2003-03-21 PalSpec Status Review 1
PalSpec Status Review
WITH NOTES RE KECK APPLICATION
Terry Herter, Chuck Henderson (Cornell)John Wilson, Mike Skrutskie (Univ. or Virginia)Keith Matthews (Caltech), Jim Howard (Telic)
March 21, 2003
2003-03-21 PalSpec Status Review 2
Spectrograph Requirements
• Original Baseline– Simultaneous coverage from 0.80 – 2.5 m
• Emphasis on J, H, and K bands
– R ~ 2500 with 30 x 0.9 arcsec slit– For keck R~2500 with slit ~ 15 x 0.45 arcsec– Slit viewer with > 2x2 arcmin2 FoV– Keck slit viewer ~ 40”x40”
• Delivery– December 2003– For Keck, delivery TBD
2003-03-21 PalSpec Status Review 3
WHY DOES IT WORK ON KECK
• Instrument is being designed to study faint, small (<~1”) objects, one at a time
• f number: at palomar 16, keck 16.6• Seeing at keck ~1/2 that at Palomar
– =>palomar instrument will work at keck with fov reduced by factor of 2
2003-03-21 PalSpec Status Review 4
OH Line Positions
Positions of atmosphere airglow (OH) lines vs. wavelength overlaid with atmospheric transmission.
0
500
1000
1500
2000
2500
3000
3500
4000
4500
5000
0.8 1 1.2 1.4 1.6 1.8 2 2.2 2.4 2.6
Wavelength (um)
Rel
ativ
e In
t. (
phot
ons)
0.0
0.1
0.2
0.3
0.4
0.5
0.6
0.7
0.8
0.9
1.0
Atm
osph
eric
Tra
nsm
issi
on
2003-03-21 PalSpec Status Review 5
Perspective Views
Collimator
Reimager
Grating
Slit viewer
Focal Plane
2003-03-21 PalSpec Status Review 6
Perspective Views
2003-03-21 PalSpec Status Review 7
View with Shell
2003-03-21 PalSpec Status Review 8
6 inches
CaF2/CaF2 Infrasil/ZnS/ZnSe ZnSe/ZnSe
Asphere
Asphere
Array tilted
1.3 deg
Prototype Camera by Jim Howard, Telic Optics
Prototype Spectrograph Camera
2003-03-21 PalSpec Status Review 9
Top/Bottom of
30 arcsec slit
Camera Spot Diagrams
2003-03-21 PalSpec Status Review 10
2 pix radius = 18 micron
If 2.78 pix/arcsec (slit width direction):
@ Palomar = 72 arcsec
@ Keck = 36 arcsec
Encircled Energy
2003-03-21 PalSpec Status Review 11
Spectrum Layout in
Focal Plane
Possible array rotation (also rotate slit to keep on columns)
2003-03-21 PalSpec Status Review 12
Spectral Resolution
Spectral resolution for 1.0 arcsec slit with 2.78 pixels/arcsecond.
2003-03-21 PalSpec Status Review 13
Grating Efficiency
2003-03-21 PalSpec Status Review 14
* includes primary through detector
System Throughput
Atmospheric transmission
Off the array
2003-03-21 PalSpec Status Review 15
Slit Viewer• Design Specs
– Operates at Ks– Images to ~ 0.14 arcsec/pix– Giving 2.4 arcmin FoV => 5.7 sq. arcmin
IntegrationTime (sec)
Ks mag(S/N = 5)
Number of Galaxies
Number of Stars
1 17.2 3 1
10 18.4 15 1
30 19.0 27 1
2003-03-21 PalSpec Status Review 16
KECK SLIT VIEWER
• WE’LL USE 256X256 ARRAY FROM EXISTING IR INSTRUMENT
• FOV EQUIVALENT TO NIRC FOV (40”)
2003-03-21 PalSpec Status Review 17
Slit Viewer Detection Rate
Slit viewer with 2.4 arcmin FoVCounts from Glazebrook et al. 1994, MNRAS, 266, 65.
0.01
0.1
1
10
100
1000
10 12 14 16 18 20 22 24
K-magnitude
# o
f O
bje
cts
in F
oV
Galaxies
Stars
1 sec
10 sec
30 sec
2003-03-21 PalSpec Status Review 18
Spectrograph Line Sensitivity
• Assumptions– S/N = 5, 10 pixels to extract line– System throughput = 0.15 in all bands– Between OH-lines (J,H,K bkgnd = 70, 200, 70 Jy/arcsec2)– RN = 5 e-, i(dark) = 0.01 e-/sec
• KECK SHOULD BE 4x BETTER
Flux (10-17 ergs/cm2/s) tback
Band 600 sec 1800 sec 3600 sec (sec)
J 2.1 1.1 0.75 410
H 2.2 1.2 0.87 170
K 3.0 1.7 1.2 57
tback = integration time for RN to contribute < 20% to noise.
2003-03-21 PalSpec Status Review 19
Spectrograph Continuum Sensitivity
• Assumptions– S/N = 5 per resolution element– System throughput = 0.15 in all bands– Between OH-lines (J,H,K bkgnd = 70, 200, 70 Jy/arcsec2)– RN = 5 e-, i(dark) = 0.01 e-/sec
• KECK WILL BE 1.5 MAG DEEPER FOR POINT SOURCES
Mag in 1 resolution element
Band 600 sec 1800 sec 3600 sec
J 19.7 20.4 20.8
H 18.8 19.5 19.8
K 17.7 18.3 18.7
2003-03-21 PalSpec Status Review 20
Nov-02 Dec-02 Jan-03 Feb-03 Mar-03 Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03
Spectrographpre-preliminary design
strawman designfinal design
camera prelim designcamera design
camera fab
collimator designcollimator fab
grating fabprism fab
Slit viewerrequirements
preliminary designfinal designcamera fab
Cryostatbrainstormingrough design
final designfab
Electronicsharnesses (2)
layoutmanufacture
integ. and testmisc. dewar wiring
Array control/readoutPC board clones
PC board assemblybox fab (clone)integ. and test
Palomar Spectrograph Development Schedule
2003-03-21 PalSpec Status Review 21
WIRC-2K PC boardJPL array delivery
requirementsdesign
programming mods
requirementsdesignbuild 0build 1
requirementsdesignbuild 0build 1
lab I&Tobserving I&T
Handling cartdesign
fab
Telescope mountscope requirements
preliminary designfinal design
fab
IntegrationTest
First science light
Nov-02 Dec-02 Jan-03 Feb-03 Mar-03 Apr-03 May-03 Jun-03 Jul-03 Aug-03 Sep-03 Oct-03 Nov-03 Dec-03Palomar Spectrograph Development Schedule