARI SCHOOL,

GOPIBALLAVPUR-I

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

GOPIBALLAVPUR-I

154/PM(F)/P

/1B-

160/2011

04-07-2012 22.64728 WORK ORDER

ISSUED ON 29-

01-2013

Page 51: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

22 CONSTRUCTION OF NEW

SCHOOL BUILDING AT

MURABONI NETAJI HIGH

SCHOOL, MURABONI,

BINPUR-I

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

BINPUR-I

167/PM(F)/P

/1B-

140/2011

13-07-2012 24.69324 11.52803 55% 11.08708 WORK IN

PROGRESS

23 REPAIRING OF BITUMEN

ROAD FROM BINPUR TO

PAPATPUR NODIGHAT

AND BOXI VIA HARDA AND

MURGIMORE, BINPUR-I

BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

175/PM(F)/P

/1B-

141/2012 &

06/PM(F)/P/

1B-141/2012

16-07-2012 &

14-01-2013

517.42392 372.89069 60% 30-11-2013 372.89069 WORK ORDER

ISSUED IN 3

PARTS; WORK

IN PROGRESS

24.1 CONSTRUCTION OF

ADDITIONAL CLASS ROOM

OF KENDIJAMBANI ICDS

CENTRE, GARHBETA-III

BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

GARHBETA-III

194/PM(F)/P

/1B-

153/2012

27-07-2012 4.09890 4.09890 100% 4.09890 COMPLETE

24.2 CONSTRUCTION OF

BOUNDARY WALL AND

OTHER WORK OF

KADAMDIHA PRIMARY

SCHOOL

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

GARHBETA-III

194/PM(F)/P

/1B-

153/2012

27-07-2012 20.64973

Page 52: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

25 REPAIRING OF

KADAMKANALI TO

RADHANAGAR ROAD,

JHARGRAM BLOCK

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

196/PM(F)/P

/1B-

161/2012

27-07-2012 7.74436 7.51782 100% 25-05-2013 7.51782 COMPLETE

26 CONSTRUCTION OF 6 NOS.

OF CLASSROOMS AT

RANTUA HIGH SCHOOL,

JHARGRAM

HEADMASTER, RANTUA

HIGH SCHOOL

198/PM(F)/P

/1B-17/2012

& 305

30-07-2012 &

19-09-2012

36.82552 36.82552 60% 18.41276 WORK IN

PROGRESS

27 CONSTRUCTION OF

CLASSROOMS AT SALJORA

PRIMARY SCHOOL,

NARAYANGARH PS

HEAD TEACHER, SALJORA

PRIMARY SCHOOL

200/PM(F)/P

/1B-

129/2012

31-07-2012 12.01479 12.01479 100% 12.01479 COMPLETE

28 EXCAVATION OF POND ON

BRWS LAND, BELPAHARI

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

203/PM(F)/P

/1B-

155/2012

01-08-2012 3.52199 1.22058 100% 1.22058 COMPLETE

29 PLANT AND MACHINERY

OF MILK PROCESSING

UNIT AT KESHIARY AND

CHANDRAKONA ROAD

MILK CHILLING PLANT,

GARHBETA-III BLOCK

MANAGING DIRECTOR,

MIMUL, PASCHIM

MEDINIPUR

205/PM(F)/P

/1B-

152/2012

01-08-2012 69.51000 34.75500 50% 10.34000 M.P.U. AT

KESHIARY IS

PROPOSED FOR

SHIFTING AT

MIDNAPUR

SADAR,

CHILLING

PLANT

COMPLETE

Page 53: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

30.1 INSTALLATION OF MINI

DEEP TUBE-WELL AT

HARTORA MOUZA, J.L. NO.

– 130, SALBONI BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

210/PM(F)/P

/1B-

160/2012

03-08-2012 2.13945 SENT TO

DEPTT. FOR

ADDL.

SANCTION

30.2 INSTALLATION OF MINI

DEEP TUBE-WELL AT

JOYPUR MOUZA, J.L. NO. –

46, SALBONI BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

210/PM(F)/P

/1B-

160/2012

03-08-2012 2.13945 SENT TO

DEPTT. FOR

ADDL.

SANCTION

30.3 INSTALLATION OF MINI

DEEP TUBE-WELL AT

BARAMESHA MOUZA, J.L.

NO. – 271, PLOT NO. - 49,

SALBONI BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

210/PM(F)/P

/1B-

160/2012

03-08-2012 2.13945 2.13945 100% 2.13945 COMPLETE

30.4 INSTALLATION OF MINI

DEEP TUBE-WELL AT

BHEDUA MOUZA, J.L. NO.

– 435, PLOT NO. – 59, 7

NO. GP, GARHBETA-III PS

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

210/PM(F)/P

/1B-

160/2012

03-08-2012 3.79870 3.79328 100% 3.79328 COMPLETE

Page 54: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

30.5 CONST. OF PUCCA DRAIN

WITH COVER SLAB AT

GUIADAHA MOUZA, J.L.

NO. – 713, PLOT NO. –

370, KARSA GP,

GARHBETA-III PS

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

210/PM(F)/P

/1B-

160/2012

03-08-2012 15.84989 10.24387 85% 10.24387 WORK IN

PROGRESS

30.6 CONSTRUCTION OF

SCHOOL BUILDING AT

DABCHA NABKOLA SISHU

NIKETAN, J.L. NO. – 672,

PLOT NO. – 26,

SATBANKURA GP

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

GARHBETA-III

210/PM(F)/P

/1B-

160/2012

03-08-2012 7.48394

30.7 CONSTRUCTION OF

INDOOR BADMINTON

COURT AT GARHBETA-I

BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

GARHBETA-I

210/PM(F)/P

/1B-

160/2012

03-08-2012 5.53052

30.8 CONSTRUCTION OF

BOUNDARY WALL WITH

M.S. SHEET GATE OF

KIABONI HIGH SCHOOL,

GARHBETA-III BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

GARHBETA-III

210/PM(F)/P

/1B-

160/2012

03-08-2012 9.94051

Page 55: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

30.9 CONSTRUCTION OF STAGE

WITH GREEN ROOM OF

KIABONI HIGH SCHOOL,

GARHBETA-III BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

GARHBETA-III

210/PM(F)/P

/1B-

160/2012

03-08-2012 4.02888

31 CONSTRUCTION OF

SCHOOL HOSTEL BUILDING

AT ARJUNI DESHBANDHU

VIDYAPITH,

NARAYANGARH BLOCK

HEADMASTER, ARJUNI

DESBANDHU VIDYAPITH,

P.O.-THAKURCHAK,

PASCHIM MEDINIPUR, PIN-

721424

130/PM(F)/P

/1B-

120/2011

23-05-2013 24.50248 12.25124 TENDER

INVITED ON 14-

02-2013

32 CONSTRUCTION OF

HOSTEL BUILDING AT

KHALSEULI HIGH SCHOOL

(H.S.), JHARGRAM SUB-

DIVISION

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

JHARGRAM

221/PM(F)/P

/1B-

175/2012

14-08-2012 24.79534 11.27231 50% 01-06-2013 11.27231 WORK IN

PROGRESS

33 ELECTRICAL INSTALLATION

WORK AT BAITA SRI

GOPAL HIGH SCHOOL,

BINPUR-I BLOCK

EXECUTIVE ENGINEER,

P.W.D., MIDNAPORE

ELECTRICAL DIVISION

222/PM(F)/P

/1B-

172/2012

14-08-2012 3.85001 3.85001 100% 3.85001 COMPLETE

Page 56: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

34 REPAIRING OF ASUI-

NURISOLE ROAD BY

PATCHING POTHOLES BY

JHAMA METAL

CONSOLIDATION,

GOPIBALLAVPUR-I BLOCK

EXECUTIVE ENGINEER,

MIDNAPORE HIGHWAY

DIVISION-II, P.W.D.(ROADS)

DIRECTORATE

223/PM(F)/P

/1B-69/2011

14-08-2012 8.22649 8.22649 100% 8.20037 COMPLETE

35 CONSTRUCTION OF

BOUNDARY WALL AT

MADHUPUR BINAPANI

HIGH SCHOOL (H.S.),

MADHUPUR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

SALBONI

225/PM(F)/P

/1B-

171/2012

14-08-2012 16.76151

36 EXCAVATION/ RE-

EXCAVATION OF 5 NOS.

OF WHS AND DHALL

BANDHS AT LOGDICHALK,

GARBERIA, MARCHI AND

LOCHANGARH MOUZAS,

GARHBETA-III BLOCK

ASSISTANT DIRECTOR OF

AGRICULTURE (ADMN.),

SOIL CONSERVATION,

MEDINIPUR

228/PM(F)/P

/1B-

165/2012

17-08-2012 27.64158 27.37148 100% 27.37148 COMPLETE,

BALANCE

REFUNDED

37.1 CONSTRUCTION OF

GROUND FLOOR OF

GAJASHIMUL K.C.M. HIGH

SCHOOL BUILDING

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

JHARGRAM

229/PM(F)/P

/1B-

170/2012

17-08-2012 24.69324 17.88513 01-07-2013 17.88513 WORK IN

PROGRESS

Page 57: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

37.2 CONSTRUCTION OF

BOUNDARY WALL OF

GAJASHIMUL K.C.M. HIGH

SCHOOL

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

JHARGRAM

229/PM(F)/P

/1B-

170/2012

17-08-2012 9.96994 4.77381 60% 30-04-2013 4.77381 WORK IN

PROGRESS,

DELAYED DUE

TO LAND

DISPUTE

37.3 CONSTRUCTION OF FIRST

FLOOR OF GAJASHIMUL

K.C.M. HIGH SCHOOL

BUILDING

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO,

JHARGRAM

229/PM(F)/P

/1B-

170/2012

17-08-2012 7.96313 01-06-2013 NOT STARTED

38 SINKING OF 9 INDIA MARK-

II TUBE WELL AND 124

MDTW WITH

SUBMERSIBLE PUMPS IN

JHARGRAM BLOCK

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

230/PM(F)/P

/1B-

112/2012

17-08-2012 174.93129 129.92006 85% 25-05-2013 129.92006 9 INDIA MARK-

II TUBEWELLS

& 114 MDTW

COMPLETE

39.1 REPAIRING OF BITUMEN

ROAD FROM BINPUR TO

PAPATPUR NODIGHAT

AND BOXI VIA HARDA AND

MURGIMORE, BINPUR-I

BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

265/PM(F)/P

/1B-

141/2012

27-08-2012 9.87435 9.21765 100% 9.21765 COMPLETE

39.2 REPAIR OF BITUMEN

ROAD FROM MURGI

MORE TO BOXI, BINPUR-I

BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

265/PM(F)/P

/1B-

141/2012

27-08-2012 9.52170 7.46780 100% 7.46780 COMPLETE

Page 58: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

40 CONSTRUCTION OF

HOSTEL BUILDING AT

JOYPUR ST, SC & BC HIGH

SCHOOL (HS), SALBONI

BLOCK

BLOCK DEVELOPMENT

OFFICER, SALBONI BLOCK

271/PM(F)/P

/1B-

181/2012

28-08-2012 24.41466 22.04488 80% 22.04488 WORK IN

PROGRESS

41 CONSTRAUCTION OF

BOUNDARY WALL AT

ANDHARIA RAJBALLAV

HIGH SCHOOL AT

ANDHARIA

SCHOOL AUTHORITY,

ANDHARIA RAJBALLAV HIGH

SCHOOL

300/PM(F)/P

/1B-

139/2011

14-09-2012 24.98108 12.49054

42 SINKING OF 2 (TWO) DEEP

TUBE-WELL IN NUYASAI

AND BORADANGA

VILLAGE, NAYAGRAM

DEVELOPMENT BLOCK

BLOCK DEVELOPMENT

OFFICER, NAYAGRAM BLOCK

307/PM(F)/P

/1B-82/2012

19-09-2012 10.00000

43.1 CONSTRUCTION OF

CONCRETE ROAD WITH

GUARD WALL FROM

JHARBONI TO RAJABUNDH

(447.50 MTR.)

DISTRICT MAGISTRATE,

PASCHIM MEDINIPUR

308/PM(F)/P

/1B-

191/2012

19-09-2012 25.00411 25.00411 DM HAS ASKED

BDO,

NAYAGRAM TO

INITIATE

TENDER

PROCESS

43.2 CONSTRUCTION OF

CONCRETE ROAD WITH

PUCCA DRAIN IN THE

VILLAGE NEMAINAGAR

DISTRICT MAGISTRATE,

PASCHIM MEDINIPUR

308/PM(F)/P

/1B-

191/2012

19-09-2012 24.95039 24.95039 DM HAS ASKED

BDO,

NAYAGRAM TO

INITIATE

TENDER

PROCESS

Page 59: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

44 CONSTRUCTION OF

BOUNDARY WALL AT

BARUA MSK, SIROMONI

GRAM PANCHAYAT,

MIDNAPUR SADAR

PANCHAYAT SAMITY

BLOCK DEVELOPMENT

OFFICER, MIDNAPUR SADAR

BLOCK

309/PM(F)/P

/1B-

190/2012

19-09-2012 9.50534 9.50534 100% 9.50534 COMPLETE

45.1 INSTALLATION OF MINI

DEEP TUBE-WELL FOR

IRRIGATION WATER

SUPPLY WITHIN

GARHBETA-III BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

311/PM(F)/P

/1B-85/2012

21-09-2012 4.25000 WORK ORDER

NOT YET

ISSUED

45.2 CONSTRUCTION OF

MODEL PUMP HOUSE IN

GARHBETA-III PS

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

311/PM(F)/P

/1B-85/2012

21-09-2012 0.43965 NIT ISSUED ON

10/10/2012

45.3 CONSTRUCTION OF

PROPOSED GROUND

FLOOR OF NEW BUILDING

OF KIABONI HIGH

SCHOOL, GARHBETA-III PS

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

311/PM(F)/P

/1B-85/2012

21-09-2012 24.83621 10% 30-11-2013 WORK

STARTED

45.4 CONSTRUCTION OF

PROPOSED FIRST FLOOR

OF NEW BUILDING OF

KIABONI HIGH SCHOOL,

GARHBETA-III PS

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

311/PM(F)/P

/1B-85/2012

21-09-2012 16.90667 10% 30-11-2013 WORK

STARTED

Page 60: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

46.1 CONSTRUCTION OF

BUILDING OF CIRCLE LEVEL

TRAINING HALL AT

CHANDRAKONA ROAD

WITHIN GARHBETA-III PS

BLOCK DEVELOPMENT

OFFICER, GARHBETA-III

BLOCK

314/PM(F)/P

/1B-

174/2012

24-09-2012 11.50839

46.2 SUBMERSIBLE PUMP FOR

DRINKING WATER SUPPLY

PURPOSE AT

CHANDRAKONA ROAD S.I.

OF SCHOOL, GARHBETA

SOUTH CIRCLE, GARHBETA-

III PS

BLOCK DEVELOPMENT

OFFICER, GARHBETA-III

BLOCK

314/PM(F)/P

/1B-

174/2012

24-09-2012 2.31251

47 CONSTRUCTION OF FIRST

FLOOR SCHOOL BUILDING

AT BAGHPICHLA MSK,

SALBONI BLOCK

BLOCK DEVELOPMENT

OFFICER, SALBONI BLOCK

316/PM(F)/P

/1B-

173/2012

25-09-2012 11.09307 10.75146 100% 10.75146 COMPLETE

48 CONSTRUCTION OF

SINGLE STORIED

CLASSROOM WITH

STAIRCASE AND

BOUNDARY WALL OF

ORGANJA SHRI

RAMKRISHNA SARADA

VIDYANIKETAN

SCHOOL AUTHORITY,

ORGANJA SHRI

RAMKRISHNA SARADA

VIDYANIKETAN

317/PM(F)/P

/1B-16/2010

25-09-2012 8.32500 4.16250

Page 61: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

49 RENOVATION OF AGRO

INDUSTRIAL TRAINING

CENTRE, JHARGRAM

BLOCK

BLOCK DEVELOPMENT

OFFICER, JHARGRAM BLOCK

331/PM(F)/P

/1B-

195/2012

01-10-2012 4.68177 4.68177 100% 15-01-2013 4.68177 COMPLETE

50 CONSTRUCTION OF

BUILDING AT

KANCHADAHARI-

GUIADAHA HIGH

MADRASAH (10,57,801/-)

& SINKING OF 6 NOS. OF

DEEP TUBE-WELLS

(12,00,000/-) IN

DIFFERENT PLACES

WITHIN GARHBETA-III PS

BLOCK DEVELOPMENT

OFFICER, GARHBETA-III

BLOCK

332/PM(F)/P

/1B-

194/2012

01-10-2012 22.57801 9.68232 50% 9.68232 MADRASAH'S

WORK

COMPLETE

51 REPAIRING THE PUCCA

ROAD (8.4 KM) FROM

KHALSEULI TO MALANCHA

(KHARAGPUR), BINPUR-I

BLOCK

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

335/PM(F)/P

/1B-

196/2012

04-10-2012 199.99948 20% WORK IN

PROGRESS

52.1 CONSTRUCTION OF

BOUNDARY WALL OF

NETAI JUNIOR HIGH

SCHOOL

SCHOOL AUTHORITY, NETAI

JUNIOR HIGH SCHOOL

341/PM(F)/P

/1B-49/2012

09-10-2012 8.71574 8.71574 50% 4.35787 WORK IN

PROGRESS

Page 62: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

52.2 CONSTRUCTION OF

GOUND FLOOR OF

SCHOOL BUILDING OF

NETAI JUNIOR HIGH

SCHOOL

SCHOOL AUTHORITY, NETAI

JUNIOR HIGH SCHOOL

341/PM(F)/P

/1B-49/2012

09-10-2012 13.02039 13.02039 50% 6.51020 WORK IN

PROGRESS

53 SPECIAL REPAIRING IN

DAMAGED STEEL FRAMED

BRIDGE ON NAHARKHAL,

JHARGRAM BLOCK

DISTRICT MAGISTRATE,

PASCHIM MEDINIPUR

354/PM(F)/P

/1B-

212/2012

17-10-2012 7.88511 7.88511

54 CONSTRUCTION OF

HOSTEL BUILDING AT

SATRANGI VIVEKANANDA

HIGH SCHOOL,

KHARAGPUR-II BLOCK

TEACHER-IN-CHARGE,

SATRANGI VIVEKANANDA

HIGH SCHOOL

356/PM(F)/P

/1B-

213/2012

18-10-2012 17.73412 17.73412 100% 17.73412 COMPLETE

55 CONSTRUCTION OF FOUR

CLASSROOMS AT

MALANCHA HIGH

SCHOOL, GOPIBALLAVPUR-

II BLOCK

TEACHER-IN-CHARGE,

MALANCHA HIGH SCHOOL

361/PM(F)/P

/1B-

169/2012

30-10-2012 28.32338 28.32338 55% 14.16169 WORK IN

PROGRESS

56 CONSTRUCTION OF

CLASSROOM IN

MIDNAPORE TOWN

WELFARE SOCIETY WITHIN

SOCIETY TRAINING

CENTRE (VIKASH)

COMPOUND, MEDINIPUR

SADAR

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

380/PM(F)/P

/1B-

232/2012

21-11-2012 16.33982 10.14014 80% 10.14014 WORK IN

PROGRESS

Page 63: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

57 CONSTRUCTION OF

INSTITUTIONAL BUILDING

(GROUND FLOOR) FOR

SATSOLE KIRANMOYEE

HIGH SCHOOL (H.S.),

PHASE-I, ANANDAPUR

P.S., KESHPUR

SCHOOL AUTHORITY,

SATSOLE KIRANMOYEE HIGH

SCHOOL (H.S.)

388/PM(F)/P

/1B-

226/2012

23-11-2012 24.54446 24.54446 50% 12.27223 WORK IN

PROGRESS

58 ARRANGEMENT OF

FOOTBALL TOURNAMENT

AND ARCHERY

TOURNAMENT IN

AMLASOLE AND ITS

SURROUNDING AREA,

PASCHIM MEDINIPUR

SECRETARY, DURBAR

MAHILA SAMANWAYA

COMMITTEE

399/PM(F)/P

/1B-53/2012

04-12-2012 1.69125 1.69125 100% 1.69125 COMPLETE

59 CONSTRUCTION OF

GROUND FLOOR SCHOOL

BUILDING AT TALNANNA

MADRASAH SIKSHA

KENDRA, MUGBASAN GP,

KESHPUR BLOCK

BLOCK DEVELOPMENT

OFFICER, KESHPUR BLOCK

400/PM(F)/P

/1B-

131/2012

04-12-2012 18.11025 15.38467 75% 15.38467 WORK IN

PROGRESS

60 CONSTRUCTION OF

BOUNDARY WALL AT

SEVAYATAN SIKSHAN

MAHAVIDYALAYA AT

JHARGRAM (IN 3 PART,

TOTAL 580 METRE)

EXECUTIVE ENGINEER,

VIDYASAGAR UNIVERSITY

DIVISION, P.W.(C.B.) DTE.,

P.W.DEPTT.

404/PM(F)/P

/1B-

184/2012

06-12-2012 34.95322 34.95322

Page 64: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

61 CONSTRUCTION OF

BOUNDARY WALL AND

EXTENSION AND

RENOVATION WORK OF

SCHOOL BUILDING AT

CHAKMAKRAMPPUR HIGH

SCHOOL

HEADMASTER,

CHAKMAKRAMPUR HIGH

SCHOOL, P.O. -

CHAKMAKRAMPUR, DIST. -

PASCHIM MEDINIPUR,

721149

408/PM(F)/P

/1B-

218/2012

11-12-2012 29.21601 29.21601 55% 14.60801 WORK IN

PROGRESS

62 INSTALLATION/ SINKING

OF 7 NOS. OF MINI DEEP

TUBE-WELLS IN DIFFERENT

MOUZAS (DUKI,

DWARIGERIA(NORTH),

BHOGISOLE,

GHOSHKHIRA, GUIADAHA,

NABKOLA AND AT

GURAHARA, GUJRAT &

KENDERISOLE MOUZA)

WITHIN GARHBETA-III

BLOCK

BLOCK DEVELOPMENT

OFFICER, GARHBETA-III

BLOCK

419/PM(F)/P

/1B-

239/2012

13-12-2012 32.87133 21.35992 65% 21.35992 4 SCHEME AT

DUKI,

DWARIGERIA(N

ORTH),

GHOSHKHIRA &

GUIADAHA

COMPLETE

63 SINKING OF ONE MINI

DEEP TUBE-WELL AT

MOHASOLE MOUZA

WITHIN SALBONI BLOCK

BLOCK DEVELOPMENT

OFFICER, SALBONI BLOCK

420/PM(F)/P

/1B-

239/2012

13-12-2012 4.14910 4.03005 100% 4.03005 COMPLETE

Page 65: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

64 SINKING OF 8 NOS. (@

`8.64647 LAC) MINI DEEP

TUBE-WELLS IN DIFFERENT

MOUZAS (UMRAPATA,

JAMSOLE, BHURUBONI,

DUMURIA,

CHHOTONAKDONA,

BATHANTORE,

HAMARGORA,

GANGDUARI), GARHBETA-

II BLOCK

BLOCK DEVELOPMENT

OFFICER, GARHBETA-II

BLOCK

421/PM(F)/P

/1B-

239/2012

13-12-2012 69.17176 45.90722 100% 45.90722 COMPLETE

65 DISTRIBUTION OF SPORTS

KITS TO 75 NOS. OF

CLUBS/ YOUTH

ORGANIZATIONS WITHIN

FIVE ASSEMBLY

CONSTITUENCIES OF

JHARGRAM SUB-DIVISION

422/PM(F)/P

/1B-

257/2012

14-12-2012 16.50000 15.28800 100% 15.28800 COMPLETE

66 CONSTRUCTION OF

BRIDGE OVER BAGDIHA

KHAL, GOPIBALLAVPUR-I

BLOCK

BLOCK DEVELOPMENT

OFFICER, GOPIBALLAVPUR-I

BLOCK

425/PM(F)/P

/1B-90/2012

18-12-2012 22.61065

67 CONSTRUCTION OF RCC

BOX BRIDGE AT

KAMALPUR SAKAMUHI

KHAL, NAYAGRAM

PANCHAYAT SAMITY

EXECUTIVE OFFICER,

NAYAGRAM PANCHAYAT

SAMITY

428/PM(F)/P

/1B-

251/2012

18-12-2012 23.03097 23.03097

Page 66: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

68 CONSTRUCTION OF

OLDAGE HOME OF RED

CROSS SOCIETY AT

JHARGRAM

SECRETARY, RED CROSS

SOCIETY, JHARGRAM SUB-

DIVISIONAL BRANCH

433/PM(F)/P

/1B-

113/2012

18-12-2012 4.84250 4.84250

69 FITTING & INSTALLATION

FOR SUPPLYING SAFE

PURIFIED RURAL

COMMUNITY DRINKING

WATER FOR 9 NOS.

PHC/BPHC/RH AT AN

ESTIMATED COST OF

27.56771 LAC EACH

NAMELY LALGARH PHC

(BINPUR-I), CHINCHIRA

PHC (JAMBONI),

CHILKIGARH BPHC

(JAMBONI), BINPUR RH

(BINPUR-I), BELPAHARI RH

(BINPUR-II),

GOPIBALLAVPUR RH

(GOPIBALLAVPUR-I),

TOPSIA RH

(GOPIBALLAVPUR-II),

KHARIKAMATHANI RH

(NAYAGRAM),

BHANGAGARH RH

(SANKRAIL) WITHIN

JHARGRAM SUB-DIVISION

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

440/PM(F)/P

/1B-

264/2012

28-12-2012 248.10939 247.99388 100% 30-06-2013 247.99388 COMPLETE

Page 67: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

70 CONSTRUCTION OF

BOUNDARY WALL AT

DEBAGRAM MAHADEV

HIGH SCHOOL UNDER

SALBONI BLOCK

SCHOOL AUTHORITY,

DEBAGRAM MAHADEV HIGH

SCHOOL

04/PM(F)/P/

1B-263/2012

10-01-2013 14.84400 14.84400 55% 7.42200 WORK IN

PROGRESS

71 INFRASTRUCTURAL

DEVELOPMENT OF SILDA

CHANDRA SEKHAR

COLLEGE

EXECUTIVE ENGINEER-I,

P.W.D., KHARAGPUR

DIVISION

08/PM(F)/P/

1B-

67/2008(Par

t-IV)

15-01-2013 100.00000 100.00000

72.1 CONSTRUCTION OF

HOSTEL BUILDING AT

GARHBETA HIGH SCHOOL,

GARHBETA-I BLOCK

BLOCK DEVELOPMENT

OFFICER, GARHBETA-I

BLOCK

14/PM(F)/P/

1B-262/2012

24-01-2013 28.17772 16.59022 60% 16.59022 WORK IN

PROGRESS

72.2 CONSTRUCTION OF

SCHOOL BUILDING AT

GARHBETA HIGH SCHOOL,

GARHBETA-I BLOCK

BLOCK DEVELOPMENT

OFFICER, GARHBETA-I

BLOCK

14/PM(F)/P/

1B-262/2012

24-01-2013 24.95645 18.55971 60% 18.55971 WORK IN

PROGRESS

73 CONSTRUCTION OF

BOUNDARY WALL AT

JANARDANPUR HIGH

SCHOOL, KHARAGPUR-II

PS

SCHOOL AUTHORITY,

JANARDANPUR HIGH

SCHOOL

15/PM(F)/P/

1B-261/2012

24-01-2013 3.63184 3.63184 100% 3.63184 COMPLETE

Page 68: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

74 CONSTRUCTION OF 10

NOS. OF RAIN WATER

HARVESTING TANK

(RWHT) IN DIFF. BLOCKS

DM THROUGH EE(AI),

JHARGRAM (AI) DIVISION

21/PM(F)/P/

1B-05/2013

30-01-2013 75.10019 75.10019

75 SINKING OF 10 NOS. OF

MINI DEEP TUBE-WELLS

(6.34440 EACH),

NAYAGRAM BLOCK

BLOCK DEVELOPMENT

OFFICER, NAYAGRAM BLOCK

24/PM(F)/P/

1B-03/2013

30-01-2013 63.44400

76 ADDITIONAL FUND FOR

AWARDING 1888 NOS. OF

BICYCLES TO TRIBAL GIRL

STUDENTS OF CLASS X, XI

& XII OF PASCHIM

MEDINIPUR

DISTRICT MAGISTRATE,

PASCHIM MEDINIPUR

31/PM(F)/P/

1B-02/2011

05-02-2013 20.80120 20.80120

77.1 CONSTRUCTION OF RCC

BOX CULVERT AT

JAMSOLA OVER MAHULIA

KHAL, NAYAGRAM BLOCK

BLOCK DEVELOPMENT

OFFICER, NAYAGRAM BLOCK

33/PM(F)/P/

1B-243/2012

07-02-2013 22.51000 BDO

REQUESTED

VIDE NO.

379/PUP/BNK/

1A-04/12 DT.

20-02-2013

77.2 CONSTRUCTION OF BOX

CULVERT AT JARKA OVER

NAYAGRAM-ATMAJHIA

ROAD , NAYAGRAM BLOCK

BLOCK DEVELOPMENT

OFFICER, NAYAGRAM BLOCK

33/PM(F)/P/

1B-243/2012

07-02-2013 23.03000 22.91880 100% 22.91880 COMPLETE

Page 69: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

77.3 CONSTRUCTION OF

BANSPAT BOX CULVERT AT

BANSPAT, NAYAGRAM

BLOCK

BLOCK DEVELOPMENT

OFFICER, NAYAGRAM BLOCK

33/PM(F)/P/

1B-243/2012

07-02-2013 7.00000 BDO

REQUESTED

VIDE NO.

379/PUP/BNK/

1A-04/12 DT.

20-02-2013

77.4 CONSTRUCTION OF RCC

BOX CULVERT AT

BARSOLE, NAYAGRAM

BLOCK

BLOCK DEVELOPMENT

OFFICER, NAYAGRAM BLOCK

33/PM(F)/P/

1B-243/2012

07-02-2013 7.83000 BDO

REQUESTED

VIDE NO.

379/PUP/BNK/

1A-04/12 DT.

20-02-2013

77.5 CONSTRUCTION OF BOX

CULVERT AT TOPOBAN

OVER TOPOBAN BARSULI

ROAD, NAYAGRAM BLOCK

BLOCK DEVELOPMENT

OFFICER, NAYAGRAM BLOCK

33/PM(F)/P/

1B-243/2012

07-02-2013 7.00000 BDO

REQUESTED

VIDE NO.

379/PUP/BNK/

1A-04/12 DT.

20-02-2013

77.6 CONSTRUCTION OF RCC

BOX CULVERT OVER

SITALANA KHAL AT

KEYAJHARIA, NAYAGRAM

BLOCK

BLOCK DEVELOPMENT

OFFICER, NAYAGRAM BLOCK

33/PM(F)/P/

1B-243/2012

07-02-2013 14.59000 BDO

REQUESTED

VIDE NO.

379/PUP/BNK/

1A-04/12 DT.

20-02-2013

78.1 PIPE LINE WATER SUPPLY

AT MURAKATI JR. HIGH

SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 TENDER

INVITED ON 20-

02-2013

Page 70: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

78.2 PIPE LINE WATER SUPPLY

AT KHAMARMOHULI JR.

HIGH SCHOOL, SANKRAIL

BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 TENDER

INVITED ON 20-

02-2013

78.3 PIPE LINE WATER SUPPLY

AT KUKURAKHUPI JR. HIGH

SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 TENDER

INVITED ON 20-

02-2013

78.4 PIPE LINE WATER SUPPLY

AT SIMULIA JR. HIGH

SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 TENDER

INVITED ON 20-

02-2013

78.5 PIPE LINE WATER SUPPLY

AT DURGAPUR JR. HIGH

SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 TENDER

INVITED ON 20-

02-2013

78.6 PIPE LINE WATER SUPPLY

AT BAHARADANRI JR.

HIGH SCHOOL, SANKRAIL

BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 TENDER

INVITED ON 20-

02-2013

Page 71: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

78.7 PIPE LINE WATER SUPPLY

AT HARIPURA JR. HIGH

SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 TENDER

INVITED ON 20-

02-2013

78.8 PIPE LINE WATER SUPPLY

AT ANDHARI JR. HIGH

SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 TENDER

INVITED ON 20-

02-2013

78.9 PIPE LINE WATER SUPPLY

AT KASHIDANGA JR. HIGH

SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 TENDER

INVITED ON 20-

02-2013

78.10 PIPE LINE WATER SUPPLY

AT CHHATRI JR. HIGH

SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 2.34185 100% 2.34185 COMPLETE

78.11 PIPE LINE WATER SUPPLY

AT BAKRA JR. HIGH

SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 1.81459 100% 1.81459 COMPLETE

Page 72: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

78.12 PIPE LINE WATER SUPPLY

AT CHUNPARA JR. HIGH

SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 1.79130 100% 1.79130 COMPLETE

78.13 PIPE LINE WATER SUPPLY

AT NEKRASULI JR. HIGH

SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 1.99820 100% 1.99820 COMPLETE

78.14 PIPE LINE WATER SUPPLY

AT BANKATI JR. HIGH

SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 2.02123 100% 2.02123 COMPLETE

78.15 PIPE LINE WATER SUPPLY

AT BHAMAL JR. HIGH

SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 1.52722 100% 1.52722 COMPLETE

78.16 PIPE LINE WATER SUPPLY

AT PECHABINDHYA JR.

HIGH SCHOOL, SANKRAIL

BLOCK

BLOCK DEVELOPMENT

OFFICER, SANKRAIL BLOCK

34/PM(F)/P/

1B-243/2012

07-02-2013 2.50000 1.74802 100% 1.74802 COMPLETE

Page 73: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

79.1 CONSTRUCTION OF

CONCRETE ROAD FROM

GOPIBALLAVPUR THANA

CHOWK TO GOBINDA

MANDIR, GOPIBALLAVPUR-

I BLOCK

BLOCK DEVELOPMENT

OFFICER, GOPIBALLAVPUR-I

BLOCK

35/PM(F)/P/

1B-243/2012

07-02-2013 19.36000 19.36000 100% 19.36000 COMPLETE

79.2 CONSTRUCTION OF

CAUSEWAY AT

CHUTARPATA,

GOPIBALLAVPUR-I BLOCK

BLOCK DEVELOPMENT

OFFICER, GOPIBALLAVPUR-I

BLOCK

35/PM(F)/P/

1B-243/2012

07-02-2013 7.12000 7.01092 100% 7.01092 COMPLETE

79.3 CHECK DAM AT

ANDHARKULI,

GOPIBALLAVPUR-I BLOCK

BLOCK DEVELOPMENT

OFFICER, GOPIBALLAVPUR-I

BLOCK

35/PM(F)/P/

1B-243/2012

07-02-2013 7.74000 TENDER

INVITED ON 25-

02-2013

80.1 CONSTRUCTION OF

GUARD WALL AT

BAKULTALA TO PAIKUIBAR

AT MAHULI,

GOPIBALLAVPUR-II BLOCK

BLOCK DEVELOPMENT

OFFICER, GOPIBALLAVPUR-II

BLOCK

36/PM(F)/P/

1B-243/2012

07-02-2013 3.00000 3.00000 100% 3.00000 COMPLETE

80.2 CONSTRUCTION OF

CULVERT AT EKDAL

VILLAGE, GOPIBALLAVPUR-

II BLOCK

BLOCK DEVELOPMENT

OFFICER, GOPIBALLAVPUR-II

BLOCK

36/PM(F)/P/

1B-243/2012

07-02-2013 2.11000 BDO

REQUESTED

VIDE NO.

378/PUP/BNK/

1A-04/12 DT.

20-02-2013

Page 74: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

80.3 CONSTRUCTION OF

CULVERT NEAR EKUR PRY.

SCHOOL, GOPIBALLAVPUR-

II BLOCK

BLOCK DEVELOPMENT

OFFICER, GOPIBALLAVPUR-II

BLOCK

36/PM(F)/P/

1B-243/2012

07-02-2013 3.46000 3.43955 100% 3.43955 COMPLETE

81 EXCAVATION OF DINHI

BUNDH, GARHBETA-III

PANCHAYAT SAMITY

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

64/PM(F)/1B-

204/2012

05-03-2013 49.67589 100% COMPLETE

82 CONSTRUCTION OF

ADDITIONAL CLASSROOMS

OF KENDIJAMBANI ICDS

CENTRE, GARHBETA-III

BLOCK (ADDL. AMOUNT)

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD THROUGH BDO

65/PM(F)/P/

1B-153/2012

05-03-2013 0.54882 0.41300 100% 0.41300 COMPLETE

83 INFRASTRUCTURAL

DEVELOPMENT

(BOUNDARY WALL

12,91,449/- & SCHOOL

BUILDING 24,74,328/-) OF

SIJUA MSK, BINPUR-I PS

SECRETARY, SIJUA MSK 66/PM(F)/P/

1B-18/2013

05-03-2013 37.65777 37.65777

84 INSTALLATION OF MINI

DEEP TUBE-WELL AT

BARAMESHA MOUZA,

SALBONI BLOCK (ADDL.

SANCTION)

CHIEF EXECUTIVE OFFICER,

PASCHIMANCHAL UNNAYAN

PARSHAD

70/PM(F)/P/

1B-160/2012

08-03-2013 2.68887 2.17864 100% 2.17864 COMPLETE

Page 75: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

85 RENOVATION WORK OF

CLASSROOMS AT

JHARGRAM BANITIRTHA

HIGH SCHOOL (HS)

SCHOOL AUTHORITY,

JHARGRAM BANITIRTHA

HIGH SCHOOL (HS)

76/PM(F)/P/

1B-19/2013

14-03-2013 8.21248 8.21248

86.1 CONSTRUCTION OF BORE

WELL AND BOUNDARY

WALL AROUND TRIBAL

HOSTEL ATTACHED AT

KAPGARI SEVA BHARATI

MAHAVIDYALAYA,

KAPGARI MOUZA

TEACHER-IN-CHARGE,

KAPGARI SEVA BHARATI

MAHAVIDYALAYA

78/PM(F)/P/

1B-31/2013

18-03-2013 6.93129 6.93129

86.2 ADDITION AND

ALTERATION OF GROUND

FLOOR AND FIRST FLOOR

OF TRIBAL HOSTEL

BUILDING AT KAPGARI

SEVA BHARATI

MAHAVIDYALAYA,

KAPGARI MOUZA

TEACHER-IN-CHARGE,

KAPGARI SEVA BHARATI

MAHAVIDYALAYA

78/PM(F)/P/

1B-31/2013

18-03-2013 44.67335 44.67335 55% WORK IN

PROGRESS

87 DEVELOPMENT OF PLAY

GROUND AT AMLASOLE

UNDER BINPUR-II BLOCK

(TOTAL SANCTION -

1,02,452/-)

DURBAR MAHILA

SAMANWAYA COMMITTEE,

KOLKATA

79/PM(F)/P/

1B-32/2013

19-03-2013 0.14860 0.14860

Page 76: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

DISTRICT: PASCHIM MEDINIPURDETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED REMARKSPHYSICAL

PROGRESS

SANCTIONED

AMOUNT

RELEASED

AMOUNT

EXPECTED DATE

OF

COMPLETION

88 CONSTRUCTION OF RCC

SLAB CULVERT OVER

BAJUDIHA KHAL UNDER

BERAJAL GRAM

PANCHAYAT, NAYAGRAM

PANCHAYAT SAMITY

BLOCK DEVELOPMENT

OFFICER, NAYAGRAM BLOCK

96/PM(F)/P/

1B-91/2012

18-03-2013 27.20384 26.60348 100% 26.60348 COMPLETE

89.1 NERAKOPA MINI PIPED

WATER SUPPLY SCHEME,

GARHBETA-III PANCHAYAT

SAMITY

EXECUTIVE ENGINEER,

MIDNAPORE MECHANICAL

DIVISION, PHE DTE.,

PASCHIM MEDINIPUR

97/PM(F)/P/

1B-125/2012

18-03-2013 18.67077 18.67077

89.2 DWARIGERIA MINI PIPED

WATER SUPPLY SCHEME,

GARHBETA-III PANCHAYAT

SAMITY

EXECUTIVE ENGINEER,

MIDNAPORE MECHANICAL

DIVISION, PHE DTE.,

PASCHIM MEDINIPUR

97/PM(F)/P/

1B-125/2012

18-03-2013 17.95473 17.95473

90 CONSTRUCTION OF

HOSTEL BUILDING

ATTACHED TO SALANGA

GOPINATHPUR

VIVEKANANDA VIDYAPITH

(HIGH SCHOOL), KESHPUR

BLOCK

SCHOOL AUTHORITY,

SALANGA GOPINATHPUR

VIVEKANANDA VIDYAPITH

(HIGH SCHOOL)

101/PM(F)/P

/1B-20/2013

26-03-2013 24.99440 24.99440 60% 12.49720 WORK IN

PROGRESS

TOTAL: 5058.71832 3414.74922 2209.19734

Page 77: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE1.1 CONST. OF GARDIH

VILLAGE ROAD P.C.C. AT

AJODHYA GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 2.86800 2.70086 100% 12-11-2012 2.70086 COMPLETED

1.2 IMPROVEMENT OF ROAD

FROM HELIPAD TO TURGA

FALLS IN BAGHMUNDI

GRAM PANCHAYAT (PART-

I)

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 24.02200 17.16683 100% 28-11-2012 17.16683 COMPLETED

1.3 CONST. OF SOPARAMBERA

NICHPARA TO UPAR PARA

P.C.C. ROAD IN AJODHYA

GRAM PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 9.03500 7.52028 100% 15-10-2012 7.52028 COMPLETED

1.4 CONST. OF KULTAR

VILLAGE ROAD P.C.C. AT

AJODHYA GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 5.72000 5.72000 100% 5.72000 COMPLETED

1.5 CONST. OF SIMULBERA

VILLAGE ROAD P.C.C. AT

AJODHYA GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 2.61000 2.61000 100% 25-11-2012 2.61000 COMPLETED

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

Page 78: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

1.6 CONST. OF PUNIASASAN

UP ROAD P.C.C. AT

AJODHYA GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 6.00000 6.00000 100% 15-11-2012 6.00000 COMPLETED

1.7 CONST. OF JAMGHUTU

GRAMIN ROAD P.C.C. AT

AJODHYA GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 2.61000 2.61000 100% 24-08-2012 2.61000 COMPLETE

1.8 CONST. OF KENDGUTU TO

BHURSABERA P.C.C. ROAD

AT AJODHYA GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 3.04000 3.01176 100% 3.01176 COMPLETE

1.9 CONST. OF DUNGRI

VILLAGE P.C.C. ROAD IN

BURDA-KALIMATI GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 15.04900 13.27616 100% 13.27616 COMPLETE

1.10 CONST. OF ICHHAKOTO

VILLAGE P.C.C. ROAD IN

BURDA-KALIMATI GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 15.04900 13.47469 100% 13.47469 COMPLETE

1.11 CONST. OF BASARE TO

DUNGRIDIH ROAD IN

AJODHYA GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 6.17200 6.17200 100% 30-08-2012 6.17200 COMPLETE

Page 79: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

1.12 CONST. OF SONAHARA

VILLAGE P.C.C. ROAD IN

AJODHYA GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 2.91900 2.91900 100% 31-08-2012 2.91900 COMPLETE

1.13 CONST. OF BHUINGHORA

VILLAGE P.C.C. ROAD IN

AJODHYA GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 5.82300 5.57933 100% 19-10-2012 5.57933 COMPLETED

1.14 CONST. OF HATINADA

VILLAGE P.C.C. ROAD IN

AJODHYA GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 5.85700 5.70125 100% 18-08-2012 5.70125 COMPLETED

1.15 CONST. OF DARUDIH

VILLAGE P.C.C. ROAD IN

AJODHYA GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 5.89000 5.89000 100% 11-10-2012 5.89000 COMPLETED

1.16 CONST. OF BONGADA

(SANTAL PARA) VILLAGE

P.C.C. ROAD IN AJODHYA

GRAM PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 5.79000 5.79000 100% 14-02-2013 5.79000 COMPLETED

1.17 CONST. OF KAMLABAHAL

VILLAGE P.C.C. ROAD IN

AJODHYA GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 5.84000 5.84000 100% 5.84000 COMPLETED

Page 80: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

1.18 CONST. OF KUCHRIRAKHA

VILLAGE P.C.C. ROAD IN

AJODHYA GRAM

PANCHAYAT

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

82/PM(F)/P/

1B-69/2012

03-05-2012 5.75500 5.75500 100% 08-11-2012 5.75500 COMPLETED

2 CONSTRUCTION OF SMALL

CULVERTS AND GUARD

WALL ON PUCCA ROAD

ALONG WITH PCC TO

PROPOSED BAGHMUNDI

POLYTECHNIC SITE IN

BAGHMUNDI BLOCK

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

97/PM(F)/P/

1B-83/2012

31-05-2012 20.21388 10.97533 10.68147 WORK

COMPLETE FOR

CULVERT &

GUARD WALL;

ROAD NOT

STARTED AS

ESTIMATE

REVISED

3.1 CONSTRUCTION OF

INCOMPLETE ROAD AT

KALIMELA UNDER

SALTORE G.P.

BLOCK DEVELOPMENT

OFFICER, NETURIA BLOCK

112/PM/P/1

B-101/2012

11-06-2012 2.00000 BDO HAS BEEN

REQUESTED TO

SUBMIT

ALTERNATIVE

SCHEME AS

THE

SANCTIONED

SCHEME

ALREADY

COMPLETED

Page 81: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

3.2 CONSTRUCTION OF ROAD

AT NABAGRAM,

KHAWASPARA

BLOCK DEVELOPMENT

OFFICER, NETURIA BLOCK

112/PM/P/1

B-101/2012

11-06-2012 2.50000 BDO HAS BEEN

REQUESTED TO

TAKE UP THE

SCHEME VIDE

NO.

807/PUP/BNK/

1S-116/12

DATED 18-07-

2012

4 CONSTRUCTION OF

GROUND FLOOR OF

KOTSHILA

MAHAVIDYALAYA AT

KOTSHILA, P.O.-JIUDARU

BLOCK DEVELOPMENT

OFFICER, JHALDA-II BLOCK

113/PM(F)/P

/1B-96/2012

11-06-2012 114.88371 59.54367 50% 59.54367 WORK IN

PROGRESS

5 CONSTRUCTION OF

COMMUNITY HALL AT

TUNTURI

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

114/PM(F)/P

/1B-

110/2012

12-06-2012 13.35423 6.54633 40% 6.54633 WORK IN

PROGRESS

6 CONSTRUCTION OF

JHALDA SATYABHAMA

VIDYAPITH HOSTEL

BUILDING

BLOCK DEVELOPMENT

OFFICER, JHALDA-I BLOCK

115/PM(F)/P

/1B-

110/2012

12-06-2012 16.90770 10.92300 80% 10.92300 NIT ISSUED ON

25/07/2012

7 CONSTRUCTION OF 3 NOS.

CLASSROOM AND

BOUNDARY WALL AT

KASHIDIH C.R.C.G.

VIDYAPITH

HEADMASTER, KASHIDIH

C.R.C.G. VIDYAPITH

120/PM(F)/P

/1B-

107/2012

12-06-2012 39.31213 39.31213 50% 30.55910 WORK IN

PROGRESS

Page 82: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

8 CONSTRUCTION OF

SCHOOL BUILDING OF

JITUJURI DEBASISH HIGH

SCHOOL (H.S.)

HEADMASTER, JITUJURI

DEBASISH HIGH SCHOOL

(H.S.)

121/PM(F)/P

/1B-

108/2012

12-06-2012 21.66977 10.83488

9 CONSTRUCTION OF

HOSTEL BUILDING AND

SCHOOL BOUNDARY WALL

AT TATARI-KENDADIH

HIGH SCHOOL

HEADMASTER, TATARI-

KENDADIH HIGH SCHOOL

122/PM(F)/P

/1B-

109/2012

12-06-2012 25.13340 25.13340 100% 25.13340 COMPLETE

10 CONSTRUCTION OF TWO

CLASS ROOM AT

BADALDIH HIGH SCHOOL,

BARABAZAR BLOCK

BLOCK DEVELOPMENT

OFFICER, BARABAZAR BLOCK

123/PM(F)/P

/1B-

103/2012

12-06-2012 14.13534 11.41001 100% 11.41001 COMPLETE

11 IMPROVEMENT OF ROAD

FROM ANARA SHIV

MANDIR TO ANARA BUS

STAND (1.60 KM), PARA

BLOCK DEVELOPMENT

OFFICER, PARA BLOCK

124/PM(F)/P

/1B-

114/2012

12-06-2012 14.28769 14.28769 100% 14.28769 COMPLETE

12 CONSTRUCTION OF TWO

CLASS ROOM AT

KHARIDURA HIGH

SCHOOL, MANBAZAR-II

BLOCK DEVELOPMENT

OFFICER, MANBAZAR-II

BLOCK

127/PM(F)/P

/1B-

104/2012

12-06-2012 14.13534 11.99356 100% 15-02-2012 11.78770 COMPLETE

Page 83: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

13 CONSTRUCTION OF

BOUNDARY WALL, REPAIR

AND RENOVATION OF

BUILDING OF MUDALI

R.N.M. HIGH SCHOOL,

ARSHA

BLOCK DEVELOPMENT

OFFICER, ARSHA BLOCK

128/PM(F)/P

/1B-

102/2012

13-06-2012 26.42877 25.86574 100% 25.86574 COMPLETE

14 EXCAVATION OF A SILTED

POND AT KHUKRAMURA

VILLAGE, ARSHA

SECRETARY, RAMAKRISHNA

MISSION VIDYAPITH,

PURULIA

141/PM(F)/P

/1B-

122/2012

25-06-2012 24.99686 24.99686 100% 23.47824 COMPLETE

15 PIPED LINE DRINKING

WATER SUPPLY FOR 97

NOS. ANGANWADI

CENTRES AT KASHIPUR &

NETURIA BLOCKS

DISTRICT MAGISTRATE,

PURULIA

144/PM(F)/P

/1B-

121/2012

25-06-2012 9.26611 9.26611 100% COMPLETE

16 CONSTRUCTION OF A

LIBRARY AND READING

ROOM CUM COMMUNITY

HALL AT RAMAKRISHNA

MATH, BAGDA

ADHYAKSHA, RAMAKRISHNA

MATH, BAGDA, PURULIA

145/PM(F)/P

/1B-

123/2012

25-06-2012 25.00000 25.00000 65% 23.25967 WORK IN

PROGRESS

17 CONSTRUCTION OF

BIDHAKATA JORE-CUM-

CULVERT

BLOCK DEVELOPMENT

OFFICER, SANTURI BLOCK

159/PM(F)/P

/1B-

136/2012

11-07-2012 24.86748 WORK ORDER

ISSUED ON 19-

10-2012

Page 84: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

18.1 CONSTRUCTION OF

CLASSROOMS AT

GHATBERA KEROWA H.S.

SCHOOL

BLOCK DEVELOPMENT

OFFICER, BALARAMPUR

BLOCK

165/PM(F)/P

/1B-

128/2012

12-07-2012 16.94634 16.10281 100% 16.10281 COMPLETE

18.2 DEVELOPMENT OF PLAY

FIELD OF LAGDA HIGH

SCHOOL (H.S.)

BLOCK DEVELOPMENT

OFFICER, PURULIA-I BLOCK

165/PM(F)/P

/1B-

128/2012

12-07-2012 14.17509 11.26578 100% MAY'2013 11.26578 COMPLETE

18.3 UPGRADATION OF

LALMATI GIRLS HIGH

SCHOOL BUILDING

BLOCK DEVELOPMENT

OFFICER, BALARAMPUR

BLOCK

165/PM(F)/P

/1B-

128/2012

12-07-2012 15.15221

18.4 CONSTRUCTION OF ROAD

BRIDGE AT ARABAID JORE

BLOCK DEVELOPMENT

OFFICER, BARABAZAR BLOCK

165/PM(F)/P

/1B-

128/2012

12-07-2012 24.56084

18.5 CONSTRUCTION OF

SAPUJORA CULVERT

UNDER BELA GP

BLOCK DEVELOPMENT

OFFICER, BALARAMPUR

BLOCK

165/PM(F)/P

/1B-

128/2012

12-07-2012 15.81713 WORK ORDER

ISSUED,

SCHEME

RUNNING

18.6 CONSTRUCTION OF

CULVERT WITH

GUARDWALL AT CHITAHA

VILLAGE

BLOCK DEVELOPMENT

OFFICER, BALARAMPUR

BLOCK

165/PM(F)/P

/1B-

128/2012

12-07-2012 6.15369 WORK ORDER

ISSUED,

SCHEME

RUNNING

Page 85: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

19 CONSTRUCTION OF 1ST

FLOOR BUILDING WITHIN

GARHJOYPUR SHRI SHRI

RAMKRISHNA

VIVEKANANDA ASHRAM

HEADMASTER, GARHJOYPUR

SHRI SHRI RAMKRISHNA

VIVEKANANDA ASHRAM

174/PM(F)/P

/1B-

135/2012

16-07-2012 17.06713 17.06713

20 CONSTRUCTION OF

GROUND FLOOR (PHASE-I:

24.84568 LAC & PHASE-II:

12.32675 LAC) OF A

HOSTEL BUILDING FOR SC,

ST AND OBC STUDENTS AT

THE AJODHYA HILL TOP,

BAGHMUNDI P.S.

SECRETARY, BHARAT

SEVASHRAM SANGHA,

PURULIA

176/PM(F)/P

/1B-

147/2012

16-07-2012 37.17243 37.17243 13.51339 WORK IN

PROGRESS

21.1 EXTENSION OF HOSPITAL

BUILDING AND CONST. OF

STAFF QUARTERS OF

LOKESWARANANDA EYE

FOUNDATION, PARA (50%

OF REMAINING AMOUNT)

SECRETARY, NANRITAM 182/PM(F)/P

/1B-09/2012

24-07-2012 56.56642 56.56642 95% 26.11229

21.2 PURCHASING OF

EQUIPMENTS, INCLUDING

SURGICAL EQUIPMENT,

2ND PHASE OF

LOKESWARANANDA EYE

FOUNDATION, PARA (FULL

REMAINING AMOUNT)

SECRETARY, NANRITAM 182/PM(F)/P

/1B-09/2012

24-07-2012 91.28300 91.28300 95% 85.01005

Page 86: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

21.3 MOBILE VAN OF

LOKESWARANANDA EYE

FOUNDATION, PARA (FULL

REMAINING AMOUNT)

SECRETARY, NANRITAM 182/PM(F)/P

/1B-09/2012

24-07-2012 1.67708 1.67708 100% 1.67708

22.1 CONSTRUCTION OF PCC

ROAD FROM BAGHRA TO

KOLABANDH, PURULIA-II

BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-II BLOCK

207/PM(F)/P

/1B-

163/2012

01-08-2012 19.99650 BDO HAS BEEN

REQUESTED TO

TAKE UP THE

SCHEME VIDE

NO.

988/PUP/BNK/

1S-152/12

DATED 17-08-

2012

22.2 CONSTRUCTION OF PCC

ROAD FROM ARITA TO

DESHRA, PURULIA-II

BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-II BLOCK

207/PM(F)/P

/1B-

163/2012

01-08-2012 19.99304 13.84730 100% 13.84730 COMPLETE

22.3 CONSTRUCTION OF PIPE-

CAUSEWAY AT HUTMURA,

PURULIA-II BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-II BLOCK

207/PM(F)/P

/1B-

163/2012

01-08-2012 14.77170 14.29116 100% 14.29116 COMPLETE

Page 87: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

22.4 CONSTRUCTION OF LOW

LEVEL BRIDGE OR

CAUSEWAY AT LALBAZAR-

PURDA, PURULIA-II BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-II BLOCK

207/PM(F)/P

/1B-

163/2012

01-08-2012 15.31920 14.86673 100% 14.86673 COMPLETE

23 CONSTRUCTION OF 1ST

FLOOR OF COMMUNITY

HALL AT LALPUR, HURA

BLOCK

BLOCK DEVELOPMENT

OFFICER, HURA BLOCK

270/PM(F)/P

/1B-

182/2012

28-08-2012 48.86409 26.24129 50% 26.04705 WORK IN

PROGRESS

24 CONSTRUCTION OF

SCHOOL BUILDING OF

SIMAKANALI SIDDIKA

MADRASAH SHIKSHA

KENDRA, PUNCHA PS

EXECUTIVE OFFICER,

PUNCHA PS

136/PM(F)/P

/1B-

176/2012

28-05-2013 23.51743 12.10120 50% 12.10120 ONGOING

25 IMPROVEMENT OF ROAD

FROM ANARA SHIV

MANDIR TO ANARA BUS

STAND (PART-B, C, & D),

PARA

BLOCK DEVELOPMENT

OFFICER, PARA BLOCK

277/PM(F)/P

/1B-

114/2012

30-08-2012 75.10098 65.79291 70% 65.79291 WORK IN

PROGRESS

Page 88: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

26 CONSTRUCTION OF 2ND

FLOOR FOR GYNAE,

PEDIATRIC WARD,

ELECTRICAL INSTALLATION

AND ALLIED WORKS AT

DEBEN MAHATO (SADAR)

HOSPITAL

EXECUTIVE ENGINEER,

P.W.D., WESTERN ELECTICAL

DIVISION NO. - II

279/PM(F)/P

/1B-85/2011

30-08-2012 15.27580 15.27580

27 CONSTRUCTION OF

CLASSROOMS AT BERADA

HIGHER SECONDARY

SCHOOL, BARABAZAR

BLOCK

BLOCK DEVELOPMENT

OFFICER, BARABAZAR BLOCK

280/PM(F)/P

/1B-

179/2012

31-08-2012 24.44847 24.09003 100% 23.73399 COMPLETE

28 CONSTRUCTION OF

BRIDGE ON RIVER

THAKURCHATANI NEAR

GURRABERA, JHALDA-II

BLOCK (ADDITIONAL

FUND)

BLOCK DEVELOPMENT

OFFICER, JHALDA-II BLOCK

324/PM(F)/P

/1B-

166/2011

27-09-2012 7.77867 WORK IN

PROGRESS

29 RE-CONSTRUCTION WITH

REPAIRING OF APPROACH

ROAD OF RANGANITARD

CULVERT UNDER

UPARKAHAN GP

BLOCK DEVELOPMENT

OFFICER, JOYPUR BLOCK

325/PM(F)/P

/1B-

199/2012

27-09-2012 5.13605 4.89772 100% 4.89772 COMPLETE

Page 89: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

30 CONSTRUCTION OF ROAD

FROM GOPALPUR BUS-

STAND TO BAGDA BUS-

STAND VIA RASUDI (4 KM),

PUNCHA BLOCK (PHASE-I

& PHASE-II)

DISTRICT MAGISTRATE,

PURULIA

326/PM(F)/P

/1B-

198/2012

27-09-2012 52.92606 52.92606 80% 31-05-2013 TENDER

INVITED ON 26-

12-2012

31 CONSTRUCTION OF

BOUNDARY WALL OF

MAIN BUILDING AT

PATHARDIH BPHC,

BAGHMUNDI BLOCK

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

327/PM(F)/P

/1B-

201/2012

27-09-2012 33.32000 15.52902 70% 15.52902 WORK IN

PROGRESS

32 CONSTRUCTION OF CHECK

DAM AT DHANSURA,

BELMA, CHAKIRBAN AND

SENERA AMRA VILLAGE,

PURULIA-II PS

BLOCK DEVELOPMENT

OFFICER, PURULIA-II BLOCK

338/PM(F)/P

/1B-

162/2012

05-10-2012 34.71569 14.34387 14.34387 BDO HAS BEEN

REQUESTED TO

TAKE UP THE

SCHEME VIDE

NO.

1424/PUP/BNK

/1S-198/12

DATED

12/10/2012

33 ADDITIONAL

EXPENDITURE FOR

CONSTRUCTION OF 18

(EIGHTEEN) NOS. OF PCC

ROAD IN BAGHMUNDI

BLOCK

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

339/PM(F)/P

/1B-69/2012

08-10-2012 10.36500 8.23995 8.23995

Page 90: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

34.1 CONSTRUCTION OF

CULVERT ON SALDAHA

RIVER AT GOKULNAGAR

MOUZA UNDER JHALDA-I

BLOCK

BLOCK DEVELOPMENT

OFFICER, JHALDA-I BLOCK

346/PM(F)/P

/1B-

205/2012

10-10-2012 24.59000 12.15688 12.15688 WORK IN

PROGRESS

34.2 CONSTRUCTION OF BLACK

TOP ROAD ON BOTH SIDE

OF SALDAHA CULVERT IN

GOKULNAGAR

BLOCK DEVELOPMENT

OFFICER, JHALDA-I BLOCK

346/PM(F)/P

/1B-

205/2012

10-10-2012 12.46029 TENDER

INVITED ON 26-

11-2012

35 CONSTRUCTION OF MAIN

GATE AND TWO NOS. OF

SECURITY ROOMS AT

PURULIA POLYTECHNIC

PRINCIPAL, PURULIA

POLYTECHNIC

350/PM(F)/P

/1B-

207/2012

12-10-2012 5.50742 5.50742 100% 5.50742 COMPLETE

36 CONSTRUCTION OF

CLASSROOMS AT

CHANDRA HIGH SCHOOL

(HS) (ADDITIONAL

AMOUNT)

BLOCK DEVELOPMENT

OFFICER, MANBAZAR-I

BLOCK

352/PM(F)/P

/1B-

134/2011

16-10-2012 3.05053

37 CONSTRUCTION OF A

PATIENT WAITING HALL IN

PHASE-I & PHASE-II AT

BHARAT SEVASHRAM

SANGHA CHARITABLE

DISPENSARIES , PURULIA

SECRETARY, BHARAT

SEVASHRAM SANGHA,

PURULIA

353/PM(F)/P

/1B-

210/2012

17-10-2012 40.43369 40.43369 15.30247

Page 91: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

38 CONSTRUCTION OF

BOUNDARY WALL &

SCHOOL BUILDING OF

RAMAKRISHNA

VIVEKANANDA MISSION

AT BELKURI

SECRETARY, RAMAKRISHNA

VIVEKANANDA MISSION,

PURULIA

355/PM(F)/P

/1B-

211/2012

18-10-2012 31.07141 31.07141 65% 20.47293 WORK IN

PROGRESS

39 CONSTRUCTION OF

BRIDGE ON TULIN MAGHA

ROAD ON SALDAH RIVER,

JHALDA-I BLOCK

DISTRICT MAGISTRATE,

PURULIA

359/PM(F)/P

/1B-

110/2012 &

364/PM/201

2

19-10-2012 &

02-11-2012

154.81423 154.81423 2% 31-03-2015 TENDER

INVITED ON 26-

12-2012

40.1 CONSTRUCTION OF

CLASSROOMS AT

GENGARA HIGH SCHOOL,

PURULIA-II BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-II BLOCK

369/PM(F)/P

/1B-

202/2012

09-11-2012 5.00000 BDO HAS BEEN

REQUESTED TO

TAKE UP THE

SCHEME VIDE

NO.

1688/PUP/BNK

/1S-210/12

DATED

05/12/2012

40.2 CONSTRUCTION OF

CLASSROOMS AT

KHUDIBANDH HIGH

SCHOOL, PURULIA-II

BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-II BLOCK

369/PM(F)/P

/1B-

202/2012

09-11-2012 9.95945 9.94479 100% 9.94479 COMPLETE

Page 92: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

41 CONSTRUCTION OF

GALLERY OF THE STADIUM

FOR TWO BLOCKS AT

MANBHUM VICTORIA

INSTITUTION IN TWO

PHASE

DISTRICT MAGISTRATE,

PURULIA

371/PM(F)/P

/1B-

220/2012

20-11-2012 39.31756 39.31756 55% 31-07-2013 19.65878 WORK IN

PROGRESS

42 CONSTRUCTION WORK OF

EXISTING SCHOOL

BUILDING AT

KUKRUDABAR PRIMARY

SCHOOL, BANDWAN

BLOCK

HEADMASTER,

KUKRUDABAR PRIMARY

SCHOOL, BANDWAN

389/PM(F)/P

/1B-

214/2012

27-11-2012 2.80000 2.80000 2.80000 CONSTRUCTIO

N WORK

COMPLETE

43.1 CONSTRUCTION OF PCC

ROAD FROM BILTORA

DEOGHORIA PARA TO

BAURI BANDH, PURULIA-II

BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-II BLOCK

391/PM(F)/P

/1B-

215/2012

27-11-2012 3.50000 0.08436

43.2 CONSTRUCTION OF PCC

ROAD FROM NADIHA

ROAD TO PURANDIH VIA

MALTHORE, BELMA,

PURULIA-II BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-II BLOCK

391/PM(F)/P

/1B-

215/2012

27-11-2012 10.50000 9.85288 100% 9.85288 COMPLETE

44.1 CONSTRUCTION OF ROAD

FROM GARAFUSRO

SHIVAMANDIR TO

GARAFUSRO JORE,

PURULIA-I BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-I BLOCK

392/PM(F)/P

/1B-

127/2012

27-11-2012 24.64165 24.31300 100% MAY'2013 23.85706 COMPLETE

Page 93: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

44.2 CONSTRUCTION OF

CONCRETE ROAD FROM

BALIAGARA SHIVAMANDIR

TO BOSTOMTUPA JORE,

PURULIA-I BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-I BLOCK

392/PM(F)/P

/1B-

127/2012

27-11-2012 10.01256 8.19331 100% MAY'2013 8.01139 COMPLETE

44.3 CONSTRUCTION OF ROAD

FROM GHARJURI TO

GARAFUSRO VILLAGE,

PURULIA-I BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-I BLOCK

392/PM(F)/P

/1B-

127/2012

27-11-2012 19.80377 0.36760 MAY'2013 WORK ORDER

ISSUED

44.4 CONSTRUCTION OF ROAD

FROM DULMI 40 QUARTER

TO RAIBUNDH MORE,

PURULIA-I BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-I BLOCK

392/PM(F)/P

/1B-

127/2012

27-11-2012 19.80377 18.47510 100% MAY'2013 18.47510 COMPLETE

44.5 CONSTRUCTION OF

CONCRETE ROAD FROM

MANGURIA SHIVAMANDIR

TO OLD BEGUNKODAR

ROAD, PURULIA-I BLOCK

BLOCK DEVELOPMENT

OFFICER, PURULIA-I BLOCK

392/PM(F)/P

/1B-

127/2012

27-11-2012 10.72774 8.89049 100% MAY'2013 8.89049 COMPLETE

45 CONSTRUCTION OF

BOUNDARY WALL AT PARA

SHIB NARAYAN HIGH

SCHOOL (H.S.), PARA

BLOCK

HEADMASTER, PARA SHIB

NARAYAN HIGH SCHOOL

(H.S.)

409/PM(F)/P

/1B-

234/2012

11-12-2012 23.51551 23.51551 100% 23.51551 COMPLETE

Page 94: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

46 CONSTRUCTION OF

CLASSROOM AT

CHELYAMA B.P. HIGH

SCHOOL, RAGHUNATHPUR-

II BLOCK

SCHOOL AUTHORITY,

CHELYAMA B.P. HIGH

SCHOOL

413/PM(F)/P

/1B-01/2012

13-12-2012 17.22960 8.61480 WORK ORDER

ISSUED,

DELAYED DUE

TO RAIN

47.1 CONSTRUCTION OF

CULVERT AT KALIMATI

MORE TO BIDDRI ROAD IN

SERENGHDIH G.P.,

BAGHMUNDI BLOCK

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

417/PM(F)/P

/1B-

233/2012

13-12-2012 24.91970 24.05276 100% 24.05276 COMPLETE

47.2 CONSTRUCTION OF

CULVERT ON BUKHADIH

TO SARAMCHAKI ROAD IN

BURDA-KALIMATI G.P.,

BAGHMUNDI BLOCK

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

417/PM(F)/P

/1B-

233/2012

13-12-2012 24.91970 0.54360 0.54360 WORK IN

PROGRESS

47.3 CONSTRUCTION OF

CULVERT ON THE ROAD

SURJANDIH TO

KAMALBAHAL ROAD IN

AJODHYA G.P.,

BAGHMUNDI BLOCK

BLOCK DEVELOPMENT

OFFICER, BAGHMUNDI

BLOCK

417/PM(F)/P

/1B-

233/2012

13-12-2012 24.91970 0.54360 0.54360 WORK IN

PROGRESS

48 SUPPLYING OF DRINKING

WATER BY LAYING PIPE

LINE TO 9 (NINE) NOS. OF

ANGANWARI CENTRES IN

PARA ICDS PROJECT

EE, CIVIL, PHE DTE., PURULIA 418/PM(F)/P

/1B-

237/2012

13-12-2012 0.97038 0.97038

Page 95: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

49 RENOVATION AND

FURNISHING OF

LABORATORIES AT

CHITTARANJAN GIRLS'

HIGH SCHOOL

HEADMISTRESS,

CHITTARANJAN GIRLS' HIGH

SCHOOL

423/PM(F)/P

/1B-

248/2012

14-12-2012 3.35674 3.35674 100% 3.35674 COMPLETE

50 CONSTRUCTION OF PCC

ROAD FROM SATNALA

STREAM TO MAMUDIH

VILLAGE (3.0 KM) WITHIN

JHALDA-II BLOCK

DISTRICT MAGISTRATE,

PURULIA

424/PM(F)/P

/1B-70/2012

18-12-2012 119.22956 119.22956 25% 30-09-2013

51 CONSTRUCTION OF OFFICE

BUILDINGS OF R.B.B. HIGH

SCHOOL (H.S.) AT

GARHJOYPUR

HEADMASTER, R.B.B. HIGH

SCHOOL (H.S.)

426/PM(F)/P

/1B-

249/2012

18-12-2012 19.30177 19.30177 50% 9.65088 WORK IN

PROGRESS

52 CONSTRUCTION OF 2 NOS.

OF CLASSROOMS

INCLUDING STAIRCASE AT

MANIPUR SWAMI

VIVEKANANDA HIGH

SCHOOL (H.S.)

HEADMASTER, MANIPUR

SWAMI VIVEKANANDA HIGH

SCHOOL (H.S.)

435/PM(F)/P

/1B-

256/2012

20-12-2012 16.36239 16.36239 8.18100

53 CONSTRUCTION OF

BRIDGE ON SATNALA,

JHALDA-II BLOCK

DISTRICT MAGISTRATE,

PURULIA

17/PM(F)/P/

1B-70/2012

24-01-2013 4.45262

Page 96: 2012-2013 Fund - All Entry

` IN LAC

NO. DATE

REMARKSSANCTIONED

AMOUNT

RELEASED

AMOUNT

PHYSICAL

PROGRESS

EXPECTED DATE

OF

COMPLETION

DISTRICT: PURULIADETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13

SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY

WITH CONTACT DETAILS

PUA DEPT.'S SANCTION

ORDER

UC RECEIVED

54 CONSTRUCTION OF PUCCA

ROAD FROM TELEKOCHA

TO JAMUNA BANDH (5.70

KM), MANBAZAR-II BLOCK

DISTRICT MAGISTRATE,

PURULIA

29/PM(F)/P/

1B-143/2012

04-02-2013 149.72598 149.72598 20% 30-09-2013

55 CONSTRUCTION OF A

LIBRARY AND READING

ROOM CUM COMMUNITY

HALL AT RAMAKRISHNA

MATH, BAGDA (ADDL.

FUND)

ADHYAKSHA, RAMAKRISHNA

MATH, BAGDA, PURULIA

74/PM(F)/P/

1B-123/2012

13-03-2013 19.52958 19.52958

56 CONSTRUCTION OF

ADDITIONAL CLASSROOMS

AT BALARAMPUR PHOOL

CHAND HIGH SCHOOL,

BALARAMPUR BLOCK

BLOCK DEVELOPMENT

OFFICER, BALARAMPUR

BLOCK

95/PM(F)/P/

1B-22/2013

18-03-2013 14.88602 BDO

REQUESTED

VIDE NO.

640/PUP/BNK/

1S-278/12 DT.

22-03-2013

TOTAL: 2128.55477 1669.37295 963.35976