Page 1: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

2011 Port Heavy Weather Plan for Northeast and

Eastern Central Florida

Jacksonville, FL08 June 2011

Page 2: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Overview

• Contents of the Plan• Hurricane Readiness Conditions• Port Preparedness• Reopening the Ports• Post-Storm Surveys• Operational Priorities

Page 3: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Heavy Weather Plan Outline

• Chapter 1: Introduction

• Chapter 2: Unit Preparedness

• Chapter 3: Port Readiness & Post Storm Actions

• Chapter 4: Unit Post Storm Operations

• Annexes: The plan currently has 19 annexes (A-S)

*we will focus on Chapters 3 & 4 for this presentation

Page 4: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Hurricane Readiness ConditionsUnit Hurricane

ConditionPort Hurricane

ConditionWhen Set Port Status

5 5 December 1 - May 31 Open

4 4 June 1 - November 30 Open

4 Whiskey Sustained Gale Force winds from a hurricane force storm predicted within

72 hoursOpen

3 X-Ray Sustained Gale Force winds from a hurricane force storm predicted within

48 hoursOpen

2 Yankee Sustained Gale Force winds from a hurricane force storm predicted within

24 hoursRestricted

1 Zulu Sustained Gale Force winds from a hurricane force storm predicted within

12 hoursClosed

Page 5: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

Incident Commander

Planning Section Chief

Operations Section Chief

Logistics Section Chief

Finance/Admin Chief

Situation Unit

Vessel Control Unit

Resource Unit

Documentation Unit

MTS Recovery Unit

ATON Branch

Waterways Branch

Enforcement/SAR Branch

Fernandina Division

St. Johns River North Division

St. Johns River South Division

St. Johns River Blount Island

Division

Alpha Division

Green Cove Springs Division

Ponce Inlet Division

Port Canaveral Diviision

Bravo Division

Charlie Division

Shoreside Group

Cutters/Boats Group

Service Branch

Support Branch

Communications Unit

Medical Unit

Food Unit

Sector Evacuation Unit

Ground Support Unit

Procurement /Supply Unit

Cost Unit

Liaison Officer

Safety Officer

Sector Command Center

Information Officer

Sector Jacksonville Hurricane ICS Organization (Annex B)

Page 6: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Port Preparedness - Chapter 3

Planning Factors• Safe Havens

• Vessel Sortie Policy

• Vessel Sortie Requirements

Vessel Evacuations• Bridges

• Harbor Tugs

• Pilots

• Lay-up Vessels

Page 7: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Planning Factors - Safe Havens

• The Ports of Jacksonville and Canaveral are not considered safe hurricane havens since surrounding low topography does not provide adequate windbreak.

Page 8: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Planning Factors - Vessel Sortie Policy

• All commercial, ocean-going vessels and ocean-going tug/barge combinations over 500 GT will generally be required to depart the port when hurricanes approach.

• No vessels are allowed to remain at facilities which are within one half mile of any bridge.

Page 9: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Planning Factors - Vessel Sortie Requirements

• Condition Whiskey (Alert – 72 Hrs) Make preparations to get underway within 48 hours. Set navigation and radio watch. “Dead” vessels unable to put to sea must make written application to the COTP to remain in port. Requests should be submitted prior to setting X-Ray.

• Condition X-Ray (Readiness – 48 Hrs) All vessels are required to give COTP advanced notice of arrival. All vessels should prepare to complete cargo operations and depart port within 24 hours or when Condition Yankee is set. Vessels and barges unable to depart must request permission from COTP.

Page 10: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Vessel Sortie Requirements (Cont.)

• Condition Yankee (Warning – 24 Hrs) Port is closed to incoming traffic without specific written approval of COTP. All ship-to-shore cargo operations must stop within 6 hrs of setting Zulu. All vessels must put to sea unless in receipt of specific written approval of the COTP to remain in port.

• Condition Zulu (Max Prep – 12 Hrs) Port is closed to vessel movements. No ship-to-shore movement of cargo is permitted.

Page 11: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Vessel Evacuations - Bridges

• Typically, mandatory civilian evacuations ordered about 18 hours prior to the arrival sustained gale force winds.

• About 8 hours prior the predicted arrival of sustained gale force winds, most bridges will be locked down and not reopened until severe weather has passed.

Page 12: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Vessel Evacuations - Bridges (cont)

• It is critical that vessels intending to evacuate the Ports of Jacksonville, Fernandina or Canaveral via the St. Johns River or the ICW depart early to avoid being blocked by bridges.

• In the Port of Canaveral, once the SR 401 bridge has been locked down it is not possible to evacuate the port.

Page 13: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Vessel Evacuations - Harbor Tugs

• Masters and agents of deep draft vessels and tug/barges that require assistance during docking and transit should plan to depart the port early and anticipate some scheduling conflicts caused by the simultaneous departure of many deep draft vessels.

• Jacksonville regularly has 15 tugs available, Fernandina has one, and Canaveral has 4.

Page 14: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Vessel Evacuations - Pilots

• Pilots generally stop working when conditions at the sea buoy prevent safe transfer from ship to pilot boat, or at the onset of sustained gale force winds.

Page 15: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Vessel Evacuations - Lay-Up Vessels

• Vessels in lay-up during the off-season (01 DEC-31 May) must depart port no later than May 31.

• Vessels unable to depart before June 1 each year must obtain written permission from the COTP to remain in port.

Page 16: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Reopening the PortsReopening the Ports

Post-Storm Reporting Requirements• Terminal and Facility

Owners/Operators• Barge and Barge Fleet Managers• Dredge Operators • Pilots • Harbor Tug Companies• Masters, Agents, Operators of All Commercial Vessels Remaining

In Port

Page 17: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Reporting Requirements -Terminal and Facility Owners/Operators

• Survey facilities listed in Annex J and report any damage, pollution, or unsafe conditions.

• All damaged areas must be secured.• Re-establish security operations.• If shoaling is suspected, ensure soundings are taken and report

results.• Account for all vessels and barges moored at the facility prior to

the storm. Report status to COTP.• Make a recommendation to the COTP regarding the operational

status of your facility.• Use the form in Annex N to report your Post-Storm Survey.

Page 18: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Reporting Requirements - Barge and Barge Fleet Managers

• Survey the barges or barge fleets. Account of all barges moored prior to the storm.

• Use the form in Annex N to report the status of your barges, including any damage, pollution or unsafe

conditions.

Page 19: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Reporting Requirements - Dredge Operators

• Survey all dredge equipment. Use the form in Annex N to report status to the COTP.

• Assess availability of emergency dredge equipment.

Page 20: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Reporting Requirements - Pilots

• Make a recommendation to COTP regarding the status of the main channels, the need for extensive surveys, and the timeline for re-opening the port.

• Re-stage assets for support of post storm assessment.

Page 21: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Reporting Requirements - Harbor Tug Companies

• Survey all tugs and facilities. Use the form in Annex N to report and damage, pollution, or unsafe conditions. Make a recommendation to the COTP regarding the availability of tugs.

• Re-stage assets for support of post storm assessment.

Page 22: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Reporting Requirements -Masters, Agents, Operators of All

Commercial Vessels Remaining In Port

• Survey vessels and mooring facilities. Use the form in Annex N to report any damage, pollution or unsafe condition.

• Make a specific recommendation to the COTP regarding the operational status of each vessel.

• Make any requests for shifting berths, deadship movements, or vessel departures as soon as possible.

• Plan for resumption of operations.

Page 23: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Post-Storm Operations – Chapter 4

• Post-Storm Surveys• Operational Priorities• Communication within the Port

Page 24: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Post Storm Surveys - ATON• Navigation aids may become damaged during periods of severe

heavy weather. • Even upon re-opening a waterway, port pilots may not bring

vessels into port if critical navigation ranges/buoys are damaged or destroyed.

• Pilots and other expert mariners have often reported that the extinguishment or damage of fixed navigational ranges is the primary ATON discrepancy that would inhibit safe vessel operation.

• While floating ATON generally provide assistance to mariners, they are not to be relied upon for their designated position, especially after sustained heavy weather.

Page 25: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Post Storm / Bottom Surveys• The USCG has no organic capability to perform bottom

surveys other than with depth sounders.

• The National Oceanographic and Atmospheric Administration (NOAA) maintains two Navigational Response Teams (NRTs) that are available to respond to emergency navigation issues, particularly channel shoaling.

• The Army Corps of Engineers (USACE) has a capability to perform an immediate 3-line crosshatch bottom survey after passage of storms. This process must take place prior to USACE emergency dredging operations.

Page 26: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Operational PrioritiesOperational PrioritiesOperational Priorities as per D7 SOP:

1. Continue essential assigned missions and assure internal security of the unit, including safety of dependents.

2. Provide other military commands assistance as required to allow them to execute their assigned missions.

3. Provide nonmilitary federal agencies whatever off-station assistance is required to protect the interests and property of the U. S. Government.

4. Provide aid to civil authorities in the event the established civilian agencies are overwhelmed.

5. In cases of domestic disturbance, take action in accordance with the Coast Guard Civil Disturbance Support Plan.

Page 27: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Communication within the Port

• Upon setting Hurricane Condition III/Port Condition YANKEE, Conference Calls will be held daily with stakeholders in Jacksonville and Fernandina.

• Times of calls and call-in numbers will be released via MSIBs once Hurricane Condition III/Port Condition YANKEE has been set.

• MSIBs will also regularly be released along with BNTMs to keep the maritime community and public informed of the port conditions, port closures, location of the storm and the unit’s SAR posture.

Page 28: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Changes to the 2011 Plan

• Annex J (Facility Status Boards) • Updated to better reflect port infrastructure & locations

Page 29: 2011 Port Heavy Weather Plan for Northeast and Eastern Central Florida Jacksonville, FL 08 June 2011

US Coast Guard Sector Jacksonville

Questions?