2010 bicycle and pedestrian work program update. several top projects from 2008 work program have...
TRANSCRIPT
![Page 1: 2010 Bicycle and Pedestrian Work Program Update. Several top projects from 2008 Work Program have been completed. Design is ongoing on other top projects](https://reader035.vdocuments.us/reader035/viewer/2022062423/5697c02b1a28abf838cd87e2/html5/thumbnails/1.jpg)
The Alachua County Mobility Plan:
2010 Bicycle and Pedestrian Work Program Update
![Page 2: 2010 Bicycle and Pedestrian Work Program Update. Several top projects from 2008 Work Program have been completed. Design is ongoing on other top projects](https://reader035.vdocuments.us/reader035/viewer/2022062423/5697c02b1a28abf838cd87e2/html5/thumbnails/2.jpg)
Several top projects from 2008 Work Program have been completed.
Design is ongoing on other top projects
Funding for portion of Archer Braid Trail procured through FDOT for construction in 2012-2013
10% of the 5 cent local option gas tax funds approximately $200,000 – $250,000 per year dedicated for construction of bicycle and pedestrian projects
Bike / Ped Work Program Update
![Page 3: 2010 Bicycle and Pedestrian Work Program Update. Several top projects from 2008 Work Program have been completed. Design is ongoing on other top projects](https://reader035.vdocuments.us/reader035/viewer/2022062423/5697c02b1a28abf838cd87e2/html5/thumbnails/3.jpg)
Commission requested staff to review priority project list following recent community meetings.
Staff reviewed specific projects requested by the Commission and have produced a recommendation on project priorities.
Bike / Ped Work Program Update
![Page 4: 2010 Bicycle and Pedestrian Work Program Update. Several top projects from 2008 Work Program have been completed. Design is ongoing on other top projects](https://reader035.vdocuments.us/reader035/viewer/2022062423/5697c02b1a28abf838cd87e2/html5/thumbnails/4.jpg)
Move restriping of SE 15th Street towards top of priority list.
Consider reconstruction and widening to 8’ the existing sidewalk on the east side of SE 15th rather than construct new 8’ facility on the west side.
Move neighborhood connector at SW 1st Place towards the top of the priority list.
Consider construction of 8’ facility on the north side of SW 24th Ave between Tower Road and I-75 rather than complete the existing sidewalk on the south side over I-75.
Specific projects requested for review
![Page 5: 2010 Bicycle and Pedestrian Work Program Update. Several top projects from 2008 Work Program have been completed. Design is ongoing on other top projects](https://reader035.vdocuments.us/reader035/viewer/2022062423/5697c02b1a28abf838cd87e2/html5/thumbnails/5.jpg)
SE 15th Street Corridor
![Page 6: 2010 Bicycle and Pedestrian Work Program Update. Several top projects from 2008 Work Program have been completed. Design is ongoing on other top projects](https://reader035.vdocuments.us/reader035/viewer/2022062423/5697c02b1a28abf838cd87e2/html5/thumbnails/6.jpg)
SW 1st Place at SW 77th Terrace
![Page 7: 2010 Bicycle and Pedestrian Work Program Update. Several top projects from 2008 Work Program have been completed. Design is ongoing on other top projects](https://reader035.vdocuments.us/reader035/viewer/2022062423/5697c02b1a28abf838cd87e2/html5/thumbnails/7.jpg)
SW 20th/24th Ave Corridor
![Page 8: 2010 Bicycle and Pedestrian Work Program Update. Several top projects from 2008 Work Program have been completed. Design is ongoing on other top projects](https://reader035.vdocuments.us/reader035/viewer/2022062423/5697c02b1a28abf838cd87e2/html5/thumbnails/8.jpg)
Project Priority Ranking:
1. SW 8th Ave Multiuse Trail2. NW 98th Street Sidewalk3. SE 15th Street Restriping4. SW 1st Place Connector5. SE 15th Street Multiuse Path6. SW 20th/24th Sidewalk Extension on south side
and feasibility study of multiuse facility on north side
STAFF RECOMMENDATION
![Page 9: 2010 Bicycle and Pedestrian Work Program Update. Several top projects from 2008 Work Program have been completed. Design is ongoing on other top projects](https://reader035.vdocuments.us/reader035/viewer/2022062423/5697c02b1a28abf838cd87e2/html5/thumbnails/9.jpg)
◦Approve 2010 Bicycle/Pedestrian Work Program Priority List
STAFF RECOMMENDATION