7/18/2019 2 Marine Operations Intro http://slidepdf.com/reader/full/2-marine-operations-intro 1/12 FGN - Date: 2002-10-29 - Page: 1 DEVELOPMENT RE WATER DEPTH = 850 m TOP OF SLIDE EDGE WATER DEPTH = 250 m 10 KM N TO SHORE DEVELOPMENT RE WATER DEPTH = 850-900 m TOP OF SLIDE EDGE WATER DEPTH = 250 m N EXPORT LINES: INFIELD FLOWLINES: 2 x 30” 2 x 6” MEG 3” Service Control Umb. 2 x 12” 2 x 4,5” MEG SU (2”) Example: Ormen Lange Approx. 21 KM TO TOP OF SLIDE EDGE

Upload: tt3340

Post on 01-Mar-2016

219 views

Category:

Documents


0 download

DESCRIPTION

2 Marine Operations Intro

TRANSCRIPT

Page 1: 2 Marine Operations Intro

7/18/2019 2 Marine Operations Intro

http://slidepdf.com/reader/full/2-marine-operations-intro 1/12

FGN - Date: 2002-10-29 - Page: 1

DEVELOPMENT

RE

WATER DEPTH = 850 m

TOP OF SLIDE EDGE

WATER DEPTH = 250 m

10 KM

N

TO SHORE

DEVELOPMENT

RE

WATER DEPTH = 850-900 m

TOP OF SLIDE EDGE

WATER DEPTH = 250 m

N

EXPORT LINES:

INFIELD FLOWLINES:

•2 x 30”

•2 x 6” MEG

•3” Service

•Control Umb.

•2 x 12”

•2 x 4,5” MEG

•SU (2”)

Example: Ormen Lange

Approx. 21 KM TO TOP OF SLIDE EDGE

Page 2: 2 Marine Operations Intro

7/18/2019 2 Marine Operations Intro

http://slidepdf.com/reader/full/2-marine-operations-intro 2/12

FGN - Date: 2002-10-29 - Page: 2

AUV mapping of the sea bottom

Page 3: 2 Marine Operations Intro

7/18/2019 2 Marine Operations Intro

http://slidepdf.com/reader/full/2-marine-operations-intro 3/12

FGN - Date: 2002-10-29 - Page: 3

Environmental conditions

Water Depth

1000m

Page 4: 2 Marine Operations Intro

7/18/2019 2 Marine Operations Intro

http://slidepdf.com/reader/full/2-marine-operations-intro 4/12FGN - Date: 2002-10-29 - Page: 4

Environmental conditions

0 5 10 15 20 25 30

0

2

4

6

8

10

12

14

16

18

20

22

Wav e pe ak perio d, Tp(s)

   S   i  g  n   i   f   i  c  a  n   t  w  a  v  e   h  e   i  g   h   t ,   H  m  o   (  m   )

Approx im ate 100y r co ntourline s

Faroe area

Haltenbanken

 Norte rn North S e a

GOM

WOA

-2000

-1750

-1500

-1250

-1000

-750

-500

-250

0

   W  a   t  e  r   D  e

  p   t   h   (  m   )

Hoover/Diana

Ursa

RamPowel

Girassol

Dalia

Roncador 

Marlin Sul

Marlin 4

NorneTroll

Njord

Foinhaven

Schiehallion

Ormen

Lange

  5

WA

  8

Brazil

  12

GoM

  18

NNS/AM

Hs(m)

Crazy Horse

I  n c r  e a s i  n g   

c h a l  l  e n g  e s 

Page 5: 2 Marine Operations Intro

7/18/2019 2 Marine Operations Intro

http://slidepdf.com/reader/full/2-marine-operations-intro 5/12

FGN - Date: 2002-10-29 - Page: 5

Numerical simulation of current

Page 6: 2 Marine Operations Intro

7/18/2019 2 Marine Operations Intro

http://slidepdf.com/reader/full/2-marine-operations-intro 6/12

FGN - Date: 2002-10-29 - Page: 6

Pipelaying, Semisubmersible LB200

Page 7: 2 Marine Operations Intro

7/18/2019 2 Marine Operations Intro

http://slidepdf.com/reader/full/2-marine-operations-intro 7/12

FGN - Date: 2002-10-29 - Page: 7

S-laying and J-laying

Page 8: 2 Marine Operations Intro

7/18/2019 2 Marine Operations Intro

http://slidepdf.com/reader/full/2-marine-operations-intro 8/12

FGN - Date: 2002-10-29 - Page: 8

Free spanning pipeline

10000 15000 20000 25000 300000 5000

-900

-800

-700

-600

-500

-400

-300

-200

30” pipeline

Storegga s lide area, route South Eas t

   W  a   t  e  r   D  e  p   t   h   (  m   )

Page 9: 2 Marine Operations Intro

7/18/2019 2 Marine Operations Intro

http://slidepdf.com/reader/full/2-marine-operations-intro 9/12

FGN - Date: 2002-10-29 - Page: 9

Free span distribution

Ro u te S E (20 00 ) - ROV Pro file

Em p ty P ip e , T= 1 0 0 0 k N, 3 1 k m

S p a n Le n g th [m ]

   S  p  a

  n   H  e   i  g   h   t   [  m   ]

S-Lay

0 .5

5 .5

10 .5

15 .5

20 .5

4 0 1 4 0 2 4 0 3 4 0 4 4 0

Dn VG1 4

Page 10: 2 Marine Operations Intro

7/18/2019 2 Marine Operations Intro

http://slidepdf.com/reader/full/2-marine-operations-intro 10/12

FGN - Date: 2002-10-29 - Page: 10

TECHNOLOGY GAPS - PIPELINES

 

J-lay in deep water;

reduced radius, dynamics,Installation software

Pre/Post-lay dredging equipment

Trenching equipment in hard soil

 Trawling - Long spans

 Hydrate Prevention/Remediation

 Long free span design

Page 11: 2 Marine Operations Intro

7/18/2019 2 Marine Operations Intro

http://slidepdf.com/reader/full/2-marine-operations-intro 11/12

FGN - Date: 2002-10-29 - Page: 11

Why is free spans a problem?

Vortex induced vibrations (VIV)

Page 12: 2 Marine Operations Intro

7/18/2019 2 Marine Operations Intro

http://slidepdf.com/reader/full/2-marine-operations-intro 12/12

FGN - Date: 2002-10-29 - Page: 12

From Troll to Ormen Lange -

A step into the deep.