2010 Annual Interruption Tender. Shiv Singh Gas Customer Forum 26 th July 2010. Place your chosen image here. Turn on the Grid and Guides option under View and check the ‘display drawing guides on screen’ box for position. Contents. 2010 Requirement Bid Summary and Outcome - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: 2010 Annual Interruption Tender](https://reader035.vdocuments.us/reader035/viewer/2022072016/56813419550346895d9b061a/html5/thumbnails/1.jpg)
Place your chosen image here. Turn on the Grid and Guides option under View and check the ‘display drawing guides on screen’ box for position.
2010 Annual Interruption TenderShiv Singh Gas Customer Forum 26th July 2010
![Page 2: 2010 Annual Interruption Tender](https://reader035.vdocuments.us/reader035/viewer/2022072016/56813419550346895d9b061a/html5/thumbnails/2.jpg)
Contents
2010 Requirement Bid Summary and Outcome Further Information
![Page 3: 2010 Annual Interruption Tender](https://reader035.vdocuments.us/reader035/viewer/2022072016/56813419550346895d9b061a/html5/thumbnails/3.jpg)
2010 Requirement
Interruption Requirements Locational East Midlands
Min MaxEM Scunthorpe DN15-17, DN20 5 45 1.5
1.5
LDZ Interruption Zone Post Codes
Interruptible Allowance (Days)
Interruptible Capacity (GWh)
Requirement for Interruption during period 01/10/13 to 30/09/18
Interruption Requirements LTS
Min MaxEA Fakenham HP NR21 5 25 0.387
NW Barrow HP LA12, LA14, LA18 5 10 0.5NW Barrowford HP BB1-3, BB5-12, BB18 5 10 0.6
1.487
Interruptible Allowance (Days)
LDZ Interruption Zone Post CodesInterruptible
Capacity (GWh)
![Page 4: 2010 Annual Interruption Tender](https://reader035.vdocuments.us/reader035/viewer/2022072016/56813419550346895d9b061a/html5/thumbnails/4.jpg)
Bid Summary and Outcome
6 bids considered for 4 supply points 2 Locations 2 LDZ’s
No contracts awarded Too expensive relative to alternative costs
![Page 5: 2010 Annual Interruption Tender](https://reader035.vdocuments.us/reader035/viewer/2022072016/56813419550346895d9b061a/html5/thumbnails/5.jpg)
Further Information
Further information is available on National Grid Website
http://www.nationalgrid.com/uk/Gas/OperationalInfo/interruptionstosupply/DnInterruptionReform/
Joint Office Website
http://www.gasgovernance.co.uk/int
National Grid Contacts [email protected] [email protected] [email protected]