HEAD LOSSES CALCULATIONS
FERNANDO CHANDUVI
KINGSTON JAMAICA
MARCH 2011
TCP/JAM/3203 PROMOTING RAINWATER HARVESTING
AND SMALL SCALE IRRIGATION IN SOUTH SAINT
ELIZABETH
FAO AND NATIONAL IRRIGATION COMMISSION LIMITED
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
2/44
HEAD LOSSES CALCULATIONS
ACKNOWKEDGEMENT IS GIVEN TO MR. ASHER AZENKOT (CARDI)
M.Sc. OF THE MINISTRY OF AGRICULTURE, EXTENSION SERVICE,
FIELD SERVICE WHO PREPARE THE BASE MATERIAL IN A PDF FILE.
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
3/44
WATER FLOW IN PIPES
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
4/44
WATER FLOW IN PIPES
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
5/44
WATER FLOW IN PIPES
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
6/44
SAMPLE CALCULATIONS
ANSWER:
a. Convert m3/h to cm3/sec, 27,780 cm3/sec
b. Cross section of pipe, 314.2 cm2
c. Water flow velocity, 88.8 cm/sec
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
7/44
S
A
M
P
L
E
C
AL
C
U
L
A
TI
O
N
S
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
8/44
SAMPLE CALCULATIONS
ANSWER: Q = 67.8 m3/h and V = 9.6 m/sec
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
9/44
SAMPLE CALCULATIONS
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
10/44
HYDROSTATIC
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
11/44
HYDROSTATIC
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
12/44
HYDROSTATIC
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
13/44
HYDROSTATIC
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
14/44
HYDROSTATIC
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
15/44
HYDROSTATIC
http://udel.edu/~inamdar/EGTE215/Hydrostatics.pdf
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
16/44
PRESSURE HEAD
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
17/44
PRESSURE HEAD
WE KNOW THAT 1 ATMOSPHERE = 0.76 m OF MERCURY COLUMN
SPECIFIC WEIGHT OF WATER = 1 kg/dm3
SPECIFIC WEIGHT OF MERCURY= 13.6 kg/dm3
THEREFORE:
1 ATMOSPHERE = 10.33 meters of water column.
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
18/44
HEAD LOSSES: EMPIRICAL FORMULA
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
19/44
C COEFFICIENTS FOR PIPES
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
20/44
S
A
M
P
L
E
C
A
L
C
U
L
A
TI
O
N
S
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
21/44
HEAD LOSS IN A PIPE
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
22/44
HEAD LOSSES IN PLASTIC PIPES
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
23/44
HEAD LOSS IN PIPES
http://www.engineeringtoolbox.com/pump-head-pressure-d_663.html
http://www.engineeringtoolbox.com/hazen-williams-water-d_797.html
http://www.piping-toolbox.com/pvc-pipes-friction-loss-d_802.html
http://www.lmnoeng.com/hazenwilliams.htm
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
24/44
HEAD LOSSES IN PIPES
TOTAL HEAD LOSS = 22 meters
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
25/44
HEAD LOSS IN PIPES
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
26/44
HEAD LOSS IN PIPES
Visit also FLOW CONVERTER in the WEB
Difference in elevation: 125-94 = 31 meters = 89 feet
Head loss= 16.2 feet = 5.62 m (from Engineering Toolbox)
Required pressure at head of field = 4 atm = 41.32 m = 118.7 feet
TOTAL HEAD REQUIRED AT PUMP = 89 ft + 16.2 ft + 118.7 ft
TOTAL HEAD REQUIRED AT PUMP = 223.9 ft = 77.91 m = 7.5 atm
2,155 feet
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
27/44
LOCAL HEAD LOSS
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
28/44
MINOR LOSS COEFFICIENTS
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
29/44
HEAD LOSS IN PIPES AND FITTINGS
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
30/44
LATERAL LINES
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
31/44
REDUCTION COEFFICIENTS
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
32/44
CHARACTERISTICS OF LATERAL PIPE
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
33/44
PRESSURE AND HEAD LOSS IN LATERAL
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
34/44
FLOWS IN LATERAL
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
35/44
HEAD LOSS ALONG A LATERAL PIPE
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
36/44
EXAMPLE PROBLEM
Example:
A flat field, 360 x 360 m, is irrigated with a hand moved
aluminum lateral pipe (C = 140). The water source to the
lateral pipe is from a sub main, which crosses the center ofthe field. The selected sprinklers are Naan 233/92 with a
nozzle of 4.5 mm, 25 m pressure of (hs) and flow rate (qs ) of
1.44 m3/hr. The space between the sprinklers is 12 meters
apart, and the location of the first sprinkler is 6 meters awayfrom lateral inlet. The riser height is 0.8 meter and the
diameter is 3/4".
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
37/44
EXAMPLE PROBLEM
360 m
360 m
Lateral line
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
38/44
EXAMPLE PROBLEM
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
39/44
EXAMPLE PROBLEM
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
40/44
EXAMPLE PROBLEM
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
41/44
EXAMPLE PROBLEM
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
42/44
EXAMPLE PROBLEM
-
7/27/2019 2011-03 HEAD LOSSES CALCULATIONS.pdf
43/44
THANK YOU VERY MUCH
-