2011 portfolio
DESCRIPTION
My 2011 Portfolio, originally created to be a 7x7 Blurb book.TRANSCRIPT
CHRIS BAUMBACHArchitect, LEED AP, CCCA
CaliforniaMassachusetts
Vermont
[email protected](802) 505-3046
winery programming diagram and rendering : RRM Design Group
Clos du Bois Winery Expansion
NOT TO SCALE2005.02.25process flow diagram
TANK AREARECEIVING
BARREL AREA
BOTTLING DOCK
SPECIALTY
REDFERMENTATION
DE-STEM
PRESS HOLDING
M.L.
WHITESETTLING
WHITEFERMENTATION
BLENDING
COLDSTABILIZATION
PRESS
BOTTLINGTANKS
RED
WHITE
BOTTLING LINE #1
BOTTLING LINE #2
DRY GOODS
TRUCK DOCK
TRUCK DOCK
HOLDING / BARREL LINETANKERS
TANKERS
BARREL STORAGE
POMACE
POMACE
FINING
FILTER
HOLDING /PRE-BLENDING
marketing / proposal diagrams : TLCD Architecture
DESIGN TEAM
SITE PLANNING AND DESIGN
BUILDING PLANNING AND DESIGN
OWNER TEAM
Alcohol and Drug ServicesConnie Moreno-Peraza and Team
Child Welfare ServicesLinda Canan and Team
Self Sufficiency ServicesTeresa Zimny and Team
HHSA AdministrationMitch Wippern and Staff Cmte.
HHSACore Group
HHSA DirectorExecutive Cmte.Facilities Leaders
DIVISION STAKEHOLDER GROUPS
Spark : Change ManagmentMarina van Overbeek
Page & Turnbull : Historic ConsultingRuth Todd and Rebecca Fogel
GnuGroup : WayfindingTom Donnelly
Gilleran Energy : LEED ConsultingKevin Gilleran
Catalyst : SecurityKevin Wood
Davis Langdon : Cost Estimating *Gary Holland and Paul Abernathy
ZFA : Structural EngineeringKevin Zucco
Kleinfelder : Materials TestingCharlie Almestad
Costa : Mechanical Engineering *Tony Costa and Chris Del Core
O’Mahony & Myer : Electrical Engineering *Paul Carey and Jan Myer
Charles Salter : Acoustics / AudioVisual *Ken Graven
Napa Design Partners : Community LiaisonStephen Cuddy
Miller Pacific : Geotechnical EngineeringMichael Morisoli
TLCD Project ManagerBrian Wright *
TLCD Project Team
Alan Butler *Programmer/Master Planning
Nate Bisbee *Project Architect/Lead Designer
Suzanne Nagorka *Planning / Interior Design /
Furniture
Napa CountyProject Manager
Juan Arias
Community Stakeholdersand Public Review
Napa CountyManagement Team
and OversightDon RidenhourHillary Gitelman
Larry FlorinMolly RattiganMitch Wippern
Chaudhary : Civil Engineering *Arvin Chaudhary and John Stitt
Quadriga : Landscape Architecture *Bill Mastick and Shannon Sobeck
Comprehensive Servicesfor Older Adults
Kristin Brown and Team
Mental HealthJaye Vanderhurst and Team
Public HealthDr. Karen Smith, M.D. and Team
* “Core Experience” team members from the Napa Valley College master planning and buidling projects (see p. 7).
activities
discovery (2 mo.) programming (3 mo.) master planning and conceptual design (6 mo.) schematic design (4 mo.) design development (2 mo.) design-build docs (5 mo.) construction (20 mo.) occupancy
STEP 1 STEP 2 STEP 3
environmental impact report
observations& surveys
historicanalysis
stakeholderinput
countystandards &guidelines
documentexisting
conditions
preparedesign program
develop sitemaster planning
alternatives
developdesign
vocabulary
assist countywith analysisof alternates
integrateEIR
findings
issueSTEP 1report
developand selectpreferredsite plan
publicmeeting
publicudpate
publicudpate
publicoutreach
publicoutreach
costestimate
costestimate
costestimate
costestimate
Napa County Project Manager
Napa County Management Team
HHSA Core Group
HHSA Stakeholder Groups
TLCD Project Manager
Site Planning and Design
Building Planning and Design
outline specsand performance
documents
specificationsand performance
documents
issueSTEP 2report
selectD/B team
RFP document planning & pre-qualification
reviewD/B
documents
constructionadministration
support
building design and design documents
(bridging documents)
design development ofbridging documents(potential additional
phase)
workshopworkshopworkshopworkshopkickoff
design team
owner team
public