2011 bie summer institute reno nevada repeat sessions june 21, 2011 june 22, 2011

46
Bureau of Indian Education American Recovery and Reinvestment Act QUARTER 2 REPORTING, DATA QUALITY, PRIOR QUARTER CORRECTIONS AND CLOSEOUT 2011 BIE Summer Institute Reno Nevada Repeat Sessions June 21, 2011 June 22, 2011

Upload: cargan

Post on 08-Feb-2016

44 views

Category:

Documents


0 download

DESCRIPTION

American Recovery and Reinvestment Act QUARTER 2 REPORTING, DATA QUALITY, PRIOR QUARTER CORRECTIONS AND CLOSEOUT. 2011 BIE Summer Institute Reno Nevada Repeat Sessions June 21, 2011 June 22, 2011. Overview. Updates Preparing to Report Reporting Significant Errors Reporting Concerns - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

Bureau of Indian Education

American Recovery and Reinvestment Act QUARTER 2 REPORTING, DATA QUALITY, PRIOR QUARTER CORRECTIONSAND CLOSEOUT

2011 BIE Summer InstituteReno Nevada

Repeat SessionsJune 21, 2011June 22, 2011

Page 2: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

2

Overview

o Updateso Preparing to Reporto Reportingo Significant Errorso Reporting Concernso Timelineo Correction Phaseo Data Qualityo OMB Guidance on Reportingo OMB Guidance on Correctionso ARRA Closeout reportso Additional Supporto Questions

Page 3: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

3

Updates – Changes to Prior quarter reports

Beginning on April 1, 2011 recipients can submit data change requests via the ADC (Automated Change Data Tool in Federal Reporting.gov).

Chapter 16 of the User Guide•How to Request a Change•Who can request changes? •When can changes be requested?•What types of changes can be requested?

Page 4: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

4

Page 5: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

504/22/23

Page 6: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

604/22/23

Page 7: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

704/22/23

Page 8: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

804/22/23

Page 9: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

904/22/23

Page 10: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

1004/22/23

Page 11: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

1104/22/23

Page 12: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

1204/22/23

Page 13: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

1304/22/23

Page 14: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

14

Preparing to Report

As the Prime Recipient of ARRA funding the following should be established prior to reporting:

– DUNS number– Active Central Contractor Registration (CCR )

https://www.bpn.gov/CCR/default.aspx– Federal Reporting Pin Number (FRPin)– Primary Point of Contact who will serve as your ARRA Reporter during

the July 1-10, 2011 reporting period– Identify a Secondary Point of Contact (POC) for your report who is able

to report in the Primary POC absence or respond to questions– Download or obtain an updated Tip Sheet(s) for your respective fund(s)

to assist with reporting

Page 15: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

15

Preparing to Report

As the Prime Recipient of ARRA funding identifying the following items prior to reporting will assist with your timely submission of your ARRA Q2 report:

– Preparing total expenditures made from the time you received the award to June 30, 2011 to be entered on the Q2 Total Federal Amount of ARRA Expenditure Q2 field.

– Outlining job positions during April 1-June 30, 2011 to be entered in Q2 report Number of Jobs & Description of Jobs Created fields.

– Identify the vendors paid <$25,000 from the time you received the award to June 30, 2011 to enter into the Total Number & Total Amount of Payments to Vendors <$25,000 fields.

– Identify the status of your project and enter the appropriate selection for the Project Status field.

– Gather information to appropriately address the Quarterly Activities/Project Description field.

Page 16: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

16

FIELD(S) CUMULATIVE/QUARTERLY

Total Federal Amount of ARRA Expenditure Cumulative(Receipt of Award –June 30, 2011)

Number of Jobs Quarterly(April 1-June 30, 2011)

Description of Jobs Created Quarterly(April 1-June 30, 2011)

Total Number of Payments to Vendors <$25,000 Cumulative(Receipt of Award –June 30, 2011)

Total Amount of Payments to Vendors <$25,000 Cumulative(Receipt of Award –June 30, 2011)

Quarterly Activities/Project Description Quarterly(April 1-June 30, 2011)

Preparing to Report

Page 17: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

17

How to Copy Forward a Previously Submitted Report

Click ―Prime Recipient in the Quick Links in the left sidebar

At the My Reports View, enter the following search criteria and click ―Search Calendar Year = Select a Calendar Year Calendar Quarter = Select a Previous Calendar Quarter Report Status = Select Submitted

Copy Forward

Page 18: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

18

How to Copy Forward a Previously Submitted Report

Choose the report you want to ―copy forward and click on the link in the Prime Award #/Order # field.

Click the Award Number link to open the desired report.

Copy Forward

Page 19: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

19

How to Copy Forward a Previously Submitted Report

Click ―Copy Forward on the report.

Click CopyForward Button

You will see a confirmation box asking, ―Are you sure you want to leave this report? (This means you will leave the report in the new quarter, NOT that you are navigating away from the report) You will lose any data that you have updated, including Sub Recipient and Vendor data.

Click ―OK to continue to the Copy Report Forward page.

No data will be removed from the previous quarter report.

Copy Forward

Page 20: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

20

Reporting

Consequences of Non-Reporting• 1st missed report: award official sends a cure notice or

other strong letter to remind recipient reporting is mandatory

• 2nd missed report: award official will initiate termination action or other strong sanction, including suspension or debarment

Page 21: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

21

The following are considered “Significant Errors” by OMB if entered incorrectly.

• Recipient Name*• Award Number*• Amount of Award*• Number of Jobs*

Significant Errors

Page 22: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

22

Reporting Concerns

Vendors >$25,000• Payments to vendors of $25,000 or more• Prime recipients must report required information $25,000 or more under

the Vendor Tab of the report on federalreporting.gov• The Vendors in this tab should include all vendors of $25,000 or more up

to December 31st

Page 23: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

23

Reporting Concerns

Vendors <$25,000

• Section 1512(c)(4) and OMB Guidance allows for prime recipients to aggregate reporting on Payments to vendors less than $25,000

• Fields on Report:– Total Number of Payments to Vendors less than $25K/ Award– Total Amount of Payments to Vendors less than $25K/ Award

Page 24: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

24

Number of Jobs Field• “Jobs Created/Retained” is reported in the “Number of Jobs” field• Number of Jobs is expressed in terms of “full-time equivalents” (FTE)• Number of Jobs is a simple calculation:

• Maintain documentation of how you calculated Number of Jobs and include a description of the calculation in the “Description of Jobs Created” field.

Total Number of Hours Worked & Funded by Recovery Act within Reporting Quarter

Quarterly Hours in a Full-Time Schedule (520 hours)

Reporting Concerns

Page 25: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

25

Description of Jobs Created

• Brief description of the types of actual jobs created or jobs retained

• Description may rely on job titles

• Recipient’s existing practice for describing jobs as long as the terms used are widely understood and describe the general nature of the work

• Include the CALCULATION of how “Number of Jobs" in the Description of Jobs Created field. Example: Total Number of hours ÷ 520 hours = ______________

1000÷520=1.92

1.92

Reporting Concerns

Page 26: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

26

July Reporting TimelineJuly 1 – 10

Initial Submission Period (Prime Recipients & Subs Enter Reports)

July 11 – 14Extended Submission Period

July 15 - 18Prime Recipient Review Period (Prime Recipients Review Data Submitted by Sub(s) / Prime Recipients & Subs Make Corrections)

July 19 – 29Agency Review Period (Agency Review or Data Submitted / Prime Recipients & Subs Make Corrections)

July 30Recipient Reports published on Recovery.gov

Page 27: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

27

Continuous QA TimelineAugust 2 - 22

Continuous QA – Period 1

August 23Office of Management and Budget Review

August 24Data from Period 1 Published on Recovery.gov

August 24 – September 5Continuous QA – Period 2

September 6Office of Management and Budget Review

September 7Data from Period 2 Published on Recovery.gov

September 8 – September 19Continuous QA – Period 3 (ends at 11:59 PM ET)

September 20Office of Management and Budget Review

September 21Data from Period 3 Published on Recovery.gov

Page 28: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

28

Correction Phase

Prime Recipient Review PeriodJuly 15 - 18, 2011

• Prime Recipient may correct reports at this time.• Enter report, make corrections in the appropriate fields.• Press submit and enter your FRPIN#

Page 29: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

29

Correction PhaseAgency Review Period

July 19- 29, 2011• Reports are “locked” and may not be freely modified by recipients• Agencies review reports• Recipients are provided with formal comments through FR.GOV• If a recipient receives a comment, the report is “unlocked” and able

to be modified for correction• Agencies identify any non-compliant or missing reporters. This

information is provided by another department in DOI and DPA does not have access to this information until provided by this office.

Page 30: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

30

Correction PhaseComments

• When your report has been reviewed comments will be provided in the comment screen illustrated below.

• If you have any questions you can also make a comment through the comment screen.• Please check comments periodically throughout the review & quality assurance periods.

Page 31: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

31

Data Quality

U.S. Department of the InteriorARRA Program Management Support

•BIA-BIE Monthly Status Report•Overall Status as of 04/30/11

Page 32: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

32

Page 33: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

33

Data Quality

U.S. Department of the InteriorARRA Program Management Support

• BIA-BIE Monthly Status Report

• $500K and Above Project Status as of 04/30/11

• Projects Awarded, Not Yet Mobilized - Sorted by: (1) Program; (2) Estimated Date of Mobilization

Page 34: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

34

Page 35: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

35

Page 36: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

36

ARRA Closeout

ARRA Items to check•Section 1512 mandates quarterly reports intended to provide the public with an unprecedented level of transparency into federal spending•Recipient close-out reports will answer the following:

– Who is receiving ARRA dollars and the amount?– What projects are being funded?– What is the completion status?– What is the impact on job creation/retention?

Page 37: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

37

Issues/errors identified•Confirm the Total Federal Amount of ARRA Funds and the Total Federal Amount of ARRA Expenditure fields are correct.•Confirm jobs are calculated using the following formula: # of hrs worked/520 = No. of jobs created/retained.•You indicated in your report that the project is less than 50% complete; however, you also indicated that there have been zero jobs created. Please justify why there have been no jobs.

ARRA Closeout

Page 38: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

38

ARRA Closeouts and final reports•Award closeout and Final ARRA Quarterly Reporting are two separate processes:

– Requirements for submission of Final ARRA report driven by OMB and agency specific guidance

• ARRA Project Specialist will review reports each quarter to determine which meet criteria and will set Final flag

– Award Closeout (final technical, fiscal reporting, etc.) per grant.• Timeline is the biggest difference for ARRA award closeout.

ARRA Closeout

Page 39: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

39

ARRA Closeout

ARRA Closeouts and final reports•OMB Guidance on when a report can be marked as Final:

– Project Status reported as “Fully Completed”– No additional jobs will be funded– All ARRA funds have been expended– All ARRA funds have been invoiced and received– Project status is complete per grant requirements and/or

performance measures.

Page 40: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

40

ARRA Closeout

ARRA Closeouts and final reports•DPA review for eligible Final reports

– Project Status in My ARRA of “Fully Completed”– BIE Administration Audit completed

• If work is completed and funds fully expended on a project, closeout process may commence in advance of award end date

• Once Final report is submitted to FederalReporting.gov no adjustments to ARRA expenditures can be reported.

– If an Unexpended Balance remains, additional steps required by DPA:

• Explanation why Expenditures less than Award Amount and confirmation of no future additional expenditures added to Quarterly Activities Description

Page 41: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

41

ARRA Closeout

• What should be reported in MyARRA if Project Status on a prior report was “Fully Completed” but report did not meet other criteria for Final report at that time?– Report must be completed by the POC for the current cycle– Expect to see Number of Jobs as 0

• Update description of Jobs to say no jobs to report for this quarter as work on the project was Fully Completed in a prior quarter.

– Review and Update Award Description and Quarterly/Activities as appropriate

• For both fields follow new guidance on format and content• Quarterly Activities with reference to prior project completion

– Current quarter activities might include final reporting, payment to vendors for items received in prior quarters, final invoicing/receipt of funds.

Page 42: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

42

ARRA Closeout

• What differences are there to the DPA’s Award Closeout Processes for ARRA?– If no unexpended balance:

• Standard DPA closeout: Audit > Final Financial Report/Invoice > Final Closeout

• Final ARRA report submission in next quarterly cycle– If unexpended balance to be returned to DPA

• Audit, Final Fiscal Report/Invoice and Closed status• No budget reduction until Final ARRA report submitted (as

we must report full award amount)• After close of ARRA Reporting cycle, reduction of award

amount is processed, remainder of closeout process completed.

Page 43: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

43

DPAPre-Closeout Review Slot

DPA Post-Closeout Review Slot

AWARD END DATE + 90+ 60+ 30 days– 30- 60

AdvanceCloseNotif. On-Time

Final ReportsAll project

time extension requestsshould be submitted

On-line Expense Statement

Printed Expense Statement

Continue review closeouts DPA CloseSlot

14 days

+ ~75

Initial Review

On-line Expense Statement

Printed Expense Statements

Last dayfor changesor to provide evidence ofan DPA-approvedtime extension

On-line Expense Statements

Last opportunityto check for errors(on-line expenditurestatement date+ 2 workingdays)

BIE/DPA Summary of ARRA Closeout Schedule(awards with reports due 0-90 days after end date)

Set up Early notification schedule

Post Final Expenses

CloseNotif.

Request No-Cost Extension

Finalize review

EmailFrom DPA

60 dayAfterNotif.

75 dayAfter

NoticesDPA/Unit Interaction

Model adopted from the Massachusetts Institute of Technology Office of Sponsored Programs

Page 44: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

44

ADDITIONAL SUPPORT

• FederalReporting.gov allows Recipients to submit and Federal Agencies to review required Recovery Act reporting data. If you need help with registering as a user, submitting a report, reviewing a report, or other website functions, contact their Service Desk.

• Service Desk Information Phone: 877-508-7386 TTY: 877-881-5186 Email: [email protected] Chat: LivePerson Support

Page 45: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

45

ADDITIONAL SUPPORT• FederalReporting.gov

– www.federalreporting.gov– Frequently Asked Questions (FAQs)– Service Desk (also on previous slide)– Downloads Tab (Reference Data and Additional Links)– Includes reporting templates, Recipient Reporting Data Model, Webinars,

User Guides, Look-ups for congressional districts, agency codes, CFDA numbers, Program Source numbers, and ZIP code information

• Recovery.gov website– http://www.recovery.gov/– Frequently Asked Questions (FAQs)

• DOI Recovery website– http://recovery.doi.gov/

Page 46: 2011 BIE Summer Institute Reno Nevada Repeat  Sessions June 21, 2011 June 22, 2011

46

Marie Sandoval – ADD NavajoE-mail: [email protected]: 505-563-5381

Yvonne Davis – ADD WestE-mail: [email protected]: 505.563.5372

Johnnita TsabetsayeE-mail: [email protected] Ph: 505.563.5380

BIE ARRA CONTACTS