Bergen op Zoom Seminar February 2011
Alarm ManagementPrinciples & Guidance
![Page 2: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/2.jpg)
Next generation alarm management
Today’s Seminar
Most of you here have a Plant, DCS system, ESD system Improving the effectiveness of the alarm systems improves overall operation and increases safety
Today’s seminar focuses on a good foundation to achieve this
![Page 3: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/3.jpg)
Next generation alarm management
Agenda
Introduction to UReason
Example Cases
Alarm Management Principals & Guidance
How UReason can help You!
Questions & Discussion
(Every attendee will receive the presentation)
![Page 4: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/4.jpg)
Next generation alarm management
UReason is …
Anglo-Dutch Company with offices in Leiden and Maidenhead
Delivers real-time applications and solutions in the area of Operational Excellence
Customers in Europe, North-America and Middle-East. Industries: Oil & Gas, (Petro)chemical, Traffic, Energy and Utilities
“We Combine our Expertise and Technology with that of our
customers to improve Operational Excellence”.
![Page 5: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/5.jpg)
Next generation alarm management
Operational Excellence
Operational Advisories:– Sabic– DSM– Remote Surveillance:
• Siemens Power Generation• Vestolit• Shell Global Solutions/NAM
Alarm Management:– BASF– BP– KPE– Siemens Oil & Gas– LyondellBasell– Total E&P– Anglian Water
Simulation:– WaterSpot: DZH/PWN/Waternet
/ABB/DHV/Vitens/TU-Delft
– DISCONTO: PWN/DHV/TU-Delft/Vitens/Dunea/Brabant Water
Active Participant in:
• ANSI/ISA S18.02 Standard• ISA S18.02 TR Development• EEMUA 191 Guideline
![Page 6: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/6.jpg)
Next generation alarm management
Example: Northsea Gas producer
Scope of Supply:- Alarm Management Survey- Philosophy Development- Support Alarm Rationalization- Performance Auditing- Advanced Alarm Management System for Onshore Centralized Control Room
DCS: Foxboro IAA&E Historian: TiPS LogMateAlarm Reporting: OASYS-AMAdvanced Alarm Management: OASYS-AM
Alarm reduction on 4 platforms, Visionary Approach for Centralized Control Room
Alarm reduction on 4 platforms, Visionary Approach for Centralized Control Room
![Page 7: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/7.jpg)
Next generation alarm management
Overview of the reduction realized, varying between 30% – 65%
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
300 Board Reduced 600 Board Reduced 800 Board Reduced All Boards
Next generation alarm management
Example: LyondellBasell
Scope of Supply:- Rule Discovery from Historical Data- Alarm Display Replacement- Alarm Predictions in Control Room
Corporate Agreement – Advanced Dynamic Alarm Management
DCS: Emerson DeltaVData: TiPS LogMateEmerson OPCAdvanced Alarm Management: OASYS-AM
![Page 8: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/8.jpg)
Next generation alarm management
Example: Chemical Plant Germany
Proactive 24x7 information on gas leaks
Vision/Smell & Sound Sensors Combined
Operators don’t have to do a 12 hours plant inspection
Important for keeping licence to operate
Operator Advisories
Interfaces: Emerson, ABB, Siemens
![Page 9: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/9.jpg)
Next generation alarm management
Example: Refinery Netherlands
Scope of Supply:
- Alarm & Event Historization- Alarm & Event Reporting- Alarm Awareness Workshops - Alarm Philosophy Development- Master Alarm Database- Alarm MOC
DCS: Honeywell TDC, Foxboro IA, Yokogawa CSHistorian: SQL Server
![Page 10: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/10.jpg)
Next generation alarm management
Example: Refinery Netherlands
Scope of Supply:
- Consultancy - Alarm Awareness Workshops - Alarm Philosophy Development- Setup Master Alarm Database- Vendor Selection
- A&E Historization- A&E Reporting- Master Alarm Database & MOC
DCS: Honeywell TDC, HIMA/MagLog ESD
![Page 11: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/11.jpg)
Next generation alarm management
Siemens – Process Real-Time Historian PIMAQ
SISOG PIMAQ System Embeds OASYS-AM
PIMAQ Examples:- Maersk Al-Shaheen FDP 2000- Maersk Al-Shaheen FDP 2005- Maersk Halfdan- Petrobas FPSO Piranema- Venture Oil FPSO Hummingbird- Statoil Snorre A, Snorre B- ConocoPhillips EldFiks- Hydro Njord A & B
![Page 12: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/12.jpg)
Next generation alarm management
Siemens - PIMAQ
![Page 13: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/13.jpg)
Next generation alarm management
Siemens - PIMAQ
![Page 14: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/14.jpg)
Next generation alarm management
Alarm ManagementPrinciples & Guidance
![Page 15: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/15.jpg)
Next generation alarm management
Just imagine … you drove to this seminar and every 2/3 minutes an alarm went off
Breaks are overheatingLeft front tire pressure is downOil Temperature drifting to High….
And you were also expected to find your way, drive safe-fully, listen to the radio for traffic jams and decide on alternative routes…
![Page 16: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/16.jpg)
Next generation alarm management
.. our car and our driver
![Page 17: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/17.jpg)
Next generation alarm management
Why Focus on Alarm Management ?
Abnormal conditions cost billions annually:– Loss of equipment and life– Off-spec Product and Lost Production (3-8% per year)– Environmental Excursions and Remediation
Major contributing factors include:– Information Overflow– Poorly Designed Operator Interfaces– Inadequate Alarm Management System
Alarm Management is recognized as a significant plant reliability improvement
![Page 18: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/18.jpg)
Next generation alarm management
The Alarm System - Definition
The primary function of the alarm system is to warn the operator about a situation that is not normal
Operator’s Response to an alarm = action:
Source EEMUA 191
![Page 19: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/19.jpg)
Next generation alarm management
Some Examples …
Source HSE CRR 166
On 13th May 2002, pilot lights on the flare system at a chemical plant were extinguished. This occurred because there were fluctuations in the gas supply to the flare. A large gas cloud formed but, fortunately, did not ignite. The flare gas came from an installation which was being restarted.The restart process produced 3,700 alarms so, not surprisingly, the operators failed to detect the alarm for the flare.
HSE Briefing Note No. 9
![Page 20: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/20.jpg)
Next generation alarm management
Alarm System Contributes to Stress
Alarm annunciation is the biggest stress factor for operators
EquipmentFailure
Human Errors
Control failure
Picture Source: ASM Consortium
Stress is the main cause for human errors
Human errors are the most frequent cause for incidents and upsets
Human errors are caused by ineffective systems
Next generation alarm management
![Page 21: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/21.jpg)
Next generation alarm management
How did we get here ?
Old days – hardwired – ‘optimized’ alarm system
(100 Light Fixtures)
DCS systems – Inflation of number of configured alarms per operator station:
0
500
1000
1500
2000
2500
3000
3500
4000
1960 1970 1980 1990 2000
![Page 22: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/22.jpg)
Next generation alarm management
What Do you Have?
Seminar Attendees:
Question1: How many configured alarms does your plant have?
Question2: How many Operator stations does your plant have?
Question3: Has an HAZOP ever revealed information overload and led to operability improvements?
![Page 23: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/23.jpg)
Next generation alarm management
Unfortunately incidents (re)focus attention
• Esso LongFord• Total BunceField• BP Refinery Texas City• Texaco Refinery Milford Haven
Increased attention leads to regulation and improvements
![Page 24: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/24.jpg)
Next generation alarm management
An Example - Milford Haven (’94)
On 24th July 1994 there was a major explosion at the oil refinery at Milford Haven jointly owned by Texaco and Gulf. There was plant damage that cost about £48M to repair. There was also two months lost production from the complete plant and four months lost production from the area that was damaged. The plant owners were prosecuted and fined a total of £200,000 plus costs.
Alarm system shortcomings were one major contributor to this incident. There was a lightning strike which caused a significant plant upset. For several hours after the lightning strike the operators were For several hours after the lightning strike the operators were heavily loaded with alarms at a rate estimated to be in excess of 1 heavily loaded with alarms at a rate estimated to be in excess of 1 every 2-3 seconds. During this period several operators failed to every 2-3 seconds. During this period several operators failed to identify the build up of liquid in a knock-out vessel.identify the build up of liquid in a knock-out vessel. This eventually overfilled and resulted in the explosion taking place. A number of instrument faults contributed to the operating confusion. A large number of people (26) sustained minor injuries as a result of the explosion, but fortunately there were no major injuries.
Source HSE CRR 166
![Page 25: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/25.jpg)
Next generation alarm management
An Example - Milford Haven (’94)
Lesson 1 - Alarm System– The control displays and alarms did not aid operatives– A process overview would have helped diagnosis– The alarms appeared faster than they could be responded to
and key alarms were missed in the flood– 87% of the 2040 alarms displayed as "high" priority, despite
many being informative only - safety critical alarms were not distinguishable from the rest
Lesson 2 - Safety Management System (SMS)SMS failures included:
– The plant modification procedure did not prevent removal of the flare knock-out drum emptying facility
– The instrument maintenance system did not prevent 40% of instruments from being defective
![Page 26: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/26.jpg)
Next generation alarm management
An Example - Milford Haven (’94)
Lesson 3 - Training and competenceTraining should include:
– Clear guidance on how to manage unplanned events– Clear guidance on when to initiate emergency plant shutdown– Clear authority to initiate shutdown
Lesson 4– Ultimate plant safety must not depend on operator response
![Page 27: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/27.jpg)
Next generation alarm management
Milford Haven Has Led To ?
Recognition of the Alarm Management Problem
Definition of Alarm MetricsEEMUA 191 (1999/2007)
…. and Many Alarm Improvement Programs based on EEMUA 191 Guidelines Be careful with using this picture .. Statistics and Averaging tend to hide real issues
![Page 28: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/28.jpg)
Next generation alarm management
Some EEMUA Metrics
Source EEMUA 191
![Page 29: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/29.jpg)
Next generation alarm management
Some EEMUA Metrics
Source EEMUA 191
Message: Start Measuring Your Alarm System Performance Compare and Take Action
![Page 30: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/30.jpg)
Next generation alarm management
OKAY …..
We know what to measure and how to compare
We are engineers …
Lets Start !
Using What Framework ?
![Page 31: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/31.jpg)
Next generation alarm management
Don’t start building your house without a good foundation
Foundation:
− Alarm Philosophy (Rules)− Management of Change− Monitoring & Assesment
KPIs + Follow-up
![Page 32: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/32.jpg)
Next generation alarm management
The SP18 – The Alarm Management Lifecycle
The lifecycle model is useful in identifying the requirements and responsibilities for
implementing an alarm management system.
The lifecycle is applicable for the installation of new alarm
systems or managing an existing system.
Source ISA SP18
Philosophy
Identification
Rationalization
Detailed Design
Implementation
Operation
Maintenance
Monitoring & Assessment
Management of Change
Audit
A
B
C
D
E
F
G
H
I
J
![Page 33: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/33.jpg)
Next generation alarm management
The Alarm Philosophy
Source ISA SP18
![Page 34: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/34.jpg)
Next generation alarm management
The Alarm Philosophy
The Alarm Philosophy Document can be a small document. Keep in mind that the purpose is to get common understanding, metrics and rules for MOC
![Page 35: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/35.jpg)
Next generation alarm management
First Focus On?
When writing an Alarm Philosophy first Focus on:
1. Roles & Responsibilities2. Alarm Prioritization Method3. Key Performance Indicators
![Page 36: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/36.jpg)
Next generation alarm management
Roles & Responsibilities in Alarm Management
Key is to (re)define Roles & Responsibilities related to alarm management activities. An example:
![Page 37: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/37.jpg)
Next generation alarm management
Prevent Information Overflow
Adopt a Single Prioritization Method:
1. Classify the Health, Safety, Environment, Financial & Reputation Consequences
2. Decide what Operator Response Times you use to prioritize• < 3 minutes = Immediate Action• 3 – 10 minutes = Swift Action• 10 minutes > = Take Action
3. Decide levels for Consequences of no Response, f.ex.:• Small - Immediate Action required but Small Consequence = LOW
Priority• Moderate - Immediate Action required but Medium Consequence =
HIGH Priority• High - Immediate Action required but Severe Consequence =
EMERGENCY Priority
![Page 38: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/38.jpg)
Next generation alarm management
Example Matrix
![Page 39: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/39.jpg)
Next generation alarm management
Set Targets
Set Targets for:
• Average Alarm Rate per time period (day/hour/minute) ~ 6 per hour
• Percentage of hours containing more than >= N alarms – 2% = 14 hours per month in flood condition
• Percentage contribution of the top 10 most frequent alarms to the overall alarm load
• Number of standing alarms on any day • Annunciated priority distribution
during alarm flood• Annunciated priority distribution in
steady operation• The top 10 most frequent
disabled/enabled alarms. • The top 10 most frequent inhibited
alarms.
→ ~ 6 per hour
→ 2% = 14 hours per month in flood condition
→ < 5% (otherwise many bad actors)
→ < 5
→ ~5%, 15%, 80% (Emergency, High Low)
→ <1%, 10%, 90% (Emergency, High Low)
→ <1% of total configured alarms
→ < 1% of total configured alarms
![Page 40: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/40.jpg)
Next generation alarm management
Monitor & Take Action
Monitor Weekly/Bi-Weekly/MonthlyFollowed by quick bad-actor mitigation to improve
Actual
Target
![Page 41: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/41.jpg)
Next generation alarm management
Identify & Improve
Bad Actor Mitigation is a quick-win solution (fixes the alarms that are a problem now).
Alarm Performance Monitoring may have identified following Issues:
- Priority Distribution is Off- Too many alarms in stable operation- Too many alarms during and following trips- Large number of disabled alarms
Rationalize: rethink and document your alarms
![Page 42: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/42.jpg)
Next generation alarm management
Document & Rationalize
Choose a fitting Rationalization approach:
1. Unit-by-Unit2. Full-scale
Reduce scope: Only rationalize the alarms that actually triggered during the last 12 months
Document and Rationalize according to your rules in your Alarm Philosophy.
![Page 43: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/43.jpg)
Next generation alarm management
Alarm Rationalization & Documentation
What Alarm Information Should you document:
– Alarm Rationale– Alarm Cause– Alarm Consequences– Alarm Consequential Alarms– Alarm Actions– Alarm Settings– Alarm Priority– Alarm Mode Dependencies
Tools available that help you retrieve current settings and alarm information, store and audit
(and enforce) unrequested changes
ALARM
- Type- Priority- Trip point- Dead band
AlarmConfigurations
CAUSE(S)
CONSEQUENCE(S)
ACTION(S)
AlarmHistorian
![Page 44: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/44.jpg)
Next generation alarm management
What Do you Have?
Seminar Attendees:
Question 1: Does your plant/site have an Alarm Philosophy?
Question 2: Do you have clear metrics whereby you can measure system performance? .. And do you frequently monitor these?
Question 3: Do you have an alarm historian?
Question 4: Do you store and audit changes on your alarm configuration data?
![Page 45: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/45.jpg)
Next generation alarm management
Where to Start?
HELP … I just experienced an Alarm Management Information Overflow … Where to Start:
1. Alarm Philosophy Document
2. Use Current Systems Improve Procedures:
- Document- Measure- Audit- Take Actions (Weekly/Bi-Weekly)
3. Invest in Alarm Systems:
- Alarm & Event Historization- Master Alarm Configuration Database- Alarm MOC (Electronic)- OASYS-AM
- State Based Alarming/Shelving- Operator Advisories: supporting the non routine situations- Reducing the alarm load- Prevent Alarm Storms with Alarm Predictions
- HMI improvements : sounds and presentation!
Foundation
Document/Measure & Improve
![Page 46: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/46.jpg)
Next generation alarm management
Your Goal ?!
Good Alarm Management Practices:
1. Allow your operator to focus on improving the process instead of responding to the system
2. Result in less stress and reduction of human failure
3. Result in less excursions to the safety and integrity limits of your operations and as a result fewer trips and reduction of downtime
![Page 47: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/47.jpg)
Next generation alarm management
UReason can help you in the entire Alarm Management Lifecycle:
- Alarm Awareness Workshops- Alarm Philosophy Development- Alarm Rationalization & Documentation- Alarm MOC- Measuring & Improving Alarm Systems Performance- Alarm Management Systems:
- A&E Historian, A&E Reporting, Master Alarm Database, Alarm MOC
- Advanced Alarm Reduction
![Page 48: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/48.jpg)
Next generation alarm management
Thank You for your Attention !!Questions !??
![Page 49: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/49.jpg)
Next generation alarm management
Contact Details:
UReason LeidenPompoenweg 92321DK Leiden071-5281700www.UReason.com
Presenters:Lieven Dubois: [email protected] Jules Oudmans: [email protected]
![Page 50: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/50.jpg)
Next generation alarm management
Future developments
The average age of control room operators is high – knowledge retention is becoming more and more a hot topic
There is a change in workforce:1. Higher educated control room operators staying short
period of time (2/3 yrs in control room)2. Lower educated control room operators requiring
smarter systems helping them
Improved Operational Information (at the fingertips) and Operator Training !
![Page 51: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/51.jpg)
Next generation alarm management
Future developments
ISA S18 is released this will lead to updated OSHA regulations in turn leading to investments in Improved AM procedures, Reporting and Improved Alarm Management systems
New regulations to follow …
![Page 52: 20110204 alarm management seminar ureason v1 3](https://reader035.vdocuments.us/reader035/viewer/2022062312/55632a9bd8b42ad7398b4ef0/html5/thumbnails/52.jpg)
Next generation alarm management
Further reading:
ISA SP18:http://www.isa.org/MSTemplate.cfm?Site=SP18,_Instrument_Signals_and_Alarms
EEMUA 191:
http://www.eemua.co.uk/p_instrumentation.htmHSE CRR 166: ISBN: 0717615154Human Factors & Alarm Management:
http://www.hse.gov.uk/humanfactors/topics/alarm-management.htm