2.0 Pending References / Queries on policy issues related to Vendor Approval/Specifications/Tender Conditions/Inspections
SN. Name of the Issue involved Date of Committed Communication exchanged Extended Reasons for Delay Current Status
Vendor/ Firm original timeline between the affected party & Timelines
/ Zonal reference (Reasonable RDSO
Railway / PU / received by time period)
PSU / Railway RDSO for disposal (Dates of letters/emails)
Board (through letter of the
/ web portal) reference /
(1st query/
Reference) suggestion
1 2 3 4 5 6 7 8 9
CARRIAGE
1 M/s Raneka High Tensile 09.05.17 NA i) RDSO vide letter NA In the beginning the Reply of firm vide ref. Industries Ltd., AAR H Type Ref.No.MC/BLB/CBC firm vide letter no.RIL/KJ/HTYPE/17-18 Pithampur – Tightlock CBC dt.20.7.2016 requested the dt.06.5.2016 has dt.09.05.2017 and the 454774 (M.P.) with Balanced firm to submit documents as applied for drawings & QAP sent vide Draft Gear to per RDSO spec. registration against letter no. RIL/KJ/MK/17-18/ RDSO Specn. RDSO/2011/CG-03 Rev.1 RDSO spec. No.C- dt.13.7.2017 (received on No.RDSO/2011/ with balanced draft gear. K009 Rev.02 which 06.09.2017) are under CG-03 Rev.1 deals with CBC scrutiny. Discrepancies if any, with Amendment ii)Reply of firm vide ref. without Balanced found in drawings and QAP Slip No.1 of no.RIL/KJ/HTYPE/17-18 Draft Gear which is shall be advised to the firm by November 2016. dt.09.05.2017. obsolete now. At 22.09.2017
iii) Firm’s letter no. present all the
RIL/KJ/MK/17-18/ couplers are being
dt.13.7.2017 (received in procured to RDSO
RDSO on 06.09.17)submitting spec.
drawings & QAP for approval RDSO/2011/CG-03
is under scrutiny Rev.1 with balanced
draft gear only and
that was advised to
the firm and the firm
took almost a year to
apply as per RDSO
Specn.
No.RDSO/2011/CG-
03 Rev.1 with
Amendment Slip No.1
of November 2016.
2 M/s Atul High Tensile 04.3.2017 NA RDSO vide letter NA Non receipt of The drawings and QAP
Engineering AAR H Type Ref.No.MC/BLB/CBC required information submitted by the firm are Udyog, Agra. Tightlock CBC dt.7/8.6.2017 requested the regarding eligibility to under scrutiny. Discrepancies with Balanced firm to submit documents in as per RDSO Specn. if any, found in drawings and Draft Gear to support of their eligibility. The No.RDSO/2011/CG- QAP shall be advised to the RDSO Specn. reply is awaited. 03 Rev.1 with firm by 22.09.2017
No.RDSO/2011/ Amendment Slip No.1
1
1 2 3 4 5 6 7 8 9
CG-03 Rev.1 of November 2016
with Amendment
Slip No.1 of
November 2016.
3 M/s BESCO High Tensile 08.6.2017 NA i)RDSO vide letter NA Non receipt of The drawings and QAP Ltd. AAR H Type 28.6.2017 and Ref.No.MC/BLB/CBC required information submitted by the firm have Kolkata Tightlock CBC 21.8.2017 dt.22.6.2017 & 25/26.7.2017 as per RDSO Specn. been scrutinized and the with Balanced requested the firm to submit No.RDSO/2011/CG- Discrepancies found in Draft Gear to documents as required as per 03 Rev.1 with drawings and QAP advised to RDSO Specn. specification as well as Amendment Slip No.1 the firm on 19.09.2017. No.RDSO/2011/ drawings & QAP and other of November 2016.
CG-03 Rev.1 related documents reg. fresh
with Amendment registration.
Slip No.1 of
November 2016. ii) Firm vide letter
No.WG_17_ICF/Carriage
dt.21.8.2017 have submitted
one copy of QAP and
incomplete set of drawings(A4
size) pertaining to the product.
iii)discrepancies observed advised to the form on
19.09.17
4 M/s Bhilai High Tensile 23.6.2017, NA i) RDSO vide letter NA Non receipt of Reply of firm vide ref. no. Engg. Corpn. AAR H Type 29.6.2017, Ref.No.MC/BLB/CBC required information AA/BEC/RDSO/HTCBC/2017 Ltd., Bhilai- Tightlock CBC 01.7.2017 and dt.22.6.2017 & 25/26.7.2017 regarding as per -18 dt.10.8.2017 is under 490026 with Balanced 10.8.2017 requested the firm to submit RDSO Specn. scrutiny and the drawings & Draft Gear to documents as per No.RDSO/2011/CG- QAP submitted by the firm are RDSO Specn. specification as well as 03 Rev.1 with under scrutiny. Discrepancies No.RDSO/2011/ drawings & QAP and other Amendment Slip No.1 if any, found in drawings and CG-03 Rev.1 related documents reg. fresh of November 2016. QAP shall be advised to the with Amendment registration. firm by 20.09.2017.
Slip No.1 of
November 2016. ii)Firm’s reply vide letter
no.AA/BEC/RDSO/HTCBC/2
017-18 dt.10.8.2017.
5 M/s Jupiter High Tensile 24.4.2017,18.5 NA -- NA -- The drawings of the firm have Alloys & AAR H Type .2017 & been approved. Further, Steel(I) Ltd, Tight lock CBC 24.5.2017 RDSO team visited for Kolkata with Balanced prototype inspection in the last Draft Gear to week of August 2017. During RDSO Specn. the visit, it was observed that No.RDSO/2011/ proper mechanized test setup CG-03 Rev.1 (with pneumatic system) are with Amendment not available with the firm.
Slip No.1 of Various functional tests
2
1 2 3 4 5 6 7 8 9
November 2016. cannot be carried out and
verified. The firm will raise
fresh inspection call again
after setting-up of proper test
set up.
6 SAIL/Durgapu Development of 01.06.2017 N/A 30.06.2017 N/A N/A RDSO official visited SAIL/DSP r Steel Plant, solid forged 20.07.2017 from 19.06.2017 to Durgapur wheels for FIAT 25/27.07.2017 20.06.2017 for review of the IR bogie (LHB) progress on development of LHB wheel. Five LHB wheel samples from three heats were
selected for conducting test as per RDSO specification No. IRS R-19/93 Part-II Rev.4 with Corr.1 of August 2015. The results of the test conducted on sample wheels have been found satisfactory. In addition, the following activities are required to be carried out by SAIL/DSP.
achining of LHB wheel: SAIL has planned to carry out machining of all LHB cast wheel from M/s Bonatrans / Aurangabad.
Balancing of LHB wheel: The balancing of LHB wheel will be carried out by means and method available at M/s
Bonatrans / Aurangabad.
The Non-destructive tests as UT and MPT of good wheels
would be offered by SAIL/DSP to RDSO for witnessing NDT and inspection of LHB wheels. Fatigue test: Fatigue test will be carried out as per S.No. 5 of Corr.1 of RDSO Spec. IRS R- 19/93 Part-II (Rev.4).
SAIL/DSP yet to submit the
status.
7 M/s Advance Request to 31.08.2017 NA 19.09.17 Forwarded to RCF/KXH all
paints ltd include name for PUs on 19.09.17in reference to AP/3073/2017 supply of earlier letter for trial of
dated hydrophobic hydrophobic coating.
31.082017 coating
3
1 2 3 4 5 6 7 8 9
8 M/s Milton Development of 29.09.2016 NA 10.08.17 Test result submitted by M/s
Industries Ltd Compressed Milton on 10.08.17, case is letter dated Laminates Sheet under process.
19.09.2016 (8 mm)
9 M/s Chaitanya Automatic fire 05.07.2017 NA 19.09.17 Firm submitted Firm has to submit the Electricals and smoke incomplete compliance as advised in joint Jalgaon detection cum compliance. note. Firm has submitted manual incomplete compliance. Firm suppression has been advised on 19.09.17.
system
M&C
10 Railway Board (i)Trials of Anti (i) Letter No. Final report Communication made to Rly 02 years No delay (i) Provision of Anti Graffiti Graffiti clear 89/M( C with RDSO Bd and Jt Director/ Carriage coating for 1000 coaches made coating on coach )/137/22 Vol. Specn vide letter no. by Rly Bd vide letter no. exterior II dated 08-08- no.M&C/PC M&C/PCN/II/3/Anti Graffiti 2013/M(C)/142/4 dated 2008. N/127/2009 dated 12.08.2016 on ; 13.08.2014 to sustain external (ii)Preparation of (ii) Letter No & Trial Performance of Anti Graffiti aesthetics in coaches under Specification for 2006/Elect(G)/ scheme Coating on exterior of coaches. RSP 14-15 Anti-Graffiti 114/2 Pt dated submitted to (ii) Provision of Anti Graffiti coating 22.04.2009. Rly Bd on coating for 500 coaches made (iii) Trials of (iii) Letter No 24.08.2015 by Rly Bd vide letter no.
alternative 91/M©/137/2 2016/M(C)/142/4 dated systems such as 3 Pt.II dated 28.04.2016 to sustain external nano-painting 18.01.2010. aesthetics in coaches under (iv)2007/M©/1 RSP 16-17 37/18 dated (iii)Performance of coated
13.07.2016. Antigraffiti paint is under
monitoring.
11 Railway Board Field trials of Director/Civil (i)Generic Periodical performance report Nil No delay (i)Completed joint field trial of “Coating Systems Engg. (B&S) specification of three(03) bridges painted 03 out of 05 Bridges painted . for Long Painting Rly. Bd letter s for long life submitted to B&S Dte vide
free life 15 years no. 2011/CE- coating this office note (ii) Information of joint trial and above for I/BR-III/Long systems no.M&C/PCN/II/Br-I/Vol-5 from B&S Dte of remaining
steel Girder Life paints framed dated 19.07.2017 in reference bridges is awaited. Bridges” dated to Rly Bd letter no.2011/CE-
18.03.2014 I/BR-III/Paint long Life dated
04.07.2017
12 Railway Board Trials of Director Mech. Disposed Final draft specification of tie- Nil No delay (i)Final draft specification has alternative Engg. (P)II/Rly within time coat issued to Rly. Bd vide been framed & field trial of the
systems such as Bd’s letter no. letter product has been completed. tie-coat 07.07.2014 & no.M&C/PTCEL/Project/Tie- (ii)Recommendations of 2011/M(M&P)/ Coat dated 29.08.2016 for Executive Director/ Carriage/ 1063/5113.10. extended trial order. RDSO has been sent to Rly Bd 2014. vide their letter no.MC/PNT dated 03/04.08.2017.for
extended field trial.
13 Railway Board “Technology Director Mech. Disposed Final report with Nil No delay (i)Trial on Adhesion promoting
4
1 2 3 4 5 6 7 8 9
Evaluation to Engg within time recommendations sent to Rly primer to obviate garnet obviate Garnet (Coaching), Rly Bd & ED/Carriage vide letter blasting completed and final blasting” Bd letter no. no. AED/M&C-M/Cadre dated report on “Technology (Adhesion 2007/M©/137 27.11.2015 Evaluation to obviate Garnet Promoting Primer /18 dated Blasting” has been submitted /Direct To Metal) 23.12.2013 & final report sent to Director/ME/Coaching Railway
Bd New Delhi vide this office letter No. AED/M&C-M/Cadre dated 27.11.2015. (ii)Joint recommendations of
M&C and Carriage Dte sought by Rly Bd vide their letter no. 2007/M(C)/137/18 dated 14.03.2016. which is pending
with Carriage Dte.
14 Railway Board Trials of Director Mech. Trial with Communication received by 01 year No delay (i)Functional requirement alternative Engg. (P)II/Rly ICF Specn ED/M&C from ICF/Chennai specification for water based systems such as Bd’s letter no. no.ICF/MD/ on 15.04.2016 PU paint has been framed. water based PU 2011/M(M&P)/ Spec-240 (ii)The manufacturers were paint 1063/5113.10. done for 90 advised to submit samples of 2014 conventional water based PU paint for its coaches at conformity check as per ICF/Chenna requirement of functional i during specification
2012-13
15 Director/VDG/ Development Director.Mech. Pending IS Specn based r painting of Nil Under process of Technical comments & Carriage note specification for Engg(Chg)Rly Helical coil spring has been development of new suggestions have been received no.SV.FIAT painting of LHB Bd letter no. recommended to RDSO specn from paint manufacturers for Spring dated Coil Spring of 89/M©/137/2 Director/VDG/Carriage vide development new specification 19.01.17,02.02. FIAT Bogie 2 Vol.III dated letter no. as per RDSO Apex guideline. 17 & (Alternate to 21.11.2016 M&C/PCN/I/64/Fiat
21.08.2017 recommended Bogie/Spring dated
system of 23.01.2017
IS:12744-89 &
IS:8662:2004)
16 M/s Asian Proposal for High (i)Director Disposed Reply sent to Nil No delay Recommendations of Paints PPG Performance Mech.Engg. within time Director/Std/Carriage vide ED/Carriage has been sent to Pvt.Ltd, coating system (Chg.)/Railway letter no.M&C/PCN/Asian Railway Board vide his note no. Mumbai for coaches Board’s Letter Paints Proposal dated MC/PNT dated 13/17.04.2017. No.89 /M(C)/ 15.02.2017.
137/22 vol (III),
New Delhi
Dated:
15.11.2016.
(ii)Director/Std
s./ Carriage
5
1 2 3 4 5 6 7 8 9
Letter
No.MC/PNT
Dated:
23.11.2016.
8 Railway Board Development of Rly Bd letter Pending New proposal 01 year New proposal nder technical evaluation of the special coatings no.2006/M©/1 following 16 proposals as per and paint system 37/20.Vol.X standard format for application on dated
Exterior, Interior 21.07.2017 M/s Kansai Nerolac Paints, surface of Mumbai coaches, Axles & M/s Berger Paints Pvt. Ltd.,
Wheels, Bogies & Kolkata Under frame for )M/s Advance Paints Pvt. Ltd., improved Mumbai corrosion )M/s Ajay Industries, Kanpur resistance, fire M/s Stork HKB India Pvt.Ltd, resistance, life, ) M/s Shanti Electricals, color, gloss Jodhpur retention, heat & i) M/s Axon MiorosystemsPvt. weight reduction, Ltd., Jalandhar, Punjab noise/vibration ii) M/s Cypruss Agency Private reduction, Anti Limited, Mumbai stain &self ) M/s Mangirish Enterprises, cleaning coating, Kolhapur hydrophobic M/s Meta Chem Paints and coatings, Adhesives Pvt. Ltd, Nasik corrosion xi) VTT Technical Research prevention of Centre of Finland Ltd railway tracks (FinnesterHybrid Coating), etc Finland.
xii) Gangotri Hi-Tech Coatings, Nagpur xiii) M/s GFX GROUND FX, 754, Mathura Road, Bhogal, New Delhi xiv) M/s Trimurti (India) Ltd, Allahabad. xv) M/s Ricasil Industries, Gujrat xvi) M/s Mohan Paints,
Lucknow.
6
1 2 3 4 5 6 7 8 9
TELECOM
17 Railway Board IPIS 24.8.2017 Pending NA NA NA At present Warranty/AMC, (RDSO/SPN/TC- conditions are not included in 61/2015, Rev - the Technical specification. 4): Same may be included as a Provision of special conditions in the warranty of 3 Tenders however it will be years followed by discussed in forthcoming 39th
5 years AMC in Telecom Standards Committee the specification (TCSC) meeting & decision
(Letter No. shall be taken accordingly. 2003/Tele/TCM/
1 pt.1, Dated:
22.08.2017).
18 M/s Infosoft IPIS 28.8.2017 Pending NA NA ---- Item is being reviewed & Digital & (RDSO/SPN/TC- specification will be amended Services Pvt. 61/2015, Rev - accordingly. Ltd., New Delhi 4):
Viewing angle of
LED is minimum
120° as LED
available in
market while as
per specification
it is given 100°
±10° (Letter No.
Nil, Dated:
28.08.2017).
19 SCR Electronic LC 17.2.2017 Pending NA NA NA Item is being reviewed and gate telephone specification may be amended system taking into consideration other (RDSO/SPN/TC- zonal railway’s
51/2011, Rev - feedback/comments. 3):
Call of ASM to be
disconnected by
on-hook
condition instead
of “disconnect”
button. (Letter
No. SG.135/V/8,
Dated: 31.1.17)
WAGON
20 Railway Board Inspection of 27 2005/M(N)/204 Feb 2017 MW/BCNHL December Status of wagon not
Nos. of BCNHL /1 Vol III Dt: 15.02.2017 2017 received from Zonal Pending
7
1 2 3 4 5 6 7 8 9
wagons turned Dt:10.02.2017 Reminder- Railways
out from JUDW MW/BCNHL
workshop after Dt: 09.03.2017
its Center Sill
Repair between
JUL’16 to Dec’16
21 CWM/Kota/ Modification M-116/3/SS MW/BCNHL/ Door December Trial information not Pending WCR proposed by Kota Wagon dt Dt:20.06.2016 2017 received from Kota
workshop for 07.06.2016. Rly Bd. Lt no. workshop
wider door 2005/M(N)/204/1 Vol III
opening of Dt:11.08.2016
BCNHL wagon MW/BCNHL/ Door
Dt:06.09.2017
22 Railway Board Clarification on 2011/M(N)/204 Nil Nil October under examination Pending design of Flyash /3 Vol.III 2017
wagon. Dt:20.06.2017
23 Rly Board Proposal of 2015/M(N)/951 - Condonation processed vide October The issue is pending Pending Condonation for /31 dt 29-09- MW/SPD/BG/BOXNS dt 11- 2017 with Track dte for
BOXNS 16 11-16 forwarding to CCRS
CCRS letter Q.14011/ 01/
2017-18-T.W dt 09-05-17
MW/SPD/BG/BOXNS dt 31-
05-17
CCRS Q.14011/01/2017-18-
T.W dt 17-07-17
MW/SPD/BOXNS dt 11-08-17
24 EDME,FR/ Increase speed 2016/M(N)/951 MW/SPD/BG dt 16-9-16 December Criteria need to be Pending
Rly Board on turnouts /5 dt 15-09-16 CT/PTX/TO/Speed 26.09.16 2017 decided by Track dte
25 SE Rly Oscillation trial M6/2016/BOX MW/SPD/BG/BOXNR dt 9-3- December New trial section has Pending of BOXNR NR/11 17 2017 been sought from TM
dt 12-01-17 M6/2016/BOXNR/144 dte.
dt10-8-17
MW/SPD/BG/BOXNR dt 4-9-
17
26 IROAF Approval of IROAF letter no Nil NR letter no 802- Sept. 2017 Report is being pending Guard comfort IROAF/SOLAR M/92/3/Brake Van/ Solar examined, approval
kit for BVZI /BVZI/P2/15 energy/MC2 dt 18.04.2017 shall be granted by
Wagon dt 07.3.17 Rly Bd letter no 30.09.17
2013/M(N)/60/10 dated
25.07.17
27 CWM, SWR Prototype UBLS/M/PLG/ MW/BVCM dt 01.12.2016, Sept. 2017 Deficiency in Pending inspection of EST/ BVCM dt UBLS/DO/BVCM dt prototype. The
BVCM 22.11.2016 10.12.2016, prototype is being
MW/BVCM dt 23.12.2016 tested by RDSO team
presently. Approval
shall be accorded by
30.09.17
8
1 2 3 4 5 6 7 8 9
Bogie section
28 Railway Board Board forwarded Lt. no. Not specified The issue is under deliberation Three After finalization of re- The issue is under deliberation representation of 2015/M(N)/60 months categorization of and likely to resolve by end of
Ombesco for /3 vendor categories as Dec 17 change of there dt.15.05.2017 developmental order
status from part- (Earlier Part –II) &
II to vendor for Approved vendor (Part-
developmental I) as per common
order vendor policy. The
relevant specification
is under revision.
Once the spec is
revised the issue shall
be addressed
29 Railway board Board advised Board’s letter Not specified SECR has been advised for Six month - The service trials yet to be for service trials no. service trials earlier have been commenced. of Side bearers 2005/M(N)/95 further reminded vide this
on BOXNHL 1/43 Vol.I dt. office letter dated 16/02/2017
wagon to RDSO 06.07.2016
drawing No. WD-
12008-S/01
30 Om Besco Ltd. Representation M/s Ombesco’s Not specified The issue is under deliberation Three After finalization of The issue is under deliberation of Ombesco for letter months reclassification of and likely to resolve by end of change of there OBRP/RDSO/V vendor categories as Dec 17 status from part- endoe List dt. developmental order
II to vendor for 22.05.2017 (Earlier Part –II) &
developmental Approved vendor (Part-
order after I) as per common
implementation vendor policy. The
of common relevant specification
vendor policy & is under revision.
reclassification of Once the spec is
vendor for revised the issue shall
developmental be addressed
order (Earlier
Part –II) &
Approved vendor
(Part-I)
31 Railway Board Revision/Updati Letter no. One year - Six months For collection of data Expected to be completed by ng of G-95 2015/ M(N)/ from field May 2018 951/32 dated
28.08.2016
Issues Concerning Weigh bridge and Tippler section of Wagon Directorate
32 RB Comments on 2016/Dev.Ce Six Months MW/CS/PEWB Six Months Coments from Board is RDSO draft ll/IDEI/1 18.08.2017 awaited. Likely to be completed specification dated by 31st Dec 17
"Schedule of 22.05.2017,
9
1 2 3 4 5 6 7 8 9
Technical Received by
Requirements for this office on
EIMWB (75 KMPH dated
speed) 26.05.2017
33 Weightrack Pvt. Fresh registration WIPL/RDSO One year Deficiencies observed - NA Capability assesment under Ltd. case of EIMWB /17/5235 communicated vide letter no. process. Process is likely to be (EIMWB) dated MW/CS/WB/Vendor/App/Wei completed by 31st Dec 17. 07.02.2017 gh track dated 10.04.2017
followed by reminder
16.05.2017, 28.07.2017 &
28.07.2017.
Based on the final by the firm,
STR and capability assessment
are proposed to be conducted
by team.
Wheel axle ,Bearing and WP section
34 Railway Board Revision/Updating Letter One year - December- For collection of data Expected to be completed by 5 of G-81 no.2015/M(N 2017 from field October,2017 )/951/32
dated
28.08.2016
35 M/s BEML Certification of G 14.10.2016 Deficiencies observed Non - conformities has No response has been received Limited 105 communicated vide letter been informed on from the firm (Thippasandra) (Initial Audit) dated 21.10.16, 27.01.17, dated 27.01.2017 and
16.03.17 16.03.2017.
36 M/s BEML Certification of G 14.10.2016 Deficiencies observed Non- conformities has No response has been received Limited 105 communicated vide letter been informed on from the firm (Ooragaun) (Initial Audit) dated 21.10.16, 27.01.17, dated 27.01.2017 and
22.03.17 22.03.2017
37 M/s Oriental Certification of G 24.08.2017 Letter of non- compliance will Proposal is under Under process Foundry Pvt. 105 be issued in October 2017 examination
Ltd. (Initial Audit)
WD-I (Hopper)
38 I&L RDSO Quality control on I&L/K/Tech/ 6 months NIL December Drawing with open Pending Kolkata , door mechanism Issue dated 2017 tolerances. Tolerances
railway board 23.08.2016 under finalization
new dehli &2015/M(N)
/951/37
dated
29.08.2016
39 Railway Board Modification of air 2003/M(N)/2 6 months Nil October- Delay in feasibility Pending New Delhi brake circuit on 04/8 Dated 2017 trial
BOBRN wagons 03.02.2016
and its various
issues
40 DRDO SWTR on TBU 07-12-2016 3 months 06.01.2017 October Delayed from DRDO Pending
fitted BCL and 2018 side in proving PRV on
10
1 2 3 4 5 6 7 8 9
BCLH wagon wagons
41 Railway Board Loading of Trucks 02.02.2017 3 months Feasibility trial done on October- Concept for new Pending in BCACBM 23.11..2016. Loading not 2018 wagon being
possible in existing wagon developed
42 Central Loading of edible oil M.223.Wago 1 month Replied for necessity of trial NA Waiting for reply from Pending Railway in BTPN wagon n private vide letter No MW/BTPN Central Railway and
from bottom. siding dated 29.12.15 Rly Board.
17.12.15
43 Rly. Bd. Loading of edible oil 2015/M(N)/9 20 days Replied for necessity of trial 25 days Waiting for Pending in BTPN wagon 51/17 dated vide letter No MW/BTPN conformation of trial
from bottom. 7.3.16 1.4.16
44 Rly. Bd. To reduce oil spill 2015/M(N)/9 1 month Letter to Bd No MW/BTPN June 2019 Oil industries reply Pending and vapour loss of 51/17 dated dated 29.816 awaited
BTPN wagon. 1.6.16 Drawings sent to Kota
Rly. Bd. Modification in workshop vide letter No
BTPN wagon to MW/BTPN dated 2.12.16
reduce spillage,
leakage and Tto Board vide letter No
vapours of oil. MW/BTPN dated 21.7.17.
45 Addl. Member’s SR has introduced Note of Addl. 1 month Telephonic conversion with Dy. December Details of modification Pending Minutes of a simple Member CME/SR 2017 not received from S.
meeting copy modification to (Mech. Engg.) Rly even after several
prevent the missing visit at reminders over phone
of vapour extractor Vadodara, by DD/WD-I.
cock lid. Porbander,
Hapa C&W
depot of W.R.
on 9/10.6.17
46 Rly. Bd. Fitment of RFID tag 2016/M(N)/9 1 month Informed to M/s RITES for February- Reply awaited from Pending on freight stock. 51/1 dated necessary alteration in drawing 2018 RITES
7.3.16 vide letter No MW/BTFLN
dated 22.4.16
47 Rly. Bd. Procurement of 2013/M(N)/9 6 months Nil October- Under study Pending BTFLN rakes under 51/8 dated 2017
Wagon Leasing 23.6.17
Scheme (to study
the revised PCC)
48 Rly. Bd. Increase of speed 2012/M(N)/6 2 year Nil NA Existing BCTS wagons Pending and possibility to 0/5 dated volumetric capacity
increase axle load 4.7.16 does not permit to
to 22.9t in future load beyond 20.32t
revision. axle load. The issue is
still pending for
increase of speed.
49 M/s Texmaco Speed certificate for SE/OPM/SW 2 months Nil November- Converting BTPN and Pending
BTPGLN (variant- -773/2017 2017 BTPGLN drg in auto
11
1 2 3 4 5 6 7 8 9
B) dated 8.8.17 CAD format for
merging BMBS
Diagram drg with
conventional Diagram
drg.
50 M/s Texmaco Approval of anchor SE/OPM/SW 1 month Suggested the firm to correct October- Firm’s reply awaited Pending Tee splice joint in -773/2017 the submitted drawing vide 2017
BTPGLN wagon. dated 8.8.17 letter No MW/BTPGL dated
8.9.17.
51 Railway Board Proposal of Letter no. 2 months sent to ED/B&S, ED/Track for December Feedback of Track Pending tolerance limits of 2016/Mobilit comments on 2017 Dte’s is awaited.
critical physical y/ME/P- 19.01.17.
parameter of wagon 6/10 dated
for deciding a stock 14.02.2017.
as similar stock in
proposed revised
policy circular no.6.
52 M/s. BHEL,
For refund of speed Letter no. 3 months Send to Board on 05.05.2017 October Under process for Pending certificate charges. CDX/ODC/I from Board 2017 refund .
Haridwar
B Valley 2015/M(N)/951/59 dated
2016-17/658 21.06.2017.
dated
28.11.2016.
53 /s. BHEL,
Amendment in Letter No. 1 month Reply to BHEL 2 year BHEL’s reply awaited Pending Loaded Diagram of EME/ODC/N MW/CS/660/TGS dated
Haridwar
Mandakini wagon orth 17.05.2016
Karanpura/1
6/05 dated
29.04.16.
54 M/s. BOXCO
Development of Letter no. 1 month Replied on dated 27.07.2015. 3years Delayed form firm’s Pending new ODC/OWC DD/RDSO/0 28.10.2015 side
Consignments on 7/2015 From firm 11.02.2016
IR/DFC Track dated
07.07.15
55 Railway Board TWIN PIPE BRAKE 2010/M(N)60 3 month MW/CS/RAJASHREE DATED- 2 years M/s TREL, KOLKATA PENDING SYSTEM /1 PART-II, 15.07.2016, DID NOT SUBMITTED
Dt. MODIFIED DRG.
14.07.2016
56 M/s CIMMCO Design modification 14.03.2017 3 month MW/CS/RAJASHREE DATED- 1 year REQD. DETAIL NOT PENDING LTD., of BCWM wagon 15.06.2017 & 28.06.2017 SUBMITTED BY FIRM
KOLKATA
57 Railway Board Increasing speed of 2009/CEDO 2 years Speed Certificate of BRN March 2018 Non-conformity of
freight Stock on IR /SR/48 20.32t for Oscillation Trial Track parameters of Pending Dated issued on 28.04.16 the nominated Test Scheme sent to Testing 23.06.2015 section. Dte. Vide letter MW/BRN CRS accorded sanctioned on Awaiting TRC of dated. 08.06.2017
20.04.17 vide SCR letter no nominated section
12
1 2 3 4 5 6 7 8 9
W.469/BRN/20.32t dated.
27.04.17
58 SECR Action plan for Mech/HQ/00 8 months --- December- On-site examination of Pending Unusual incident 5/001/BRN- 2017 such incidence
with EUR rake Mod.
Rake/701
dated
14.02.2017
59 Railway Board Proposal for 2014/TC(FM) 2 months NIL NIL Firm( ) has yet not
procurement of /4/9 approached RDSO for Pending wagons for DFCCIL dt.30.01.201 one-time movement
construction work 7 speed certificate
60 Eastern Repair procedure of MD/6/W/M 6 months NIL NIL December-2017 Pending
Railway Centre Sill Crack ODIFICATIO
for BRN N
dt.25.05.201
7
61 SER 22.9t axle load BG G/Wagon/BF 1 year Speed certificate no MW/BFNS April-2018 Non availability of Pending Bogie Flat Steel NSM22.9/Pt. dated 22.06.17 (Amendment- section for Oscillation
Wagon type I 04) Trials
BFNSM22.9 on dt.26.08.201
Hatia(HTE)- 6
Nawagaon(NXN)
section at the
maximum speed of
110 kmph in
loaded & empty
condition
62 JRIL Non availability of JRIL/RDSO/ 6 months Ltr to ADE/M&C for advice the December Delay in finalisation of Pending approved vendor for MISC/16-17 approved vendor equivalent to 2017 approved vendor by
class-IV MIG wire dt.06.10.16 the subject electrode to M/s M&C
in RDSO vendor JRIL
directory MW/BFNS dt.26.10.16
JRIL/RDSO/MISC/16-17 dt.03.11.16
63 SWR/ RB Request for R.B. Letter 1 year RDSO ltr to JDTM-V vid. April-2018 Section with required Pending expeditious No MW/BFNS dt.16.05.17 for (No delay) track parameters was
oscillation trial of 2014/M(N)/2 providing alternate test section not available.
BFNS (Modified) 04/2 on SWR Section changed
wagon and final dt.28.11.16 thrice.
clearance. SWR/M/T/1 ‘Amendment no.4 to speed
Conducting 2/W/BFNSM Certificate for conducting
detailed oscillation 22.9t Dt.0 detailed oscillation trial of
trial of 22.9t axle 9.05.17 22.9t axle load BG Bogie Flat
13
1 2 3 4 5 6 7 8 9
load Broad Gauge SWR/W.438/ Steel Wagon type BFNSM22.9
Bogie Flat Steel CRS/Genl. on track maintained to other
Wagon type (Vol-V) than C&M-I Vol-I standard’
BFNSM22.9 on dt.09.05.17
S.W.Railway issued on 22.06.17
64 RB Cover for coil 2014/M(N)/2 3 years RB ltr no. 2014/M(N)/204/2 July-2019 NIL Pending carrier wagons 04/2 dt.09.03.17 Concept drawing finalized. BFNS & BFNSM dt.29.07.16 Detailed drawing under RB ltr no. 2014/M(N)/204/2 preparation
dt.08.05.17
65 RB Steel plates falling 2014/M(N)/2 6 months NIL September- NIL Pending down from BFNS 04/2 2017 Loading Arrangement Drawing
wagons dt.03.03.17 finalised. Will be issued shortly
66 TEXMACO Coil loading pattern RSD/SW- 2 months NIL October - NIL Pending on BFNSM Wagon 752- 2017
BFNSM/201
7 dt.14.08.17
67 Texmaco Use of better RSD/SW- 2 months Vide letter 1 yrs. 6 Vide this office letter Open quality 753/2016 (Scrutiny MW/CONTR/ISO/BG-FLAT dt months Texmaco was advised ( at firm’s end) polyutherane DT. from M&C 18.01.2016 to submit willingness
paints on BLCM 17.01.2016(S Dte.) of purchaser on the
wagons .No. 6977) proposal which is
awaited.
68 SR Proposal to avoid CW/WP/841 4 months Under examination and December- NIL Pending infringement of DV 7dated planned to visit the GOC 2017
and APM with 28/08/17 workshop
underframe in
proto wagon
69 CONCOR Development of CON/T/N.De 2 Years Replied vide letter no 2 years 5 I)RDSO acceptance to Pending Spigot casting for velopment- MW.CONTR.Spigot Dated months undertake the said If CONCOR does not procure container flat Wagon/806/ 23.08.2017 proposal said items in next one year wagons of IR 3433 dt. ii)Drawings of spigot then the proposal will be 17.04.2013 sent to CONCOR dropped.
iii)Test scheme for
trial of Spigot sent to
CONCOR
iv) Concor had been
repeatedlyadvised to
expedite procurement
of spigot.
v) Interested firms has
been advised to
approach CONCOR for
procurement of
spigots
14
1 2 3 4 5 6 7 8 9
70 AD Electro Development of AD/1370/20 3 Years Replied vide letter no 2 years Firm could not Firm proposal has not meet all
Steel Co. Pvt. new sources of 12-13 dt. MW.CONTR.ATL.ADE Electro complete the of the pre-requisites of Ltd. Automatic Twist 26.10.2012 dt.03.01.2013. prerequisites of MSG Annexure I & II Lock (ATL) for low AD Electro letters (i.e. impact test) Of MSG of ATL platform container Service environment
flat wagon of Indian AD/1584/2014-15 dt. was advised outside (Series of other Railway 04.02.2015 scope of MSG. correspondences has been
AD/1566/2014-15 dt. Matter was delayed on carried out with firm in due
07/09.02.2015 account of being sub- course)
RDSO Letter no. MW.CONTR. judiced(case filed by
Sanrok against RDSO
ATL. ADE Electro dt. 03.01. & RB)
2013. Firm could not provide Letter no MW.CONTR.ATL.ADE tested samples on
Electro dt.28.03.2014. time. MW.CONTR.ATL.ADE Electro Firm could not
dt.24.05.2017 & 20.06.2017. complete fitment MW.CONTR.ATL.ADE Electro scheme for fitment on
dt.28.07.2017 wagons.
71 Titagarh Oscillation trials M/s. TWL 2 ½ months M/s. TWL No. TWL/COR-01 3years Delayed from firm’s Pending (stage-I, II & III Wagon Ltd. (Design of auto car No. dated 04.08.2017 side. Firm has not resolved. Stage IV & V pending) carrying wagon TWL/COR/2 transported the trial
‘COR ’for 015 dated wagons to trial site
transportation of 25.02.2015
Automobile cars
Under PWDA
Policy).
72 TITAGARH Design of Multi M/s. TWL 30 Days To TWL on 12.08.14 & 4 year Delayed from firm’s Pending (Stage-I resolved. Wagon Ltd Model wagon ( No. 01.08.16 side. Firm has not Stage II-V pending) Kolkata CCM) Under TWL/LK/CC From TWL 26.06.17 submitted the detailed
PWDA Policy.. M-04 dated design
Stage-II (Detail 21.03.2014.
design approval)
73 TITAGARH Design of Multi M/s. TWL 30 Days To TWL on 04.08.14, 4 year Delayed from firm’s Pending (Stage-I resolved. Wagon Ltd Model wagon (CCN) No. 08.08.14, 17.10.14 and side. Firm has not Stage II-V pending) Kolkata Under PWDA TWL/LK/CC 06.02.15 submitted the detailed
Policy. PWDA N-04 dated From TWL 10.03.14 to firm on design
Policy. Stage-II 04.03.2014. 05.03.15
(Detail design
approval)
74 Texmaco Rail Design of auto car M/s. TREL 1 year 2 years Delayed from firm’s Pending (stage-I&II resolved. & Engineering carrying wagon No. To TREL 04.05.2016 side. Prototype Stage III-V pending) Ltd./ ‘BDDAC’ for Tex/BDDAC- manufacturing fron
TATRAVAGON transportation of TATRAVAGO firms side pending
KA Automobile cars NKA/WPS/0
Under PWDA 1 dated
Policy. Stage-III 04.04.2016
15
1 2 3 4 5 6 7 8 9
75 Texmaco Rail BLC new wagon Firm not 1 year NA Delayed from firm’s Pending (stage-I&II resolved.
& Engineering approval -Project initiated Firm not initiated side. Firm has not Stage III-V pending) Ltd / M/ UGL, under PWDA manufactured
Australia Policy. Stage-III prototype
76 Northern Clarification of Letter no. 30 days Send to Track & B&S Dte’s 2 year Comments of Track Pending Railway speed certificate 802-M/92/ dated 29.06.2017 for Dte’s is awaited.
sought by Engg. 30/BOBYN/ comments
Deptt. To process BOBYNHS/M
the case for C-11 dtd.
obtaining CRS 15.06.2016.
sanction.
77 M/S TREL, TEST SCHEME 26.06.2016 15 MW/CS/RAJASHREE DATED- 15 CHARGES ISSHED TO TESTING DTE. ON 5KOLKATA FOR OSCILLATION WORKING 29.10.2016 FOR WORKING SUBMITTED BY FIRM 15.07.2016
TRIAL DAYS CUNSULTANCY CHARGES, DAYS ON 29.12.2016
78 RAILWAY TWIN PIPE BRAKE 2010/M(N)60 6 monts MW/CS/RAJASHREE DATED- November- M/s TREL, KOLKATA PENDING BOARD SYSTEM /1 PART-II, 15.07.2016, 2017 DID NOT SUBMITTED (IT IS PVT. DESIGN FIRM DID Dt. MODIFIED DRG. NOT SUBMIT DRG. FOR
14.07.2016 APPROVAL)
79 M/s CIMMCO MODIFIED DESIGN 14.03.2017 1 month MW/CS/RAJASHREE DATED- November- REQD. DETAIL NOT PENDING LTD., 15.06.2017 & 28.06.2017 2017 SUBMITTED BY FIRM (IT IS PVT. DESIGN FIRM DID KOLKATA NOT SUBMIT DRG. FOR
APPROVAL)
80 Railway Board Specification for 2016./M/(N)- 02 months Same is communicated to 1 years 6 Open at RITES end as Pending proposed RFID tag 951/1 dt RITES for NA vide letter dated months design of wagon
for fitment on 07.03.2016 22.04.2016 belongs to them.
wagon & 30.3.2016
81 CONCOR Enhancement of Email dated 2 Years Same is communicated to - RITES replied to Closed axle load of BLL 22.04.2017 RITES for NA vide letter dated CONCOR for further
wagon 03.05.2017 necessary action.
82 RITES Modification in CRF RITES/CO/R 3 months Drg examined and correction 1 Months Corrected drawing not Pending drawing of BLL SD/BLL marked in red was sent to received from RITES
wagon CONCOR Rites vide letter dt. 26.07.2017
GOC/227 dt. to resubmit after incorporating
29.06.2017 the corrections)
&
23.08.2017
83 Railway Board Running of double 2016/M(N)/6 6 Months Proposal examined and result 6 months Condonation awaited. Pending stack dwarf 0/7 dt. are sent back vide letter date
container train 15.03.2016 , 29.06.2016
under wire 25.04.2016 Railway Board letters: 2016/M(N)/60/7 dt.
05.07.2016. 2016/M(N)/60/7 dt.
08.09.2016. 2013/M(N)/60/7 dt.
24.05.2017.
16
1 2 3 4 5 6 7 8 9
2016/M(N)/60/7 dt.
13.06.2017, 14.06.2017 &
03.07.2017
RDSO Examined and status of
subject matter sent vide dt
24.08.2015 ,
20.09.2016, 12.06.2017
84 Ms Frontier EOI for FASL/RDSS 3 Years Firm was advised to submit all 2 Years 3 Firm initial proposal Pending Alloy steel ltd multisourcing of O/12- docs. As per MSG. month has shortcomings.
SLDB used on 13/1150 dt. Prilimnary approval fiven vide QAP has certain
container flat 26.06.2012 letter dt 19.11.2012 deficiencies.
wagon. Firm Letters ) Firm took
FASL/RDSSO/12-13/2834 dt considerable time to
03.12.12. complete the
FASL/RDSSO/13-14/101 dt minimum supply as
12.04.13 prerequisite as per
FASL/RDSSO/13-14/101 dt MSG(i.e. 360 pieces)
18.9.2013 ) Feedback from Zonal
FASL/RDSSO/12014-15/4097 Railways awaited dt. 18.02.2015. FASL/RDSSO/16-17/1218 dt.
07.09.2016. RDSO Letters MW/ CONTA-I
NER/SDB frontier dt. 5.7.2012
85 M/s TEXMACO Guideline for Letter no. Nil 3 Years Shortcomings in proposal was 2 Years 3 There were Pending RAIL & multisourcing of dt advised to Firm and asked to months shortcomings in initial
ENGINEERING SLDB used on 06/11.06.20 submit all docs. As per MSG. proposal.
LTD. Container flat 12
Firm Letters
QAP had also certain
wagon on IR. deficiencies.
Nil dt 01.07.2013. Firm staus of
Nil. Dt. 08.01.2014 Developmental source
Nil dt 20.12.2016 was was suspended
RDSO Letters MW/ on account of lapse of
agreement with their
CONTAINER/ SDB TEXMACO principal.
dt,16.07.2013, 22.8.2013 & Later on it was
19.09.2013. 13.12.2013 reinstated after 24.02.2014 compliance of same.
05.01.2017 Firm has not completed supply
17
1 2 3 4 5 6 7 8 9
86 Railway Board Retro fitment of Letter no. Nil Nil - 35 Wagons with Rest is in process
Twin Pipe brake 2010/M(N)/60/ conventional brake
system in freight 1 Part II dated system & 18 wagons
stock 14.07.16 & with BMBS have been
2017/M(N)/60/ converted to twin pipe
3 dated system.
25.08.17
87 West Central Clarification Dy. CME letter 30 Oct.- Nil - - Pending Railway regarding weight no. 2017
of Knuckle WCR/M/W/06
thrower to Item – /811 Vol-VII
9 of RDSO dated 07.09.17
drawing no. SK-
62724 (latest)
88 PEW Material of Cut Letter no. 30 Oct. - Nil - - Pending Engineering, off Angle Cock PEW/17-18/15 2017
Howrah spring to Item dated
no.-8 of drg. no. 04/05.09.17
WD-88123 S/02
89 GOC Infringement of CW/WP/8417 30 Oct.- Provisional drawing is being - - Pending workshop, S. DV and APM dated 17.08.17 2017 prepared and RDSO
Railway with under frame & 28.08.17 representative will visit GOC
in BWBL wagon for physically solve the
problem on site.
90 East Central, Malfunctioing of Sr. DME letter 30 Oct.- Nil - - Pending Mughalsarai M/s Escorts no. 2017
make APM (EL- MC/AME(frt.)/
60) CORR./MGS/1
7 dated
24.08.17
91 South Western SPAD case of SWR/M/N/19 30 Sep.- Design is adequate - - Pending Railway train no. PSJT- Vol-VIII 2017 modification if any will be
118 in UBL 24.08.17 advised to Railway Board.
division of WSR
92 North Central Report on poor Sr. DME (C&W) 30.09.2017 Issue was examined by RDSO - - Firm’s reply dated 07.09.17 Railway, ICD/ performance of Letter no. and inspection of one firm Received and being examined. Dadri L-type RS/337/Materi (M/s ILPL) was stopped and a
composition al/2017 dated show cause notice has been
Brake blocks in 08.08.17 and served to firm for temporary
Container Dy. CME / NCR delisting vide letter no.
wagons. letter no. MW/AVB/CBS/ILPL dated
NCR/Mech/Rej 24.08.17
ected items
dated 17.08.17
93 Raneka Inclusion of RIL/KJ/MK/17 5 Nov. 2017 - - Will be done after raft spec. will be uploaded on Industries name for 70-BD -18 dated revision of spec.WD- RDSO website on 18.09.17
CBC in vendor 01.08.17 70-BD
18
1 2 3 4 5 6 7 8 9
directory
94 East central Frequent failure MC/AME(Frt.)/ 30 Sep.-17 - - - Pending Railway of knuckle & CORR./MGS/1
CBC 7 dated
26.07.17
95 RITES Ltd. For Approval of Letter no. 30 Sep.-17 Corrections in drawings have - - Firm has to submit corrected Twin Pipe RITES/CO/RS been advised to RITES vide drawings drawings for D/BLL RDSO letter no. MW/APB
manufacture of CONCOR/GOC dated 26.07.17 & 12.09.17
proto BLL /227 dated
wagons. 15.06.17
96 West Central Seeking approval CWM Kota 30 Sep.-17 Regarding BMBS components, - Matter is pending in Pending Railway to purchase letter no. in- principle can not be WD-II section
BMBS parts for M120/1 Vol-VII allowed
BOXNHL/BCNH dated 08.06.17
L wagons from
open market
97 Bhilai Inclusion of Letter no.- nil 5 Nov. 2017 - Will be done after raft spec. will be uploaded on Engineering name for 70-BD dated 24.05.17 revision of CBC RDSO website on 18.09.17 Corporation CBC in spec.WD-70-BD
developmental
vendor directory
TRACTION INSTALLATION
98 M/s Aditya Revalidation of Nil dated RDSO: -- -- As per advice of RDSO’s letter Birla 25 kV Silicone 28.01.2017 02.01.2017, No. Insulators, Composite 09.01.2017 TI/SPC/OHE/INSCOM/GEN/1 Halol (Gujarat) Insulators as per Firm: 28.01.2017, 10.03.2017, 6 dated 02.01.2017 &
revised 17.04.2017 09.01.2017, M/s ABI has specification No. submitted the revised QAP & TI/SPC/OHE/IN drawings to RDSO vide letter
SCOM/1071, No. nil dated 28.01.2017. Rev-01. Further firm has submitted compliance of revised STR No.TI/STR/006, Rev-04 and specification No. TI/SPC/OHE/INSCOM/1071, Rev-01 vide letter No. nil dated 10.03.2017 and 17.04.2017 respectively. The document submitted by the firm is scrutinized and under approval for carry out revalidation test
at firm premises.
99 M/s Asiatic Revalidation of AESPL/GMR/2 RDSO: -- -- As per advice of RDSO’s letter
19
1 2 3 4 5 6 7 8 9
Electrical & 25 kV Silicone 017-18 dated 02.01.2017, No. Switchgear Pvt. Composite 14.05.2017 09.01.2017 TI/SPC/OHE/INSCOM/GEN/1 Ltd, New Delhi Insulators as per Firm: 6 dated 02.01.2017 & revised 14.05.2017, 09.01.2017, M/s AESPL has specification No. 22.08.2017 submitted compliance of STR TI/SPC/OHE/IN vide letter No. SCOM/1071, AESPL/GMR/2017-18 dated
Rev-01. 14.05.2017. Further, revised QAP & drawings and compliance of revised specification No.
TI/SPC/OHE/INSCOM/1071, Rev-01, have been submitted by the firm vide letter No. AESPL/GMR/2017-18 dated
22.08.2017. Documents are
under scrutiny. 100 M/s V-Bro Requesting for Firm letter no. M/s V-Bro Tech -- -- The firm i.e. M/s Merit has
Tech India Pvt. reinstatement of V-
changed their name as M/s V- 30.08.2016,
Ltd., Chennai vendor original BRO/RDSO/TI Bro Tech India Pvt Ltd. And status for / 02 09.12.2016, (Received on also change their work address SCADA system 19.12.2016), during delisting period. Due to after outright. 19.12.2016, name change and change in 13.02.2017 (Received on work address, advised the 21.02.2017), firm to apply afresh as per 28.03.2017 (Received on RDSO vendor registration 03.04.2017), procedure. The reply is 20.04.2017 (Received on pending from firm side as firm 24.04.2017), did not applied afresh so far. 26.07.2017 (Received on
31.07.2017), RDSO :
04.01.2017,
24.03.2017,
20.04.2017,
26.05.2017,
21.08.2017
101 SECR Arrangement of Letter no. - - - Under Examination retractable OHE SRCPL/SECR/
under silo OHE/2017/201
loading for coal 7 dated
under PKCL 07.09.2017
siding.
102 Railway Board System Letter No. - - - Under Examination Improvement 2012/Elect(G)/
regarding 180/2 dated
preparation of 04.07.2017
20
1 2 3 4 5 6 7 8 9
estimates
103 Railway Board Regulations for Letter No. - - - Under Examination Power Line 2008/RE/17/0
Crossings of 3 dated
Railway Tracks, 08.09.2017
Appendix IV-
ACTM Vol.II, Pt.-
II-Revision of IS
regarding.
104 Railway Board Development of Letter no. EOI The specification and
Gas Insulated 2015/Elect published STR has been
Switchgear (TRS)/138/4 on send to Railway Board
Specification Dated- 25.12.2015. for approval
10.12.2015 Panel of vide letter no.
respondents TI/PSI/GIS/POLICY/1
5 firms 6/04 dated
framed on 08.09.2016.
01.04.2016. Replies of Board
Meeting Queries send on
held on 03.03.2017.
21.04.2016. A meeting with
Draft suppliers held at specification Railway Board on
uploaded on 15.05.2017. website on
21.06.2016. Final draft
Specificatio
n uploaded
on
03.08.2016. Meeting for
finalisation
of
specification
held on
21.04.2016. Specificatio
n finalised
on
05.09.2016
and send to
Railway
Board for
approval.
105 MRVC Review of Letter no. RDSO vide letter dated Reply of RDSO letter
21
1 2 3 4 5 6 7 8 9
Specification no. MRVC/EL/TRD 18.05.2017 and 11.09.2017 is awaited.
TI/SPC/PSI/30T /Policy/138 has asked from Central and
RN/1050 and dated Western Railway for the
Fault level. 17.03.2017 necessity of Automatic Voltage
Regulator and NIFPES System
in the Traction Power
Transformer as per
Specification no.
TI/SPC/PSI/30TRN/1050.
Fault level also asked from
Zones vide letter dated
18.05.17
106 Revision of Letter no. Draft of A&C slip to the Suggestions/comment
Central Specification no. L.689.AC.PSI.5 specification has been s awaited.
Railway TI/SPC/PSI/30T dated prepared and sent for
RN/1050 21.07.2017 uploading for 30 days.
107 North Central Testing of Letter No. The type testing has been Final Inspection
Railway 150MVA, Three Elect/C/ALD/S carried out at the works of M/s schedule after short
Phase Auto -1547/83 dated BHEL & CPRI. circuit test is awaited.
Transformer. 30.03.2017
108 Santoshi Query on Steel 29.08.2017 Being analyzed
Hyvolt drum of contact
wire.
109 BEML Drawings for 12.06.17 Note to Carriage Dte dated Awaiting reply from
Suspension for 12.06.17 Carriage.
approval.
110 Phooltas Drawings for 05.05.17 Note to Carriage Dte, dated Awaiting reply from
Suspension for 12.05.17 Carriage
approval.
111 BEML Specification for 1.9.17 Note to Carriage Dte, dated Awaiting reply from
Squeeze test to 5.09.17 Testing
be approved Note to testing Dte, dated
5.09.17
112 BEML RDSO Team to 12.09.17 Note to Carriage Dte, dated Awaiting reply from
nominated for 15.09.17 Carriage
Shell testing
113 RE Chennai & Intermediate i) Dy. TI RE letters; The issue has been studied by RE Ambala failure of CSTE/RE/MS Telecom (i) 24.03.17 RDSO and a scheme has been communication letter no. (ii) 28.03.17 prepared for mitigation of the
due to failure of 4624/TELE/IN problem and sent to Railway LSD card in DOOR/SRR- RDSO letter Board vide RDSO letter No.
PNMB/Vol-II
TI/RCC/SCADA/SPC/TCPIP SCADA system
(i)
dated
dated 12.06.2017. commissioned as TI/RCC/SCADA/SP
22
1 2 3 4 5 6 7 8 9
per RDSO 24.03.17 C/TCPIP dated Railway Board vide letter dated specification no. ii) Dy. 12.06.2017 23.08.2017 advised to RDSO TI/SPC/RCC/SC CSTE/RE/UMB (ii) for getting a feedback from the
ADA/0130 letter no. TI/RCC/SCADA/SP Railways on different kind of (Rev.1) RE/UMB/S&T/ C/TCPIP dated problems faced by them with
Tele/Outdoor/G
SCADA system commissioned 27.07.2017
r.159 dated
as per RDSO specification No. (iii) 28.03.17 TI/SPC/RCC/SCADA/0130
TI/RCC/SCADA/SP (Rev.1).
C/TCPIP dated Pending Since : Accordingly, RDSO has sent a
05.09.2017 28.03.17 letter to Zonal Railways on
Rly Board Letter
5.9.2017 for submission of performance feedback of
(i) SCADA system of revision 1
93/Elect(G)/220/3 specification.
Pt.-II dt. 29.06.2017
93/RE/220/3 Pt.II dt.
23.08.2017No delay
from RDSO. 114 SECR Arrangement of SRCPL Letter - Under Examination.
retractable OHE no.
under silo SRCPL/SECR/
loading for coal OHE/2017/201
under PKCL 7 dated
siding. 07.09.2017
Pending Since :
07.09.2017
115 Central Revision of Letter no. Draft of A&C slip to . Railway Specification no. L.689.AC.PSI.5 the specification has
TI/SPC/PSI/30T dated been prepared and
RN/1050 21.07.2017 sent for uploading for
Pending Since : 30 days.
21.07.17
116 West Central Drawings of WCR letter RDSO vide letter
Railway switching dated dated 25.01.2017 has
stations for three 28.11.2016 circulated the Draft
line section. Pending Since : drawing for 3rd Line
28.11.16 to Zonal Railways.
Suggestions/
Comment awaited
from Zonal Railways.
117 North Central Testing of Letter No. The type testing has Final Inspection schedule after Railway 150MVA, Three Elect/C/ALD/S been carried out at short circuit test is awaited. Phase Auto -1547/83 dated the works of M/s
Transformer. 30.03.2017 BHEL & CPRI.
Pending Since :
23
1 2 3 4 5 6 7 8 9
30.03.17 Yet to be offered for
final inspection.
118 South East Testing of AAA Letter No. Note to M & C Dte, Report awaited from M & C Central Catenary Wire. SECR/Elect./T dated 16.06.2017 is
Railway RD/204/RDSO yet to be replied
/2073 alongwith test results
Pending Since :
08.06.2017
South Eastern Testing of 14 Note to M & C Dte, Report from M & C received on 119 Railway nos. 65 sq.mm CKP/D/110/35 dated 23.06.2017 07.09.2017. Under analysis &
Cd- Copper 11 reply to SER..
sample to Pending Since :
ascertain the life 19.06.2017
of Catenary wire.
120 East Central Testing of 65 Note to M & C Dte, Report awaited from M & C Railway sq.mm Cad-Cu KA/VI/TAK/01 dated 21.07.2017 is
Catenary Wire. /RDSO/17- yet to be replied
18/3 alongwith test results.
Pending Since :
17.07.2017
South East Testing of AAA SECR/Elect./T Note to M & C Dte, Report awaited from M & C 121 Central Catenary Wire. RD/204/3263 dated 12.09.2017
Railway Pending Since : is yet to be replied
06.09.2017 alongwith test results.
SIGNAL
122 SECR Inspection of 19.12.16 by Sr. 6 months 21.01.17, 27.04.17, 24.07.17, 31.03.18
Non-Dissipative DMM/SECR 07.08.17, 14.08.17
110V DC 4W
Main LED Signal
123 SECR Test for Low 12.01.17 by 6 months --- 31.03.18
Wattage 110 CSE/SECR
VDC Lit LED
Main Signal
124 NFR Modification/ 21.10.16 6 months 16.11.16 -- replied Already replied vide this office Alteration of by CSE/NFR 10.8.17 letter No. STS/E/TFTR Vol. XII Clauses of RDSO 31.05.17 dtd31.05.17.vide his earlier Specification for letter. Track Feed
Battery Charger.
125 NR Modified switch No. 569- 6 months 30.09.17 Got delayed on RDSO Field visit planned on 21/9/17, extension 22.12.16 by end, it is being issue under finalization. bracket. CSTE/ expedited.
Planning/NR
126 NR Performance 27.1.17 by 6 months 30.11.17 Case delayed for want Under trail at Faridabad and feedback of CSE/NR of slide testing. Ballabhgarh station of DLI modified lock division.
slide.
24
1 2 3 4 5 6 7 8 9
127 SR Re-design of the 14.02.17 by Workshop asked to submit 30.10.17 No delay Sample asked for evaluation.
enclosure of Dy.CSTE/ sample letter dt 15.9.17
Electric Point SD&T/WS/PTJ
Machine
128 NWR, NER, Breakage of NWR - N.A. 25.08.15, 30.09.17 Nil Discussed in 84th SSC & NFR, NCR boom of ELB SG/141/1/Vol. 17.06.16, committee recommended for IV dt. 03.06.15, 29.08.16, new drawing with austenitic NER - stainless steel for material of N/229/0/RDS boom to be issued. O/1665 dt. Proposed drawing issued on 09.10.15, 17.06.16 in association with
NFR - S&T W/S, MFT. N/237/0/1(AP) Proposed modified drawings /Misc. dt. issued to all CWMs in 25.07.16, association with S&T W/S, NCR – MFT on 07.03.17. NCR/S&T/105 Final new drawing is under 7/SIG/Level preparation to issue. Target Crossing 30.09.17. Gate/Part-3 dt.
03.11.16.
129 Northern Working of Received 30 Days Mail to Manufacturer 07.08.17 15 Days Delay in getting Reply to NR processed dt Railway Token Block through email & Partial information recd. information. 07.09.17. Instrument on on dt 28.07.17 21.08.17
OFC Full information recd. 28.08.17
TESTING
130 Ajay Nandan, Work for No. Proposal for procurement of Exec. Directior augmentation of 2016/M(N)/20 instrumented measuring wheel Mech. Engg rolling stock 4/3 dated and other requirements (Fr) RB design 31.08.17 mentioned in the Railway evaluation and Boards reference has been testing prepared and uploaded on capability at IRPSM on 15.09.17.
RDSO.
131 Dimpi Garg, Introduction 97/M©/137/1 The issues pertain to Carriage ED Mech. light weight Vol.VII Part.3 Directorate. Railway Board aluminum tilting dated 11.08.17.
type coaches for
use in Indian
Railways.
132 S Srinivas Oscillation trials MD/D/ASPR/5 Rolling stock is yet to be CDE/Mech/ of 160KN air 4 dated offered for trial. CRS sanction ICF springs 26.07.17 is also awaited. On receipt of above, trial will be conducted
on priority.
133 Dr. Mahendra Trial of AC No. The reference received through
Kumar, Coach fitted 2006/Elect(G)/ Director PE&Battery RDSO
25
1 2 3 4 5 6 7 8 9
Dir/Elect. with 30kw 165/1 Part.1 pertains to procedure for trial Engg.(G) permanent dated 19.07.17 of LHB AC II coaches with 30 Railway Bd. magnet kw permanent magnet alternator. alternator. The issues was clarified to ED PS&EMU on
26.07.17
134 R.N.Mishra, AMOC of TBMS No. The system of TBMS at Bakkas Additional at Bakkas 2010/Dev.Cell/ is already covered under AMC Member (PU), IGRI/2 dated till December 2017. Initiative RB 07.07.17 for subsequent AMOC has already been taken and
proposal shall be put up to Finance Directorate for concurrence immediately on receipt of budgetary quote
from OEM which is expected
shortly.
135 Ravindra Oscillation trials D.O No. The sections were identified as Gupta of rolling stock 2016/M(N)/95 desired by Railway Board for MRS/RB 1/6 Pt dated Oscillation trials. The details 21.06.17 of 5 sections were furnished to railway board along with requirement vide DG Letter No.
DG/Misc. dated 7.08.17
136 Ravindra Issues relating No ED/Wagon was nominated as Gupta to CC+8+2t & 20/M(N)/951/6 member of the Standing MRS/RB 25t axle load 2 Pt dated Criteria Committee as desired
wagons. 31.03.17 by Railway Board.
137 Amit Saran Dir Research Plan No Inputs requested have been E&R /ME/RB for Indian 2017/E&R/7(1 furnished to Research Dte vide Railways Vision 3)/3 dated Testing Dte note no. RM2/Res
2035 8.03.17 & Perf/1 dated 26.04.17
138 Advisor/ Review of No. The details were furnished to Mobility/RB provisions of 2016/Mobility/ Railway Board and many Railway Board ME/P-6/10 round of discussions also Policy Circular 6 dated 20.01.17 completed at Railway Board. with a view to
rationalize the
provision of the
circular
139 Dy CME/CR Conducting No. Zonal Railway sought coupler force T601.L.9SE/NE clarification from Motive Power trials, ghat dated Dte regarding validity of Speed controllability 02.09.2016 Certificate for trial. This issue and EBD trials is being dealt by MP Dte. Trial on NE & SE will be conducted on priority ,
ghats in once CRS sanction is received.
26
1 2 3 4 5 6 7 8 9
Mumbai
Division
140 A.Dutta Loco No. Issue pertains to Carriage Dte. CME/NFR arrangement for Mech./R&L/G Coupler Force trial had been passenger trains C//134/Pt-III conducted and report MT- of more than 14 dated 10.02.16 1423-F issued. Intimation to Air braked ICF Carriage Dte sent vide note no. coaches on RM1/B/120 dated LMG-SCL Hill 01.03.2016. section fresh
coupler force
trials
141 Vashishtha Controllability No. Speed Certificate for both Johri GM/SR and Emergency TP.42/3/DSL/ Freight and passenger trains Braking Passr. Trials have been issued vide letter Distance trials dated 5.02.16 no. SD.Pol.12.8.7 dated 11.08.16 & 17.02.16 for freight and passenger stock respectively. CRS sanction is
awaited for trials.
142 Dir/E&R/ME/ RDSO’s new No.2015/E&R/ Details submitted to Railway RB work of (6)/1 dated Board for procurement of Procurement of 24.11.15 measuring wheel calibration measuring wheel test rig. The same has been calibration test sanctioned by Railway Board rig. under works Programme 2017- 18 and procurement process
has been initiated.
143 Prabhat Sahai Oscillation trials No Matter is regarding extension CMD/ MRVC of Modified bogie MRVC/EL/EM of delivery schedule and Ltd. assemblies U/Procur.of pertains to PS&EMU supplied by M/s Bogies/OT/Vol Directorate. It is confirmed by Siemens Austria 6 dated Director/MRVC that the 17.07.15 contract has since been terminated and trials are no
longer required.
144 Arvind Khare, Methodology of No. As desired by Railway Board, Additional Oscillation 2007.Dev.Cell/I the Standing Criteria Member (PU), trials. GRI/1 Vol. IV Committee has deliberated the
RB dated matter of switching over to UIC 11.12.2014. 518 several times in depth and various issues were noticed. Finally, in the meeting held in August 2017 it has been decided that an EOI should be floated for engaging a
consultant to guide and assist
27
1 2 3 4 5 6 7 8 9
in implementation of UIC code in addition to the similar activity being undertaken
under TMIR.
Accordingly an EOI for switching over to UIC 518 has
been published and responses from interested parties are
expected by 5th October, 2017.
Motive Power
145 WR Dia deference in M IB no.
HHP locomotive 233/172/6/HH IB/LD.01.07.
P (WTA) 17 Dated
Pending Since : 31.07.17 has
been
21.07.2016
prepared
and under
comment
with different
stake
holders.
146 SCR Inability of M.92/Dsl/Micro It is a
detection of processor/172 complicated
wheel slipping dt.29-05-2017 issue.
when all wheels Pending Since: Subject is
in a bogie slip on
under joint
02.06.2017
conventional study along
diesel loco with OEMs.
147 RB Wheel gauge EDME traction Report on
widening report Inspection note wheel gauge
of DLS KJM widening
dated under
24.06.2017 preparation
Pending Since: 24.06.2017
148 NR / UMB Suggestion to 50- To study the
division prevent S/Material/Stor root cause of
decoupling of e/ UMB problem, a
shackle of A.B.C. /Misc/09 team of
coupler of ZDM- Pending Since: RDSO visited 3 locomotive
19.07.2017 Kalka
based at Kalka
Shed/NR on
shed. 05.09.2017.
The design
review of
28
1 2 3 4 5 6 7 8 9
shackle is
under
progress.
149 Railway Board Trials for online 2015/Fuel/289 Concerned
monitoring of /3dt. 10-07- Railway,
SFC 2017 SCR and
Pending Since: SWR advised
to furnish
19.07.2017
the
performance
feedback.
150 NR Reg. Hydraulic No. 516-
oil M/DMU/Materi
al/Policy/ML-3
dt 30-08-2017
Pending Since:
28.07.2017
151 SR Rationalisation M/Dsl/92/V/M The subject
of wheel slip BCS/Medhadt.2 is under
algorithm in 8-07-2017 joint study
version-2 Pending Since: along with
Microprocessor
OEMs.
01.08.2017
based control
system fitted in
Alco locomotives
152 Parel NG Railcar for Railcar/Mfg/11 The
Workshop KLK-SML to be /KLK-SML comments
manufactured by Pending Since: on RDSO’s Parel Workshop. 10.08.2017 specification have been
received
from Parel
W/s. The
preparation
of detailed
design
drawings
and
resolving
design
issues under
progress at
RDSO.
RB Meeting at (2011/M(M&P)/ The
Railway Board 175/3/A/T maintenance
regarding 04/08/17 schedule for
manufacturing both
29
1 2 3 4 5 6 7 8 9
MLR & POH of Pending Since: Gottwald
140T Breakdown 11.08.2017 and Cowans
cranes Sheldon
cranes are
under
preparation
duly taking
inputs from
OEMs of
major sub-
assemblies.
153 NR Reg. DEMU No.
Coolant 25.6.DSL.SSB.A
CMT Dt. 14-08-
2017
Pending Since:
14.08.2017
154 CCRS Lucknow Final speed Q.17012/03/20 Item pertains
certificate for 16-17- rñfoñ to Carriage
operation of BG dated- and PS &
LHB SLR coach 24.07.2017 EMU Dte.
fitted with under Pending Since: Comments
slung DG set. 16.08.2017
received
from PS &
EMU Dte.On
receipt from
carriage dte
final reply
would be
sent to
Dy.CRS. 155 E.Co. Rly Haulage of Diesel M7/11/Loco Feasibility
MU as ANR by link/ANR/3135 study Under
Mail/Express/Pa Pending Since: process
ssenger train 18.08.2017
156 RB Development of 2 2016/M(L)/101 Draft spec. is
coach or 3 coach /2BG(A) under
consist 10/08/17
preparation
for DEMU.
Pending Since:
22.08.2017
157 NR Reg. DEMU No. 516 A meeting
Coolant M/DMU/Materi was held at
al/Policy/ML-3 RDSO on
dt 28.07.2017 13.09.2017
30
1 2 3 4 5 6 7 8 9
Pending Since: with OEM of
30.08.2017 the engine.
The matter
was referred
to OEM.
OEM has
agreed to
share the
details of
hydraulic oil
& coolant by
24.09.2017.
On receipt of
details from
OEM, one IB
shall be
issued to
ZRs to
resolve the
issue.
158 RB Failure of ML No. Director/SB
series Cyl Head 2016/M(L)/466 C has been
of HHP loco /3 dt. 31-08- advised to
2017 visit UBL
Pending Since: shed to
04.09.2017 study the
extent of
problem.
After receive
of report
from
Director/SB
C, joint
action plan
by DLW &
RDSO shall
be decided.
159 Central CRS sanction for T.601.L.9.24 Reply would
Railway operation of Coach be sent after
passenger train dated 06.09.17. examining
in IGP–KSRA Pending Since: the result of ghat section of 06.09.2017 Brake
Mumbai Division
holding test
in RDSO
Testing Lab.
160 Railway Board Strategic 2017/M(L)/466 DSO issued
31
1 2 3 4 5 6 7 8 9
transformation /3dt.23-08- specification
Initiative On 2017 to DLW &
Condition Pending Since: DMW for
Monitoring for 11.09.2017 fitment of
Motive Power onboard
condition
monitoring
system in 10
locos each.
DLW & DMW
being
pursued to
provide the
timeline. On
receipt of
inputs from
DLW & DMW
Rly Bd would
be apprised. Track Design
161 CR Problem of fixing TR/Policy/136 Track Design Signal Directorate vide
switch clamps Pending Note No. CT/PTX dated
within 9” from Since : 25/27.01.2016has
the toe of tongue 08.05.2015 been advised to furnish
rail at machine technical comments
operated points. and suggest measures
to address the problem
being experienced in
field. Comments are
still awaited.
162 NR Alterations in 151- Track Design The issue has been
drawings for 60 S/TWS/TP/16- referred to Signal
kg, 1:12 Thick 17 (L) Directorate vide note
web switch. Pending no.
Since : CT/PTX/TWS/Design
07/14.12.2016 dated 16.02.2017for
their examination,
vetting or technical
comments, which are
still awaited.
163 WCR Problem of track WCR/W- Track Design The issue has been
circuiting being 3/TP/Misc. referred to Signal
faced in Kota Pending Directorate vide Note
Division while Since : No. CT/PDS dated
32
1 2 3 4 5 6 7 8 9
laying Diamond 21.02.2017 06.03.2017 for their
crossing in examination and
Shamgarh Yard. technical comments,
which are still awaited.
164 NR & Laying of thick 151- Track Design In order to assess the
ECoR, web switches on S/TWS/TP/16- suitability of laying of
curved track 17 & W- thick web switches on
7/661/Pt.IV/ curved track, all zonal
6021 railways have been
Pending asked vide letter dated
Since : 26.10.2016
28.10.2016 & &09.01.2017 &
25.07.2017 02.08.2017 to send the
performance of thick
web switches laid on
curved as well as
straight track on their
railway.
165 NR Development of There has been Track Design At present, 6 mm thick
Composite GRSP suggestion from GRSP is provided in
for Points & the field to P&C portion whereas
Crossing develop 6.2 mm thick
composite GRSP Composite GRSP
for P&C portion (CGRSP) is being used
also. in normal i.e. tangent
Development of track. As the structure
CGRSP for of Points & Crossing is
Points & different from main
Crossing has line, the behavior of
been taken up composite GRSP is to
accordingly. be assessed on Points
(Target & Crossing portion. It
31.12.2017) is therefore desirable
(NR ref: 211- that initially drawings
S/Tender shall be issued for field
Policy/TS/Pt.X trial in all the Zonal
dated Railways for 50-100
12.07.2016 sets before its full-
Pending fledged adoption in
Since : P&C portion on IR.
12.07.2016
166 ER Suggestions for letter no. Track Design The case is not delay
change in sleeper W.582/18 / but in process as per
specification, IRS Correspondence RDSO ISO procedure of
T-39 regarding / RDSO change in specification
concrete cubes dated:25.07.201 after carefully going the
33
1 2 3 4 5 6 7 8 9
testing during 7 suggestions of ER. As
sleeper Pending per ER suggestions,
production Since : 04.08.17 draft corrigendum to
IRS T-39 & IRS T-45
uploaded on RDSO
website on 24.08.2017
& sent to all Zonal
Railways & sleeper
manufactures for
sending their
comments/suggestion
upto 24.09.2017 as per
ISO procedure of
RDSO.
167 NER Permission to letter no. Track Design Provisional approval for
use coarse & W/362/Mix change for source of
fine aggregate Design/PSC/pa coarse & fine
supplied by M/s rt-I/W-4C aggregates and revised
Shanti Crushing Dated mix design has been
Unit, Jhansi to :02.08.2017 given by letter no.
M/s PRIL, Pending CT/SRC/INSP/ACPL
Burhwal for M55 Since : 09.08.17 dated: 22.08.2017.
concrete for PSC
sleepers Case is in process for
final approval of mix
design after physical
verification of the same
with cube casting
testing at concrete
sleeper plant. Cube
testing has been done
for steam cubes on
08.09.2017 and
planned for water
cubes on 22.09.2017.
168 NER Approval of Letter no. Track Design Provisional approval for
revised M-60 W/362/Mix M-60 mix design with
mix design with Design/part- crushed stone sand
crushed stone II/W-4C Dated has been given by letter
sand & Ambuja :31.08.2017 no.
Cement to M/s Pending CT/SRC/INSP/ACPL
PRIL Burhwal Since : 04.09.17 dated: 11.09.2017.
Verification of mix
design at the plant is
under process.
34
1 2 3 4 5 6 7 8 9
Case is in process for final approval of mix
design after physical
verification of the same
with cube casting
testing at concrete
sleeper plant. Cube
testing has been done
for steam cubes on
14.09.2017 and
planned for water
cubes on 28.09.2017.
169 (i) Western WR & NR has (i) Western Track Design Directorate Trial scheme with
Railway requested RDSO Railway letter standard Performa is
(ii) Northern to advise No. W 350/24 being finalized for
Railway standard (Trial items) submitting the
Performa for dated performance report.
submitting the 22.06.2017
performance Pending Since:
report of 22.06.2017
concrete panels. (ii) Northern
Railway letter
No. 836-
W/460/TM
dated
19/21.06.2017
Pending Since:
21.06.2017
170 North Central (i) Query North Central Track Design Directorate Zonal Railways have
Railway related to Para Railway letter been advised to refer
2.4(i) of CT-35. no.219-W/Rail Para 2.3.2 instead of
“Rails from EUR Failure/NCR/ Para 2.4 (i) of CT-35.
are unloaded on TP/Pt VI(a)
both side of dated
track and it is 15.11.2016
not possible to Pending Since: The issue is being
unload panels 28.12.2016 taken up with M&C
only on shoulder Dte for consultation.
side. Panels are
to be unloaded
on top of
shoulder ballast
and not on the
cess.”
35
1 2 3 4 5 6 7 8 9
Query related to
Para 3.2 of CT-
35.
To examine effect
of small size
defect (to the
order of 0.25mm)
being reason of
Rail breakage,
and also to lay
down
mechanism/tech
nology to
measure such
small defects in
field.
171 Western Western Railway Western Track Design Directorate Subject matter is being
Railway has requested to Railway’s letter scrutinized in
examine the No. W.632/0 association with other
issue of AFTC Policy Corres. Directorates of RDSO.
already laid in Vol. III dated The reply will be
existing track 13.07.2017 submitted to Western
and give Pending Since: Railway shortly.
comments on 13.07.2017
provisions of
MSDAC are to be
laid.
172 East Coast ECoR has ECoR letter no. Track Design Directorate After detailed study
Railway submitted the W.1/163/Pt- and various
report of trial III/KK/4327 deliberations in the
LWR laid on dated meetings of Track
sharp curve of 8 23.05.2017 Standard Committee a
degree and steep report for
gradient of 1:60 Pending Since: “Continuation of
seeking the 23.05.2017 LWR/CWR on sharp
instructions for curves and steep
continuation of gradients on Indian
LWR on sharp Railways” has been
curves and steep finalized and submitted
gradients on KK to Railway Board on
line of ECoR. 23.12.2015 for
consideration and
approval.
After receipt of
approval from Railway
Board, Instructions will
be circulated to ECoR
36
1 2 3 4 5 6 7 8 9
and all other Zonal
Railways for regular
adoption.
173 DFCCIL SSOD of GM (ELEC.) Track Design Directorate No delay. Draft
DFCCIL- Technical Addendum &
Amendment in Services letter Corrigendum Slip
reference to ACS no. (ACS) has been
of IRSOD HQ/EL/SOD/Pt prepared by Track Dte
.III dated of RDSO.
19.07.2017
Pending Since:
29.07.2017
174 Central Maintenance Central Track Design Directorate No delay. No standards
Railway standards for NG Railway’s letter exist as of now. 3 Zonal (610mm)/(2’0”).n no. Railways operating
arrow gauge T/102/PWT/NR narrow gauge namely
section Neral- L-MAE(NG) NR, NFR & SR have
Matheran dated been asked to advise
03.07.2017 track maintenance
standards on their NG
Pending Since: system so as to put up
17.07.2017 a consolidated
document for
deliberation in Track
Standard Committee
meeting.
175 South Western Enhancement of GM/SWR’s Track Design, Traffic and S&T No delay. Under
Railway Line Capacity on letter no. Dte deliberation
Ghat sections- SWR/W-
Amendment to 439/SKLR-
“The Railways SBHR/Relaxatio
opening for n dated
Public Carriage 30.08.2017
of Passengers
Rules, 2000” Pending Since:
(Provision of 08.09.2017
Catch/Slip
siding)
176 Railway Board DFWR weld in Railway Board Track Design Dte Under technical
/Northern AT welding. Letter no examination.
Railway 2012/Track-
1/10/1 dated
14.07.2017
Pending Since:
24.07.2017
QA MECHANICAL
177 Rly Board Approved Rly Bd’s letter There was no RDSO
37
1 2 3 4 5 6 7 8 9
vendors for NO.2007/M(C) spec. for this item,
supply of /137/16 hence, Carriage Dte. of
Spring Steel Dated: RDSO was asked to
Rounds for 30.01.2015. & finalize its spec. The
FIAT springs. 2007/M(C)/13 spec no.
7/16 (ix) RDSO/2017/CG-01
Dated: was finalized by
29.01.2016. Carriage dte. on
Pending Since: 23/02/2017.
Thereafter, STR was
30.01.2015 finalized by QA(Mech.)
Dte. on 26/04/2017.
After that applications
were invited for fresh
registration. Till now
four nos of firms have
applied for fresh
registration. The field
verification of all these
four firms has been
conducted and the
deficiencies have been
advised to the
respective firms. The
firms are being
regularly chased for
submitting the
compliance of the
advised deficiencies.
178 ALD Div./ NCR Poor E-mail by NCR ALD Div. /NCR has
performance of dated reported failures of EM
EM Pads 18/08/2017 Pads supplied by M/s
supplied by and forwarded Aryan Exports Pvt. Ltd
M/s Aryan by Wagon Dte. and Side bearer
Exports Pvt. vide note no. springs supplied by
Ltd and Side MW/CSNB/Fai M/s India Tools Craft
bearer springs lure dated (P) ltd.. On
supplied by 25/08/2017 examination of the
M/s India Pending Since: report, it is found that
Tools Craft (P) 25/08/2017 all the failures are
ltd. prior to Oct-2016. Also
the failures are of the
items supplied by the
firms prior to Aug-
2016. These are not
recent failure.
In view of above facts,
38
1 2 3 4 5 6 7 8 9
in order to ascertain
the quality of these
items produced by the
above firms, out of
turn Quality Audit of
both the firms has
been ordered.
Electric Loco
179 M/s Thermo M/s Thermo 31.03.17 Compliance of RDSO letter is Cables Ltd. Cables Limited submitted by the firm on has applied for 11.08.2017. The case is under
fresh vendor
Process and will be finalised in a fortnight.
registration for
Thin walled
cables for
three phase
locomotives
against
temporary
vendor
reference id
no.
QAE2017/419
5 dated
40
1 2 3 4 5 6 7 8 9
31.03.2017.
Geotechnical
180 SECR Railway Letter of RDSO team visited the
requested Dy.CE/Const/ site on 02.06.17 & RDSO for SECR with 03.06.17 & also assessing reference no. collected
slope stability DCE/C/R/DR details/relevant data of high bank G/DUG- from site.
location on RSM/3rd line/ Soil Samples received 3rd new broad CRS/65, from railway on gauge railway dated- 06.07.17 and testing of
line between 23.05.17. the samples completed
Durg & on 28.08.17. Draft Rajnandgaon Pending Since: consultancy report of Durg- Letter under prepared & under Nagpur reference review and to be section, South received on finalised by East Central 23.05.2017. 30.09.2017
Railway.
181 ER Railway Letter of Inspection of site done
requested Dy.CE/Const/ from 03.07.17 to
RDSO for ER with 06.07.17, along with investigation reference no. collections of
of problematic DCE/Con/V/ details/data from site.
locations of HWH/W/ Soil samples received new formation BZLE-AZ on 14.07.17. Testing of
for doubling Doubling/750, soil samples will be
work between dated: completed by Bazarsau- 02.05.17 26.09.17. Consultancy
Azimganj Pending Since: report to be finalised Junction in Letter under by 13.10.17.
Howrah reference
Division, received on
Eastern 05.05. 2017.
Railway and
suggesting
remedial
measures.
182 WCR Railway CTE/WCR RDSO team visited the
informed Letter no. W- site from 21.08.17 to RDSO that HQ/W- 23.08.17, & also cracks have 4/Track/RVN collected relevant been observed L Unusual, details/data from site.
during dated: Soil samples received previous 01.07.2017 on 01.09.17 & testing
monsoons in Pending Since: to be completed by
the formation Letter under 14.11.17. Consultancy
41
1 2 3 4 5 6 7 8 9
of third line reference report to be finalised between Bina- received on by 30.11.17.
Bhopal section 04.07.2017.
commissioned
in 2015-16.
Therefore,
Railway
requested
RDSO for
investigation
of problematic
locations of
third line
between Bina-
Bhopal
section, and
suggesting
remedial
measures for
effective
solution.
183 ECR Railway CTE/ECR/Haj Site inspection by informed ipur Letter RDSO team carried RDSO that no. W- out from 05.09.17 to cracks in 7/436/09/For 08.09.17, along with formation & mation/ collection of details puncturing of Pt.1/2144 from site.
ballast is dated: Soil samples received observed, 08.08.2017. on 18.09.17. resulting in Pending Since: Designated soil testing
frequent Letter under to be completed by cross-level reference 11.12.17 and variation received on Consultancy report to
between 17.08.2017. be finalised by Patna- 29.12.17.
Mughalsarai
sections.
Railway
requested
RDSO for
investigation
of problematic
locations
between
Patna-
Mughalsarai
section, and
42
1 2 3 4 5 6 7 8 9
suggesting
remedial
measures for
effective
solution.
184 SR Railway CTE/SR Letter Southern Railway has informed no. 49/1/ been asked to submit RDSO Formation complete details of regarding Treatment/CN identified problematic sinkage/settle projects, dated stretches vide this ment problem 24.07.17. office letter No.
in P-way Pending Since: RS/G/95-SR Vol.-20
section of Letter under dated 23.08.17, which
Kottayam on reference is still awaited.Team of
Ernakulam- received on GE officials shall be Kottayam- 10.08.2017. visiting to inspect Kayamkulam problematic sites
section. shortly.
185 CR Railway PCE/CR Letter RDSO team inspected
requested no. the referred site on
RDSO to T/102/PWT/ 07.09.2017.
examine the Unusual dated Final report
boulder fall 21.08.2017 suggesting remedial
locations Pending Since: measures will be
between Letter under finalised by 30.09.2017
Karjat- reference
Lonavala received on
Section & 22/08/2017
suggesting
remedial
measures to
be taken to
prevent
boulder falling
on the track.
.
43