Page 1: 2009 Summit Event Master Keynote Bellman

Please WelcomeBeryl Bellman

FEAC

Page 2: 2009 Summit Event Master Keynote Bellman

Program Management for EA

Center for the Advancement of the

Enterprise Architecture Profession

2009 Summit

Beryl Bellman, PhDFEAC Academic Program

Director

Page 2

Page 3: 2009 Summit Event Master Keynote Bellman

What You Should Not Expect to Learn How to Do Here

3

Page 4: 2009 Summit Event Master Keynote Bellman

What we will Cover• Managing the Unmanageable in organizations• Program management in the context of EA – as both topic

and resource• Risk management as an exemplar • Dealing with Organizational Culture as a risk factor• Modeling culture and organizational behavior• Culture as Business Rules – OV6A• Cultural Perspectives and Developing a Communication

Plan• Architecting for Decision Support – a case study of a golf

course• Finding our way

Page 4

Page 5: 2009 Summit Event Master Keynote Bellman

The Need for Enterprise Architecture

The effective organization is “garrulous, clumsy, superstitious, hypocritical, monstrous, octopoid, wandering and grouchy" Karl Weick

On Re-Punctuating the Problemin New Perspectives on Organizational Effectiveness; Jossey Bass 1977

Page 6: 2009 Summit Event Master Keynote Bellman

Making Sense of Organizations This is because organizations

organically emerge out of the communication patterns that develop in the course of doing business and in response to the host of environmental variables in dynamically changing business landscapes.

Enterprises are instances of complex adaptive systems having many interacting subcomponents whose interactions yield complex behaviors

Enterprise Architecture is a way of understanding and managing such complexity

Page 7: 2009 Summit Event Master Keynote Bellman

Dealing with Organizational Messes rather than Problems

• In a real sense, problems do not exist. They are distractions from real situations. The real situations from which they are abstracted are messes.

• A mess is a system of interrelated problems. We should be concerned with messes, not problems.

• The solution to a mess is not equal to the sum of the solution to its parts. The solution to its parts should be derived from the solution of the whole; not vice versa.

• Science has provided powerful methods, techniques and tools for solving problems, but it has provided little that can help in solving messes. The lack of mess-solving capability is the most important challenge facing us.”– Russ Ackoff, University of Pennsylvania

Page 7

Page 8: 2009 Summit Event Master Keynote Bellman

Program and Project Management

• Program management involves the hierarchy within enterprises providing oversight to various projects

• Project management is the planning, organizing, directing, and controlling of organizational resources for relatively short-term objectives

Page 8

Page 10: 2009 Summit Event Master Keynote Bellman

PMI BOK Nine Knowledge Areas• Project integration management

– The processes to ensure elements of the project are coordinated, including tradeoffs between competing objectives and alternatives to meet stakeholder needs

• Scope Management – Ensures only the work necessary to

successfully complete the project is done

• Time management– Processes required to complete the

project in a timely manner

Page 10

Page 11: 2009 Summit Event Master Keynote Bellman

Nine Knowledge Areas

• Cost management– The processes required to

complete project within the approved budget

• Quality Management – Processes required to ensure

customer satisfaction with the product of the project

• Human Resource Management– Processes required to effectively

use people assigned to project

Page 11

Page 12: 2009 Summit Event Master Keynote Bellman

Nine Knowledge Areas• Communications Management

– Processes required to collect, distribute, store and dispose of project information

• Risk Management – Processes required to identify,

analyze and respond to risk events in the project

• Procurement Management– Processes required to acquire goods

and services for the project

Page 12

Page 15: 2009 Summit Event Master Keynote Bellman

Risk Assessment and Mitigation• Identify risks to program and

project• Determine impact each risk

realization could have on project• Determine likelihood of risk

occurrence• Weigh risk against others

affecting project according to qualitative rankings (high, medium or low) and quantitative measures

• Develop risk mitigation strategies

Risk Description& Data Input

RiskIdentification &Quantification

RiskConsequence

Estim ation

RiskLikelihoodEstim ation

RiskProfileMatrix

Is the RiskAcceptable

Operate w iththe Risk

No

Yes

Avoidance,Mitigation or

Transfer

Page 17: 2009 Summit Event Master Keynote Bellman

Culture and Risk Culture is the leading risk factor for

compromising integrity and compliance in companies today.

Risk Assessment The process by which the results of a

risk analysis (i.e., risk estimates) are used to make decisions, either through relative ranking of risk reduction strategies or through comparison with risk targets

Risk Management The planning, organizing, leading and

controlling of an organization’s assets and activities to minimize adverse effects

Page 17

Page 18: 2009 Summit Event Master Keynote Bellman

Vision

Operations

Strategy

Mission

As is To beGoals

Enterprise Architecture

SegmentsCultureLeadership

peopleActions

products processes people IT

Enterprise Architecture as a management instrument

“Next to its architecture, which could be viewed as the “hard part of the company,” the soft part, its culture is formed by its people and leadership and is of equal if not higher importance in achieving these goals” Enterprise Architecture at Work by Marcc Lankhorst et al. P 9

. Page 18

Page 19: 2009 Summit Event Master Keynote Bellman

The Culture – EA Connection

• Virtually all experienced enterprise architects recognize the significance of culture.

• They most often attribute to it negative experiences such as encounters with not-invented-here attitudes; turf battles between and among functional stovepiped organizations to seeing EA initiatives challenged as unwelcome intrusions by management to put another bureaucratic obstacle in the way of those who do the real work.

• Culture from this view is seen as an impediment and something that has to be managed, dealt with and changed.

• As intercultural business communication theorist Geert Hofstede observed, “Culture is more often a source of conflict than of synergy. Cultural differences are a nuisance at best and often a disaster."     

Page 19

Page 20: 2009 Summit Event Master Keynote Bellman

Modeling Culture into EA

In this discussion we consider how architects might develop cultural models that integrate into enterprise architecture allowing queries to determine impacts on some proposed or actual technological or business process change.

Page 20

Page 21: 2009 Summit Event Master Keynote Bellman

Culture as represented in an Object Oriented Model

• OO modeling is the underlying structure for many EA tools and methods

• Objects are structures holding data and procedures

• It provides for both a set of meta models and their instantiation in diagrams relating to different architectural products or artifacts.

Page 21

Page 22: 2009 Summit Event Master Keynote Bellman

The Modernist View of Culture

• Culture… taken in its widest ethnographic sense, is that complex whole which includes knowledge, belief, art, morals, law, custom, and any other capabilities and habits acquired by man as a member of society. The condition of culture among the various societies of mankind, in so far as it is capable of being investigated on general principles, is a subject apt for the study of laws of human thought and action. (Tyler, 1871)

• Culture is the deposit of knowledge, experiences, beliefs, values, attitudes, meanings, hierarchies, religion, timing, roles, spatial relations, concepts of the universe (world view), and material objects and possessions acquired by a group of people in the course of generations through individual and group striving (Gudykunst and Kim, 2002).

Page 22

Page 23: 2009 Summit Event Master Keynote Bellman

Contrasting Views of Culture

• Culture as a Thing - culture as a container - something that people exhibit

• Culture as a Process - a managed accomplishment - something that people do

Page 23

Page 24: 2009 Summit Event Master Keynote Bellman

Culture as a Communication System

“Culture is a theory of practice” (Pierre

Bordeaux)“Culture is software

for the mind”(Geert Hofstead)

Page 24

Page 25: 2009 Summit Event Master Keynote Bellman

An example of an Intercultural Misunderstanding

• B: So, how’s your math?• I: ((silence))• B: Not so good huh?• I: No

Page 25

Page 26: 2009 Summit Event Master Keynote Bellman

Organizational Culture

• According to the anthropologist Mary Douglas, culture is not a static ‘thing’ but something which everyone is constantly creating, affirming and expressing.

• Organization culture is the emergent result of the continuing negotiations about values, meanings and proprieties between the members of that organization and with its environment.

Page 27: 2009 Summit Event Master Keynote Bellman

The Underlying Basis of Culture

• Culture is learned from experience and the interpretation of experience.

• Culture is like the operating system of a computer, a pattern of basic assumptions that governs behavior.

• Culture operates at different levels of awareness; values, beliefs, attitudes and behavior.

• Changing culture cannot be separated from the success of the associated organizational changes.

(from Edgar M. Johnson - IDA)

Page 28: 2009 Summit Event Master Keynote Bellman

Parallels between Language and Social Cognition (Ray Jackendoff – Language,

Consciousness, Culture)

• Unlimited number of understandable sentences

• Requires combinational rule system in mind of language user

• Rule system not available to consciousness

• Rule system acquired with only imperfect evidence in environment – virtually no teaching

• Learning requires inner unlearned resources, perhaps partly specific to language

• Inner resources determined by genome interacting with process of biological development

• Unlimited number of understandable social situations

• Requires combinational rule system in mind of social participant

• Rule system only partly available to consciousness

• Rule system must be acquired with only imperfect evidence, only partially taught

• Learning requires inner unlearned resources, perhaps partly specific to social cognition

• Inner resources determined by genome interacting with process of biological development

Page 28

Page 29: 2009 Summit Event Master Keynote Bellman

Structures• Surface Structure - the array

of lived experience• Deep Structure - a finite set

of underlying principles or components that generate the infinite variety of surface structure possibilities

Page 30: 2009 Summit Event Master Keynote Bellman

Cultural Levels

• Artifacts include the visible products of the group as the architecture of its physical environment

• Espoused Values – “focus on what people say is the reason for their behavior, what they ideally would like those reasons to be and what are often their rationalizations for their behavior” – • These include stated mission

and vision statements, strategies, values, goals etc that are conscious guides

• Basic assumptions are theories of practice in use that actually guide behavior and inform group members about how to perceive, think about and feel about things.• The underlying reasons for

behavior remain concealed and unconscious

Page 31: 2009 Summit Event Master Keynote Bellman

ArtifactsVisible organizational structures and processes

(the technical components of EA)

Espoused ValuesThe organization’s strategies, goals and philosophies

(the strategic components of EA)

Tacit AssumptionsUnconscious taken-for-granted beliefs, perceptions, thoughts and feelings –

“the way we do things around here”

Three Levels of Culture – Adapted from Edgar ScheinPage 31

Page 32: 2009 Summit Event Master Keynote Bellman

Finding and Modeling Assumptions

• Unless one digs down to the level of basic assumptions one cannot decipher artifacts, norms and values

• Assumptions are interlocking and systemic

• Locate by exploring with informants anomalies observed between visible artifacts and espoused beliefs and values

Page 33: 2009 Summit Event Master Keynote Bellman

Mechanisms and Constraints

• Enterprise culture is the accumulated learning that becomes taken for granted and drops from awareness

• The learning concerns both how the organization deals with external environments and how it manages its internal integration

• Culture changes are inevitably a source of anxiety because they upset the ability of members to predict what is ahead

• The underlying assumptions that comprise enterprise culture and contribute to its success can as business and technological landscapes change become an impediment to survival

Page 34: 2009 Summit Event Master Keynote Bellman

Rugged IndividualismEntrepreneurial spirit

InnovationWork is fun

Family paternalismJob security

Truth through conflictPush backGet buy-in

Personal responsibilityHe who proposes does

Do the right thing

DEC’s Cultural Paradigm - Internal

Page 34

Page 35: 2009 Summit Event Master Keynote Bellman

Moral commitment to customers

Solving the customer’s problem

Engineering arroganceWe know what is best

Central controlBudget approval at

Operations Committee

The market as arbiterLet the market decide

Organizational idealismResponsible people of goodwill

can solve the problem

DEC’s Cultural Paradigm – External – Surviving in a dynamic environment

Page 35

Page 36: 2009 Summit Event Master Keynote Bellman

Engineering versus Sales• DEC grounded in MIT academic

culture• A basic assumption of engineering

culture that ‘good work speaks for itself,” and an engineer ‘ should not have to sell himself.’ Public relations and image building are forms of ‘lying’ and are to be avoided

• Idealism of engineering and dominance over sales and the lack of “the money gene” in the cultural DNA countered DEC’s ability to adapt to growth and changes in the business and technological landscapes

• The positive innovative culture that could at the same time grind out “fabulous new products” and develop such strong internal animosities that groups would accuse one another of lying, cheating and misuse of resources.

Page 37: 2009 Summit Event Master Keynote Bellman

Cultural Object Relations Expressed as Business Rules

• A business rule is guidance that there is an obligation concerning conduct, action, practice, or procedure within a particular activity or sphere (from the BRG)

• In DoDAF (MoDAF) Operational Rules Model (OV-6a) specifies operational or business rules that are constraints on the way that business is done in the enterprise.• At lower levels, OV-6a describes

the rules under which the architecture or its nodes behave under specified conditions.

• Such rules can be expressed in a textual form, for example, “If (these conditions) exist, and (this event) occurs, then (perform these actions).”

Page 37

Page 38: 2009 Summit Event Master Keynote Bellman

Locating and Discovering Business Rules

• Some are located in policy and other organizational policy and business process documentation

• While many rules are expressed as formal rules of the business, there are many that are hidden from view and to be uncovered.

• Both types both constrain activity and provide schema for culturally appropriate organizational behavior.

Page 38

Page 39: 2009 Summit Event Master Keynote Bellman

Business Rules as Schema with Story Grammars

• This also is relevant to the work of psychologist David Rumelhart on parallel distributed processing as microstructures of cognition (he won a McArthur award for this).

• He developed the concept of “story grammars” as cognitive microstructures that constitute formal grammars to capture the structure of stories.

• A formal grammar is an abstract structure composed of a set of (rewrite) sequencing rules that comprise schema.

• A schema is an abstract representation of a generic concept for an object, event, or situation. He showed schema consist of a network of interrelationships among the major constituents of the situation represented by the schema.

• In this way we can consider a business rule as an instance of this concept, which as I argued can be formally modeled.

Page 39

Page 40: 2009 Summit Event Master Keynote Bellman

Business Rules as Transformational Grammars

• This relation of business rule to cultural schema is consistent with linguistic theories of generative grammars and transformational linguistics.

• This approach, first proposed by Chomsky asserts there are transformational operations that are defined for any linguistic string (sentence) that modify (transform) it from, for instance, such as being an assertion to a question to a request.

• These are also called “rewrite rules.” Anthropologists adapted this idea to develop “rewrite” rules for various cultural concepts or terminological systems such as kinship (c.f. the cognitive anthropological work of Kimball Romney

• In this way we can consider a business rule as an instance of this concept, which as I argued can be formally modeled.

Page 40

Page 41: 2009 Summit Event Master Keynote Bellman

If presented with bill

Then evaluate contextual status relative to others present

Then leave table until bill is paid

lower

evaluate

Then pay bill

highest

DEC Conflict Avoidance as Business Rule used Restaurants

Page 41

Stay at table

Recognized lower than others at table

Page 42: 2009 Summit Event Master Keynote Bellman

The Digital Localized Business Rule for Paying Checks

• This business rule corresponds to the assumption system structural schema

• Schein described for internal integration in the interaction between the two cultural assumptions of family paternalism and truth through conflict.

• On the one hand there is the strong integrative function expressed in the assumption about the DEC family and on the other hand of the “truth through conflict” when decisions are made.

• In this case the there is a “pushing back” and “buying in” rather than openly negotiating status in the presence of non-family members.

Page 42

Page 43: 2009 Summit Event Master Keynote Bellman

From Hurlbut Managing Domain Architecture Evolution Through Adaptive Use Case and Business Rule ModelPage 43

Page 44: 2009 Summit Event Master Keynote Bellman

From Saurabh Mittal, Amit Mitra, Amar Gupta, Bernard P. Zeigler -Strengthening OV-6a Semantics with Rule-Based Meta-models inDEVS/DoDAF based Life-cycle Architectures Development

Business Rules in the EA Context

Page 44

Page 45: 2009 Summit Event Master Keynote Bellman

Enterprise Culture A Three Perspective View of Culture (Joanne

Martin) Integration – culture as shared by all members

in organization wide consensus Where there is lack of consensus remedial

actions are taken or suggestions that those who do not agree leave the organization

Differentiation – sub-cultural perspective – focus on inconsistent interpretations based on sub-culture and stakeholder perspectives.

A loose coupling between representations of the culture as expressed to outsiders versus insiders

Fragmentation – focus on ways in which organizational cultures are inconsistent, ambiguous, multiplicitous and in a state of flux –

Fragmentation focuses on multiplicities of interpretation that do not coalesce into a collectivity wide consensus of an integration view nor create sub cultural consensus of the differentiation perspective

Page 46: 2009 Summit Event Master Keynote Bellman

Cultures, sub cultures and contra cultures

Page 46

Integrationist view Differentiation view

Page 47: 2009 Summit Event Master Keynote Bellman

Fragmented view

This perspective includes irreconcilable tensions between opposites including ironies, paradoxes or contradictions within organizations

Page 47

Page 48: 2009 Summit Event Master Keynote Bellman

Fuselage Versus Wing Cultures

Intercultural Conflict on the C17 Page 48

Page 49: 2009 Summit Event Master Keynote Bellman

The Emergence of Enterprise Culture An enterprise arises from local interaction of

often independent units that exist within a common environment

Each unit or entity interacts with its immediate environment according to a set of low order rules

The combined effects of these lower order interactions within an environment gives rise to higher order organizational phenomenon or organizational culture

Culture emerges from localized interactions As culture is grounded at the local level,

culture is highly resistant to change Changing culture entails re-specifying local

level rules rather than simply imposing change from the top

EA necessitates an enterprise-wide ethnography taking into account multiple perspectives

Creating an enterprise architecture proffers a mechanism to initiate positive change

Page 50: 2009 Summit Event Master Keynote Bellman

Contrasting Perspectives

• Picking up the poker – Wittgenstein versus Popper• Does philosophy center on the resolution of puzzles posed by language

or are there genuine problems to be resolved? • When we speak of solutions – do they pertain to puzzles or problems?

Page 50

Dave Edmonds & John Eidinow

Page 51: 2009 Summit Event Master Keynote Bellman

Contrasting Perspectives

•   “All art — symphonies, architecture, novels — it’s all puzzles. The fitting together of notes, the fitting together of words have by their very nature a puzzle aspect. It’s the creation of form out of chaos. And I believe in form.” (Stephen Sondheim )

Page 52: 2009 Summit Event Master Keynote Bellman

“One of the things I’m passionate about ...  is having an Enterprise Architecture and making sure that everything we do fits the puzzle."

Bob Napier, HP EVP & CIO

Page 52

Puzzles and Enterprise Architecture

Page 53: 2009 Summit Event Master Keynote Bellman

Resolving Puzzles

• Modeling human communications from each of the three DoDAF perspectives and/or FEAF levels, and during all phases of the TOGAF ADM

• Accounting for human communications from the top Zachman rows

• Linking to infrastructures used to support them at every layer of relevant depth

• Resolving conflicts as putting together pieces of a complex puzzle

Page 54: 2009 Summit Event Master Keynote Bellman

Where to begin?

Start anywhere – “go where the money is” (Willie Sutton)

Understand human communications as business processes that incorporate the cultural, social and political/policy dimensions of organizations

Analyze where the technical infrastructure supports, constrains and contradicts

Build models FOR not OF – “in order to… rather than “because”

Page 55: 2009 Summit Event Master Keynote Bellman

Enterprise Modeling

Involves assessment of aspects of the enterprise to understand, restructure and design enterprise operations

Reference architectures are intellectual paradigms that facilitate analysis and accurate discussion and specification of a given area of discourse.

They provide a way of viewing, conceiving and talking about an issue

Page 56: 2009 Summit Event Master Keynote Bellman

Best Practices and Unique Practices

Best practices are useful in developing hypotheses about causation but should not be taken as necessary truth

Correlation does not necessarily equal causation

Page 56

Page 57: 2009 Summit Event Master Keynote Bellman

If we observe that all birds and butterflies have wings it doesn’t necessary follow that they will enable human’s to fly

Page 57

Page 58: 2009 Summit Event Master Keynote Bellman

Ethnography and EA

“The breakthroughs that led from categorization to an understanding of fundamental causality generally come not from crunching ever more data but from highly detailed field research, when researchers crawl inside companies to observe carefully the causal processes at work (Christensen and Raynor) .”

Page 58

Page 59: 2009 Summit Event Master Keynote Bellman

Growing Societies from the Bottom Up

• We have discussed how agent modeling can be described as sets of cultural “business rules.”

• These sets comprise different types of strategic interaction games, as exemplified in the classic example of the prisoner’s dilemma.

• However in game theory focus has been on one game at a time. Using evolving automata cognitive behavior is modeled across multiple games.

• This points to a games-theoretic model of culture as simultaneously playing out a series of games as constituting ensembles that impacts the strategy for any particular game.

• By locating the underlying business rule schema that underlie social contextualized behaviors we can in a sense run computational models that allow the traceability we suggested earlier between business process proposals and cultural assumptions that are entailed.

Page 59

Page 60: 2009 Summit Event Master Keynote Bellman

New Capability Enterprise Architecture for Eagle Eye

Golf ClubFEAC Certification Program

Winter 09

By Team ACIS

Page 61: 2009 Summit Event Master Keynote Bellman

Products• Overview and Summary (AV-1) - Excerpt

• High Level Operational Graphic (OV-1)

• Operational Activity Model – Activity Tree Node (OV-5)

• Operational Node Connectivity (OV-2)

• Organizational Relationships Chart (OV-4)

• Operational Information Exchange (OV-3) - Excerpt

• Operational Activity Model – Context Diagram (OV-5)

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS 61

Operational Activity Mode – Activity Decomposition Models (OV-5)

Operational Event Trace Description (OV-6c)

Systems Interface Description (SV-1)

Systems Communications Description (SV-2)

Operational Activities to Systems Traceability Matrix (SV-5b)

Technical Standards Profile (TV-1)

Integrated Dictionary (AV-2) - Excerpt

Conclusion

Page 62: 2009 Summit Event Master Keynote Bellman

Overview and Summary (AV-1)Excerpt

• The Professional Golf Association (PGA) has offered Mr. Chipitin, owner/operator of Eagle Eye Golf Course, an opportunity to host a celebrity charity golf event in April 2012.

• Purpose: To create a To-Be enterprise architecture that provides information on the activities, organizations, and systems necessary to support a new capability (e.g. host a celebrity charity golf event). – In doing so, the architecture also identifies new as well as existing primitives (e.g.

op nodes, system nodes, etc.) that remain functional as they are today or that may need to be modified in support of the To-Be scenario.

– This enterprise architecture is the first in a series of tasks that need to be performed as part of the overall decision making process for accepting or rejecting the PGA’s proposal to host the celebrity charity golf event at EEGC in April of 2012.

• Viewpoint: Owner/Operator EEGC

• Timeframes: To-Be– Timeframe for making decision to host or not is 6 months – Timeframe for event is April 2012

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS 62

Page 63: 2009 Summit Event Master Keynote Bellman

High Level Operational Graphic (OV-1)

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS63

Page 64: 2009 Summit Event Master Keynote Bellman

Operational Activity Model (OV-5)Activity Tree Node

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS64

Page 65: 2009 Summit Event Master Keynote Bellman

Operational Node Connectivity (OV-2)Excerpt - EEGC Central

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS

65

Page 66: 2009 Summit Event Master Keynote Bellman

Operational Node Connectivity (OV-2)Excerpt - Course and Landscape Management

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS66

Page 67: 2009 Summit Event Master Keynote Bellman

Operational Node Connectivity (OV-2)Excerpt - Marketing & Media Relations

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS

67

Page 68: 2009 Summit Event Master Keynote Bellman

Organizational Relationships Chart (OV-4)

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS 68

Page 69: 2009 Summit Event Master Keynote Bellman

Operational Information Exchange (OV-3) - Excerpt

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS69

Page 70: 2009 Summit Event Master Keynote Bellman

Operational Activity Model (OV-5)Context Diagram

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS70

Page 71: 2009 Summit Event Master Keynote Bellman

Operational Activity Model (OV-5)Activity Decomposition Model (A0)

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS71

Page 72: 2009 Summit Event Master Keynote Bellman

Operational Activity Model (OV-5)Activity Decomposition Model (A1)

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS72

Page 73: 2009 Summit Event Master Keynote Bellman

Operational Activity Model (OV-5)Activity Decomposition Model (A2)

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS

73

Page 74: 2009 Summit Event Master Keynote Bellman

Operational Activity Model (OV-5)Activity Decomposition Model (A3)

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS 74

Page 75: 2009 Summit Event Master Keynote Bellman

Operational Activity Model (OV-5)Activity Decomposition Model (A4)

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS75

Page 76: 2009 Summit Event Master Keynote Bellman

Operational Event Trace Description (OV-6c)

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS76

Page 77: 2009 Summit Event Master Keynote Bellman

Systems Interface Description (SV-1)Excerpt - EEGC Clubhouse

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS77

Page 78: 2009 Summit Event Master Keynote Bellman

Systems Interface Description (SV-1)Excerpt - Superintendent Station

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS78

Page 79: 2009 Summit Event Master Keynote Bellman

Systems Interface Description (SV-1)Excerpt - Public Information & Media Relations Village

March 16, 2009New Capability Enterprise Architecture for EEGC by Team

ACIS

79

Page 80: 2009 Summit Event Master Keynote Bellman

Systems Communications Description (SV-2)Excerpt - EEGC Central (1 of 2)

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS80

Page 81: 2009 Summit Event Master Keynote Bellman

Systems Communications Description (SV-2)Excerpt - EEGC Central (2 of 2)

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS81

Page 82: 2009 Summit Event Master Keynote Bellman

Systems Communications Description (SV-2)Excerpt - Superintendent Station

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS82

Page 83: 2009 Summit Event Master Keynote Bellman

Systems Communications Description (SV-2)Excerpt - Public Information & Media Relations Village

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS83

Page 84: 2009 Summit Event Master Keynote Bellman

Operational Activities to Systems Traceability Matrix (SV-5b)

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS 84

Page 85: 2009 Summit Event Master Keynote Bellman

Technical Standards Profile (TV-1)

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS

85

Page 86: 2009 Summit Event Master Keynote Bellman

Integrated Dictionary (AV-2) Excerpt

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS 86

Page 87: 2009 Summit Event Master Keynote Bellman

Integrated Dictionary (AV-2) – cont’dExcerpt

March 16, 2009 New Capability Enterprise Architecture for EEGC by Team ACIS 87

Page 88: 2009 Summit Event Master Keynote Bellman

Finding a Way There is a true story that organizational theorist Karl Weick told

showing the importance of frameworks or roadmaps to organizations.  He describes how …

” A group of mountain climbers was in the process of ascending one of the most daunting peaks in the Alps when they were engulfed by a sudden snow squall. All were experienced climbers and each had their own idea of the direction they should go in to get back to the base camp. They wander around for some time, arguing about which way to go, while their circumstances became more dire and threatening with each moment of indecision. Finally, one of the climbers dug around in their backpack and found a map. Everyone huddled around the map, studied it, and quickly determined their direction. Several hours later, they arrived safely at the camp. While they were warming themselves around the fire, regaling each other with the story of their near misadventure, one of the climbers picked up the map they had used to descend the Alps. On looking at it more carefully, they realized it was actually a map of the Pyrenees!”

Page 89: 2009 Summit Event Master Keynote Bellman

The Enterprise Architecture Map of the IRS

Page 89