2. CHAPTER 2 PROJECT DESCRIPTION 2.1 Rationale Energy is the important factor to mobilize economy and to identify competitive potential of the country. At present, Thailand has confronted with energy problem due to insufficiency to support demand of private sector and local people. Energy must be imported from other countries. For example, Thailand needs to import petroleum for700,000 barrels per day or 63 percent of domestic procurement (Ministry of Energy, 2011). Therefore, energy procurement is important to support demand and economic expansion. Salamander Energy (Bualuang) Ltd expected that petroleum production from BLWPA (Bualuang Wellhead Platform A) will be decreased in 2013. According to the 3D seismic survey in 2010 in Block B8/38 of Bualuang Area, the potential of Bualuabg area is still effective for petroleum production. The remaining crude oil is approximately 38 million barrels. In order to keep the production of Bualuang, it is necessary to expand petroleum production by installing one additional wellhead platform and drilling new production wells. It is expected that the petroleum from new production platform can compensate the decreasing amount of petroleum. Moreover, the project will support using of domestic energy, reduce imported oil, maintain petroleum reserve of the country, increase national income by taxes and royalties, and to strengthen national energy security. However, the production rate was limited due to capacity of existing Floating Production Storage and Offloading (FPSO). Therefore, the production rate from 2009 was not changed. There is no additional production process, worker, and equipment on FPSO. 2.2 Background and Law Status of Concession 2.2.1 Background of the Concession Many concessionaires have been occupied the concession Block B8/38 as follows; x 1972: Gulf Oil obtained general concession area x 1973: Sun Oil (Thailand) Ltd. obtained the concession and explored petroleum x 1991: Sun Oil (Thailand) Ltd. obtained the concession Block B7/32 which is the same block of B8/38 In 1996, Soco Exploration (Thailand) Limited (SOCO) was awarded offshore Block B8/38 from the Ministry of Energy on 24th October 2006under the concession agreement number 3/2539/50. The total exploration area was 9,548 km2. According to the concession agreement, duration of petroleum exploration was 6 years or from 24 October 1996 to 23 October 2002. 100 Nanglinchee Road, Chongnonsee Yannawa Bangkok 10120 t (66-2) 678 18 18 f (66-2) 678 06 22 ISET (Thailand) Limited

Upload: others

Post on 05-Apr-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2. CHAPTER 2 PROJECT DESCRIPTION

2. CHAPTER 2

PROJECT DESCRIPTION

2.1 Rationale

Energy is the important factor to mobilize economy and to identify competitive potential of the country. At

present, Thailand has confronted with energy problem due to insufficiency to support demand of private sector and

local people. Energy must be imported from other countries. For example, Thailand needs to import petroleum

for700,000 barrels per day or 63 percent of domestic procurement (Ministry of Energy, 2011). Therefore, energy

procurement is important to support demand and economic expansion.

Salamander Energy (Bualuang) Ltd expected that petroleum production from BLWPA (Bualuang Wellhead

Platform A) will be decreased in 2013. According to the 3D seismic survey in 2010 in Block B8/38 of Bualuang Area,

the potential of Bualuabg area is still effective for petroleum production. The remaining crude oil is approximately 38

million barrels. In order to keep the production of Bualuang, it is necessary to expand petroleum production by

installing one additional wellhead platform and drilling new production wells. It is expected that the petroleum from

new production platform can compensate the decreasing amount of petroleum. Moreover, the project will support

using of domestic energy, reduce imported oil, maintain petroleum reserve of the country, increase national income

by taxes and royalties, and to strengthen national energy security.

However, the production rate was limited due to capacity of existing Floating Production Storage and

Offloading (FPSO). Therefore, the production rate from 2009 was not changed. There is no additional production

process, worker, and equipment on FPSO.

2.2 Background and Law Status of Concession

2.2.1 Background of the Concession

Many concessionaires have been occupied the concession Block B8/38 as follows;

x 1972: Gulf Oil obtained general concession area

x 1973: Sun Oil (Thailand) Ltd. obtained the concession and explored petroleum

x 1991: Sun Oil (Thailand) Ltd. obtained the concession Block B7/32 which is the same block of B8/38

In 1996, Soco Exploration (Thailand) Limited (SOCO) was awarded offshore Block B8/38 from the Ministry

of Energy on 24th October 2006under the concession agreement number 3/2539/50. The total exploration area was

9,548 km2. According to the concession agreement, duration of petroleum exploration was 6 years or from 24

October 1996 to 23 October 2002.

100 Nanglinchee Road, Chongnonsee Yannawa Bangkok 10120 t (66-2) 678 18 18 f (66-2) 678 06 22

ISET (Thailand) Limited

Page 2: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

petroleum

no. 3/253

follows;

another 5

T

that the

followed t

a result,

Productio

contracte

2008, Sa

Productio

agreemen

Limited (

Afterward

T

2009 (Ap

2.2.2

2009, Sa

(no.4) of

90-CHAP_2_in_fn_

In 1999, the

m commerce

39/50 dated

x Soco Exp

x MMC Exp

SOCO was res

In November

50 percent of t

The amendme

concession w

the obligations

According to t

SOCO received

on Area. Tota

ed GFI Oil & G

alamander Ene

on Area).

On 27 July 2

nt number 3/2

(Salamander).

d, the rights a

x Salamand

x SOCO Ex

The detail is s

ppendix1-1).

Background

Petroleum ex

alamander too

concession no

_eng (24-10-12

e Ministry of

in Bloc B/3

8 June 1999.

ploration (Thai

ploration and P

sponsible for w

2000, SOCO re

the concession

ent (no. 3) of

was extended

s of concession

the seismic sur

d the permiss

l Bualuang ar

as Thailand In

ergy (Bualuan

2009, Soco E

2539/50revise

Salamander

and obligations

der Energy (B

xploration (Tha

shown in add

d of the Con

xploration and

ok over petrol

o. 3/2539/50.

)

Industry allo

38 in accorda

The rights a

land) Limited

Production(Th

working manag

eturned 50 pe

n to DMF.

petroleum con

for 3 years fr

n period 3 in te

rvey and explo

ion from DMF

rea is 376.56

nc (GFI) in 31

g) Limited bo

Exploration (T

ed by amendm

holds 60 perc

s of concessio

ualuang) Limit

ailand) Limited

itional conces

ncession

production in

eum producti

2-2

owed MMC Ex

ance of ame

and obligation

50 percent

ailand)50 perc

gement and co

ercent of the co

ncession no.3/

rom 23 Octob

erms of work

oration drilling,

F in March 200

6 km2 which

March 2006 t

ought all GFI

Thailand) Limi

ment petroleum

cent of the co

naire were div

ted 60 percen

d 40 percent

ssion agreeme

n Block has s

ion from SOC

Offshore Pet

xploration and

ended conces

ns of concessi

cent

ontrol.

oncession to D

2539/50dated

ber 2002 to 2

and budget.

, Bualuang is p

06 to produce

is equivalent

to operate tech

stocks and st

ited transferre

m concession (

oncession and

vided as follow

nt

ent (no.4) of c

started since

CO and followe

troleum Production

Salam

d Production

ssion agreeme

onaires were

DMF and in Oc

17 July 2003,

23 October 20

potential to de

petroleum in

to current ar

hnical and oth

tart operating

ed rights and

(no.3) to Sala

d being the o

ws;

concession no

1972 by man

ed the amend

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

(Thailand) L

ent (no.2) o

divided by p

ctober 2002, S

, dated17July2

005.The conce

evelop a produ

Block B8/38 o

rea of Block

her tasks for S

in Block B8/

d obligation o

mander Energ

operator in thi

o. 3/2539/50 d

ny concession

ded concessio

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

imited joined

of concession

percentage as

OCO returned

2003 identifies

essionaire has

uction area. As

or in Bualuang

B8/38. SOCO

OCO. In May

/38 (Bualuang

of concession

gy (Bualuang)

s concession.

dated 27 July

aires. In July

on agreement

t

d

d

n

s

s

s

s

O

y

y

y

t

Page 3: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.2.2.1

seismic d

shallow d

data was

seismic s

that deve

the total

deep data

lines and

km2) wh

petroleum

2.2.2.2

During19

before S

productio

2.2.2.3

There is

produced

barrels pe

90-CHAP_2_in_fn_

Seismic Surv

Petroleum sei

1) In 1992,

data was fair

data level.

2) In 1998 a

s quite good bu

3) In Febru

urvey for 1,00

4) In May 2

eloped in 2002

5) During M

seismic surve

a was not clea

6) In Januar

the length w

ich covers al

m trap in many

Exploration

The petroleum

972 – 2009, t

SOCO obtaine

on wells, and 2

Petroleum P

Petroleum pro

one wellhead

d for 12,060 b

er day.

_eng (24-10-12

vey

ismic survey in

Sun Oil (Tha

but some in

and 1999,SOC

ut there was s

uary 2002, SO

00 km. M.V. P

2002, SOCO re

2 in order to im

May – June 20

ey length was

ar because the

ry – February

as 31 kilomete

l Block B8/38

y locations.

Well/ Produ

m exploration

otal 18 explo

ed the conces

2 water injecti

Production

oduction in Bu

d platform, na

barrels per da

)

n Block B8/38

ailand) Ltd. c

nformation wa

CO used Sun O

some ringing d

OCO contracte

Polar Dukewas

e-interpreted t

mprove the qu

007, SOCO con

820 kilomete

e receptor rec

2010, SOCO c

ers per one se

8. The data w

uction Well D

drilling in this

ration wells/p

ssion. After o

ion wells as sh

ualuang Produ

amely “BLWPA

ay. At present

2-3

has started s

conducted 2D

as omitted. R

Oil’s 2D seismi

data in shallow

ed Multi Geo

s the survey v

the survey da

uality of data.

nducted 2D se

ers. Data inter

ceived only sho

conducted 3D

eismic line. Th

was interprete

Drilling

s area has be

production we

obtaining the

hown in Table

uction Area of

A”. The produ

t (13 July201

Offshore Pet

ince 1992 as f

seismic surve

Ringing data p

ic survey data

w area, especi

ophysical Com

essel.

ata of 1992 (2

eismic survey

rpretation was

ort wave and s

seismic surve

he total survey

ed in the end

een started be

ells were drille

e concession,

e 2.2-1.

f Block B8/38

uction process

12), crude oil

troleum Production

Salam

follows;

ey for 5,290

problem was

to re-analyze

ially along the

mpany (MGC)

80 kilometers

again. There

s finished in S

source of soun

ey in Block B8/

y is 1,550 kilo

d of 2011 an

efore identifyin

ed. Three exp

SOCO drilled

has been star

s is on FPSO.

production ra

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

kilometers. T

occurred esp

e. The result f

e fault.

to conduct a

s) by interpret

were 48 seis

September 20

nd wave was

/38. There we

ometers (appro

nd found the

ng concession

ploration wells

d 5 explorati

rted since 27

. Previously, c

ate is approxi

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

The quality of

ecially at the

ound that the

additional 2D

tation process

smic lines and

07. However,

small.

ere 50 seismic

oximately 384

possibility of

Block B8/38.

s were drilled

on wells, 10

August 2008.

crude oil was

imately 7,207

t

d

d

n

f

e

c

4

f

s

Page 4: 2. CHAPTER 2 PROJECT DESCRIPTION

D

T

O

5

3

2

1

2

1

2

1

1

D2011-00590-CHAP_2_in_

Table 2.2-1 Ex

Duration

October 2515 7-1

May1993 B7

0 June1993 B7

8 July1997 B8(Po

3 August 1997 B8

3 August1997 B8

7 February2000 B8

5 February2000 B8

4 February2008 BA

5 February2008 BA

_fn_eng (24-10-12)

xploration Well/ P

Well Lat103/1x N

7/32-1 10° 56'

7/32-2 10° 31'

8/38-1 ornsiri-1)

10° 31'

8/38-2 10° 38'

8/38-3 10° 30' 5

8/38-4 10° 40'

8/38-5 10° 40'

A-01 10° 30'

A-05 10° 30'

Production Well D

Coordinaitude Lo

N/A

41.30" N 100° 3

38.73" N 100° 1

36.74" N 100° 1

15.116" N 100° 1

56.2814" N 100° 1

55.276" N 100° 3

55.276" N 100° 3

42.700" N 100° 1

42.644" N 100° 1

Drilling in Block B

ate ngitude DatuN/A N/A

30' 45.31" E N/A

17' 09.49" E N/A

16' 44.56" E India197

16' 09.408" E India197

17' 0.1177" E India197

39' 49.529" E India197

31' 18.167" E India197

17' 12.080" E WGS198

17' 12.056" E WGS198

2-4

B8/38

Type of Wellum A exploration

well A exploration

well A exploration

well

an 5

exploration well

an 5

exploration well

an 5

exploration well

an 5

exploration well

an 5

exploration well

S 4

production well

S 4

production well

Depth (foot) Conce

8,660 G

7,770 Su

7,210 Su

5,970 S

4,500 S

4,200 S

4,199 S

4,602 S

6,706 S

4,549 S

Offshore Petr

essionaire Rock

ulf Oil Ra

un Oil Ra

un Oil Ra

SOCO Ra

SOCO Sa

SOCO Sa

SOCO Miocen

SOCO Ratb

SOCO Sand

SOCO Sand

Environ

troleum Production in Bloc

Salamander

Ch

k Formation

tburiGroup PetrWel

tburiGroup PetrWel

tburiGroup Petrthe comTheabawell

tburiGroup Petrthe comTheabawell

ndstones - Miocene

PetrWel

ndstones - Miocene

Petrthe comTheabawell

ne –T-3 PetrWel

buri Group –Permian

PetrWel

dstones - T2 Petrthe to pprodon.

dstones - T4 Petrthe to pprodon.

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

Status

roleum was not founl was abandoned. roleum was not founl was abandoned. roleum was found but amount was not

mmercially produced. well as shut down anndoned (Suspended o)

roleum was found but amount was not

mmercially produced. well as shut down anndoned (Suspended o)

roleum was not founl was abandoned. roleum was found but amount was not

mmercially produced. well as shut down anndoned (Suspended o)

roleum was not founl was abandoned. roleum was not found.l was abandoned. roleum was found andamount is commercia

produce. Currently, duction process is goin

roleum was found andamount is commercia

produce. Currently, duction process is goin

ent

and

ited

tion

nd.

nd.

nd oil

nd oil

nd.

nd oil

nd.

.

d l

ng

d l

ng

Page 5: 2. CHAPTER 2 PROJECT DESCRIPTION

D

T

1

1

1

S

D2011-00590-CHAP_2_in_

Table 2.2-1 (cont’

Duration

6 February2008 BA

9 March2008 BA

5 February2008 BA

Source: Salamander (

_fn_eng (24-10-12)

’d)

Well LatA-02 10° 30'

A-03 10 ° 30'

A-05 10° 30'

2011)

Coordinaitude Lo42.700” N 100° 1

42.605” N 100° 1

42.644" N 100° 1

ateongitude Datu17' 12.073" E WGS

1984

17' 11.995" E WGS1984

17' 12.056" E WGS1984

2-5

Type of Well mS 4

production well

S 4

production well

S 4

production well

Depth (foot) Conce

8,036 S

5,186 S

4,549 S

Offshore Petr

essionaire Rock

SOCO Ratb

SOCO Sand

SOCO Sand

Environ

troleum Production in Bloc

Salamander

Ch

k Formation

buri Group –Permian

Petrthe to pprodon.

dstones - T3 Petrthe to pprodon.

dstones - T4 Petrthe to pprodon.

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

Status

roleum was found andamount is commercia

produce. Currently, duction process is goin roleum was found andamount is commercia

produce. Currently, duction process is goin roleum was found andamount is commercia

produce. Currently, duction process is goin

ent

and

ited

tion

d al

ng

d al

ng

d al

ng

Page 6: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.2.2.4

The EIA

Ministry o

to the DM

for petrol

Bualuang

wells. Th

B8/38. Th

August 2

exploratio

Table 2.

Year

2007

2007

2009

2010

2011

2011

2.3

and Offlo

Salamand

decrease

the small

petroleum

meters. I

Platform

to respon

project as

90-CHAP_2_in_fn_

Report for P

Exploration

Petroleum ex

report was no

of Science Tec

MF in 1996, EI

leum producti

g Area since A

e supplement

he seismic su

2009. After 3D

on drilling in 2

2-2 EIA

EIA of BlockSurvey EIA of BlockProduction SupplementPetroleum PEIA of BlockSurvey in BEIA of BlockExploration SupplementPetroleum E

Objective

Currently, Blo

oading Vessel

der has drilled

d and the seis

l basin in the

m reserve in t

It is expected

Therefore, Sa

Bravo (BLWP

nse the govern

Subsurface ta

s well as two

_eng (24-10-12

Petroleum Ex

and Product

xploration and

ot conducted i

chnology and

IA reports of B

on in Block B3

August 2008. A

t report was a

rvey was finis

D seismic sur

2011 to drill 10

report for P

EIA Repo

k B8/38 Offshor

k B8/38 Offshorin Bualuang Aret of Block B8/38Production in Buk B8/38 Offshorualuang Area k B8/38 OffshorDrilling

t report of BloExploration Drill

e and Tar

ock B8/38 inc

(FPSO) name

d 10 productio

smic survey in

West. The b

the middle of

that volume o

alamander Ene

B)” and to dri

nment policy i

arget map of

injection wells

)

xploration an

tion in Block

development

n the beginnin

Environment

Block B8/38 ha

3/38 in 17 Oct

After that, SO

pproved on 6

shed in the firs

rvey in 2010,

0 wells (curren

etroleum Ex

ort

re 2D Seismic

re Petroleum ea 8 Offshore ualuang Area re 3D Seismic

re Petroleum

ck B8/38 Offshing

rget of th

ludes BLWPA

ely Rubicon Va

on wells and 2

n 2010 found

lock is separa

f basin from T

of petroleum w

ergy plans to i

ill additional 1

n strengthenin

16 productio

s (BA-07i and

2-6

nd Productio

k B8/38 (Bua

t in Block B8/

ng because th

no.3, dated 2

as been condu

tober 2007, S

OCO submitted

February 200

st quarter of

SOCO subm

ntly drilling at

xploration an

C

SOCOEx

SOCOEx

SOCOEx

SOCOEx

SalamanLimited

hore SalamanLimited

he Projec

(Bualuang W

antage, one p

2 water inject

the petroleum

ated by a hill.

Tertiary perio

will be approxi

install one add

16 production

ng domestic e

on wells for t

BA-10iST1) ar

Offshore Pet

on in Block B

aluang Produ

/38 has starte

he project has

2 January 199

ucted since 20

OCO installed

d supplement

09. Then, SOC

2010. The EIA

itted EIA repo

present) as s

nd Productio

Concessionair

ploration (Thaila

ploration (Thaila

ploration (Thaila

ploration (Thaila

nder Energy (Bu

nder Energy (B

t

Wellhead Platfo

roduct pipelin

ion wells. How

m reserve in B

There is a fa

d. The depth

mately 11 mil

ditional wellhe

wells to main

energy security

his project an

re shown in F

troleum Production

Salam

8/38 EIA re

uction Area)

ed since 1972

s been started

96”. After SOC

007. After ONE

one productio

report to incr

CO conducted

A of seismic s

ort for Block

hown in Table

n in Block B8

e

and) Ltd. InteMan

and) Ltd. InteMan

and) Ltd. InteMan

and) Ltd. InteMan

aluang) InteMan

Bualuang) InteMan

orm Alpha), F

e and one aff

wever, the pro

Bualuang Area

ault in the We

of petroleum

lion barrels (e

ead platform n

ntain petroleum

y.

nd 10 produc

igure 2.3-1.

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

port for Petr

2 by many con

d before “the N

CO obtained th

EP approved t

on well and p

rease addition

3D seismic su

survey was ap

B8/38 offsho

e 2.2-2.

8/38

Consul

ernational Envirnagement Ltd. ernational Envirnagement Ltd. ernational Envirnagement Ltd. ernational Envirnagement Ltd. ernational Envirnagement Ltd. ernational Envirnagement Ltd.

Floating Produ

fluent pipeline

oduction capa

a. Block B8/38

est of basin. T

m reserve is 1

equivalent to o

namely “Bualu

m production

ction wells for

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

roleum

ncessionaires.

Notification of

he concession

the EIA report

roduced oil in

nal production

urvey in Block

pproved on 21

ore petroleum

tant

ronmental (IEM) ronmental (IEM) ronmental (IEM) ronmental (IEM) ronmental (IEM) ronmental (IEM)

ction Storage

e. Previously,

city has been

8 is located at

Thus, there is

1,100 – 1,130

oil).

ang Wellhead

potential and

r the existing

t

d

d

n

f

t

k

t

s

Page 7: 2. CHAPTER 2 PROJECT DESCRIPTION

DD2011-00590

Sou

Figure 2

0-CHAP_2_in_

rce: Salam

2.3-1

Symbol BLWPA BLWPB EPSO Location o Location o of existing Injection w

_fn_eng (24

mander (201

Location

of production weof production ang project well

4-10-12)

12)

n of Subsu

ells nd injection wells

urface Ta

s

arget of 116 produuction weells and 2

2-7

2 water innjection wwells (BAA-7i and

Offshore

BA-10iST

e Petroleum P

T)

En

Production in

Salama

nvironmental

n Block B8/38

ander Energy

Chapter 2

l Impact Asse

8 in Gulf of T

y (Bualuang)

2 Project Desc

essment

Thailand

Limited

scription

Page 8: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.4

2.4.1

promotes

royalties

years Pet

procured

were ass

mitigation

health an

platform

cutting m

2.4.1.1

consideri

previous

the reser

pipeline o

of wellhe

around th

2.4.1.2

casing se

criteria is

pressure

character

pressure.

Small size

alternativ

events.

90-CHAP_2_in_fn_

Project A

With Projec

Petroleum pro

s energy secu

as well as em

troleum Devel

from domesti

Impacts to se

sessed in ter

n and monito

nd safety polic

The alternativ

location, (2)

management. T

Alternative o

The location

ng 3D seismic

projects in Bu

According to

rve structure

or new produc

ead platform

he project are

Alternative o

Well design is

eat must cove

s considered b

and preventio

ristics such as

. The enginee

Size of hole

e is more eco

ve for conside

_eng (24-10-12

Alternativ

ct Case

oduction proje

rity of the cou

mployment whi

opment Plan

ic sources (DM

ea water qua

ms of effects

oring measure

cy is also propo

ves of these

Alternative of

The result of a

of BLWPB Lo

of BLPWB is

c survey resu

ualuang Area.

the geologica

is small, the

ction process.

is appropriate

a. Therefore,

of Productio

s depended o

er high porosit

by risk of drill

on of shallow

s formation p

r will design c

(Slim Hole or

nomical. How

eration to sel

)

ve

ect supports d

untry. The pro

ich are benefit

of DMF. Accor

MF, 2011).

lity, sea botto

s to environm

s are address

osed to mitiga

following pro

f production w

alternative sele

ocation

50 meters ea

lt in 2010 as

l data (Sectio

equipment ca

Moreover, the

e and safe. T

the location is

on Well Desig

on the specific

ty of rock form

pipe blockage

rock formatio

pressure and

asing seat bas

r Conventiona

wever, the drill

ected the ap

2-8

domestic ener

oject will also

t to national e

rding to this p

om sediment,

ment, social,

sed (see Cha

ate potential im

ocedures are

well design, (

ection is desc

ast to the exi

well as petro

on 3.3), the

an be connect

e sea floor an

The previous

s proper for pl

gn

c geological c

mation. Otherw

e which cause

on are conside

direction clea

sed on the ass

l Hole) is con

ing tools are

ppropriate opt

Offshore Pet

rgy use, reduc

increase the

economy. In a

plan, 246,000

marine orga

and health.

pter 5 and C

mpacts.

considered an

(3) Alternative

ribed as follow

isting wellhea

oleum drilling,

petroleum res

ted to existin

nd shallow gas

operations fo

latform installa

condition of th

wise, loads of

ed by decreasi

ered when sele

avage are ne

sumption befo

nsidered by b

other factors

tion for budge

troleum Production

Salam

ces amount o

national incom

additions, the

barrels/day of

nism fishery,

The environm

Chapter 6 of

nd selected (

e of drilling flu

ws;

d platform. T

seafloor and

serve is comm

g production

s survey in the

und that ther

ation.

he area. In so

f drilling mud

ing of well pre

ecting location

eded to know

ore drilling.

udget and re

of size selecti

et, readiness

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

of imported pe

me by collect

project is con

f crude oil in 2

and marine t

mental, social

f this report).

(1) Alternative

uid, and (4) A

This location i

shallow gas

mercially valua

process witho

e past showed

re is no sens

ome cases, th

will be lost.

essure. For de

n of casing se

w in order to

eadiness of th

on. Deviated

of tools, and

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

etroleum, and

ing taxes and

sistent with 5

2014 must be

transportation

l, and health

Occupational

e of wellhead

Alternative of

s selected by

survey of the

able. Although

out additional

d that location

sitive receptor

he location of

Site selection

eep hole, well

at. Geological

o control well

e equipment.

drilling is one

d unexpected

t

d

d

n

e

f

y

e

r

f

e

Page 9: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.4.1.3

types of d

type of m

usually lo

drilling flu

and WBM

Although

such as r

the time.

mudstone

economic

because

while SBM

reduce cu

2.4.1.4

Cuttings

lower sec

for dispo

cutting d

2.4.2

insufficien

1,000,000

from othe

no projec

as;

energy su

90-CHAP_2_in_fn_

Alternative o

Drilling fluid t

drilling mud su

mud has differe

Sea water an

ost in the up

uid is selected

M will be used

WBM is envir

reaction with

Therefore, ot

High technolo

e and drilling

cal. Moreover,

it will plug in t

Therefore, se

M will be used

uttings, to sav

Alternative o

Method of cu

from upper d

ction will be s

osal by the co

isposal of the

Without Pro

Demand of o

nt (Figure 2

0 barrels per

er countries. T

ct, Thailand m

1) If there is

uch as water e

2) Taxes, roya

_eng (24-10-12

of Drilling Fl

that normally

uch as Water

ent characteri

d water based

per drilling se

d. To minimize

for medium s

ronmentally fr

mud and salt

ther drilling flu

ogy is neede

fluid which m

, drilling mud

the space of f

eawater will be

d for lower dr

ve cost, and to

of Cutting D

utting disposal

drilling section

separated to s

ontractor who

project is env

oject Case

oil consumptio

2.4-1). The

day which is

The value of

must import oi

s no productio

energy and co

alties, and inc

)

luid

used in Gulf

Based Mud (W

stic.

d mud (WBM)

ection becaus

e the impacts t

section. Howe

riendly, the eff

y layer. In ad

uid is need for

ed to apply i

ay cause obst

d must be use

formation. In a

e used for up

rilling section

o minimize env

isposal

is considered

(sea water)

separate mud

obtained lice

vironmentally f

on in Thailan

capacity of

counted only

petroleum imp

il from other c

on in Bualuang

oal may be use

come from pet

2-9

of Thailand i

WBM), Oil Bas

) will be used

se the hole is

to the environ

ever, drilling w

ffectiveness of

dditions, WBM

r lower section

in lower drilli

truction of dri

ed for drilling

additions, SBM

pper drilling se

in order to p

vironmental im

d by technica

will be directl

from cutting.

ense from Dep

friendly and p

nd has been

domestic cru

21 percent of

port is 7.5 hu

countries. In

g Area, oil mu

ed.

troleum selling

Offshore Pet

ncludes sea w

ed Mud (OBM

as drilling flu

s wide and fo

nment, sea wa

with sea water

f drilling is low

lifetime is lim

n drilling.

ing section to

ll pipe. SBM

g of hydrocar

M can be reuse

ection. WBM

revent technic

mpacts.

l and practica

ly discharged

Then, cutting

partment of In

ractical.

steadily incre

de oil and c

f country dem

undred thousa

additions, it m

ust be importe

g will not be re

troleum Production

Salam

water and dril

), and Synthe

uid in the upp

ormation is so

ater will be use

r will generate

w and may gen

mited and the

o control the

is widely acce

bon formation

ed after separ

will be used f

cal error, to s

al possibility a

into the sea.

gs will be colle

ndustry. Mud

ased while d

ondensate pr

mand. The rem

nd million Bah

may cause los

d from other c

eceived.

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

lling mud. The

etic Based Mud

per section. D

oft. Therefore

ed for upper s

e great amoun

nerate difficul

quality will b

e reaction be

epted that it is

n. Barite mus

rating from cut

for medium d

shorten drilling

and environme

Cutting from

ected in a big

will be reuse

domestic prod

roduction is a

maining has to

ht (DMF, 201

ss of country’s

countries. Oth

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

ere are many

d (SBM). Each

Drilling fluid is

e, inexpensive

section drilling

nt of cuttings.

ties in drilling

be reduced by

etween shale/

s efficient and

st be avoided

ttings.

drilling section

g duration, to

ental impacts.

medium and

g bag pending

ed. Therefore,

duction is still

approximately

o be imported

1). If there is

s benefit such

her sources of

t

d

d

n

y

s

e

y

/

o

y

s

f

Page 10: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Sour

Figure 2

million ba

productio

North of

assessme

might be

Tota

l Oil

Dem

and

and

Cru

de O

il

90-CHAP_2_in_fn_

rce:adapted fro

2.4-1 Tota

BLWPB drillin

arrels can be

on wells at cur

The other alte

East Bualuan

ent of East Bu

completed at

Therefore, ha

0

200

400

600

800

1000

1200Pr

oduc

tion

(Tho

usan

d B

arre

ls p

er D

ay)

_eng (24-10-12

m energy statis

al Oil Deman

g will produce

produced unt

rrent wellhead

ernative is dev

g. This altern

ualuang must

t the same tim

aving project is

2000 2001

)

stic 2010 (Office

nd and Crude

e oil for more

til end of con

d platform (BLW

viation of drilli

ative is not ec

be conducted

me of end of co

s better and m

2002 2003

2-10

e of Energy Polic

e Oil Product

e than 16,000

ncession in 20

WPA).

ing direction f

conomical bec

d. The product

oncession in 2

more appropria

2004 2005

Year

Offshore Pet

cy and Planning

tion of Thaila

0 barrels per d

020 when com

from existing B

cause it consu

tion of other r

2020.

ate alternative

5 2006 2007

troleum Production

Salam

, Ministry of Ind

and (2000– 2

day (Figure 2

mparing to the

BLWPA to drill

umes long tim

resources is st

e than no proje

7 2008 200

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

dsutry2011)

2010)

2.4-2). Addit

e production o

l 16 productio

me to operate

till in the surv

ect.

09 2010

ProducDeman

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

ional 30 – 40

of 10 existing

on wells in the

and potential

vey stage and

ctionnd

t

d

d

n

e

Page 11: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.5

2.5.1

(50 mete

Paknam

BLWPB a

West to

approxim

District, C

2.5.2

Bualuang

archeolog

described

Figur

Sour

90-CHAP_2_in_fn_

Project L

Project Loca

BLWPB is loca

ers long) conn

sub-district, M

nd Koh Tao, S

Sattahip Dis

mately 55 mete

The shorebas

Chonburi Prov

Land Inspe

The location

g Production

gical, military,

The details of

d in Chapter

re 2.4-2 C

rce:Salamande

_eng (24-10-12

Location a

ation

ated in Block

necting BLWPB

Muang District

Suratthani Pro

strict, Chonbu

ers.

se is located in

ince. The sho

ction and Pe

of BLWPB is

Area is not

and underwa

f sensitive eco

3 of this repo

Crude Oil Pro

r (2011)

)

and Land

B8/38 of Bual

B to the curre

t, Chumphon

ovince is 65 kil

uri Province (

n Sattahip Com

re base is curr

ermission

50 meters ea

in the Marin

ater pipeline.

ology, protecte

rt.

oduction Plan

2-11

d Inspect

luang Area in

nt wellhead p

is 110 kilome

ometers in th

(Figure2.5-1

mmercial Port

rently used to

ast to the exis

ne National P

ed area, unde

n of Wellhea

Offshore Pet

ion/ Land

the middle of

platform (BLW

eters in the E

e North East d

1). The depth

(Chuksamed

support comp

sting wellhead

Park, protecte

erwater archeo

ad Platform o

troleum Production

Salam

d Use Per

f Gulf of Thaila

PA). The dist

East direction

direction. BLW

h of seawate

Port) in Pluta

pany activities

d platform in

ed area, sea

ology, underw

of the Projec

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

rmit

and. There wi

tance betwee

and the dista

WPB is 242 kilo

er in the pro

aluang sub-dis

s.

Bualuang Pro

grass, coral

water pipeline

ct

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

ill be a bridge

n BLWPB and

ance between

ometers South

oject area is

strict, Sattahip

oduction Area.

, underwater

and cable are

t

d

d

n

e

s

p

r

e

Page 12: 2. CHAPTER 2 PROJECT DESCRIPTION

D

T

W

B

B

P

F

B

R

R

R

R

R

S

D2011-00590-CHAP_2_in_

Table 2.5-1 Co

Location

Wellhead Platform

BLWPB

BLWPA

Production and Stor

PSO

Boundary of Bualuan

Reference LocationA

Reference LocationB

Reference LocationC

Reference LocationD

Remark:Location of F

Source:Salamander (2

_fn_eng (24-10-12)

oordinate of Well

Latitude

10o30'42.67''

10o30'42.69'' rage Ship

10o30'58.57'' ng Production Area

10° 26' 7.56"

10° 40' 7.50"

10° 40' 7.54"

10° 26' 7.57"

PSO is referred to the

2011)

head Platform an

Coordinate (

GPS

Longitude

100o17'14.38

100o17'12.04

100o17'28.10in BlockB8/38

100° 13' 48.3

100° 13' 48.3

100° 21' 48.3

100° 21' 48.3

position that the ship

nd Bualuang Prod

(Datum : WGS84)

North

8'' 1162294.3

4'' 1162294.8

0'' 1162784.8

3" 1153818

5" 1179621

0" 1179683

2" 1153878

p is tied because the s

2-12

uction Area

UTM

East

9 640870.11

6 640799.05

3 641285.33

634639

634538

649122

649235

hip can move around

Latitude

10o30'35.80''

10o30'35.81''

10o30'51.69''

10° 26' 0.68"

10° 40' 0.69" N

10° 40' 0.71"

10° 26' 0.68"

depending on wind an

Offshore Petr

Coordinate(Da

GPS

Longitud

100o17'25.9

100o17'23.5

100o17'39.6

100° 13' 59

N 100° 13' 59

100° 21' 59

100° 21' 59

nd tide.

Environ

troleum Production in Bloc

Salamander

Ch

atum : Indian 1975)

de N

94'' 1161993

56'' 1161993

63'' 1162483

.87" 1153608

.90" 1179412

.91" 1179474

.92" 1153668

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

)

UTM

E

.24 641203.50

.11 641131.14

.07 641617.42

.03 634990.64

.98 634889.83

.86 649475.61

.02 649588.64

ent

and

ited

tion

0

4

4

4

Page 13: 2. CHAPTER 2 PROJECT DESCRIPTION

D

D2011-00590-CHAP_2_in_

Figure 2.5-1

_fn_eng (24-10-12)

BLWPB Location

Ch

n in BlockB8/38

110 km

65

Ko

humphon

242 km

5 km

oh Tao

Koh Pa Nyan

2-13

Gulf of TThailand

Offshore

Lege

En

e Petroleum Production in

Salama

Ch

BLWPA

BLWPB

FPSO

Block B8/38 Shore base

nd

nvironmental Impact Asse

n Block B8/38 in Gulf of T

ander Energy (Bualuang)

hapter 2 Project Descripti

essment

Thailand

Limited

tion

Page 14: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.6

productio

wells will

inches) a

transmitt

transport

maximum

petroleum

BLWPB a

2.6.1

2.6.1.1

approxim

petroleum

drill all 1

sufficient

90-CHAP_2_in_fn_

Overview

The project a

on. The major

1) Offshore

x One

2) Currently

x BLW

x FPSO

x The

Satta

BLWPB and B

be drilled and

along the brid

ted to 3 Phase

tation. The ma

The productio

m petroleum p

m production

nd FPSO.

The detail of e

Wellhead P

Details of W

BLWPB has

mately 25 mete

m from 16 pro

16 wells. All

t for affluent w

_eng (24-10-12

w and Com

activities includ

compositions

new installati

wellhead plat

y installed com

WPA which is cu

O (Floating Pro

shorebase: lo

ahip District, C

BLWPA will be

d petroleum w

dge which is

e Production

ajor compositio

on rate is dep

production (20

rate was app

each composit

Platform

Wellhead Plat

4 legs. The

ers above sea

oduction wells

new 16 wells

water manage

)

mposition

de installation

of constructio

on:

tform (BLWPB)

mposition: whic

urrently opera

oduction Stora

ocated in Satta

Chonburi Prov

e connected b

will be produce

connected to

Separator). T

ons are shown

pended on ex

,400 barrels/

proved in 2009

tion is describ

tform

width X leng

a level) as sho

in the same t

s will be used

ment from exi

2-14

n of the P

n of one wellh

on are as follo

) with 50 met

ch will be used

ated in Bualua

age and Offloa

tahip Commer

ince

by 50 meters

ed. Liquid fro

offshore pip

The separated

n in Figure 2

xiting FPSO c

day) will not b

9. There is no

bed as follows;

gth is 17 m

own in Figur

time. The well

d for product

isting product

Offshore Pet

Project

head platform,

ows;

ers long bridg

d in BLWPB pr

ng Area

ading) which i

cial Port (Chu

long bridge.

m drilling will

eline system

petroleum w

.6-1.

apacity in Bu

be changed fr

o additional in

;

X 31 m. It

re 2.6-2. Tota

head platform

tion well beca

ion wells and

troleum Production

Salam

, production w

e connecting

roject includes

s currently op

uksamed Port)

After BLWPB

be transferred

of BLWPA. A

ill be stored o

aluang Produ

om the existin

nstallation and

is approxima

al 16 well slot

m can support j

ause the exist

new productio

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

well drilling, a

BLWPA

s

perated in Bua

) in Plutaluang

installation, 2

d to petroleum

After that, all

on FPSO pend

uction Area. T

ng situation. T

d no additiona

ately 70 met

ts are designe

jack-up rig wh

sting productio

on wells.

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

nd petroleum

luang Area

g sub-district,

26 production

m pipeline (10

liquid will be

ding for truck

Therefore, the

This maximum

al workers on

ters high (or

ed to support

hich is able to

on process is

t

d

d

n

e

k

e

r

t

o

s

Page 15: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Figure

Figur

Sour

90-CHAP_2_in_fn_

Source: Salam

2.6-1 Co

re 2.6-2 W

rce: Salamande

_eng (24-10-12

mander (2011)

mposition of

Wellhead Pla

r (2011)

)

f the Project

atform Comp

2-15

t

position Mod

Offshore Pet

el

troleum Production

Salam

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

To

Ja

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

opside

acket

t

d

d

n

Page 16: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

worker a

able to m

platform

Appendi

piles in o

and tools

2.6.1.2

90-CHAP_2_in_fn_

BLWPB works

nd no produc

maintain at inst

can be remov

The structure

ix 2-1).

1) Wellhead

rder to be abl

2) Topside i

s. The topside

x Uppe

x Mezz

tank

x Cella

x Sub

Equipment a

The following

x Productio

x Electrical

x Electrical

x Active Ha

x Wellhead

x Well Test

x Multiphas

x Controls

x Power Ge

x Chemical

x Seawater

x Diesel Sy

_eng (24-10-12

s by remote

ction on the pl

tallation place

ved and reused

e of wellhead

d platform jack

e to support w

is installed ab

is divided into

er Deck is use

zanine Deck is

k.

ar Deck is used

Cellar Deck is

and Tools on

equipment w

on Manifolds

Submersible

Switchgear

armonic Filters

d Controls

t Facilities

se Flow Meter

and Shutdown

eneration

Injection Fac

r Lift Pump

ystem

)

control from

latform. Only

e as much as p

d in other prod

platform is

ket has 4 legs

weight of struc

bove the sea a

o 4 floors as fo

ed for lifting cr

s used for sto

d for storage o

used for stora

n Wellhead P

will be installed

Pump (ESP)

s

(MPFM)

n System

cilities

2-16

FPSO which

necessary eq

possible. Life t

duction area.

divided into

s and truss st

cture and all e

at the top of j

ollows;

rane installatio

orage of electr

of diesel oil, p

age of drain s

Platform

d on the wellhe

Offshore Pet

is currently o

uipment is on

time of BLWPB

2 parts (see

tructure. Thes

equipment on

jacket. It is u

on and equipm

ric generators

petroleum pum

system (close

ead platform;

troleum Production

Salam

operated in Bu

n the platform

B is not less th

details of we

se 4 legs are f

the upper sec

sed for storag

ment storage.

, chemical tan

mp, and contro

and open).

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

ualuang Area

m. BLWPB is de

han 15 years.

ellhead platfo

fixed with the

ctions.

ge of equipme

nk, and consu

ol room.

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

. There is no

esigned to be

The wellhead

orm design in

e sea floor by

ent, machine,

umption water

t

d

d

n

o

e

y

r

Page 17: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.6.1.3

2.6.1.4

water wi

substance

is limited

2.6.1.5

(10 inche

productio

outside d

Powder (

productio

injection

the FPSO

underwat

petroleum

90-CHAP_2_in_fn_

Other Facilit

Other facilities

x Consump

x Drain Sys

o Close

o Open

Equipment S

In production

ill be transpo

es in the cont

and only suff

Underwater

No additional

es) which is c

on process on

Currently, the

diameter is 10

FBE) without

The first unde

on process on

wells. There w

O buoy and th

ter pipeline in

The existing

m is limited by

_eng (24-10-12

ties

s on wellhead

ption Water Sy

stem

ed Drain Syste

n Drain System

Storage on W

phase, it is n

orted to the

tainers will be

ficient for work

r Pipeline

underwater p

onnected to B

FPSO.

ere are 2 und

.75 inches in

concrete coat

erwater pipelin

FPSO. The se

will be a pipel

ere is a contr

Bualuang Pro

pipeline syste

y FPSO capacit

)

platform inclu

ystem

em

m

Wellhead Pla

needed to use

platform by

lifted up and

king.

pipeline will b

BLWPA at pig

erwater pipeli

accordance of

ing.

ne will connec

econd underwa

ine end manif

ol valve in the

oduction Area

em is able to

ty.

2-17

ude;

atform

chemical sub

support vess

stored on the

be installed. O

launcher. The

ines. The pipe

f WT API 5LX4

ct to the main

ater pipeline w

fold (PLEM) at

e middle of sy

is shown in Fi

o support pet

Offshore Pet

bstances. The

els and draw

e platform. Th

Oil will be draw

en, all fluid w

elines are 800

42. The pipeli

n pipe at BLW

will transports

t the end of un

ystem to open

igure 2.6-3.

troleum from

troleum Production

Salam

fluids such as

wn to platform

he equipment

wn via produc

will be transpo

0 meters long

nes are coate

PA to transpo

the affluent w

nderwater pip

n and close th

the new pro

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

s oil, fuel, and

m via soft pi

and chemical

ction manifold

orted via marin

g and 0.5 inch

ed by Fusion B

ort fluid from B

water from BL

pe. PLEM is co

he system. Th

oject since th

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

consumption

ipe. Chemical

l storage area

d and pipeline

ne pipeline to

hes thick. The

Bonded Epoxy

BLWPA to the

WPA to water

onnected with

e overview of

he amount of

t

d

d

n

e

o

e

y

e

r

f

f

Page 18: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.6.2

2.6.2.1

used in

petroleum

tons and

water is

approxim

day and

oil produ

capacity

2.6-5.

Figur

Sou

90-CHAP_2_in_fn_

Floating Pro

Qualification

FPSO namely

this project.

m production a

able to conta

16,090 barrel

mately 16.3 me

to support aff

ction capacity

is sufficient fo

Details of “Ru

re 2.6-3 O

urce: Salamand

_eng (24-10-12

oduction Sto

n of FPSO

“Rubicon Van

This FPSO w

and storage in

ain 570,000 b

ls at maximum

eters.The pro

fluent for 30,4

y was 7,207 b

or fuel and wat

ubicon Vantag

Overview of U

der (2011)

)

orage and O

ntage” which is

was made by

n 1996). The

barrels of crud

m or 2,558.5

duction proce

400 barrels/ d

barrels per da

ter storage as

ge” are descri

Underwater

2-18

Offloading (F

s currently wo

y Rubicon Off

ship is 230 m

de oil (14 oil

m3 (2 wastew

ess is designe

day at maximu

ay. Total 11,5

s shown in Ta

ibed in Appen

Pipeline in B

Offshore Pet

FPSO)and S

orking in Bualu

fshore Interna

eter line and

tanks). The c

water tanks). A

ed to produce

um. According

587 barrels of

ble 2.6-1.

ndix 2-2. Th

Bualuang Pro

troleum Production

Salam

upport Vess

uang Productio

ational Compa

32 meters wid

capacity to sto

A draught lev

crude oil for

to the data o

affluent were

he diagram of

oduction Are

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

sel

on Area Block

any in 1987

dth. The capa

ore wastewate

vel at maximu

maximum 24

on 13 July 20

e produced p

f FPSO is show

ea

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

B8/38 will be

(adapted for

acity is 83,000

er and ballast

um capacity is

4,000 barrels/

12, the crude

er day. FPSO

wn in Figure

t

d

d

n

e

r

0

t

s

/

e

O

e

Page 19: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Table 2.

Heavy Fue

Diesel Fue

Water

Source: R

2.6.2.2

pipeline (

System c

(Safety F

the pullin

capacity o

Figure

90-CHAP_2_in_fn_

6-1 Stor

Tyel

el

Rubicon Vantage

Mooring Sys

FPSO is fixed

(PLEM) as sho

The Maximum

can support 27

Factor =67 pe

ng power is 5

of the ship. Ho

e 2.6-4 “R

_eng (24-10-12

rage Capacit

ype of Materia

e (2011)

stem

d by Semi-we

own in Figure

m Breaking Li

70ѿ movemen

rcent). Suctio

50 tons in no

owever, FPSO

Rubicon Vant

Source:

)

ty of FPSO

al

eathering Moo

2.6-3 and Fi

mit of FPSOs

nt of FPSO. Th

n pile can als

ormal situation

O can be unfixe

tage” FPSO i

Salamander (2

2-19

oring System

igure 2.6-6.

is 610 and 6

he mooring ba

so support pul

n and 100 to

ed and moved

in Bualaung

2011)

Offshore Pet

and connect

615 tons, resp

ase and swive

ling power fo

ns during typ

d to safety zon

Production A

troleum Production

Salam

Capacity1,648.

788.9

446.8

ting between

pectively. The

l can support

r 300 tons. Ac

phoon which i

ne when the w

Area

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

y(m3) .60

90

80

the ship and

e Semi-weathe

pulling power

ccording to th

is less than t

weather is bad

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

d underwater

ering Mooring

r for 300 tons

he calculation,

the maximum

d.

t

d

d

n

r

s

Page 20: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Sourc

Figure

90-CHAP_2_in_fn_

ce: Salamande

e 2.6-5 Di

_eng (24-10-12)

er (2012)

iagram of “R

)

Rubicon Vanttage” FPSO

The recontro

Wat

esidents and ol area

Workshop, eand waste treatment are

engine water ea

Proceessing area

2-20

Head ofPositionaffluent

Flare gas

f FPSO n of fluid rect pipe

eiver and

Offshore Petrole

The pipe

wellhead f

The p

for pro

Env

eum Production in

Salaman

from the

fluid

pipe connec

oduced water

vironmental Impac

n Block B8/38 in Gu

nder Energy (Bual

Chapter 2 Projec

ction

r

act Assessment

Gulf of Thailand

aluang) Limited

ect Description

Page 21: 2. CHAPTER 2 PROJECT DESCRIPTION

DD2011-00590-CHAP_2_in_

Figure 2.6-6

Source: SOCO (2

Sucap

Subsea Layout

_fn_eng (24-10-12)

Suction System o

2008)

ction Pile apacity = 30

of FPSO

Cable Product

I

and Swivel: 00 tons

tion

Injection

Metal ca

2-21

S

ble

Slick

Cab

Slic

Offshore Petr

ble

ck

Environ

troleum Production in Bloc

Salamander

Ch

Heavy

(30 m

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

Chapter 2 Project Descripti

Chain

y Chain

m)

ent

and

ited

tion

Page 22: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.6.3

Table2.6

Preparati

Sea bottom

Wellhead p

Productio

Production

Equipmentshore base

Petroleum

Equipmentshore baswarning of

Source: S

The engin

respectiv

2.6.4

district, S

support a

Commerc

yard, was

and equip

area. Thi

the separ

will not b

productio

90-CHAP_2_in_fn_

Support Ves

Various types

6-2 Type

P

ion and Instal

m and shallow g

platform installa

on Well Drillin

n well drilling

t and waste te

m Production

t and waste tse and within f other ships tha

Salamander (20

Two ships (28

ne power of t

ely (see Appe

Shore Base

Shore base o

Sattahip Distri

activities in Blo

For travelling

cial Port (Figu

ste and chemi

1) Warehou

2) Stock Yar

pment will be

3) Chemical

s area is also

ration factory

be stored in th

Chuk Samed

on activities s

_eng (24-10-12

ssel

s of ships are u

e and numbe

hase/ Activity

llation Phase

gas survey

ation

ng Phase

transportation

Phase

transportation offshore opera

at are entering

11)

84 and 441 to

the ships are 1

endix 2-3).

of the project

ict, Chonburi

ock B8/38 of B

g from Bangko

ure 2.6-7). T

ical storage ar

se: managed

rd: is used for

further transp

and Waste S

used to collec

on the same

e shore base

port of Roya

uch as equipm

)

used in each p

er of Ships in

y

between offsh

between offshating place as close to the saf

ons gross) wh

1800 BHP and

is located at

Province (Fig

Bualuang Area

ok to shore b

There are 6 pe

rea (see diagra

by Salamande

r temporary st

ported to the o

Storage Area:

ct general was

day that chem

until the next

al Thai Navy

ment and wa

2-22

phase as summ

n the Project

W

hore and (sp

hore and well as

fety zone

(alr

hich are curre

d 2500 BHP an

t Sattahip com

gure 2.6-6).

a.

base, the trav

ermanents sta

am Figure 2.

er (Figure 2.

torage of equ

offshore area

is used to s

stes from offsh

mical substan

day due to sy

is used. Two

aste transporta

Offshore Pet

marized in Tab

t

Ship/ P

Surve

Wellhead platforbo

Tug boat and

Lifting

Drillin

Supporpecific for produ

Supporready using for

well d

ently using in

nd the numbe

mmercial port

This shore ba

veler can use

affs. The shore

6-8). The com

.6-9)

ipment, pipeli

by support ve

tore chemical

hore works. C

ces are delive

ystematic coor

o support ves

ation for 3 ro

troleum Production

Salam

ble 2.6-3.

Platform

ey ship

rm transportatiooat

support vessel

g crane

ng rig

rt vessel uction well drillin

rt vessel existing produc

drilling)

Bualuang Pro

r of stand-by

(Chuk Same

ase is current

e Highway no

e base include

mpositions of s

ne, and other

essels.

substances b

Chemical subst

ered to shore

rdination befor

ssels are runn

ounds/month

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

Num

on

ng)

ction

oduction Area

staffs is 5 and

ed Port) in Plu

tly used by S

o. 3 and 3126

es office, ware

shore base ar

r materials. Th

before sendin

tance will be t

base. Chemic

re waste trans

ning to suppo

until the proj

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

mber (units)

1

1

2

1

1

2

2

will be used.

d 10 persons,

utaluang sub-

Salamander to

6 to Sattahip

ehouse, stock

re as follows;

hese materials

g to offshore

transported to

cal substances

sportation.

ort petroleum

ect is ended.

t

d

d

n

o

p

k

s

e

o

s

Page 23: 2. CHAPTER 2 PROJECT DESCRIPTION

DD2011-00590-CHAP_2_in_

Figure 2.6-7

_fn_eng (24-10-12)

Location and Acccess to Shore Bas

C

se

Chuk Samed Port

Shore base

2-23

Offshore Petr

Environ

troleum Production in Bloc

Salamander

Ch

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

Chapter 2 Project Descripti

ent

and

ited

tion

Page 24: 2. CHAPTER 2 PROJECT DESCRIPTION

D

D2011-00590-CHAP_2_in_

Figure 2.6-8

Source:Salaman

_fn_eng (24-10-12)

Shore Base Diag

der(2011)

ram

2-24

Salaamander Yard

Offshore Petr

Environ

troleum Production in Bloc

Salamander

Ch

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

Chapter 2 Project Descripti

ent

and

ited

tion

Page 25: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

the existi

productio

2.7

shown in

Figure

90-CHAP_2_in_fn_

Therefore, th

ng project. Th

on phase will b

Work Pla

The main acti

1) Preparati

2) Drilling p

3) Productio

Offshore activ Table 2.7-1

2.6-9 Wa

Sour

_eng (24-10-12

ere is no add

he additional a

be the same.

an

ivities of the p

on and install

hase

on phase

vities will be .

arehouse at

rce:Salamande

)

itional activity

activities inclu

project can be

ation phase

started after

the Shore Ba

r(2011)

2-25

y at the shore

ude transporta

divided into t

the EIA repo

ase

Offshore Pet

e base becaus

tion in prepar

three phases a

ort is approve

troleum Production

Salam

se all activities

ation and drill

as follows;

d by ONEP. T

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

s are already

ling phase. Th

The primarily

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

operating for

he activities in

work plan is

t

d

d

n

r

s

Page 26: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Table 2.

1. Wellhe

Installa

2. Produc

Prepar

3. Petrole

Remark:

Source: S

2012 – J

expiration

accordan

Table 2.

Preparati- Sea bot- Inform - Transpo- Jacket i- Top side- Wellhea- Bridge s- Installat

BLWPA - PipelineProductio- Rig mob- Drilling

- Product

- Produc- Transfe

product

Source: S

90-CHAP_2_in_fn_

7-1 Wor

Activity1/

ead Platform

ation

ction Well Dril

ration2/

eum Productio

1/ BLWPB incand Construapproximateagencies. Th

2/ Period = ap 3 /Q1, Q2, Q3

Salamander (20

BLWPB will be

June 2013. It

n of BLWPB is

For well com

ce of Thai Law

7-2 Proj

A

ion and Instalttom survey project informaortation of jackenstallation e structure tranad platform strustructure transption of connec

e installation on on Well Drillinbilization and inand wire loggin

tion well prepara

ction Phase r petroleum frotion process on

Salamander (20

_eng (24-10-12

rk Plan

Q

ling and

on

luding connectiouction Corp., Lly 1 year. Cons

herefore, onshorpproximately 223 andQ4 refer to

12)

e constructed

is expected t

s approximatel

mpletion and

w and the plan

ject Activitie

Activity

llation Phase

tion to the staket to wellhead p

sportation cture transporta

portation tion bridge be

the bridge (50 ng Phase stallation

ng

ation

m BLWPB to BLFPSO

11)

)

2012

Q13/ Q2

on bridge to BLLtd. in Bangpastruction activitire construction 2 days/ one welo Quarter 1, 2, 3

in October 20

that BLWPB c

y in 2020. De

demolition ph

n which is app

es and Worki

eholders platform

ation

tween BLWPB

m long)

LWPA and then t

2-26

2

Q3 Q4

LWPA in Bualuanakong District, ies onshore of is not included l 3 and 4

012 and the p

can produce t

etails and dura

hase, the con

proved by DMF

ing Duration

- Approx- One mo- Approx- Approx- Approx- Approx- Approx

to - Approx

- Approx

- Approx- Approx

months- Cutting

hours p- Approx

16 wells

to - Start afuntil en

Nov 2013

Oct 2012

Offshore Pet

201

Q1 Q2

ng Area will be Chachoengsao

the contractor in this EIA.

production we

the petroleum

ation of activit

nstruction of

F.

n

imately 2 daysonth before platimately 2 daysimately 11 daysimately 2 daysimately 7 daysimately 2 daysimately 5 days

imately 2 days

imately 2 daysimately 17 days) per all 16 wel

discharge duraper well or 240 himately 5 days s

fter preparationnd of concession

Start

2012–June

troleum Production

Salam

13

Q3 Q4

constructed by o Province. Thwill be operate

ell drilling can

m at the end o

ties are summ

wellhead pla

Duration

tform mobilizatio

s

ys per one prols ation (only fromhours (10 days)per one product

of production n (2020) or until

t Production

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

20

Q1 Q2

Thai Nippon Stehe period of ed under their o

be done duri

of Quarter 2

marized in Tab

atform will be

n

on

oduction well o

m upper section) per all 16 wellsction well or 2.7

well preparatiol end of petrole

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

020

Q3 Q4

eel Engineeringconstruction isown authorized

ng November

of 2013. The

ble2.7-2.

e removed in

or 272 days (9

n drilling) is 15s months per all

n and continueum reserve

t

d

d

n

s

r

e

Page 27: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8

phase, pr

2.8.1

shallow g

condition

2.8.1.1

impacts t

about the

issue ma

marine no

the notifi

Informati

Radio wil

will be ac

project a

give infor

Organizat

position o

90-CHAP_2_in_fn_

Project A

The project a

roduction phas

Preparation

Preparation a

gas survey, co

of installation

Information

Salamander w

to navigation a

e project as w

Salamander w

arine notificati

otification issu

1) After rece

cation in adva

2) Maritime

ion Technolog

3) Public Re

ll send English

cknowledged

rea.

4) Maritime

rmation for ge

5) Maritime

tion (IHO) to

The company

of platform. Th

_eng (24-10-12

Activities

activities inclu

se, completion

n and Instal

and installation

onstruction an

n area in orde

n Disseminat

will inform abo

and fishery. M

well as the com

will contact DM

on to fishing

ue are as follo

eiving the lett

ance

Division will

gy Department

elation Depart

h marine notif

about position

Division will

eneral people

Division colle

share other co

y will monitor

his can be mo

)

de 4 major p

n and demoliti

lation Phase

n phase includ

nd mobilization

r to find out th

tion to the St

out the project

Moreover, the

mpensation to

MF to inform a

boats and tr

ws;

ter from DMF,

inform abou

t, Marine Depa

tment and Ma

fication will be

n of platform

publish marin

ects marine no

ountry’s memb

r whether ma

onitored via int

2-27

phases; prepa

ion phase. Th

e

des informing

n of wellhead

he most appro

takeholders

t to the stakeh

complaint han

fishing tools.

about the pro

ransportation

, Maritime Div

ut marine not

artment, Publi

arine Radio wi

e sent to Nav

and duration

ne notification

otification eve

bers

arine notificat

ternet athttp:/

Offshore Pet

ration and ins

e details of ea

project descr

platform. Sid

opriate locatio

holders one m

ndling channe

oject to Hydrog

boats to avoi

vision will draf

tification to n

ic Relation De

ll translate ma

vigation Telex

of the project

on http://ww

ery month and

tion is issued

//www.navy.m

troleum Production

Salam

stallation phas

ach phase are

ription to the

de-scan Sonar

on for installati

month in advan

ls will be infor

graphic Depar

id passing the

ft Thai marine

navy radio, N

partment, and

arine notificat

(NAVTEX). As

t. The captain

ww.navy.mi.th

d submits to

to inform ab

mi.th/hydro/nt

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

se, production

described as

stakeholders,

r is used to su

ion.

nce (Table 2.

rmed to receiv

rtment, Royal

e area. The p

e notification

Naval Commun

d Marine Radio

tion to English

s a result, the

n can avoid en

h/hydro/ntm.h

International

bout project

tm.htm

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

n well drilling

follows;

, seafloor and

urvey seafloor

8-1) to avoid

ve complaints

Thai Navy to

procedures of

and will issue

nications and

o.

h. The Marine

e foreign ship

ntering to the

tmin order to

Hydrographic

schedule and

t

d

d

n

r

s

o

f

e

e

p

e

o

c

Page 28: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Table 2.

Central LDMF HydrograpMarine DeRegional First NavaMiddle GuMiddle GuDevelopmeEnvironmeProvincia

ChumphonSuratthaniChumphonSuratthaniChumphonChumphonSuratthaniMarine TraOthers Thailand FFishery asKoh Tao S

2.8.1.2

area i.e.

gas pock

will be co

wellhead

survey bo

sound wa

sea wate

interprete

affect str

are used

shallow g

90-CHAP_2_in_fn_

8-1 Informa

ALevel

phic Departmentepartment

Level l Area Commanlf of Thailand Filf of Thailand Ment Center ental Regional Oal Level

n Governor i Governor n Energy Office i Energy Office n Fishery Office n Natural ResouiNatural Resourcansportation Off

Fishery Associatsociations in Ch

Sub-district Adm

Bathymetry

Bathymetry a

high-low, sha

ket must be av

onducted at t

platform insta

1) Sea botto

oat is 3 – 5 k

ave and then

er and the ref

ed to show co

2) Shallow G

ructure securit

with the Ech

gas is found at

_eng (24-10-12

ation Dissem

Agency/ Pers

t, Royal Thai Na

d,Royal Thai Naishery Research

Marine and Coast

Office 14

urces and Enviroces and Environfice 4, Chumpho

ion humphon Provin

ministration Offic

and Shallow

nd Shallow Ga

llow fault, to

voided becaus

the same time

allation. Then,

om will be ins

knots. The sur

the sound wa

flection shows

ompositions an

Gas Survey wi

ty and safety

ho-sounder Sy

t surface level

)

mination to th

on

avy

avy h and Developmtal Research an

onment Office nment Office on Province

ce ce

w Gas Pocket

as Pocket surv

confirm locati

se it affects st

e by one surv

, the location

spected by Sid

vey equipmen

ave will be refl

s the underw

nd characterist

ill be conducte

of the person

ystem to surv

within 150 m

2-28

he Concerne

ment Center nd

t Survey

rvey is the geo

on of platform

tability of the

vey vessel. T

of platform an

de Scan Sona

nt includes sid

lected to the r

water structure

tic of sea bott

ed before plat

nal. Normally,

vey underwat

m radius, it is d

Offshore Pet

d Agencies a

Directly contacContact DMF to

Contact DMF to

Contact DMF to

Contact DMF to

ographical sur

m, and to inve

platform. Bat

he duration o

nd support ves

r. The survey

de-sonar scan

receptor. The

e (Figure 2.8

om.

tform installati

sound wave

ter typology,

dangerous for

troleum Production

Salam

and Stakeho

Met

ct o inform the info

o inform the info

o inform the info

o inform the info

rvey. It aims t

estigate the un

hymetry and

of survey is ap

ssels will be id

area is 1 km

and receptor

duration of so

8-1). The refl

on to inspect

generator suc

large cutting,

rig installation

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

lders

thod

formation to the

formation to the

formation to the

formation to the

to find our ch

nderwater bar

Shallow Gas P

pproximately

dentified.

m2 (1 km x 1 k

r. Side sonar s

ound wave sh

lected sound

the shallow g

ch as Sparker

, and existing

n and drilling.

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

e agencies

e agencies

e agencies

e agencies

aracteristic of

rriers. Shallow

Pocket survey

1 day before

km). Speed of

scan will send

hows depth of

wave can be

gas that might

r and Boomer

g structure. If

t

d

d

n

f

w

y

e

f

f

e

t

r

f

Page 29: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8.1.3

be constr

Province.

operated

construct

2.8.1.4

and insta

down to

direction.

location o

4 legs (Fi

Figure

90-CHAP_2_in_fn_

Wellhead Pl

Jacket and to

ructed by Tha

The period o

under their o

When the co

tions to the pr

Wellhead Pl

Wellhead plat

allation is appr

Firstly, Remot

install in the s

. Then, the v

of legs. After t

igure 2.8-2).

e 2.8-1 S

Sour

_eng (24-10-12

atform Cons

opside of BLW

i Nippon Stee

of construction

own authorized

onstruction is

roject location

atform Insta

tform installat

roximately 1 m

te Operated v

sea. There is

ventilation valv

that, the found

. The structure

Sea Bottom S

rce: http://www

)

struction and

WPB including c

l Engineering

n is approxima

d agencies. Th

completed, a

(Figure 2.8-

allation

tion will starte

month.

vehicle (ROV)

oxygen inside

ve is opened

dation pile is i

e of connectio

Survey

w.noaanews.noa

2-29

d Mobilizatio

connection Br

and Construct

ately 1 year. C

herefore, onsh

ll parts will b

-2). The mobi

ed in August 2

will survey th

e the legs to l

and the legs

installed to fix

on bridge and

aa.gov/stories20

Offshore Pet

on

ridge to BLWP

tion Corp., Ltd

Construction ac

hore construct

be moved to

lization period

2012. It is ex

he sea bottom

ift the platform

are put into

x the structure

10 inches of p

005/s2383.htm

troleum Production

Salam

PA in Bualuang

d. in Bangpako

ctivities onsho

ion is not inclu

barge and tu

d is less than 2

pected that th

m again and th

m. The jacket

the sea bott

e. Then, the to

pipeline will be

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

g Area (Figur

ong District, C

ore of the cont

uded in this st

ug boat will m

2 days.

he duration o

hen the jacket

t will be lifted

tom. The dive

opside is comb

e combined w

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

re 2.8-2) will

Chachoengsao

tractor will be

tudy.

mobilize these

f mobilization

t will be lifted

up in vertical

ers will adjust

bined with the

with BLWPA.

t

d

d

n

o

e

e

t

e

Page 30: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Figure

Sourc

90-CHAP_2_in_fn_

e 2.8-2 Ex

ce: SOCO (2008

_eng (24-10-12

xample of we

8)

)

Well

We

ellhead platf

2-30

lhead Platform

ellhead Platfo

form constru

Offshore Pet

m Constructio

rm Mobilizatio

uction and m

troleum Production

Salam

n

on

mobilization

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

t

d

d

n

Page 31: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Figur

Sou

90-CHAP_2_in_fn_

re 2.8-3 P

rce: SOCO (200

_eng (24-10-12

Procedure of

08)

)

f Wellhead Pl

2-31

latform Inst

Offshore Pet

tallation

troleum Production

Salam

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

t

d

d

n

Page 32: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Corp., Ltd

BLWPB in

BLWPB,

documen

BLWPB in

responsib

90-CHAP_2_in_fn_

Risk assessm

d. (TNS) is an

nstallation, and

TNS has con

the risk asse

nt number BLW

nstallation as f

x Mobilizat

x Use of Pe

x Anchor H

x General D

x Main Pile

x Boat-Lan

x Bridge In

x Tempora

x Pre-Insta

The procedur

ble agency are

_eng (24-10-12

ent for BLWP

n engineering

d risk assessm

ducted docum

essment cover

WPB-RPT-HS-1

follows;

ion & Demobi

ersonal Basket

Handling

Diving Operati

Installation

ding Installati

nstallation con

ry Rigging Pla

allation Activiti

res of each

e addressed.

)

PB installation

contractor an

ment.

ments for Proj

rs jacket insta

1014 (Append

lization

t

ion

on

necting Existin

atform

es

activity will b

2-32

was conduct

nd responsible

oject Installati

tallation, tops

dix 2-4). Ris

ng Platform

be identified

Offshore Pet

ted. Thai Nipp

e for engineer

on Task Risk

ide installatio

k assessment

to assess ris

troleum Production

Salam

pon Steel Eng

ring design, co

Assessment

n, and bridge

document div

k. Then, the

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

gineering and

onstruction, tr

(Job Safety A

e installation

vided by majo

mitigation m

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

Construction

ransportation,

Analysis). For

as shown in

or activities of

measures and

t

d

d

n

r

f

Page 33: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8.2

2.8.2.1

economic

approved

planned

assessme

Maritime

rig is 68

There is a

is 154 m

Emerald

tank, and

Figure

90-CHAP_2_in_fn_

Production

Production w

Selection of d

c benefit in t

d by ONEP. In

to be used in

ent of this proj

Emerald Drille

Organization

m wide, 8.5 m

a spud can (1

. There is a s

Driller are sho

The area on

d helideck. Det

e 2.8-4 Em

_eng (24-10-12

Well Drilling

well drilling

drilling rig will

terms of obje

nitially, jack u

n production

ject.

eris Baker Mar

(IMO). It can

m high, and 72

7 m diameter

pud can (17 m

own in Appen

Emerald Drill

tails of machin

merald Drille

Sour

)

g Phase

rig

be considered

ective and du

up rig namely

well drilling.

rine Pacific Cla

drill deeper t

2 m long (99

and 9.8 m hig

m diameter an

ndix 2-5.

er is systema

ne, equipment

er Rig

rce: Vantage Dr

2-33

d by technical

ration of proj

“Emerald Dri

The details o

ass 375 Jack-

han 9,000 me

m long includ

gh). The supp

nd 9.8 m high

atically divided

t, and facilities

rilling Company

Offshore Pet

qualification,

ject. The con

iller” (Figure

of Emerald dr

-up (Self Eleva

eters. The bas

ding helicopter

port area of ea

h). The suppo

d to drill floor

s on the drille

(2007)

troleum Production

Salam

safety, enviro

ntract will be

2.8-4) of Va

riller are also

ation Unit) an

ement of drille

r yard). The le

ach leg is 227

rt area of eac

r, main deck,

r are describe

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

onmental mana

made after

antage Drilling

o considered i

nd certified by

er is triangle s

ength of each

m2. The lengt

ch leg is 227

chemical sto

ed in this sectio

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

agement, and

EIA report is

g Company is

n the impact

International

shape. Size of

leg is 154 m.

th of each leg

m2. Details of

orage, bottom

on.

t

d

d

n

s

s

t

f

f

Page 34: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

10.7m X

area. Oth

area for d

68 tons w

used for w

chemical

pumps, t

tank (tota

tank (tota

living are

helicopte

Table2.8-

Diesel Oil ConsumptDrilling WaDrilling MuEnhanced Brine Chemical BBentonite/Cement

Source: V

90-CHAP_2_in_fn_

1) Drill Floo

The total

10.7m). The

her areas are u

drilling control

2) Deck

The midd

weight, 30-37

worker’s living

3) Bottom T

The Eme

storage. Six

hree air comp

The lowe

al capacity =

al capacity =

4) Helideck

Helideck

eas. The diam

r. The maximu

Water, ch

-2 Stora

Sub

ion Water ater ud Mineral Oil

Bags Storage Ar/ Barite

Vantage Drilling

_eng (24-10-12

r

l area of drill f

rotary table (

used for lifting

l i.e. Chock an

dle area of the

m long). Mo

g, office, aesth

Tank

erald Driller is

electric gene

pressors, and m

er floor is used

3,600 barrels

16,700 barrels

area is at the

meter of helide

um helicopter

hemical, and f

age Capacity o

bstance

rea

Company (200

)

floor is 143 m

49 ½ inches)

g equipment (

nd kill Manifold

e deck is used

reover, there

hetic area, kitc

s divided into

rators (capaci

mud preparati

d for storage o

s). The outside

s).

head of platfo

eck area is 22

weight for th

fuel storage ca

of Drilling Rig

7)

2-34

m2 (11.9m X 1

) which is run

draw works st

d and Mud Ga

for pipe rack

are shale sha

chen, and first

o 2 floors. Th

ity = 2,150 k

ion area are in

of diesel oil ta

e of these 2 f

orm and oppo

2.9 meters an

is helideck is a

apacity of the

g

Offshore Pet

11.9 m). The a

by 1,150 hor

tation and 4 r

s Separator.

and storage.

aker and mud

t aid.

he upper floor

kW, 5 for nor

n this upper flo

ank (total capa

floors are divi

osite the crane

nd designed t

approximately

platform is su

S591 m3 580 m3 688 m3 665 m3 222 m3 228 m3 5,000 bags (25165 m3 165m3

troleum Production

Salam

area is divided

rse power of t

ig floor winche

There are thre

preparation a

r is used for

mal use and

oor.

acity = 3,900

ded to store b

e. Helideck is c

to support Sik

y 9,300 kilogra

ummarized in T

Storage Capac

kg per bag)

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

d to derrick ar

top drive is in

es) storage as

ree hoisting eq

area. The foll

machine, eq

1 for reserve

barrels) and

ballast tank a

connected to t

korksky S-61

ams.

Table 2.8-2.

city

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

rea (115m2 or

stalled in this

s well was the

quipment (22-

owing area is

uipment, and

e), three mud

potable water

nd drill water

the office and

or equivalent

t

d

d

n

r

s

e

s

r

r

t

Page 35: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8.2.2

5.7 km/h

to take a

vessels w

transport

which ar

accordan

approxim

Figure

90-CHAP_2_in_fn_

Rig Mobiliza

Two support v

hr) (Figure 2.

pproximately

will be stand-

tation between

re going to e

ce of Petroleu

Production w

mately 9 month

e 2.8-5 Ri

_eng (24-10-12

ation and Ins

vessels will be

8-5). The du

2 days for rig

-by all the tim

n shore base a

enter the saf

um ACT B.E.25

well drilling w

hs for drilling 1

g Mobilizatio

)

stallation

e used for rig

ration of mob

mobilization

me to support

and platform.

fety zone or

514.

will be started

16 production

on

2-35

mobilization.

bilization is dep

and installatio

rt rig mobiliza

Support vesse

500 meters

d after BLWP

wells.

Offshore Pet

The speed of

pended on the

on with produc

ation, equipme

els also co-ord

around wellh

PB installation

troleum Production

Salam

vessels is app

e last position

ction well (Fig

ent and chem

dinate with rad

head platform

n or about N

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

proximately 2-

n rig. Initially,

gure 2.8-6).

mical transpor

dio room to w

m and produc

November 20

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

-3 knots (3.7-

it is expected

Two support

rtation, waste

warn the boats

ction wells in

012. It takes

t

d

d

n

t

e

s

s

Page 36: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8.2.3

depth. Th

Details of

Table 2.

Producti

Pattern 1Top well IntermediaBottom wePattern 2Top well Intermedia

Bottom we

Remark:

Source: S

Figure

90-CHAP_2_in_fn_

Well and Ca

Production we

he well is sep

f each well are

8-3 Size

ion Well Desig

1 (For 7 wells)

ate well ell 2 (For 9wells)

ate well

ell

Depth in the ta

Salamander (20

Sou

e 2.8-6 Ex

_eng (24-10-12

sing Design

ell of project h

arated to be

e shown in Ta

e of Productio

gn Size of

)

able referred fro

11)

urce: SOCO(200

xample of Dr

)

has been desi

3 sections inc

able 2.8-3.

on Well in Ea

Well (inch)

17½ 12¼ 8½

12¼ 8½

61/8

m platform heig

08)

rilling Rig tha

2-36

igned as horiz

cluding top we

ach Section

Size of Ca(inch)

133/8

95/8

95/8

– –

ght at 96 feet fr

at Combined

Offshore Pet

zontal well fol

ell, intermedia

asing )

rom sea surface

d with Wellhe

troleum Production

Salam

lowing geolog

te well and bo

True Ve

e

ead Platform

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

gical structure

bottom well (F

ertical Depth)

600 2,600 3,350

600 2,600

3,350

m

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

and targeted

Figure2.8-7).

(m)

t

d

d

n

Page 37: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8.2.4

by using

to rock fo

pushed p

Bit size 1

well for 1

will prote

drilling flu

of 16 we

to the sea

12¼ and

section w

will be us

and 61/8 i

not be us

accelerat

(OCNS).

90-CHAP_2_in_fn_

Petroleum P

Drilling proces

Drilling Bit (H

formation. Afte

passing Drilling

Drilling operat

1) Top secti

17½ or12¼inc

17½ and 12¼

ect well collaps

uid in the sect

lls, the drilling

a will take abo

2) Intermed

d 8½ inches fo

well. After that

sed to seal at

3) Bottom w

inches for pat

sed in the sect

Cement will

tor. The subst

Details are sh

_eng (24-10-12

Production W

ss will be imp

Hole Opener).

er that, seaw

g Bit to bring c

tion and casin

ion: Firstly, w

ches for patte

¼ inches, resp

se and preven

tion. Cuttings

g operation w

out 10 days.

diate well: Inte

or pattern 1 a

t, casing size 9

the gap. For i

well: Bottom w

tern 1 and 2,

tion.

be used to s

tance is identif

own in Figure

)

Well Drilling M

lemented afte

Drilling Bit ha

ater or drilling

cuttings to we

ng installation

ell will be ope

ern 1 and 2, re

pectively. Cem

nt cuttings mov

will be releas

ill take about

ermediate we

and 2, respect

95/8 inches wi

ntermediate w

well will be dril

respectively.

seal gap betw

fied as E type

e2.8-4.

2-37

Method

er platform ins

as got weight

g mud will be

ellhead.

for production

ened to 600 m

espectively. C

ment will be us

oving to inner

sed to seabed

15 hr/well or

ll will be drille

tively. Water b

ill be put in th

well size 8½ in

lled to about 3

Synthetic Bas

ween casing

e (Low Toxic S

Offshore Pet

stallation comp

from drill strin

e pumped pas

n well are divid

m depth (from

Casing size 133

sed to seal ga

well and loss

around wellh

r 240 hr for 16

ed to about 2,

based mud (W

he well (for 12

nches, casing

3,350 m depth

ed Mud (SBM)

and well. Ca

Substance) by

troleum Production

Salam

pletely. Firstly

ng or casing a

ssing Drilling S

ded as 3 secti

reference po3/8 and 95/8 in

ap between w

of drilling mud

head (Figure2

6 wells. There

,600 m depth

WBM) will be u

2¼ inches of i

will not be pu

h from interme

) will be used

lcium chloride

y Offshore Che

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

y, well (Spud)

and drill collar

String. Drilling

ions as follows

oint on platfor

nches will be p

well and casing

d. Seawater w

2.8-8). For to

efore, the rele

from top sec

used as drilling

intermediate w

ut in the well.

ediate section

as drilling flu

e will be use

emical Notific

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

will be drilled

r to penetrate

g fluid will be

s;

m) by Drilling

put in the top

g. The casing

will be used as

op well drilling

eased cuttings

ction with size

g fluid for the

well). Cement

with size 8½

id. Casing will

ed as cement

ation Scheme

t

d

d

n

e

e

p

s

s

e

e

t

t

e

Page 38: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Figure

Sour

90-CHAP_2_in_fn_

e 2.8-7 W

rce: Salamande

TopDrill

Reference poiKelly Bushing

InterDrill to

Botom WDrill to 3,3

_eng (24-10-12

ell and Casin

er (2011)

p Well l to 600 m dept

int for RKB or at 315 feet (96

rmediate Well o 2,600 m dept

Well 350 m depth

)

ng Designs o

h

Rig m)

h

2-38

of Project

Offshore Pet

Not to

Platform

- Patterninches

- Patterninches

- Patterinches

- Pattercasing

- Patterncasing b

- Patterncasing b

troleum Production

Salam

Sclae

Seabed Leve

Sea Level

1:Well size 17

2: Well size 12¼

rn 1:Well size 12s rn2: Well size g but use produc

1:Well size 8but use product2: Well size6 but use product

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

el

½ inches, Casin

¼ inches, Casin

2¼ inches, Cas

8½ inches. Tction pipe size 7

8½ inches. Thtion pipe size 7

1/8 inches. Thtion pipe size 4

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

ng size 13 3/8

ng size 95/8

sing size 95/8

There is no 7 inches.

here is no inches

here is no ½ inches

t

d

d

n

Page 39: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Table2.8

Toxic to m

Toxic to se

Aquatic totoxicity tesSource: h

with conv

well. Cut

Shale Sh

disposed

process.

90-CHAP_2_in_fn_

8-4 Haz

Item

marine living thin

ea sediment (pp

oxicity refers tosts. Sediment tohttp://www.cefa

Other reasons

x Prevent d

x Increase

x Control in

x Prevent l

x Seal unsa

x Seal high

x Seal trou

Slim hole will

ventional drilli

ttings from int

haker (Figure

on land by co

_eng (24-10-12

ardous Subs

m

ngs (ppm)

pm)

o the Skeletoneoxicity refers to as.co.uk/ocns/O

s for casing us

drilling mud le

strength of w

nner pressure

oss of drilling

afely rock form

h pressure rock

ble rock forma

be used as d

ng. Cuttings w

termediate an

e 2.8-8) to s

ontractor who

)

stance Ident

A

<

<1

macostatum ECthe Corophiumv

OCNSGUIDELINE

se are as follow

akage to natu

well and suppo

of well

mud

mation for drill

k formation

ation i.e. rock

drilling techniq

will be release

nd bottom we

separate drillin

o is certified b

2-39

tification ofO

A B

1 >1-1

10 >10-1

C50, Acartiatonsvolutator LC50ES2000.pdf

ws;

ural groundwa

ort Blowout Pre

ling

k salt formation

que to reduce

ed to the sea a

ells will be br

ng mud and

by Ministry of

Offshore Pet

OCNS

C

10 >10

100 >100-

sa LC50, and Stest.

ter source or

eventer (BOP)

n

cuttings volum

around wellhe

ought to plat

cuttings. Cut

Industry. For

troleum Production

Salam

C

-100 >

-1,000 >1

Scophthalmusma

aquifer

)

me from drillin

ead because ca

form. The cut

ttings will be

drilling mud w

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

D

>100 -1,000

1,000-10,000

aximus (juvenil

ng process wh

asing is not in

ttings will be

collected in

will be circula

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

E

>1,000

>10,000

e turbot) LC50

hen compares

nstalled at top

managed by

big bag and

ated in drilling

t

d

d

n

s

p

y

Page 40: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8.2.5

(WBM) an

fluid for i

collected

String to

Figure

90-CHAP_2_in_fn_

Drilling Fluid

Three drilling

nd synthetic b

ntermediate w

Drilling mud w

x To bring

x To transf

x To reduc

x To preve

x To contro

Details of eac

1) Seawate

Seawater

in water tan

Drilling Bit. Se

e 2.8-8 C

Top Well

_eng (24-10-12

d

fluids will be

based mud (SB

well. Synthetic

will be used as

cuttings to we

fer hydraulic p

e heat at Drill

nt other fluids

ol inner pressu

ch drilling fluid

er

r will be used

nk on platform

eawater will n

utting Mana

Drilling

)

used for prod

BM). Seawate

c based mud w

s drilling fluid

ellhead

power and lubr

ing Bit and inn

s flowing to in

ure of well

s are describe

as drilling flu

m. After that,

ot be added a

gement in E

Depth 600 m

Seabed Leve

Sea Level

2-40

duction well d

r will be used

will be used as

because of fo

ricate Drilling

ner well

ner well and b

ed as follows;

uid for top we

seawater wil

all chemical su

Each Section

el

Offshore Pet

rilling operatio

for top well. W

s drilling fluid f

llowing purpo

Bit

blow out

ell. Seawater

l be pumped

ubstances.

of Well

Intermedi

troleum Production

Salam

on including s

Water based m

for bottom we

ses;

will be pumpe

to drilling flu

ate and Botto

600 m

2,600 m

3,350 m

S

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

seawater, wate

mud will be us

ell. (Table2.8

ed passing wa

uid system pa

om Well Drillin

S

Solid Control System

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

er based mud

sed as drilling

-5)

ater pipe and

assing Drilling

ng

Seabed Level

Sea Level

t

d

d

n

Page 41: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Table2.8

CompSeawaterSeawater Water Ba

Fresh wate

Bentonite

DEO-TEC

Soda Ash Synthetic

Barite

Calcium ca

Calcium Ch

ECOTROL

Escaid 110

HRP

Lime

VERSACOA

Versatrol

VG Plus

Source: S

chemical

all chemic

Hydrocar

Versacoa

MSDS of

90-CHAP_2_in_fn_

8-5 Drill

ponent r

ased Mud (WB

er

c Based Mud (

arbonate

hloride

RD

0

-

AT IC

Salamander (20

2) Water B

Water ba

substances a

cal substances

3) Synthet

SBM will

rbon, which is

Almost co

t IC (Table 2

the chemical

_eng (24-10-12

ling Mud Com

Comm

BM)

Bentonite

- GLYOXAL <- Xanthan GUSodium Carbon

(SBM) - 91-93% Ba- 1-11% silic- 1-5% Mica - Calcium ca- Quartz, CryCalcium Chlorid- Substituted

copolymer 95-98%

- Synthetic A5%

- Substitutedcopolymer 95-98%

- Synthetic A1-5%

- Polyamide,- Triethylene

ether, 30-6- Propylene - Calcium Hy- Distillates

Hydrotreat- Distillates

HydrotreatUnspecified

- ISO-ButanGilsonite 60-100- Benzyl Qua

BentoniteC- Silica, crys

11)

Based Mud (W

ased mud is

re shown in (

s are non-haz

ic Based Mu

l be used as

alkaline subst

omponents of

2.8-6). After d

substances ar

)

mposition

mon Name

< 1% UM 60-100% ate

arite ca, crystalline, q

rbonate 60-100ystalline Silica, <de, 60-100% d styrene acryla(pre-cross-linke

Amorphous Silic

d styrene acryla(pre-cross-linke

Amorphous Silic

, 30-60% e glycol monobu60% carbonate 1-5%ydroxide (Petroleum), ted Middle (Petroleum), ted Light; Kerosd. ol 0% aternaryAmmonCompound 94-1stalline, quartz 1

WBM)

a component

Table 2.8-6)

ardous substa

d(SBM)

s drilling fluid

tance and fatt

f SBM are non

drilling operat

re shown in Ap

2-41

Conce

Vol

quartz Vol

0% <1% Vol

ate ed)

ca 1-

ate ed)

ca Vol

utyl

%

sine -

nium 00%

1-5%

t between wa

). WBM will be

ances.

d for bottom

ty acid. It func

n-hazardous s

tion completio

ppendix 2-6

Offshore Pet

entration (kg/

ume as required

70

10

0.2

ume as required

ume as required

20-30%

3

ume as required

5

5

20

20

14

ater and che

e used as drill

m well. Major

ctions as emul

substances, ex

on, all chemica

.

troleum Production

Salam

m3)

Drilling f

d FreshwacomponThickeneSubstan

Thickene

Hardnes

d Increaseinner pr

d Increaseloss of mControl

Control rock for

d Major co

Improve

Control

Emulsifie

Reduce

Thickene

mical substan

ing fluid for in

r component

sifier.

xcept Barite, E

al substances

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

Property

fluid for top we

ater will be usednent for WBM er and Penetrat

nce

er

ss improvement

e mud weight aressure of well

e mud weight amud reaction in shal

infiltration passrmation

omponent of SB

e drilling fluid

alkalinity

er

loss of mud

er

nces. For MSD

ntermediate w

of SBM is

Escaid 110, H

will be return

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

y

ll

d as major

tion Central

t substance

nd control

nd prevent

le formation

sing through

BM mud

DS of drilling

well. However,

Dearomatized

RP, Lime and

ned to dealer.

t

d

d

n

Page 42: 2. CHAPTER 2 PROJECT DESCRIPTION

D

T

DS

CB

D2011-00590-CHAP_2_in_

Table 2.8-6 M

Chemical SubstaDrilling Fluid for TopSeawater

Chemical SubstanceBentonite

_fn_eng (24-10-12)

SDS of Chemical

ance p Well

e of Water Based Mux Benton

substax If it ha

canceR IA

fo(C

Substances for D

Toxic

ud (WBM) for Intermnite is non-hazaance as silica, it may be car ARC has determined sorm of quartz as GrouCause of cancer for hu

Drilling Mud

S

mediate Well ardous

ause of

silica in up 1 uman)

x ACGIH: concentreffect toTWA is working

x Chemicairritationexposes

x May cswallowe

x Powder mx Chemica

irritationx The sub

quantitytouch ofthan stalungs Becausecomposiis neglig

2-42

Safety Level

value of chemiration that does no human health (TLequal 10 mg/m3 forhours.

al dust may cause lunn and hazard severely

for a long time cause discomfort ed. may irritate skin.

al particle may caun or pain of eyes bstance contains smy of quartz. Prolongf high concentration ovandard (TWA) may cau

disease (silicose of quantity aition, the health hazagible.

Utilization

x Seawater wcollect in platform. seawater wdrilling fsystem String and

ical not

LV). r 8

ngs y if

if

use

mall ged ver use is). and ard

x Prevent letreatment drainage sy

x If the chworker mucontainer.

x Avoid to cowith chemic

x If workinimproper proper Pprovided fo

x Chemical; sstored in clo

x Chemical sstored in garea.

Offshore Petr

and Storage

will be pumped to water tank on

After that, will be pumped to fluid circulation passing Drilling Drilling Bit.

eakage to water system or water

ystem hemical leakage,

ust grab it to dry

ontact and breathe cal dust

ng area is in air ventilation,

PPE should be or worker. substance must be osed container. ubstance must be ood air ventilation

x

x

Environ

troleum Production in Bloc

Salamander

Ch

Personal

N

x Respiratory prevused, appropriate

x Gloves should beworking

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

Prevention

N/A

ventive tool should ely e used every time wh

ent

and

ited

tion

be

en

Page 43: 2. CHAPTER 2 PROJECT DESCRIPTION

D

T

D- -

Sa

D2011-00590-CHAP_2_in_

Table 2.8-6 (Cont’

Chemical SubstaDEO-TEC

GLYOXAL <1 % Xanthan GUM 60-

Soda Ash (Sodium Carbnhydrous)

_fn_eng (24-10-12)

’d)

ance

-100 %

x The irritatiand lu

x May cax The

mechax Chemi

irritati

bonate, x Chemiirritati

x Chemion ski

x Acute x The

irritatidiarrh

x The irritatisystem

Toxic substance may

ion of respiratory sungs. ause giddy if swallowe

substance may anical irritation of skinical particle may ion and pain of eyes.

ical particle may ion and pain of eyes.ical particle may causin. toxicity, if swallowed.substance may

ion, giddy, vomit ea. substance may

ion of upper respm and lungs.

Scause

system

ed. cause

n. cause

x Dust mhealth.

x Acceptabdust (Walveolar mg/ m3

cause

se rush

cause

and

cause piratory

x LC50 at mice is

x LD50 in 4,090 mmice we

x The chemcarcinoghuman aNTP and

x EC50 at DaphniaEC50 at is 242 m

x LC50 at macroch

x EC biomphytopla

x The chemtoxic subenvironm

2-43

Safety Level may disturb huma

ble value for repairaEL) that appropriates or gas exchange is

. TSP is 10 mg/ m3.

2hr in experimental 2,300 mg/m3. experimental mice is

mg/kg of experimental eight. mical substance is no genic substance for as defined by OSHA, d ACGIH 48 hr of Crustacean,

a magna is 256 mg/m3

5 of Nitszcheria linearmg/m3. 96hr in Lepomic

hirus is 300 mg/m3. ass at 7 days in ankton is 14 mg/l. mical substance is notbstance for ment.

Utilizationan’s

ble for

s 4

x Prevent accumulatio

x Chemical suused in goarea.

x Worker muslens.

x Chemical sustored in coair ventilatio

3. r is

t

x Prevent eyesx Prevent

inhalation x Prevent to

substance fox Chemical su

stored in coair ventilatio

Offshore Petr

n and Storage chemical mist

on. ubstance must be ood air ventilation

st not wear contact

ubstance must be old area and good on area.

s contact. chemical dust

ouching chemical or a long time. ubstance must be old area and good on area.

Environ

troleum Production in Bloc

Salamander

Ch

Personalx Good air ventilat

for working areax If working ar

ventilation and uair purifier mustworkers.

x Proper gloves sworker e.g. bpolyvinyl acetattouching chemictime.

x Safety glasses sworker to protechemical mist.

x Wear appropriaskin contact

x Emergency eyeshould be provid

x Working area prevent dust acc

x Proper safety maprotect face and

x Prevent chemicalusing gloves and

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

l Prevention tion should be provid. rea has nogood aunacceptable air qualitt be installed (P2) f

should be provided fbutyl rubber glovete gloves to proteal substance for a lo

should be provided fct eyes from dust a

ately dress to preve

es washing machied in the area. must be cleaned umulation.

ask must be provided eyes e.g. ANSI Z87 etl substance touching safety suit.

ent

and

ited

tion

ed

air ty, for

for es, ect ng

for nd

ent

ne

to

to tc. by

Page 44: 2. CHAPTER 2 PROJECT DESCRIPTION

D

T

CB- -

-

C6-

D2011-00590-CHAP_2_in_

Table 2.8-6 (Cont’

Chemical SubstancChemical SubstanceBarite

Barite 91-93% 1-11% Silica, crystalline, quartz1-15% Mica

Calcium Carbonate 60-100%

<1 % Silica, crystalline, quartz

_fn_eng (24-10-12)

’d)

ce es of Synthetic Base

z

x Particle meyes, skin a

x Prolonged be harmful

x Silica may cx IARC has d

of quartzGroup 1 (for human)

x May cause

z

x Chemical mof respirato

x May cause x Chemical

irritation anx The subs

quantity touch of hthan standlungs diseof quantityhealth haza

Toxic ed Mud for Bottom Way cause irritation and respiratory systemtouch the particle m to lungs. cause cancer diseasedetermined silica in tez or crystalline silica (carcinogenic substan) discomfort if swallowe

mist may cause irritatiory system and lungs.discomfort if swalloweparticle may cau

nd pain of eyes. tance contains smof quartz. Prolonghigh concentration ovdard (TWA) may cauase (silicosis). Becauy and composition, tard is negligible.

SWell Drilling

of m. may

erm as

nce

ed.

x Barite o ACGIH:

10 mg/(TWA)

o OSHA: chemicaworkingPM-10 i

x Silica, Crystao ACGIH:

chemicanot affeworkingmg/m3.

x Mica o ACGIH:

chemicanot affeworking

ion

ed. use

mall ged ver use use the

x Safety stanwith calcium(silica crystarespectively

2-44

Safety Level

the lowest value equ/l (TLV) for 8 working that may cause impathe acceptable value oal substance (PEL) forg hours. TSP is 15 mg/is 5 mg/m3. alline, Quartz the acceptable value al substance (TLV) thaect to human’s health g hours. TWA is 0.025.

the acceptable value al substance (TLV) thaect to human’s health g hours. TWA is 3 mg/

dard for working (Tm carbonate and qalline) is 4 and 0.1 mg.

Utilizatio

uals hours ct. of r 8 /m3.

of at do for 8

of at do for 8 /m3.

x Prevent toeyes.

x Prevent dx Usage mu

open areventilatio

TWA) quartz g/ m3,

x Worker contact le

x Working good air v

x Prevent thaccumula

x Chemical stored incontainerventilatio

Offshore Petr

on and Storage

ouching at skin and

ust in storage. ust be conducted in ea and good air n.

must not wear ens.

area must have ventilation. he chemical particle ation. substance must be

n cold and closed r and good air n.

Environ

troleum Production in Bloc

Salamander

Ch

Personal

x Wear mask to prex Wear appropriate

contact x Use PPE to prot

following article(U.S. OSHA RStandard) or Sta

x In case of chemshould be used system followingface mask (N95protect respiratothat has dust dis

x Working dress shday by separatin

x In case of chemiventilation systemworker’s health.

x If working areventilation and uair purifier musworkers.

x Rubber or plaprovided for wor

x Safety glasses worker.

x Wear appropriatecontact

x Working area smanaged. Ememachine should b

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

l Prevention

event dust. ely dress to prevent sk

tect respiratory systee 29 of CFR1910.1Respiratory Protectindard of Thailand. mical dispersion, ma

to protect respirato NIOSH regulation. H5) should be used ory system in the arpersion or oil mist. hould be cleaned eveg with other dresses.

ical dispersion, good m must be provided f

ea has no good aunacceptable air qualitt be installed (P2) f

stic gloves must ker. must be provided f

ely dress to prevent sk

hould be appropriatergency eyes washibe provided in the are

ent

and

ited

tion

kin

em 34 on

ask ory alf to

rea

ery

air for

air ty, for

be

for

kin

ely ng

ea.

Page 45: 2. CHAPTER 2 PROJECT DESCRIPTION

D

T

C

E-

-

D2011-00590-CHAP_2_in_

Table2.8-6 (Cont’

Chemical SubstancCalcium Chloride

ECOTROL RD Substituted styrenacrylate copolyme(pre-cross-linked)95-98% Synthetic AmorphSilca 1-5 %

_fn_eng (24-10-12)

’d)

ce x It may

respiratory x May cause

and vomit ix Chemical d

of skin. Irritouch for a

x Chemical mof eyes and

x Chemical dof eyes.

ne er

ous

x May causstomachachswallowed.

x The chemimechanical

Toxic cause irritation

system. e stomachache, gidif swallowed. ust may cause irritatiitation may be severe long time.

mist may cause irritatid conjunctiva. ust may cause irritati

se injured stomache, giddy and vomit cal particle may caul irritation for skin.

Safof

ddy

ion , if

ion

ion

x Dust may disx Acceptable

dust (WEL) alveolar or gm3. TSP is 1

ch, t if

use

x ACGIH: acceconcentratioirritation of nose andAcceptable dust (WEL) alveolar or g3 mg/ m3, r

x OSHA: Acrespiratory appropriatesexchange isrespectively

x PEL: Accepdust is 10.

x Oral LD50 acrylate cois <5,000 experimenta

2-45

fety Level sturb human’s health.value for respirabthat appropriates fo

gas exchange is 4 mg10 mg/ m3.

eptable inhalable duon that may causrespiratory system e.g

d mouse (PNOSvalue for reparabthat appropriates fo

gas exchange is 10 anrespectively. cceptable value fo

dust (PNOR) thas for alveolar or gas 15and 5 mg/ m3. table value for silic

(Substituted styrenopolymer-pre-cross-link

mg/ kg (weight oal mice).

Utilization

le or g/

x Prevent the accumulation

x Working areaair ventilation

x Chemical sustored in container ventilation.

st se g.

S). le or nd

or at as 3,

ca

ne k) of

x Prevent skin ax Prevent acti

fugitive dust.of chemical s

x Chemical sustored in during transp

x The chemical used only ventilation.

x Chemical sustored in clos

x Chemical sustored in roogood air vent

Offshore Petr

and Storage chemical particle

n. a must have good n. ubstance must be cold and closed and good air

and eyes contact. ivity that causes . Do not inhalation ubstance.

ubstance must be closed container

portation. substance must be

in good air

ubstance must be sed container. ubstance must be m temperature and tilation.

Environ

troleum Production in Bloc

Salamander

Ch

Personalx Good air ventila

provided to prevaccumulation.

x If working areventilation and uair purifier musworkers.

x Rubber or plastgloves must be p

x Safety glasses sworker to protemist.

x Wear appropriatecontact

x Emergency eyeshould be provid

x Use PPE to protfollowing article(U.S. OSHA RStandard) or Sta

x In case of chemshould be used system followingface mask (N95protect respiratothat has dust dis

x Nitrile or neopprovided for wor

x Safety glasses sworker to protemist.

x Wear appropriatecontact

x Working dress shday by separatin

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

l Prevention ation system must vent chemical substan

ea has no good aunacceptable air qualitt be installed (P2) f

tic gloves or neopreprovided for worker. should be provided fect eyes from chemic

ely dress to prevent sk

es washing machied in the area. tect respiratory syste

e 29 of CFR1910.1Respiratory Protectindard of Thailand. mical dispersion, ma

to protect respirato NIOSH regulation. H5) should be used ory system in the arpersion or oil mist. rene gloves must ker. should be provided fect eyes from chemic

ely dress to prevent sk

hould be cleaned eveg with other dresses.

ent

and

ited

tion

be nce

air ty, for

ne

for cal

kin

ne

em 34 on

ask ory alf to

rea

be

for cal

kin

ery

Page 46: 2. CHAPTER 2 PROJECT DESCRIPTION

D

T

E-

H- -

-

D2011-00590-CHAP_2_in_

Table2.8-6 (Cont’d

Chemical SubstancEscaid 110

Distillates (Petroleum), Hydrotreated Ligh100%

HRP Polyamide, 30-60%Triethylene glycol monobutyl ether, 60% Propylene carbona1-5%

_fn_eng (24-10-12)

d)

ce T

ht,

x Volatile masubstance.

x Volatile acignitable po

x The substaload accucause explo

x The substdamage ofinhaled.

x Prolonged dry skin or

x It may ceyes, nsystem and

%

30-

ate

x If the subsheat or hmist may respiratory

x May causestomachachvomit if sw

x Chemical irritation of

x Prolonged severe irritaeyes

Toxic atter is flammable

ccumulation makes oint of explosion. ance has electrical mulation. It may osion. tance may cause f lungs or death, if

touch may cause disease. ause irritation of ose, respiratory d lungs.

stance reacts with high temperature, cause irritation of system.

e injured stomach, he, giddy and

wallowed. mist may cause

f skin. touch may cause ation or damage of

Safex Average concentr

time x (8hr) by calculati

or 165 ppm. x LD50 (consumptio

mg/kg (low toxicix LD50 (Respiratio

toxicity)

x Triethylene glycolx LC50 at 48 hr (

mg/l. x LC50 at 96 hr

2,200-2,600 mg/x LC50 at 96 hr (F

5,000 mg/l. x Propylene carbonx LC50 at 96 hr is 2

2-46

ety Level ration for normal wor

ion (RCP): 1,200 mg/

on and swallow) >15ity)

on) > 3,160 mg/kg

l monobutyl ether (Daphnia) is 2,990-5

(Leuciscusidus (carp)l.

Fathead minnow is 2,4

ate 2,200-5,300 mg/l.

Utilizationrking

/ m3

,000

(low

x Prevent skix Avoid leakax Chemical s

stored in cx Open ch

slowly topressure in

x Chemical sstored in container ventilation

x Ground wirto protectValve shoutransfer thand pressube installed

,520

)) is

400-

x Prevent contact.

x Prevent afugitive inhalation substance.

x The chemibe used ventilation

x Chemical sstored in dair ventilat

x Chemical sstored in c

x The chemibe protectfire.

Offshore Petr

n and Storage in contact. age to prevent slip. substance must be closed container. hemical container o control inner n container. substance must be

cold and closed and good air

. re must be installed t static electricity. uld be installed to

he substance. Spark ure detectors must d at container.

skin and eyes

ctivity that cause dust. Do not

of chemical . cal substance must only in good air . substance must be dry area and good tion. substance must be closed container. cal substance must ted from spark and

Environ

troleum Production in Bloc

Salamander

Ch

Personalx Good air ventilat

for working areax Worker must w

protect respiratochemical dispersstandard.

x Safety mask shstandard EuropStandardization safety mask sta405, EN 149 and

x Wear nitrite gchemical substanbe selected as EStandardization 374).

x Safety glasses sworker to protemist.

x Wear appropriatecontact

x Safety suit and regularly.

x Safety glasses worker.

x Wear appropriatecontact

x Butyl rubber glovfor worker.

x Use PPE to protfollowing article(U.S. OSHA RStandard) or Sta

x Safety mask shoNIOSH/MSHA sta

x Working dress shday by separatin

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

l Prevention tion should be provid. wear safety mask ory system in case ion in the air over th

hould be selected pean Committee f

(CEN) determinndard as EN 136, 14 143.

gloves when touchince. The gloves shouEuropean Committee f(CEN) (EN 420 and E

should be provided fect eyes from chemic

ely dress to prevent sk

PPE must be clean

must be provided f

ely dress to prevent sk

ves should be provid

tect respiratory systee 29 of CFR1910.1Respiratory Protectindard of Thailand. ould be selected as andard. hould be cleaned eveg with other dresses.

ent

and

ited

tion

ed

to of an

as for ed 40,

ng uld for EN

for cal

kin

ed

for

kin

ed

em 34 on

s

ery

Page 47: 2. CHAPTER 2 PROJECT DESCRIPTION

D

T

L

V-

-

-

D2011-00590-CHAP_2_in_

Table 2.8-6 (Cont’d

Chemical Substancime

VERSACOAT IC Distillates (Petroleum), Hydrotreated middDistillates (Petroleum), Hydrotreated lightKerosine- Unspecified ISO-Butanol

_fn_eng (24-10-12)

d)

ce Tx The subst

irritation system anincluding breathing e

x The substirritation trachea, sto

x Prolonged severe irritaeyes.

x Chemical irritation of

dle

t;

x Chemical irritation system.

x The substdamage ofinhaled.

x Prolonged irritation of

x Prolonged severe irritaeyes

Toxic tance may cause

of respiratory nd other diseases cough, discomfort etc. tance may cause of nasal cavity, omach etc. touch may cause ation or damage of

mist may cause f skin.

mist may cause of respiratory

tance may cause f lungs or death, if

touch may cause f skin. touch may cause ation or damage of

Safetyx Acceptable valu

touching calciummg/ m3.

x Acceptable valchemical substaand short tomwithout health immg/ m3) and 75 p

2-47

y Level ue for prolonged

m hydroxide (WEL) 5

ue for touching nce (WEL) in long

mes (STEL) (WEL) mpact is 50 ppm (75 ppm (231 mg/ m3).

Utilization ax Prevent chemicax Prevent skin andx Chemical subs

stored in dry aventilation.

x Prevent chemicax Prevent skin andx Chemical subs

stored far fromx Chemical subs

stored in cold aventilation.

Offshore Petr

nd Storage al mist inhalation d eyes contact. stance must be area and good air

x

x

x

x

x

x

al mist inhalation d eyes contact. stance must be

m heat and fire. stance must be area and good air

x

x

x

x

x

x

Environ

troleum Production in Bloc

Salamander

Ch

Personal x Good air ventilati

for working area.x Air purifier must

workers. x Rubber or plastic g

for worker. x Safety glasses m

worker. x Wear appropriatel

contact x Working area sh

managed. Emermachine should be

x Good air ventilatifor working area.

x Proper safety mashigh chemical cpurifying mask.

x Gloves should betouching chemicatime e.g. nitrile polyethylene gloveetc.

x Safety glasses shworker to protecmist.

x Emergency eyes wbe provided in the

x Proper safety suitprotect touching clong time.

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

Prevention on should be provid

be installed (P2) f

gloves must be provid

must be provided f

y dress to prevent sk

hould be appropriategency eyes washie provided in the area

on should be provid

sk should be provided concentration e.g. a

e provided to proteal substance for a lo

gloves, PVC glovees and neoprene glov

hould be provided fct eyes from chemic

washing machine shoue area. t should be provided chemical substance for

ent

and

ited

tion

ed

for

ed

for

kin

ely ng

a.

ed

in air

ect ng es, ves

for cal

uld

to r a

Page 48: 2. CHAPTER 2 PROJECT DESCRIPTION

D

T

V-

-

-

V-

D2011-00590-CHAP_2_in_

Table 2.8-6 (Cont’

Chemical SubstancVERSACOAT IC

Distillates (Petroleum), Hydrotreated middDistillates (Petroleum), Hydrotreated lightKerosine- Unspecified ISO-Butanol

VERSATROL Gilsonite 60-100%

_fn_eng (24-10-12)

’d)

ce T

dle

t;

x Chemical irritation system.

x The substdamage ofinhaled.

x Prolonged irritation of

x Prolonged severe irritaeyes

% x The subst

irritation system or l

x May cause swallowed.

x The substmechanical

Toxic mist may cause

of respiratory

tance may cause f lungs or death, if

touch may cause f skin. touch may cause ation or damage of

tance may cause of respiratory

lungs. giddy and vomit if

tance may cause l irritation of skin.

Safetyx Acceptable val

chemical substanshort tomes (SThealth impact is 5and 75 ppm (231

x Acceptable valuedust in 8hr work4mg/m3, respecti

2-48

y Level ue for touching

nce(WEL) in long and TEL) (WEL) without 50 ppm (75 mg/ m3) 1 mg/ m3).

e of TSP respiratory king time is 10 and ively.

Utilization ax Prevent chemicax Prevent skin andx Chemical subs

stored far from x Chemical subs

stored in cold aventilation.

x Worker must nlens.

x Proper air ventiair purifier shou

x Chemical subsstored in cold aventilation.

x Prevent toucsubstance from

Offshore Petr

nd Storage al mist inhalation d eyes contact. stance must be heat and fire.

stance must be area and good air

x

x

x

x

x

x

not wear contact

ilation system and uld be arranged. stance must be area and good air

ching chemical spatter.

x

x

x

x

x

x

Environ

troleum Production in Bloc

Salamander

Ch

Personal x Good air ventilati

for working area.x Proper safety mas

high chemical cpurifying mask.

x Gloves should betouching chemicatime e.g. nitrile polyethylene gloveetc.

x Safety glasses shworker to protecmist.

x Emergency eyes wbe provided in the

x Proper safety suitprotect touching clong time.

x Good air ventilatifor working area.

x Air purifier must workers.

x Rubber or plastic gfor worker.

x Safety glasses mworker.

x Wear appropriatelcontact

x Working area shmanaged. Emermachine should be

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

Prevention on should be provid

sk should be provided concentration e.g. a

e provided to proteal substance for a lo

gloves, PVC glovees and neoprene glov

hould be provided fct eyes from chemic

washing machine shoue area. t should be provided chemical substance for

on should be provid

be installed (P2) f

gloves must be provid

must be provided f

y dress to prevent sk

hould be appropriategency eyes washie provided in the area

ent

and

ited

tion

ed

in air

ect ng es, ves

for cal

uld

to r a

ed

for

ed

for

kin

ely ng

a.

Page 49: 2. CHAPTER 2 PROJECT DESCRIPTION

D

T

V

S

D2011-00590-CHAP_2_in_

Table2.8-6 (Cont’

Chemical SubstancVG Plus

Source: 1.MSDS 2. http://www

_fn_eng (24-10-12)

’d)

ce Tx The subst

mechanicaland eyes.

x Prolonged dry skin or

w.pesticideinfo.org/Lis

Toxic tance may cause l irritation of skin

touch may cause disease.

st_AquireAcuteSum.jsp

Safetyx Silica, crystalline,

o ACGIH: accedust concentcause irritatisystem e.g. (PNOS). Accerespirable dufor alveolar o10 and 3 mg

o OSHA: Acceprespiratory dmg/ m3

p?Rec_Id=PC35051

2-49

y Level quartz

eptable inhalable tration that may on of respiratory nose and mouse eptable value for ust that appropriates or gas exchange is g/ m3, respectively. ptable value for dust (PNOR) is 15

Utilization ax Prevent skin andx Prevent chemicax Chemical substa

in good air ventx Prevent chemic

to avoid slip. x Prevent chemicax Chemical substa

in good air ventx Chemical subs

stored in closed

Offshore Petr

nd Storage d eyes contact. al mist inhalation ance must be used tilation area. al stance leakage

al mist inhalation ance must be used tilation area. stance must be d container.

x

x

Environ

troleum Production in Bloc

Salamander

Ch

Personal x Proper safety suit

protect touching clong time.

x Use PPE to pretfollowing article (U.S. OSHA RStandard) or Stand

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

Prevention t should be provided chemical substance for

tect respiratory syste29 of CFR 1910.1

Respiratory Protectidard of Thailand.

ent

and

ited

tion

to r a

em 34 on

Page 50: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8.2.6

which are

character

Cuttings

After cut

certified b

calculatio

volume c

h is meas

2.8-7.

or 12 ¼

expected

70m3/we

respectiv

drilling fl

respectiv

90-CHAP_2_in_fn_

Drilling Fluid

Drilling fluid v

e rock particl

ristics of the r

from interme

ttings separati

by Ministry of

Cuttings volu

ons of diamete

can be calculat

sured depth of

Drilling fluids

1) Top wel

Seawater

inches). Drill

to be 93 and

2) Interme

Intermed

ll. Cuttings vo

ely.

3) Bottom

Bottom w

uid about 30

ely.

_eng (24-10-12

d and Cuttin

volume will d

e or fragmen

rock formation

diate and bot

ion, cuttings w

Industry.

ume from dri

er of well and

ted by using c

f each section

(seawater, W

l drilling by

r will be used

ing operation

46 m3 for we

ediate well b

diate well will

olume is expe

well by usin

well will be dr

m3. Cuttings

)

gs Volume

iffer in each

nt (less than 0

n. Cuttings fro

ttom sections

will be collect

lling process

depth of each

cylinder capaci

n.

WBM and SBM)

using seawa

as drilling fluid

will take abo

ell sizes 17 ½ a

by using WBM

be drilled at

ected to be 1

g SBM

rilled at 3,350

s volume is ex

2-50

section of we

0.02 – less th

om top section

of well will b

ted in big bag

can be calc

h section will u

ity (¶r2 x h), w

) and cuttings

ater

d about 6,500

out 15hr/well

and 12 ¼ inch

M

t 12 ¼ or 8

152 and 73 m

0 m depth (w

xpected to be

Offshore Pet

ell. During dri

han 6 mm). P

n of well will

be brought to

g to move to

ulated by us

use measured

when r is equa

s volumes in e

0 m3/well (mea

or 240 hr (10

hes, respectiv

½ inches. W

m3 for interme

ell sizes = 8½

e 14 and 27

troleum Production

Salam

lling process,

Properties of

be released to

separate by

dispose on l

ing well volu

depth and w

al diameter of

each section o

asured depth

0days). For 16

ely.

BM will be u

ediate well siz

½ or 6 1/8 inc

m3 for well s

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

drilling will m

cutting depen

o seabed arou

Shale Shaker

land by contr

ume in each

washout values

f well x percen

of well are sho

= 600 m, wel

6 wells, cuttin

sed as drillin

zes 12 ¼ and

ches). SBM wi

sizes 8½ and

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

make cuttings

nd on natural

und wellhead.

r on platform.

ractor, who is

section. The

s. For cuttings

nt of washout,

own in Table

l size = 17 ½

ngs volume is

g fluid about

d 8½ inches,

ill be used as

6 1/8 inches,

t

d

d

n

s

s

e

s

e

s

t

s

Page 51: 2. CHAPTER 2 PROJECT DESCRIPTION

D

T

W

P

T

Inw

B

P

T

Inw

B

S

D2011-00590-CHAP_2_in_

Table 2.8-7 Ex

Well Design Diamwel

Pattern 1 (For 7 wel

Top well

ntermediate well

Bottom well

Pattern 2 (For 9 wel

Top well

ntermediate well

Bottom well

Source: Salamander (

_fn_eng (24-10-12)

xpected Drilling F

meter of l (inch)

DiameteCasin(inch

ls)

17½ 133/8

12¼ 95/8

8½ –

ls)

12¼ 95/8

8½ –

61/8 –

2011)

Fluid Volume, Cutt

er of ng h)

Measured Depth (m)

8 600

2,600

3,350

600

2,600

3,350

tings Volume and

Drilling

Fluid

Seawater

WBM

SBM

Seawater

WBM

SBM

2-51

d Released Cutting

Drilling Fluid Volume (m3)

V

6,500

70

30

6,500

70

30

gs to the Sea (Vo

Cuttings Volume per

Well (m3)

R

Vothe

93

152

27

46

73

14

Offshore Petr

olume/Well)

Released Mud

olume to e Sea(m3)

ReleCuttinthe Se

– 9

– –

– –

– 4

– –

– –

Environ

troleum Production in Bloc

Salamander

Ch

eased ngs to ea(m3)

ReleaseCutting

Period (

93 15

46 15

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

ed gs (hr)

Cuttings Disposal

Release at seabed arounwellhead Collect to dispose at lanCollect to dispose at lan

Release at seabed arounwellhead Collect to dispose at lanCollect to dispose at lan

ent

and

ited

tion

nd

nd

nd

nd

nd

nd

Page 52: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8.2.7

has no ca

the sectio

will be pu

land by c

to use in

system. W

fluid whic

well pass

separate

etc. Sepa

shown in

fragment

to Cutting

rock frag

separate

Centrifug

Centrifug

dispose o

silt (4 – 6

volume fr

certified b

purifier (n

will be re

90-CHAP_2_in_fn_

Drilling Mud

Details of drill

1) Top wel

All cuttin

asing.

2) Interme

In interm

on will be sepa

urified and rec

contractor, wh

other project

3) Bottom

SBM will

When drilling o

ch functions to

sing annulus

cuttings and

arated mud wi

Figure 2.8-1

Drilling m

t from mud. M

gs Dryer (num

gment to colle

fine solid from

ge will be colle

Drilling m

ges to separat

on land.

Fine solid

62 micron) to

rom drilling pr

by Ministry of

Separate

number 7) to

ecirculated to d

_eng (24-10-12

d and Cutting

ling mud and

l

gs of top sect

ediate well

mediate section

arated as sam

circulated to r

ho is certified

in the future

well

be used as d

operation, dril

o friction redu

between Dril

mud (Figure

ill be recircula

10.

mud and cuttin

Mud and fine c

mber 2) to se

ct in big bag.

m mud. After

ected in big ba

mud in Mud T

te fine particle

ds from Dryer

o clay (less th

rocess. All cutt

Industry (Fig

d drilling mud

adjust mud co

drilling proces

)

gs Managem

cuttings mana

tion of well w

n, WBM will b

me process as

euse in drilling

by Ministry of

or return to it

drilling mud f

lling mud will

uction during d

ling String an

2.8-9). Solid

ted to reuse i

ng will be bro

cuttings will p

eparate drilling

Drilling mud

that, drilling m

ag to dispose o

Tank (number

e from the m

Centrifuge (n

an 4 micron).

tings will be c

gure 2.8-11).

d will be collec

ondition by ad

s.

2-52

ment

agement are a

will be released

be used as dr

bottom sectio

g process. All

f Industry. Aft

ts dealer.

for bottom se

be pumped fr

drilling proces

nd well. After

control system

n drilling proc

ought from we

ass to Mud Ta

g mud from th

from cutting

mud will be co

on land.

r 4) will be se

mud. The cutti

umber 3) and

. Fine solid vo

collected in big

.

cted in Mud T

dding additive

Offshore Pet

as follows;

d to seabed a

rilling fluid. Cu

on, which uses

cuttings will b

er drilling com

ction of well.

rom Mud Tank

ss. Drilling mu

r that, mud w

m consists of

cess. Cuttings

ell to Shale Sh

ank (number

he rock fragm

dryer will be

ollected in Mu

ent to Active

ings from the

Active Centrif

olume from 2

g bag in order

Tank (number

s including Es

troleum Production

Salam

round wellhea

uttings and m

s SBM to be d

be collected in

mpletion, all dr

Drilling mud

k to Drilling Str

d brings cuttin

will circulate t

Shale Shaker,

and drilling m

haker (numbe

4). The large

ment as much

sent to Dryer

d Tank (numb

Centrifuge (n

process will

fuge (number

Centrifuges is

to dispose on

6). After that

scaid 110 etc.

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

ad because th

ud from drillin

rilling fluid. Se

n big bag to b

rilling mud wi

will circulate

tring and Drilli

ngs from bott

to solid contr

, Cuttings Dry

mud managem

er 1) to separa

rock fragmen

as possible a

r Centrifuge (

ber 4). Cutting

number 5), co

be collected

r 5) have parti

s 13 percent o

n land by cont

t, it will be pu

After that, the

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

he top section

ng process of

eparated mud

be disposed at

ll be collected

in close-loop

ng Bit. Mud is

om section of

rol system to

er, Centrifuge

ment system is

ate large rock

nt will be sent

and make dry

number 3) to

gs from Dryer

onsisting of 2

in big bag to

cle sizes from

of all cuttings

ractor, who is

mped to mud

e drilling mud

t

d

d

n

f

t

p

s

f

o

e

s

k

t

y

o

r

o

s

s

Page 53: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Figure

Figure

C

Collect i

90-CHAP_2_in_fn_

e 2.8-9 Dr

e 2.8-10 So

Well

Cutting sand muddrilling

1. Shale Shak

2. Cutting Dry

in big bag to be

_eng (24-10-12

rilling Mud C

olid Control S

d from

ker

yer

e disposed on la

)

Circulation Sy

System

nd

Mud Fine cuttings

2-53

ystem

Mud Pu

5. Mud T

3. Dryer Centrif

F

C

Offshore Pet

urifier

Tank

fuge

Fine cuttings

Fine

lean mud

troleum Production

Salam

Mud

e cuttings

Mud

Fin

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

5. Two Dryer

4. Mud 6

ne cuttings

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

r Centrifuges

Tank

t

d

d

n

Page 54: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8.2.8

circulatio

project m

(Figure 2

Figure

90-CHAP_2_in_fn_

Mass Balanc

WBM and SB

n process con

must add mud

2.8-12).

e 2.8-11 Cut

_eng (24-10-12

ce of Drilling

M will be use

nsists of hole

d to the proce

ttings Collec

)

g Mud

ed in close sys

fill mud, mu

ess to keep p

ction and Sol

2-54

stem for inter

d in Mud Tan

roper mud pr

lid Control Sy

Offshore Pet

rmediate and

nk and loss o

roperty and m

ystem

troleum Production

Salam

bottom wells,

of mud from d

mass balance o

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

, respectively.

drilling proces

of mud for dr

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

. Drilling mud

ss. Therefore,

rilling process

t

d

d

n

s

Page 55: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8.2.9

During dr

operation

will provid

reservoir.

pipe, cas

annular w

consist of

the well b

Figure

90-CHAP_2_in_fn_

Well Contro

Well control w

rilling process

n, pressure fro

de and install

Blowout Prev

. BOP will be i

1) Annular i

sing, other pip

will be installed

2) Ram is a

f 2 gate valve

bore to preven

e 2.8-12 Dr

Mass balanc

Lo

_eng (24-10-12

l and Blowou

will be implem

s, drilling mud

om bottom we

Blowout Prev

venter (BOP)

installed at we

is a rubber va

pe systems o

d 1 unit.

valve, installe

es. In an even

nt any leakage

rilling Mud M

ce of SBM

ss of mud 9 m3

Mud is pump30 m

)

ut Preventer

mented when d

will be used

ell is higher th

venter or BOP

has been de

ellhead. It has

alve. In case

r open hole).

ed at wellhead

nt of a high pr

e of oil to the

Mass Balance

ped to well m3

2-55

r

drilling to pet

to control the

han mud weigh

at wellhead to

esigned to pr

s main compos

of blowout, a

Also, the an

d. It will close

ressure influx

environment.

e for Bottom

Mud TankCapacity 80 m

Well

Offshore Pet

roleum reserv

e inner pressu

ht as also kno

o prevent petr

revent uncont

sitions as follo

annular will be

nular can clo

rapidly at we

into the well

For the proje

Well

m3

Returned21 m

Re

troleum Production

Salam

voir because th

ure of well, ap

own blowout o

roleum leakage

trollable high

ws; (Figure 2

e pressed to c

se many sizes

ellhead when b

bore, the ram

ct, ram will be

d mud m3

ecirculated Mud 17 m3

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

he area has h

ppropriately. D

or “kick”. Ther

e.

pressure fro

2.8-13)

close pipe sys

s of pipe. Fo

blowout. Ram

ms can be clos

e installed 1 o

Solid Contro

Attached mucutting

4 m3

Cuttings is codispose on

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

high pressure.

During drilling

refore, project

om petroleum

stems (drilling

r the project,

compositions

sed to seal off

r 2 units.

l System

ud with gs 3

llected to n land

t

d

d

n

t

s

f

Page 56: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8.2.10

logger. W

formation

etc. In so

results of

Surface D

Tools, Pr

detector.

non-destr

platform.

1/http://ww

Figure

90-CHAP_2_in_fn_

0 Wireline Lo

A wireline lo

Wireline loggin

n and fluid in

ome cases, sa

f wireline logg

Wireline log

Data Acquisitio

robe, Electrode

When the e

ructive techni

The data sho

To identify ph

ww.bakerhughes

e 2.8-13 Co

_eng (24-10-12

ogging

gging operatio

g equipment

the rock form

amples of flui

ing will be use

gging equipme

on (3) Wirelin

e and Sonde

equipment is p

iques. The da

ows rock struc

hysical propert

.com/bakeratlas/

omposition o

Source: htt

)

on will be imp

will run into th

mation includin

ids will be tak

ed to evaluate

ent consist o

e and (4) Jac

etc will be pu

put to bottom

ata will be co

cture by depth

ties of rock for

/about/log4.htm

of Blowout P

tp://www.glos

2-56

plemented afte

he borehole v

g Electricity C

ken in order t

e potential for

of 4 parts inc

k. For wireline

ut into the bo

well, it will b

ontinually tran

h. The wireline

rmation includ

m

Preventer

ssary.oilfield.s

Offshore Pet

er completion

via cable in ord

Conductivity (E

to appraise po

petroleum pro

cluding (1) D

e logging proc

ottom well. Th

be rolled up sl

nsferred pass

e logging data

ding porosity,

slb.com/Displa

troleum Production

Salam

of each drillin

der to inspect

EC), density of

otential of the

oduction.

Downhole Inst

cess1/, downh

he equipment

owly to inspe

ing cable line

will be used f

geometric por

y.cfm?Term=

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

ng section by

physical prop

f rock, radioac

e petroleum r

trument (2)

ole instrumen

has an energ

ect rock forma

e and recorde

for the followin

rosity and infil

blowout%20p

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

using wireline

perties of rock

ctive property

reservoir. The

Computerized

nt i.e. Logging

gy source and

ation by using

ed in Log on

ng purposes;

ltration etc.

preventer

t

d

d

n

e

k

y

e

Page 57: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

productio

log, dens

by Office

2.8.2.11

Hanger w

After that

from oth

Perforatin

and Chris

2.8.3

be transf

wait for t

gas, if na

will be bu

2.8.3.1

However,

non-comm

be consid

FPSO.The

3,900 ba

operation

90-CHAP_2_in_fn_

1) To identif

2) To evalua

3) To identif

4) To evalua

5) To compa

After interpre

on well prepar

Wireline loggi

sity porosity an

of Atom for p

1 Production

After wirelin

will be put in

t, cement will

her rock forma

ng gun will be

stmas Tree wi

Petroleum P

After well com

ferred to sepa

trading. Produ

atural gas has

urnt by flare o

Petroleum P

Company has

, project may

mercial value

Main petroleu

dered with pro

erefore, maxim

arrels/day) (T

n.

_eng (24-10-12

fy potential ar

ate depth and

fy difference o

ate relation of

are results of

etation of wire

ration and dete

ing of the pro

nd neutron po

peace.

n Well Prepar

ne logging pro

the well and

be pressed fo

ations. Electri

e put in the w

ll be installed

Production

mpletion, hydr

rator on FPSO

uced water wi

high volume,

on FPSO.

Production S

s planned to s

y stop the ope

for production

um product tha

oduction rate o

mum petroleu

Table 2.8-8).

)

rea for petrole

thickness of r

of oil, gas and

f rock formatio

wireline loggin

eline logging

ermine produc

oject must use

orosity log. Th

ration

ocess complet

tied with top

ollowing produ

ical Submersi

well to targete

and tested be

Phase

rocarbons from

O to separate

ll be re-injecte

it will be used

chedule

tart petroleum

eration before

n.

at will be prod

of BLWPA to e

um production

However, pe

2-57

eum productio

rock formation

d water reserv

on characterist

ng and seismi

result, projec

ction plan for

e sealed radio

he process wil

tion, project

of casing to

uction pipe an

ble Pump (ES

ed depth for s

efore petroleum

m the well inc

crude oil and

ted to water in

d to be fuel of

m production f

e expired date

duced from BL

ensure that tot

n rate is expec

etroleum prod

Offshore Pet

n

ns

voirs

tics

c survey

ct will use th

other wells.

oactive source

l be implemen

will prepare w

function as p

d returned to

SP) will be in

hooting. Tubi

m production

cluding crude

gas from wat

njection well w

f electricity ge

from BLWPB i

e of concessio

LWPB is crude

tal production

cted to be11,

duction of pr

troleum Production

Salam

e result to p

e to be energy

nted by experi

well completio

roduction tub

annuals to se

nstalled to pu

ng-Retrievable

process.

oil, natural ga

er. Crude oil w

without releas

enerator on FP

n early second

on, if reserved

e oil. Petroleum

rate will not o

100 barrels/da

oject will be

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

plan for casing

y source to in

ienced person

on process. F

bing (size 7 or

eparate petrole

ump petroleum

e Subsurface

as and produc

will be collecte

sing to the sea

PSO. If it has l

d quarter of 2

d petroleum d

m production

over productio

ay (Minimum

approved by

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

g shooting in

nspect density

n and certified

Firstly, Casing

r 4 ½inches).

eum reservoir

m. After that,

Safety Valves

ced water will

ed in FPSO to

a. For natural

ow volume, it

2013 to 2020.

disappears or

of project will

on capacity of

rate is about

y DMF before

t

d

d

n

y

r

s

o

t

r

f

t

e

Page 58: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Table2.8

Yea

255

255

255

255

256

256

256

256

Source: S

2.8.3.2

Table2.8

Propertie

Density at

API Gravit

Arsenic

Characteri

Flash Poin

hydrogen

Kinematic

Mercury

Nickel

Vanadium

Upper Pou

Lower Pou

Reid Vapo

Salinity

Sulphate

Total Acid

Wax

Source: S

90-CHAP_2_in_fn_

8-8 Petr

ar Pr

(

56

57

58

59

60

61

62

63

Salamander (20

Petroleum P

Results of cru

8-9 Crud

es

t 15 °C tempera

ty

zation Factor

t (Abel)

sulfide

Viscosity at 50°

ur Point

ur Point

r Pressure

Number

Salamander (20

_eng (24-10-12

roleum Prod

Crude Oil roduction Rate

(Barrel/Day)

11,100

7,600

6,600

5,800

5,200

4,700

4,300

3,900

11)

Property

ude oil propert

de Oil Prope

ture

°C

11)

)

uction Expec

e

WatProductiofrom Prod

Proce

(Barrel/

25,60

29,50

30,40

31,20

31,80

32,30

32,70

33,10

ties of Bualuan

rties of Bual

2-58

ctation of Pr

ter on Rate duction ess

Rei

/Day) (

00

00

00

00

00

00

00

00

ng production

luang Produc

Offshore Pet

roject

Water injection Rate

Barrel/Day)

25,600

29,500

30,400

31,200

31,800

32,300

32,700

33,100

area are show

ction Area

Unit

kg/l

API

ppb by we

°C

ppm by w

Centistoke

ppb by we

ppm by w

ppm by w

°C

°C

psi

kg/l

Percent b

mg KOH/

Percent b

troleum Production

Salam

e

Gas Volfrom Prod

Proce

(mmcf

0.012

0.008

0.007

0.006

0.005

0.004

0.004

0.004

wn in Append

eight

weight

es (cSt)

eight

weight

weight

y mass

gram oil

y mass

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

ume duction ess

Ac

fd) (M

2

8

7

6

5

4

4

4

dix 2-7 and T

Value

0.8930

26.9

140

11.8

<ambie

<1

14.78

1

8

85

-15

<-18

2.4

9.4

1.85

<0.05

0.9

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

ccumulative Crude Oil Volume

illion Barrel)

17.2

19.9

22.3

24.5

26.4

28.1

29.6

31.1

Table2.8-9

0

ent

t

d

d

n

Page 59: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8.3.3

Electrical

capacity

Manifold

productio

be sent

Produced

sea.

90-CHAP_2_in_fn_

Petroleum P

Hydrocarbons

Submersible

of 40,000 ba

and pipe line

on separator. P

Separated cru

to burn at fla

d Water Degas

Petroleum pro

1) Crude oil

2) Natural g

3) Produced

_eng (24-10-12

Production P

s from produc

Pump (ESP)

arrels/day). Hy

e size 10 inch

Production pro

ude oil will be

are. Produced

sser. After tha

oduction capac

: FPSO has cr

gas: FPSO has

d water: Wate

)

rocess

tion well i.e. c

to FPSO, wh

ydrocarbons w

hes to BLWPA

ocess on FPSO

collected on

d water will b

t, produced w

city of FPSO c

ude oil produc

natural gas p

r reinjection s

2-59

crude oil, natu

hich has stor

will be pumpe

A. After that,

O is shown in

FPSO to wait

be sent to Hy

water will be re

can be conclud

ction capacity

production cap

system has a c

Offshore Pet

ural gas and p

rage capacity

ed passing ca

hydrocarbons

Figure 2.8-1

for transferrin

ydro cyclone t

e-injected to w

ded as follows

of 24,000 bar

pacity of 25mm

capacity of 40,

troleum Production

Salam

produced wate

of 570,100 b

sing to wellhe

s will be trans

4.

ng to oil loadin

to separate o

water injection

;

rrels/day.

mcfd.

,000 m3/day w

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

er will be pum

barrels (Maxi

ead of BLWP

sferred to thr

ng vessel. Na

oil from water

n well.

without releasi

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

mped by using

mum storage

B, Production

ree phases of

atural gas will

r and sent to

ing to the

t

d

d

n

e

f

o

Page 60: 2. CHAPTER 2 PROJECT DESCRIPTION

DD2011-00590-CHAP_2_in_

Figure 2.8-14

BLW

_fn_eng (24-10-12)

Production Sche

WPA

ematic of FPSO

2-60

Offshore Petr

Environ

troleum Production in Bloc

Salamander

Ch

1. HydrocarbonsfromBLWPB BLWPA

2. Underwater plong)

3. Increase highydrocarbons

4. Heat exchang5. Three Phases6. (A) If there i

it will be used(B) If there gas, it will be

7. Hydrocyclone8. Crude oil will

Phase Separa9. Produced wa

to water injec10. Water Injectio11. Separated oi

FPSO 12. Produced wa

to water injpressure of re

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

s are pumpeand transferred t

pipeline route (800 m

gh temperature fos by heat ge s Separator is enough natural gasd as fuel for generatoris not enough natura

e burnt at flare e l be returned to Threator ater will be re-injectection well on Well l will be collected o

ater will be re-injectejection well to keeeservoir

ent

and

ited

tion

ed to

m

or

s, r al

ee

ed

on

ed ep

Page 61: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.8.3.4

store at m

3-4 week

for reserv

immediat

8)

2.8.3.5

improved

commerc

laws and

implemen

Crude Oil

Figure

Sourc

90-CHAP_2_in_fn_

Storage and

Crude oil will

maximum pet

ks. (Figure 2.

Crude oil will

ve). It will ta

tely. Crude oil

Production C

BLWPB produ

d to expand it

cial for produc

decommissio

nting. At prese

l and Natural G

e 2.8-15 Cr

ce: Salamander

_eng (24-10-12

d Product Tra

be collected

troleum produ

8-15).

be transferre

ake less than

transfer will

Completion a

uction platform

ts expired date

ction. Decomm

oning regulatio

ent, concessio

Gas.

rude Oil Tran

r (2011)

)

ansportation

on vessel (R

ction rate of 4

d between FP

24 hr. In cas

be strictly imp

and Decomm

m had been d

e. Project will

missioning ope

ons in Gulf of

onaire coopera

nsfer in Bualu

2-61

n

Rubicon Vantag

40,000 barrels

PSO to oil load

se of oil leaka

plemented fol

missioning P

designed to o

l stop the pro

eration will be

f Thailand. De

ated with DM

uang Produc

Offshore Pet

ge), which ha

s/day to wait

ding vessel by

age during oi

lowing Berth

hases

operate for 15

oduction when

e strictly imple

ecommissionin

F and PTIT to

ction Area

troleum Production

Salam

as a capacity

for trading of

y using 2 oil p

l transfer, the

and Oil Trans

5 years. How

reserved pet

emented in ac

ng plan will be

o provide Deco

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

of 570,100 b

f oil loading ve

pumps (used 1

e process wil

sfer Manual. (A

wever, the pla

troleum disapp

ccordance with

e approved by

ommissioning

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

barrels. It can

essel in every

1 pump and 1

l be stopped,

Appendix 2-

tform can be

pears or non-

h related Thai

y DMF before

Guideline for

t

d

d

n

y

e

e

r

Page 62: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.9

onshore b

support v

area. Th

accommo

Table 2.

PreparatiSeabed su

Production

ProductioProductionMaterial between onshore baPetroleumPetroleum

Petroleumprocesses Material between onshore baOnshore Material between onshore ba

Remark:

Source: S

90-CHAP_2_in_fn_

Employm

Project will e

base. Number

vessels for 24

For onshore

herefore, proj

odation at ons

9-1 Num

Activities

ion and Instalurvey and shallo

n platform insta

on Well Drillinn drilling proces

and waste offshore worase m Production production at p

production

and waste offshore worase base Activitieand waste offshore worase

There is no cre

Salamander (20

_eng (24-10-12

ment

mploy both T

r of staffs and

hr. Therefore

base, there a

ect activities

shore base.

mber of Crew

s

llation Phasesow gas reservoir

llation

ng Phase s

transportationrking area an

Phase platform*

and storag

transportationrking area an

es transportation

rking area an

ew on production

11)

)

Thai skilled wo

d workers in ea

, there is no a

are 6 staffs at

will not effe

w in Each Ope

FPSO/Pla

s r Seabed sur

vessel Cargo vessproduction platform installationTug vessel support ves Drilling Rig

ns d

support ves

Production platform BL

e FPSO

ns d

support ves

ns d

Onshore ba

n platform. The

2-62

orkers and ot

ach phase are

accommodatio

t the base to

fect to numb

eration

atform NFPS

rvey

sel and

and ssel

ssel

LWPB

ssel

ase

e crew lives in F

Offshore Pet

her foreigners

e shown in Ta

on at onshore

support mat

ber of worker

Number of SO/Platform

1

1

2

110 2

1

1

2

PSO

troleum Production

Salam

s to work in F

able 2.9-1. Al

base.

erial transpor

r at onshore

Number o(Person/F

Platfo

32

150

15

11015

35

15

6

(Already actprese

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

FPSO, suppor

ll workers will

rtation to offs

e base. Also,

of Crew FPSO of

orm)

2

0

5

0 5

5

5

tive in the ent)

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

rt vessels and

live at FPSO,

shore working

there is no

Total Crew(Person)

32

150

30

110 30

35

30

6

t

d

d

n

o

Page 63: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.10

2.10.1

2.10.1.1

2.10.1.2

drilling fl

provide e

2.10.1.3

water) w

for consu

2.10.2

2.10.2.1

engine. E

2.10.2.2

have 6 e

activities

vessel.

2.10.2.3

be collect

have to u

generato

emergenc

worker ac

atmosphe

90-CHAP_2_in_fn_

Facilities

Water Use

1 Prepara

All vessels of

2 Product

Water use for

uid will be co

enough water

3 Petroleu

There is reve

ill be sent from

umption and sa

Power Use

1 Prepara

In preparatio

Each vessel wi

2 Product

All vessels of

electric genera

and drilling

3 Petroleu

On production

ted in oil tank

use electricity

For FPSO, the

rs with a cap

cy event. FPS

ctivities. Howe

ere.

_eng (24-10-12

s

tion and Ins

project will pr

tion Well Dril

r consumption

ollected in po

use from land

um Productio

erse osmosis,

m land. In add

afety equipme

tion and Ins

n and installa

ll provide eno

tion Well Dril

f project will

ators (1 reser

operation, su

um Productio

n platform of

k with a capac

about 1.4 MW

ere are five die

pacity of 1,82

SO will use ma

ever, project w

)

stallation Pha

rovide enough

lling Phase

n of workers a

ortable water

d and collect o

on Phase

installed on F

dition, there w

ent. Water tan

stallation Pha

tion phases, a

ugh diesel oil

lling Phase

provide diese

rved generato

fficiently. For

on Phase

project, there

city of 300 bar

W/day. Therefo

esel generato

5 KW for pro

aximum diesel

will use natura

2-63

ases

h water use fro

nd drilling flui

tank and dril

on the vessels

FPSO. It can

will be a water

nk will be filled

ases

all vessels wil

for working.

l electricity ge

or) with a tot

r support vess

will have 1 m

rrels. Diesel o

ore, it will use

rs including 3

oduction proce

l oil volume of

al gas from pr

Offshore Pet

om land and c

d will be prod

ll water tank,

for consumpt

produce cons

r tank, capacit

d by passing h

ll use diesel o

enerator as a

tal capacity of

sels, there w

main diesel gen

il must be fille

diesel oil 70 b

generators w

ess and 1 ge

f about 160 b

roduction proc

troleum Production

Salam

collect on the v

duced from sea

respectively.

ion.

sumption wate

ty of 1,000 ga

hose from supp

oil as fuel to g

power sourc

f 1,720 kW. I

ill have 2 gen

nerator and 1

ed in every 14

barrels/day.

with a capacity

enerator with

arrels/day for

cess to be fue

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

vessels for con

awater. Porta

All vessels o

er. Portable w

allons, installe

port vessel.

generate elect

ce. For platfor

It can suppor

nerators, inst

for reserved.

4 days. Produc

y of 1,024 KW

a capacity of

r petroleum pr

l to reduce ga

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

nsumption.

ble water and

of project will

water (bottled

d on platform

tricity and for

rm, there will

rt all workers

talled in each

Diesel oil will

ction platform

for engine, 2

f 500 KW for

roduction and

as emission to

t

d

d

n

r

s

r

o

Page 64: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

vessels w

2.10.3

2.10.3.1

Some of

about 14

It will tak

2.10.3.2

Services)

capacity

located in

the waste

to waste

highway

highway

(Figure 2

2.11

2.11.1

drilling pr

volume is

be 3,101

in Solid C

Services)

Cuttings f

are show

90-CHAP_2_in_fn_

Support vesse

will have diese

Transportat

1 Navigat

Most of mate

materials mu

-18 hr to proje

Also, salaman

ke about 1 hr.

2 Land Tra

1) Waste T

After was

will transpor

of 4 m3. The

n ThungSukra

e will be dispo

separating pla

Waste transpo

no.3126, high

2) Chemica

Chemical

no.331 (Chon

2.10-2).

Waste an

Drilling Mud

Slim hole dril

rocess when c

s expected to

m3). Cuttings

Control System

, who is cert

from intermed

wn in Table 2.

_eng (24-10-12

els of project

l oil enough to

tion

ion

erials and equ

ust be transpo

ect location.

nder has provi

Moreover, the

ansportation

Transportatio

ste has been s

rt the waste

e waste will n

a sub-district,

osed by types

ant of Premier

ortation route

hway no.331, h

al Substance

substance tr

nburi province

nd Waste

d and Cuttin

ling technique

compares with

be about 1,06

s from interme

m. Cutting wi

tified by Minis

diate and bott

8-7.

)

t will use dies

o work. It is ex

ipment must

orted from on

ided a helicop

e helicopter w

n

on

sent to onshor

to separate a

not be stored

Sriracha distr

of waste. Fro

r Oil Services f

e from Sattahip

highway no.36

e Transportat

ansportation w

e) and highwa

Managem

ngs

e will be used

h conventional

65 m3 from 16

ediate and bot

ll be collected

stry of Indust

om wells will

2-64

sel oil to prod

xpected to be

be imported

nshore base a

pter to transpo

will be used in

re base at Sat

at waste sepa

overnight. T

rict. It is far fr

om previous im

for about 3 tri

p Seaport to w

6 and highway

tion

will use truck

ay 3126. It w

ment

d for the proj

l drilling. Cutti

6 wells (Cuttin

ttom wells will

d in big bag t

try. Drilling m

not be release

Offshore Pet

duct electricity

about 60 bar

from foreign

at Sattahip Se

ort workers fro

emergency ev

ttahip Seaport

arating area b

The waste sep

rom onshore b

mplementation

ips/month. Wa

waste separat

y no.3 (Figure

of MI Swaco

will take about

ect. The tech

ngs from top

ngs volume fr

be brought o

to wait for be

mud will be pu

ed to the sea.

troleum Production

Salam

y, navigation

rels/day.

countries by n

eaport by 2 su

om U-Ta Pao

vent.

, waste transp

by using 2 wa

parating area

base of projec

n, wastes of S

aste volume a

ion plant of P

e 2.10-1).

from Bangko

t 1-2 trips/mo

nique can red

well will be re

om 3 sections

on platform to

eing disposed

urified to reci

Cuttings volu

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

and engine.

navigation to

upport vessels

Airport to pro

port contracto

aste loading

of Premier O

ct about 64 k

Salamander ha

averaged 12 m

Premier Oil Ser

ok to onshore

onth (Distance

duce cuttings

eleased to the

s of 16 wells i

separate mud

by contractor

irculate in dri

mes in each s

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

Each support

project area.

s. It will take

oject location.

or (Premier Oil

trucks with a

Oil Services is

m. After that,

ave been sent

m3 per trip.

rvices will use

base passing

e = 187 km).

volume from

sea. Cuttings

s expected to

d and cuttings

r (Premier Oil

illing process.

section of well

t

d

d

n

t

e

s

t

e

s

o

s

Page 65: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.11.2

wastewat

2.11.2.1

wastewat

wastewat

90-CHAP_2_in_fn_

Wastewate

There are 2

ter from consu

1 Wastew

Wastewater v

ter managem

ters etc. will b

_eng (24-10-12

er

sources of w

umption. Deta

water from Dr

volume from

ment system o

be drained to t

)

wastewater of

ails of wastewa

rainage Syst

drainage sy

of project. C

the sea. Oily w

2-65

project inclu

ater managem

tem

ystem of plat

lean wastewa

water will be t

Offshore Pet

ding oily wat

ment of projec

tform, FPSO

ater i.e. rain

reated as follo

troleum Production

Salam

er from drain

t are as follow

and support

water, ballas

ows;

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

nage system

ws;

vessel will

st water and

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

and domestic

be less than

d other clean

t

d

d

n

c

Page 66: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Figure

90-CHAP_2_in_fn_

e 2.11-1 W

_eng (24-10-12

aste Transpo

)

ortation Rou

Sa

2-66

ute of Projec

Waste Se

attahip Seapo

Offshore Pet

ct

egregation Fac

rt

troleum Production

Salam

cility

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

t

d

d

n

Page 67: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Figur

90-CHAP_2_in_fn_

re 2.11-2 T

_eng (24-10-12

Transportatio

)

on Route for

Pha Kano

2-67

r Chemical Su

Satt

ng-BKK

Offshore Pet

ubstance of

tahip Seaport

troleum Production

Salam

Project

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

t

d

d

n

Page 68: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

released

released

water. Se

Released

than 12 n

must be

Project m

and dispo

2.11.2.2

reinjectio

and oil. A

system is

project w

shown in

of 40,000

tank on F

Figure

Source

90-CHAP_2_in_fn_

1) Uncontam

to the sea. Fo

2) Ballast w

to Oily Wate

eparated wate

Wastewater o

nautical miles

less than 15 p

may employ Pr

ose waste of p

2 Produce

All produced w

on trouble, pro

After that, unc

s able to oper

will stop petrole

Figure 2.11

Water reinjec

0 barrels/day.

FPSO before b

e 2.11-3 Pr

e: Salamander (

_eng (24-10-12

minated water

or rain water f

water and wast

er Separator,

er properties

of Vessel, for

s, oil value mu

ppm. The oil a

remier Oil Serv

project.

ed Water

water will be

oject will colle

contaminated

rate. If the w

eum productio

-1.

tion system of

The re-inject

being released

roduced Wat

(2011)

)

rs i.e. rain wat

from drilling eq

tewater from

installed on p

must relate w

example oil va

ust be less th

and grease mu

vices, waste d

re-injected to

ct produced w

produced wa

ater reinjectio

on to repair th

f FPSO consist

ted water mu

to injection w

ter Managem

2-68

ter, ballast wa

quipment area

cleaning whic

platform, prod

with MARPOL

alue must be

an 15 ppm. F

ust be collecte

disposal compa

water injectio

water in produ

ater will be co

on system is n

he system. Pro

ts of Hydrocyc

st have oil va

well.

ment

Offshore Pet

ater and waste

as will be drain

ch is oily wate

duction well p

73/78 Annex4

less than 100

For released w

ed in bin to be

any which is c

on well withou

uced water ta

ollected in prod

not able to pe

oduced water

clone, Degass

alue less than

troleum Production

Salam

ewater from c

ned to open d

r. The waste

platform and

4 (Regulation

ppm. If separ

water from pla

e disposed as

ertified by Min

ut releasing to

nk to wait for

duced water t

erform until p

management

er and pump.

40 mg/l. The

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

cleaning etc. w

drainage syste

ewater will be

FPSO, to sep

for Pollution

rated water is

atform and FP

same as haza

nistry of Indus

o the sea. In

r separation b

tank until wat

produced wate

from product

The system h

e water will b

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

will be directly

m.

collected and

parate oil and

Control from

s released less

PSO, oil value

ardous waste.

stry, to collect

case of water

etween water

ter reinjection

er tank is full,

tion process is

has a capacity

e collected in

t

d

d

n

y

s

e

t

r

r

s

y

Page 69: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

wells incl

wastewat

able to in

formation

1,200 ps

barrels/d

in the fut

installed

of new pr

able to s

construct

It will inc

capacity

will be sto

2.11.2.3

be calcul

Therefore

m3/perso

90-CHAP_2_in_fn_

Wastewater f

luding BA-7i a

ter from proje

Project has e

ncrease depen

n as hydrocarb

As Figure 2.

i, reinjection

ay, respective

ture, because

1) Fourth qu

on BLWPA un

roduction mod

2) Second q

support incre

tion to support

3) First quar

crease water re

of 25,000 ba

op to be reser

3 Wastew

Wastewater s

1) Wastewa

ated by using

e, wastewater

2) Fecal wa

on/day). (Poll

_eng (24-10-12

from petroleum

and BA-10iST

ect operation.

evaluated reinj

nding on petro

bon reservoir (

.11-2 shows

rate was abou

ely. In addition

produced wat

uarter of 2012

ntil high pressu

dule is being s

quarter of 201

asing water

t water reinjec

rter of 2014: N

einjection cap

rrels/day. Afte

rved system. F

water from Co

source is accom

ater from cons

g 80% of wat

r will be about

ste can be es

ution Control

)

m production

1 (Figure 2.

jection well ca

oleum produc

(crude, water

water reinjec

ut 38,000 bar

n, Salamande

ter volume fro

2: High pressu

ure pump of n

studied. The m

13: Salamande

injection volu

ction volume a

New productio

pacity to be ab

er new modul

For water rein

onsumption

mmodations in

sumption i.e.

er use volume

t 160liters/pers

stimated by ca

Department,

2-69

in Bualuang p

3-1). Capacit

apacity of Bua

ction duration.

and gas) whi

ction capacity

rrels/day. It w

er will improve

om production

ure pump (cap

new productio

module detail i

er has a plan

ume. In addit

at least 50,00

on module and

bout 50,000 ba

le has been c

njection system

and Fecal W

ncluding;

wastewater f

e. Water cons

son/day (0.16

alculating feca

1994)

Offshore Pet

production are

ty of both wa

aluang area,

Produced wa

ch is deeper t

testing of cu

was divided fro

e production p

process is hig

pacity of abou

on module is c

s not related w

to repair curre

tion, project

0 barrels/day.

d water reinje

arrels/day by u

completely ins

m of BLWPA, it

Waste

rom cleaning

sumption rate

6m3/person/da

al waste gene

troleum Production

Salam

ea will be re-in

ter injection w

resulting that

ater will be re

han crude oil

rrent 2 wells.

om BA-7i 13,0

process to sup

gher. (Figure

t 25,000 barre

completely ins

with the EIA)

ent water rein

will consider

ction system w

using 3 high p

stalled, curren

t will be decom

etc. Wastewa

is 200 liters/

ay).

ration rate =

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

njected in 2 w

wells is able

the capacity

e-injected to t

level.

. At maximum

000 and BA-1

pport petroleu

2.11-3)

els/day) will b

stalled. (Engin

njection well (

third water

will be comple

pressure pump

nt water reinje

mmissioned.

ater from con

/person/day (O

60 liters/pers

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

water injection

to contain all

is stable and

he same rock

m pressure of

10iST1 25,000

um production

be temporarily

eering design

(BA-07i) to be

injection well

etely installed.

ps with a total

ection system

sumption can

ONEP, 1999).

son/day (0.06

t

d

d

n

k

f

0

y

e

6

Page 70: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Figure

S

90-CHAP_2_in_fn_

e 2.11-4 W

Source:Salaman

_eng (24-10-12

Water Reinjec

nder (2012)

)

ction Well Te

2-70

esting

Offshore Pettroleum Production

Salam

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

t

d

d

n

Page 71: 2. CHAPTER 2 PROJECT DESCRIPTION

DD2011-00590-CHAP_2_in_

Figure2.11-5

Sourc

_fn_eng (24-10-12)

Produced Water V

ce: Salamander (2012

Volume Estimatio

)

on from BLWPB

2-71

Offshore Petr

Environ

troleum Production in Bloc

Salamander

Ch

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

ent

and

ited

tion

Page 72: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

The dom

installatio

productio

BLWPB. A

ton) befo

Annex1 a

COD valu

be less th

occurred

However,

Table2.1

A

PreparatiSeabed sugas sourceProductioninstallation

ProductioProductionMaterial transportaoffshore onshore baPetroleumPhase PetroleumProductionPetroleumStorage PrMaterial antransportaoffshore wonshore baActivitiesSupport mtransportaoffshore wonshore ba

Remarks

Source: S

90-CHAP_2_in_fn_

3) Domestic

estic wastewa

on phases. I

on phase, the

Also, project w

Wastewater w

ore being rele

and Annex2).

ue must be les

han 100 mpn/

For onshore

about 0.96 a

, project will n

11-1 Was

Activities

ion and Instalurvey and shalle n platfon

on Well Drillinn Well Drilling

and waation betwe

working aase m Producti

Production at n Platform Production arocesses nd waste

ation between working and ase s in Onshore Bmaterial and waations betweworking area aase

: 1/ Domestic

wastewater v2/ Fecal waste

Salamander (20

_eng (24-10-12

c wastewater

ater and fecal

It will be dispo

waste volume

will not hire m

will be treated

eased to the

Treated wate

ss than 125mg

100ml.

base, there a

and 0.36 m3/d

not increase n

stewater and

Vessel/

llation Phaseslow Seabed

Veorm Cargo

Tug VeSuppor

ng Phase Plat

aste een and

Suppor

ion

ProdPlatform

and FP

Suppor

Base aste een and

Onsho

wastewater is

volume will be 0

is equal 60 liter

12)

)

and fecal was

waste volume

osed by on sit

e will not incre

ore employee

d by wastewa

sea in accord

er must have

g/l. Total susp

are 6 workers

day, respectiv

umber of work

d Fecal Wast

Platform Nof

s d Survey ssel

o Vessel

essel and rt Vessel

tform rt Vessel

uction m BLWPB PSO

rt Vessel

ore Base

80% of daily

0.16 m3/person/

rs/person/daym

2-72

ste volumes in

es will be incr

te wastewater

ease from cur

both offshore

ater treatment

dance with A

pH value in r

pended solid va

s in onshore

vely. Wastewa

ker in onshore

te Volumes i

Number f Vessel

N

(Pe

1

1

2

110 2

1

1

2

y water use fo

/day.

m3/person/day.

Offshore Pet

n each phases

reased from c

r treatment on

rrent operation

e and onshore

t on platform

nnex4 of MA

ange 6 – 8.5.

alue must be

base. Domes

ater and feca

e base.

n Each Phas

Number of Worker

erson/Vessel)

32

150

15

110 15

35

15

6

(Presence)

r consumption(

troleum Production

Salam

s of project ar

urrent operati

n platform and

n because the

base.

and large ves

RPOL 73/78 (

. BOD value m

less than 35m

tic wastewate

l waste will b

es of Project

Total Worker

32

150

30

110 30

35

30

6

(0.2 liters/perso

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

re shown in Ta

ion only in pre

d vessel. Duri

ere will have n

ssel (over tha

(Thailand has

must be less t

mg/l. Coliform

er and fecal w

be collected in

t

Domestic Wastewater

Volume (m3/day)1/

5.12

24.00

4.8

17.60 4.80

5.60

4.80

0.96

on/day). There

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

able 2.11-1.

eparation and

ing petroleum

no workers on

an 400 gross-

s ratified only

than 25 mg/l.

bacteria must

waste will be

n septic tank.

Fecal Waste

(m3/day)2/

1.92

9.00

1.8

6.60 1.80

2.10

1.80

0.36

efore, domestic

t

d

d

n

-

y

t

e

c

Page 73: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.11.3

garbage

substance

Industry,

wastes vo

are as fol

2.11.3.1

be groun

from land

treatmen

will be co

2.11.3.2

substance

collected

2.11.3.3

mentione

clean the

leakage t

clean imm

Chonburi

Thungsoo

each was

90-CHAP_2_in_fn_

Garbage an

Wastes from

i.e. food scrap

Hazardous w

e and solvent,

Salamander w

to collect and

All garbage a

olume and we

llows;

1 Garbage

1) Food scra

d less than 25

d at least 12 n

2) Fecal wa

nt on platform,

3) Other wa

ollected in clos

2 Hazardo

Hazardous w

e and solvent

in close conta

3 Garbage

Both garbage

ed above. In c

e leakage area

to the sea. In

mediately.

Both garbage

province. Aft

okra sub-distr

ste.

_eng (24-10-12

nd Hazardou

project opera

ps, wood scrap

wastes include

, chemical con

will employ P

d dispose wast

and hazardous

eight of each

e

aps:All food s

5 mm before b

nautical miles i

aste: Fecal wa

, FPSO and ve

astes include

se container (2

ous waste

wastes include

t, chemical co

ainers on platf

e and Hazard

e and hazardo

case of hazard

a by using spi

addition, proj

e and hazard

ter that, Prem

rict, Sriracha d

)

us Waste

ation consist

ps, paper, plas

used oil, oil

ntainer, batter

remier Oil Se

tes from proje

s wastes will

waste at colle

craps from pla

being released

in accordance

aste will be c

essel to treat a

wood scraps,

200 liters) on

used oil, oil

ontainer, batt

form, producti

dous Waste

ous wastes w

dous waste lea

ill kit, immedi

ject will provid

dous wastes w

mier Oilfield S

district of Cho

2-73

of garbage a

stic and meta

ly water, exp

ry, used PPE a

ervices, waste

ect operation.

be collected

ecting point at

atform, FPSO

d to the sea to

e with MARPOL

collected in se

and being rele

paper, plasti

platform, FPS

ly water, exp

tery, used PP

ion well and F

will be collecte

akage, project

ately. Bund w

de enough cle

will be transf

Service will tra

onburi provinc

Offshore Pet

nd hazardous

l scraps etc.

pired refrigera

and contamina

e disposal com

(Appendix 2

in containers

t platform, pr

and vessel w

o be fish food

L 73/78 Annex

eptic tank. Af

eased to the se

c and uncont

O and vessel.

pired refrigera

E and contam

FPSO.

ed to proper w

t will move wo

wall will be ins

eaning equipm

ferred to Chu

ansport the w

ce to segrega

troleum Production

Salam

s waste. How

ant, fluorescen

ted matter etc

mpany which

2-7)

by types of

oduction well,

will be collected

. Released foo

x 5.

fter that, it w

ea.

taminated met

ant, fluorescen

minated matte

waste contain

orkers to safet

stalled on plat

ment on waste

uk Samed Se

wastes to thei

te and dispos

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

wever, most o

nt lamp, exp

c.

is certified b

waste. Worke

, FPSO and ve

d to close con

od scraps mus

will be sent to

etal scraps etc

nt lamp, exp

er etc. The w

ners to preven

ty area. Clean

tform and FPS

e loading vess

eaport, Sattah

r waste dispo

se by proper

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

of wastes are

ired chemical

by Ministry of

er will record

essel. Details

ntainer. It will

st be done far

o wastewater

c. The wastes

ired chemical

wastes will be

nt leakage as

ning staffs will

SO to prevent

sel in order to

hip district of

osal center at

techniques of

t

d

d

n

e

f

s

r

r

s

e

s

t

o

f

t

f

Page 74: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

filling me

process t

incombus

as same

90-CHAP_2_in_fn_

For recyclable

ethods. Details

1) Recyclab

to improve its

2) Non-haza

stible non-haz

x Com

incin

x Inco

landf

3) Hazardou

x Com

be s

or di

x Inco

landf

Cuttings from

as hazardous

_eng (24-10-12

e wastes, the

s of waste man

le wastes incl

properties to

ardous wastes

ardous waste.

mbustible non-h

nerator of Prem

mbustible non

fill.

us wastes of p

mbustible haza

ent to burn in

isposed by lan

mbustible haz

fill technique b

m intermediate

waste. Details

)

company will

nagement of p

ude paper, iro

reuse again.

s can be divi

. Details are s

hazardous wa

mier Oilfield Se

n-hazardous w

project can be

rdous wastes

n certified incin

ndfill of Profess

zardous waste

by Premier Oil

and bottom w

s are shown in

2-74

l collect to reu

project are de

ron, wood, pla

ided as 2 typ

hown as follow

astes i.e. pape

ervice in Srira

waste, Premie

divided as 2 t

i.e. contamin

nerator i.e. Si

sional Waste T

es i.e. dry-ce

lfield Service.

wells will be a

n Section2.1

Offshore Pet

use. After tha

scribed as foll

astic, used oil

pes including

ws;

er and garbag

cha district of

er Oilfield Serv

types as follow

nated matter,

am City Ceme

Technology (1

ll battery etc.

about 2,036 m

1.1.

troleum Production

Salam

t, it will be di

ows;

etc. The was

combustible

e etc. The wa

Chonburi prov

vice will transp

ws;

cloth, oily sed

ent Public Com

1996) Ltd.

The waste w

m3. The cutting

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

isposed by bu

stes will be se

non-hazardou

aste will be se

ovince.

port to dispos

diment etc. T

mpany at Sara

will be dispos

gs will be disp

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

urning or land

ent to recycle

us waste and

ent to burn in

se by sanitary

The waste will

aburi province

sed by secure

posed on land

t

d

d

n

e

y

e

e

Page 75: 2. CHAPTER 2 PROJECT DESCRIPTION

DD2011-00590-CHAP_2_in_

Figure 2.11-6 W

Source: App

_fn_eng (24-10-12)

LO

Yes

Professional Technology Hazardous L

LO

Yes

Professional Technology Hazardous L

Waste Manageme

plied from Waste Mana

Co

Ha

Yes

Licensed LandfillOption Available?

Nos

Waste(PWT)

Landfill

Siam CityCompany

Kiln

Co

Ha

Yes

Licensed LandfillOption Available?

Nos

Waste(PWT)

Landfill

Siam CityCompany

Kiln

ent Schematic fro

agement Schematic of

ombustible

azardous?

M

No

y Cement (S.C.C.C)

n #4

On

Fly A

ombustible

azardous?

M

No

y Cement (S.C.C.C)

n #4

On

Fly A

om Project Operat

f Premier Oilfield Servi

2-75

Point of Origin Rig

Transportation WStreams

Premier Oilfield Se(Camp Site)

Medical Waste(incl. sharps)

nsite Incineration

SterSha

Ash

Point of Origin Rig

Transportation WStreams

Premier Oilfield Se(Camp Site)

Medical Waste(incl. sharps)

nsite Incineration

SterSha

Ash

tion

ces

g Site

Waste

ervices

Non-Combustible H& Non Hazard

ilized arps

Steel Smelt

Cu

g Site

Waste

ervices

Non-Combustible H& Non Hazard

ilized arps

Steel Smelt

Cu

Offshore Petr

Hazardous dous

ter

uttings Mud

Hazardous dous

ter

uttings Mud

Environ

troleum Production in Bloc

Salamander

Ch

Others

Black Water

GreyWater

Others

Black Water

GreyWater

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

ent

and

ited

tion

Page 76: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.11.3.4

greenhou

flare etc.

Calculatio

the equat

Greenho(TonCO2

2.11-3 t

Table 2.

So

Emission

Global W

Seabed su

Platform

vessel

Crane vess

Support

platform in

Remarks

90-CHAP_2_in_fn_

4 Greenho

Greenhouse g

use gases com

. Greenhouse

on in Draft Fin

tion is shown

ouse Gases 2e)

As the equati

to Table 2.11

11-2 Gree

urce (

Factor of Diese

Warming Poten

urvey vessel

mobilization

sel

vessel for

nstallation

: (1) Lower H

for the

consum

about 6

(2) Emission

Compen

(3) Global w

during 2

_eng (24-10-12

ouse Gases

gas sources

me from other

gas volume

nal Report of

as below;

=

ion above, gre

1-5)

enhouse Gas

Heat from Fue

(106 BTU/Day)

el Oil (Ton of g

ntial (CO2e)(3)

613

613

613

613

Tota

Heating Value r

Oil and Natur

mption rate of v

613,033,680 BTU

n factor of dies

ndium of Greenh

warming potent

2008-2012 (API

)

include carbo

r activities inc

can be calcu

Greenhouse G

= (Heat from(Emission

eenhouse gas

ses Estimatio

el

)(1)

Number o

Vessel

greenhouse ga

1

1

1

2

al

efers to Figure

ral Gas Industr

vessels of proje

U/dayor 613 x 1

sel oil for mobil

house Gas Emis

ial value (GWP)

, 2009)

2-76

on dioxide (C

cluding diesel

ulated by usin

Gas List of Th

m Fuel , 106BTn Factor) x (Gl

s emission of

on during Pr

of Operat

Duration

ases / 106BTU)

2

6

5

29

3-8, page 3-20

ry (API, 2009)

ect (at 12 knots

106BTU/day.

le source refers

ssions Methodol

) refers to Secon

Offshore Pet

CO2), nitrous

engine, elect

ng equation,

hailand (ONEP

TU/Day) x (Opobal Warming

project can b

reparation an

ting

(Day)

Gr

CO

) (2) 0.07

1

95.

287

239

2,776

0, Compendium

. Lower Heat

s) is equal 4,65

s to Figure 4-3,

ogies for the Oi

nd Assessment

troleum Production

Salam

oxide (N2O)

ricity generato

which is appl

P), provided b

perating Day, g Potential)

be calculated a

nd Installatio

reen House Ga

(T

O2 CH4

781 0.0000

7

1 21

75 0.08

.25 0.24

.38 0.20

6.77 2.37

3

of Greenhouse

ting Value is 5

56 gallons/day.

page 4-17 an

il and Natural G

Report ofIPCC (

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

and methane

or on platform

lied from Gre

by KMUTT (20

Day) x

as following d

on Phases

as from Other

Project

Ton CO2e)

4 N2O

0031 0.00000

3

1 310

8 0.24

4 0.72

0 0.60

7 6.98

3,410.58

e Gas Emissions

5.53 x 106BTU/

Therefore, H

nd Figure 4-5,

Gas Industry (AP

(1995). UNFCCC

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

e (CH4). The

m and vessel,

eenhouse Gas

010). Detail of

detail; (Table

r Vessel of

O

Total0063

0

4 96.07

2 288.21

0 240.18

8 2,786.1

2

s Methodologies

/day. Diesel oil

eating Value is

page 4-21 of

PI, 2009)

C had approved

t

d

d

n

e

s

f

e

s

s

f

Page 77: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Table 2.

Sour

Emission

Global W

Platform

Support Ve

Remarks

90-CHAP_2_in_fn_

11-3 Gree

rce Hea

(106

Factor of Diese

Warming Poten

essel

: (1) Lower H

Method

- Lo

eq

- Ma

BT

(2) Emission

Compen

(3) Global w

during 2

_eng (24-10-12

enhouse Gas

at from Fuel

BTU/Day)(1)

el Oil (Ton of

ntial (CO2e)(3)

1,957.3

613

Total

Heating Value re

ologies for the

ower Heating Va

qual 4,656 gallon

aximum diesel o

TU/day.

n factor of dies

ndium of Greenh

warming potent

2008-2012 (API

)

s Volume Est

Number of

Vessel

greenhouse ga

1

2

l

efers to Figure 3

Oil and Natural

alue is 5.53 x 10

ns/day. Therefo

oil consumption

sel oil for mobile

house Gas Emis

ial value (GWP)

, 2009)

2-77

timation from

Operatin

Duratio

(Day)

ases / 106BTU

272

272

3-8, page 3-20

Gas Industry (A

06BTU/day. Dies

ore, Heating Va

n rate of platfo

e source refers

ssions Methodol

) refers to Secon

Offshore Pet

m Production

ng

on

Green

CO2

) (2) 0.0781

1

41,579.3

26,044.1

of Compendium

API, 2009). Low

sel oil consumpt

alue is about 613

rm is 354 barre

s to Figure 4-3

ogies for the Oi

nd Assessment

troleum Production

Salam

n Well Drillin

House Gas fro

(To

CH4

1 0.0000031

21

32 35.44

16 22.20

67

m of Greenhouse

wer Heating Val

tion rate of ves

3,033,680 BTU/

els/day. Heating

, page 4-17 a

il and Natural G

Report ofIPCC (

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

ng Phase

om Other Vess

on CO2e)

N2O

17 0.0000006

310

104.47

65.44

7,851.03

e Gas Emissions

lue is 5.53 x 106

ssels of project

/dayor 613 x 10

g Value is abou

and Figure 4-5,

Gas Industry (AP

(1995). UNFCCC

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

sel of Project

Total 633

41,719.23

26,131.80

s 6BTU/day.

(at 12 knots) is

06BTU/day.

ut1,957.3 x 106

page 4-21 of

PI, 2009)

C had approved

t

d

d

n

0

s

6

f

Page 78: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Table 2.

Sou

Emission

Emission (4)

Global W

Gas Burnin

Diesel Oil

Consumpt

Production

Diesel Con

for Vessels

Remarks

and prod

atmosphe

3,410.58

be releas

project in

follows;

90-CHAP_2_in_fn_

11-4 Gree

urce F

R

Factor of Diese

Factors of Ga

Warming Poten

ng

ion for

n Platform

nsumption

s

: (1) Lower Hfor the - Ga- Die

(2) EmissioGreenho

(3) Accordinconsulta44of Co

(4) Emissio(5) Global w

during (6) As prev

Some activitie

duction well d

ere during pro

and 67,851.0

sed to atmosph

Greenhouse g

ncluding fuel

x Preparati

x Productio

x Petroleum

_eng (24-10-12

enhouse Gas

Fuel Consumpt

Rate/Gas Volu

el Oil (Ton of

as Burning (To

ntial (CO2e)(5)

2.46 Million Cub

Foot Per Month

690m3/month

3,350 m3/mont

To

Heating Value rOil and Natural

as is transferredesel oil: 5.53 x n Factor for Douse Gas Emissng to natural gant company chompendium of Gn factor of CO2hwarming potent2008-2012 (AP

vious operation,

es will occur

drilling (Table

oduction well

03 tons as CO

here about 13

gas volumes i

use and max

on and install

on wells drillin

m production w

)

ses Estimatio

tion

ume

Heating

(1

greenhouse ga

on of Greenho

bic

h6/

h

th

otal

efers to FigureGas Industry (A

d to burn at flare106 BTU/diesel oiesel Oil refersions Methodologas properties fhose emission fGreenhouse Gashas an assumptial value (GWP)I, 2009) the data is a m

from project

e 2.11-2 an

preparation a

O2 equivalent,

34,583.32 tons

in petroleum

ximum burnt g

ation will take

g phase (16 w

will be implem

2-78

on during Pe

g Value from P

or Gas Burnin

106BTU/Month

ases / 106BTU

use Gas/Cubi

2,733

24,013.21

116,586.90

3-8, page 3-20API, 2009) as foe : 1,111 BTU/ coil consumption

s to Figure4-3, ogies for the Oil from well in nefactor for naturs Emissions Methtion that carbon) refers to Secon

maximum gas vo

including BLW

d Table 2.1

and installation

respectively.

sCO2 as equiva

production ph

gas volume b

e about 1 mon

wells) will take

mented until ex

Offshore Pet

etroleum Pro

Petroleum

ng

h) (1) C

) (2) 0.

c Foot) (3)

0.

19

1,8

9,

0of Compendiumollows; cubic foot

n 1 barrels or 0.page 4-17 andand Natural Gaearby areas foural gas burning hodologies for t will be burnt and Assessment

olume from prod

WPB productio

11-3). Greenh

n phases and

In petroleum

alent. (Figure

hase has been

y flare. The s

nth.

e about 272day

xpired date of

troleum Production

Salam

oduction Pha

Green House

CO2 CH4

07810.0000

7

0710 0.0000

1 21

94.05 2.58

875.43 1.60

105.44 7.76

11,215.26

134,583

m ofGreenhouse

1589 m3. d Figure 4-5, ps Industry (API,und that sulphu(Sweet Gas), r

the Oil and Natund changed to bReport ofIPCC (

duction process

on platform m

house gas vo

production we

m production p

e 2.11-4)

n calculated b

schedules of e

ys or 9months

f concession (2

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

ase

e Gas from Ot

Project

(Ton CO2e)

4 N2O

0031 0.0000

33

045 0.00000

310

8 26.45

0 4.71

6 22.88

6 Tons CO2ePe

3.12Tons CO2e

e Gas Emissions

page 4-21 of C, 2009) ur is in low varefers to Figureural Gas Industrbe CO2 (100% (1995). UNFCCC

in Bualuang pro

mobilization an

olumes may b

well drilling pha

phase, greenh

by using data

each project a

s.

2020)

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

ther Vessel of

O

Total

006

0096

0

5 197.44

1 1,881.7

8 9,136.0

er Month or

e Per Year

s Methodologies

Compendium of

lue. Therefore,e 4-12, page 4-ry (API, 2009) conversion).

C had approved

oduction area.

nd installation

be emitted to

ase are about

house gas will

from current

activity are as

t

d

d

n

l

4

74

08

s

f

o

t

t

s

Page 79: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

operation

2.11-5).

Table2.1

GreenVolume

PreparatioPhases1/: 3,410.58 t

Production67,851.03

Petroleum1,076,664

Remarks

90-CHAP_2_in_fn_

During projec

n because pro

Supporting ca

11-5 GreeGree

nhouse Gas Emfrom Project A

on and Installatio

tons as CO2 equ

n Well Drilling Ptons as CO2 eq

Production Pha.96tons as CO2

:1/ Preparatio 2/ Production 3/ Petroleum

_eng (24-10-12

ct operation,

oject will not

apacities betwe

enhouse Gasenhouse Gas

mission Activities

on

uivalent

hase2/: quivalent

ase3/: equivalent

on and installation well drilling ph production will

)

greenhouse g

increase petr

een BLWPA an

s Emission Vs EmissionVo

Current GEmissi

9,333.52tons

9,333.52tons

T

on phases will tahase will take ab be implemente

2-79

gas volume f

roleum produc

nd BLWPB are

Volume from olume

reenhouse Gaion Volume

s as CO2 equival

s as CO2 equival

Total

ake about 1 mobout 272 days oed until expired

Offshore Pet

from project o

ction or chan

e shown in Ta

Project Acti

as GrB

ent

ent

onth. or 9 months. date of concess

troleum Production

Salam

operation will

ge number of

ble 2.11-6

vities When

reenhouse GasBualuang Petro

12,744.1ton

151,852.71to

1,076,664.96

1,241,261.44

sion (2020)

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

not change

f vessel and

Compares w

s Emission Vooleum Produc

ns as CO2 equiv

tons as CO2 equ

tons as CO2 eq

tons as CO2 eq

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

from current

FPSO (Table

with Current

lume From ction Area

valent

ivalent

uivalent

uivalent

t

d

d

n

t

e

t

Page 80: 2. CHAPTER 2 PROJECT DESCRIPTION

1

2

3

45

6

78

D2011-0059

Table2.1

. Petroleum P- Crude Oil- Produced- Gas

. Support Ves- Installatio- Support P- Support P

. Garbage Ma- Hazardou- Garbage

. Cuttings fro

. Domestic W- Preparatio- Productio- Petroleum

. Undersea Fe- Petroleum

Platform - BLWPA to- Pipeline f

Water Inj. Water Injec. Onshore Ba

Remark:

90-CHAP_2_in_fn_

11-6 Sup

Detail

Production of FPl d Water

ssel onBLWPB PlatfoProductionWell Petroleum Produanagement us Waste

om Drilling ProceWastewater and

on and Installaton Well Drilling Pm Production Pheeder Line m Feeder Line fr

oFPSO from Productionjection Well

ction Well se2/

1/Support vesseDuring pet

2/Activities

_eng (24-10-12)

porting Capa

PSO

orm Drilling uction

ess Fecal Waste tion Phases Phase hase

rom Production

Process to

el for BLWPB protroleum productin onshore bas

)

acities of BLW

Cap

2440

2

31

216

40

40

38

oduction platfortion phase, projse will not increa

WPA and BL

pacity

,000 ,000 25 - - -

300 100

-

212 140 65

,000

,000

,000 -

rm installation wject will use thease because the

LWPB

Unit

Barrel/DBarrel/D

MMCF

VesseVesseVesse

Ton/DTon/D

M3

PersoPersoPerso

Barrel/D

Barrel/D

Barrel/DPerso

will implement o current vessels

e activities have

t

Day Day FD

el el el

Day Day

on on on

Day

Day

Day on

nly in platform s. e been implemen

Petroleum PBLW

(Pres

7,12,0.0

00

6

19,

12,

12,

installation pha

nted so far. The

Production of WPA sence)

500 ,000 0353

- - 2

0.2 0.4 - - -

65

,500

,000

,000 6

se (1 month). S

e increasing acti

201

7,4011,500.03

532

108

689.1

21214065

18,90

11,50

11,506

Support vessel f

ivities of project

2-80

2 20

0 1100 255 0.0

11 2,4

2 0 1

6

00 36

00 25

00 25

or production w

t will be occued

013

1,100 5,600 05217

- 3 2

10 8 11.89 -

140 65

6,700

5,600

5,600 6

well drilling will i

only in product

Petroleu

2014

7,600 29,500 0.03572

- - 2

0.2 0.4 - - -

65

37,100

29,500

29,500 6

mplement only

tion well prepar

um Production

2015

6,600 30,400 0.03102

- - 2

0.2 0.4 - - -

65

37,000

30,400

30,400 6

in production w

ration and instal

n of BLWPA an

2016

5,800 31,200 0.02726

- - 2

0.2 0.4 - - -

65

37,000

31,200

31,200 6

well drilling phas

llation phase. Fo

ndBLWPB (For

2017

5,200 31,8000.02444

- - 2

0.2 0.4 - - -

65

37,000

31,800

31,8006

se (9months). A

or petroleum pr

Offshore Petrole

r Approval)

201

4,7

0 32,34 0.02

--2

0.0.- --

65

0 37,0

0 32,3

0 32,36

After that, the ve

roduction phase

Env

eum Production in

Salaman

18 2

700 4300 32209 0

- - 2

.2

.4 -

- - 5

000 3

300 3

300 36

essels will move

e, the activities w

vironmental Impac

Block B8/38 in Gu

nder Energy (Bual

Chapter 2 Proje

2019

4,300 32,700 .02021

- - 2

0.2 0.4 - - -

65

37,000

32,700

32,700 6

e out of the proj

will not change.

act Assessment

Gulf of Thailand

aluang) Limited

ject Description

2020

3,900 33,100 0.01833

- - 2

0.2 0.4 - - -

65

37,000

33,100

33,100 6

ject area.

.

Page 81: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.12

2.12.1

operation

low light

accommo

compress

misunder

during ch

2.12.2

aimed to

impact fr

safety an

human he

sanitation

internatio

90-CHAP_2_in_fn_

Safety, O

Environmen

Working area

1) Drilling o

n and petroleu

intensity in w

2) Workers

odation area, c

3) Workers

sor, generator

4) In all wo

rstanding and

5) Workers

hemical transfe

Occupation

During condu

promote occu

1) Safety an

om project ac

2) Preserve

3) Give resp

Salamander E

nd environmen

ealth and env

To meet this a

1) Promote

n, safety and e

2) In case n

onally accepte

_eng (24-10-12

Occupatio

ntal working

that can be a

operation and

um production

orking area, a

who stay at

contagious dis

who work in

r and chemica

rking areas, p

lacking of goo

who work at

erring.

nal Health an

cting all busin

upational healt

nd occupation

ctivities.

environment

pect to commu

Energy (Bualua

nt as well as v

vironment caus

aim, Salamand

organizationa

environment.

no protocols o

d.

)

onal Heal

g condition a

a threaten hea

d petroleum p

n have a risk

and heat outsid

accommodati

sease involving

engine and

l spillage.

poor working p

od relationship

onshore supp

nd Environm

ness and work

th and environ

nal health for

in the project

unity’s demand

ang) Limited is

verification an

sed by workin

der Energy (B

al culture to e

r regulations s

2-81

th and En

and threate

alth factor for

production are

to expose to

de.

ion on FPSO

g respiratory s

chemical sto

posture can ca

p among colle

porting area,

mental Mana

king activities o

nment as follo

r all company

areas.

d in the projec

s concentrate

nd developmen

g activities.

Bualuang) Limi

ncourage all w

specified, com

Offshore Pet

nvironme

en health

workers is as

eas, workers

chemical con

vessel may g

system, digest

rage areas m

ause a health

agues.

especially in

agement

of Salamander

owing protocol

y’s workers an

ct area

d to enforce u

nt these polici

ited will follow

workers partic

mpany shall fo

troleum Production

Salam

ental

follows:

especially wh

taminated in

get impact on

tive system an

may expose to

impact for all

the port area

r Energy (Bua

ls:

nd involved p

using the polic

es. Company

w these protoco

cipate to follow

llow protocols

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

ho take cont

drilling mud,

n climate, air

nd skin.

o noise espec

workers, as w

a, may expose

aluang) Limited

persons who

cy on health a

aims to redu

cols:

w the policy o

s and regulatio

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

trol in drilling

engine noise,

distillation in

cially from air

well as strees,

e to chemical

d, company is

may get any

nd sanitation,

ce any risk to

on health and

ons which are

t

d

d

n

r

s

y

o

e

Page 82: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

manage w

organizat

protocols

on the im

well as w

and envir

2.12.3

impacts f

90-CHAP_2_in_fn_

3) Develop

working activi

4) Develop

tion managem

5) Specify a

s to emergency

6) Specify a

mportance of h

7) Ensuring

8) Searching

waste reduction

9) Appropria

ronment.

Emergency

Project has p

from the even

x Drilling co

x Emergen

x Medical p

x Death res

x Response

x Response

x Response

x Response

x Response

x Response

x Response

x Documen

_eng (24-10-12

management

ties by empha

awareness a

ment field.

appropriate m

y incidence fro

appropriate an

health and san

that policy of

g appropriate

n, resource co

ately monitor

y Response P

rovided emerg

t. Emergency

ontrol plan

cy response p

plan

sponse plan

e plan for helic

e plan for vess

e plan for fallin

e plan for divin

e plan for crim

e plan for typh

e plan for oil s

nt forms

)

t system on

asis on avoidin

and responsib

mitigation me

om any compa

nd sufficient tr

nitation, safety

f contractors is

measures to

onservation, an

the progress

Plan

gency respons

response plan

plans for fire o

copter crash o

sel crash

ng overboard

ng accident

me on a vessel

hoon emergen

spill

2-82

health and s

ng and protect

bility on hea

asures to pr

any’s working

raining progra

y and environm

s in line with p

reduce an im

nd biodiversity

and implemen

se plan for Bu

n of project ca

or explosion

or fire

ncy

Offshore Pet

sanitation, sa

ting risk.

lth and sanit

otect and co

activities.

ams for worke

ment.

policy of comp

mpact on envir

y conservation

nting based o

ualuang produ

an be conclude

troleum Production

Salam

fety and env

tation, safety

ontrol the risk

rs and contrac

pany in related

ronment cause

n.

n policy on he

uction area (Bl

ed as follows:

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

vironment to

y and environ

ks as well a

ctors to make

d aspects.

ed by working

ealth and san

lock B8/38) to

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

indicate and

nment within

s responding

e them realize

g activities as

itation, safety

o mitigate the

t

d

d

n

e

s

y

e

Page 83: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

only the

typhoon e

2.12.3.1

and resp

block B8/

impact on

oil situati

and Coop

90-CHAP_2_in_fn_

x Individua

Details of eme

important em

emergency. D

1 Oil Spill

Salamander C

onse on oil sp

/38 (Bualuang

n oil spill to e

ion. This proto

peration, 2002

Handbook of

x PartA: St

R Intro

R Class

R Strat

x Part B: A

R Asse

R Setti

R Stan

R Oper

R Indiv

x Part C: A

R Incid

R Oil s

R Oil s

R Shor

R Appe

_eng (24-10-12

al or organizat

ergency respo

mergency resp

Detail of each p

Response

Company had

pillage which

g area). This h

nvironment. T

ocol is corresp

2 which also co

Oil Spill Contin

trategy Plan

oduction: obje

sification and

tegic and resp

Action Plan

essment the le

ing up the org

ndard practice

ration plan

vidual or organ

Appendices

dent reporting

pill clean-up t

pill chemical t

reline oil spill c

endices

)

ion contact lis

onse plan of p

ponse plan e.g

plan is as follo

successfully p

may occur du

handbook is p

This will help t

ponded to the

overs petroleu

ngency Plan (O

ectives, inciden

oil spill risks

ponse to emerg

evel of oilspill

ganization to p

to preparedne

nization conta

document for

ool

treating agent

clean-up

2-83

st for emergen

project are sho

g. response p

ows:

prepared hand

uring petroleu

provided the co

to control the

e Internationa

um exploration

OSCP) is divid

nt control and

rgency inciden

preparedness a

ess and respo

act list for eme

rms

Offshore Pet

ncy incident

own in Appen

plan for oil sp

dbook for Oil S

m exploration

ontrol and res

distribution o

l Convention o

n and producti

ded into 3 part

policy

ces

and response

onse to emerge

ergency case

troleum Production

Salam

ndix 2-9. How

pill, medical p

Spill Continge

n and product

sponse proced

of spilled oil as

on Oil Pollutio

ion of the curr

ts including

to emergency

ency incidents

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

wever, this rep

plan and respo

ency Plan (OSC

tion in the Gu

dure to preven

s well as remo

on Preparedne

rent project.

y incidents

s

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

port will show

onse plan for

CP) to control

lf of Thailand

nt and reduce

oval of spilled

ess, Response

t

d

d

n

w

r

e

e

Page 84: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

spill into

control of

Bangkok.

who are r

incident i

2.12-3 s

90-CHAP_2_in_fn_

Overall picture

Salamander g

the sea. There

1) Incident

f Bualuang Fie

2) Local Inc

. LIMT office a

responsible fo

Figure 2.12-

into the sea,

shows scheme

_eng (24-10-12

re of company

group set up t

e are 2 organi

Command Po

eld Superinten

cident Manage

at Sattahip Po

or managing th

-1 shows ove

and Figure2.

e of emergency

)

y to preparedn

the organizati

izations includ

ost (ICP) is se

ndent served a

ement Team (

ort is coordina

he incident un

erall picture of

.12-2 represe

y incident man

2-84

ness and respo

on to prepare

ding

et up on FPSO

as On Scene C

(LIMT) is set

ated with Prod

nder the contro

f organization

ents scheme o

nagement tea

Offshore Pet

onse to oil spil

edness and re

O vessel in Bu

Commander (O

up at Sattahi

duction and Op

ol of General M

to preparedn

of emergency

am (IMT) of Sa

troleum Production

Salam

ll emergency

sponse to the

ualuang area.

OSC).

p Port and Sa

peration Mana

Manager (GM)

ness and respo

management

alamander Gro

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

e emergency

This organiza

alamander off

ager or their r

).

onse to oil sp

t team in the

oup.

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

incident of oil

ation is under

fice located in

representative

pill emergency

area. Figure

t

d

d

n

r

e

y

e

Page 85: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Figure

Sour

90-CHAP_2_in_fn_

2.12-1 Oveem

rce: Salamande

_eng (24-10-12

erall picturemergency inci

r (2011)

)

e of organident into th

2-85

nization to he sea

Offshore Pet

preparedne

troleum Production

Salam

ss and res

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

sponse to o

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

oil spill

t

d

d

n

Page 86: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Figure

Sourc

90-CHAP_2_in_fn_

2.12-2 Sc

ce: Salamander

_eng (24-10-12

hematic of E

(2011)

)

Emergency M

2-86

Management

Offshore Pet

t Team in Ba

troleum Production

Salam

ngkok

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

t

d

d

n

Page 87: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Figure

Sou

90-CHAP_2_in_fn_

2.12-3 Sc

Advise

Support and R

Responsible

Respond Em

Evenurce: Salamand

_eng (24-10-12

hematic of E

Co

e and support LI

RIMT

e Person

mergency

ntder (2011)

)

Emergency I

Local Incid

oordinate with R

IMT

Inform

2-87

ncident Man

Region Incid

ofSalaman

dent Manageme

RIMT

m

Offshore Pet

nagement Te

Crisis M

ofSalam

dent Manageme

nder Energy Sin

ent Team: LIMT

troleum Production

Salam

eam (IMT) of

Management Te

mander Energy P

ent Team: RIMT

gapore Plc Ltd

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

f Salamande

eam: CMT)

Plc London

T)

Inform

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

er

Inform

t

d

d

n

Page 88: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

response

Departme

follows:

area as w

2.12-5 s

90-CHAP_2_in_fn_

Oil Spill Res

Oil spill respo

can be classif

x Tier 1refe

x Tier 2refe

x Tier 3 ref

Whenever an

ent.

Protocol to pr

The purposes

x To efficie

x To contro

x To report

Bualuang Fiel

well as On Sce

x Follow th

x Set up In

x To respo

x Warn and

Manager

Figure 2.12-

shows the prot

_eng (24-10-12

sponse Level

onse depends

fied as 3 level

ers to an oil sp

ers to oil spill

fers to an oil s

ny level of oi

reparedness a

s of protocol t

ently prepared

ol high amoun

t incident and

ld Superintend

ene Commande

he safety meas

ncident Comm

nse to oil spill

d give summa

stationed as o

-4 shows ope

tocol to prepa

)

ls

on oil spill vo

s as follows:

pill with volum

with a volume

spill with a vol

il spill occurs

and response t

to preparedne

ness and resp

nt of oil spill in

ask for help f

dent will be a

er (OSC) in th

sures immedia

and Post to ev

emergency in

ary to Product

office in Bangk

rating system

redness and r

2-88

olume, severit

me of less than

e between 20

ume of more

s, Salamander

to oil spill eme

ess and respon

ponse to oil sp

ncident emerge

from Local Inc

a representativ

he drilling oper

ately when oil

valuate and re

ncident

tion and Ope

kok

to response t

response to oi

Offshore Pet

ty of event, o

n 20 tons.

and 1,000 ton

than 1,000 to

r Company w

ergency incide

nse to oil spill

pill incident Tie

ency (Tier 2 a

cident Manage

ve of Salama

ration area. Th

spill incident o

esponse to oil

ration Manage

to oil spill inci

l spill incident

troleum Production

Salam

il type and oi

ns.

ns.

will report Tha

ent into the sea

emergency in

er 1

nd Tier 3) imm

ement Team (L

nder Energy (

he responsibili

occurs

spill emergen

er stationed a

dent emergen

emergency

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

l spill location

ai Governmen

ea

ncident into th

mediately

LIMT) located

(Thailand) sta

ities of OSC a

ncy incident

as Sattahip off

ncy in the are

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

n. The oil spill

nt via Marine

he sea are as

in Bangkok

ationed in the

re as follows:

fice and Duty

a and Figure

t

d

d

n

e

s

e

y

e

Page 89: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Figure

Sour

90-CHAP_2_in_fn_

e 2.12-4 Oi

rce: Salamande

Inform to Oper

Excl

Vess

Shorel

HSE Staff

_eng (24-10-12

l Spill Respo

r (2011)

ration Manager Manager

usion Zone

sel Masters

line Exclusion

fs of Salamande

)

onse Flow Ch

Dire

and Shift

er

2-89

hart

ector of Bualuan

Offshore Pet

ng (OSC)

troleum Production

Salam

Aerial Su

Aircraft C

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

urveillance

Coordinator

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

t

d

d

n

Page 90: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Fig

I

P

e

Si

So

90-CHAP_2_in_fn_

gure 2.12-5

Identify source o

Prevent sparklin

Report toL

Manageme

Manage by oequipmen

Manage by addequipmen

Finish, collecequipment, and

the same p

Warning

te supervisor assituatio

Immediately stoworks

ource: Salaman

_eng (24-10-12

Procedure

FPSO

of leaking

ng sources

LIMT

ent

n-site nt

ditional nt

ct all return to lace

g

ssesses the n

op all hot

nder (2011)

)

for Oil Spill

O (Rubicon Va

Analy

As

On-site equipment

is sufficient.

R

t

2-90

Response

antage)

yze and assess

ssess level of le

On-site and additional

equipment is sufficient.

Request additioassistance

OSRL’s equipmtransportation to

area

Offshore Pet

situation

aking

On-site and additional

equipment is insufficient.

nal

ment o the

troleum Production

Salam

LI

In

Logist

Prespo

Duty

+

T

OProd

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

IMT Bangkok

nform members ofLIMT

HSE and tic consultants a

recorder

Provide oil spill onse tool for leve

and 3

y Manager informthe GM

contactOSRL +65-6266-1566

Transportation preparation

Report Operation and duction Manage

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

and

el 2

ms

er

t

d

d

n

Page 91: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

Field eme

available

the proje

However,

response

for adsor

removal s

handle oi

Rubicon V

supportin

the pillow

90-CHAP_2_in_fn_

In cooperatio

1) Tier 1 O

Tier 1 oil

ergency respo

tools in the a

ect area. Ther

, all informatio

The infor

to oil spill inc

x Oil s

anch

x Skim

self-a

x DESM

spille

x Pillow

tank

x Tow

for s

x Outr

lengt

x Pum

Salamand

rbing oil at Bu

spilled oil, it i

il spill in the v

The tools

Vantage of th

ng vessel in th

w tank. After t

_eng (24-10-12

on to prepared

il Spill

spill is define

onse team and

area. The situ

refore, it is no

on needs to be

rmation of ava

cident emerge

sweeping boom

hor and lifting

mmer: DESMI

adjusting weir

MI Hydraulic P

ed oil.

w Tank, Mode

k has capacity

able Flexible

store pumped

rigger Arm, 2

th. Additional

p, controlling

der Company

ualuang produ

s expected to

olume of 80,0

s for removing

he project loca

he area and a

hat, oil will be

)

dness oil spill

ed as oil spill w

d on scene com

uation should

ot necessary t

e informed to

ailable tools an

ncy include

m: Internal Fo

cable) used fo

TERMITE We

r skimmer acc

Power Pack, 1

el CANFLEX CP

of 3.785 m3 u

Floating Tank

oil before sen

sets. First set

devices are in

valve, hydrau

also provides

uction site. Th

o use at the ra

000 L (500 bar

g of oil spill ar

ated in Block

assemble oil sw

e transferred a

2-91

incident in an

with the volum

mmander are

be solved imm

to ask help fr

Salamander o

nd devices in

oam Sweep Bo

or sweeping o

eir Skimmer, 1

cording to the

1 unit, used fo

PT-1000FS, 2

used for store

k, CANFLEX FC

nding to clear u

t is size of 6 i

nstalled tools a

ulic cable and o

oil adsorbent

his chemical w

atio of 1:40 o

rrel approxima

re normally ke

B8/38. When

weeping boom

and eliminated

Offshore Pet

ny level, the de

me less than 2

responsible to

mediately with

rom Salamand

office in Bangk

the project ar

oom, 4 sets, le

oil

1 unit, centrif

pumping rate

or generating

tanks. Capaci

pumped oil be

CB-43E Model,

up.

nch and 10 m

at the side of

other necessa

“COREXIT 95

will be kept o

of spilled oil. W

ately).

ept in containe

these tools a

m. Then, skim

d by approved

troleum Production

Salam

etails are as fo

20 tons in the

o control and s

hout cause an

der support te

kok.

rea which are

ength 60 m, w

fugal submers

. Pump can re

energy or pow

ty tank of 3.8

efore sending

,1 tank, capac

m length. Seco

the vessel, rop

ry tools

527” (Append

on the vessel

With the availa

er located on t

are needed, w

mmer will pum

contractor.

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

ollows:

e working area

solve the situa

ny impact to t

eam stationed

e used to prep

with additiona

sible pump qu

emove oil 30 m

wer to block a

875 m3 used fo

to clear up.

city tank of 16

ond set is 8 in

pe and tie too

dix 2-10) whi

at volume of

able COREXIT

the production

workers will ins

mp the spilled

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

a and nearby.

ation by using

the outside of

d in Bangkok.

paredness and

al devices (i.e.

uipped with a

m3/hr.

and pump the

or store. Each

6.277 m3 used

nch and 10 m

ols.

ch works well

f 2,000 L. For

T 9527, it can

n platform, or

stall arm with

oil to keep in

t

d

d

n

f

e

r

r

Page 92: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

and near

Team (LI

tools or

companie

district, C

which SE

productio

Table 2.

Ne

Benjam

Platon

Jasmin

Remark: Source: S

area and

Incident

and may

additiona

(OSRL) to

Singapore

After Sala

90-CHAP_2_in_fn_

2) Tier 2 O

Tier 2 oil

rby. For this

IMT) stationed

devices from

es with conduc

SEACOR

Chonburi prov

EACOR has pro

Estimated

on area to Bua

12-1 Duraarea

earby Product

mas production s

ng production sit

ne production si

*estimated fromSalamander Ene

3) Tier 3 Oil

Tier 3 oil

d nearby whic

Management

y influence for

al tools/device

o suspend the

Salamand

e. OSRL is a c

amander infor

x Imm

site i

x Tool

airpo

the a

_eng (24-10-12

il Spill

l spill is define

level, Salama

d in Bangkok

m in-country

cting the simil

provided too

vince and Son

ovided for othe

d time to tra

aluang product

ation for traa located in G

tion Site

site (Chevron)

te (Chevron)

te (Pearl Oil)

m speed of 10 kergy (Bualuang)

l Spill

spill is define

ch is exceed t

Team (LIMT)

r a long time

es from Salam

e situation as s

der Company

company that

rmed OSLR, th

mediately after

in Thailand wi

s and device

ort. Duration t

airport.

)

ed as a signifi

ander team in

still can contr

institutions e

lar business an

ols for oil spi

gkla province

er petroleum p

ansfer spilled

tion area is at

ansferring spGulf of Thaila

Distance Sit

knot Limited Compa

ed as a signific

the capability

stationed in B

for the area

mander located

soon as possib

has a contract

service for pr

he procedure o

getting inform

ithin 6 hours.

will be trans

to reach the p

2-92

icant oil spill w

ncluding Incid

rol the situati

e.g. SEACOR

nd located ne

ll manageme

e. According to

production com

oil removal

t least 6 hours

pilled oil remand to Bualu

to Bualuang Pte (nautical m

58

81

75

any (2012)

cant oil spill w

of Salamande

Bangkok still c

and domestic

d outside cou

ble.

ct with Oil Spill

roviding aeria

of OSLR to ma

med, OSLR wi

sferred by O

production site

Offshore Pet

with the volum

ent Command

on. In some c

Environmenta

ar by, and Tha

nt at the SE

o service cont

mpany. The d

tools belonge

s (Figure 2.12

moval tools uang Produc

Production mile)

with the volum

er team inclu

can control th

c and internat

ntry, Thai gov

l Response Lim

l dispersant sp

anage the situ

ill prepare too

SLR airplaneC

e should not m

troleum Production

Salam

me of 20-1,00

d Post and Lo

cases, LIMT m

al Services In

ai government

ACOR’s ware

tract, Salaman

etail is shown

ed to SEACO

2-1).

from nearbytion Area

Duration

me larger than

ding Incident

e situation. T

tional levels.

vernment, or

mited (OSRL)

pray and cons

ation is as foll

ols and devices

C-130 Hercule

more than 6 ho

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

00 tons in the

ocal Incident

may ask help

nc. (SES) Th

t, etc.

ehouse located

nder can use

n in Appendix

OR from nearb

y petroleum

n of transport

5.8

8.1

7.5

n 1,000 tons in

Command Po

This level is se

Company will

Oil Spill Resp

located in

sultant when o

low:

s and reach th

es leaving fro

ours dependin

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

working area

Management

for additional

hailand, other

d at Sriracha

tools/devices

x 2-11.

by petroleum

m production

t (hour)*

n the working

ost and Local

vere situation

l ask help for

ponse Limited

oil spill occur.

he production

om Singapore

g on traffic at

t

d

d

n

t

r

s

r

e

t

Page 93: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

to furthe

which are

2.12.3.2

January.

and adve

incident i

drilling w

protocol.

depressio

typhoon (

which ca

will make

are show

90-CHAP_2_in_fn_

x Dura

appr

airpo

x Whe

and

x From

However,

er inform peop

e internationa

2 Respons

In the area o

However, the

erse climate co

immediately to

well as well as

The best resp

The protocol

on (equal or

(exceed 64 kn

The response

n be classified

e decision.

Protocols of a

wn in Figure 2

_eng (24-10-12

ation from Si

roximately 2

ort including c

en OSLR reach

summary of s

m Utaphao airp

, in case the s

ple who live a

lly accepted fo

se plan for T

of the Gulf of T

ey may occur

ondition, Sala

o protect emp

workers who

ponse is the ev

in typhoon r

less than 33

not).

e plan is speci

d in 5 phases

all 5 phases to

2.12-6. Detail

)

ingapore airp

hours. Salam

ustom and im

h Utaphao air

situation befor

port, it will tak

spilled oil is go

at the coast f

or oil spill resp

Typhoon

Thailand, Typ

outside this p

mander Energ

ployees and co

work on supp

vacuation from

response plan

knot), tropic

fied the proto

s. To determin

o give warning

s can be conc

2-93

port to Utaph

ander will co

mmigration.

rport, it will ta

re staring aeria

ke approximat

oing to reach t

for situation p

ponse will han

phoon and adv

period. Therefo

gy (Bualuang)

ontractor’s wo

port vessel. Th

m the area.

n is depended

cal storm (34

ocol including

ne the period,

g and evacuat

cluded as follow

Offshore Pet

hao airport,

oordinate and

ake approxima

al dispersant s

tely 1 hour to

the coast. Sal

preparedness.

dle the overal

verse climate

ore, in order t

) Limited has

orkers who wo

e response pl

d on the stre

4-47 knot), se

warning and

, manager on

tion of employ

ws:

troleum Production

Salam

Sattahip distr

prepare all

ately 1-2 hour

spray.

reach Bualuan

amander will i

At the same

l situation.

condition mos

to protect the

preparedness

ork on FPSA v

an is followed

ngth of clima

evere tropical

evacuation of

drilling rig an

yee from the a

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

rict, Chonbur

ground works

rs for custom

nd production

inform all rela

e time, SEACO

stly occur dur

e emergency f

and response

vessel, produc

d the typhoon

ate condition

l storm (48-6

f all workers f

nd company r

area when Ty

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

ri province is

s at Utaphao

, immigration

site.

ated provinces

OR and OSRL

ing August to

from Typhoon

e plan for the

ction well and

preparedness

from tropical

63 knot), and

from the area

representative

yphoon occurs

t

d

d

n

s

o

s

L

o

e

s

e

s

Page 94: 2. CHAPTER 2 PROJECT DESCRIPTION

DD2011-00590-CHAP_2_in_

Figure2.12-1 W

Source: Salama

_fn_eng (24-10-12)

Warning in each

nder (2011)

phase of Typhoonn in the Gulf of Th

2-94

hailand by Salamaander

Offshore Petr

Environ

troleum Production in Bloc

Salamander

Ch

nmental Impact Assessme

ck B8/38 in Gulf of Thaila

r Energy (Bualuang) Limit

hapter 2 Project Descripti

ent

and

ited

tion

Page 95: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

2.12.3.3

sanitation

sickness

response

order tran

of patient

90-CHAP_2_in_fn_

x Warning

the dista

formation

usual. Ho

x Phase I

distance

stationed

carefully.

temporal

every 6 h

x Phase I

distance

and caref

will be ev

x Phase II

distance

evacuate

on the dr

moving t

Weather

x Phase4

distance

FPSO ves

Project w

to the saf

3 Respons

Salamander E

n of employe

or severe inju

plan will be

nsfer patients

Salamander C

ts/injured pers

Details of serv

_eng (24-10-12

g phase (gre

nce more than

n of a Typhoo

owever, all inv

(green zone

around 650 n

d at Sattahip

. Unnecessary

ly paused. Pro

hours.

I(yellow zon

around 550 n

fully. All proje

vacuated from

II (orange z

around 450

ed to the safe

rilling rig and

the drilling rig

Service (MWS

(red zone:3

around 350 n

ssel are evacu

will move the d

fe port or safe

se plan for m

Energy (Bualu

ee who work

ury from accid

used as the f

to the doctor

Company has t

son for 24 hou

vice contract w

)

ey zone: 1,1

n 1,150 nautic

on and be ab

volved persons

e:650 nautic

nautical miles

office will sta

y project acti

oject will get

ne:550 naut

autical miles f

ect activities o

m drilling rig an

one:450 nau

nautical mile

zone. Howeve

FPSO vessel a

g and droppin

S) Company ev

350 nautical

nautical miles

uated, except

drilling rig and

e anchored po

medical

uang) Limited

in the Bulua

dents of emplo

first-aid for th

rs safety and i

the contract w

urs (365 days)

with SOS as fo

2-95

50 nautical

cal miles from

ble to reach th

s need to watc

cal miles fro

from the pro

art preparedne

ivities on dril

update on sit

tical miles fr

from the proje

on drilling rig w

nd FPSO vesse

utical miles f

es from the

er, the employ

are still in the

ng the ancho

very 3 hours.

miles from

from the proj

for some em

d floating oper

osition.

d Company h

ng production

oyees are occ

e patient/inju

nstantly, as w

with Internatio

) which can be

ollows:

Offshore Pet

miles from

m the project a

he project are

ch out the situ

om the proje

oject area. Em

ess the situat

lling rig, prod

uation from M

rom the proj

ect area. The s

will be paused

el to the safe a

from the pro

project area

yee who is re

e project area

or. Project wi

the project

ject area. All

mployee who i

ration unit to t

has a medical

n area. The

curred during

red person be

well as to reduc

onal SOS Serv

e reached by

troleum Production

Salam

project area

area. The warn

ea. The proje

uation closely.

ect area)Whe

mergency Res

tion. The resp

duction well a

Marine Weathe

ject area)Wh

situation will b

d. All uninvolv

area.

oject area)W

a. More uninv

sponsible for d

. Project will s

ll get update

t area) When

employees wh

s in charge a

the safe area.

response pl

response plan

project activit

efore reaching

ce the severity

ice (Thailand)

phone 24-hou

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

a)When Typho

ning of the po

ect activity is

en typhoon st

sponse Onshor

ponse plan w

and FPSO ve

er Service (MW

hen typhoon s

be watched ou

ved persons an

When typhoon

volved emplo

drilling and co

specified the s

on situation

n typhoon sto

ho work on d

re still in the

The vessels w

an relating t

n will be perf

ties (Figure 2

g the infirmar

y as less as po

) Limited for th

ur hotline.

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

oon occurs in

ossible for the

conducted as

torm is in the

re Committee

will be verified

essels will be

WS) Company

stormis in the

ut very strictly

nd employees

stormis in the

oyees will be

ommunication

safe route for

from Marine

orm is in the

rilling rig and

project area.

will be moved

o health and

formed when

2.12-7). This

ry on shore in

ossible.

he evacuation

t

d

d

n

e

s

e

e

y

e

y

s

e

e

r

e

e

s

Page 96: 2. CHAPTER 2 PROJECT DESCRIPTION

D2011-0059

doctor st

sickness/

informati

patient. I

company

doctor du

project. I

hospital

patient/in

for transf

is foreign

method f

severity o

distance,

be preced

transferri

is respon

name of

for select

services f

90-CHAP_2_in_fn_

Evacuation of

1) When the

ationed at dri

/injury, and o

on will facilita

If necessary,

y.

2) ISOS Com

uring the tran

If transferring

in Thailand i.

njured person

3) If patient

ferring patient

ner).

4) ISOS Co

for patient/inju

of sickness/inj

etc. in order

ded by medic

ing.

Medicine and

When medicin

sible for delive

Hospital for g

ISOS Compan

hospital, loca

ting the hospit

Outpatient

ISOS Compan

for patients, a

_eng (24-10-12

f patients/injur

e sickness an

lling rig will in

other useful

ate ISOS Com

these inform

mpany is resp

nsferring proce

g by air is n

e. Bangkok P

work or more

t/injured perso

t/injured pers

mpany is res

ured person.

jury, urgent le

to select the

cal plane, helic

d medical supp

ne and medica

ery to patient

general sicknes

ny will specify

tion, telephon

tal or other m

ny will be res

as well as will h

)

red person ba

d severe injur

nform doctor’s

information (

mpany be able

mation will be

ponsible for tra

ess, and comm

eeded, ISOS

Pattay Hospita

e appropriate h

on need conti

on back to th

ponsible for

For transferrin

evel, health c

most appropri

copter, regula

plies delivery

al supply for p

immediately (

ss

y an appropri

ne number, ap

edical cares.

sponsible for

help to facilita

2-96

ack to home co

ry occurs and

s ISOS Compa

(i.e. the expo

e to prepare m

e transferred

ansferring pat

munication pr

Company wi

al, Pattaya Int

hospital outsid

inually care o

eir working co

making decis

ng preparation

condition of pa

iate choice for

ar plane or lan

patient are no

(if there is no

ate hospital/c

ppointment tim

making conta

ate the transpo

Offshore Pet

ountry

d transferring

any for sicknes

osed hazardou

medical devic

to destination

tients/injured

ocess related

ll firstly cons

ternational Ho

de the country

r physical the

ountry or hom

ion of selecti

n, ISOS Comp

atient, prepare

r any patient/

nd vehicle. Do

t available in t

restricted law

clinic/infirmary

me. However,

act and appo

ortation (land)

troleum Production

Salam

patient/injure

ss symptoms/

us chemical,

es and suitab

n hospital wh

persons by p

to transfer pa

ider transferri

ospital. Howev

y are also inclu

rapy, ISOS Co

me country (w

ng the hospit

pany will consi

edness of the

injured person

octor will be p

the working a

w of the destin

y for the patie

the patient m

ointment with

) and follow-u

Environmental Im

n in Block B8/38 in

amander Energy (B

Chapter 2 P

ed person is n

/injury of patie

details of ac

ble transferrin

hich in contra

plane and/or v

atient/injure p

ing patients t

ver, other ho

uded for consi

ompany will b

when patient/in

tal as well as

ider these fac

e airport, clima

n. Transferring

provided for p

are/country, IS

ation country)

ents. The det

may make the

hospital or o

up process for

mpact Assessment

in Gulf of Thailand

Bualuang) Limited

Project Description

necessary, the

ents, cause of

ccident). This

g method for

act with ISOS

van, providing

person of this

to contracted

ospitals where

ideration.

be responsible

njured person

s transferring

ctors including

ate condition,

g method can

patient during

SOS Company

).

tails including

e last decision

other medical

the patients.

t

d

d

n

e

f

s

r

S

s

e

e

y