PRESENTATIONOSSA, founded in 1952, is a leading company in the underground construction sector specializing in three business
areas: Construction, Energy and Mining.
Both in underground excavations by traditional method (NATM), as well as in tunneling with TBM, and roadheader mining,
OSSA is a solid underground works partner for important industrial and construction groups internationally. At OSSA
we are highly commited to Quality, Health and safety, and Environment, and we invest in Research and Development
Projects at an international level. We promote a culture of respect and teamwork among our team.
OSSA has vast recent experience both in high speed railway tunnels with over 60 km of high speed rail tunneling projects
in the last five years, leading the Spanish market in this specialty, and also in underground power plants, having built
over fifteen underground plants with some of the largest underground caverns in the world. As a recent highlight, we are
participating in the design and construction of the Hong Kong to Shangai High Speed Rail Line.
Internationally OSSA has executed works in Hong Kong, Taiwan, Chile, Peru, Colombia, Panama, Costa Rica, Brasil and
Nicaragua and is recently focusing its tendering activity in North America, Central America, Asia, Canada and Great Britain.
After 65 years of success, our strategy is to continue expanding internationally, and to support large civil engineering and
mining industry clients at all levels, contributing our vast technical expertise and our equipment fleet, while prioritizing
health and safety and innovation in all our projects.
SAFETYSafety is Obras Subterraneas, S.A.’s main asset from the time when its operations begin, demanded by the specialisation
required for the works carried out underground.
The company’s staff have a high degree of professionalism and specialisation, which has been achieved after many years
of training and the transfer of know how. Working in confined spaces with the presence of gas, dust, noise, low visibility
and the use of explosives means that the Obras Subterraneas, S.A.’s security department is the most relevant in the
company.
The use of cutting-edge, innovative techniques in the field of underground works requires the continuous training of the
company’s human resources.
Project photos
—STRUCTURE
IsraelPROVINCE
IsraelCOUNTRY
NazarethPLACE
—
LOCATIONANDADDITIONALINFORMATION
Cross section: —
Lenght: —GEOMETRY
—OVERBURDEN
—METHODOF TUNNELING
—GEOLOGY ANDGEOTECHNICAL DATA
FormworkTUNNEL EQUIPMENT
1,300,000 €BUDGET(EXCLUDING VAT)
HYDRAULIC PROJECTS
Type Project
GILBOA HYDROPOWER PROJECT
Owner: JV PAMCO - SHURA
CONSTRUCTION DATA SHEET
01
Start: 02/2016STATUS
End: Currently being executed
Project photos
Diversion tunnel for reservoirSTRUCTURE
Arica - XV RegiónPROVINCE
ChileCOUNTRY
Valle de LlutaPLACE
Diversion tunnel for reservoir under construction 477 ml, p= -2,5%
· 440 ml Tunnel with general half-point arch section of 8 x 8 m (58 m2).
· 37 ml Gallery for future housing of valves with section of 12 x 12 m (105 m2)
100 mOVERBURDEN
Drilling and blastingMETHODOF TUNNELING
Granites and granodioritesGEOLOGY ANDGEOTECHNICAL DATA
4,522,987 USDBUDGET(EXCLUDING VAT)
HYDRAULIC PROJECTS
Type Project
DIVERSION TUNNEL CHIRONTA RESERVOIR
Owner: Consorcio Dragados-Besalco
CONSTRUCTION DATA SHEET
02
Start: 11/2017STATUS
End: Currently being executed
LOCATIONANDADDITIONALINFORMATION
1 Jumbo L2C 1 Robot PM500 1 Mixer or Huron 1 Manitou 1 20t Truck 1 Front bucket loader CAT 972 1 Backhoe with hammer 1 Drilling rig
TUNNEL EQUIPMENT
· Tunnel with a general half-point arch section of 8x8 m (58 m2) · Gallery for future housing of valves with section of 12x12 m (105 m2)
GEOMETRY
Project photos
Start: 08/2014
End: 05/2017STATUS
Hydraulic tunnel and cavernsSTRUCTURE
OsloPROVINCE
NorwayCOUNTRY
OsloPLACE
The Bekkelaget water treatment plant will increase treatment capacity from 4m3/s to 8m3/s. The works to be carried out will serve to expand the capacity of the current plant from 290,000 to 500,000 population equivalent. The Project represents the largest environmental works currently underway in Norway and will involve underground excavation, by drill and blast, of over 500,000 m3 of rock. It also includes carrying out support/reinforcement and structural work throughout the entire expansion of the plant. Furthermore, demolition and removal of concrete structures and tanks from the existing plant are also included in this contract.
The works will be carried out between 2014 and 2016. As individual projects 5 caverns of between 300 and 425 m2 in cross-section 180 m in length will be built, as well as access and evacuation tunnels, shafts, digesters, and storage and treatment tanks, with a total length of approximately 2 km.
Cross section: Tunnel 90 m2. Caverns 300 – 425 m2
Lenght: 2,000 m tunnel. 5 caverns 180 m eachGEOMETRY
LowOVERBURDEN
NATM. Drill and blast and mechanical excavationMETHODOF TUNNELING
GneissGEOLOGY ANDGEOTECHNICAL DATA
Three-boom jumboShotcrete robotBackhoe loaderTelehandler
TUNNEL EQUIPMENT
446,694,021.27 NOK.BUDGET(EXCLUDING VAT)
Type Project
EXPANSION OF THE BEKKELAGET WATER TREATMENT PLANT
Owner: Oslo Kommune
CONSTRUCTION DATA SHEET HYDRAULIC PROJECTS
03
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS PINOS SEWER
Owner: Ayuntamiento de Madrid
Start: 11/2011
End: 06/2015
Tunnels
Madrid
Spain
Madrid
Work involves construction work to build the Sewer for excess rainfall in the Pinos Subbasin. 2,400 m of excavation will be carried out with an EPB boring machine, with a diameter of 4.80 m. To cover the sewer, 20 cm thick voussoir rings will be used. Each voussoir is made up of 6 parts + the key.
Cross section: 4.7 m of diameter
Length: 2,400 m
Medium
Excavation with an EPB tunnelboring machine of 4.20 interior diameter
Sand and Clay
EPB tunnel boring machine of 4.20 interior diameter
33,720,132 €
Type Project
Project photos
STATUS
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
04
LOCATIONANDADDITIONALINFORMATION
Work involved construction of a hydraulic tunnel to collect and divert/redirect residual and industrial waters.
The tunnel built measured 2,313 m in length and excavation was carried out using a 4.22 m diameter boring machine. The tunnel was covered with reinforced concrete of 0.34 m in thickness.
5 discharge niches needed to be built in the vertical conduits. Said niches were excavated using perfection and blasting. This same system was used to build a 6.1 m gallery for a planned Storm Tank.
HYDRAULIC PROJECTS
Type Project
NERVIÓN–IBAIZABAL INTERCEPTOR. BOLUETA-URBIA SECTION
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Vizcaya
Spain
Basauri, Etxebarri
15,973,850 €
Medium
Marls, marl - limestones, sandstones and lutites
Tunnel boring machine (TBM). Drill and blast
TBM Ø = 4.22 m
03/1999
11/2003
8 m²
2,313 m
Owner: Consorcio de Aguas de Bilbao Bizcaia
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
05
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS
Type Project
AVILÉS ESTUARY GENERAL SEWER
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Asturias
Spain
Avilés
32,979,518 €
20 m
Dry and impermeable clays intercalate with sandstones and massive dolomite and murlstone
Earth Pressure Balance
EPB LOVAT Ø = 3.95 m, blind microtunneling shield
03/1998
09/2003
7 m²
5,317 m
Owner: Conf. Hidrográfica del Norte
BUDGET(EXCLUDING VAT)
The principal difficulty with this work was in executing the sewer with materials stuck in the depths of the tunnel (20 m below sea level).
Of the 6,082 m of sewer, 5,317 m of perforated tunnel was built with EPB of Ø = 3.95 m and the remaining 765 m with pipe jacking, with a micro TBM pushing 1.6 m diameter tubes.
The tunnel built with an EPB was covered with 30 cm thick voussoirs and was waterproofed with cement mortar injections in the voussoir backfill up as far as the excavation line. 6 working shafts were built, 8 waterdistribution wells, 8 spillways and secondary sewers.
CONSTRUCTION DATA SHEET
06
LOCATIONANDADDITIONALINFORMATION
Project photos
Start: 05/2003
End: 06/2003STATUS
TunnelsSTRUCTURE
BurgosPROVINCE
SpainCOUNTRY
TrespadernePLACE
The works involved repairing and supporting a 70 m long collapsed section in a water canal tunnel, with an average cross-section of 40 m2.
Cross section: 40 m²
Lenght: 70 mGEOMETRY
LowOVERBURDEN
NATM. Mechanical excavationMETHODOF TUNNELING
Calcareous limonitesGEOLOGY ANDGEOTECHNICAL DATA
Two-boom jumboShotcrete robotBackhoe loaderTelehandler
TUNNEL EQUIPMENT
1,696,518.12 €BUDGET(EXCLUDING VAT)
HYDRAULIC PROJECTS
Type Project
Owner: Iberdrola
REPAIR OF TUNNEL 3 OF THE CANALOF THE TRESPADERNE HYDRO POWER PLANTCONSTRUCTION DATA SHEET
07
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS
Type Project
ZURGUÉN TUNNEL (RIVER TORMES DEVELOPMENT)
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Salamanca
Spain
Salamanca
1,122,849 €
11 m
Clayly sands and silt with organic matter, coarse - grained clayly sands and uncemented sandstones
Bernold Method, full face. Additional umbrella of micropiles all along the design
Ripper hammer and concrete spraying machine ALIVA - 500
Undergrade crossing railway tunnel betweet Salamanca to Fuentes de Oroño close to Tormes River.
Forehole joint beams is formed by 40 micropiles (TM - 80, Ø = 114 mm, 9 mm thick).
The micropile umbrellas overlap 4 m in middle of excavation.
07/2002
10/2002
57 m²
57 m
Owner: Aguas de Duero S.A.
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
08
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS
Type Project
JACKED PIPELINE FOR ZAMORA TREATMENT PLANT
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Zamora
Spain
Zamora
751,011 €
5 m
Clayly sands with sandy graves and schist
Pipe jacking
Microtunneling Øext = 1,800 mm and head power = 1,200 Tn
Pipeline to Sewage Treatment Plant of Zamora.
338.66 m Pipe Jacking and 1,800 mm of diameter reinforced concrete pipe.
Microtunneling is deviated by competent materials. Vertical shaft is required to retrieve the microtunneling. The work is continuated by cut and cover method.
10/2001
01/2002
2 m²
540 m
Owner: Junta de Castilla y León
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
09
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS
Type Project
BUTARQUE II SEWER
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Cavern Shaft Tunnel
Madrid
Spain
San Martín de la Vega
13,885,161 €
Medium
Evaporite Deposits composed of gypsum and clays belong to Tagus Tertiary Basin
Earth Pressure Balance
Earth Pressure Balance, LOVAT Ønom = 2,664 m
07/1998
02/2001
6 m²
7,303 m
Owner: Ayuntamiento de Madrid
BUDGET(EXCLUDING VAT)
Construction of a 7,567 m long sewer, of which 7,283 correspond to tunnel space and the remainder is open air. Tunnel excavation was carried out with an EPB shield of 2.25 m interior diameter and covering was done with 150 mm thick reinforced concrete voussoirs.
A storm deposit with a 27,000 m³ capacity was also built, along with twelve distribution wells along the entire length of the tunnel. The wells are of different diameters and are used for ventilation, access and galleries on the tunnel’s interior. Additionally, three small caverns were built (15.9 m² section). Mechanical excavation and suppot system: steel ribs, wire mesh and shotcrete.
CONSTRUCTION DATA SHEET
10
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Cavern Shaft Tunnel
Vizcaya
Spain
Bilbao
16,462,916 €
Medium
Marls and limestones
Tunnel Boring Machine. Earth Pressure Balance (EPB). Drill and blast and mechanical excavation. Full section
Circular sewer to sewage wastewaters. 2,473 m tunnel excavation with EPB and 770 m cavern with 14 m² excavated by conventional method.
20 cm thickness steel reinforced concrete segment lining H - 400. Cross tunnel Supporting with shotcrete, bolt, steel ribs and wiremesh.
594 m reinforced concrete pipeline Ø1,500 mm (pipejacking) and 362 m reinforced concrete pipe Ø500 - 1,000 mm.
12/1997
09/2000
9 m²
3,243 m
Type Project
ARENAL–BOLUETA SEWER
Project photos
Owner: Consorcio de Aguas de Bilbao
BUDGET(EXCLUDING VAT)
EPB Ø = 3.8 m. Head power = 570 Kw, drive power max. = 1,200 Tn, cutters 17”
CONSTRUCTION DATA SHEET
11
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS
Type Project
DIVERSION OF RIVER CARDONER
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Barcelona
Spain
Cardona
3,724,163 €
Max. 20 m
Limolites and marl - lutites with sandstones and conglomerates
NATM (Top-Heading and Bench). Drill and blast and mechanical excavation
Jumbo has two booms and service plataform Atlas Copco Boomer. Wet - mix Aliva AL-285 η = 9 - 21 m³/h
Channel tunnel of Cardoner River. 45 m long artificial tunnel located in one of the tunnel portals.
Steel reinforced shotcrete HP - 25 15 cm thickness and 50 Kg/m³, 4 m long bolts Ø = 25 mm, steel ribs THN - 29 and 2 mm thick Bernold plate. Micropile umbrella 15 m long and Ø = 102 mm.
Impermeabilization and drainage: PVC pipes Ø = 20 mm (Ø = 160 mm in cut and cover tunnel) every 20 m, SBS sheet and geotextil sheet of 140 g/m².
09/1999
07/2000
95 m²
244 m
Owner: Generalitat de Catalunya
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
12
LOCATIONANDADDITIONALINFORMATION
Work involved the construction of a 2,684 m long underground channel, excavated using a TBM of a free interior diameter of 2.80 m. The channel was covered using 30 cm thick voussoirs; in areas where land was of poorer quality supports were previously applied in the tunnel, usingshotcrete, 25 mm diameter anchorage bolts and mesh.
HYDRAULIC PROJECTS
Type Project
HERRERA–LOIOLA WASTEWATER TREATMENT PLANT SEWER
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Guipuzcoa
Spain
San Sebastián
3,401,513 €
Medium
Marls, limestones with karst process and altered sandstones
Tunnel boring machine (TBM). Drill and blast
TBM. Wet - mix Meynaider η = 2 m³/h and Aliva AL - 262 η = 7 - 10 m³/h
10/1998
03/2000
9 m²
2,684 m
Owner: Diputación Foral de Guipuzcoa y Mancomunidad de Aguas de Añarbe
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
13
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS
Type Project
ZÚJAR–ORELLANA REVERSIBLE HYDRO TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Badajoz
Spain
Orellana, La Serena
17,566,021 €
Medium
Sandstones and slates
Tunnel boring machine (TBM). Drill and blast
Work involved the execution of a 4,168 m reversible tunnel joining the Orellana and Zújar reservoirs. This tunnel was excavated with a 4.2 m diameter TBM.
The following were also carried out:
Orellana Cavern dimensions: 17 x 8.6 x 14 m Ramp and roadway of 364 m and 44 m long respectivaly. Excavated by explosives.
Acces ramp to the cavern of 470 m long and 5 x 5 m cross section excavated by explosives. 20 cm thick concrete segment lining.
01/1996
12/1999
10 m²
4,168 m
Owner: Confederación Hidrográfica del Guadiana
BUDGET(EXCLUDING VAT)
TBM Mod. Robbins Øexc of 4.2 mMod. Robins 112 - 238. Electric engines.Total Power = 750 Kw, cutter 17”,drive power/cutter = 20 tn. JumboAtlas Copco Boomer. Meyco gM - 090 η = 6 - 7 m³/h andAliva AL - 285 η = 9 - 21 m³/h
CONSTRUCTION DATA SHEET
14
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS
Type Project
SANTA CATALINA–LOIOLA WASTEWATER TREATMENT PLANT SEWER
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Guipuzcoa
Spain
San Sebastián
1,835,447 €
Medium
Limestones and megaturbidites
Drill and blast and mechanical excavation. Full section
Jumbo has two booms Tamrock Minimatic. Wet - mix Meyco GM - 090 η = 6 - 7 m³/h
Sewage sewer. The design was 2.8 m of diameter.
Middle point cross section. The north potal is excavated from reinforced shaft.
Steel reinforced shotcrete, bolts, wire mesh and steel ribs TH - 21.
01/1998
11/1999
9 m²
665 m
Owner: Mancomunidad de Aguas del Añarbe
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
15
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS
Type Project
VILLACARRALÓN AND GUAZA TUNNELS
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Valladolid
Spain
Villacarralón, Guaza de Campós
9,769,420 €
40 m
Hard claystone belongs to miocene that intercalate with satured dense limely sands
Mechanical excavation full section.Covering with free-standing cart.
Ripper hammer ITC112. Wet - mix Robojets Meyco and Putzmeister Wetkret η = 20 m³/h
11/1997
09/1999
20 m²
4,085 m
Owner: Confederación Hidrográfica del Duero
BUDGET(EXCLUDING VAT)
Two hidraulic tunnels, Villacarralón and Guaza with 2,300 m and 1,777 m respectively.
Excavated in clay, sand lens appear saturated in water within the tunnel layout, causing significant building problems. A second, more comprehensivedrilling survey was carried out.
In sands: TH16.5 steel ribs, Bernold plate. 40 kg/m³ steel fibre reinforced shotcrete.
In more unstable areas, covering is carried out straight after excavation.
CONSTRUCTION DATA SHEET
16
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS
Type Project
ZARAUTZ TUNNEL
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Tunnels
Guipuzcoa
Spain
Zarautz
1,847,111 €
Low
Limestones, sandy limestones, marls and sandstones
Drill and blast and mechanical excavation. Full section
Roadheader WESTFALIA WAV. Jumbo has two booms and service plataform Atlas Copco Boomer. Wet - mix Robojet Meyco η = 18 m³/h, Meyco GM - 090 η = 6 - 7 m³/h and Aliva AL - 262 η = 7 - 10 m³/h
Roadway 4 m heigh and 4.8 m width and 1,160 m length. Objective: to channel Irain regatta because of flooding in Zarautz.
Blast vibrations and overpressure monitoring due to closed houses.
1,700 m³ of shotcrete, 3,301 ud. bolts L = 3 m, 2,900 m² of wire mesh, 14,438 Kg of steel ribs THN - 29/HEB - 160 and Bernold plate.
12/1997
07/1999
20 m²
1,200 m
Owner: Gobierno Vasco
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
17
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS
Type Project
UNIVERSITY SIPHON
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Shafts - Tunnel
Vizcaya
Spain
Bilbao
1,150,000 €
Passage under the Estuary of Bilbao
Marls
Mechanical excavation
300 kW Roadheader
Entrance shaft of 28 m depth, first 5 m poligonal dimension of 387 m² and the next 23 m with 90 m² circular cross section.
Exit shaft of 39 m depth, the first 18 m oval dimension of 188 m² and the next metres are 90 m² circular cross section.
The cross tunnel is 5.2 m heigh and 5.7 m width, and 461 m length.
06/1995
04/1996
27 m²
461 m
Owner: Consorcio de Aguas de Bilbao
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
18
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS
Type Project
LLANES WASTEWATER TREATMENT PLANT
Project photos
STATUSStart:
End:
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
Cross section:
Length:
Cavern
Asturias
Spain
Llanes
693,897 €
Low
Dark laminated limestones
Mechanical excavation and drill and blast
Jumbo has two booms and ripper hammer.Dry - mix ALIVA - 260
Cavern to sewage treatment plant with poligonal section and discharge gallery of the Llanes population.
Excavation, support and shotcreting of the cavern belonging to “Estación Depuradora de Agua Residuales de Llanes”.Ground vibration and blast monitoring.
425 m³ shotcrete, 4,011 m rock bolts AEH - 500 and 70.00 Kg steel ribs TH - 21.
06/1993
11/1993
200 m²
200 m
Owner: Principado de Asturias
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
19
LOCATIONANDADDITIONALINFORMATION
HYDRAULIC PROJECTS
Type Project
SAN PEDRO DO SUL HYDRAULIC TUNNEL
Project photos
Start: 09/1992
End: 03/1993
Cross section: 3.5 m diameter, 5.8 km length
Increasing incline of 6%
Loading tunnel
Distrito de Viseu
Portugal
San Pedro do Sul
5,900,000 €
High
High quality granite
Borer TBM
Robbins Open TBM
Driving with large diameter pressure tube.
Carried out with Robbins open TBM of 3.5 m diameter.
A 20 m gallery section was made at the entrance to the tunnel and the remainder with a machine.
Medium profitability of 800 m/month. Work was carried out with EPOS-AST.Co consortium (Specialist Austrian Company in this type of machinery).
Owner: EPOS-AST.Co
STATUS
STRUCTURE
PROVINCE
COUNTRY
PLACE
GEOMETRY
OVERBURDEN
METHODOF TUNNELING
GEOLOGY ANDGEOTECHNICAL DATA
TUNNEL EQUIPMENT
BUDGET(EXCLUDING VAT)
CONSTRUCTION DATA SHEET
20
LOCATIONANDADDITIONALINFORMATION