2011 portfolio

44
CHRIS BAUMBACH

Upload: chris-baumbach

Post on 09-Mar-2016

213 views

Category:

Documents


0 download

DESCRIPTION

My 2011 Portfolio, originally created to be a 7x7 Blurb book.

TRANSCRIPT

CHRIS BAUMBACH

CHRIS BAUMBACHArchitect, LEED AP, CCCA

CaliforniaMassachusetts

Vermont

[email protected](802) 505-3046

oil pastel on paper

rendering for mixed-use development : TLCD Architecture

renderings for mixed-use development : TLCD Architecture

women’s staff residences for teaching hospital in Pakistan : Payette

drawings

design and modeling for city hall expansion : Archilogix

design and modeling for city hall expansion : Archilogix

site plan and renderings for Montessori school : TLCD Architecture

design models

winery programming diagram and rendering : RRM Design Group

Clos du Bois Winery Expansion

NOT TO SCALE2005.02.25process flow diagram

TANK AREARECEIVING

BARREL AREA

BOTTLING DOCK

SPECIALTY

REDFERMENTATION

DE-STEM

PRESS HOLDING

M.L.

WHITESETTLING

WHITEFERMENTATION

BLENDING

COLDSTABILIZATION

PRESS

BOTTLINGTANKS

RED

WHITE

BOTTLING LINE #1

BOTTLING LINE #2

DRY GOODS

TRUCK DOCK

TRUCK DOCK

HOLDING / BARREL LINETANKERS

TANKERS

BARREL STORAGE

POMACE

POMACE

FINING

FILTER

HOLDING /PRE-BLENDING

renderings for bank renovation : TLCD Architecture

renderings for bank renovation : TLCD Architecture

maps for transit authority : TLCD Architecture

renderings for primary school : TLCD Architecture

photography

marketing / proposal diagrams : TLCD Architecture

DESIGN TEAM

SITE PLANNING AND DESIGN

BUILDING PLANNING AND DESIGN

OWNER TEAM

Alcohol and Drug ServicesConnie Moreno-Peraza and Team

Child Welfare ServicesLinda Canan and Team

Self Sufficiency ServicesTeresa Zimny and Team

HHSA AdministrationMitch Wippern and Staff Cmte.

HHSACore Group

HHSA DirectorExecutive Cmte.Facilities Leaders

DIVISION STAKEHOLDER GROUPS

Spark : Change ManagmentMarina van Overbeek

Page & Turnbull : Historic ConsultingRuth Todd and Rebecca Fogel

GnuGroup : WayfindingTom Donnelly

Gilleran Energy : LEED ConsultingKevin Gilleran

Catalyst : SecurityKevin Wood

Davis Langdon : Cost Estimating *Gary Holland and Paul Abernathy

ZFA : Structural EngineeringKevin Zucco

Kleinfelder : Materials TestingCharlie Almestad

Costa : Mechanical Engineering *Tony Costa and Chris Del Core

O’Mahony & Myer : Electrical Engineering *Paul Carey and Jan Myer

Charles Salter : Acoustics / AudioVisual *Ken Graven

Napa Design Partners : Community LiaisonStephen Cuddy

Miller Pacific : Geotechnical EngineeringMichael Morisoli

TLCD Project ManagerBrian Wright *

TLCD Project Team

Alan Butler *Programmer/Master Planning

Nate Bisbee *Project Architect/Lead Designer

Suzanne Nagorka *Planning / Interior Design /

Furniture

Napa CountyProject Manager

Juan Arias

Community Stakeholdersand Public Review

Napa CountyManagement Team

and OversightDon RidenhourHillary Gitelman

Larry FlorinMolly RattiganMitch Wippern

Chaudhary : Civil Engineering *Arvin Chaudhary and John Stitt

Quadriga : Landscape Architecture *Bill Mastick and Shannon Sobeck

Comprehensive Servicesfor Older Adults

Kristin Brown and Team

Mental HealthJaye Vanderhurst and Team

Public HealthDr. Karen Smith, M.D. and Team

* “Core Experience” team members from the Napa Valley College master planning and buidling projects (see p. 7).

activities

discovery (2 mo.) programming (3 mo.) master planning and conceptual design (6 mo.) schematic design (4 mo.) design development (2 mo.) design-build docs (5 mo.) construction (20 mo.) occupancy

STEP 1 STEP 2 STEP 3

environmental impact report

observations& surveys

historicanalysis

stakeholderinput

countystandards &guidelines

documentexisting

conditions

preparedesign program

develop sitemaster planning

alternatives

developdesign

vocabulary

assist countywith analysisof alternates

integrateEIR

findings

issueSTEP 1report

developand selectpreferredsite plan

publicmeeting

publicudpate

publicudpate

publicoutreach

publicoutreach

costestimate

costestimate

costestimate

costestimate

Napa County Project Manager

Napa County Management Team

HHSA Core Group

HHSA Stakeholder Groups

TLCD Project Manager

Site Planning and Design

Building Planning and Design

outline specsand performance

documents

specificationsand performance

documents

issueSTEP 2report

selectD/B team

RFP document planning & pre-qualification

reviewD/B

documents

constructionadministration

support

building design and design documents

(bridging documents)

design development ofbridging documents(potential additional

phase)

workshopworkshopworkshopworkshopkickoff

design team

owner team

public

renderings for cancer treatment center : TLCD Architecture

renderings for cancer treatment center : TLCD Architecture

photography

digital painting