2010 sgs study conference questionnaire
TRANSCRIPT
7/28/2019 2010 SGS Study Conference Questionnaire
http://slidepdf.com/reader/full/2010-sgs-study-conference-questionnaire 1/8
2010 SGS Study Conference User Group Sessions Survey INSTRUCTIONS
System Name
Subject Area
Topic
Reliability Decision Support Using Data Management and Analysis INTEREST
Key Process Indicators used for your Transmission Business (Who, What,
When, Where, Why, How). Are they a “dashboard” with sophisticated
gauges or a simple format (e..g., red-yellow-green stoplight)? Are KPIs
used for incentives (if so, how)?
Examples of Applying the SGS Study Results
Development and Application of Circuit Importance Measures
Examples of Statistical Analysis of Reliability
Lessening Transmission Impacts on Distribution Systems
Application of Probabilistic Methods
Decision Support Methods for Budgeting Maintenance Resources
What sort of outage exclusion or Screening Criteria does your system use?
Weather Normalization (removing the effects of weather to assess
underlying reliability)
Transmission Benchmarking
How are Results from Between-System Benchmarking Surveys Used?
What are the most effective forums for between-system information
exchange?
Does your system benchmark costs and practices? If so how and where?
How are results used and interpreted?
Success Stories INTEREST
Does your system have long-term, sustainable improving reliability trends?
If so, how have you accomplished this and how will they be maintained?
Individual Line or Area improvement success stories (Who, What, When,
Where, Why, How)
NERC TADS, RMWG and Regional Entity Reliability Reporting
Experience with Implementing, Interpreting or Applying NERC TADS
Results (either from SGS or NERC)
Application of Results from NERC TADS or WECC Common Transmission
Outage Database
Experience with NERC RMWG metrics – data provision, use of results, etc.
System Name
7/28/2019 2010 SGS Study Conference Questionnaire
http://slidepdf.com/reader/full/2010-sgs-study-conference-questionnaire 2/8
Will NERC RMWG metrics supplant internal KPIs (i.e., similar to state
distribution reliability mandates?)
Capital Projects and Major Project Management
Decision Support Methods for Budgeting Capital Resources
Experiences of systems involved in major, system-wide transmissionCapEx?
Transmission Engineering and Maintenance
Transmission Line Engineering Practices (structures, designs, insulation,
grounding)
Transmission Line Inspection Practices
Restoration and Recovery from Disasters
Maintenance Practices for “Old” Lines and Facilities
Determination of “End of Life” and Replacement for Transmission Lines
and Facilities
Maintenance Management Systems (What does your organization use?
e.g., SAP, Maximo, Cascade, etc.). How are these system utilized in terms
of helping your maintenance organization prioritize work (time based PMs,
condition based, both?).
Post Event and Root Cause Analysis INTEREST
Analysis and Mitigation of Lightning (FALLS or other options). FALLS and
lightning correlation criteria (DFR satellite time-stamp or largest amplitude
stroke)
What is your practice for establishing a threshold for determining that
lightning caused outages are non-preventable (stroke KVA vs. BIL rating of
line)?
Use of TADS and TADS+/TOOF root cause descriptors
Internal Root Cause determination practices and procedures
When is post-event line patrol warranted? What is the feedback process
from the field to communicate patrol findings?
Regulation
Impacts or Oversight of State or Provincial Regulation on Load-Serving
Transmission
Miscellaneous Topics
Implementation of New Technologies (e.g., System Protection, Planning,Operations, new Outage tracking systems)
Reliability Programs, Organizational Practices and Methods (e.g., Six
Sigma, Lean Methods, etc)
7/28/2019 2010 SGS Study Conference Questionnaire
http://slidepdf.com/reader/full/2010-sgs-study-conference-questionnaire 3/8
Please return by February 26, 2010
PARTCIPATE LEAD
PARTCIPATE LEAD
7/28/2019 2010 SGS Study Conference Questionnaire
http://slidepdf.com/reader/full/2010-sgs-study-conference-questionnaire 4/8
PARTCIPATE LEAD
7/28/2019 2010 SGS Study Conference Questionnaire
http://slidepdf.com/reader/full/2010-sgs-study-conference-questionnaire 5/8
7/28/2019 2010 SGS Study Conference Questionnaire
http://slidepdf.com/reader/full/2010-sgs-study-conference-questionnaire 6/8
7/28/2019 2010 SGS Study Conference Questionnaire
http://slidepdf.com/reader/full/2010-sgs-study-conference-questionnaire 7/8
American Transmission Co.
Arizona Public Service
BC Transmission Corp
Dominion Virginia Power
Duke Energy
E.ON-US
Entergy Services Inc.
Exelon Corp.
First Energy
Florida Power & Light
Georgia Integrated Transmission System
Hydro One Networks
Idaho Power Company
ITC Holdings Corp.
Long Island Power Authority
National Grid USA
Northeast Utilities
NorthWestern Energy
Oncor Electric Delivery
Pacific Gas & Electric
PacifiCorp
Progress Energy
Salt River Project
South Carolina Electric & Gas
Southern Company
Tennessee Valley Authority
Tucson Electric Power
7/28/2019 2010 SGS Study Conference Questionnaire
http://slidepdf.com/reader/full/2010-sgs-study-conference-questionnaire 8/8
Xcel Energy