water · 2012-06-06 · 14 the water management decision continuum study dentistry turn dirty water...
TRANSCRIPT
WaterA Construct for Sustainable Drilling
2
All Water Is Local.
3
Water as AssetWhat is the value?
4
thirst
5
6
7
8
9
Unfeasible#5793288
RegulationsRegulationsRegulations
10
11
OilmanTreehugger
O&G Water Source Transition
12
Frac Water(Years)
Produced Water(Decades)
13
14
The Water Management Decision Continuum
Study Dentistry
Turn Dirty Water into Fresh Water
Dump to Evap Pit
Reduce Volume to Dispose
Clean a little and Reuse
Maximize Water Value and Minimize Disposal
Obtain Max Results + PR with BAT
RechargeAquifer
impact $$$$ impact $$$$ impact $$$$ impact $$$$ impact $$$$ impact $$$$
15
200,000,000Gallons Clean
The Real Deal
16
IP Processes High-Rate Turbulent Flow Vapor Recompression Submerged Boiling Flash Evaporation
Process BenefitsMax Concentration Any TDS Feedstock No Fouling No Scaling
Toyota, Caterpillar, AisenWarner, YKK, International Paper, MARTA, and more…
Zero-Discharge for 15 Years
Proven Science in Action
17
Thermal Compression
Mechanical Compression(Remove if use Thermal Compre.)
BrineConcentrate or Recovered Oil
Oil-Water Separator
Recovered Alcohol
RecoveredOil
40-E
ffect
Dis
tilla
tion
Clean Water
Feed
Optional (if existing steam source)
Opt
iona
l
ContinuousConcentrating
Flash
Feed
HeatExchanger
Pre-Heat
Back Pressure
Western Flowback
1815,000 to 40,000 mg/L TDS
Eastern Flowback
1950,000 to 120,000 mg/L TDS
20
21
Water for Reuse or Discharge
Produced Concentrated Pre-Strip DistilledWater Brine Water Water
22
Permits for Unique Water Use or Discharge
Passed WET TestWhole Effluent Toxicity
to Sustain Life
Surface Hole DrillingFirst in the Nation
Substitute for “Fresh” Water
23
PODIntegrated Distillation
Hydrocarbon & Alcohol Recovery
NPDES Water Quality
Landfill or Value Residue
3,000 bbl/day Transportable System
Vetted & Backed by
Secured Debt forCapital Asset Construction
Energy Financial Services
24
Heat Exchanger
Steam Disengagement Vessel
Distillation Column
Effluent Polishing and Discharge
Mechanical Steam Compressor
25
PODLarge or Little
Mobile or Modular
Plug ‘n Play
26
On the Anticline in Wyoming
Evaporation Skid
27
Pump and Blower Skid
28
PODTwo Evaporators and One Distillation Column
29
Flexible Site Configurations
30
Advanced Control and Automation
31
Foundation Field Bus and DeviceNet
The Piceance in ColoradoVega Field
32
Site Overview (across from Compressor Station)
33
Set for Ten Year Operation
34
Pitless Site Infrastructure
35
Site Planned for Five PODs
36
37
The Clear Difference
38
Clean Dirty
FAQs TEL 801-924-9191
• How much does it cost?It depends.
• How much water do you recover?It depends.
• How much energy do you require?It depends.
• How much time does it take to build a POD?It depends.
• How much money and hassle can you save me?Sometimes a lot. 40