2. introduction file - part 1

21
One Stop Destination for all need of HT & EHT Switchyard 24 Hr. EMERGENCY SERVICE AT YOUR DOOR STEP A-17/1, Sundramnagar soc., B/H Yash Complex, Gotri road, Vadodara : 21 (M) 9879614456, 9879619456, 9426564456 (Telefax) 0265 2371156 E-mail : [email protected] Manish Corporation

Upload: amitkumar-n-pandya

Post on 06-Mar-2015

167 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: 2. Introduction File - Part 1

One Stop Destination for all need of HT & EHT Switchyard

24 Hr. EMERGENCY SERVICE

AT YOUR DOOR STEP

A-17/1, Sundramnagar soc., B/H Yash Complex, Gotri road, Vadodara : 21

(M) 9879614456, 9879619456, 9426564456(Telefax) 0265 2371156

E-mail : [email protected]

Manish Corporation

Page 2: 2. Introduction File - Part 1

Manish Corporation 24 Hr. EMERGENCY SERVICE

AT YOUR DOOR STEP

1. Trouble shooting/Overhauling of various types of HT & EHT Breakers i.e. SF6, MOCB, BOCB, VCB up to 220kV & etc.

2. We have developed new concept, Reconditioning/overhauling of outdoor C.T./P.T. from 33kV to 220kV system at your site (New concept).

3. Hot Line Washing, Nut-Bolt tightening in Hot line, Replacement of joints, By-pass

jumper, Measurement of Contact Temperature, Cleaning of Switchyard, this entire job in Hot line (Live Line) switchyard with special tools and trained manpower.

4. Power Transformer / Distribution Transformer Overhauling and Compete Testing.

5. Isolator repairing, overhauling and alignment work up to 400kV including pantograph type

6. Cold line washing and cleaning of switchyard with hand operated pump. And Temperature

measurement by Thermal Imaging Camera in Live switchyard.

7. Complete Testing of Switchyard Equipment including Tan-Delta of insulation, Timing of breaker, Contact Resistance, Due point Measurement of Sf6 gas of breaker with proper instrument and skilled manpower.

8. Switchyard Modification, Replacement of Conductor, Clamps and nut-bolts and Painting

with silver aluminum paint or light gray epoxy color.

9. Evacuation & reuse of old SF6 gas including measurement of Due Point by DILO make (Germany) instrument or Supply of New SF6 gas (IEC - 376) with cylinder with GAS test certificate.

Manish N. Pandya

Amit N. Pandya A-17/1, Sundramnagar soc., B/H Yash Complex,

Gotri road, Vadodara : 21(Telefax) 0265 2371156(M) 9879614456, 9879619456, 9426564456 E-mail : [email protected]

ISO 9001-2008 COMPANY

Page 3: 2. Introduction File - Part 1

Ref. : MCORP/ - /Contractor Information Date : / /20

To Whom It May Concern:

Name of Company : Manish CorporationOffice Address : A-17/1, First floor, Sundramnagar

Soc., B/H Yash Complex, Gotri Road, Vadodara – 21.

Res. cum Office : Phone No. : 0265 2371156 (Telefax) Mobile No. : 9879614456, 9879619456

Email Address : [email protected]

Type of Work : Servicing, Overhauling, Commissioning and Testing of Switchgear/Electrical Equipments up to 245KV.

Service Tax No. : MRS/D-III/V-I/795/MC/08-09

Pan No. : AAPFM3171M

Sales Tax No. (TIN No.) : 24192500431 Dtd. 01/03/2006

Electrical Supervisor : G/AS/E/22104 Permit No.

Electrical contractor : G/B/C – 2820 License No.

PF Establishment Code : GJ/65035

Our Banker : Bank of India – Vidyutnagar Branch, Vadodara

Our Bank A/C No. : 250620110000074

E-Urja Vendor No. : 1249 for GETCO

Firm Registration No. : GUJ/VDD/18397

IEC Number : 3409000411 Dtd. 17/04/2009

TAN Number : BRDM03447D

ISO Certificate : ISO 9001:2008

For Manish Corporation

Page 4: 2. Introduction File - Part 1
Page 5: 2. Introduction File - Part 1

Sr. No.

DescriptionRating/

CapacityMake Qty.

1 Megger 0-1 kV Meco, India 1 No.2 Megger 0-10 kV Megger, U.K. 1 No.3 SF6 Gas Evacuation Kit - DILO, Germany 1 No.4 SF6 Due Point Measurement Meter - DILO, Germany 1 No.5 Transformer Tesing Kit - AD Control 1 No.6 Thermal Imaging Camera for Non-touch temperature

measurement- IRISYS - U.K. 1 No.

7 CT / PT Polarity Check Meter - Manish Corporation, India 1 No.

8 3 Pole Close, Trip & C-O Timer For Any make Breaker - Scope, India 3 Nos.

9 Tan-Delta Measurement Instrument 0-10 kV Subal, India 1 No.10 Oil Testing Kit. 0-80 kV Allied Electrical, India 1 No.11 Contact Resistance Measurement Kit with Variabal

Current0-100 Amps DC Continious Duty

SCOPE, India &Manish Corporation. India

2 Nos.

12 Primary Injection Kit for CT/PT, Transformer protection checking and ratio checking

0-100 Amp AC Manish Corporation, India 1 No.

13 SF6 Gas Leakage Detector with Suction Pump - Unitor 3 Nos.14 Winding Resistance Measurement Meter 1 Amp DC &

10 Amps DCAgronic 1 No.

15 Special Manual water Spray Washing pump for Washing 0-3 Kg Pressure GATOR, India 2 Nos.

16 High Pressure water Pump for Switchyard Washing 0-200 Bar pressure

Unitor 1 Nos.

17 All Hot-line (On-Line) maintenance Equipment Up to 220kV and Hot-line washing facility.

- Ritz, Brazil Full set

18 Earth Resistance Tester 1-10-100 Ω Nippon 1 No.19 Vacuum pump with Tank - PARAG - India 1 No.20 Miniature dry Vacuum Pump for SF6 Breaker 0.02 mBar Value 1 No.21 Oil circulation and heating Equipment capacity up to 700C

for bushing and CT/PT reconditioning with 5 Micron Filter Cartridge

0-70°C Manish Corporation, India 1 No.

22 Special spanners for Various types of Breakers - 1. Stenlly, Germany2. Estman3. Taparia

3 Sets.

23 All required general Tools and Tackles. - 1. Stenlly, Germany2. Estman3. Taparia

2 Sets.

24 Multimeter - RisubhaMacoMetrel

3 Nos.

For MANISH CORPORATION

List of Important Equipments & Measurement Facility

Note: We have all required Safety equipment, Lifting equipment and general measuring instrument which is not listed above.

Page 6: 2. Introduction File - Part 1

LIST OF WORK AND TEST THAT CAN BE PERFORMED BY US INSWITCHYARD MAINTENANCE

Sr.No.

Equipment Name, Required Test Description & Facility available list

01 For Circuit Breaker1) Overhauling, Alingment and Adjustment of Any make and Any type

circuit breaker up to 220kV Voltage level2) Closing, Tripping & C-O Time measurement.3) Contact Resistance measurement at (0-150A DC).4) Measurement of Total Travel.5) Closing and Tripping coil Resistance.6) Sf6 Gas Leakage Detection.

02 For Power Transformer1) Bushing Tan – Delta Test at 10kV.2) IR Test with 5 & 10kV megger.3) Oil BDV Test.4) Winding Resistance measurement.5) Ratio Measurement Test.6) O.C. Test7) S.C. Test8) Polarity Test.9) Magnetizing Current & Modified Magnetizing Current test.

03 For CT & PT1) Overhauling and IR value improvement of any make and any type of

CT/PT2) Tan – Delta Test at 10kV3) IR Test with 5 & 10kV megger.4) Oil BDV Test in special case.5) Ratio Measurement Test.6) Primary Injuction test.7) Polarity Test.8) Knee Point Voltage measurement

04 For Isolator1) Overhauling, Alignment and Adjustment of Any make and Any type of

Isolator.2) Operational Test from Local & Remote if available.3) Contact Resistance Test at 100A DC.4) Post Insulator Tracking & Insulation Checking with 80kV AC voltage.

Page 7: 2. Introduction File - Part 1

05 For Indoor Circuit Breaker1) Overhauling, Alingment and Adjustment and fault finding of any make

and any type indoor circuit breaker2) Closing and Tripping Timing3) Vacuum Bottle Checking with High Voltage test.4) Total Circuit Breaker Resistance Measurement at 100A DC.5) Wipe Measurement in case of VCB.6) BDV Testing in case of MOCB.7) Gas Leakage Testing in case of Sf6 gas type.8) Spring Charging Motor Operation Time measurement.

06 For Relay1) Relay Calibration facility is available (at site / at works)2) Relay Repairing (Electro mechanical type, any make)

07 For Switchyard1) On-Line Temperature Measurement.2) On-Line Water Spray Washing (Hotline Washing)3) Cold Line Washing with 600 PSI Pressure DM / Normal water.4) Cleaning of Switchyard with Cotton Cloth.5) Re-conditioning of Joints.6) Checking of Joints resistance.7) Replacement of String Insulator or Post Insulator.8) Replacement of CT / PT / Breakers or any equipment of Switchyard.9) Commissioning Test for all equipment of switchyard.10) Painting of Switchyard.11) AMC for switchyard equipments.

08 For Breaker Compressor (if Pneumatic Drive)1) Total Overhauling of Compressor.2) Checking of Working Cycle of Compressor in 24Hrs.3) Attending of Air leak point in air pipe line.

09 For Earthing1) Re-creation of Earthing.2) Measurement of Earth Resistance.3) Re-Conditioning of Earth Resistance.

10 All types of ON – LINE maintenance for Switchyard up to 400kV1) Thermal Imaging of switchyard at very low cost.2) Measurement of ON-LINE Temperature of Clamp and Conductor3) Washing of Total Switchyard and Tower in On-Line4) Tightening of Clamps and Connector with out shutdown5) By-Pass Jumper for Hot-Spot in switchyard.6) Painting of Live Switchyard.7) Replacement of Damaged Insulator in to Live Line or Bus

Page 8: 2. Introduction File - Part 1

The temperature is a key variable in virtually any situation and for all process. Temperature is simply crucial and having control over it will mean higher quality. Better safety andmoney saved.

An infrared imaging device contains one or more detectorsthat converts energy in the infrared spectrum in to anelectrical signal. The more energy detected, the greater theelectrical signal output. The electrical signals are typicallyformatted in to video signal. If two objects are at sametemperature, the object with higher emissivity radiates more than object with low emissivity. Hence the first object looksbrighter than the second.

1) Electrical2) Mechanical friction3) Furnace & Boilers4) Quality control and process monitoring5) Fluid Flow problems6) Tank and Vessels.

Electrical Applications:Abnormal heat in electrical equipments is often the result of loose connections and over loaded circuits. The thermography can locate these problems before costly failure occurs,corrective action can be planned – which avoids shutdowns or costly down time.

Page 9: 2. Introduction File - Part 1

The power generation, Transmission & Distribution problemsmanifest themselves as overheating when they resistant tocurrent flow increases as a result of poor connection.

Hence thremography allows diagnosing temperature relatedequipment problems developing trending data to predictequipment failure and determine equipment and plantpriorities and enhance operational safety.

Approximately 25% of electrical equipment failures are caused by faulty electrical connections, whether they are loose, dirty, corroded or over-tightening. The faults are not found during regular maintenance because one can not see the problemsuntil real damage to the component which may create faultor fire or emergency outage.

Advantage of Thermography:1) Improve quality of power supply2) Increase productivity3) Reduce Energy, Maintenance const & Scrap Materials Cost.4) Eliminate Down Time5) Schedule Maintenance Program improve Plant Safety &

Save Money.6) Early Fault Diagnosis Prevent Unscheduled & Costly

Production Stoppage.7) Analysis of results enables failure trends to be predicted.

In Generator / Alternators heated up observed due to :1) Phase Imbalance2) Dust / Carbon Accumulation on Slip ring Brush3) Improper tension of slip rings4) Poor Cooling of commutator / Armature5) Thyristor Bank failure

In Short, Thermography help to reach up to the targetwithout compromise the quality and Provide sufficient timefor preventive action.

Page 10: 2. Introduction File - Part 1

Sr.No. Name of Company Equipment Details Description of Problem

1) GETCO - 132kV Gotri S/s 132kV Sf6 breaker ABB make Spring Charge mechanism of 40MVA T/R

Breaker Mechanism was nonworking same could not be repaired even by ABB service enginer. Attended by us with in 8 hours after receipt of emergency call

2) GETCO - 132kV Gotri S/s 132kV Sf6 Breaker ABB make pneumatic drive mechanism of 12.5MVA Transformer

Due to heavy air leakage working pressue become zero from pneumatic drive and Problem attended with in 10 hours.

3) GETCO - 400kV Jetpur S/s 66kV BHEL MOCB of 66kV Jetpur Line Breaker mechanism Problem. Attended with in 20 Hours after receipt of emergency call

4) GETCO - 66kV Gorwa S/s 66kV Crompton Greaves make of 10MVA Transformer

Breaker Mechanism problem. Due to drive problem. Attended with in 1 hours after receipt of emergency call

5) GETCO - 132kV Karjan S/s 132kV Sf6 ABB make Breaker Mechanism of 50MVA Transformer

Due to heavy air leakage working pressue become zero from pneumatic drive and Problem attended with in 10 hours.

6) GETCO - 66kV Mobha S/s 66kV BHEL MOCB of 66kV Bharat Starch Line Breaker Mechanism Trouble. Attended with in 4 Hours. After receipt of Emergency call

7) GETCO - 66kV Kalol S/s 66kV BOCB of Westing House USA make of 66kV Line

Air Compressor problem attended at site with in 8 hours.

8) GETCO - 220kV Waghodiya S/s 66kV SF6 Breaker ABB make Pneumatic Drive mechanism

Heavy Air leakage problem from pneumatic drive attended with in 8 hours.

1) Western Railway - 132kV Makarpura S/s

132kV BHEL make Sf6 Breaker Spring charge mechanism 132kV Incoming Jambuva Line

Problem of SF6 gas leakage and gas pressure become Zero same is attended with complete overhauling of interpture pole with in 72 Hours after receipt of emergency call.

2) M/s Vedeocon Narmada Glass - Bharuch

66kV Sf6 Crompton Greaves make bkr of 10MVA T/R

Breaker Mechanism was stuckup. With in 2hous after receipt of call we have reached at site and problem attended

Emergency Problem attended and Service Extended on War basis byM/s Manish Corporation - Vadodara

Client : GETCO

Client : EHV Industrial Consumer

Page 11: 2. Introduction File - Part 1

3) M/s Remi Metal Gujarat Ltd - Zagadia

220kV Sf6 Breaker make crompton Greaves of 220/33kV 42MVA Transformer

Breaker was not getting close Problem observed by them afrter routine outage period. Problem was attended with in 5 hours after receipt of call from client

4) Nirma Ltd. - Alindra, Savali 132kV C.T. serious oil leakage Oil leakage observed by client and with in a day time problem attended.

5) M/s Filatax Inda Ltd. - Selvasa (U.T.) 66kV Alind breaker of 66kV incomming line Breaker Mechanism problem attended within day time.

6) M/s Modernpetrofils Ltd. 132kV Sf6 Breaker ABB make Pneumatic drive mechanism of 132kV Incoming line

Heavy Air leakage from mechanism and attended with in 8 Hours after receipt of call.

7) M/s GSFC Ltd. - Fertilizernagar, Vadodara

132kV Sf6 Breaker ABB make Pneumatic drive mechanism of 132kV Incoming line

Suddenly air leakage observed and with in half hours Air come down to Zero pressure. With in 6 Hours problem attended and with in 7 Hours bkr put back to service.

1)M/s Siemens Ltd - Bombay Site : Corporate ispat aloy ltd- Raipur, chittisgadh

220kV Sf6 Breaker ABB make 3Nos. And 11kV ABB make Sf6 breaker 6 Nos.

Complete Overhauling and Testing and commissioning done on war basis including supply of all required gaskets sets and SF6 gas with in 20days time. After first vist of our enginer at site

2) J.K. Power, Chittodgadh, Rajasthan

132kV MOCB of BHEL make 3Nos. 132kV CT 9Nos. 132kV PT 3Nos. 11kV VCB siemens make 11Nos.

Complete Overhauling and Testing done

3) M/s Birla Cement Ltd. Rajasthan 132kV MOCB Jyoti make 2Nos. 132kV CT 6 Nos.

Complete Overhaulinig and Testing of breaker and CT done.

1)

Congo Steel Mils Ltd. - Lumbumbashi, South Africa through Kumar World Trad Ltd. - Vadodara

132kV ABB make SF6 Breaker 2 Nos. and 132kV CT / PT 6 Nos.

Complete Overhauling done at vadodara and commissioning done at South Africa

Client : EHV Industrial Consumer (Outside Gujarat state) (Routine Service provided)

Client : EHV Industrial Consumer (Outside India) (Routine Service provided)

Page 12: 2. Introduction File - Part 1

Some Photographs shows the problems created at site.

Bushing Connector Overheating Problem

Defective Cable Lug Joint

Overheating of Delta Connection Strip of Transformer

12.6°C

58.7°C

20

30

40

50

LI01SP01

AR01

36.4°C

63.3°C

40

45

50

55

60

SP01

SP02

SP03

42.1°C

113.1°C

60

80

100

LI01

SP01

AR01

Page 13: 2. Introduction File - Part 1

Isolator Jaw overheating

Isolator Connector Overheating

CT Connector Bolt Overheating

Page 14: 2. Introduction File - Part 1

Uneven Heating of Moose conductor due to corrosion

BOCB Bkr. Bushing Overheating due to loose connection

Page 15: 2. Introduction File - Part 1

132kV ABB make ELF 2-1 (R) Bkr at GETCO S/s

Drive Overhauling Procedure with complete Overhauling of Compressor.

Page 16: 2. Introduction File - Part 1

132kV Switchyard Washing and cleaning with water in Pvt. Company

Page 17: 2. Introduction File - Part 1

220kV CGL SF6 Breaker Overhauling at

220kV GETCO – Zagadiya S/s

Page 18: 2. Introduction File - Part 1

220kV Telk Breaker Mechanism Overhauled at 220kV Gavasad S/s UnderGETCO - Gotri TR Div. Vadodara

Page 19: 2. Introduction File - Part 1
Page 20: 2. Introduction File - Part 1

LIST OF SOME MAJOR CUSTOMERSR NO. CUSTOMER NAME LOCATION

1 ABB LTD VADODARA2 ANGLIQUE INTERNATIONAL ‐ SUDAN SUDAN3 AMBUJA CEMENT LTD KODINAR4 AMOLI ORGENIC LTD LUNA ‐ VADODARA5 APOLLO TYRE LTD WAGHODIYA ‐ VADODARA6 AQUAGEL CHEMECAL LTD GANDHIDHAM7 ATUL LTD. VALSAD8 BINANI CEMENT ABU ROD9 BIRLA CEMENT & CHANDERIYA CEMENT CHITTODGADH10 ELECTRICITY DEPARTMENT (D & NH) SELVASA11 FILATEX INDIA LTD DADARA ‐ SELVASA12 GAIL (INDIA) LTD. VIJAIPUR ‐ MP13 GUJARAT ENERGY TRNS. CO. (GETCO) GUJARAT14 GUJARAT STATE ELECT. CO. (GSECL) GUJARAT15 GUJARAT STATE FURTILISER LTD (GSFC) VADODARA16 GUJARAT FLAVOUR LTD. JAROD ‐ VADODARA17 HEAVY WATER PLANT (BARODA) VADODARA18 HINDUSTAN GAS INDUSTRIES (HGI) BASKA ‐ VADODARA19 J.K. POWER CHITTODGADH20 JAYANT OIL MILL VADODARA21 INDIAN OIL CORPORATION LTD VADODARA22 MADHU SILICA LTD. BHAVNAGAR23 LNG PETRO NET LTD DAHEJ24 MAFATLAL BURLINGTON LTD NAVSARI25 MODERN PETROFILS LTD POR26 NIRMA CHEMICAL LTD‐ VADODARA27 PHILIPS CARBON BLACK LTD PALEJ28 RAJENDRA STEEL (JAISWAL NEEKO) RAIPUR29 RAJSHRI POLIFILS LTD ACHHALIYA ‐ NEAR RAJPIPADA30 REMI METAL INDIA LTD ZAGADIYA31 SIEMENS LTD BOMBAY32 SOLARIS BIOCHEMICAL LTD KARAKHADI ‐ VADODARA33 STERLING BIOTECH LTD VADODARA ‐ JAMBUSAR ROAD34 VIDEOCON INTERNAL LTD. ‐ BHARUCH BHARUCH35 WESTERN RAILWAY VADODARA & AHMEDABAD36 WELSPUN SYNTEX SELVASA

FOR MANISH CORPORATION

LIST OF CUSTOMER

Page 21: 2. Introduction File - Part 1

Sr. No.

Type of Product Work Done before 08‐09

Work Done in 08‐09

Work Done in 09‐10

Work Done in 10‐11

Work Done in 11‐12

Total Nos.

1 400KV ABB SF6 Breaker Drive O/h 1 12 220KV ABB SF6 Breaker Drive / Pole O/h. 3 5 8 3 4 233 220KV TELK SF6 Breaker Drive / Pole O/h. 2 10 10 1 234 220KV CGL SF6 Breaker Drive O/h. 5 1 65 132KV ABB SF6 Breaker Drive / Pole O/h. 8 5 10 5 286 132KV CGL Breaker Drive / Pole O/h. 6 4 1 5 3 197 132KV BHEL SF6 Breaker Drive / Pole O/h. 2 3 1 1 2 98 132kV JYOTI MOCB Breaker Drive / Pole O/h. 2 1 39 66KV ABB SF6 Breaker Drive / Pole O/h. 2 3 11 6 1 2310 66KV CGL SF6 Breaker Drive / Pole Total O/h 8 6 5 1911 66KV Alind MOCB Drive / Pole Total O/h 10 9 13 3 3512 66KV BHEL MOCB Drive / Pole Total O/h 28 47 60 50 8 19313 66KV BHEL BOCB O/h. 3 314 66KV TELK SF6 BREAKER Drive O/h. 1 115 33kV Indoor SF6 Bkr 4 416 25KV CGL Breaker Drive / Pole (for W.R.) 2 9 1117 22KV ABB make SF6 breaker Drive / Pole O/h. 4 2 1 718 11KV SF6 Breaker Drive / Pole Total O/h (In & Out) 2 28 3019 11KV SF6 Breaker Drive / Pole O/h. (In & Out) 9 4 1320 11KV VCB O/h. (Indoor) 32 12 40 13 9721 22KV VCB Oh. (Outdoor) 6 622 400KV CVT of Alsthom Trf. & Instrument 1 0 123 400KV Pentograph Isolator O/h. 2 5 724 220KV CT Overhauling 1 125 CT Overhauling 43 2 4526 132kV CVT/PT OH / Leakage attending 6 4 1027 Overhauling of Air Compressor 2 228 440V ACB Repairing / OH 5 529 Overhauling of Tapchanger (OLTC) 1 2 1 430 Isolator Overhauling 34 39 15 26 6 12031 Thermography (Job) 4 5 1 6 4 2032 SF6 Gas Evacuation Work 8 9 5 2233 Tandelta Testing 59 8 67

For Manish Corporation

Work Completion Details by Product CategoryExecuted / On Hand till Date